Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Artemis Resources Limited Capital/Financing Update 2017

Jun 18, 2017

10429_rns_2017-06-18_6e73527c-cfe0-409b-8927-584fcb6a34b9.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

19 June 2017

==> picture [202 x 74] intentionally omitted <==

ASX / Media Announcement

Artemis Resources Limited ARBN: 80 107 051 749

Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006

PO Box R933 Royal Exchange NSW Australia, 1225

Phone: +61 2 9078 7670 Facsimile: +61 2 9078 7661 Email: [email protected] Website: artemisresources.com.au

COBALT METALLURGY TESTS PROVE VERY POSITIVE -CARLOW CASTLE COBALT PROJECT-

  • Mineralogy of the cobalt at Carlow Castle is predominantly cobaltite, which is analogous to eCobalt’s cobalt mining project in Idaho in the USA, which has proven metallurgy.

  • Initial metallurgy test work conducted on RC drill chips by ALS Global Metallurgical Services indicate very good first pass flotation recoveries of Carlow Castle sulphides from high grade gold (13.8 g/t) and cobalt (0.84%) intersections:

  • 67.3% Gold Recovery (calculated head grade 13.8 g/t Au)

  • 55.5% Cobalt Recovery (calculated head grade of 0.84% Co)

  • 87.4% Copper recovery (calculated head grade 2.16% Cu)

  • Recoveries are expected to improve significantly with further tests on diamond core.

  • Gold is relatively coarse and amenable to low cost gravity concentration.

Directors:

Executive Chairman David Lenigas

Executive Directors Ed Mead Alex Duncan-Kemp

Non-Executive Directors Campbell Baird

Company Secretary: Guy Robertson

Corporate Information ASX Code: ARV

David Lenigas, Artemis’s Chairman, commented;

“These initial metal recovery results are very positive indeed and we would expect to see significant improvements to these numbers when we repeat this test work on diamond core samples. We are now planning a phase of diamond drilling at Carlow Castle, to provide samples for further metallurgy test work and for geotechnical open pit design studies.”

Figure 1: Co/Cu/Au concentrates generated from ALS Global test work.

==> picture [316 x 236] intentionally omitted <==

1 | P a g e

==> picture [88 x 842] intentionally omitted <==

==> picture [130 x 48] intentionally omitted <==

Artemis Resources Limited (“ Artemis ” or “ the Company ”) ( ASX: ARV ) is pleased to report that samples recovered from the recent Reverse Circulation (RC) drilling campaign at the Carlow Castle Cobalt/Gold/Copper Project near Karratha, were submitted for analysis and basic metallurgical testing at ALS Global’s Metallurgical Services laboratories in Perth, Australia.

Initial results from RC drill chips returned 67.3%, 55.5% and 87.4% metal recovery for gold, cobalt and copper respectively. These results are expected to improve with the use of diamond core samples.

The drilling was completed along a limited 250m strike out of what is now a possible 2km of newly identified strike potential. Mineralisation remains open in all directions along strike and at depth.

The RC chips were sized by ALS Global’s Metallurgical Services laboratories in Perth and each size fraction was analysed. It is now planned to do further diamond drilling to recover core, which will be coarser than RC chips and would typically result in a much-improved metallurgical response.

This analysis also demonstrates the coarse nature of the gold, most of it being in the +106 micron fraction, which is amenable to recovery by low cost gravity separation before finer grinding of the ore for cobalt and copper recovery by flotation, which is expected to increase overall gold recoveries.

Table 1: Analysis by size fraction

Size
fraction
(microns)
Mass Gold Gold Cobalt Cobalt Copper Copper
Distn. % Grade g/t Distn. % Grade % Distn.% Grade % Distn.%
+106 20.9 36.6 55.5 0.37 9.3 1.11 10.8
-106 +75 14.4 8.1 8.4 1.01 17.4 2.10 14.0
-75+53 10.9 10.9 8.6 1.48 19.4 2.83 14.3
-53+38 8.4 10.4 6.3 1.54 15.4 3.25 12.6
-38 45.4 6.4 21.2 0.71 38.5 2.30 48.3
Calc. Head 100.0 13.8 100.0 0.84 100.0 2.16 100.0

Preliminary tests, in which only rougher flotation was done with no attempt at this stage to improve the concentrate grade, resulted in acceptable recoveries shown below. These tests were done on samples from RC drill chips which traditionally result in depressed recoveries. Further work will be done on diamond drill core and improved results are expected. By way of comparison, eCobalt, at their cobalt project in Salmon, Idaho, USA, have reported gold, cobalt and copper recoveries from sulphide flotation of similar cobaltite ore of 78% ,91% and 93% respectively[1] .

Table 2: Rougher Flotation Recoveries

Mass Gold Cobalt Copper
Recovery to concentrate 21.1% 67.3% 55.5% 87.4%
Calc. head 7.44 g/t 0.85% 2.70%

The mineralogy of the cobalt at Carlow Castle is predominantly cobaltite, which is similar to the eCobalt project. The eCobalt project has proven metallurgy, which involves conventional crushing, milling and sulphide flotation to produce a concentrate for downstream processing in a refinery to recover cobalt and other valuable metals. The eCobalt project is projected to start production in 2019 via underground production.

1 From eCobalt’s web page: http://www.ecobalt.com/project/technical-reports

2 | P a g e

==> picture [88 x 842] intentionally omitted <==

==> picture [130 x 48] intentionally omitted <==

The Carlow Castle project based on metallurgy to date would have the added advantage of significant gold recovery by low cost gravity processing ahead of the cobalt/copper flotation plant at Artemis’s fully permitted Radio Hill sulphide ore treatment plant located 27 km south-west of Carlow Castle.

BACKGROUND INFORMATION ON ARTEMIS RESOURCES

Artemis Resources Limited is a resources exploration and development company with a focus on its prospective Pilbara (gold, cobalt, base metals, platinum, platinum group elements, diamonds and iron ore) and the Mt Clement-Paulsens (gold) project in Western Australia. Artemis owns the fully permitted 425,000tpa Radio Hill nickel and copper operations, processing plant and associated mining and exploration tenements with significant existing JORC 2004 compliant resources of Nickel, Copper and Zinc situated within a 15 km radius of the Radio Hill plant. The Radio Hill Plant is located 35 km south of Karratha in the Pilbara Region of Western Australia.

CONTACTS

For further information on this update or the Company generally, please visit our website at www.artemisresources.com.au or contact:

Investors / Shareholders
Edward Mead
Executive Director
Telephone: +61 407 445 351
Email:[email protected]
Media
David Tasker
Professional Public Relations
Telephone: +61 433 112 936
Email:[email protected]

COMPETENT PERSONS STATEMENT

The information in this document that relates to Exploration Results and Exploration Targets is based on information compiled or reviewed by Allan Younger, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Younger is a consultant to the Company, and is employed by Indigo Geochemistry Pty Ltd. Mr Younger has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Younger consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE

This report contains forecasts, projections and forward looking information. Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance that these will be achieved. Expectations, estimates and projections and information provided by the Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of Artemis’ control. Actual results and developments will almost certainly differ materially from those expressed or implied. Artemis has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. To the maximum extent permitted by applicable laws, Artemis makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for (1) the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this report and (2) without prejudice to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward looking information contained or referred to in this report.

Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s securities.

3 | P a g e