ASX Announcement 12 November 2015
Heritage Survey Completed on West Pilbara Projects, Yangibana moves to PFS
Highlights
-
Heritage clearance obtained on Weerianna, Mt Sholl and Carlow Castle area, on West Pilbara Projects, with no restrictions
-
Plans finalised for West Pilbara drilling
-
Yangibana Rare Earth project advances towards PFS
Artemis Resources Limited (ASX: ARV) (“Artemis” or “the Company”) is pleased to advise that a heritage survey has been completed on its West Pilbara projects.
Artemis is pleased to report that heritage clearance of the Weerianna, the Carlow Castle area comprising the Milburn, Goodluck (Chapman), Little Fortune (Thorpe) and Fortune South prospects and the Mt Sholl gold prospect has now been obtained with no restrictions imposed on planned exploration in these areas.
Artemis has now finalised plans for the first phase of drilling, which comprises 4 drill holes to test electro‐magnetic (EM) conductors at each of the prospects outlined above. Commencement of drilling is subject to funding which the Company continues to progress (see our announcement of 6 November 2015).
The Carlow Castle Project currently hosts a JORC (2012) Inferred Mineral Resource of 418,000 tonnes at 3.0 g/t Au and 0.6% Cu , for total contained metal of 40,000 ounces of Au, and 2,500 tonnes of Cu[1] . Potential exists to increase this resource with a number of structures identified with shafts and recent prospector activity that have never been drilled.
The Weerianna Gold Project is 4km west of Roebourne and currently hosts a JORC (2012) Inferred Mineral Resource of 1 million tonnes at 2.2 g/t Au for a total of 70,000 ounces of gold[2] . Excellent potential exists for a substantial increase in tonnage, as the current resource is open at depth, and along strike.
Yangibana Project
Artemis is pleased to advise that the Yangibana Rare Earth Project operated by Hastings Technology Metals limited (“Hastings”) is advancing towards a Pre‐Feasibility Study (“PFS”). The Project is in the Gascoyne region of Western Australia and 280km from the port of Carnarvon.
According to their announcement to ASX on 10 November 2015, Hastings have now completed a scoping study which indicates the “compelling viability” of the Yangibana Project. Hastings have announced that they will now seek to complete a PFS by Q1 2016 and then, based on a positive outcome, will complete a BFS with project funding in Q1 2017.
In 2011 Artemis sold to Hastings a 60% interest in the Yangibana joint venture project. Artemis has a contingent asset relating to the Yangibana joint venture project in the amount of AUD$1.8 million, as outlined in its Annual Report for 2015 lodged with the ASX on 28 September 2015. The contingent asset relates to a net payment of AUD$1.8 million due to the Company by Hastings on completion of a BFS and an offer of project finance being made on the joint venture project.
With positive results to date from work undertaken by Hastings, Artemis looks forward to further positive outcomes from the PFS.
- 1 As per ASX announcement dated 30 June 2014 “Completion of Gold Project Acquisition – Update on West Pilbara Resource Status” 2 As per ASX announcement dated 30 June 2014 “Completion of Gold Project Acquisition – Update on West Pilbara Resource Status”
==> picture [65 x 64] intentionally omitted <==
Artemis Resources Limited ABN: 80 107 051 749 Telephone: +61 2 9078 7670 | Facsimile: +61 2 9078 7661 | Email: [email protected] Level 3, IBM Building, 1060 Hay Street, West Perth, WA, Australia, 6006 | PO Box R933 Royal Exchange, NSW 1225 Australia www.artemisresources.com.au
==> picture [220 x 66] intentionally omitted <==
==> picture [463 x 73] intentionally omitted <==
==> picture [463 x 74] intentionally omitted <==
==> picture [463 x 73] intentionally omitted <==
==> picture [463 x 74] intentionally omitted <==
==> picture [463 x 73] intentionally omitted <==
==> picture [463 x 74] intentionally omitted <==
==> picture [463 x 73] intentionally omitted <==
==> picture [463 x 74] intentionally omitted <==
==> picture [463 x 73] intentionally omitted <==
Figure 1. Artemis tenements in West Pilbara in blue.
ASX Announcement dated 12 November 2015
2
==> picture [220 x 66] intentionally omitted <==
ABOUT ARTEMIS RESOURCES
Artemis Resources Limited is a resources exploration company with a focus on its prospective West Pilbara (gold, base metals, platinum and platinum group elements) projects in Western Australia. These projects have only recently been consolidated into Artemis and offer significant exploration potential with close proximity to existing infrastructure.
For further information, please contact:
==> picture [214 x 146] intentionally omitted <==
==> picture [214 x 146] intentionally omitted <==
Edward Mead
Managing Director
Phone: +61 8 9480 0459 Email: [email protected]
Web Site: www.artemisresources.com.au
Competent Person Statements
The information in this document that relates to Exploration Results is based on information compiled or reviewed by Edward Mead, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Mead is a Director of Artemis Resources Limited and is a consultant to the Company, and is employed by Doraleda Pty Ltd. Mr Mead has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Mead consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Forward Looking Statements
This report contains forecasts, projections and forward looking information. Such forecasts, projections and information are not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of Artemis’ control. Actual results and developments will almost certainly differ materially from those expressed or implied. Artemis has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. To the maximum extent permitted by applicable laws, Artemis makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for (1) the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this report and (2) without prejudice to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward looking information contained or referred to in this report.
ASX Announcement dated 12 November 2015
3