Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARK MINES LIMITED Capital/Financing Update 2014

Jul 20, 2014

64339_rns_2014-07-20_4da67c4a-ffbe-4b51-8e75-21cdce2c7360.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [121 x 49] intentionally omitted <==

Ark Secure s Funds and will Com m ence Drilling at F rances Creek Gold Project, N orthern Territory

Sydney, 21 July 2014: The Boar d of Ark Mines Ltd (ASX: AHK) is pleased to ann o unce that it plans to commence drilling in August at its Frances Creek Gold Projects in the Northern T erritory.

Ark Mines Ltd (Ark) is pleased to announce that Arafura Resources Limited h a s agreed to extend, until 26 December 2014, the period for Ark to undertake its minimum obligatio n s under the Mining, Farmin and Joint Venture Agreement dated 14 January 2014 (Agreement) – see further Ark ASX Announcement of 14[th] January 2 013.

Ark is required to spend on ex p loration of certain tenements set out in the Ag r eement (as recently varied) not less than $200,000 , on or before 26 December 2014 (Immediate Expense). A further $200,000 is required to be spe n t on or before 26 August 2015. Subject to sati s fying expenditure of not less than $400,000 Ark shall earn a 40% interest in assets identified in the A greement and then be entitled to either earn a fur t her 30% of those assets (making a total of 70 % ) or acquire 100% of those assets.

In order to fund the Immediate Expense Ark has recently raised $285,000 by way of a placement of 3,000,000 ordinary shares at $0 . 095 per share.

Ark wishes to extend the strike and further define the size of the Golden Hon c ho deposit, with the view of defining a high-grade s h allow oxide gold deposit. This project is proxi m al to the Ark Mines Mt Porter 34,000 oz (1999 JOR C ) gold project resource announced by Arafura on 1 April 2004. Ark is not in possession of any new i n formation or data that materially impacts on t he reliability of that estimate or that the supporting information has changed materially.

On completion of the drilling an d costeaning Ark intends to propose a second p h ase of drilling with a view to defining a JORC resourc e at the Golden Honcho and Golden Slips deposi t s.

For the duration of the Agree m ent Ark has also been granted mining rights o ver ML23839 in the Mount Porter area (see further Ark ASX announcement of 14[th] January 2014). P rior to commencing mining at Mount Porter Ark m ust conduct a base case environmental stu d y and has recently engaged a consultant to condu c t this work (Study). Subject to a satisfactory o u tcome of the Study Ark intends to commence mining at Mount Porter as soon as practicable t h ereafter, subject to raising funds or securing debt s u fficient for such purposes.

FRANCES CREEK GOLDEN HONCHO PROGRAM

  • Targeting the oxide z o ne less than 20m vertical depth from surfa c e

  • Infill drilling - 20 by 1 5 m angled RC holes targeting 8m vertical d e pth (refer to Fig 2)

  • • Infill drilling - 20 by 3 0 m angled RC holes targeting 15m vertical d epth (refer to Fig 2)

  • 20 costeans to test the near surface Gold value

1

==> picture [121 x 49] intentionally omitted <==

==> picture [145 x 115] intentionally omitted <==

==> picture [54 x 115] intentionally omitted <==

==> picture [145 x 114] intentionally omitted <==

==> picture [54 x 114] intentionally omitted <==

==> picture [145 x 115] intentionally omitted <==

==> picture [54 x 115] intentionally omitted <==

==> picture [133 x 114] intentionally omitted <==

==> picture [74 x 114] intentionally omitted <==

==> picture [133 x 115] intentionally omitted <==

==> picture [74 x 115] intentionally omitted <==

==> picture [133 x 114] intentionally omitted <==

==> picture [74 x 114] intentionally omitted <==

Figure 1 – Cross section of G olden Honcho – refer to Ark announcemen t of 14 January 2014 and Arafura announc e ment of 27 August 2004

2

==> picture [121 x 49] intentionally omitted <==

Figure 2 – Proposed drill traces along the strike of Golden Honcho

==> picture [145 x 121] intentionally omitted <==

==> picture [216 x 121] intentionally omitted <==

==> picture [72 x 121] intentionally omitted <==

==> picture [145 x 121] intentionally omitted <==

==> picture [216 x 121] intentionally omitted <==

==> picture [72 x 121] intentionally omitted <==

==> picture [145 x 120] intentionally omitted <==

==> picture [216 x 120] intentionally omitted <==

==> picture [72 x 120] intentionally omitted <==

==> picture [145 x 121] intentionally omitted <==

==> picture [216 x 121] intentionally omitted <==

==> picture [72 x 121] intentionally omitted <==

==> picture [72 x 121] intentionally omitted <==

Plan n ed RC Drill Holes

3

==> picture [121 x 49] intentionally omitted <==

Table 1 –Drill Intersection Hi g hlights at Frances Creek (not true thicknes s )

Hole Number From
m

To
m

Interval
m
Au grams Prospect
FCRC015 16 17 1 1.02 Golden Slips
FCRC016 6 8 2 2.47 Golden Slips
FCRC017 15 19 4 47.54 Golden Slips
FCRC017 21 23 2 1.68 Golden Slips
FCRC018 27 28 1 3.3 Golden Slips
FCRC019 27 28 1 1.47 Golden Slips
FCRC020 27 28 1 2.88 Golden Slips
FCRC023 33 34 1 10.32 Golden Slips
FCRC024 32 34 2 9.92 Golden Slips
FCRC035 32 33 1 5.07 Golden Slips
FCRC035 45 47 2 1.44 Golden Slips
FCRC037 33 35 2 10.07 Golden Slips
FCRC038 3 4 1 1.38 Golden Slips
FCRC040 10 12 2 1.67 Golden Slips
FCRC041 12 14 2 6.39 Golden Slips
FCRC042 13 14 1 2.58 Golden Slips
FCRC044 17 18 1 3.33 Golden Slips
FCRC045 1 3 2 1.56 Golden Slips
FCRC045 8 11 3 1.78 Golden Slips
FCRC045 14 15 1 3.75 Golden Slips
FCRC046 3 4 1 1.07 Golden Slips
FCRC046 7 8 1 2.06 Golden Slips
FCRC047 30 31 1 2.31 Golden Slips
FCRC048 46 48 2 2.09 Golden Slips
FCRC026 19 21 2 6.51 Golden Honcho
FCRC027 17 19 2 3.88 Golden Honcho
FCRC027 25 27 2 11.61 Golden Honcho
FCRC028 14 19 5 4.44 Golden Honcho
FCRC029 9 10 1 1.38 Golden Honcho
FCRC029 14 17 3 10.66 Golden Honcho
FCRC029 23 24 1 1.1 Golden Honcho
FCRC029 30 31 1 5.08 Golden Honcho
FCRC030 14 16 2 8.15 Golden Honcho
FCRC030 28 29 1 3.89 Golden Honcho
FCRC031 11 12 1 1.06 Golden Honcho
FCRC031 22 24 2 13.29 Golden Honcho
FCRC032 15 16 1 2.85 Golden Honcho
FCRC033 26 27 1 2.88 Golden Honcho
FCRC034 52 53 1 3.3 Golden Honcho
FCRC050 35 36 1 1.28 Golden Honcho
FCRC051 29 32 3 9.59 Golden Honcho
FCRC052 17 20 3 10.96 Golden Honcho
FCRC053 30 35 5 19.11 Golden Honcho

4

==> picture [121 x 49] intentionally omitted <==

Note 1

Table 1. Refer to Arafura AS X announcement 27[th] August 2004

Note 2

Frances Creek

  • First stage drilling co m pleted by Arafura- 40 RC holes drilled for 1, 6 46m

  • Sub Vertical quartz v eins outcropping on top of steep ridge crests which are amenable to simple l o w cost open pit mining

  • The results show similar grades and widths to the surface samplin g

  • Average surface grad e s of 17.6 g/t over 420 meters (Golden Honc h o)

  • And 18.2 g/t over 180 metres (Golden Slips)

  • Over 2,400 metres of s trike length with only 390 metres drilled to date

Refer to Arafura ASX a nnouncement 27[th] August 2004

About Ark Mines

Ark Mines Ltd (ASX: AHK) is a publicly listed company with Gold Tenements in N o rthern Territory and New South Wales. Ark’s three E x ploration Licences (ELs) in New South Wales (NSW) all lie within the Lachlan Fold Belt. This area is t h e focus for significant Exploration in NSW and t h e epicentre of many major poly metallic and preciou s metal Mines.

FURTHER INFORMATION: Roge r Jackson, Managing Director, Ark Mines Limite d : +61400 408 550

5