ASX RELEASE: 12 March 2020

Kookynie Gold Project – Development Strategy & Exploration Target Update

HIGHLIGHTS

  • An Updated “Exploration Target” has been estimated for the Kookynie Gold Project in the Eastern Goldfields, Western Australia.

  • Exploration Target was estimated using data from historical pre-JORC 2012 mineral resource estimates, historical production, historical and recent drilling results.

  • Metalicity outlines the “Development Strategy” for the Kookynie Gold Project to realise the “Exploration Target”.

  • Exploration Target provides an estimate of potential to be tested by further drilling.

Metalicity Limited (ASX: MCT) (“ MCT ” or “ Company ”) is pleased to announce a JORC-2012 compliant Exploration Target for the Kookynie Gold Project in the Eastern Goldfields, Western Australia coupled with how the Company intends to develop the assets in conjunction with our farm-in partner, Nex Metals Explorations Ltd (ASX:NME).

The Exploration Target – as detailed in Table 1 below – was estimated in accordance with JORC 2012 guidelines utilising data from recent drilling results and historical work, including the review by the Company of pre-JORC 2012 mineral resource estimates and historical production:

==> picture [575 x 182] intentionally omitted <==

----- Start of picture text -----

Kookynie Gold Project "Exploration Target" Summation
Grade Range Tonnage Range Ounces
Prospect
Lower g/t Au Upper g/t Au Lower tonnes Upper Tonnes Lower ounce range Upper Ounce Range
Diamantina-Cosmopolitan-Cumberland (DCC) Trend 10.0 15.0 300,000 600,000 100,000 290,000
previously excluded area of underground development 6.0 10.0 600,000 1,000,000 115,000 320,000
Overall Ounce Range 215,000 610,000
The Champion Prospect 3.6 6.0 200,000 400,000 25,000 80,000
previously excluded area of underground development 2.0 4.0 60,000 150,000 4,000 20,000
Overall Ounce Range 29,000 100,000
The McTavish Prospect 1.8 5.0 250,000 500,000 15,000 80,000
previously excluded area of underground development 1.5 5.0 100,000 200,000 5,000 32,000
Overall Ounce Range 20,000 112,000
The Leipold Prospect 1.5 5.0 500,000 800,000 25,000 120,000
previously excluded area of underground development 1.5 4.0 100,000 200,000 5,000 25,000
Overall Ounce Range 30,000 145,000
----- End of picture text -----

Table 1 – Kookynie Gold Project Exploration Target[(1)]

(1) Exploration Target ” cautionary statement: The potential quantity and grade is conceptual in nature, given that there has been insufficient exploration to estimate a Mineral Resource and that it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Based on the above tabulation the Kookynie Gold Project has a total “ Exploration Target” of between 294,000 ounces and 967,000 ounces and is inclusive of historically stated mineral resource estimates and previously

Metalicity Limited ASX Code: MCT ABN: 92 086 839 992

www.metalicity.com.au Level 3, 30 Richardson Street West Perth WA 6005

excluded areas of underground development. The work by the Company in drilling mapping sampling has supported historical work and provided confidence to include historical work in the “Exploration Target”.

Since entering into the farm-in agreement, Metalicity has completed:

  • Three drilling programmes of 19 drill holes for 1,955.83 metres over the Cosmopolitan, Cumberland, Diamantina, Champion, Leipold and McTavish Prospects,

  • The Company has managed to more than double our landholding,

  • Undertaken on-ground exploration through methodical “fact” field mapping and ground truthing,

  • Reprocessed regional geophysics and commenced a drone magnetic survey to delineate regional trends of mineralisation, and

  • Detailed assessment of past and present exploration to facilitate stating the updated “Exploration Target”.

The Kookynie Project is host to six, prospects; Champion, McTavish, Leipold, Diamantina, Cosmopolitan and Cumberland. Each has been assessed in the preparation of the Exploration Target based on an in-depth review of the existing data.

At Cosmopolitan, the mineralisation is extrapolated some 200 meters to 300 meters down dip from historic workings to estimate the Exploration Target. The update is based on the Company’s review of historical reports, sampling and the results of the company’s drilling and exploration work. Historical reports from 1905, detailed channel sampling conducted during the development of the gold mine, coupled with a mineralisation estimate (actual date of publishing was 1989) illustrated that both sets of information detailed remnant mineralisation was evident.

The Company has drill tested part of the Cosmopolitan Gold Mine that was excluded in this May 2019 estimated Exploration Target. A drill hole result from within the Cosmopolitan Gold Mine returned 2 metres @ 22.1 g/t Au from 76 metres (please refer to ASX Announcement dated 31 July 2019 titled “ Metalicity Confirms Mineralisation ”) coupled with other significant intercepts in the general area (detailed in that same announcement dated 31 July 2019), has instigated a revue of the “Exploration Target” in this area.

At Diamantina and Cumberland, mineralisation is extrapolated 300 meters to 500 meters down dip and 700 meters along strike. The maximum grade is assumed to be the historically mined grade of Cosmopolitan as the Diamantina and Cumberland are strike continuations of that mineralisation. The revision of the “Exploration Target” within the Diamantina and Cumberland Prospects is due to the extrapolation and confirmation of information previously excluded from the original May 2019 estimate.

At Champion, McTavish and Leipold, the mineralisation is extrapolated between 150 meters to 200 meters down dip and along strike. The upper grade is assumed to be between 1.5 g/t Au and 6 g/t Au based on averages of significant drill hole intersections (both historic and recent) within the structures hosting mineralisation.

Below in Figure 1, Prospect locations are illustrated.

==> picture [133 x 28] intentionally omitted <==

2

==> picture [427 x 428] intentionally omitted <==

Figure 1 – Kookynie Prospect Locality Map.

The drilling performed by Metalicity to date has been successful by way that every drill hole has intersected the mineralised structure at each Prospect. A revision of our “Exploration Target” for the Kookynie Gold Project articulates the results, exploration philosophy and overall potential of what we know now. Given the work completed so far by the Company to understand the strike extents of the known prospects, the Company sees the development of the Kookynie Gold Project will be supplemented through the potential additional discovery of well-endowed Prospects peripheral to the known DDC Trend, Leipold, McTavish and Champion Prospects.

Commenting on the Exploration Targets, Metalicity MD & CEO Jason Livingstone said:

“I am pleased with the results to date in light of capital restrictions that have faced Metalicity and the market in general. We have consistently demonstrated news flow from the drill bit and have delivered phenomenal results that I am very proud of. The work conducted to date has allowed a revision of our Exploration Target, especially in areas we previously excluded due to a lack of information.”

“Metalicity is working towards the development of a maiden JORC-2012 compliant mineral resource estimate. We are well advanced in confirming historical work with mineralisation extensions being developed at all

==> picture [133 x 28] intentionally omitted <==

3

known prospects. Therefore, we are able to articulate a revised Exploration Target of up to approximately 1 million ounces of gold. This is a fantastic result and truly illustrates the Kookynie Gold Project to be a truly wellendowed and prolific gold field.”

“I look forward to developing the Kookynie Gold Project and reaching this target in due course. Monetising our other assets and easing of restrictions in the general market are key to enabling Metalicity to fully concentrate on this fantastic asset and work towards our goals. Working with Nex Metals has been an absolute pleasure and I further look forward to ongoing discussions that are designed to truly unlock the value of this Project.”

Forward Activities – Development Strategy

Metalicity continues to follow the strategy developed as part of entering into the Joint Venture agreement on Kookynie.

The approach to the Kookynie Gold Project is:

  1. Address aspects of the Pre-2012 JORC Mineral Resource Estimates centered around density, down hole surveys and metallurgy through drilling.

  2. a. Density is a key aspect to understanding the tonnage of a mineral resource estimate, with our diamond drilling to date, we are able to contribute towards not only qualifying the gold grades, but also the bulk densities of mineralised and waste material,

  3. b. Down hole surveys are key to understanding where mineralisation exists in three-dimensional space as drill holes do deviate as they are drilled. Understanding this aspect of how drill holes behave as they are drilled, and where the mineralisation is located in situ, allows for a higher degree of confidence in the location of the ore in future mining activities.

  4. c. Whilst the area has previous gold production stated, understanding what process methodology is appropriate is paramount to ensure a robust operation is possible. Therefore, ore body knowledge not only includes what tonnes and grade are possible within a Prospect, but how the commodity is extracted efficiently, cheaply and as environmentally responsible as possible impacts directly on the financial metrics of an operation.

  5. Continue to develop an understanding of the boundaries of the observed mineralisation through targeted and methodical drilling programmes.

  6. a. To date, every drill hole has intersected the mineralised structure or a zone where mineralisation did exist but has been mined out.

  7. b. As we work to defining these limits, we are understanding and become able to estimate the tonnes and grade of these ore bodies.

  8. c. Understand the remnant mineralisation within previously developed areas of underground mining as we have illustrated that mineralisation does still exist.

  9. d. The above all contributes towards our last point;

  10. Issue a maiden JORC-2012 compliant Mineral Resource Estimate to allow further studies to illustrate financial metrics around this Project to allow an investment decision.

  11. Finally, continue the tenement consolidation efforts.

  12. a. Metalicity, with our partner Nex Metals, have managed to make great strides in reconsolidating the Kookynie and Yundamindra areas. Since the farm-in agreement was signed, the Company has managed to more than double our landholding that we have exclusive right to explore to nearly 15,000 hectares.

  13. b. Around the Kookynie Gold Project, we have tripled our landholding from just under 2,400 hectares, to just over 7,000 hectares.

  14. c. This aspect is important as historical exploration appears to have been hampered by the fractured ownership of tenure in the area. Our consolidation efforts is exposing Metalicity to further exploration upside through potential discoveries.

==> picture [133 x 28] intentionally omitted <==

4

The updated “Exploration Target” illustrates the potential of the Kookynie Gold Project. Establishing a mineral resource base within the “Exploration Target” range during the coming months is key next step to unlock value is pivotal for the Company’s success.

Estimation of the Exploration Target

The Company’s stated Exploration Target for Kookynie of 294,000 to 967,000 ounces is a realistic outcome from targeted and results driven exploration. Ongoing drilling will be dictated by results.

The estimated Exploration Target is based on reviewing the historical work, including the review of pre-JORC (2012) mineral resource estimates estimated by current and historical operators (which contributed towards the evaluation of the Prospects), historical production notably historical underground development that has removed mineralisation and quantifying that extraction, and drilling results both completed by Metalicity and by previous operators. Mineralisation is open down dip and along strike at all prospects within the Kookynie Gold Project and provides the opportunity for further expansion of drill programmes to define the resource potential.

Drilling Completed to Date

Below is a table of historical drilling completed to date by Prospect to detail the level of information available in stating the Exploration Targets:

==> picture [567 x 117] intentionally omitted <==

----- Start of picture text -----

Project: Kookynie
Reverse Circulation Diamond Drilling Total
Prospect
No. of holes Metres No. of holes Metres No. of holes Metres
Diamantina-Cosmopolitan-Cumberland (DCC) Trend 447 21,543 15 3,761.3 462 25,304.3
The Champion Prospect 123 6,291 - - 123 6,291
The McTavish Prospect 166 6,213 - - 166 6,213
The Leipold Prospect 184 9,053 - - 184 9,053
Total 920 43,100 15 3,761.3 935 46,861.3
----- End of picture text -----

Table 2 – Kookynie historical drilling details.

Please refer to the significant drill hole intercepts released in the Company’s announcement dated 6[th] May 2019, “ Metalicity Farms Into Prolific Kookynie & Yundamindra Gold Projects, WA ”. The results details in that announcement were a facet in estimating the stated Exploration Targets above.

==> picture [133 x 28] intentionally omitted <==

5

Furthermore, Metalicity has completed three drilling programmes to date and below is a summation of the results:

==> picture [517 x 443] intentionally omitted <==

----- Start of picture text -----

MGA 94 Zone 51 South
Down
Grade
Hole From To Hole
Prospect Hole ID Tenement Easting Northing RL EOH Dip Azi (Au Comments
Type (m) (m) Width
g/t)
(m)
-60 250 34 43 9 7.31 9m @ 7.31 g/t Au from 34m
including 34 37 3 7.91 inc. 3m @ 7.91 g/t Au from 34m
LPRC0001 RC 350,744 6,752,130 420 48
including 39 43 3 10.4 inc. 3m @ 10.4 g/t Au from 39m
including 40 41 1 31.2 inc. 1m @ 31.2 g/t Au from 40m
-60 250 18 22 4 7.1 4m @ 7.1 g/t Au from 18m
Leipold LPRC0002 M40/22 RC 350,760 6,752,040 431 42 including 19 21 2 10.8 inc. 2m @ 10.8 g/t Au from 19m
-60 250 26 29 3 3.4 3m @ 3.4 g/t Au from 26m
-60 250 24 30 6 9.4 6m @ 9.4 g/t Au from 24m
LPRC0003 RC 350,766 6,752,030 431 42
including 26 28 2 19 inc. 2m @ 19 g/t Au from 26m
-60 250 38 46 8 3.2 8m @ 3.2 g/t Au from 38m
LPRC0004 RC 350,785 6,752,027 431 60
including 38 41 3 6.3 inc. 3m @ 6.3 g/t Au from 38m
-60 270 67 71 4 6.4 4m @ 6.4 g/t Au from 67m
McTRC0001 350,647 6,754,118 423 112
RC including 67 68 1 15.47 inc. 1m @ 15.47 g/t Au from 67m
McTRC0002 350,647 6,754,098 424 84 -60 270 73 76 3 1.41 3m @ 1.41 g/t Au from 73m
McTavish McTRC0003 M40/77 RC 350,576 6,754,153 423 30 -60 270 14 15 1 1.9 1m @ 1.9 g/t Au from 14m
McTRC0004 RC 350,596 6,754,153 423 48 -60 270 33 35 2 2.2 2m @ 2.2 g/t Au from 33m
-60 270 48 53 5 17.9 5m @ 17.9 g/t Au from 48m
McTRC0005 RC 350,618 6,754,083 424 66
including 51 52 1 80.17 inc. 1m @ 80.17 g/t Au from 51m
CPRC0001 352,224 6,757,503 417 112 -60 270 Stope fill intersected - structure present but mined out.
RC
CPRC0002 352,265 6,757,582 416 138 -60 250 127 128 1 1.35 1m @ 1.35 g/t Au from 127m
CPRC0003 RC 352,158 6,757,586 417 48 -60 270 31 33 2 1.8 2m @ 1.8 g/t Au from 31m
-60 270 28 30 2 25.2 2m @ 25.2 g/t Au from 28m to EOH
Champion CPRC0004 M40/27 RC 352,149 6,757,566 417 30
including 28 29 1 42.04 inc. 1m @ 42.04 g/t Au from 28m
16 17 1 1.3 1m @ 1.3 g/t Au from 16m
CPRC0005 RC 352,167 6,757,631 417 42 -60 270
39 40 1 2.1 1m @ 2.1 g/t Au from 39m
CPRC0006 RC 352,167 6,757,649 417 54 -60 270 Assays Pending
167 168 0.72 3.1 0.72m @ 3.1 g/t Au from 167m
RC/DD
CDRCDD0001 M40/61 354,377 6,753,209 427 186 -60 270 173.1 173 0.21 8.8 0.21m @ 8.8 g/t Au from 173.07m
Tail
174.9 176 1.15 1.5 1.15m @ 1.5 g/t Au from 174.85m
DCC Trend
CLRC0001 M40/61 RC 354,153 6,754,058 429 136 -60 270 72 74 2 1.4 2m @ 1.4 g/t Au from 72m
CDDD0001 E40/332 DD 354728 6753398 432 530 -60 270 Structure diluted by Proterozoic Dolerite Dyke
CDRC0001 M40/61 RC 354284 6753513 430 148 -60 270 76 78 2 22.1 2m @ 22.1 g/t Au from 76m
----- End of picture text -----

Table 3 – Kookynie drilling results to date.

Historical Mineral Resource Estimates & Information

The following table is a summary of mineral resource estimates commissioned by Nex Metals Exploration Ltd as detailed in the ASX Announcement dated 1[st] August 2011 “ Update on activities ”:

Prospect Cut Off Indicated Indicated Indicated Inferred Inferred Inferred Total Total Total
g/t Au Tonnes g/t Au Ounces Tonnes g/t Au Ounces Tonnes g/t Au Ounces
Champion 0.5 49,643 2.53 4,033 67,753 4.70 10,237 117,396 3.78 14,270
Leipold 0.5 293,727 1.90 18,251 261,240 1.80 14,791 554,968 1.90 33,042
McTavish 0.5 61,463 2.45 4,836 17,239 1.50 829 78,701 2.24 5,665

Table 4 – Nex Metals Exploration Ltd Mineral Resource Estimate Summary.

The mineral resource estimates above were reported prior to the release of JORC 2012. Quality control/assurance (QAQC) and whole rock density determinations of both mineralisation and waste need qualifying to ensure a best practice mineral resource estimate can be performed moving forward. The drilling

==> picture [133 x 28] intentionally omitted <==

6

programmes have been designed to address part of those aspects, but infill and further extensional drilling will be required to ensure a robust estimation. Note - the Exploration Targets are exclusive of prior resource estimates.

Furthermore, a historical mineral resource estimate completed in 1989 by R. H. A. Cochrane for the holders at the time, Golden Valley Mines N.L. stated that the remnant and deeper parts of the Cosmopolitan gold mine may host a resource of 120,000 tonnes @ 10.5 g/t Au for 40,000 ounces let alone the down dip and along strike extrapolations. This coupled with underground sampling and stope/drive mapping completed in 1905 illustrates that remnant mineralisation via un-mined lodes remain and presents an opportunity for resource development activities. As stated previously, this was omitted from use in the previous Exploration Target as there was no historical drilling on hand to confirm these assumptions. The Company has now tested this, and the results have allowed an estimation to the potential using the recent drilling results to give validity to historical statements. This statement is also true for the Leipold, McTavish and Champion Prospects as recent drilling into areas previously omitted form the Exploration Target are shown to hold mineralisation and are not mined out.

Project tenure

As announced by the Company on the 6[th] May 2019, “ Metalicity Farms Into Prolific Kookynie & Yundamindra Gold Projects, WA ”, Nex Metals Exploration are the tenement holders whereby the Company can:

  • Spend a minimum $500,000 before withdrawal and $5 million over up to 5 years to earn 51% of the Projects.

  • Upon 51% earn in completion, NME and MCT will form a co-contributing joint venture to develop the Kookynie and Yundamindra Projects.

Below is a table detailing the tenements subject to the Metalicity – Nex Metals Farm-In Agreement post 6[th] May 2019 and include details of subsequent tenements that are now included in the overall farm-in agreement:

==> picture [133 x 28] intentionally omitted <==

7

==> picture [426 x 492] intentionally omitted <==

----- Start of picture text -----

Tenement Registered Holder Shares Held Plainted Status Area (ha)
Kookynie
E40/333 Nex Metals Explorations Limited 100/100 No Live 600.0
G40/3 Nex Metals Explorations Limited 100/100 No Live 7.2
L40/9 Nex Metals Explorations Limited 100/100 No Live 1.0
E40/332 Nex Metals Explorations Limited 100/100 No Live 600.0
M40/22 Nex Metals Explorations Limited 100/100 No Live 121.7
M40/27 Nex Metals Explorations Limited 100/100 No Live 85.5
M40/61 Nex Metals Explorations Limited 100/100 No Live 832.7
M40/77 Nex Metals Explorations Limited 90,405/90,405 No Live 119.2
P40/1331 KYM Mining Limited 100/100 No Live 161.2
E40/289 Paris Enterprises Pty Ltd 100/100 No Live 1,222.7
P40/1499 Nex Metals Explorations Limited 100/100 No Pending 8.3
P40/1500 Nex Metals Explorations Limited 100/100 No Pending 5.9
P40/1501 Nex Metals Explorations Limited 100/100 No Pending 21.1
E40/390 KYM Mining Limited 100/100 No Pending 3,300.0
Kookynie Total Area (ha) 7,086.4
Yundamindra
L39/34 Nex Metals Explorations Limited 100/100 Yes Live 1.0
L39/52 Nex Metals Explorations Limited 96/96 Yes Live 1.0
L39/258 Nex Metals Explorations Limited 100/100 Yes Live 3.2
M39/84 Nex Metals Explorations Limited 100/100 Yes Live 378.0
M39/274 Nex Metals Explorations Limited 100/100 Yes Live 230.0
M39/406 Nex Metals Explorations Limited 100/100 Yes Live 124.0
M39/407 Nex Metals Explorations Limited 100/100 Yes Live 896.0
M39/408 Nex Metals Explorations Limited 100/100 Yes Live 785.0
M39/409 Nex Metals Explorations Limited 100/100 Yes Live 966.0
M39/410 Nex Metals Explorations Limited 100/100 Yes Live 978.0
M39/839 Nex Metals Explorations Limited 100/100 Yes Live 7.3
M39/840 Nex Metals Explorations Limited 100/100 Yes Live 9.7
P39/6126 Nex Metals Explorations Limited 100/100 No Pending 10.4
P39/6127 Nex Metals Explorations Limited 100/100 No Pending 5.6
E39/1773 Paddick Investments Pty Ltd 100/100 Yes Live 903.0
E39/1774 Paddick Investments Pty Ltd 100/100 Yes Live 2,517.0
Yundamindra Total Area (ha) 7,815.1
----- End of picture text -----

Table 5 – Metalicity - Nex Metals Exploration Ltd Farm-In Tenure Table.

ENQUIRIES

Investors Jason Livingstone Managing Director & CEO +61 (0)8 6500 0202 [email protected]

This announcement is released under the full authority of the Board of Metalicity Limited.

Competent Person Statement

Information in this report that relates to Exploration results and targets is based on, and fairly reflects, information compiled by Mr. Jason Livingstone, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Livingstone is an employee of Metalicity Limited and a shareholder. Mr. Livingstone has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Livingstone consents to the inclusion of the data in the form and context in which it appears.

==> picture [133 x 28] intentionally omitted <==

8

Information in this report that details pre-JORC 2012 Mineral Resource Estimates, please refer to the ASX Announcement dated 1st August 2011 “Update on activities” lodged by Nex Metals Exploration Ltd for the relevant competent persons statements.

Forward Looking Statements

This announcement may contain certain “forward-looking statements” which may not have been based solely on historical facts, but rather may be based on the Company’s current expectations about future events and results. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have reasonable basis. However, forward-looking statements:

(a) are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company, are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and contingencies;

(b) involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward-looking statements. Such risks include, without limitation, resource risk, metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as political and operational risks in the countries and states in which the Company operates or supplies or sells product to, and governmental regulation and judicial outcomes; and

(c) may include, among other things, statements regarding estimates and assumptions in respect of prices, costs, results and capital expenditure, and are or may be based on assumptions and estimates related to future technical, economic, market, political, social and other conditions.

The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule” and similar expressions identify forward-looking statements.

All forward-looking statements contained in this presentation are qualified by the foregoing cautionary statements. Recipients are cautioned that forward-looking statements are not guarantees of future performance and accordingly recipients are cautioned not to put undue reliance on forwardlooking statements due to the inherent uncertainty therein.

The Company disclaims any intent or obligation to publicly update any forward-looking statements, whether as a result of new information, future events or results or otherwise.

==> picture [133 x 28] intentionally omitted <==

9

Appendix One – JORC Code, 2012 Edition – Table 1

Section 1: Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (eg cut channels, random chips, or •Historical:
techniques specific specialised industry standard measurement tools appropriate •Reverse Circulation (RC sampling; the drilling collar file and historical
to the minerals under investigation, such as down hole gamma WAMEX reports note the use of various bit sizes between 5 and 5 ¼
sondes, or handheld XRF instruments, etc). These examples should inch, with riffle splitting to obtain a sample for analysis. All sampling
not be taken as limiting the broad meaning of sampling. appears to be on 1 metre samples.
Include reference to measures taken to ensure sample representivity •Diamond core (DD) is NQ sized with ½ core submitted for analysis
and the appropriate calibration of any measurement tools or systems and based on geological intervals, no bigger than 1m and no smaller
used. than 30cms.
Aspects of the determination of mineralisation that are Material to the •Analysis varied between AAS and 30 to 50g fire assay. Approximately
Public Report. 2% of samples were subjected to screen fire assay analysis.
In cases where ‘industry standard’ work has been done this would be •The work conducted and under review appears to be “industry
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 standard practice”. However, the data on hand requires field
m samples from which 3 kg was pulverised to produce a 30 g charge verification, follow up drilling and further screen fire assay to address
for fire assay’). In other cases more explanation may be required, potential course gold aspects of the mineralisation.
such as where there is coarse gold that has inherent sampling •Metalicity Completed Drilling:
problems. Unusual commodities or mineralisation types (eg
Half core with samples only taken from the right side of the core
submarine nodules) may warrant disclosure of detailed information. (looking down hole on the orientation line) with a cut line offset to
the right of the orientation line by 1cm. Core was cut using a
brick saw and a semi-automated Almonte core saw – samples
were washed with clean water, prior to sampling.

Reverse circulation (RC) sampling was conducted by the
offsiders on the drill rig and checked at the end of each rod (6
metres) to ensure that the sample ID’s matched the interval that
was intended to be represented by that sample ID. No issues
were seen or noted by the Competent person during the entire
drilling campaign. These samples are kept onsite in a secure
location available for further analysis if required.

All RC samples were sieved and washed to ensure samples
were taken from the appropriate intervals and to determine
composites.

Composites in interpreted non mineralised zones were taken on
2 metre intervals using the spear methodology:

A 50mm spear made from PVC tubing was used to create
composites in zones where mineralisation was not dominant.
The green bag containing the RC sample was laid on its side,
andina topleft to bottom right stabwiththe spear, thenthe

10

Criteria JORC Code explanation Commentary Commentary
opposite side, was taken from each 2 bags that represented 2
metres of RC drilling. On intervals where mineralisation or
anomalism was seen, a single sample to represent that metre
was taken using the above method. The original rig cone split
samples remain onsite for further analysis or test work if needed
and represent a physical record, beyond the chip trays, of the
sample taken.
Channel samples from the Cumberland Pit where chisled off
using both a G-Pick and hammer and chisel, collected into a
clean 20l bucket. The collected sample was then transferred to a
pre-numbered calico bag and submitted for analysis
The quality of the sampling is industry standard and was
completed with the utmost care to ensure that the material being
sampled, can be traced back to the interval taken from the drill
hole for both RC and diamond core.
OREAS standards of 60 gram charges of OREAS 22F (Au grade
range of <1ppb Au – this is a blank), OREAS 251 (Au grade
range of 0.498ppm Au to 0.510ppm Au), OREAS 219 (Au grade
range of 0.753ppm Au to 0.768ppm Au) and OREAS 229b (Au
grade range of 11.86ppm Au to 12.04ppm Au) were used in
alternating and sporadic patterns at a ratio of 1 QAQC sample in
10 samples submitted. The material used to make these
standards was sourced from a West Australian, Eastern
Goldfields orogenic gold deposit.
Drilling Drill type (eg core, reverse circulation, open-hole hammer, rotary air •Historical:
techniques blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple •RC drilling notes the use of various bit sizes between 5 and 5 ¼ inch.
or standard tube, depth of diamond tails, face-sampling bit or other •DD is noted at being NQ diameter core. Structural measurements are
type, whether core is oriented and if so, by what method, etc). on file, however the method of obtaining such measurements was not
noted but appear to be concordant with observed structures in
historical workings.
•Metalicity Completed Drilling:
RC drilling used a bit size of 5 ¼ inch.
DD is orientated NQ2 diameter core.
Drill sample Method of recording and assessing core and chip sample recoveries •Historical:
recovery and results assessed. •No records exist to the method of recording and assessing core and
Measures taken to maximise sample recovery and ensure chip recoveries.
representative nature of the samples. •Unknown.
Whether a relationship exists between sample recovery and grade •There appears to be no biased in the data with regards to a
and whether sample bias may have occurred due topreferential relationship betweensamplerecovery and grade. The drilling

11

Criteria JORC Code explanation Commentary
loss/gain of fine/coarse material. intercepts delineate similar plunged shoots that the historical
workings mined – so, prima facie, there appears to be little bias.
However, future work will include such assurance protocols including
twinned holes to verify stated mineralised intercepts on selected
sections.
•Metalicity Completed Drilling:

RC drilling sample recovery was excellent.

Diamond core recovery was exceptional with near 100%
recovery.

No relationship was displayed between recovery and grade nor
loss/gain of fine/course material.
Logging Whether core and chip samples have been geologically and •Historical:
geotechnically logged to a level of detail to support appropriate •All recovered sample from RC and DD have been geologically
Mineral Resource estimation, mining studies and metallurgical logged. No records of geotechnical logging exist beyond noting
studies. structural measurements of certain features like veins, joints and
Whether logging is qualitative or quantitative in nature. Core (or faults.
costean, channel, etc) photography. •The drilling data in its current state will not support a Mineral
The total length and percentage of the relevant intersections logged. Resource Statement to JORC 2012 guidelines. Confirmatory drilling
is required and investigation of existing core/RC sample (if possible)
is required. Further QAQC and whole rock density determinations are
also required in future programmes to assist in the estimation of a
mineral resource.
•Geology logging was qualitative, and no core photography exists.
•Metalicity Completed Drilling:

All recovered sample from RC and DD has been geologically
logged by the Competent Person to a level where it would
support an appropriate Mineral Resource Estimate, mining
studies and metallurgical test work.

Logging was qualitative, sampling with the diamond core was
based on geological boundaries, and as practical, on the metre
in which a geological boundary was intersected in the RC
drilling.

Core photography was taken on the diamond core with a
suitable colour scale within the frame of the photograph
Sub- If core, whether cut or sawn and whether quarter, half or all core •Historical:
sampling taken. •Core was halved and a consistent side was taken for analysis as
techniques If non-core, whether riffled, tube sampled, rotary split, etc and noted in logging sheets detailed in submitted exploration reports on
_whether sampled wet or dry. _ file through the WAMEX system.

12

  • Criteria JORC Code explanation and sampleFor all sample types, the nature, quality and appropriateness of the preparation sample preparation technique.Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

  • Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

  • Whether sample sizes are appropriate to the grain size of the material being sampled.

Commentary

RC samples were riffle split to obtain a nominal 3kg sample for RC samples were riffle split to obtain a nominal 3kg sample for
analysis.
No notes were available regarding the quality and appropriateness of
the sample preparation technique.
Field duplicates have been noted as a historical issue previously and
requires attention in future programmes.
Sample size is appropriate, whilst larger sizes given the nature of the
mineralisation would be better, it would be logistically and cost
prohibitive.
Metalicity Completed Drilling:
Selected intervals, therefore, not all core, within the core drilling
was sampled based on geological boundaries, the core was cut
using a brick saw set up, and the right side looking downhole
was the consistent side for sampling.
RC samples were cone split from the rig. However, a 50mm
spear made from PVC tubing was used to create composites in
zones where mineralisation was not dominant. The green bag
containing the RC sample was laid on its side, and in a top left to
bottom right stab with the spear, then the opposite side, was
taken from each 2 bags that represented 2 metres of RC drilling.
On intervals where mineralisation or anomalism was seen, a
single sample to represent that metre was taken using the above
method. The original rig cone split samples remain onsite for
further analysis or test work if needed and represent a physical
record, beyond the chip trays, of the sample taken.
All RC samples were dry except for one sample at Champion. All
recoveries were >90%.
Duplicates were taken every 20 samples, however, given the
lack of QAQC data in historical drilling, the Competent Person
performed a 1 in 10 standard or blank or duplicate QAQC
protocol across both the RC and diamond core sampling.
Diamond core duplicates were ¼ from the right side to ensure
that ½ core remains and is available for further test work if
necessary.
Outside of duplicates in the diamond core sampling, the right
side of the cut line (with the cut line consistently on the right side
of the orientation line (offset by 1cm), the ½ core was sampled
and submitted for analysis.
The Competent Person is of the opinion the sampling method
described above is appropriate as far aspractical,and

13

Criteria JORC Code explanation Commentary
anomalous assays will be tested further by submission of the
original cone split sample.
Quality of The nature, quality and appropriateness of the assaying and •Historical:
assay data laboratory procedures used and whether the technique is considered •The fire assay data appears sufficient, whereas the AAS analysis
and partial or total. may be understating the gold content. Therefore, to address the
laboratory
tests
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument

potential course gold aspect of the observed mineralisation, screen
fire assay on mineralised sections is recommended.
make and model, reading times, calibrations factors applied and their •No geophysical tools, spectrometers, handheld XRF instruments
derivation, etc. were used.
Nature of quality control procedures adopted (eg standards, blanks, •Since all of the drilling was conducted by historic explorers there is a
duplicates, external laboratory checks) and whether acceptable levels
failure to document the QAQC practices conducted at the time of
of accuracy (ie lack of bias) and precision have been established. drilling. As such there is no data to be examined for this work.
•Regarding the 1905 channel sampling – this information was sourced
from public archives and converted to digital information that allowed
three-dimensional interrogation. The nature of the mineralisation
surrounding aspects of how the mineralisation plunges, vein width
described in the logs appears to be accurate as it correlates with
modern day observations. However, the analytical method used to
qualify the gold grades has not been ascertained and will not be able
to be used in a mineral resource estimate at this point in time. Its
inclusion in this Exploration Target is solely to indicate the presence
of mineralisation, grades have been extrapolated from known
productions figures and drill hole results where possible.
•Metalicity Completed Drilling:

Fire assay and screen fire assay was used across channel, RC
and diamond core samples. The methodologies employed at
NAGROM and Intertek Genalysis in these analytical procedures
are industry standard with appropriate checks and balances
throughout their own processes.

The analytical method employed is appropriate for the style of
mineralisation and target commodity present.

No geophysical tools, spectrometers, handheld XRF instruments
were used.

A 1 in 10 standard or duplicate or blank was employed during
this programme. QAQC analysis shows that the lab performed
within the specifications of the QAQC protocols. The standards
used were from OREAS and based on material sourced from
with the Eastern Goldfields. Blanks were also sourced from
OREAS as well.

14

Criteria JORC Code explanation Commentary

All core submitted for analysis has had specific gravity
determinations made to start to build the database of insitu
density information for any impending mineral resource
estimates in the future.

Umpire analysis was performed on the NAGROM samples by
submitted rig cone split derived samples to Intertek Genalysis.

No twinned holes have been completed.

Data was collected on to standardised templates in the field and
data entered at night. Cross checks were performed verifying
field data

No adjustment to the available assay data has been made.
Verification of The verification of significant intersections by either independent or •Lab certificate inspection on selected jobs was conducted by the CP
sampling and alternative company personnel. and found to be within specification.
assaying The use of twinned holes. •No twinned holes have been completed.
Documentation of primary data, data entry procedures, data •No record of primary data protocols, however, historical data has
verification, data storage (physical and electronic) protocols. been collated and interrogated with spiralis data omitted (that being
Discuss any adjustment to assay data. drill holes with no recorded collar coordinates or down hole survey
information – that being the drill hole set azimuth and inclination.
•No adjustment to the available assay data has been made.
Location of Accuracy and quality of surveys used to locate drill holes (collar and •Historical:
data points down-hole surveys), trenches, mine workings and other locations •No mineral resources are being estimated/stated beyond the
used in Mineral Resource estimation. referenced Pre JORC 2012 mineral resource statements noted – for
Specification of the grid system used. those please refer to ASX Announcement by NME dated 1st August
Quality and adequacy of topographic control. 2011 “Update on activities” and have been reproduced from that
source. The mineral resource estimates are considered historical and
require further work to establish current best practice estimations
before restating the mineral resource estimation.
•Regarding the use of the
•Both AMG84and GDA94 were used, collars were picked up by a
qualified surveyor using a DGPS (Trimble S7).
•The surveyed collar coordinates appear to be enough, however,
better definition is required of the topography to allow for a JORC
2012 compliant estimation.
•Metalicity Completed Drilling:

The channel sample and drill holes were marked in the field
using a Garmin 62S handheld GPS.

Drill hole collars will be surveyed using a DGPS.

The diamond andRCholeswere downhole surveyed using a

15

Criteria JORC Code explanation Commentary Commentary
“Champ Gyro multi-shot down hole survey camera”.

GDA94 Zone 51S was used, collars will be picked up by a
qualified surveyor using a DGPS (Trimble S7).

The surveyed collar coordinates appear to be sufficient,
however, better definition is required of the topography to allow
for a JORC 2012 compliant estimation.
Data spacing Data spacing for reporting of Exploration Results. Historical & Metalicity Completed Drilling:
and Whether the data spacing and distribution is sufficient to establish the The data spacing is sufficient to establish a relatively high confidence
distribution degree of geological and grade continuity appropriate for the Mineral in geological and grade continuity, however, peripheral data to
Resource and Ore Reserve estimation procedure(s) and support the drill holes requires further work to ensure compliance with
classifications applied. JORC 2012 guidelines.
Whether sample compositing has been applied. No sample compositing was applied beyond the calculation of down
hole significant intercepts.
Orientation of Whether the orientation of sampling achieves unbiased sampling of Historical & Metalicity Completed Drilling:
data in possible structures and the extent to which this is known, considering All drilling appears to be perpendicular to the main structure that
relation to the deposit type. hosts mineralisation. Secondary structures oblique to the main
geological
structure
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
structure may have influence hanging and foot wall intercepts.
The author believes that the drilling orientation and the orientation of
sampling bias, this should be assessed and reported if material. key mineralised structures has not introduced a bias.
Sample The measures taken to ensure sample security. Unknown as historical work is being discussed.
security Metalicity Completed Drilling:

The chain of supply from rig to courier to deliver the samples to
the laboratory was overseen by the Competent Person. At no
stage has any person or entity outside of the Competent Person,
the drilling contractors, the courier contractors and the assay
laboratory, Nagrom, came into contact with the samples.

Samples dispatched to Intertek Genalysis in Kalgoorlie were
delivered to the laboratory by the Competent Person, no third-
party courier used.
Audits or The results of any audits or reviews of sampling techniques and data.
Beyond verifying laboratory certificates and cross checking with the
reviews database, no further reviews of the sampling techniques and data
was completed at the time of reporting.
Metalicity Completed Drilling:
No external audit of the results, beyond the laboratory internal QAQC
measures, has taken place.

16

17

Section 2: Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral Type, reference name/number, location and ownership including •Please refer to the tenement schedule supplied within the
tenement agreements or material issues with third parties such as joint announcement:
and land ventures, partnerships, overriding royalties, native title interests, •As illustrated above, the tenements associated with the
tenure status historical sites, wilderness or national park and environmental Yundramindra Project are currently subject to plaint proceedings.
settings.
The security of the tenure held at the time of reporting along with any
_known impediments to obtaining a licence to operate inthe area. _
Exploration Acknowledgment and appraisal of exploration by other parties. •Nex Metals Explorations Ltd have done a great job of collating the
done by other historical drilling completed over the previous 30 years.
parties •The historical work completed requires further field verification via re-
down hole surveying (if possible) of drill holes beyond 60 metres
depth – it appears below this depth; hole deviation becomes a factor
in establishing the location of mineralisation in 3D. Furthermore, collar
pickups require verification. All laboratory certificates for the assays
on file are collated, only recommendation is possibly more duplicate
information in mineralised zones.
Geology Deposit type, geological setting and style of mineralisation. •Kookynie:
•The project area is in the Keith-Kilkenny Tectonic Zone within the
north-northwest trending Archean-aged Malcolm greenstone belt.
The Keith-Kilkenny Tectonic Zone is a triangular shaped area
hosting a succession of Archean mafic-ultramafic igneous and
meta-sedimentary rocks. Regional magnetic data indicates the
Kookynie region is bounded to the west by the north-trending Mt
George Shear, the Keith-Kilkenny Shear Zone to the east and the
Mulliberry Granitoid Complex to the south.
•There are several styles of gold mineralisation identified in the
Kookynie region. The largest system discovered to date is the
high-grade mineralisation mined at the Admiral/Butterfly area,
Desdemona area and Niagara area. The gold mineralisation is
associated with pyritic quartz veins hosted within north to
northeast dipping structures cross-cutting 'favourable' lithologies
which can also extend into shears along geological contacts.
Gold mineralisation tends to be preferentially concentrated in
differentiated dolerite sills associated with
pyrite/carbonate/silica/sericite wall rock alteration.
•Yundramindra:
•The Project area covers a belt of gold mineralisation occurring
alongthe margin of a regional hornblendegranodioritepluton

18

Criteria JORC Code explanation Commentary Commentary
intrusive to mafic rocks, largely metabasalts of Association 2 in
the Murrin-Margaret sector of the Eastern Goldfields. The
mineralised contact area between granitoid and mafic rocks is
arcuate in shape and is subdivided on geographic locations into
the “Western” and “Eastern” lines:
The Western Line consists of a NNW trending zone of generally
continuous, east dipping quartz reefs and quartz filled shears in
granitoid near the contact between a large hornblende
granodiorite pluton and a thin, remnant greenstone succession.
The Eastern Line encompasses the eastern portion of the arcuate
granodiorite/greenstone contact. The greenstones here are
poorly exposed and the high-Mg basalt, in turn intruded by
doleritic and porphyritic felsic dykes. The greenstone succession
is several kilometres in thickness. It’s eastern margin forms a
fault bounded contact with rocks of the regionally significant,
southerly plunging Eucalyptus Anticline. The western margin of
the Eastern Line exhibits sharp to gradational assimilated
contacts with hornblende granodiorite. Mineralisation along the
Eastern Line occurs in two settings: 1. Associated with quartz
veining within the mafic succession, and 2. Within quartz
veins/stockworks within the granodiorite.
Drill hole A summary of all information material to the understanding of the •Historical:
Information exploration results including a tabulation of the following information •For both Kookynie and Yundramindra, please refer to the Company’s
for all Material drill holes: announcement dated 6th May 2019, “Metalicity Farms Into Prolific
o easting and northing of the drill hole collar Kookynie & Yundamindra Gold Projects, WA”, for all drill collar
o elevation or RL (Reduced Level – elevation above sea level in information, and selected significant intercepts.
metres) of the drill hole collar •The rationale behind presenting the significant intercepts in the
o dip and azimuth of the hole Company’s announcement dated 6th May 2019, “Metalicity Farms
o down hole length and interception depth Into Prolific Kookynie & Yundamindra Gold Projects, WA” using the
o hole length. methodology described was to illustrate the significance of the
If the exclusion of this information is justified on the basis that the intercepts and the extent, that being, the actual number of this high
information is not Material and this exclusion does not detract from tenor type intercepts within both Projects.
the understanding of the report, the Competent Person should clearly •Metalicity Completed Drilling:
explain why this is the case. For the drilling performed and subject to this announcement,
please see table 3 in the above announcement.
Data In reporting Exploration Results, weighting averaging techniques, •Historical:
aggregation maximum and/or minimum grade truncations (eg cutting of high •Initially, significant intercepts were calculated using values >1 g/t Au
methods grades) and cut-off grades are usually Material and should be stated. over a minimum width of 1m with no more than 1m internal waste or
Where aggregate intercepts incorporate short lengths of high grade values <1g/t Au. Subsequently,since 1,263 significant intercepts

19

Criteria JORC Code explanation Commentary
results and longer lengths of low grade results, the procedure used were produced (771 for Yundramindra and 492 for Kookynie) from the
for such aggregation should be stated and some typical examples of data available, a further refinement of intercepts that produced >10-
such aggregations should be shown in detail. gram metres were presented.
The assumptions used for any reporting of metal equivalent values •Please refer to the Company’s announcement dated 6th May 2019,
should be clearly stated. Metalicity Farms Into Prolific Kookynie & Yundamindra Gold
Projects, WA
•All intercepts were treated as above with no top cuts applied.
•No metal equivalents are discussed or reported.
•Metalicity Completed Drilling:
•All intercepts have been calculated using the weighted average
method. Specific intervals within a weighted average interval have
been described as part of the overall intercept statement. All results
are presented in Appendix 2 for the reader to reconcile the
Competent Persons’ calculations.

Intervals were based on geology and no specific cut off was
applied.

No metal equivalents are discussed or reported.
Relationship These relationships are particularly important in the reporting of •Historical & Metalicity Completed Drilling:
between Exploration Results. •Given the shallow dipping nature (approximately -45° on average) of
mineralisatio If the geometry of the mineralisation with respect to the drill hole the mineralisation observed at Kookynie and Yundramindra, the
n widths and angle is known, its nature should be reported. nominal drilling inclination of -60° lends to close to truth width
intercept
lengths
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
intercepts.
•However, cross cutting structures within the hanging wall and footwall
are noted and may influence the results.
Diagrams Appropriate maps and sections (with scales) and tabulations of •Please see main body of the announcement for the relevant figures.
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
_drill hole collar locations and appropriate sectional views. _
Balanced Where comprehensive reporting of all Exploration Results is not •It is noted that historical mineral resource estimates commissioned by
reporting practicable, representative reporting of both low and high grades Nex Metals Explorations Ltd were used to assist in defining the stated
and/or widths should be practiced to avoid misleading reporting of Exploration Targets, however, the Exploration Target are inclusive of
Exploration Results. the mineral resource estimates stated in the ASX Announcement
dated 1st August 2011 “Update on activities”.
•Regarding the significant intercept tables presented in the
announcement by the Company on the 6th May 2019, “Metalicity
Farms Into Prolific Kookynie & Yundamindra Gold Projects, WA”, the
sheer volume of data (No. of significant intercepts - 771 for
Yundramindra and 492 for Kookynie) based on the data aggregation
methods described aboveisnot practicaltoreportnorbeneficial.

20

Criteria JORC Code explanation Commentary
•In context though, below is a table of the recorded drilling to date so a
comparison to the number of holes drilled versus the number of
significant intercepts present can be made. However, more detailed
drilling tabulations are within the body of the announcement so as to
communicate the level of drilling at each prospect within each Project:
No. drill holes Metres
No. drill holes Metres
No. drill holes Metres No. drill holes
Metres
Kookynie
920 43,100
11 3,223.3
4
538.1
935 46,861.4
Yundramindra
837 39,233
15 1,785.6
1
56.3
853 41,074.9
Total
1757 82,333
26 5,008.9
5
594.4
1788 87,936.3
RC
DD
RC/DD
Total
Drilling Summary
Other Other exploration data, if meaningful and material, should be reported
•The area has had significant historical production recorded and is
substantive including (but not limited to): geological observations; geophysical accessible via the MINEDEX database.
exploration
data
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
•All stated mineral resources for the Kookynie and Yundramindra
Projects are pre-JORC 2012. Considerable work around bulk density,
groundwater, geotechnical and rock characteristics; potential QAQC, down hole surveys and metallurgy, coupled with the planned
deleterious or contaminating substances. drilling will be required to ensure compliance with JORC 2012
guidelines.
Further work The nature and scale of planned further work (eg tests for lateral •Metalicity intends to drill the known and extend the mineralised
extensions or depth extensions or large-scale step-out drilling). occurrences within the Kookynie and Yundramindra Projects. The
Diagrams clearly highlighting the areas of possible extensions, Yundramindra Project is currently under the plaint process, however
including the main geological interpretations and future drilling areas, Metalicity believes that Nex Metals is well advanced in defending
provided this information is not commercially sensitive. those claims. The drilling will be designed to validate historical drilling
with a view to making maiden JORC 2012 Mineral Resource Estimate
statements. Metalicity has made the aspirational statement of
developing “significant resource and reserve base on which to
commence a sustainable mining operation focusing on grade and
margin”.
•Diagrams pertinent to the area’s in question are supplied in the body
of this announcement.

21