ASX ANNOUNCEMENT

==> picture [98 x 99] intentionally omitted <==

17 May 2017

DRILLING CONTINUES TO HIT THICK ZONES OF SPODUMENEBEARING PEGMATITE AT SEYMOUR LAKE, CANADA

Latest drilling continues to expand the scale and potential of the Seymour Lake Lithium Project

HIGHLIGHTS:

  • Phase 2 resource drilling program progressing well with a further five diamond holes now completed.

  • Multiple shallow and deeper spodumene-bearing pegmatites intersected in latest holes, including thick mineralised zones with a combined down-hole width of up to 21m.

  • Drilling is confirming the interpreted mineralised extensions, providing a greater level of geological understanding and confidence while also steadily increasing the overall scale of the project.

  • Drilling continues to confirm the presence of multiple pegmatite zones at the North Aubry prospect – with the mineralisation remaining open to the east, west and down-dip.

  • Phase 2 results to underpin a maiden JORC 2012 Mineral Resource.

Diversified minerals explorer and developer Ardiden Limited (ASX: ADV) is pleased to advise that it continues to make excellent progress with the ongoing Phase 2 resource delineation diamond drilling program at its Seymour Lake Lithium Project in Ontario, Canada, with the latest drill-holes intersecting multiple spodumene-bearing pegmatites from close to surface.

NORTH AUBRY PROSPECT DRILLING

The latest five drill-holes (SL-17-10 to SL-17-13, SL-17-24) have now been completed and logged by the geological team. This batch of drill holes has again intersected multiple spodumene-bearing pegmatites both close to surface and at depth over various widths, confirming the presence of multiple pegmatite layers, including:

  • Hole SL-17-13, which intersected a total of 21.04m (including 16.1m zone from 95m down-hole) of spodumene-bearing sills over a total down-hole width of 121m; and

  • Hole SL-17-12, which intersected a total of 11.95m of spodumene bearing sills over a total down-hole width of approximately 110m (refer to Table 1 below).

The drilling has continued to validate the known primary mineralised zones, further defining the boundaries of the main outcropping area and extensions of the secondary spodumene-bearing pegmatites at the project. Once the drill core has been logged, cut and prepared, the drill samples will be sent to Activation Laboratories in Thunder Bay for assay.

Ardiden Limited

Suite 6, 295 Rokeby Road Subiaco WA 6008

Tel: +61 (0) 8 6555 2950 SX Code: ADV Fax: +61 (0) 8 9382 1222 Shares on Issue: 819.0M www.ardiden.com.au

Ardiden notes although the pegmatites at Seymour Lake can be somewhat difficult to model and predict due to the erratic nature of the formation paths, confirmation of the interpreted extensions of the spodumene-bearing pegmatites and the verification of multiple pegmatite layers in the latest drilling provides the Company with a greater level of understanding and confidence in the project, while also steadily expanding the overall scale of the project and its future resource potential.

The first part of the current drilling program was designed with close-spaced drilling to ensure a high level of confidence in the data to support initial maiden JORC 2012 Mineral Resource.

Once a sufficient number of drill results and geological data have been obtained during this drill program, it will provide the Company a solid basis of understanding about the multiple spodumene-bearing mineralisation zones contained in the central portion of the North Aubry prospect – underpinning an initial JORC 2012 Mineral Resource for Seymour Lake.

Once it has established the basis for an initial JORC 2012 Mineral Resource in the central mineralised zone at North Aubry, Ardiden will conduct wider-spaced drilling in order to confirm the extensions of the spodumene mineralised zones which can be incorporated in future resource estimates.

As previously advised, the current diamond drilling program is designed to target the immediate project area around the North Aubry prospect, which is located within an extensive 5km long pegmatite zone identified during the mapping and sampling campaign completed in 2016.

==> picture [442 x 310] intentionally omitted <==

----- Start of picture text -----

24
----- End of picture text -----

Figure 1. Overview showing the current drill hole locations (Blue) and the pegmatite exposures at North Aubry prospect, with interpreted extensions.

These drill holes have continued to verify the western and northern extension of the multiple pegmatite mineralised sills. The continued intersection of multiple high quality spodumene-bearing pegmatite reinforces the potential to establish a maiden JORC 2012 Mineral Resource estimate for the Seymour Lake Project.

The identification of pegmatites either at or close to surface represents a strategic advantage for the project, potentially allowing easier access to high-quality mineralisation in a future mining scenario.

The proximity of the pegmatites to surface is likely to reduce the required pre-strip, resulting in lower extraction costs and therefore improved project economics.

Table 1. Drilling Logs for holes SL-17-10 to SL-17-13, SL-17-24 at Seymour Lake Lithium Project.

Hole ID East North Total
Depth
(m)
Dip From
(m)

To
(m)

Interval
(m)

Description
SL-17-10 396885 5585145 108 -60 0.00 5.00 5.00 Overburden
SL-17-10 396885 5585145 108 -60 5.00 13.80 8.80 Mafic Volcanic
SL-17-10 396885 5585145 108 -60 6.10 6.45 0.35 Nb/Ta Pegmatite
SL-17-10 396885 5585145 108 -60 6.45 64.20 57.75 Mafic Volcanic
SL-17-10 396885 5585145 108 -60 64.20 68.50 4.30 Spodumene Nb/Ta
Pegmatite
SL-17-10 396885 5585145 108 -60 68.50 69.45 0.95 Mafic Volcanic
SL-17-10 396885 5585145 108 -60 69.45 70.40 0.95 Nb/Ta Pegmatite
SL-17-10 396885 5585145 108 -60 70.40 108.00 Mafic Volcanic
TOTAL 5.60
SL-17-11 396885 5585165 107 -60 0.00 0.90 0.90 Overburden
0.90 1.70 0.80 Mafic Volcanic
SL-17-11 396885 5585165 107 -60 1.70 1.90 0.20 Nb/Ta Pegmatite
1.90 11.80 9.90 Mafic Volcanic
SL-17-11 396885 5585165 107 -60 11.80 12.23 0.43 Nb/Ta Pegmatite
SL-17-11 396885 5585165 107 -60 12.23 17.27 5.04 Mafic Volcanic
SL-17-11 396885 5585165 107 -60 17.27 18.05 0.78 Nb/Ta Pegmatite
18.05 70.12 52.07 Mafic Volcanic
SL-17-11 396885 5585165 107 -60 70.12 77.00 6.88 Spodumene Nb/Ta
Pegmatite
SL-17-11 396885 5585165 107 -60 77.00 107.00 30.00 Mafic Volcanic
TOTAL 8.29
SL-17-12 396885 5585185 110 -60 0.00 16.10 16.10 Mafic Volcanic
SL-17-12 396885 5585185 110 -60 16.10 18.53 2.43 Nb/Ta Pegmatite
SL-17-12 396885 5585185 110 -60 18.53 63.30 44.77 Mafic Volcanic
SL-17-12 396885 5585185 110 -60 63.30 64.75 1.45 Nb/Ta Pegmatite
SL-17-12 396885 5585185 110 -60 64.75 80.20 15.45 Mafic Volcanic
SL-17-12 396885 5585185 110 -60 80.20 86.40 6.20 Spodumene Nb/Ta
Pegmatite
SL-17-12 396885 5585185 110 -60 86.40 96.23 9.83 Mafic Volcanic
SL-17-12 396885 5585185 110 -60 96.23 98.10 1.87 Nb/Ta Pegmatite
SL-17-12 396885 5585185 110 -60 98.10 110.00 11.90 Mafic Volcanic
TOTAL 11.95
SL-17-13 396885 5585205 121 -60 0.00 3.50 3.50 Overburden
SL-17-13 396885 5585205 121 -60 3.50 8.80 5.30 Mafic Volcanic
SL-17-13 396885 5585205 121 -60 8.80 9.00 0.20 Nb/Ta Pegmatite
SL-17-13 396885 5585205 121 -60 9.00 33.49 24.49 Mafic Volcanic
SL-17-13 396885 5585205 121 -60 33.49 38.20 4.71 Spodumene Nb/Ta
Pegmatite
SL-17-13 396885 5585205 121 -60 38.20 95.00 56.80 Mafic Volcanic
SL-17-13 396885 5585205 121 -60 95.00 111.13 16.13 Spodumene Nb/Ta
Pegmatite
SL-17-13 396885 5585205 121 -60 111.13 121.00 9.87 Mafic Volcanic
TOTAL 21.04
SL-17-24 396901 5585273 140 -60 0.00 3.40 3.40 Overburden
SL-17-24 396901 5585273 140 -60 3.40 105.52 102.12 Mafic Volcanic
SL-17-24 396901 5585273 140 -60 105.52 105.68 0.16 Nb/Ta Pegmatite
SL-17-24 396901 5585273 140 -60 105.68 106.30 0.62 Mafic Volcanic
SL-17-24 396901 5585273 140 -60 106.30 106.95 0.65 Nb/Ta Pegmatite
SL-17-24 396901 5585273 140 -60 106.95 108.00 1.05 Mafic Volcanic
SL-17-24 396901 5585273 140 -60 108.00 110.25 2.25 Spodumene Nb/Ta
Pegmatite
SL-17-24 396901 5585273 140 -60 110.25 110.68 0.43 Mafic Volcanic
SL-17-24 396901 5585273 140 -60 110.68 110.79 0.11 Pegmatite
SL-17-24 396901 5585273 140 -60 110.79 112.25 1.46 Mafic Volcanic
SL-17-24 396901 5585273 140 -60 112.25 113.17 0.92 Pegmatite
SL-17-24 396901 5585273 140 -60 113.17 117.38 4.21 Mafic Volcanic
SL-17-24 396901 5585273 140 -60 117.38 120.33 2.95 Spodumene Nb/Ta
Pegmatite
SL-17-24 396901 5585273 140 -60 120.33 121.04 0.71 Mafic Volcanic
SL-17-24 396901 5585273 140 -60 121.04 121.60 0.56 Pegmatite
121.60 140.00 18.40 Mafic Volcanic
TOTAL 7.60

Ardiden looks forward to providing further updates as they come to hand.

ENDS

For further information:

Investors : Media : Brad Boyle Nicholas Read Ardiden Ltd Read Corporate Tel: +61 (0) 8 6555 2950 Mobile: 0419 929 046

About Ardiden Ltd

Ardiden Limited (ASX: ADV) is an emerging international strategic metals company which is focused on the exploration, evaluation and development of multiple projects located in the established mining jurisdiction of Ontario, Canada.

The Seymour Lake Lithium Project comprises 7,019 Ha of mining claims and has over 4,000m of historic drilling. Mineralisation is hosted in extensive outcropping spodumene-bearing pegmatite structures with widths up to 26.13m and grades of up to 6.0% Li2O. These high-grade pegmatite structures have been defined over a 5km strike length.

The 100%-owned Root Lake Lithium Project is located in Ontario, Canada. The project comprises 1,013 Ha of mining claims and has over 10,000m of historic drilling. Mineralisation is hosted in extensive outcropping spodumene-bearing pegmatite structures with widths up to 19m and grades of up to 5.10% Li2O. In addition, tantalum grades of up to 380 ppm were intersected.

The 100%-owned Root Bay lithium project is strategically located approximately 5km to the east of the recently acquired Root Lake Lithium Project and consists of three claim areas, totalling 720 hectares. The project was staked by Ardiden as part of its regional exploration focus in and around the Root Bay spodumene-bearing pegmatite.

Initial observations of the exposed pegmatite are characterized by coarse white albite, grey quartz and pale grey-green spodumene crystals up to 10cm long.

The 100%-owned Manitouwadge Flake Graphite Project covers an area 5,300 Ha and has a 20km strike length of EM anomalies with graphite prospectivity. Previous preliminary metallurgical testwork indicated that up to 80% of the graphite at Manitouwadge is high value jumbo or large flake graphite. Testwork also indicated that simple, gravity and flotation beneficiation can produce graphite purity levels of up to 96.8% for jumbo flake and 96.8% for large flake. With the proven caustic bake process, ultra-high purity (>99.95%) graphite can be produced. The graphite can also be processed into high value expandable graphite, high quality graphene and graphene oxide.

All projects located in an established mining province, with good access to infrastructure (road, rail, power, phone and port facilitates) and local contractors and suppliers.

Competent Person’s Statement

The information in this report that relates to exploration results for the Seymour Lake Lithium project and is based on, and fairly represents, information and supporting geological information and documentation in this report has been reviewed by Mr Robert Chataway who is a member of the Association of Professional Geologists of Ontario. Mr Chataway is not a full-time employee of the Company. Mr Chataway is employed as a Consultant Geologist. Mr Chataway has more than five years relevant exploration experience, and qualifies as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). Mr Chataway consents to the inclusion of the information in this report in the form and context in which it appears.

Forward Looking Statement

This announcement may contain some references to forecasts, estimates, assumptions and other forward-looking statements. Although the company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions,

it can give no assurance that they will be achieved. They may be affected by a variety of variables and changes in underlying assumptions that are subject to risk factors associated with the nature of the business, which could cause actual results to differ materially from those expressed herein. All references to dollars ($) and cents in this presentation are to Australian currency, unless otherwise stated. Investors should make and rely upon their own enquires and assessments before deciding to acquire or deal in the Company’s securities.

Table 1: Seymour Lake Lithium Project (Claim Title 1245661)

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information.
• Diamond Drill Core was cut in half split using a core saw. along a plane
perpendicular to the foliation within the host rock gneiss.
• Bagging of the half core samples was supervised by a geologist to ensure
there are no numbering mix-ups.
• One tag from a triple tag book was inserted in the core tray in the position
of the sample interval.
• Standard sample intervals averaged 1 m.
• Sampling continued through intervening barren rock (if less than 10m
width) where multiple Spodumene Pegmatite zones were intersected
• The sample preparation and assaying techniques are industry standard and
appropriate for this type of mineralisation.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
• Diamond wireline core drilling.

The drill core size is CHD 76, core diameter is 43.5 millimetres
• Drill holes were orientated using the Reflex ACT II RD core orientation tool
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• The sample interval of core was measured and recorded along with a
description and incorporated in the completed drill logs.
• Core within the mineralised zone tended to be uniform and competent so
loss was minimal and samples represent the true nature of the
mineralisation
• No relationship between sample recovery and grade is evident.
Criteria JORC Code explanation Commentary
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length andpercentage of the relevant intersections logged.
• Samples represent half the core width, and are logged in detail to support
appropriate Mineral Resource estimation at a later stage of exploration.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-
half sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
• Core is split in half using a core saw with the remaining half retained in the
core tray.
• Mineralisation is massive and relatively uniform so assay samples closely
represent the in-situ material.
• Samples were taken on an average of 1 meter intervals and were
determined to be appropriate for the mineralised material being sampled
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e. lack of bias) andprecision have been established.
• All samples will be analysed by Actlabs in Thunder Bay, Ontario Canada a
SCC (Standards Council of Canada) accredited laboratory.
• The assay technique will be FUS-Na202
• Quality control procedures included the insertion of certified standards and
blanks into the sample stream.
• Results of the Heavy Liquid Separation tests are outlined in Table 3.
verification of
sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
• Drill logs and sample information is documented and stored digitally in field
laptop units and backed up on the Ardiden server.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
Specification of thegrid system used.
• Drill holes were located with handheld WAAS enabled handheld GPS units
set for recording UTM NAD83 Zone 16N projection coordinates.

Drill holes were orientated using the Reflex ACT II RD core orientation
tool
Criteria JORC Code explanation Commentary
Quality and adequacy of topographic control.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
• Core samples of the mineralised zone were taken at approximately 1 meter
intervals and deemed appropriate to represent the in situ nature of the
mineralization.
• Further drilling and sampling will be required to adequately establish the
geologic and grade continuity for any Mineral Resource and Ore Reserve
estimationprocedure.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Drill hole locations were designed to intercept the mineralised zone as close
to true width as possible to avoid sampling bias.
Sample
security
The measures taken to ensure sample security. • Samples were secured and delivered to the assay lab under chain of custody
controls by the Caracle Creek Consulting group
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. • No audits or reviews of sampling techniques have been conducted

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a license to operate in the area.

All claims in the Seymour Lake Lithium project are in good standing and
these include claims 1245661 1245648 1245662 1245664 1245646,
which are 100% owned by Stockport Exploration Inc. Ardiden has
exercised option to acquire 100% ownership of the project claims.

Ardiden staked and owns additional claims around the project including
claims:
4270593, 4270594, 4270595, 4270596, 4270597, 4270598, 4279875,
4279876, 4279877, 4279878, 4279879, 4279880, 4279881, 4279882,
4279883, 4279884, 4279885, 4279886, 4279887, 4279888, 4279889,
4279890, 4279891, 4279869, 4279870, 4279871, 4279872, 4279873 and
4279874
Criteria JORC Code explanation Commentary
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties. • Other parties have not appraised the exploration carried out to date
Geology Deposit type, geological setting and style of mineralisation. • Seymour Lake area pegmatites have been classified as belonging to the
Complex-type, Spodumene-subtype. Mineralization is dominated by
spodumene (Li), with lesser tantalite(Ta) hosted in a series of variably
steeplydipping pegmatite dykes and and sills.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
• See Tables 1 and 2 and Figures 2 and 3 for the location of the drill collars
and other dill hole information.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
• With the homogeneity of the mineralised material, sample intervals for the
most part were kept at one metre intervals
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (e.g. ‘down hole length, true width not
known’).
• Mineralised zones were determined to be shallow dipping and drill holes
were drilled at -60 degrees so that drilling orientation bias was minimised
Criteria
JORC Code explanation
Criteria
JORC Code explanation
Commentary
diagrams Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
• See Figures 2 and 3 for the location of the drill hole collars
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
• No comprehensive report has been completed to date to include the latest
Ardiden exploration results.
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
• All meaningful and material data is reported
Further work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Refer to text within the report.