ASX ANNOUNCEMENT

==> picture [98 x 100] intentionally omitted <==

23 June 2017

SEYMOUR LAKE: DMS METALLURGICAL TESTWORK CONTINUES TO PRODUCE HIGH-GRADE LITHIUM CONCENTRATE

Grades of up to 6.43% Li2O from latest lab DMS testwork confirms project’s commercial potential

HIGHLIGHTS:

  • High-grade lithium concentrate of up to 6.43% Li2O produced from latest lab Dense Media Separation (DMS) testwork on drill core samples from the Seymour Lake Lithium Project in Canada.

  • High Li2O recovery of 91% achieved.

  • Variability testwork currently underway with a range of drilling hole samples from the North Aubry prospect.

  • The most recent testwork again verifies that the spodumene particles are well-liberated at a very coarse particle size.

  • Testwork is continuing to develop a suitable processing flowsheet.

Diversified minerals explorer and developer Ardiden Limited (ASX: ADV) is pleased to advise that it has received further highly encouraging metallurgical testwork results from Independent Metallurgical Operations (IMO), based in Perth, Western Australia, for a composite bulk sample obtained from the North Aubry prospect at its majorityowned Seymour Lake Lithium Project in Ontario.

Ardiden confirms that the lab Dense Media Separation (DMS) tests conducted at a specific gravity of 2.80 produced an overall concentrate grade of 5.97% Li2O with recovery of 90.8% (refer to Table 2 & 3).

The initial testing of the spodumene ore used a very coarse crush size of 9.5 mm which produced a concentrate of 6.43% Li2O with a recovery of over 75%. Ardiden notes that the recovery was lower than expected due to a portion of the spodumene crystals being misplaced, as the lab Dense Media Cyclone had difficulty managing the coarse crush size.

Second stage of DMS tests produced the overall concentrate grade of 5.97% Li2O with recovery of 90.8% at crushing size of 3.35mm. Staged crushing reduced the 0.5 mm material produced, therefore additional processing is not required.

The Company notes that the coarse spodumene concentrate will lead to reduced processing costs and will create a greater variety of potential applications, which in turn should attract premium prices from potential end-users, which may improve the project economic value.

Ardiden Limited

Suite 6, 295 Rokeby Road Tel: +61 (0) 8 6555 2950 Subiaco WA 6008 Fax: +61 (0) 8 9382 1222 www.ardiden.com.au

ASX Code: ADV Shares on Issue: 819.0M

==> picture [595 x 45] intentionally omitted <==

A comparison between the previous Heavy Liquid Separation (HLS) testwork conducted by IMO on these spodumene samples and this round of DMS testwork, found that the HLS test was conducted at a similar specific gravity of 2.70 and with a crush size of less than 3.35 mm. The HLS achieved a concentrate grade of 5.88% Li2O and with a recovery of 83.0%, which is comparable to the results achieved with the DMS testwork.

==> picture [250 x 263] intentionally omitted <==

Figure 1. Sample of coarse lithium concentrate (Spodumene) created with DMS at the specific gravity of 3.10.

IMO also noted the significant presence of Micas in the spodumene concentrate sample at the coarse crushing size of 9.5mm. Ardiden will undertake additional testwork on the Micas to better understanding of the material and whether this material could improve the Li2O recovery and concentrate grade.

The lab DMS testwork results from the drill core samples provided to IMO, have again indicated that the spodumene particles are well liberated at vary coarse particle size. Additional phase of testwork is more comprehensive and being undertaken on a broad range of ore samples with a range of head grades and locations. These tests will assist Ardiden to identify the most appropriate process to recover Li2O from the spodumene ore at the Seymour Lake project.

Ardiden considers these current laboratory DMS tests to be extremely encouraging, having replicated similar results to those obtained from the earlier HLS metallurgical tests, announced on 9 February 2017, which demonstrated the ability to produce very high-grade lithium concentrate with grades of up to 7.73% Li2O .

The composite sample was obtained by combining drill cores from three separate locations across the North Aubry Prospect (refer to Figure 2).

2

==> picture [595 x 45] intentionally omitted <==

==> picture [357 x 243] intentionally omitted <==

Figure 2. Overview showing the drill hole locations at North Aubry prospect at the Seymour Lake Lithium Project.

Ardiden confirms the laboratory DMS tests has again provided additional specific data which helps to determine the physical properties of samples and provides guidance with characterising the parameters of ore processing. The lab DMS tests also help to predict the recovery of Li2O.

The DMS tests were conducted on the composite sample of drill cores obtained from diamond drill holes SL-09-33, SL-09-27A and SL-09-45 and after crushing to 100% and passing 9.5mm, 6.7mm and 3.35mm.

The interpolated recoveries and Li2O concentrate grade at each crush size for the samples are tabulated below in Tables 2 and 3 below.

Ardiden notes these are highly encouraging results for preliminary DMS assessments. Metallurgical variability of the deposit will be investigated in future test work programs.

The next phase of the metallurgical testwork program will allow Ardiden to investigate the lithium recovery and various extraction process options including gravity, flotation and magnetic separation processes to develop an optimum process flowsheet for the project.

Ardiden looks forward to providing further updates as they come to hand.

ENDS

For further information:

Investors : Brad Boyle Ardiden Ltd Tel: +61 (0) 8 6555 2950

Media : Nicholas Read Read Corporate Mobile: 0419 929 046

About Ardiden Ltd

3

==> picture [595 x 45] intentionally omitted <==

Ardiden Limited (ASX: ADV) is an emerging international strategic metals company which is focused on the exploration, evaluation and development of multiple projects located in the established mining jurisdiction of Ontario, Canada.

The Seymour Lake Lithium Project comprises 7,019 Ha of mining claims and has over 4,000m of historic drilling. Mineralisation is hosted in extensive outcropping spodumene-bearing pegmatite structures with widths up to 26.13m and grades of up to 6.0% Li2O. These high-grade pegmatite structures have been defined over a 5km strike length.

The 100%-owned Root Lake Lithium Project is located in Ontario, Canada. The project comprises 1,013 Ha of mining claims and has over 10,000m of historic drilling. Mineralisation is hosted in extensive outcropping spodumene-bearing pegmatite structures with widths up to 19m and grades of up to 5.10% Li2O. In addition, tantalum grades of up to 380 ppm were intersected.

The 100%-owned Root Bay lithium project is strategically located approximately 5km to the east of the recently acquired Root Lake Lithium Project and consists of three claim areas, totalling 720 hectares. The project was staked by Ardiden as part of its regional exploration focus in and around the Root Bay spodumene-bearing pegmatite. Initial observations of the exposed pegmatite are characterized by coarse white albite, grey quartz and pale grey-green spodumene crystals up to 10cm long.

The 100%-owned Manitouwadge Flake Graphite Project covers an area 5,300 Ha and has a 20km strike length of EM anomalies with graphite prospectivity. Previous preliminary metallurgical testwork indicated that up to 80% of the graphite at Manitouwadge is high value jumbo or large flake graphite. Testwork also indicated that simple, gravity and flotation beneficiation can produce graphite purity levels of up to 96.8% for jumbo flake and 96.8% for large flake. With the proven caustic bake process, ultra-high purity (>99.95%) graphite can be produced. The graphite can also be processed into high value expandable graphite, high quality graphene and graphene oxide.

The Wisa Lake Lithium project (under option to acquire 100%) is located 80km east of Fort Frances, in Ontario, Canada and only 8km north of the Minnesota/US border. The property is connected to Highway 11 (Trans-Canada), which is located 65km north via an all-weather road that crosses the centre of the project. The Wisa Lake Lithium Project consists of five claims (1,200 hectares) and covers the historical drilling location of the North Zone. Ardiden is aiming to commence a limited drill program to drill test and verify the historical lithium results.

The Bold Properties project (under option to acquire 100%) is located approximately 50km north-east of the town of Mine Centre in Ontario, Canada. The property is connected to Highway 11 (Trans-Canada), which is located 25km south via an allweather road. The Bold Property Project consists of four claims (1,024 hectares) and covers a number of anomalous sulphide zones. In 1992, Hexagon Gold (Ontario) Ltd. completed a total of 17 drill holes in multiple locations on and around the Bold Property Project at various depths of up to 428m down-hole. The nine grab samples that were collected by Hexagon in 1992 returned encouraging grades of up to 0.33% cobalt, 5.54% copper and 0.73% nickel, confirming the significant exploration potential.

All projects located in an established mining province, with good access to infrastructure (road, rail, power, phone and port facilitates) and local contractors and suppliers.

Competent Person’s Statement

The information in this report that relates to exploration results for the Seymour Lake Lithium project and is based on, and fairly represents, information and the supporting geological information and documentation in this announcement and has been reviewed by Mr Robert Chataway who is a member of the Association of Professional Geologists of Ontario. Mr Chataway is not a full-time employee of the Company. Mr Chataway is employed as a Consultant Geologist. Mr Chataway has more than five years relevant exploration experience, and qualifies as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). Mr Chataway consents to the inclusion of the information in this report in the form and context in which it appears.

Forward Looking Statement

This announcement may contain some references to forecasts, estimates, assumptions and other forward-looking statements. Although the company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions, it can give no assurance that they will be achieved. They may be affected by a variety of variables and changes in underlying assumptions that are subject to risk factors associated with the nature of the business, which could cause actual results to differ materially from those expressed herein. All references to dollars ($) and cents in this presentation are to Australian

4

==> picture [595 x 45] intentionally omitted <==

currency, unless otherwise stated. Investors should make and rely upon their own enquires and assessments before deciding to acquire or deal in the Company’s securities.

5

==> picture [595 x 45] intentionally omitted <==

Table 1. Drilling Hole co-ordinates and information for drill holes SL-09-33, SL-09-45 and SL-09-27A at Seymour Lake Lithium Project.

Hole ID East North Total
Depth
(m)
Azimuth Dip From
(m)

To
(m)

Interval
(m)

Description
SL-09-33 396921 5584973 114 0 -90 15.80 23.10 7.30 Spodumene Nb/Ta
Pegmatite
SL-09-45 397054 5584905 126 0 -90 48.00 55.20 7.20 Spodumene Nb/Ta
Pegmatite
SL-09-27A 396958 5584900 95 0 -90 64.33 66.74 2.41 Spodumene Nb/Ta
Pegmatite

6

Table 2. Lithium Stream Grades

Stream Mass% Al2O3 BeO
(ppm)
CaO Fe2O3 K2O Li2O **MgO ** Na2O Nb2O5
(ppm)
SiO2 Ta2O5
(ppm)
LOI -
1000
-9.5mm DMS Sinks(+2.80 Sg) 31.3 23.85 292 0.5 1.16 0.9 6.43 0.14 0.69 204 68 312 0.68
-3.35mm DMS Sinks(+2.80 Sg) 9.4 20.47 691 0.6 1.22 1.8 4.44 0.16 1.03 305 65.4 395 1.02
Total DMS Sinks(+2.80 Sg) 40.7 23.07 384 0.52 1.17 1.11 5.97 0.14 0.77 227 67.4 331 0.76
-9.5mm DMS Feed: -0.5mm
Fraction
7.9 14.45 328 0.8 0.64 1 1.44 0.1 5.56 193 61 281 0.73
-9.5mm DMS Floats (-2.80 Sg): -
0.5mm Fraction
11.2 14.39 475 0.6 0.95 1.8 0.73 0.11 5.26 194 74.4 220 0.64
Total DMS: -0.5mm Fraction 19.1 14.41 414 0.68 0.82 1.47 1.03 0.11 5.38 194 68.87 245 0.68
-3.35mm DMS Floats(-2.80 Sg) 40.1 10.32 636 0.3 0.43 2 0.12 0.06 4 95 80.9 144 0.51
Total -0.5mm and -3.35mm
Floats(-2.80 Sg)
59.3 11.64 564 0.42 0.56 1.83 0.42 0.07 4.45 127 77.02 177 0.56
Calculated Head 100 16.3 491 0.46 0.81 1.54 2.68 0.1 2.95 168 73.1 240 0.64
Assay Head 16.21 563 0.5 0.83 1.7 2.55 0.1 2.59 176 72.1 237 0.65

Table 3. Lithium Stream

Table 3. Lithium Stream
Metal Recoveries
Stream Mass% Al2O3 BeO
(ppm)
CaO Fe2O3 K2O Li2O **MgO ** Na2O Nb2O5
(ppm)
SiO2 Ta2O5
(ppm)
LOI -
1000
-9.5mm DMS Sinks(+2.80 Sg) 31.3 45.84 18.63 33.75 44.96 18.36 75.22 42.47 7.33 38.09 29.14 40.8 33.11
-3.35mm DMS Sinks (+2.80
Sg)
9.4 11.82 13.24 12.16 14.2 11.03 15.6 14.58 3.27 17.1 8.42 15.52 14.92
Total DMS Sinks(+2.80 Sg) 40.7 57.65 31.86 45.91 59.17 29.39 90.81 57.05 10.6 55.19 37.55 56.32 48.03
-9.5mm DMS Feed: -0.5mm
Fraction
7.9 7 5.27 13.61 6.25 5.14 4.25 7.65 14.88 9.08 6.59 9.28 8.96
-9.5mm DMS Floats (-2.80
Sg): -0.5mm Fraction
11.2 9.93 10.88 14.53 13.22 13.18 3.08 11.98 20.05 13 11.44 10.31 11.19
Total DMS: -0.5mm Fraction 19.1 16.93 16.15 28.15 19.47 18.32 7.33 19.63 34.94 22.08 18.03 19.59 20.15
-3.35mm DMS Floats (-2.80
Sg)
40.1 25.42 51.99 25.95 21.36 52.29 1.86 23.32 54.46 22.73 44.42 24.1 31.82
Total -0.5mm and -3.35mm
Floats(-2.80 Sg)
59.3 42.35 68.14 54.09 40.83 70.61 9.19 42.95 89.4 44.81 62.45 43.68 51.97
Calculated Head 100 100 100 100 100 100 100 100 100 100 100 100 100

Table 1: Seymour Lake Lithium Project (Claim Title 1245661)

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30g charge for fire assay’). In other cases
more explanation may be required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed information.
• Diamond Drill Core was cut in half using a core saw along the core axis.
• Bagging of the half core samples was supervised by a geologist to ensure
there are no numbering mix-ups.
• One tag from a triple tag book was inserted in the core tray in the position
of the sample interval.
• Standard sample intervals averaged 1 m.
• Sampling continued through intervening barren rock (if less than 10m
width) where multiple Spodumene Pegmatite zones were intersected
• The sample preparation and assaying techniques are industry standard and
appropriate for this type of mineralisation.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Diamond wireline core drilling.

The drill core size is CHD 76, core diameter is 43.5 millimetres
• Drill holes were orientated using the Reflex ACT II RD core orientation tool
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and results
assessed.
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
• The sample interval of core was measured and recorded along with a
description and incorporated in the completed drill logs.
• Core within the mineralised zone tended to be uniform and competent so
loss was minimal and samples represent the true nature of the
mineralisation
• No relationship between sample recovery and grade is evident.
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging isqualitative orquantitative in nature. Core(or costean,
• Samples represent half the core width, and are logged in detail to support
appropriate Mineral Resource estimation at a later stage of exploration.
Criteria JORC Code explanation Commentary
channel, etc) photography.
The total length andpercentage of the relevant intersections logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
• Core is split in half using a core saw with the remaining half retained in the
core tray.
• Mineralisation is massive and relatively uniform so assay samples closely
represent the in-situ material.
• Samples were taken on an average of 1 meter intervals and were
determined to be appropriate for the mineralised material being sampled
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack
of bias) andprecision have been established.
• All samples will be analysed by Actlabs in Thunder Bay, Ontario Canada a
SCC (Standards Council of Canada) accredited laboratory.
• The assay technique will be FUS-Na202
• Quality control procedures included the insertion of certified standards
and blanks into the sample stream.
• Results of the Heavy Liquid Separation tests are outlined in Table 3.
verification of
sampling and
assaying
The verification of significant intersections by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
• Drill logs and sample information is documented and stored digitally in
field laptop units and backed up on the Ardiden server.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
• Drill holes were located with handheld WAAS enabled handheld GPS units
set for recording UTM NAD83 Zone 16N projection coordinates.

Drill holes were orientated using the Reflex ACT II RD core orientation
tool
Criteria JORC Code explanation JORC Code explanation Commentary
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
• Core samples of the mineralised zone were taken at approximately 1
meter intervals and deemed appropriate to represent the in situ nature of
the mineralization.
• Further drilling and sampling will be required to adequately establish the
geologic and grade continuity for any Mineral Resource and Ore Reserve
estimationprocedure.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Drill hole locations were designed to intercept the mineralised zone as
close to true width as possible to avoid sampling bias.
Sample
security
The measures taken to ensure sample security. • Samples were secured and delivered to the assay lab under chain of
custody controls by the Caracle Creek Consulting group
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. • No audits or reviews of sampling techniques have been conducted
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a license to operate in the area.

All claims in the Seymour Lake Lithium project are in good standing and
these include claims 1245661 1245648 1245662 1245664 1245646,
which are 100% owned by Stockport Exploration Inc. Ardiden has
exercised option to acquire 100% ownership of the project claims.

Ardiden staked and owns additional claims around the project including
claims:
4270593, 4270594, 4270595, 4270596, 4270597, 4270598, 4279875,
4279876, 4279877, 4279878, 4279879, 4279880, 4279881, 4279882,
4279883, 4279884, 4279885, 4279886, 4279887, 4279888, 4279889,
4279890, 4279891, 4279869, 4279870, 4279871, 4279872, 4279873 and
4279874
Criteria JORC Code explanation Commentary
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties. • Other parties have not appraised the exploration carried out to date
Geology Deposit type, geological setting and style of mineralisation. • Seymour Lake area pegmatites have been classified as belonging to the
Complex-type, Spodumene-subtype. Mineralization is dominated by
spodumene (Li), with lesser tantalite(Ta) hosted in a series of variably
steeplydipping pegmatite dykes and and sills.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
• See Table 1 and Figure 2 for the location of the drill collars and other dill
hole information.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
• With the homogeneity of the mineralised material, sample intervals for the
most part were kept at one metre intervals
Relationship
between
mineralisation
widths and
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect(e.g. ‘down hole length, true width not
• Mineralised zones were determined to be shallow dipping and drill holes
were drilled at -60 degrees so that drilling orientation bias was minimised
Criteria JORC Code explanation Commentary
intercept
lengths
known’).
diagrams Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
• See Figure 2 for the location of the drill hole collars.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
• No comprehensive report has been completed to date to include the latest
Ardiden exploration results.
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
• All meaningful and material data is reported
Further work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Refer to text within the report.