Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARDIDEN LTD Capital/Financing Update 2017

Nov 14, 2017

64307_rns_2017-11-14_1b920328-97da-4530-89c8-cf0abaf99642.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT

==> picture [98 x 100] intentionally omitted <==

15 November 2017

FURTHER OUTSTANDING METALLURGICAL RESULTS FROM SEYMOUR LAKE BULK SAMPLES

Heavy Liquid and Dense Media Separation tests in China on bulk samples from the North Aubry lithium deposit, provide viable support to the potential commerciality of the project

HIGHLIGHTS:

  • Metallurgical testwork program continues to demonstrate robust recoveries on the bulk sample obtained from the North Aubry Lithium deposit at Ardiden’s 100%-owned Seymour Lake Lithium Project in Ontario, Canada.

  • Additional Heavy Liquid Separation (HLS) testwork on the bulk spodumene sample improves previous Yantai results, producing very high-grade lithium concentrate of up to 7.01% Li2O using a liquid density of 2.95g/ml and achieving a very impressive 91.63% recovery rate.

  • Initial Dense Media Separation (DMS) testwork on the spodumene sample produces high-grade lithium concentrate of up to 6.92% Li2O, with a recovery of 81.74%, and a concentrate of 6.05% with recovery of 85.58%

  • Positive results obtained from the bulk sample with coarse spodumene particles of up to 6.0mm and an average head feed grade of 1.29% Li2O.

  • Extensive metallurgical testwork programs continue on the bulk samples.

  • The overall results from this testwork program will assist in the development of a suitable commercial process flow design for the Seymour Lake lithium processing facility.

Diversified minerals explorer and developer Ardiden Limited (ASX: ADV) is pleased to provide a further update on the comprehensive metallurgical testwork program being completed by the Company’s strategic partner, Yantai Jinyuan Mining Machinery Co., Ltd (“Yantai”), on the bulk sample obtained from the North Aubry Lithium Deposit at its 100%-owned Seymour Lake Lithium Project in Ontario, Canada.

Ardiden confirms the Yantai metallurgical test results have provided further confirmation the spodumene crystals from the North Aubry Lithium deposit, liberate extremely well at a very coarse particle size of up to 6.0mm , confirming the previous testwork results. The 500kg spodumene sample had a solid average head grade of 1.29% Li2O (refer Table 1).

Ardiden Limited

Suite 6, 295 Rokeby Road Tel: +61 (0) 8 6555 2950 ASX Code: ADV Subiaco WA 6008 Fax: +61 (0) 8 9382 1222 Shares on Issue: 964M www.ardiden.com.au

==> picture [280 x 212] intentionally omitted <==

----- Start of picture text -----

Spodumene Crystals
----- End of picture text -----

Figure 1. Bulk sample of Spodumene bearing pegmatite obtained from the North Aubry prospect.

The comprehensive testwork on the bulk sample is to develop a commercial process flowsheet design for the Seymour Lake lithium processing facility.

COURSE SPODUMENE PARTICLE SIZES

The bulk sample feed material was collected from the North Aubry deposit using a large rock breaker and excavator. This sample did not have a natural particle size distribution (PSD) resulting from the typical drill and blast and crushing process that would normally occur on site.

Ardiden confirms the large rocks were hand broken and homogenised, then using a number of high controlled staged crushing and sample preparation procedures, Yantai artificially generated a typical feed for processing units. 500kg sample and the top size of 6mm was selected for the first stage of testwork. 6mm is the topical size limit for lithium chemical plant. The crushed head sample size distribution and grades are shown in Table 1 below, with 86.46% of the particle sizes ranging from 0.5mm to 6.0mm and having an average head grade of 1.37% Li2O . There was only 13.54% of the particles that were below the 0.5mm produced with an average head grade of 0.84% Li2O.

==> picture [148 x 203] intentionally omitted <==

==> picture [183 x 203] intentionally omitted <==

Figure 2. Images of Ardiden Director, Dr. Michelle Li inspecting the bulk sample of spodumene material at Yantai, obtained from the North Aubry Lithium deposit.

2

The aim of these metallurgical tests is to create the commercial process flow design which will increase the quantity of coarse material produced during the crushing phase, without the need to use a roller crusher, which in turn reduces the quantity of fine material generated and potentially assisting Ardiden with reduced crushing and processing times, which in turn are likely to reduce the costs of producing a lithium concentrate.

==> picture [198 x 238] intentionally omitted <==

==> picture [187 x 237] intentionally omitted <==

Figure 3. Images of a concentrate producedin 0.5mm to 6mm range (Left), Ardiden Director, Dr. Michelle Li inspecting the sample and discussing the testwork with Prof Gao (Right).

HEAVY LIQUID SEPARATION (HLS) TESTWORK

The HLS float and sink test results have continued to provide further evidence of the high-quality nature of the spodumene material from Seymour Lake.

==> picture [169 x 220] intentionally omitted <==

==> picture [128 x 220] intentionally omitted <==

==> picture [138 x 219] intentionally omitted <==

Figure 4. Images of Ardiden Director, Dr. Michelle Li inspecting Spiral separation test work.

3

The HLS tests on the North Aubry spodumene material shows that, with the heavy liquid density of 2.95g/ml, a very impressive spodumene concentrate of up to 7.04% Li 2 O , with a recovery of 91.63% is produced (Refer to Table 2).

DENSE MEDIA CYCLONE SEPARATION TEST WORK

The Dense Media Cyclone mineral separation tests were conducted on 0.5mm to 6mm size fractions, under a number of different operating conditions (refer to Table 3).

The testwork results indicate that with recovery rate of 85.58%, a lithium concentrate grade of 6.05% Li2O can be achieved . Ardiden notes as shown in Table 3, that should it be needed the lithium concentrate grades can be improved with an increase in feed pressure, but the recovery rate is likely to be decreased.

Different medium densities were also tested, as shown in Table 4. A lithium concentrate grade of 6.92% Li2O with a strong recovery rate of 81.74% was achieved. The most encouraging results occurred when using:

  • Feeding density of 2400kg/m;

  • Ore feeding pressure 0.045Mpa;

  • Ratio of ore and medium at 1:6; and

  • Feed size of 0.5mm to 6.0mm.

The metallurgical test results support that gravity separation is viable method to produce commercial grade lithium concentrate from the Seymour Lake spodumene. Testwork on bulk sample is continuing.

COMMERICAL PRODUCTION POTENTIAL

These latest metallurgical testwork results obtained from Yantai confirm that the North Aubry spodumene quality is world-class and appears to contain only traces amounts of deleterious minerals (announced 12 April 2017). High grade lithium concentrates with excellent recovery rates can also be achieved.

The Company anticipates the development of a robust commercial process flowsheet from the bulk sample testwork program.

Unlike some lithium deposits found in Australia, the North Aubry lithium deposit does not appear to have any issues with iron. Higher content of iron in spodumene will negatively impact the down-stream processing, and hence the commercial value of the lithium concentrate produced.

CONCLUSION

Ardiden considers these latest metallurgical testwork results from Yantai to be extremely encouraging. The HLS having achieved high-grade lithium concentrate of up to 7.01% Li2O , combined with impressive recovery rates of up to 91.63% , the Company looks forward to advancing the development of an optimal process flowsheet to produce a commercial grade lithium concentrate.

Ardiden confirms that as these are still only preliminary testwork results and further work is underway for the development of the process flowsheet as part of the feasibility studies being conducted at the Seymour Lake Lithium Project.

The Company looks forward to providing further updates as they come to hand.

4

==> picture [431 x 304] intentionally omitted <==

Figure 5. Overview showing the Phase 2 drill hole locations (Red) and the pegmatite exposures at North Aubry prospect, with interpreted extensions. Highlighted in the blue circle is approximate sample location for the bulk sample, which was taken at 5585185N, 3969000E.

5

Table 1. Yantai fraction analysis of the spodumene material obtained from the North Aubry Lithium deposit.

Product fraction
(mm)
Sample weight
(kg)
Productivity(%) Grade Li2O(%)
6-0.5 434.6 86.46 1.37
-0.5 68.1 13.54 0.84
Raw ore 502.7 100.00 1.29

Table 2. Heavy Liquid Float-and-Sink test of the Bulk Sample completed by Yantai.

Heavy-liquid density
(g/ml)
2.95
2.85
2.75
2.65
Raw ore
Productivity(%) Grade Li2O(%) (%)
RecoveryLi2O
17.51 7.04 91.63
0.51 3.11 1.24
0.51 1.06 0.42
81.47 0.03 1.92
100.00 1.28 100.00

Table 3. The mineral test result under different feed pressure

Test conditions Product name Productiv
ity
(%)
Grade
Li2O(%)
Recovery Rate
Li2O(%)
Pressure:0.035MPa
Flow:10.5 m3/h
Second stage under flow
density:
ρ=2970 kg/m3
Spodumene
concentrate
17.15 6.05 85.58
Spodumene
middlings
64.35 0.24 12.74
Spodumene
tailings
18.50 0.11 1.68
Raw ore 100.00 1.21 100.00
Pressure:0.045MPa
Flow:11.5 m3/h
Second stage underflow
density:
ρ=3010 kg/m3
Concentrate
Spodumene
concentrate
14.25 6.74 82.45
Spodumene
middlings
62.14 0.31 16.53
Spodumene
tailings
23.61 0.05 1.02
Raw ore 100.00 1.16 100.00
Pressure:0.055MPa
flow:12.7 m3/h
Second stage underflow
density:
ρ=3090 kg/m3
Spodumene
concentrate
12.70 6.88 74.30
Spodumene
middlings
55.84 0.53 25.17
Spodumene
tailings
31.46 0.02 0.53
Raw ore 100.00 1.18 100.00

6

Table 4. Different feed media density test result

Test condition Product name Productivi
ty
(%)
Grade(%) Grade(%) Recovery
Li2O(%)
Li2O Fe
Feed density :1800kg/m3
feed pressure:0.045MPa
Second
stage
underflow
density : 3090kg/m3
Flow:12.33m3/h
Spodumene
concentrate
11.78 6.89 0.40 67.64
Spodumene
middlings
41.34 0.86 29.83
Spodumene
tailings
46.88 0.07 2.73
Raw ore 100.00 1.20 100.00
Feed density:2000kg/m3
Feed pressure:0.045MPa
Second
stage
underflow
density: 3050kg/m3
Flow:11.80m3/h
Spodumene
concentrate
13.06 6.93 0.43 75.11
Spodumene
middlings
32.26 0.76 20.35
Spodumene
tailings
54.68 0.10 4.54
Raw ore 100.00 1.21 100.00
Feed density:2200kg/m3
Feed pressure:0.045MPa
Second
stage
underflow
density: 3060kg/m3
Flow:11.65m3/h
Spodumene
concentrate
14.82 6.42 0.39 78.30
Spodumene
middlings
31.03 0.73 23.35
Spodumene
tailings
54.15 0.07 2.72
Raw ore 100.00 1.22 100.00
Feed density:2400kg/m3
Feed pressure:0.045MPa
Second
stage
underflow
density: 3070kg/m3
Flow:11.70m3/h
Spodumene 81.74
concentrate 14.58 6.92 0.48
Spodumene
middlings
13.35 1.31 14.17
Spodumene
tailings
72.07 0.07 4.09
Raw ore 100.00 1.23 100.00

7

ENDS

For further information:

Investors : Media : Brad Boyle Nicholas Read Ardiden Ltd Read Corporate Tel: +61 (0) 8 6555 2950 Mobile: 0419 929 046

About Ardiden Ltd

Ardiden Limited (ASX: ADV) is an emerging international diversified exploration and development company possessing a mature multi-element asset portfolio, with a near term development pipeline, focused quality projects located in the established mining jurisdiction of Ontario, Canada.

The 100%-owned Seymour Lake Lithium Project comprises 7,019 Ha of mining claims and has over 4,000m of historic drilling. Mineralisation is hosted in extensive outcropping spodumene-bearing pegmatite structures with widths up to 26.13m and grades of up to 6.0% Li2O. These high-grade pegmatite structures have been defined over a 5km strike length.

The 100%-owned Wisa Lake Lithium project is located 80km east of Fort Frances, in Ontario, Canada and only 8km north of the Minnesota/US border. The property is connected to Highway 11 (Trans-Canada), which is located 65km north via an all-weather road that crosses the centre of the project. The Wisa Lake Lithium Project consists of five claims (1,200 hectares) and covers the historical drilling location of the North Zone. Ardiden is aiming to commence a limited drill program to drill test and verify the historical lithium results.

The Pickle Lake Gold Properties (under option to acquire 100%) are located within the prolific gold-producing MeenDempster Greenstone Belt of the Uchi Geological Sub-province of the Canadian Shield, in close proximity to several of the Company’s existing projects and to the regional mining centre of Thunder Bay. The Properties consists of four separate gold properties offering both advanced development opportunities and early stage exploration. Over 25,000m of historical diamond drilling completed across the Pickle Lake Gold Properties, confirming the potential for multiple extensive gold mineralised zones at both Dorothy-Dobie Lake and Kasagiminnis Lake, with gold mineralisation remaining open along strike and at depth.

The 100%-owned Root Lake Lithium Project is located in Ontario, Canada. The project comprises 1,013 Ha of mining claims and has over 10,000m of historic drilling. Mineralisation is hosted in extensive outcropping spodumene-bearing pegmatite structures with widths up to 19m and grades of up to 5.10% Li2O. In addition, tantalum grades of up to 380 ppm were intersected.

The 100%-owned Root Bay lithium project is strategically located approximately 5km to the east of the recently acquired Root Lake Lithium Project and consists of three claim areas, totalling 720 hectares. The project was staked by Ardiden as part of its regional exploration focus in and around the Root Bay spodumene-bearing pegmatite. Initial observations of the exposed pegmatite are characterized by coarse white albite, grey quartz and pale grey-green spodumene crystals up to 10cm long.

The 100%-owned Manitouwadge Flake Graphite Project covers an area 5,300 Ha and has a 20km strike length of EM anomalies with graphite prospectivity. Previous preliminary metallurgical test work indicated that up to 80% of the graphite at Manitouwadge is high value jumbo or large flake graphite. Test-work also indicated that simple, gravity and flotation beneficiation can produce graphite purity levels of up to 96.8% for jumbo flake and 96.8% for large flake. With the proven caustic bake process, ultra-high purity (>99.95%) graphite can be produced. The graphite can also be processed into high value expandable graphite, high quality graphene and graphene oxide.

The Bold Properties project (under option to acquire 100%) is located approximately 50km north-east of the town of Mine Centre in Ontario, Canada. The property is connected to Highway 11 (Trans-Canada), which is located 25km south via an all-weather road. The Bold Property Project consists of four claims (1,024 hectares) and covers a number of anomalous sulphide zones. In 1992, Hexagon Gold (Ontario) Ltd. completed a total of 17 drill holes in multiple locations

8

on and around the Bold Property Project at various depths of up to 428m down-hole. The nine grab samples that were collected by Hexagon in 1992 returned encouraging grades of up to 0.33% cobalt, 5.54% copper and 0.73% nickel, confirming the significant exploration potential.

All projects located in an established mining province, with good access to infrastructure (road, rail, power, phone and port facilitates) and local contractors and suppliers.

Competent Person’s Statement

The information in this report that relates to metallurgical results on lithium recovery from drill core obtained from the Seymour Lake Lithium project is based on, and fairly represents, information and supporting documentation prepared by Ms Karen Lloyd, who is a Fellow of the Australasian Institute of Mining & Metallurgy. Ms Lloyd is not a full-time employee of the Company Ms Lloyd is employed as a Consultant from Jorvik Resources Pty Ltd. Ms Lloyd has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources and Ore Reserves (the JORC Code)’. Ms Lloyd consents to the inclusion in this report the exploration results and the supporting information in the form and context as it appears.

.

Forward Looking Statement

This announcement may contain some references to forecasts, estimates, assumptions and other forward-looking statements. Although the company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions, it can give no assurance that they will be achieved. They may be affected by a variety of variables and changes in underlying assumptions that are subject to risk factors associated with the nature of the business, which could cause actual results to differ materially from those expressed herein. All references to dollars ($) and cents in this presentation are to Australian currency, unless otherwise stated. Investors should make and rely upon their own enquires and assessments before deciding to acquire or deal in the Company’s securities.

9

Table 2: Seymour Lake Lithium Project (Claim Title 1245661)

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30g charge for fire assay’). In other cases
more explanation may be required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed information.
• A bulk sample was taken using a hydraulic rockbreaker and excavator to
load several tonnes of material into a rock truck for shipment and export
to Canada for process flow test work
• The bulk sample will be utilised by Yantai, a potential project partner, to
assess optimise process flow, recovery techniques and other metallurgical
factors as part of their due diligence into the project.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• No drilling was undertaken
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and results
assessed.
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
• No drilling was undertaken
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
No logging was undertaken

10

Criteria JORC Code explanation Commentary
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length andpercentage of the relevant intersections logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
• No sampling was undertaken
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack
of bias) andprecision have been established.
• Laboratory testing is being undertaken in China by Yantai, a potential
project partner
• Preliminary metallurgical testwork results are reported in the main body of
the text and in Table 1
verification of
sampling and
assaying
The verification of significant intersections by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
• No sampling was undertaken
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
• Figure 4 presents the location of the bulk sample excavation, which was
recorded using UTM NAD83 Zone 16N projection coordinates.
• A DGPS handheld unit was used to record the location and this method is
deemed appropriate for use.

11

Criteria JORC Code explanation Commentary
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
• No Exploration results are reported
• No Mineral Resource estimate is reported
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• No grab sampling, channel sampling, trench sampling or drill core sampling
was undertaken
• A bulk sample was taken for metallurgical testwork
Sample
security
The measures taken to ensure sample security. • Samples were secured and delivered to Chin under chain of custody
controls by Gardewine transport, and Global Pack and Send via road
shipment to Winnipegthen Vancouver and byslow boat to China
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. • No audits or reviews of the bulk excavation have been conducted

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a license to operate in the area.

All claims in the Seymour Lake Lithium project are in good standing and
claims 1245661 1245648 1245662 1245664 1245646, 4270593, 4270594,
4270595, 4270596, 4270597, 4270598, 4279875, 4279876, 4279877,
4279878, 4279879, 4279880, 4279881, 4279882, 4279883, 4279884,
4279885, 4279886, 4279887, 4279888, 4279889, 4279890, 4279891,
4279869,4279870,4279871,4279872,4279873 and 4279874.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties. • Other parties have not appraised the exploration carried out to date
Geology Deposit type, geological setting and style of mineralisation. • Seymour Lake area pegmatites have been classified as belonging to the

12

Criteria JORC Code explanation Commentary
Complex-type, Spodumene-subtype. Mineralization is dominated by
spodumene (Li), with lesser tantalite(Ta) hosted in a series of variably
steeplydipping pegmatite dykes and and sills.
Drill hole
Information
A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the
drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the information
is not Material and this exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain why this is the case.
• No drilling is reported
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation
should be stated and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• No exploration results are reported
• No drilling is reported
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should be
a clear statement to this effect (e.g. ‘down hole length, true width not known’).
• No drilling is reported
diagrams Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
• See Figure 4 for the location of the bulk sample excavation

13

Criteria JORC Code explanation Commentary
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
• No comprehensive report has been completed to date to include the latest
Ardiden exploration results.
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminating substances.
• All meaningful and material data is reported
Further work The nature and scale of planned further work (e.g. tests for lateral extensions
or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Refer to text within the report.

14