ARDEA RESOURCES LIMITED Investor Presentation 2022

Aug 1, 2022

64421_rns_2022-08-01_55b546ef-33a3-408c-9142-beb56cb5a35a.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [720 x 39] intentionally omitted <==

==> picture [720 x 172] intentionally omitted <==

Diggers & Dealers Mining Forum 3:30pm AWST, 2 August 2022 Ardea Resources Limited - Kalgoorlie Nickel Project Globally significant sustainable and ethical Critical Minerals

==> picture [148 x 38] intentionally omitted <==

==> picture [145 x 37] intentionally omitted <==

Disclaimer

Important notice

This presentation contains general information only and is, or is based upon, information which has been released to ASX or is contained in the Ardea Resources Limited (Ardea or the Company) prospectus dated 9 November 2016 (including supplementary prospectuses dated 18 November 2016 and 6 January 2017), the Goongarrie Nickel Cobalt Project Pre-Feasibility Study (dated 28 March 2018) the Goongarrie Expansion Study (24 July 2018), Goongarrie Pilot Plant trial produces battery grade crystals (31 October 2018), Goongarrie Nickel Cobalt Project Update (8 April 2019), Ardea Quarterly Operations Report, for the quarter ended 31 March 2020 (9 April 2020), Quarterly Activities Report - June 2020 (23 July 2020), Nickel Sulphide Targets within the Ardea Tenement Portfolio including KNP (30 September 2020), Quarterly Activities Report - September 2020 (27 October 2020), Quarterly Activities Report - December 2020 (21 January 2021), GNCP High Grade Resource - 60 million tonnes at 1.0% nickel (15 February 2021), Quarterly Activities Report - March 2021 (21 April 2021), Basal contact nickel sulphide intersected at Ardea’s Emu Lake (27 April 2021), CSIRO/Ardea research at Goongarrie BTZ – insights for nickel sulphide and gold targets (27 May 2021), Kalgoorlie Nickel Project – Feasibility Study Underway (31 May 2021), Semi-massive nickel sulphide intercept at Emu Lake (10 June 2021), Highway Nickel Deposit - Mineral Resource Estimate (16 June 2021), Nickel Sulphide Exploration Update – Emu Lake (13 July 2021), Ardea Quarterly Operations Report, for the quarter ended 30 June 2021 (27 July 2021), Ardea Annual Report 2021 (24 September 2021), FBICRC signs contract for $18M flagship Cathode Precursor Production Pilot Plant (22 October 2021), Quarterly Activities Report - September 2021 (27 October 2021), Goongarrie Hub Feasibility Study Update (15 November 2021), Emu Lake Discovery (3 December 2021, 14 January 2022, 7 February 2022), Goongarrie Hub Feasibility Study Update (25 January 2022) Quarterly Activities Report – December 2021 (28 January 2022), Successful A$21.5 Million Capital Raising (22 February 2022), High-grade Nickel-Cobalt Confirmed at Kalpini with Scandium and Rare Earth Elements (14 March 2022), Kalgoorlie Nickel Project Recognition on All Tiers of Australian Government (21 March 2022), Quarterly Activities Report – March 2022 (28 April 2022) Confirmation of High-Grade Nickel-Cobalt from Goongarrie South Metallurgical Drilling (16 May 2022), Kalgoorlie Nickel Project Feasibility Study Update (14 June 2022) and Quarterly Activities Report – June 2022 (19 July 2022).

This presentation is not an invitation, offer or recommendation (express or implied) to subscribe for, or apply for the purchase of, or to take any other action in respect of securities of any entity described herein and is not a prospectus, product disclosure statement or disclosure document for the purposes of the Corporations Act 2001 (Cth) and has not been lodged with ASIC. None of Ardea Resources Limited (Ardea or the Company) or its representatives are providing or offering investment advice or services by making this presentation.

Neither Ardea nor its representatives make any representation, warranty or guarantee of any kind, express or implied, as to the accuracy, completeness or reasonableness of the information contained herein or any other written or oral communication transmitted or made available to any person receiving this presentation. To the maximum extent permitted by law, Ardea and representatives expressly disclaim any and all liability based on or arising from, in whole or in part, such information, or any errors or omissions.

This presentation contains forward-looking statements regarding the Company’s resources, intentions and future business. These statements reflect current information, expectations, intentions and strategies regarding the future, and are subject to certain risks and uncertainties. Should one or more of these risks or uncertainties materialise, or should any of the underlying assumptions prove incorrect, actual results may vary from the expectations, intentions and strategies described in this presentation. Investors are cautioned not to place undue reliance on forward-looking statements, which speak only as of the date they are made. Other than where required by law, the Company is under no obligation to revise any forward looking statement to reflect events or circumstances after the date of this presentation or to reflect the occurrence of unanticipated events.

The Goongarrie Project has completed the Pre-Feasibility Study phase and has commenced programs that are part of the Definitive Feasibility Study. Though reasonable care has been taken to ensure that the facts are accurate and/or that the opinions expressed are fair and reasonable, no reliance can be placed for any purpose whatsoever on the information contained in this document or on its completeness. Actual results and developments of projects and the market development may differ materially from those expressed or implied by these forward looking statements depending on a variety of factors. A key conclusion of the Pre-Feasibility Study and Expansion Study, which is based on forward looking statements, is that the Goongarrie Project is considered to have positive economic potential.

No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

==> picture [148 x 38] intentionally omitted <==

2

==> picture [145 x 37] intentionally omitted <==

World Class Kalgoorlie Nickel Project Mineral Resource

5.9Mt contained nickel, 384kt contained cobalt plus Sc & other Critical Minerals*

Includes:

Goongarrie Hub High grade component : 784kt contained nickel, 54kt contained cobalt

Enough for >147,000,000 Electric Vehicles ^

  • ^ 12/07/2021 UBS – Battery Material Value Chain – based on 40kg Ni powering typical NCM811 EV

Kalgoorlie Nickel Project Highlights

100% Ardea

Proven flowsheet

Premier location

For jurisdiction, infrastructure and technical expertise

High level of confidence and control behind resource

MHP production with industry leading low carbon emissions

  • Premium goethite ore (excellent comminution, less abrasive, low consumable consumption, lower maintenance)

  • WA is the premier global destination for development of minerals operations

  • The KNP database contains 19,308 drill holes with 454,730 samples and 512,167 sample assays with QAQC

  • Well established health, safety and environmental policies

    • MHP or PCAM product to meet Strategic Partner requirements
  • Detailed geological logging has resulted in a robust and repeatable model

  • Over 125 years of continuous mining with strong stake holder support in a well credentialled jurisdiction

  • FBICRC membership

  • All KNP Goongarrie Hub resources are on Granted Mining Leases with a Native Title agreement in place

  • Ni:Co:Mn ratio well suited to NCM811 battery technology

  • Access to skilled professionals in an infrastructure rich region

    • Additional Critical Mineral byproducts (current bench-scale metallurgy)
  • Ardea has full custody of all aspects of the KNP development

  • Semi-arid Great Western

  • Woodlands environment, and historic mining jurisdiction conducive to best practice safe tailings management/rehabilitation

  • Sustainable and ethical supply of nickel and Critical Minerals for a low carbon future

  • 100% off-take still available linked to project development funding

==> picture [130 x 105] intentionally omitted <==

==> picture [145 x 77] intentionally omitted <==

==> picture [127 x 72] intentionally omitted <==

Advancing

KNP gains national recognition to fast track permitting & funding

  • Awarded Major Project Status by Australian Federal Government.

  • Streamlined support, approvals, and funding options

  • KNP is ranked #1 in the WA Geological Survey Nickel Resource table (>100kt Ni) (Feb22)

  • Metallurgical test work in progress with encouraging AL feed material studies

  • DFS work streams underway to deliver a world leading nickelcobalt-scandium producer

  • Committed to nickel sulphide exploration and discovery

success

3

  • See Appendix for resource breakdown and ASX release 16 June 2021

==> picture [145 x 37] intentionally omitted <==

Ardea Resources Corporate Overview

Board

Executive Management Team

Mathew Longworth Non-Executive Chair Andrew Penkethman Managing Director & CEO Ian Buchhorn Executive Director

Sam Middlemas Company Secretary Rebecca Moylan CFO Matthew McCarthy GM - Exploration Alex Mukherji GM - Land Access & Compliance Mike Miller GM - Technical Services

Listed on ASX (ARL)

Shares on Issue 169,737,772 Performance Rights 4,542,000 Options 4,000,000 Share Price (29 July 2022) $1.25 52 week high / low $2.05 / $0.43 Cash (as at 30 June 2022) $22 million Market Capitalisation $212 million Board and Management ~11% equity Top 40 Shareholders ~64% equity

==> picture [480 x 198] intentionally omitted <==

4

==> picture [145 x 37] intentionally omitted <==

Nickel use, rapidly growing demand and declining stockpiles

==> picture [195 x 193] intentionally omitted <==

==> picture [150 x 148] intentionally omitted <==

==> picture [473 x 293] intentionally omitted <==

==> picture [148 x 38] intentionally omitted <==

The future is nickel rich batteries…

5

==> picture [145 x 37] intentionally omitted <==

Lithium-ion battery sector leads nickel demand growth

==> picture [346 x 343] intentionally omitted <==

Lithium-ion battery supply chain

  • China dominates the lithium-ion battery ( LIB ) supply chain through long term strategic planning

  • The rest of the world is rapidly trying to catch up

  • Billions of dollars are being invested in LIB plants, but where will the battery mineral supply come from?

  • The supply response must include all nickel resources

  • Especially those that can provide sustainable and ethical supply = Australia

  • Especially those with supportive Government and communities = Western Australia

  • Large scale deposits that can guarantee long term supply

  • = Kalgoorlie Nickel Project

==> picture [148 x 38] intentionally omitted <==

6

==> picture [145 x 37] intentionally omitted <==

World’s best operating jurisdiction

==> picture [443 x 229] intentionally omitted <==

  • All Projects located in Western Australia (WA)

  • 3,400km[2] ground position in Eastern Goldfields

  • City of Kalgoorlie-Boulder is the prime resource development and operating destination within WA

  • Very strong mining support from Local Government and Community

  • Multitude of world-class mining operations serviced from the City

  • Ardea maintains a local operations office and active stake holder engagement

  • Road and rail network pass through granted Goongarrie Hub mining leases with a native title agreement in place

  • Direct infrastructure links to key Kwinana battery hub and Southern Ports - Esperance

==> picture [148 x 38] intentionally omitted <==

7

==> picture [145 x 37] intentionally omitted <==

Australia’s largest nickel-cobalt resource is the KNP

==> picture [291 x 359] intentionally omitted <==

  • Kalgoorlie Nickel Project ( KNP ) tops the table in recent Geological Survey of Western Australia publication February 2022

  • KNP is the largest nickel-cobalt resource in Australia and one of the largest in the world

  • All Goongarrie Hub resources located on granted mining leases fast tracking path to production

  • Awarded Major Project Status by Australian Federal Government in March 2022 opens up streamlined access to approvals and funding

==> picture [148 x 38] intentionally omitted <==

8

==> picture [145 x 37] intentionally omitted <==

Globally Significant Resource

==> picture [262 x 344] intentionally omitted <==

  • Globally significant Mineral Resource 5.9Mt contained nickel & 348kt contained cobalt  Sustainable & ethical supply of nickel & Critical Minerals for low carbon future

Goongarrie Hub - High grade component - 78Mt at 1.0% Ni and 0.069% Co *

784kt contained Nickel, 54kt contained Cobalt

  • Kalgoorlie Nickel Project ( KNP ) Feasibility Study ( FS ) scope covering Goongarrie Hub including satellite pits at Highway and Siberia North

  • Two 1.5 Mtpa High Pressure Acid Leach ( HPAL ) trains, supplemented with a 0.5Mtpa Atmospheric Leach ( AL ) processing operation ( 3.5Mtpa ) focused on treating +1.0% Ni and 0.07% Co and subject to a reserve update as part of the in-progress feasibility study (FS)

  • • FS evaluating the potential revenue contributions from mineralised neutraliser, scandium and other Critical Minerals, including Rare Earth Elements ( REE ) throughout the KNP

==> picture [148 x 38] intentionally omitted <==

  • See Appendix for resource breakdown and ASX release 16 June 2021

9

==> picture [145 x 37] intentionally omitted <==

Enhanced flow sheet

  • Premium goethite ore (excellent comminution, less abrasive, lower maintenance)

  • MHP sale product during ramp up, in high demand and is the new Class 1 nickel

    • Evaluating PCAM production through FBICRC membership
  • Additional Critical Mineral by-products (current bench-scale metallurgy)

==> picture [102 x 101] intentionally omitted <==

==> picture [100 x 101] intentionally omitted <==

==> picture [100 x 101] intentionally omitted <==

==> picture [26 x 28] intentionally omitted <==

==> picture [26 x 28] intentionally omitted <==

Process Metallurgy

  • High ore grade + slurry density = Optimised Capex & Opex (best in Australia*)

  • Proven HPAL Ni & Co Extraction = Efficient, low energy intensity, proven “off-the-shelf”

  • Atmospheric Leach (AL) viable Ni extraction demonstrated in Vale Inco 2009 PFS

  • AL = Stability for acid plant (energy generation), maximises resource utilisation

  • Water Options = Using pit drainage + licensed borefields

  • MHP = Known technology & chosen feedstock for lithium-ion batteries

  • PCAM optionality for additional value add within Australia = Supply chain diversity

  • Potential for significant by-product credits from Sc, in addition to base case Ni-Co

  • 10 * See Appendix, KNP Superior HPAL Intensity slide, for data.

==> picture [269 x 397] intentionally omitted <==

==> picture [145 x 37] intentionally omitted <==

Proven technology

Coral Bay HPAL Example

Ramp up rates

  • HPAL chemistry is well known and has been applied successfully since the 1960s and now up to 5[th] generation technology

  • Single reactor

  • Recovery of waste heat = Energy savings

  • Horizontal autoclave at Coral Bay built Train 1: 2005, Train 2: 2008

  • At Coral Bay name plate production capacity exceeded in first year of production and thereafter

  • Goongarrie Hub flow sheet and materials of construction all successfully utilised at existing operations

==> picture [172 x 174] intentionally omitted <==

Coral Bay Ramp Up

==> picture [335 x 135] intentionally omitted <==

----- Start of picture text -----

1.4
1.2
1
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3
Production Year
Ni Prodn, % of Design
----- End of picture text -----

==> picture [83 x 7] intentionally omitted <==

----- Start of picture text -----

Train 1 Train 2
----- End of picture text -----

==> picture [148 x 38] intentionally omitted <==

The information on this slide is based on the Coral Bay HPAL process facility in the Philippines that is not an asset of Ardea, but is shown as an example of the successful implementation of HPAL technology.

11

==> picture [145 x 37] intentionally omitted <==

KNP Development Plan

Experienced team working with quality partners

Indicative Pathway to Production

  • Completion of DFS linked to Strategic Partner process, so that partner can have input into project scale and end product specification

  • Previous $35M Vale Inco PFS has already addressed multiple FS work streams, allows expedited DFS

  • Industry leading HPAL and AL practitioner, Mike Miller (previously technical management at the operating Ravensthorpe HPAL operation) leading KNP DFS

  • Gap Analysis Study by independent international engineering company, on Ardea’s Goongarrie Hub nickel-cobalt project completed and supports Ardea’s increased project scale of 3.5Mtpa for the DFS

  • Feed grade is 1% Ni and 0.07% Co, reflecting the 0.8% Ni cut-off resource*

  • Testwork underway at ALS metallurgical laboratory to confirm AL addition to flowsheet and mineralised neutraliser sourced from Goongarrie open pit mining

  • Independent logistics study has confirmed autoclave transport route through the Port of Esperance and via road to the Goongarrie plant site

  • Two Goongarrie groundwater extraction licences have been granted

  • Accelerated engagement with key stake holders, such as the City of KalgoorlieBoulder, Shire of Menzies and Southern Ports Esperance

==> picture [337 x 264] intentionally omitted <==

==> picture [148 x 38] intentionally omitted <==

12 * See Appendix for resource breakdown and ASX release 16 June 2021

==> picture [145 x 37] intentionally omitted <==

Optimum Location - sustainable and ethical mineral supply

  • Large contiguous KNP land holding allows unimpeded site planning to minimise ultimate site footprint

  • Open Mediterranean woodland highly amenable to low-impact development and rehabilitation

  • Arid environment, facilitates well managed tailings disposal

  • Rehabilitation procedures well established over last four decades in Kalgoorlie open pit gold sector

  • No ocean submarine tailings disposal

  • No valley-fill tailings dams

  • No active seismicity issues

  • No tropical high rainfall

  • No conflicting land use demands  KNP purely a mining jurisdiction

==> picture [425 x 222] intentionally omitted <==

  • No competing land use, such as food production activity (as in Eastern Australia laterite districts)

  • Low carbon future

  • KNP HPAL plant steam, heating and power generated off grid through burning elemental sulphur

  • KNP HPAL neutraliser includes Ni-enriched non-carbonate options

  • Waste landform regeneration facilitates significant agroforestry throughout the KNP

==> picture [148 x 38] intentionally omitted <==

13

==> picture [145 x 37] intentionally omitted <==

KNP sustainable and ethical production

==> picture [618 x 341] intentionally omitted <==

14

==> picture [145 x 37] intentionally omitted <==

Tailings Storage in pit disposal and progressive rehabilitation

==> picture [460 x 329] intentionally omitted <==

----- Start of picture text -----

Local neutraliser & imported lime
for tailings neutralisation
Neutralised tailings aggregate pumped
into exhausted open pit void
Waste material from previous mining can be blended in
Example Pamela Jean Pit – Pit 3 in proposed mine sequence
Fill Void
Multiple shallow pits mined in sequence, provide an ideal Stockpiled top soil retained from mining
platform for sequential in pit tailings disposal.
This allows progressive rehabilitation to
occur concurrent with
sustainable nickel-cobalt production.
15 Ripping and planting
----- End of picture text -----

==> picture [228 x 213] intentionally omitted <==

----- Start of picture text -----

Return to natural land surface and vegetation
of the Great Western Woodland
----- End of picture text -----

==> picture [24 x 24] intentionally omitted <==

==> picture [148 x 38] intentionally omitted <==

==> picture [145 x 37] intentionally omitted <==

Nickel Sulphide Upside

Nickel Sulphide discovery at Emu Lake

  • 70km north-east of Kalgoorlie on a granted mining lease within KNP Kalpini Hub.

  • Exploration at Binti South Prospect confirms high-grade massive nickel-copper-PGE sulphide discovery on the Western Ultramafic (WU):

  • AELD0003: 2.72m at 5.42% Ni and 0.85% Cu from 391.04m incl 1.23m at 8.22% Ni and 0.56% Cu from 391.04m*.

  • AELD0002: 4.8m at 1.44% Ni and 0.16% Cu from 365.9m incl 1.10m at 4.78% Ni and 0.16% Cu from 366.9m.

  • Discovery confirmed on an intact felsic footwall demonstrating thermal erosion textures analogous with the Silver Swan nickel deposit 35km west.

  • Historic exploration at the Binti Gossan Prospect located 1km northwest along strike from Binti South within an intact felsic footwall contact of the Central Ultramafic (CU):

  • ELD015: 2.0m at 6.08% Ni and 1.82% Cu from 336.0m incl 0.6m at 18.82% Ni and 5.57% Cu from 336.3m^

  • Multiple flow surfaces identified and all prospective for hosting nickel sulphide .

  • 20km of fertile komatiite strike at Emu Lake .

  • Significant scope to extend the Binti Gossan and Binti South discoveries and make additional nickel sulphide discoveries .

  • The discovery of massive nickel-copper-PGE sulphides in the highly underexplored Kurnalpi terrane is very significant

==> picture [282 x 359] intentionally omitted <==

16

*ARL ASX 14 Jan 2022. ^ HRR ASX 26 Nov 2013

==> picture [145 x 37] intentionally omitted <==

Emu Lake Nickel Sulphide Discovery

==> picture [374 x 320] intentionally omitted <==

==> picture [299 x 74] intentionally omitted <==

Geological model confirmed

Extensive exploration underway, including:

  • Drilling and DHEM and interpretation of results for

  • Binti South Prospect

  • Binti Gossan Prospect

  • 3D geological model to locate where the Western Ultramafic is untested

  • Developing technical ranking system to generate pipeline of priority NiS targets over 20km strike

An emerging nickel sulphide camp

==> picture [148 x 38] intentionally omitted <==

17

==> picture [145 x 37] intentionally omitted <==

fundamentals are … Why invest in Ardea - The compelling

Market strength

Premier location

Nickel resource Proven flowsheet Successful local team

KNP to fill gap between growing nickel demand and diminishing supply

==> picture [117 x 71] intentionally omitted <==

For leading ESG standards, jurisdiction, infrastructure and technical expertise

==> picture [135 x 72] intentionally omitted <==

5.9Mt contained nickel, 384kt contained cobalt plus Sc and other Critical Minerals*

Will continue to grow with exploration underway

==> picture [109 x 74] intentionally omitted <==

Desirable MHP production with PCAM optionality and industry leading low carbon emissions

==> picture [128 x 104] intentionally omitted <==

All Board members have lived and worked in the Eastern Goldfields of WA All staff based in WA

Board and management skill set covers technical and corporate From discovery through to project development and operations

~40kg of Nickel[^] Powering the typical NCM811 Electric Vehicle (EV)

5.9Mt

Enough for >147,000,000 Electric Vehicles

contained Nickel in the KNP*

^ 12/07/2021 UBS – Battery Material Value Chain * See Appendix for resource breakdown and ASX release 16 June 2021

18

==> picture [145 x 37] intentionally omitted <==

For further information

Andrew Penkethman, Managing Director & CEO +61 8 6244 5136 [email protected] ardearesources.com.au

==> picture [223 x 162] intentionally omitted <==

19

==> picture [720 x 39] intentionally omitted <==

==> picture [720 x 172] intentionally omitted <==

Appendices

Ardea Resources Limited - Kalgoorlie Nickel Project Globally significant sustainable and ethical Critical Minerals

==> picture [148 x 38] intentionally omitted <==

==> picture [145 x 37] intentionally omitted <==

Strong ESG – Environment, Social and Governance

Ethically Sustainable

Socially Minded

Strong Governance

  • Project designs and work practices based on ensuring the Company minimises green-house gas emission to demonstrate responsible sourcing of nickel and Critical Mineral supply

  • A low carbon future is possible through proven KNP HPAL and AL flowsheet

  • Waste landforms will benefit from regeneration agroforestry at KNP

  • Semi-arid environment, and historic mining jurisdiction conducive to best practice safe tailings management

  • Strong support from the communities in which we operate and maintain a local office

  • Native Title Agreement in place for development of the KNP

  • Ardea has initiated an education fund to assist children in the Eastern Goldfields of WA

  • The Ardea team comprises over 31% female participation, all in key management roles

  • Ardea advocates fair representation for all community groups

==> picture [241 x 119] intentionally omitted <==

  • Values are based on respect, integrity, empathy, inclusion and teamwork

  • Employer of choice

  • Environmental Social and Governance (ESG) considerations are at the forefront of the way in which Ardea does business

  • Ardea’s Board continue to strengthen and document policies to underline ESG

  • ESG compliance inherent in flowsheet and project development

==> picture [148 x 38] intentionally omitted <==

21

==> picture [145 x 37] intentionally omitted <==

Experienced team working with quality partners

==> picture [321 x 84] intentionally omitted <==

Board and Executive Management Personnel

  • Balanced financial and corporate experience, strong technical expertise in exploration, discovery, project development, metallurgical optimisation, compliance and operational management

Mathew Longworth Non-Executive Chair

33 years’ experience across exploration, project evaluation/development, operations and corporate management. Invaluable experience on the key Ardea exploration and development projects, being the KNP nickelcobalt-scandium deposits.

Andrew Penkethman Managing Director, CEO

Resources sector executive with over 27 years’ experience, including project evaluation, exploration, discovery, resource development, feasibility study management, permitting, stakeholder engagement, mine development and operations management. Extensive ASX, TSX and AIM experience.

Ian Buchhorn Executive Director

Mineral Economist and Geologist with over 40 years’ experience. Lived and worked in the Eastern Goldfields for over 20 years undertaking exploration, project evaluation and development. Operated as Registered Mine Manager in the Kalgoorlie Goldfields, City Councilor 1992 – 2006.

Sam Middlemas Company Secretary

Chartered Accountant (CA) with more than 30 years’ experience providing financial and corporate secretarial services.

Rebecca Moylan CFO

Experienced CFO with expertise in financial and corporate management, accounting, project financing and contract negotiation including 12 years in the mining industry. This has included positions as CFO and Company Secretary of several ASX-listed companies.

Matthew McCarthy General Manager - Exploration

Geologist with over 20 years experience in minerals exploration and business development in all stages of the exploration process across several commodities, with a focus on nickel exploration. Has been involved in major greenfields and brownfields nickel sulphide and gold discoveries, and completed resource definition programs, scoping and feasibility studies.

Alex Mukherji General Manager - Land Access & Compliance

Over 25 years mining industry experience including compliance reporting, drafting and negotiating Native Title, land access, commercial agreements with assessment of business development opportunities. Corporate representation with stakeholders, including State and Commonwealth agencies.

Mike Miller General Manager - Technical Services

Process Engineer with over 30 years’ experience in hydrometallurgical operations with a primary focus on nickel-cobalt production. Extensive study management experience with leading engineering firms.

==> picture [148 x 38] intentionally omitted <==

22

==> picture [145 x 37] intentionally omitted <==

KNP Superior HPAL Intensity

  • Good ore grade + good slurry density = Lower Capex & Opex $$

  • Atmospheric leach = stable operation, utilizes saprolite resource

  • MHP Product = known technology & good market acceptance

==> picture [412 x 87] intentionally omitted <==

Operating data from Australian HPAL Producers

Performance Driver Ardea **Bulong# ** Cawse# Murrin RNO^ Metric Ardea Rank Comment
Atmospheric Leach Yes No No No Yes - #1 Stable operation and full resource utilisation
HPAL Feed Density 45% 31% 35% 38% 42% % Solids #1 The higher the better = Maximises plant throughput
Residence Time 70 75 105 90 60 minutes #2 The lower the better = Maximises plant throughput
Slurry Grade Ni 7.55 2.89 3.07 3.87 7.39 Ni kg/m3 #1 The higher the better = Increased revenue stream
Slurry Grade Co 0.59 0.23 0.24 0.34 0.31 Co kg/m3 #1 The higher the better = Strategic Co-Product credits

Data Sources

Ardea – Goongarrie Hub testwork results from PFS and Expansion Study, ASX release 28 March 2018 & Goongarrie Expansion Study, 24 July 2018 and ongoing project assessment as part of completing the DFS.

Bulong, Cawse, Murrin - ALTA 1999, An Engineering Comparison of the Three Treatment Flowsheets In WA Nickel Laterite Projects. RNO – ALTA 2001, Observations from the RNO Pilot Plant at Lakefield Research, 2000 AD.

^Ravensthorpe Nickel Operation (RNO) figures based on design numbers on upgraded beneficiated ore from the Halleys Deposit which has since been mined out. # Bulong & Cawse – care and maintenance

Ardea data is based on non-beneficiated material (with always an option to beneficiate selected KNP geo-met types, notably at Highway & Goongarrie Hill).

23

==> picture [145 x 37] intentionally omitted <==

A high-quality nickel and cobalt project

Outstanding results delivered from 2018 PFS* and Expansion Studies

Flow sheet enhanced and project scale increased for in progress Feasibility Study

1.0Mtpa 1.5Mtpa 2.25Mtpa
Status PFS PFS ES
No. Trains 1 1 1
Pre Tax NPV8 US$ 1.13 billion US$ 1.52 billion US$ 2.4 billion
Pre Tax IRR 29 % 29 % 31%
CAPEX US$ 472 million US$ 588 million US$918 million
C1 cash cost US$ 0.42 / lb US$ 0.45 / lb US$ (0.34) / lb
Payback 5.3 years 5.6 years 5.1 years
Cobalt sulphate 5,500tpa 6,900tpa 10,000tpa
Nickel sulphate 41,500tpa 55,300tpa 81,000tpa
  • PFS of 1Mtpa and 1.5Mtpa base case over a 25-year mine life completed (one autoclave)

  • Expansion study of 2.25Mtpa with a 25-year mine life completed (one autoclave)

  • 94.5% nickel and 95.5% cobalt recovery – life of mine

  • Pre-cobalt credit C1 costs in line with current worldwide operators

  • High Pressure Acid Leach (HPAL) 5th generation plant is a proven design, successfully operated in other laterite projects globally

  • 2.25Mtpa case based on only 26% of Goongarrie Resource

  • Base case for in progress feasibility study is 3.5Mtpa, with two HPAL autoclaves + AL circuit for improved operations stability and increased production, with financial modelling current

  • Scandium by-product credit and nickel and cobalt recovery from mineralised neutraliser not factored in, so offers additional up-side

==> picture [148 x 38] intentionally omitted <==

The information shown on this slide has been previously released on the ASX platform by Ardea in ASX releases, *Goongarrie Nickel Cobalt Project, PFS study, 28 March 2018 & Goongarrie Expansion Study, 24 July 2018. All the material assumptions underpinning the forecast financial information derived from a production target, in the initial public report 24 referred to in rule 5.17 continue to apply and have not materially changed.

==> picture [145 x 37] intentionally omitted <==

KNP Mineral Resource

Kalgoorlie Nickel Project nickel-cobalt JORC Code (2012) Mineral Resource Estimate

Camp Prospect Resource
Category
Size
(Mt)
Ni
(%)
Co
(%)
Contained Metal
Ni(kt)
Co(kt)
Contained Metal
Ni(kt)
Co(kt)
KNP TOTAL Measured 22 0.94 0.079 207 17
Indicated 357 0.72 0.047 2,584 168
Inferred 452 0.68 0.044 3,088 199
GRAND TOTAL Combined 830 0.71 0.046 5,879 384

Note: 0.5% nickel cutoff grade used to report resources. Note figures are rounded to reflect degree of certainty and may not tally. The information shown on this slide has been previously released on the ASX platform by Ardea in ASX release 16 June 2021.

In accordance with the Australian Securities Exchange Limited Listing Rules Appendix 5A:

The information in this report that relates to KNP Exploration Results is based on information originally compiled by previous full time employees of Heron Resources Limited and or Vale Inco. The Exploration Results and data collection processes have been reviewed, verified and re-interpreted by Mr Ian Buchhorn who is a Member of the Australasian Institute of Mining and Metallurgy and currently an executive director of Ardea Resources Limited. Mr Buchhorn has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the exploration activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Buchhorn consents to the inclusion in this report of the matters based on his information in the form and context that it appears.

The information in this report that relates to Mineral Resources for the Goongarrie Hill, Goongarrie South, Big Four, Scotia Dam and Highway nickel-cobalt deposits that comprise the Goongarrie Hub is based on information compiled by Mr James Ridley who is a Member of the Australasian Institute of Mining and Metallurgy, a full time employee of Ardea Resources and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Ridley consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

==> picture [148 x 38] intentionally omitted <==

25

==> picture [145 x 37] intentionally omitted <==

Goongarrie Hub Mineral Resource (0.8% Ni cut-off)

Summary of Mineral Resource Estimate from the Goongarrie Hub, based on a 0.8% Ni cut-off grade, comprising resources at Goongarrie Hill, Goongarrie South, Highway, Big Four, Scotia Dam and Highway (ASX release 16 June 2021).



















Deposit Resource Tonnes Ni
Co
Contained Metal
Category (Mt) %
%
Ni (kt)
Co (kt)
Goongarrie Hill Indicated
Inferred
5.3
1.9
0.92
0.92
0.050
49
2.6
0.034
17
0.6
.
0.92
.
0.0
Subtotal 7.2 0.92 0.0 46
66
3.3
Goongarrie South Measured
Indicated
Inferred
11.0
21.1
1.2
1.13
0.99
0.92
0.1
0.0
0.0
06
125
11.6
71
208
15.0
43
11
0.5

In
Inf
dica
erre
11
Su bto tal 33.3 1.03 0.0 81 344 27.1
Big Fo ur In
Inf
dica
erre
ted
d
12.1
2.7
0.97
0.94
0.0
0.0
68
62
118
25
8.3
1.7
Su bto tal 147 0.97 0.0 67 143 9.9
.
Scotia Da m In
Inf
dica
erre
ted
d
2.9
1.4

0.98
1.02
0.1
0.0
08
57
29
14
3.2
0.8
Su bto tal 4.3 0.99 0.0 91 43 4.0
Highw ay In
Inf
dica
erre
ted
d
15.1
3.7

1.01
0.98
0.0
0.0
53
53
152
36
8.0
2.0
Su bto tal 18.8 1.00 0.0 53 188 10.0
Combine
Deposits
ine
sits
d
M
In
Inf
eas
dica
erre
ured
ted
d
11.0
56.5
10.8


1.13
0.98
0.95
0.1
0.0
0.0
06
66
51
125
556
103

11.6
37.1
5.6
G Total l 783 100 69 784 54.3

Note figures are rounded to reflect degree of certainty and may not tally.

26

26

==> picture [145 x 37] intentionally omitted <==

Goongarrie Hub Mineral Resources inc Sc (0.5% Ni cut-off)

Summary of Mineral Resource Estimate from the Goongarrie deposits based on a 0.5% Ni cut-off grade (ASX release 15 February 2021).

Deposit Resource
Category
Tonnes
(Mt)
Ni
%
Co
%
Contained Metal
Ni (kt)
Co (kt)
Contained Metal
Ni (kt)
Co (kt)
Sc
Mt
Resources
Sc ppm
Goongarrie Hill Indicated 40 0.65 0.037 260 14.7 10.5 16
Inferred 29 0.60 0.025 178 7.3 2.0 16
Subtotal 69 0.63 0.032 438 21.9 12.5 16
Goongarrie
South
Measured 18 0.94 0.085 172 15.4 18.2 40
Indicated 82 0.71 0.049 587 40.2 53.1 23
Inferred 10 0.64 0.033 61 3.1 5.5 24
Subtotal 110 0.75 0.053 820 58.7 76.8 27
Big Four Indicated 49 0.71 0.047 345 22.9 31.9 24
Inferred 14 0.68 0.043 95 6.1 2.9 24
Subtotal 63 0.70 0.046 440 28.9 34.8 24
Scotia Dam Indicated 12 0.71 0.065 82 7.4 11.2 25
Inferred 5 0.72 0.043 37 2.2 0.6 22
Subtotal 17 0.72 0.058 118 9.6 11.7 25
GNCP Total Measured 18 0.94 0.085 172 15.4 18.2 40
Indicated 182 0.70 0.047 1,274 85.1 106.6 23
Inferred 58 0.64 0.032 371 18.6 11.0 23
Grand Total 259 0.70 0.046 1,817 119.2 135.8 25

==> picture [148 x 38] intentionally omitted <==

Note figures are rounded to reflect degree of certainty and may not tally.

27