ARDEA RESOURCES LIMITED — Investor Presentation 2021
Feb 15, 2021
64421_rns_2021-02-15_7dc7d6eb-8e8e-4bc6-890a-9eb0a7561a60.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [720 x 70] intentionally omitted <==
RIU EXPLORERS CONFERENCE February 2021
Globally significant Nickel, Cobalt and Scandium resource, Critical Minerals, nickel sulphides and gold from the Kalgoorlie Nickel Project
==> picture [48 x 31] intentionally omitted <==
Disclaimer
Important notice
This presentation contains general information only and is, or is based upon, information which has been released to ASX or is contained in the Ardea Resources Limited (Ardea or the Company) prospectus dated 9 November 2016 (including supplementary prospectuses dated 18 November 2016 and 6 January 2017), the Goongarrie Nickel Cobalt Project Pre-Feasibility Study (dated 28 March 2018) the Goongarrie Expansion Study (24 July 2018), Goongarrie Pilot Plant trial produces battery grade crystals (31 October 2018), Goongarrie Nickel Cobalt Project Update (8 April 2019), Ardea Annual Report 2019 (24 October 2019), Ardea Quarterly Operations Report, for the quarter ended 30 September 2019 (31 October 2019), Ardea Quarterly Operations Report, for the quarter ended 31 December 2019 (17 January 2020) Ardea Quarterly Operations Report, for the quarter ended 31 March 2020 (9 April 2020), Maiden Resource for Big Four Gold Project, WA (14 May 2020), Significant gold exploration results from new target at Goongarrie South (25 June 2020), Follow-up RC drilling commences at the Aphrodite North gold target (10 July 2020), Quarterly Activities Report - June 2020 (23 July 2020), CSIRO research commences on gold behaviour within GNCP (12 August 2020), Significant gold in first RC drilling at Aphrodite North (13 August 2020), Gold Exploration Update (20 August 2020), and Ardea BTZ gold exploration success at Lady Charlotte (24 August 2020), Successful A$3.5M Capital Raising to support Gold Work Programs, SPP to follow (18 September 2020), Nickel Sulphide Targets within the Ardea Tenement Portfolio including KNP (30 September 2020), Quarterly Activities Report - September 2020 (27 October 2020), “Lily Albany” gold discovery confirmed by RC drilling at Aphrodite North (29 October 2020), Highgrade, shallow gold discovery at Zeus (9 November 2020), Quarterly Activities Report - December 2020 (21 January 2021), GNCP High Grade Resource - 60 million tonnes at 1.0% nickel (15 February 2021).
This presentation is not an invitation, offer or recommendation (express or implied) to subscribe for, or apply for the purchase of, or to take any other action in respect of securities of any entity described herein and is not a prospectus, product disclosure statement or disclosure document for the purposes of the Corporations Act 2001 (Cth) and has not been lodged with ASIC. None of Ardea Resources Limited (Ardea or the Company) or its representatives are providing or offering investment advice or services by making this presentation.
Neither Ardea nor its representatives make any representation, warranty or guarantee of any kind, express or implied, as to the accuracy, completeness or reasonableness of the information contained herein or any other written or oral communication transmitted or made available to any person receiving this presentation. To the maximum extent permitted by law, Ardea and representatives expressly disclaim any and all liability based on or arising from, in whole or in part, such information, or any errors or omissions.
This presentation contains forward-looking statements regarding the Company’s resources, intentions and future business. These statements reflect current information, expectations, intentions and strategies regarding the future, and are subject to certain risks and uncertainties. Should one or more of these risks or uncertainties materialise, or should any of the underlying assumptions prove incorrect, actual results may vary from the expectations, intentions and strategies described in this presentation. Investors are cautioned not to place undue reliance on forward-looking statements, which speak only as of the date they are made. Other than where required by law, the Company is under no obligation to revise any forward looking statement to reflect events or circumstances after the date of this presentation or to reflect the occurrence of unanticipated events.
The Goongarrie Project has completed the Pre-Feasibility Study phase and has commenced programs that are part of the Definitive Feasibility Study. Though reasonable care has been taken to ensure that the facts are accurate and/or that the opinions expressed are fair and reasonable, no reliance can be placed for any purpose whatsoever on the information contained in this document or on its completeness. Actual results and developments of projects and the market development may differ materially from those expressed or implied by these forward looking statements depending on a variety of factors. A key conclusion of the Pre-Feasibility Study and Expansion Study, which is based on forward looking statements, is that the Goongarrie Project is considered to have positive economic potential.
==> picture [48 x 31] intentionally omitted <==
No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.
2
Ardea Value Proposition
==> picture [221 x 148] intentionally omitted <==
==> picture [221 x 167] intentionally omitted <==
-
Globally significant Nickel, Cobalt and Scandium resource and Critical Minerals
-
Essential for new age technologies to meet the needs of modern society which demand ethical and sustainable mineral supply for a low carbon future
-
Ardea perfectly placed to meet these needs with the Kalgoorlie Nickel Project, multiple feasibility programs current, notably metallurgical studies, seeking a funding Strategic Partner
-
Pipeline of Nickel and Critical Mineral exploration opportunities with field work underway
-
Large, strategic 100% owned land holding in the premier mine operating jurisdiction, Western Australia
-
Outstanding nickel sulphide and gold exploration opportunities within mostly granted mining lease tenure
-
Two new gold discoveries confirmed and lodged with State Government in December Quarter 2020
3
Corporate Summary
| Capital Structure, as at 15 February 2021 | Capital Structure, as at 15 February 2021 | Capital Structure, as at 15 February 2021 |
|---|---|---|
| ASX Code | ARL | |
| Shares on Issue | 127,670,582 | |
| Share Price | $0.61 | |
| 52 week high / low | $0.63 / $0.17 | |
| Cash(as at 31 Dec 2020) | $10.9 million | |
| Market Capitalisation | $78 million | |
| Largest Shareholder | ~10% equity | |
| Top 40 Shareholders | ~60% equity | |
| Board and Executive Management Team | ||
| Mathew Longworth | Non-Executive Chair | |
| Andrew Penkethman | Managing Director and Chief Executive Officer |
|
| Ian Buchhorn | Executive Director | |
| Sam Middlemas | Company Secretary and Chief Financial Officer |
|
| Dr Matt Painter | General Manager Exploration |
==> picture [428 x 204] intentionally omitted <==
==> picture [118 x 84] intentionally omitted <==
==> picture [125 x 84] intentionally omitted <==
==> picture [124 x 84] intentionally omitted <==
==> picture [48 x 31] intentionally omitted <==
Focus on development of the GNCP for the battery revolution, with maximising shareholder value
through concurrent, complementary nickel sulphide and gold exploration
4
Prime Location and Jurisdiction
-
All Ardea Projects located in Western Australia (WA)
-
4,000km[2] ground position in Eastern Goldfields WA is the premier global destination for development of minerals operations
-
City of Kalgoorlie-Boulder is the prime resource development and operating destination within Australia Very strong mining support from Local Government and community
-
Multitude of world-class mining operations serviced from the City
-
Ardea maintains a local operations office and active stake holder engagement
==> picture [48 x 31] intentionally omitted <==
5
Ardea with its flagship KNP and subset GNCP Ni-Co-Sc resource, is poised for ethical and sustainable supply of Critical Minerals for a low carbon future
==> picture [76 x 77] intentionally omitted <==
==> picture [229 x 31] intentionally omitted <==
----- Start of picture text -----
Ardea pilot plant nickel sulphate crystal production, September 2018
----- End of picture text -----
6
Nickel and the Inevitable Rise in Demand
Total primary nickel demand by first-use sector, 2020 to 2040 (kt Ni)
==> picture [48 x 31] intentionally omitted <==
7
The Kalgoorlie Nickel Project
==> picture [346 x 332] intentionally omitted <==
Kalgoorlie Nickel Project (KNP) Mineral Resource 826Mt at 0.7% Ni and 0.046% Co*
5.8 Million tonnes contained Nickel 384,000 tonnes contained Cobalt
Goongarrie Nickel Cobalt Project (GNCP) Mineral Resource 259Mt at 0.7% Ni and 0.046% Co*
and a maiden scandium component of
74Mt at 35ppm Sc
1.8 Million tonnes contained Nickel 119,200 tonnes contained Cobalt 2,590 tonnes contained Scandium
GNCP High grade component 60Mt at 1.0% Ni and 0.074% Co
595kt contained Nickel 44kt contained Cobalt
Globally significant nickel and cobalt Mineral Resource
- See Appendix for resource breakdown and ASX release 15 February 2021.
8
Optimum Resource Scale
==> picture [495 x 331] intentionally omitted <==
-
GNCP resource update based on high grade mining strategy (>1% nickel)
-
With 5.8Mt contained nickel, easily accommodated within the KNP starting with the GNCP
-
Capability for >100 year potential supply of Ni, Co, Sc resource
-
KNP well suited for latest battery technology, NMC 811 LIB (8 parts Ni, 1 part Mn, 1 part Co)
-
GNCP has produced MSP and sulphates from pilot plant and can produce MHP or PCAM to suit needs of Strategic Partner
9
==> picture [279 x 397] intentionally omitted <==
Regional Location – Nickel Sulphide Projects
-
Highly prospective for nickel sulphide mineralisation
-
Ardea’s KNP tenure is one of the largest land holdings over ultramafic stratigraphy in Australia
-
Archaean Eastern Goldfields Province – prolific ultramafic flows hosting numerous nickel sulphide deposits
-
Multiple compelling nickel sulphide targets defined ranging from Kambalda style komatiites to Julimar style layered mafic/ultramafic intrusive complexes
-
Exploration programs underway including EM and IP surveys - Drilling to follow
10
Emu Lake Project – Binti Nickel Sulphide
- Review of historic data has highlighted high-grade nickel sulphide and a number of DHEM off-hole conductors
Priority target drill tested in December 2020 (AELD0001) and intersected a 0.65m stringer of remobilised nickel sulphide mineralisation from 336.7m. Target footwall zone appeared to be stoped out by late stage dolerites. Assays pending
- Additional DHEM work underway to find primary source of highgrade nickel sulphide
==> picture [48 x 31] intentionally omitted <==
==> picture [351 x 167] intentionally omitted <==
----- Start of picture text -----
200m
Down hole DHEM
Superimposed Plates – Emu Lake
ASX:POS
Silver Swan
Ni Sulphide
deposit
200m
Potential for high grade
Silver Swan style
Ni sulphide
to 1,500m depth
----- End of picture text -----
ASX:ARL Emu Lake Ni Sulphide 500m Open
==> picture [25 x 199] intentionally omitted <==
11
Longitudinal Projection looking west
Emu Lake Project – Binti Gossan Zone LS
looking west
12
Black Range Project
-
65km north-west of Kalgoorlie on a granted mining lease
-
Strongly anomalous Ni, Cu and PGEs within the regolith profile from historic nickel laterite drilling
-
Within the differentiated Ora Banda Sill close to the contact between the lower ultramafic zone and the upper mafic-gabbro zone
-
Cu to 2,540ppm, Ni to 2.1% and Pt + Pd to
-
1.4g/t in drill sampling
-
Targeting nickel sulphide mineralisation associated with this large mafic/ultramafic sill
-
Proposing two initial lines of Induced Polarisation testing to define sulphide zones at depth, prior to drill testing any defined targets
==> picture [48 x 31] intentionally omitted <==
13
14
==> picture [720 x 70] intentionally omitted <==
----- Start of picture text -----
Regional Gold Projects
----- End of picture text -----
==> picture [76 x 77] intentionally omitted <==
==> picture [556 x 41] intentionally omitted <==
----- Start of picture text -----
Aim: To use the area’s exceptional gold potential to maximise
----- End of picture text -----
==> picture [436 x 42] intentionally omitted <==
----- Start of picture text -----
-
Vision: Parallel development of the GNCP nickel
----- End of picture text -----
==> picture [101 x 42] intentionally omitted <==
----- Start of picture text -----
licences
----- End of picture text -----
==> picture [48 x 31] intentionally omitted <==
An emerging gold camp at Goongarrie South
==> picture [200 x 346] intentionally omitted <==
----- Start of picture text -----
Projection: GDA94 MGA Zone
51
----- End of picture text -----
-
Detailed reappraisal of Ardea’s Nickel-Cobalt mining leases for gold
-
The regional-scale Bardoc Tectonic Zone is host to numerous major gold deposits and passes beneath GNCP tenure and nickel deposits
-
New discoveries through reassessment of public and proprietary datasets to drill targets with little or no historic exploration
-
Ongoing efforts to define a new, buried gold camp at Goongarrie South:
-
Lily Albany – virgin discovery beneath cover
-
CSIRO collaboration examining gold anomalism within and beneath the nickel-cobalt deposits
-
Zeus – new hits beneath historic gold anomalism
-
Big Four Gold – historic workings being reassessed
-
>100 gold targets defined and being explored – 2 drill rigs currently operating
-
Multiple Ardea discoveries in 2020 , low discovery costs
15
New discoveries from active programs
Ardea’s gold discoveries and resources are all on GNCP mining tenure
1. Lily Albany – virgin discovery under cover, drilling ongoing
-
AARN0001 – 6m at 3.60g/t Au (from 44m) and 8m at 4.94g/t Au (from 172m), AANR0008 – 10m at 3.55g/t Au (from 40m)
-
Supergene and primary lode gold over 2km strike, layered mafic complex host
2. Zeus – historic anomalism reappraised reveals shallow high-grade gold
-
ABFR0303 – 10m at 12.97g/t Au from 42m, including 4m at 28.25g/t Au from 44m
-
~1km line of strong regolith gold anomalism. Open in all directions
3. Big Four Gold – historic workings show shallow mining potential
==> picture [169 x 217] intentionally omitted <==
-
Maiden JORC Code (2012) Mineral Resource: 178kt at 2.7g/t gold (15,300 oz gold) (Inferred Mineral Resource, 0.5g/t Au cut off)
-
2020 results include 18m at 3.38g/t gold from 18m, 14m at 2.40g/t gold from 6m, 20m at 2.91g/t gold from 76m
-
Open down plunge, more drilling required. Metallurgically benign. Overall gold extractions of 97.7%.
==> picture [48 x 31] intentionally omitted <==
1. ASX release 29 October 2020.
2. ASX release 9 November 2020. 16 3. ASX release 26 February 2020 & 14 May 2020. 16
Investment Summary
==> picture [31 x 32] intentionally omitted <==
Ardea’s KNP = unrivalled nickel, cobalt and scandium scale optionality ( 5.8Mt of nickel and 384kt of cobalt )
==> picture [33 x 33] intentionally omitted <==
Globally significant nickel-cobalt-scandium resource in an infrastructure-rich and stable jurisdiction, provides ability to produce ethical and sustainable minerals from multiple processing hubs for the rapidly expanding Critical Minerals/LIB sector, feasibility programs current
==> picture [33 x 33] intentionally omitted <==
100% off-take is available, with Company strongly leveraged to increasing nickel and cobalt demand
==> picture [31 x 32] intentionally omitted <==
Highly prospective landholding in the Eastern Goldfields of Western Australia – confirmed with recent Ardea Lily Albany and Zeus gold discoveries
==> picture [31 x 32] intentionally omitted <==
WA based Team with track record of exploration, development and production success running active exploration programs for nickel sulphides, gold and Critical Minerals with a pipeline of quality targets
==> picture [33 x 33] intentionally omitted <==
Well funded to maintain momentum - Upcoming news flow to include nickel sulphide exploration , gold exploration , Kalgoorlie focussed gold spin-out , Highway and KNP nickel, cobalt and scandium resource updates
==> picture [48 x 31] intentionally omitted <==
17
Thank you
For further information please visit: www.ardearesources.com.au or contact: Andrew Penkethman, Managing Director & CEO P: +61 8 6244 5136 E: [email protected]
==> picture [76 x 77] intentionally omitted <==
==> picture [48 x 31] intentionally omitted <==
18
==> picture [720 x 70] intentionally omitted <==
For further information regarding Ardea, please visit www.ardearesources.com.au
APPENDICES
==> picture [48 x 31] intentionally omitted <==
Optimum location for ensuring ethical and sustainable mineral supply
-
Large contiguous KNP/GNCP land holding allows unimpeded site planning to minimise ultimate site footprint
-
Open Mediterranean woodland highly amenable to low-impact development and rehabilitation
-
Arid environment, facilitates well managed tailings disposal
==> picture [76 x 77] intentionally omitted <==
-
Rehabilitation procedures well established over last four decades in Kalgoorlie open pit gold sector
-
No ocean submarine tailings disposal
-
No valley-fill tailings dams
-
No active seismicity issues
-
No conflicting land use demands
-
KNP purely a mining jurisdiction
-
No competing food production activity (as in Eastern Australia laterite districts)
-
Low carbon future
-
KNP HPAL plant steam, heating and power generated through burning elemental sulphur for sulphuric acid feedstock
-
KNP HPAL neutraliser includes Ni-enriched non-carbonate options
==> picture [48 x 31] intentionally omitted <==
----- Start of picture text -----
----- End of picture text -----
- Waste landform regeneration facilitates significant agroforestry throughout the KNP
20
A High-Quality Nickel and Cobalt Project
Outstanding results delivered from PFS* and Expansion Studies:
- PFS of 1Mtpa and 1.5Mtpa base case over a 25-year mine life completed
| Status | 1.0Mtpa PFS |
1.5Mtpa PFS |
2.25Mtpa ES |
|---|---|---|---|
| No. Trains | 1 | 1 | 1 |
| Pre Tax NPV8 Pre Tax IRR |
US$ 1.13 billion 29 % |
US$ 1.52 billion 29 % |
US$ 2.4 billion 31% |
| CAPEX C1 cash cost |
US$ 472 million US$ 0.42 / lb |
US$ 588 million US$ 0.45 / lb |
US$918 million US$ (0.34) / lb |
| Payback | 5.3 years | 5.6 years | 5.1 years |
| Cobalt sulphate | 5,500tpa | 6,900tpa | 10,000tpa |
| Nickel sulphate | 41,500tpa | 55,300tpa | 81,000tpa |
-
Expansion study of 2.25Mtpa with a 25-year mine life completed
-
94.5% nickel and 95.5% cobalt recovery – life of mine
-
Pre-cobalt credit C1 costs in line with current worldwide operators
-
High Pressure Acid Leach (HPAL) 5th generation plant is a proven design, successfully operated in other laterite projects globally
-
2.25Mtpa case based on only 26% of Goongarrie Resource
-
Scandium by-product credit not factored in, so offers additional up-side
==> picture [48 x 31] intentionally omitted <==
The information shown on this slide has been previously released on the ASX platform by Ardea in ASX releases, *Goongarrie Nickel Cobalt Project, PFS study, 28 March 2018 & +Goongarrie Expansion Study, 24 July 2018. All the material assumptions underpinning the forecast financial information derived from a production target, in the initial public report referred to in rule 5.17 continue to apply and have not materially changed.
21
KNP Resource Breakdown
Kalgoorlie Nickel Project nickel-cobalt JORC Code (2012) Mineral Resource (ASX release 15 February 2021).
| Camp | Prospect | Resource Category |
Size (Mt) |
Ni (%) |
Co (%) |
Contained Metal Ni(kt) Co(kt) |
Contained Metal Ni(kt) Co(kt) |
|---|---|---|---|---|---|---|---|
| KNP TOTAL | Measured | 22 | 0.94 | 0.079 | 207 | 17 | |
| Indicated | 339 | 0.72 | 0.048 | 2,446 | 163 | ||
| Inferred | 465 | 0.68 | 0.044 | 3,165 | 203 | ||
| GRAND TOTAL | Combined | 826 | 0.70 | 0.046 | 5,817 | 384 |
Note: 0.5% nickel cutoff grade used to report resources. Note figures are rounded to reflect degree of certainty and may not tally. The information shown on this slide has been previously released on the ASX platform by Ardea in ASX release 15 February 2021.
In accordance with the Australian Securities Exchange Limited Listing Rules Appendix 5A:
The information in this report that relates to KNP Exploration Results is based on information originally compiled by previous full time employees of Heron Resources Limited and or Vale Inco. The Exploration Results and data collection processes have been reviewed, verified and re-interpreted by Mr Ian Buchhorn who is a Member of the Australasian Institute of Mining and Metallurgy and currently an executive director of Ardea Resources Limited. Mr Buchhorn has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the exploration activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Buchhorn consents to the inclusion in this report of the matters based on his information in the form and context that it appears.
==> picture [48 x 31] intentionally omitted <==
The information in this report that relates to Mineral Resources for the Goongarrie Hill, Goongarrie South, Big Four and Scotia Dam nickel-cobalt deposits that comprise the Goongarrie Nickel Cobalt Project is based on information compiled by Mr James Ridley who is a Member of the Australasian Institute of Mining and Metallurgy, a full time employee of Ardea Resources and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Ridley consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.
22
Goongarrie Nickel Cobalt Resources
Summary of Mineral Resource from the Goongarrie Nickel Cobalt Project area, based on a 0.8% Ni cut-off grade, comprising resources at Goongarrie Hill, Goongarrie South, Big Four and Scotia Dam (ASX release 15 February 2021).
| Deposit | Resource Category |
Tonnes (Mt) |
Ni % |
Co % |
Contained Metal Ni (kt) Co (kt) |
Contained Metal Ni (kt) Co (kt) |
Sc Mt |
Resources Sc ppm |
|---|---|---|---|---|---|---|---|---|
| Goongarrie Hill | Indicated | 5.3 | 0.92 | 0.050 | 49 | 2.6 | 2.4 | 17 |
| Inferred | 1.9 | 0.92 | 0.034 | 17 | 0.6 | 0.4 | 16 | |
| Subtotal | 7.2 | 0.92 | 0.046 | 66 | 3.3 | 2.8 | 17 | |
| Goongarrie South | Measured | 11.0 | 1.13 | 0.106 | 125 | 11.6 | 11.0 | 39 |
| Indicated | 21.1 | 0.99 | 0.071 | 208 | 15.0 | 15.5 | 25 | |
| Inferred | 1.2 | 0.92 | 0.043 | 11 | 0.5 | 0.5 | 25 | |
| Subtotal | 33.3 | 1.03 | 0.081 | 344 | 27.1 | 27.0 | 31 | |
| Big Four | Indicated | 12.1 | 0.97 | 0.068 | 118 | 8.3 | 8.9 | 27 |
| Inferred | 2.7 | 0.94 | 0.062 | 25 | 1.7 | 0.5 | 27 | |
| Subtotal | 14.7 | 0.97 | 0.067 | 143 | 9.9 | 9.4 | 27 | |
| Scotia Dam | Indicated | 2.9 | 0.98 | 0.108 | 29 | 3.2 | 2.9 | 28 |
| Inferred | 1.4 | 1.02 | 0.057 | 14 | 0.8 | 0.0 | 26 | |
| Subtotal | 4.3 | 0.99 | 0.091 | 43 | 4.0 | 2.9 | 28 | |
| GNCP Total | Measured | 11.0 | 1.13 | 0.106 | 125 | 11.6 | 11.0 | 39 |
| Indicated | 41.5 | 0.97 | 0.070 | 404 | 29.0 | 29.7 | 25 | |
| Inferred | 7.1 | 0.95 | 0.051 | 67 | 3.6 | 1.4 | 23 | |
| Grand Total | 59.6 | 1.00 | 0.074 | 595 | 44.3 | 42.2 | 29 |
==> picture [48 x 31] intentionally omitted <==
Note: GNCP nickel, cobalt and scandium Mineral Resources based on a 0.8% Ni cut-off grade Note figures are rounded to reflect degree of certainty and may not tally.
23
Goongarrie Nickel Cobalt Resources
Summary of total Mineral Resource from the Goongarrie Nickel Cobalt Project area, based on a 0.5% Ni cut-off grade, comprising resources at Goongarrie Hill, Goongarrie South, Big Four and Scotia Dam (ASX release 15 February 2021).
==> picture [48 x 31] intentionally omitted <==
| Deposit | Resource Category |
Tonnes (Mt) |
Ni % |
Co % |
Contained Metal Ni (kt) Co (kt) |
Contained Metal Ni (kt) Co (kt) |
Sc Mt |
Resources Sc ppm |
|---|---|---|---|---|---|---|---|---|
| Goongarrie Hill | Indicated | 40 | 0.65 | 0.037 | 260 | 14.7 | 10.5 | 16 |
| Inferred | 29 | 0.60 | 0.025 | 178 | 7.3 | 2.0 | 16 | |
| Subtotal | 69 | 0.63 | 0.032 | 438 | 21.9 | 12.5 | 16 | |
| Goongarrie South |
Measured | 18 | 0.94 | 0.085 | 172 | 15.4 | 18.2 | 40 |
| Indicated | 82 | 0.71 | 0.049 | 587 | 40.2 | 53.1 | 23 | |
| Inferred | 10 | 0.64 | 0.033 | 61 | 3.1 | 5.5 | 24 | |
| Subtotal | 110 | 0.75 | 0.053 | 820 | 58.7 | 76.8 | 27 | |
| Big Four | Indicated | 49 | 0.71 | 0.047 | 345 | 22.9 | 31.9 | 24 |
| Inferred | 14 | 0.68 | 0.043 | 95 | 6.1 | 2.9 | 24 | |
| Subtotal | 63 | 0.70 | 0.046 | 440 | 28.9 | 34.8 | 24 | |
| Scotia Dam | Indicated | 12 | 0.71 | 0.065 | 82 | 7.4 | 11.2 | 25 |
| Inferred | 5 | 0.72 | 0.043 | 37 | 2.2 | 0.6 | 22 | |
| Subtotal | 17 | 0.72 | 0.058 | 118 | 9.6 | 11.7 | 25 | |
| GNCP Total | Measured | 18 | 0.94 | 0.085 | 172 | 15.4 | 18.2 | 40 |
| Indicated | 182 | 0.70 | 0.047 | 1,274 | 85.1 | 106.6 | 23 | |
| Inferred | 58 | 0.64 | 0.032 | 371 | 18.6 | 11.0 | 23 | |
| Grand Total | 259 | 0.70 | 0.046 | 1,817 | 119.2 | 135.8 | 25 |
Note: GNCP nickel, cobalt and scandium Mineral Resources based on a 0.5% Ni cut-off grade. Note figures are rounded to reflect degree of certainty and may not tally.
24
Big Four Gold Resource
Big Four Gold, (JORC 2012) Mineral Resource (ASX release 14 May 2020)
| Cut-off Au g/t Tonnes |
Grade Au g/t Contained gold (oz) |
|
|---|---|---|
| Inferred Resource | ≥ 0.00 194,000 |
2.5 15,400 |
| ≥ 0.50 178,000 |
2.7 15,300 |
|
| ≥ 1.00 151,000 ≥ 1.5 118,000 ≥ 2.00 92,000 |
3.0 14,600 3.5 13,300 4.0 11,800 |
Inferred resource estimate and cut-off sensitivity for the Big Four Gold deposit, reported above different Au cut-off values. The base case estimate (highlighted) uses a 0.5 g/t Au cut-off. The tonnage figures have been rounded to the nearest thousand tonnes. Au grades rounded to the nearest decimal. Contained gold is rounded to the nearest 100 oz.
In accordance with the Australian Securities Exchange Limited Listing Rules Appendix 5A:
==> picture [48 x 31] intentionally omitted <==
The information in this report that relates to Mineral Resources or Ore Reserves is based on information compiled by James Ridley, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Ridley is a full-time employee of Ardea Resources Limited and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Ridley consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
25