Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARDEA RESOURCES LIMITED Capital/Financing Update 2021

May 20, 2021

64421_rns_2021-05-20_84c2baa1-28e1-4202-9ddc-0f58642e8124.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [40 x 842] intentionally omitted <==

==> picture [344 x 44] intentionally omitted <==

KNP Highway and Black Range - Nickel Sulphide Drilling Commences

ASX & Media Release

21 May 2021

  • Drilling of two strong IP chargeability anomalies within the Kalgoorlie Nickel Project has commenced at the Highway and Black Range project areas, north of Kalgoorlie.

ASX Symbol

ARL

  • At Highway, the chargeability anomaly is located near the basal contact of the ultramafic lava Walter Williams Formation on the western side of the belt. A single drillhole by CRA in 1973 intersected broad zones of disseminated and blebby sulphides adjacent to this IP anomaly. A 300m angled hole is designed to test the core of the IP target interpreted as a potential disseminated nickel sulphide system using a Mount Keith nickel sulphide model .

Ardea Resources Limited

Suite 2 / 45 Ord St West Perth WA 6005

PO Box 1433 West Perth WA 6872

Telephone

  • At Black Range, the chargeability anomaly is associated with strong nickel, copper and platinum group element ( PGE ) anomalism in historic nickel laterite drilling, hosted within a layered mafic complex. A 280m angled hole is designed to test a primary sulphide target using a Nova/Julimar nickel-PGE exploration model .

+61 8 6244 5136

Email

[email protected]

Ardea Resources Limited ( Ardea or the Company ) is pleased to report that RC drilling to test for nickel sulphide mineralisation has recently commenced to test two strong Induced Polarisation (IP) chargeability anomalies, at the Company’s Highway and Black Range project areas located 110km north and 65km north-west of Kalgoorlie respectively (Figure 1).

Website

www.ardearesources.com.au

Directors

Mat Longworth Non-Executive Chair

Ardea’s Managing Director, Andrew Penkethman, said:

Andrew Penkethman Managing Director & CEO

“Ardea remains focussed on developing the Kalgoorlie Nickel Project ( KNP ) to provide sustainable and ethical nickel and Critical Mineral supply for the rapidly expanding lithium-ion battery sector. In tandem with completing priority Definitive Feasibility Study work streams, compelling nickel sulphide and Critical Mineral exploration opportunities that can provide further upside, continue to be evaluated on Ardea’s strategic KNP tenement holding.

Ian Buchhorn Technical Executive Director

Executive Management

Sam Middlemas Company Secretary & CFO

The recently defined IP anomalies at Highway and Black Range, occurring in association with strong geochemical anomalies and other geological vectors is very significant. These anomalies provide compelling exploration targets, and it is exciting to see that drilling has now commenced to test them.

Matt Painter General Manager Exploration

Issued Capital

Nickel sulphide mineralisation is traditionally treated through a flotation concentrator, but the proposed KNP flow-sheet is amenable to hydrometallurgical processing of sulphides, with multiple benefits for the autoclave operation.”

Fully Paid Ordinary Shares 127,670,582

Directors/Employee Performance Rights 4,236,000

ABN 30 614 289 342

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Figure 1: Location of the Highway and Black Range project areas with other Ardea KNP prospects near Kalgoorlie, Western Australia. Projection MGA 94 Zone 51.

==> picture [418 x 428] intentionally omitted <==

Highway Project Target

The Highway Project, located 110km north of Kalgoorlie (Figure 1), is within a wholly owned and granted mining lease and covers a thick portion of the ultramafic Walter Williams Formation ( WWF ). Recent IP surveys on four lines identified a strong (to 27mV/V) chargeability anomaly on two of these lines. Drilling is now targeting the strongest part of this anomaly close to where CRA in 1973 intersected disseminated and blebby sulphides within this same basal contact zone of the WWF. Copper ( Cu ) and nickel ( Ni ) are enriched in the nickel laterite drilling above and to the east of the proposed hole, suggesting a possible primary sulphide source for these metals.

Previous tenement holder Heron Resources also identified fine grained disseminated primary sulphides (Ardea ASX release 30 September 2020) further south along the basal contact (Figure 2). The current reverse circulation ( RC drilling is targeting the sub-vertical to slightly overturned basal contact of the WWF adjacent to the CRA hole (Figure 3). The target for the drilling is a Mount Keith or Perseverance style disseminated nickel-copper system associated with thick ultramafic flows. Whilst historically the WWF has not been considered prospective for nickel sulphide mineralisation, recent and ongoing reappraisal suggests that such pessimism may have been misplaced. The conjunction of the basal contact with IP anomalism and known nickel sulphides provides for a compelling drill target.

2

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Figure 2: Aeromagnetic image (total magnetic intensity) for the Highway Project showing the location of the current RC drillhole on the western, basal contact of the WWF. Projection MGA 94 Zone 51.

==> picture [497 x 337] intentionally omitted <==

Figure 3: Cross Section looking north showing the location of the current RC hole and 1973 CRA drillhole in relation to the IP chargeability anomaly and basal contact of the WWF.

==> picture [497 x 310] intentionally omitted <==

3

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Black Range Project Target

The Black Range Prospect is located 65km north-west of Kalgoorlie (Figure 1) and contains a 5 kilometre section of the Ora Banda Sill layered mafic/ultramafic sill enriched in nickel, copper, cobalt ( Co ), scandium ( Sc ) and platinum group element ( PGE ) metals. The Ora Banda Sill is 2.5 kilometres wide in the prospect area and has a distinctive ultramafic base, grading into a pyroxenite zone (target horizon) before passing into a mafic gabbro at the top of the sill (Figure 4).

The IP chargeability anomaly at Black Range is potentially related to a lava feeder zone/pipe within the Ora Banda Sill that is enriched in Ni-Cu-PGE metals. A 280 metre RC drillhole is proposed to test the anomaly at depth (Fig 5).

==> picture [390 x 315] intentionally omitted <==

Figure 4: Black Range Prospect, Ardea tenements over Geology and TMI aeromagnetic image showing the outline of the zone enriched in nickel, cobalt, copper, scandium and PGE metals with location of IP lines. Projection MGA 94 Zone 51.

The chargeability anomaly lies in at the top of the ultramafic zone just below the interpreted position of the orthopyroxenite unit (Ardea ASX release 19 April 2021). The target may represent a mineralised conduit or lava pipe “feeder structure” within the sill and hence could be off-set from the orthopyroxenite unit. The IP data on the western line is essentially quiet with a possible chargeability response at the limit of the depth penetration for the survey, 400 metres below surface.

A review by consultant Newexco of historic moving loop electromagnetic (MLEM) data (Heron Resources ASX release 31 December 2011) has also confirmed a clear mid-time, twin-peak inflection that is coincident with the IP anomaly. The combination of the strongly anomalous geochemical results and two independent geophysical surveys (MLEM and IP) has defined a compelling target. To test the target, a 280 metre deep RC drill hole is to be drilled in the next week following on from the Highway drilling.

The Ora Banda Sill is one of a number of differentiated mafic/ultramafic sills in the Archaean greenstone stratigraphy of the Kalgoorlie geological domain. It is the thickest of the sills in the area, reaching a maximum thickness of 2.8 kilometres.

It consists of a southerly facing sequence of basal ultramafic overlain by gabbro and topped with a thin coarsegrained granophyre. The ultramafic zone is made up of lower peridotite overlain by a distinctive orthopyroxenite unit

4

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

with a sharp change to the upper gabbro zone. The ultramafic zones have a distinct magnetic-high signature contrasting with the magnetic low of the gabbroic units. As with other layered intrusive systems the PGE mineralisation appears to be focussed within the orthopyroxenite unit.

Figure 5: Black Range cross-section looking west showing IP anomaly (mV/V) within the ultramafic zone of the Ora Banda Sill. The target orthopyroxenite unit is south of the anomaly, however, the anomaly may be related to a separate feeder channel within the sill. Projection MGA 94 Zone 51.

==> picture [418 x 345] intentionally omitted <==

Exploration Strategy

With Ardea’s KNP tenement package covering one of the largest areas of ultramafic stratigraphy in Australia, the Company is well positioned to make nickel sulphide and Critical Mineral discoveries. Ardea will continue to rank and prioritise fit-for-purpose exploration for nickel sulphides on its high-quality portfolio of Eastern Goldfields of Western Australia tenements. Any drilling as part of the nickel sulphide programs will also assess nickel-cobalt laterite, Critical Minerals, and gold mineralisation, but the over-riding priority continues to be nickel.

Background and Company Strategy

Ardea’s key focus continues to be the development of the KNP, commencing with the Goongarrie Nickel Cobalt Project ( GNCP ) and ongoing Definitive Feasibility Study work streams, to ensure sustainable and ethical nickel-cobalt and scandium production for the rapidly expanding lithium-ion battery supply chain. However, Ardea’s strategic tenure in the heart of the Eastern Goldfields of Western Australia is also highly prospective for both nickel sulphide and Critical Minerals with active exploration complementing the development planning of the KNP.

It is important to note that any nickel sulphide discovery, as well as processing as a conventional sulphide flotation concentrate, has the potential to be processed through the High Pressure Acid Leach (HPAL) autoclave planned for Ardea’s GNCP and has the added benefit of helping control autoclave oxidising potential and typically improving recoveries. As such, the nickel sulphide exploration strategy complements Ardea’s nickel laterite development plans.

5

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Authorised for lodgement by the Board of Ardea Resources Limited.

For further information regarding Ardea, please visit https://ardearesources.com.au/ or contact:

Andrew Penkethman

Managing Director and Chief Executive Officer Tel +61 8 6244 5136

About Ardea Resources

Ardea Resources Limited (ASX:ARL) is an ASX-listed resources company, with a portfolio of 100% controlled West Australian-based projects, focussed on:

  • Development of the Kalgoorlie Nickel Project (KNP) and its sub-set the Goongarrie Nickel Cobalt Project (GNCP), a globally significant series of nickel-cobalt and Critical Mineral deposits which host the largest nickelcobalt resource in the developed world; and

  • Advanced-stage exploration at compelling nickel sulphide and gold targets within the KNP Eastern Goldfields world-class nickel-gold province.

==> picture [507 x 274] intentionally omitted <==

==> picture [21 x 21] intentionally omitted <==

==> picture [25 x 22] intentionally omitted <==

Follow Ardea on social media

6

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release contains forward-looking statements and forward-looking information within the meaning of applicable Australian securities laws, which are based on expectations, estimates and projections as of the date of this news release.

This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to management’s expectations with respect to, among other things, the timing and amount of funding required to execute the Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits, certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s properties, environmental risks, the availability of labour, the focus of the Company in the future, demand and market outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise funding privately or on a public market in the future, the Company’s future growth, results of operations, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking information is based on the opinions and estimates of management at the date the information is given, and on information available to management at such time.

Forward-looking information involves significant risks, uncertainties, assumptions and other factors that could cause actual results, performance or achievements to differ materially from the results discussed or implied in the forward-looking information. These factors, including, but not limited to, the ability to create and spin-out a gold focussed Company, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls, regulations, political or economic developments in Australia or other countries in which the Company does business or may carry on business in the future, operational or technical difficulties in connection with exploration or development activities, employee relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, the Company. Prospective investors should not place undue reliance on any forward-looking information.

Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be consistent with such forwardlooking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

Competent Person Statement

The technical information in this report relating to Exploration Results is based on information compiled by Mr David von Perger, who is a Member of the Australian Institute of Mining and Metallurgy (Chartered Professional – Geology). Mr von Perger is an independent geological consultant providing services to Ardea and has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results. Mr von Perger consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Mr von Perger owns shares in Ardea.

7

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

JORC 2012 Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section applies to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
•Sampling is proposed to be undertaken using
4m cone split composite samples.
•Drilling has only just commenced – this ASX
release is primarily related to the release of
geophysical data, interpretation and related
follow up work. Additional details can be
provided when the drilling and sampling
program has been completed.
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and
details.
•Drilling is being undertaken by Reverse
Circulation methods.
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries and
results assessed.
•Drilling has only just commenced – this ASX
release is primarily related to the release of
geophysical data, interpretation and related
follow up work.
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
•All RC chips are being logged by qualified
geologists and recorded in an industry
standard database.
Sub-sampling
techniques
and sample
preparation
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
•No sampling undertaken as yet – this ASX
release is primarily related to the release of
geophysical data, interpretation and related
follow up work. Additional details can be
provided when the drilling and sampling
program has been completed.
Quality of
assay data
and
laboratory
tests
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias)
andprecision have been established.

No sampling undertaken as yet – this ASX
release is primarily related to the release of
geophysical data, interpretation and related
follow up work. Additional details can be
provided when the drilling and sampling
program has been completed.

8

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Verification of
sampling and
assaying
The verification of significant
intersections by either independent or
alternative company personnel.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Discuss any adjustment to assay
data.
•No sampling undertaken as yet – this ASX
release is primarily related to the release of
geophysical data, interpretation and related
follow up work. Additional details can be
provided when the drilling and sampling
program has been completed.
Location of
data points
Accuracy and quality of surveys used
to locate drill holes (collar and down-
hole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.

Hole locations are determined with a handheld
GPS unit, considered to be accurate to within
1-5 metres. This level accuracy is considered
to be sufficient for this early stage of
exploration.
Data spacing
and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
Whether sample compositing has
been applied.
•The drilling is of a reconnaissance nature
consisting of single drillholes to test specific
geophysical targets. The drill spacing is
considered appropriate for this early stage of
exploration.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
•No sampling undertaken as yet – this ASX
release is primarily related to the release of
geophysical data, interpretation and related
follow up work.
Sample
security
The measures taken to ensure
sample security.
•All sampling will be undertaken in a secure
manner with assays to be undertaken in Perth,
Western Australia at industry recognised
laboratories.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
•No audits or reviews have been undertaken
given the early stage of the exploration.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
•The project areas location are shown on Figure
1 of this report and described in the body of the
report.
•At Highway, the tenure is considered to be
secure being held under granted Mining Lease
M29/214, wholly owned by Ardea Resources
Ltd.
•At Black Range the tenure is considered to be
secure being under granted Mining Lease,
M24/757. M24/757 is being transferred 100%
into the name of Ardea Resources Ltd(awaiting

9

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
operate in the area. stamp duty assessment) at which point Ardea
will own all mineral rights apart from gold. The
gold rights are owned by a third party company.
•Given the early stage of the exploration no
mining specific applications have been made.
•An Aboriginal heritage site has been defined at
Mt Carnage the peak of which is south of the
southern boundary of M24/757. A 200m
curtilage zone was emplaced around the base of
Mt Carnage and while this zone does not cover
the area of the IP anomaly or the proposed drill
hole, it could impact on future step out drilling to
the south of the IP anomaly. Alternative drilling
angles may need to be employed to avoid the
curtilage zone.
Exploration
done by other
parties
Acknowledgment and appraisal of
exploration by other parties.
•The project areas have been explored
extensively in the past for nickel laterite and
nickel laterite resources have been defined.
This work has mostly been undertaken in the
past by Heron Resources Ltd.
Geology Deposit type, geological setting and
style of mineralization.
•The Company is seeking Archaean mafic and
ultramafic hosted Ni/Cu/PGE sulphide and
related deposits in the project areas.
Drill hole
Information

A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:
•Drilling has only recently commenced and this
ASX release is primarily related to the release of
geophysical data, interpretation, and related
follow up work.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts
incorporate short lengths of high grade
results and longer lengths of low grade
results, the procedure used for such
aggregation should be stated and
some typical examples of such
aggregations should be shown in
detail.
•Drilling has only recently commenced and this
ASX release is primarily related to the release of
geophysical data, interpretation and related
follow up work.
Relationship
between
mineralization
widths and
intercept
lengths
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
•Drilling has only recently commenced and this
ASX release is primarily related to the release of
geophysical data, interpretation and related
follow up work.

10

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to a
plan view of drill hole collar locations
and appropriate sectional views.
•Where relevant, a diagram showing the hole
positions relevant for the current phase of
exploration is included in the release.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low
and high grades and/or widths should
be practiced to avoid misleading
reporting of Results.
•The reporting is considered to be balanced
taking into account the early stage of the
exploration.
Other
substantive
exploration
data
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
•Induced Polarisation (IP) surveys were conducted.
The IP surveys were conducted by Moombarriga
Geophysics Pty Ltd in March 2021 and used the
SearchEx 50kVA transmitter and EMIT SmarTEM
receivers. The survey was conducted using a
dipole-dipole configuration, with ‘a’ spacing of
100m. Transmitted signal was 0.125Hz using a
50% duty cycle and achieved currents ranged
from 10.5-62.0A. Line length at Black Range was
approximately 1.0 kilometre giving a nominal
depth of investigation down to 400m below
surface in the centre of the lines.
Future work The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
•Ardea is seeking Archaean mafic and ultramafic
hosted Ni/Cu/PGE sulphide deposits on its
extensive tenement holding in the Eastern
Goldfields of Western Australia.
•Future work at Highway and Black Range will
entail:
o
Completing the drilling and assessing the
results. Follow-up drilling as warranted.
o
Additional geophysical surveys may be
undertaken if the proposed drilling
demonstrates the anomaly is related to
sulphide mineralisation.

11