Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARDEA RESOURCES LIMITED Capital/Financing Update 2020

Nov 24, 2020

64421_rns_2020-11-24_b1358514-fe27-48f1-9db6-bdcb93c97a8c.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [40 x 842] intentionally omitted <==

==> picture [344 x 44] intentionally omitted <==

Free Milling Gold confirmed for Lily Albany Discovery

ASX & Media Release

25 November 2020

  • Overall average gold extractions of 95.1%

ASX Symbol

  • No refractory issues or deleterious contaminants

ARL

  • Conventional operating conditions and reagent consumptions

Ardea Resources Limited

  • Process improvement opportunities under investigation for incorporation into Ardea’s broader gold strategy

Suite 2 / 45 Ord St West Perth WA 6005

PO Box 1433 West Perth WA 6872

Initial metallurgical testwork completed on four samples selected from Ardea’s Lily Albany gold discovery[1] , located on a granted mining lease within the Goongarrie Nickel Cobalt Project (GNCP), 70km north west of Kalgoorlie.

Telephone

Laboratory testwork employing industry standard (gravity-leach) procedures attained very high gold recoveries of >95% under conditions and reagent consumptions matching industry norms for both shallow supergene oxide mineralisation and deep sulphide-bearing mineralisation. Metallurgical results are highly encouraging, and indicate that the Lily Albany discovery has potential to achieve reasonable prospects for eventual economic extraction of gold.

+61 8 6244 5136

Email

[email protected]

Website

Ardea’s Managing Director, Andrew Penkethman, said:

www.ardearesources.com.au

“Ardea have rapidly advanced the understanding of the gold mineralisation in the Aphrodite North target area, with the confirmation of the Lily Albany gold discovery on 29 October 2020. To help determine the potential gold recoveries at Lily Albany ahead of further drill-appraisal, four composite RC samples were taken for metallurgical test work. The results indicate that conventional gravity and leach gold recoveries of greater than 95% can be achieved, with no refractory issues or deleterious contaminants. These results at this early project stage are important for assessing project priorities. Given the strong zones of gold mineralisation intersected thus far from exploration drilling, combined with the high gold extractions from metallurgical testwork, Lily Albany remains a priority project.

Directors

Mat Longworth Non-Executive Chair

Andrew Penkethman Managing Director & CEO

Ian Buchhorn Technical Executive Director

Executive Management

An RC drill rig is planned to be back at site in December to resume drilling at the recent Zeus and Lily Albany gold discoveries. Diamond drilling is also being planned and a core rig will be secured to further assess our projects.

Sam Middlemas Company Secretary & CFO

Matt Painter General Manager Exploration

Ardea continues to maintain momentum on the emerging Bardoc Tectonic Zone (BTZ) gold camp, hidden beneath transported cover, within its Goongarrie Nickel Cobalt Project tenements.

Issued Capital

With 65kms of strike of the major gold controlling BTZ covered by Ardea tenements, the Company is well placed to build upon the gold discovery success achieved thus far.”

Fully Paid Ordinary Shares 127,670,582

Directors/Employee Performance Rights 3,711,000

ABN 30 614 289 342

1 ASX release “Lily Albany” gold discovery confirmed by RC drilling at Aphrodite North, 29 October 2020.

==> picture [35 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Overview

On 13 August 2020, Ardea announced significant gold mineralisation from the first ever RC drilling in the Aphrodite North target area, within the Bardoc Tectonic Zone (BTZ) on Ardea’s Goongarrie Nickel Cobalt Project (GNCP) tenements[2] . Follow-up RC drilling confirmed a new gold discovery within the Aphrodite North target area, now named Lily Albany. Confirmation of the Lily Albany gold discovery confirmed the integrity of Ardea’s geological model, proposing an orogenic gold system within a layered mafic complex, that had not previously been explored before and was hidden by 10 to 40 metres of transported cover.

Follow up metallurgical bench-scale testing has been completed on four Lily Albany RC composite samples to determine routes for gold recovery. This is a necessary stage to establish that the deposit has Reasonable Prospects of Eventual Economic Extraction (RPEEE).

Initial tests on the four samples returned average gold recoveries >95%, which is consistent with that of a free-milling gold deposit, using conventional gravity gold techniques, followed by separate leaching of the gravity concentrate and tailings. These results provide metallurgical grounds for RPEEE from this discovery. Significant additional work including resource drill out, resource estimation and mining studies are still required ahead of any mining operation.

As Ardea’s understanding of the Lily Albany gold discovery continues to evolve through additional exploration and resource definition drilling, further metallurgical testwork will be conducted to both confirm the deposit’s RPEEE status and to optimise the metallurgical parameters.

The Lily Albany Gold Project

The Lily Albany Gold Project is located within Ardea’s GNCP tenure approximately 70km north west of the City of Kalgoorlie-Boulder and approximately 3.5km north east of Ardea’s Big Four gold deposit (Figure 1). As reported by Ardea in previous ASX announcements, gold mineralisation has been discovered at the Lily Albany prospect, within one of Ardea’s granted mining leases. Significant Lily Albany exploration intercepts to date include:[2 and][3]

AANR0001 6m at 3.60g/t Au from 44m (supergene) including 2 m at 4.94 g/t gold from 22 m and 8m at 4.94g/t Au from 172m to 180m EOH including 4m 9.42g/t Au from 172m AANR002 10m at 1.52g/t Au from 76m (supergene) and 2m at 0.63g/t from 226m to 228m EOH AANR004 12m at 0.73g/t Au from 160m including 2m at 2.39g/t from 162m AANR0008 10m at 3.55g/t Au from 40m (supergene) including 2m at 15.50g/t Au from 44m AANR0009 50m at 0.70g/t Au from 194m including 18m at 1.07g/t Au from 216m including 2m at 2.45g/t Au from 218m AANR0010 10m at 1.30g/t Au from 136m including 2m at 2.45 g/t Au from 136m

AANR0014 6 m at 1.68 g/t gold from 246m

Note: Holes AANR0001 and AANR0002 were stopped while drilling in mineralisation due to drilling difficulties.

2 ASX release, Significant gold in first RC drilling at Aphrodite North, 13 August 2020

3 ASX release, Lily Albany gold discovery confirmed by RC drilling at Aphrodite North, 29 October 2020.

2

==> picture [35 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

==> picture [345 x 719] intentionally omitted <==

Figure 1: Location of the Lily Albany gold discovery at Aphrodite North. Also shown is the desensitised range of gold targets along the Aphrodite Trend, the structural line linking the Aphrodite gold project to the south with Goongarrie Lady and other deposits at Goongarrie to the north. Targets for other areas not shown. Projection: GDA94 MGA94 Zone 51.

3

==> picture [35 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Metallurgical test work shows free milling recoveries

Composites recovered from existing Lily Albany RC drill samples were dispatched by Ardea personnel to Bureau Veritas, Canning Vale, for processing and evaluation.

Metallurgical tests used the same procedure as previously reported in Ardea’s recent ASX release of 12 October 2020 ( First metallurgical tests: Very high gold recoveries from Big Four Gold deposit ). This procedure comprised conventional gravity and cyanide leach technology, as used for free milling gold recovery, and is discussed in Appendix 4. Gold deportment and recovery data are summarised below (Table 1).

Table 1: Lily Albany gold deportment and recovery data from first phase metallurgical testwork. Composite samples LA#01 and LA#03 represent shallow supergene gold mineralisation and samples LA#02 and LA#04 represent deeper sulphide gold mineralisation. Note the the Lily Albany deposit forms part of Ardea’s Aphrodite North target area and is not to be confused with the similarly-named Aphrodite deposit under development by Bardoc Gold Limited.

Composite
sample
Gold Recovery
Head gold
grade
(g/t) assay
Head gold
grade
(g/t)
calculated
Gravity Gold
Recovery
(%)
Gravity Gold
Concentrate
Leach
(%)
Gravity Gold
Tails Leach
(%)
Overall Gold
Recovery
(%)
LA#01 2.45
2.3
52.3%
98.8%
99.4%
99.1%
LA#02 3.96
4.65
52.9%
97.2%
84.9%
91.4%
LA#03 1.48
1.3
27.0%
75.6%
99.5%
93.1%
LA#04 0.71
0.67
68.7%
99.3%
92.0%
97.0%
TOTAL RECOVERY
95.1%

The arithmetic average gold recovery for all samples was 95.1%. An average of 50.2% of the gold deported to the gravity gold concentrate, which is expected to provide options for enhancing the overall gold recovery. Gold recoveries were generally good, but anomalous results were observed for the sample 2 gravity tailings leach and the sample 3 gravity concentrate leach. After an appraisal of the multi-element analyses failed to identify significant levels of refractory-type elements (e.g. organic carbon, arsenic, antimony and tellurium) in these streams, further sizing and diagnostic leach tests were commissioned. These tests are in progress at the time of this report, and it is expected that the results will be used to improve testing procedures and to fine-tune the process.

Reagent consumptions were tested under both bottle roll and tank leach conditions. These are reported below (Table 2).

Table 2: Bottle roll and tank leach reagent consumptions.

Composite sample Bottle Roll Test, kg/t
VAT Leach Test, kg/t
CN
Lime
CN
Lime
LA#01 0.51
19.2
3.19
18.6
LA#02 0.13
11
0.62
7.45
LA#03 0.19
11.4
0.64
9.45
LA#04 0.15
12
0.45
8.15

Cyanide consumption in the Vat Leach tests were higher than the bottle roll tests most likely due to reagent loss though evaporation. Typically, the Vat Leach test results overestimate cyanide consumption due to scaling factors, while the bottle roll test underestimates cyanide consumption because it is conducted in a sealed vessel. Full scale operations are expected to be within the given range.

From the data to hand, it is concluded that the emerging Lily Albany discovery would be classified as “free milling” and would not justify exotic processing as required elsewhere to manage refractory-type components.

4

==> picture [35 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Trace element analysis

Table 3: Multi-element analysis of the composite head samples and gravity gold products.

Multi-element analysis of the composite head samples and gravity gold products was conducted to locate any potential chemistry issues in the mineralisation. A summary of these data is shown in Table 3.

Analyte
LA#01
LA#02
LA#03
LA#04
Au 1
ppb
2360
3750
1420
447
Au 2
ppb
2530
4160
1540
970
Au Ave
ppb
2445
3955
1480
709
Ag
ppm
<0.5
0.5
<0.5
<0.5
As
ppm
22.00
1100.00
14.00
228.00
Sb
ppm
3.99
1.30
6.18
1.07
S
ppm
300
21300
500
9250
S2-
ppm
<100
19200
<100
8000
CTOTAL
%
0.43
2.73
0.69
0.96
CORG
%
0.35
0.15
0.59
0.31
CO32-
%
0.40
12.90
0.50
3.25
Hg
ppb
10.9
26.0
10.2
47.1
Pt
ppb
<5
<5
<5
<5
Pd
ppb
<5
<5
<5
<5
Cu
ppm
64.00
90.00
44.00
48.00
Zn
ppm
92.00
64.00
286.00
254.00
Co
ppm
30.00
45.00
20.00
40.00
Ni
ppm
106.00
40.00
66.00
18.00
Te
ppm
0.10
1.09
0.10
0.13

In general, refractory elements were not seen in significant concentrations. The tellurium level in sample 2 was relatively high, this analysis being confirmed by comparing the head assays with the gravity concentration mass balance. Tellurium was found to deport to the gravity gold concentrate but did not seem to affect the gold leach recovery for that composite. Similarly, arsenic and sulphur (as sulphide) concentrated in the gravity gold concentrate but appear to have decomposed under the gravity concentrate leach conditions.

It is concluded that where refractory trace elements have been analysed, they do not appear to have affected gold recoveries.

1. Arsenic, Antimony, Mercury and Tellurium analyses were calculated from a gravity separation mass balance. Where level of detection was encountered, 50% of limit of detection (LOD) was used.

Further development of the Lily Albany discovery

Geological exploration continues with the aim of delimiting the extent of gold mineralisation and defining a maiden mineral resource.

Diagnostic metallurgical testing is being performed to identify the cause of anomalous gold recoveries in the sample #2 gravity tails and the #3 gravity concentrate leach stages. Answering those questions is expected to result in a material increase in the already very good recoveries disclosed.

Authorised for lodgement by the Board of Ardea Resources Limited.

For further information regarding Ardea, please visit https://ardearesources.com.au/ or contact:

Andrew Penkethman Managing Director and Chief Executive Officer Tel +61 8 6244 5136

5

==> picture [35 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

About Ardea Resources

Ardea Resources (ASX:ARL) is an ASX-listed resources company, with a large portfolio of 100% controlled West Australian-based projects, focussed on:

  • Development of the Goongarrie Nickel Cobalt Project, which is part of the Kalgoorlie Nickel Project, a globally significant series of nickel-cobalt deposits which host the largest nickel-cobalt resource in the developed world, coincidentally located as a cover sequence overlying fertile orogenic gold targets; and

  • Advanced-stage exploration within its WA nickel sulphide and gold exploration tenure located on crustalscale Tectonic Zone structures in lake settings within the Eastern Goldfields world-class nickel-gold province.

==> picture [410 x 293] intentionally omitted <==

----- Start of picture text -----

Multiple targets defined and being
systematically explored
Ardea controls a
large, strategic land
holding in Western
Australia
Target review current
Australia’s premier nickel-cobalt
project
----- End of picture text -----

Follow Ardea on social media

==> picture [21 x 21] intentionally omitted <==

==> picture [25 x 21] intentionally omitted <==

6

==> picture [35 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release contains forward-looking statements and forward-looking information within the meaning of applicable Australian securities laws, which are based on expectations, estimates and projections as of the date of this news release.

This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to management’s expectations with respect to, among other things, the timing and amount of funding required to execute the Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits, certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s properties, environmental risks, the availability of labour, the focus of the Company in the future, demand and market outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise funding privately or on a public market in the future, the Company’s future growth, results of operations, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking information is based on the opinions and estimates of management at the date the information is given, and on information available to management at such time.

Forward-looking information involves significant risks, uncertainties, assumptions and other factors that could cause actual results, performance or achievements to differ materially from the results discussed or implied in the forward-looking information. These factors, including, but not limited to, the ability to create and spin-out a gold focussed Company, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls, regulations, political or economic developments in Australia or other countries in which the Company does business or may carry on business in the future, operational or technical difficulties in connection with exploration or development activities, employee relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, the Company. Prospective investors should not place undue reliance on any forward-looking information.

Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be consistent with such forwardlooking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

Competent Person Statement

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled or reviewed by Dr Matthew Painter, a Competent Person who is a Member of the Australian Institute of Geoscientists. Dr Painter is a full-time employee of Ardea Resources Limited and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Supporting analysis and metallurgical review for this testwork has been provided by Mr Michael John Miller who is a Member of the Australian Institute of Mining and Metallurgy. Mr Miller is a metallurgist with over 30 years’ experience in the design, management and review of major metallurgical testwork programs and can be deemed to be knowledgeable in these activities. Mr Miller consents to the contents of this report relating to the specifics of the metallurgical testwork and reporting. Dr Painter consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

7

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Appendix 1 – Collar location data, Lily Albany metallurgical test work

Collar location data for recent RC drill holes used by Ardea Resources for metallurgical test work at Lily Albany.

Drill hole Type
Depth
(m)

Tenement
Grid Easting
(mE)
Northing
(mN)
RL
(mASL)

Dip
(°)


Azimuth
(°)
AANR0001 RC 180 M29/426 MGA94_51 327040.7 6666438.7
379
-60
090
AANR0002 RC 228 M29/426 MGA94_51 327269.8 6666442.6
379
-60
270

Appendix 2 – Individual increment subsamples tested

Hole From
(m)
To
(m)

Sample ID
Sent to Met
Lab Weight(kg)
Split for
Composite
(dry kg)
Comments Eventual
Composite
AANR0001
44
45 APN_M01_44_45 19.35 5.00 supergene AphNth#01
AANR0001
45
46 APN_M01_45_46 21.55 5.00 supergene AphNth#01
AANR0001
46
47 APN_M01_46_47 20.00 5.00 supergene AphNth#01
AANR0001
47
48 APN_M01_47_48 29.60 5.00 supergene AphNth#01
AANR0001
48
49 APN_M01_48_49 20.25 5.00 supergene AphNth#01
AANR0001
49
50 APN_M01_49_50 26.35 5.00 supergene AphNth#01
AANR0001
172
173
APN_M02_172_173

9.90
3.75 primary AphNth#02
AANR0001
173
174
APN_M02_173_174

7.55
3.75 primary AphNth#02
AANR0001
174
175
APN_M02_174_175

6.85
3.75 primary AphNth#02
AANR0001
175
176
APN_M02_175_176

11.85
3.75 primary AphNth#02
AANR0001
176
177
APN_M02_176_177

7.35
3.75 primary AphNth#02
AANR0001
177
178
APN_M02_177_178

9.50
3.75 primary AphNth#02
AANR0001
178
179
APN_M02_178_179

10.55
3.75 primary AphNth#02
AANR0001
179
180
APN_M02_179_180

16.05
3.75 primary AphNth#02
AANR0002
76
77 APN_M03_76_77 32.15 3.00 supergene AphNth#03
AANR0002
77
78 APN_M03_77_78 36.40 3.00 supergene AphNth#03
AANR0002
78
79 APN_M03_78_79 5.15 3.00 supergene AphNth#03
AANR0002
79
80 APN_M03_79_80 12.05 3.00 supergene AphNth#03
AANR0002
80
81 APN_M03_80_81 7.00 3.00 supergene AphNth#03
AANR0002
81
82 APN_M03_81_82 7.25 3.00 supergene AphNth#03
AANR0002
82
83 APN_M03_82_83 30.75 3.00 supergene AphNth#03
AANR0002
83
84 APN_M03_83_84 26.15 3.00 supergene AphNth#03
AANR0002
84
85 APN_M03_84_85 9.65 3.00 supergene AphNth#03
AANR0002
85
86 APN_M03_85_86 13.55 3.00 supergene AphNth#03
AANR0002
144
145
APN_M04_144_145

5.15
3.58 IS AphNth#04
AANR0002
145
146
APN_M04_145_146

12.85
3.92 primary AphNth#04
AANR0002
146
147
APN_M04_146_147

14.25
3.75 primary AphNth#04
AANR0002
147
148
APN_M04_147_148

18.85
3.75 primary AphNth#04
AANR0002
148
149
APN_M04_148_149

19.20
4.46 primary AphNth#04
AANR0002
149
150
APN_M04_149_150

2.80
2.34 IS AphNth#04
AANR0002
150
151
APN_M04_150_151

14.50
4.46 primary AphNth#04
AANR0002
151
152
APN_M04_151_152

20.95
3.75 primary AphNth#04

1. Composites were compiled on the basis of equal dry weight per linear metre

2. IS = Insufficient sample. Additional material to reach target sample weight was taken from adjoining interval(s).

8

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Appendix 3 – Head assay analyses for the Lily Albany testwork composites

Select multi-element head assay analyses for the Lily Albany testwork composites. Only those elements typically associated with gold mineralisation and discussed in the body of the announcement are shown here.

Abbreviations used: All element symbols are standard, Ctotal – total contained carbon, Corg – contained organic carbon, CO3[2-] - carbonate, ppm – parts per million, ppb – parts per billion.

Lily Albany Composite Feed Head Assays

AphNth#01
AphNth#02
AphNth#03
AphNth#04
Head
Repeat
Head
Repeat
Head
Repeat
Head
Repeat
Gold
ppb
2360
-
3750
-
1420
-
447
705
2530
-
4160
-
1540
-
970
-
Gold (repeat)
ppb
Gold(average)
ppb
2445
-
3955
-
1480
-
709
705
Silver
ppm
<0.5
<0.5
0.5
<0.5
<0.5
<0.5
<0.5
<0.5
22
25
1100
1130
14
13
228
250
4.2
4.2
1.2
1.2
6.2
6.4
1.2
1.0
0.43
0.44
2.73
2.75
0.69
0.70
0.96
0.97
0.35
0.35
0.15
0.16
0.59
0.59
0.31
0.33
Arsenic
ppm
Antimony
ppm
Sulphur
ppm
Sulphur(repeat)
ppm
CTOTAL
%
0.40
0.45
12.90
12.95
0.50
0.55
3.25
3.20
2360
-
3750
-
1420
-
447
705
2530
-
4160
-
1540
-
970
-
CORG
%
CO32-
%

Lily Albany Composite Gravity Separation Elemental Deportments

  • Gravity concentrate calculated from extracted grade and residue grade of high intensity leach ** - Gravity tail head grade determined by sub sampling solids for assay
AphNth#01
AphNth#02
AphNth#03
AphNth#04
Grav Con
Grav Tail
*
Grav Con
Grav Tail
Grav Con
Grav Tail
Grav Con
Grav Tail
Gold
ppb
-
964
-
2,260
-
973
-
179
-
942
-
2,290
-
967
-
172
Gold (repeat)
ppb
Gold(average)
ppb
286,597
953
276,192
2,275
60,906
970
54,540
176
Silver
ppm
0.7
<0.5
25.774
<0.5
0.3
<0.5
13.3
<0.5
173
27
36548.919
642
84
15
13224
149
1.9
4.0
12.360
1.2
2.5
6.2
8.8
1.0
1378
<100
340255.517
16200
404
<100
237086
6100
600.00
<100
334000.000
17200.00
350.00
<100
205000
5950.00
Arsenic
ppm
Antimony
ppm
Sulphur
ppm
Sulphur(repeat)
ppm
CTOTAL
%
0.10
0.42
1.265
2.94
0.14
0.69
1.80
0.97
0.06
0.31
0.020
0.05
0.07
0.55
0.22
0.23
0.18
0.58
6.23
14.43
0.38
0.68
7.88
3.73
CORG
%
CO32-
%

9

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Appendix 4 – JORC Code, 2012 Edition, Table 1 report

Section 1 Sampling Techniques and Data

(Criteria in this section applies to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information.
• All holes were sampled on a 2 metre down hole interval basis, with exceptions being
made for end of hole final-lengths. All sampling lengths were recorded in ARL’s
standard sampling record spreadsheets. Sample condition, sample recovery and
sample size were recorded for all drill samples collected by ARL.
• The drill spacing was variable with holes generally drilled on 80m spaced lines with
holes approximately 40m apart on each drill line. The drilling was for initial exploration
purposes with some select samples also providing material for the purpose of
metallurgical sampling.
• Industry standard practice was used in the processing of samples for assay, with 2m
intervals of RC chips collected in green plastic bags.
• Assay of samples utilised standard laboratory techniques with standard ICP-AES
undertaken on 50 gram samples for Au, Pt and Pd, and lithium borate fused-bead
XRF analysis used for the remaining multi-element suite. Further details of lab
processing techniques are found in Quality of assay data and laboratory tests below.
Drilling techniques Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
• In recent programs, Ardea drilled the Aphrodite North area with fifteen reverse
circulation (RC) drill holes. All holes were drilled at either -60° to 090° or -60° to 270°,
with another to 205°to define the possible orientations of structures in a target with
limited previous exploration drilling.
• RC drilling was performed with a face sampling hammer (bit diameter between 4½ and
5 ¼ inches) and samples were collected by either a cone (majority) or riffle splitter using
2 metre composites. Sample condition, sample recovery and sample size were
recorded for all drill samples collected by ARL.
Drill sample recovery Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
• RC chip sample recovery was recorded by visual estimation of the reject sample,
expressed as a percentage recovery. Overall estimated recovery was high. RC Chip
sample condition recorded using a three code system, D=Dry, M=Moist, W=Wet. A
small proportion of samples were moist or wet (11.5%), with the majority of these being
associated with soft goethite clays, where water injection has been used to improve
drill recovery.
• Measures taken to ensure maximum RC sample recoveries included maintaining a
clean cyclone and drilling equipment, using water injection at times of reduced air
circulation, as well as regular communication with the drillers and slowing drill advance
rates when variable to poor ground conditions are encountered.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
• RC logging was undertaken on 1 metre intervals. Visual geological logging was
completed for all drilling both at the time of drilling (using standard Ardea logging
codes), and later over relevant met-sample intervals with a metallurgical-logging
perspective. Geochemistry from Ardea aircore drilling data was used together with
logging data to validate logged geological horizons. Aircore results cannot be used in
a resource estimation.
• Logging was performed at the time of drilling, and planned drill hole target lengths
adjusted by the geologist during drilling. The geologist also oversaw all sampling and
drilling practices. ARL employees supervised all drilling. A small selection of
representative chips were collected for every 1 metre interval and stored in chip-trays
for future reference.
• In total, 3,687 m were drilled during the recent programs, with the chips generated
during the entire program logged in detail.
Sub-sampling
techniques and sample
preparation

If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
• 2 metre composite samples were recovered using a 15:1 rig mounted cone splitter or
trailer mounted riffle splitter during drilling into a calico sample bag. Sample target
weight was between 2 and 3kg. In the case of wet clay samples, grab samples taken
from sample return pile, initially into a calico sample bag. Wet samples were stored
separately from other samples in plastic bags and riffle split once dry.
• QAQC was employed. A standard, blank or duplicate sample was inserted into the
sample stream every 10 samples on a rotating basis. Standards were quantified
industry standards. Every 30th sample a duplicate sample was taken using the same
sample sub sample technique as the original sub sample. Sample sizes are

10

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
appropriate for the nature of mineralisation.
Quality of assay data
and laboratory tests

The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For
geophysical
tools,
spectrometers,
handheld
XRF
instruments,
etc,
the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
• All Ardea samples were submitted to Kalgoorlie Bureau Veritas (BV) laboratories and
transported to BV Perth, where they were pulverised.
• The samples were sorted, wet weighed, dried then weighed again. Primary
preparation has been by crushing and splitting the sample with a riffle splitter where
necessary to obtain a sub-fraction which has then been pulverised in a vibrating
pulveriser. All coarse residues have been retained.
• The samples have been cast using a 66:34 flux with 4% lithium nitrate added to form
a glass bead. Al, As, Ba, Ca, Cl, Co, Cr, Cu, Fe, Ga, K, Mg, Mn, Na, Ni, P, Pb, S,
Sc, Si, Sr, Ti, V, Zn, Zr have been determined by X-Ray Fluorescence (XRF)
Spectrometry on oven dry (105˚C) sample unless otherwise stated.
• A fused bead for Laser Ablation MS was created to define Ag_LA, Be_LA, Bi_LA,
Cd_LA, Ce_LA, Co_LA, Cs_LA, Dy_LA, Er_LA, Eu_LA, Gd_LA, Ge_LA, Hf_LA,
Ho_LA, In_LA, La_LA, Lu_LA, Mo_LA, Nb_LA, Nd_LA, Ni_LA, Pr_LA, Rb_LA,
Re_LA, Sb_LA, Sc_LA, Se_LA, Sm_LA, Sn_LA, Ta_LA, Tb_LA, Te_LA, Th_LA,
Tl_LA, Tm_LA, U_LA, V_LA, W_LA, Y_LA, Yb_LA, which have been determined by
Laser Ablation Inductively Coupled Plasma Mass Spectrometry (LAICP-MS).
• The samples have been analysed by Firing a 40 g (approx) portion of the sample.
Lower sample weights may be employed for samples with very high sulphide and
metal contents. This is the classical fire assay process and will give total separation
of Gold, Platinum and Palladium in the sample. Au1, Pd, Pt have been determined
by Inductively Coupled Plasma (ICP) Optical Emission Spectrometry.
• Loss on Ignition results have been determined using a robotic TGA system.
Furnaces in the system were set to 110 and 1000 degrees Celsius. LOI1000 have
been determined by Robotic TGA.
• Dry weight and wet weight have been determined gravimetrically.
• BV routinely inserts analytical blanks, standards and duplicates into the client sample
batches for laboratory QAQC performance monitoring.
• Ardea also inserted QAQC samples into the sample stream at a 1 in 10 frequency,
alternating between blanks (industrial sands) and standard reference materials.
Additionally, a review was conducted for geochemical consistency between
historically expected data, recent data, and geochemical values that would be
expected in a nickel laterite profile.
• All of the QAQC data has been statistically assessed. There were rare but explainable
inconsistencies in the returning results from standards submitted, and it has been
determined that levels of accuracy and precision relating to the samples are
acceptable.
Verification of sampling
and assaying

The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
• BV routinely inserts analytical blanks, standards and duplicates into the client sample
batches for laboratory QAQC performance monitoring.
• Ardea also inserted QAQC samples into the sample stream at a 1 in 20 frequency,
alternating between duplicates splits, blanks (industrial sands) and standard
reference materials.
• All of the QAQC data has been statistically assessed. Ardea has undertaken its own
further in-house review of QAQC results of the BV routine standards, 100% of which
returned within acceptable QAQC limits. This fact combined with the fact that the data
is demonstrably consistent has meant that the results are considered to be acceptable
and suitable for reporting.
Location of data points Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
• All drill holes are to be surveyed using an RTK DGPS system with either a 3 or 7 digit
accuracy. The coordinates are stored in the exploration database referenced to the
MGA Zone 51 Datum GDA94.
• Gyroscopic downhole surveys were undertaken with hole orientation measurements
gathered every 10m during descent and then on ascent of the tool.
• Topography is very flat. The topographic surface has been constructed from hole
collar surveys. These are consistent with regional DTMs and are considered adequate
for exploration purposes.
A DGPS pickup up of drill collar locations is considered sufficiently accurate for
reporting of resources but is not suitable for mine planning and reserves.
Data
spacing
and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been
• The drill line spacing was 80m, with collars defined on an ad hoc basis to delimit
interpreted structure, lithological, and mineralised trends.
• The spacing is not considered sufficient at this stage for the definition of Mineral
Resources.
Samples were composited over 2m for the entire drill program apart from the upper
transported lake clays, which were not sampled. This is justified by the results of the
previous aircore program where transported overburden was shown to be barren of

11

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
applied. mineralisation.
Orientation of data in
relation to geological
structure


Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• All drill holes in this program were angled. They were designed to delimit
mineralisation at depth and to close off and intercept all possible orientations of
mineralised structures at a high angle to the east-west sections. Where pre-existing
drill holes were present, these were utilised to assist with delimiting mineralisation.
This approach was undertaken due to limited knowledge concerning the orientation
of strata and structures in the area due to a complete absence of outcrop.
• Without diamond drilling, the orientation of mineralised structures is unknown, but a
steep west dip best fits the limited data collected to date. It is also consistent with
other known mineralisation along structure to the south and north. Geological
interpretation of the geology of the Aphrodite North area continues, but presently
there is sufficient uncertainty to preclude definition of sampling bias or not.
Sample security The measures taken to ensure sample
security.
• All samples were collected and accounted for by ARL employees/consultants during
drilling. All samples were bagged into calico plastic bags and closed with cable ties.
Samples were transported to Kalgoorlie from logging site by ARL employees/
consultants and submitted directly to BV Kalgoorlie.
• The appropriate manifest of sample numbers and a sample submission form
containing laboratory instructions were submitted to the laboratory. Any discrepancies
between sample submissions and samples received were routinely followed up and
accounted for.
Audits or reviews The results of any audits or reviews of
sampling techniques and data.
• No audit or review beyond normal operating procedures has yet been undertaken on
the current dataset. ARL has periodically conducted internal reviews of sampling
techniques relating to resultant exploration datasets, and larger scale reviews
capturing the data from multiple drilling programs.
• Internal reviews of the exploration data included the following:
• Unsurveyed drill hole collars (less than 1% of collars).
• Drill Holes with overlapping intervals (0%).
• Drill Holes with no logging data (less than 2% of holes).
• Sample logging intervals beyond end of hole depths (0%).
• Samples with no assay data (from 0 to <5% for any given project, usually related to
issues with sample recovery from difficult ground conditions, mechanical issues with
drill rig, damage to sample in transport or sample preparation).
• Assay grade ranges.
• Collar coordinate ranges
• Valid hole orientation data.
• The BV Laboratory was visited by ARL staff in 2017, and the laboratory processes
and procedures were reviewed at this time and determined to be robust.

12

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Section 2 - Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status

Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
• The tenement on which the drilling was undertaken is M29/426. ARL, through its
subsidiary companies, is the sole holder of the tenement. The tenement is in good
standing.
• Heritage surveys over the area did not identify any areas of interest over or near the
program area.
Exploration done by
other parties

Acknowledgment and appraisal of exploration
by other parties.
• The target area has not been subject to systematic exploration previously. The area
was identified through appraisal of regional open file datasets and proprietary
targeting criteria and datasets. Nickel laterite resource drilling is located ~3km to the
west, and sporadic historic gold drilling recorded in open file is evident outside the
tenure to the north and south. A handful of shallow drillholes of unknown type coincide
with the footprint of the current drill program but are considered to have been drilled
to insufficient depth and are therefore likely ineffective.
• Ardea’s recent aircore and RC drilling programs are the only significant drill programs
in the Aphrodite North area prior to this RC drill program. The data from these
programs was used to inform the design of this RC drill program.
Geology Deposit type, geological setting and style of
mineralisation.
• The geology of the target area is still under assessment.
• A layered mafic intrusion is either thrust repeated or isoclinally folded near the contact
of the Victorious Basalt with the basal units of the Black Flag Formation. With a
complete lack of exposure, geophysics and the results of this and the previous aircore
and RC programs are the only information available.
• The target style of mineralisation is orogenic shear or vein hosted gold mineralisation.
Veining and alteration styles intersected during drilling are consistent with this style
of mineralisation.
Drill hole Information A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.


• All holes drilled and used for metallurgical testwork in this most recent program are
listed in “Appendix 1 – Collar location data”.
Drill hole Information If the exclusion of this information is justified
on the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
• All assay data relating to the metals of interest at Lily Albany, namely gold and
associated tracefinder elements arsenic, antimony, and sulphur, are listed in
“Appendix 3 – Composite head assay results”.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• Drill hole samples have been collected over 2 m down hole intervals.
• Gold intercepts are defined using a 0.5 g/t cut-off on a minimum intercept of 1 m and a
maximum internal waste of 2 m. In each case, geological contacts are taken into
account. An additional 50m wide intercept of interest was calculated using a nominal
0.1g/t Au cutoff with larger internal dilution due justified on geological grounds.
• All assay samples were composited over 2 m.
• No metal equivalent calculations have been used in this assessment.
Relationship
between
mineralisation
widths
and intercept lengths
These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length,
• All drill holes in this program were angled.
• Without diamond drilling, the orientation of mineralised structures is unknown. At
surface, several orientations are evident, but it is not apparent in RC chips. Geological
interpretation of the area continues, and the current best-fit geometry suggests the
highest degree of representivity from the drillholes with an east azimuth, but presently
there is sufficient uncertainty to preclude definition of sampling bias or not.

13

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
true width not known’).
Diagrams Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Appropriate maps are shown in the body of the document. Sections are not pertinent
to the metallurgical testwork.
Balanced reporting Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Not applicable to this report. All results are reported either in the text or in the
associated appendices. Examples of high-grade mineralisation are labelled as such.
Other
substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited
to):
geological
observations;
geophysical survey results; geochemical
survey results; bulk samples size and method
of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating substances.
• No other data are, at this stage, known to be either beneficial or deleterious to
recovery of the metals reported.
Further work The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
• Further drilling is required to identify the extent and nature of primary mineralisation
in fresh rock. Both RC and diamond drill programs are flagged to increase the
understanding of controls and orientation of mineralised structures. Initially, 2
diamond drill holes would be likely. Closely-spaced, pattern RC drilling to a nominal
150m depth is being considered to fully define the uppermost distributions of gold in
both saprolite and fresh rock.
• More detailed metallurgical assessment, including comminution testwork, of all
material types of interest at Lily Albany will be undertaken prior to progression to a
Pre-Feasibility Study (PFS) should such a study be warranted.

14