Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARDEA RESOURCES LIMITED Capital/Financing Update 2019

Aug 11, 2019

64421_rns_2019-08-11_3424b6d5-6e97-4699-b403-f8db467a5bca.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [40 x 842] intentionally omitted <==

==> picture [344 x 44] intentionally omitted <==

Visible high-grade gold at surface at Gundagai, NSW

ASX & Media Release

12 August 2019

ASX Symbol

  • As Ardea advances the spin out of Godolphin Resources, assessment of each project continues to return significant results.

ARL

  • Recent rock-chips from historic workings on the Gundagai Project confirm locally high-grade gold mineralisation of up to 37.90 g/t . This corresponds with visible gold in surface sampling .

Ardea Resources Limited

Suite 2 / 45 Ord St West Perth WA 6005

PO Box 1433 West Perth WA 6872

  • Significant gold mineralisation in surface sampling at Big Ben (up to 4.43 g/t at Gundagai South), and, at Lewis Ponds, gold (up to 3.22 g/t), silver (up to 329 g/t), copper (up to 12.45 %), and lead (up to 9.02 %) mineralisation in surface sampling further highlights the strong potential for the Godolphin tenement suite.

Telephone

+61 8 6244 5136

Email

  • Follow-up field work at each of the projects will be undertaken by Godolphin Resources after it lists in late 2019, and is expected to include geological mapping, systematic sampling and drilling.

[email protected]

Website

www.ardearesources.com.au

  • As at a future Record Date and following listing, Ardea shareholders will receive an in-specie distribution of the 30 million Godolphin Vendor Shares at nil cost, plus have a priority right to subscribe for IPO Shares.

Directors

Katina Law Executive Chair

Ian Buchhorn Technical Executive Director

The Ardea Resources Limited (Ardea or the Company) demerger of its NSW gold and base metal assets continues into a new listing, Godolphin Resources Limited (Godolphin), via an initial Public Offering. Finalisation of work programs prior to the demerger is yielding significant exploration results as project appraisal continues.

Wayne Bramwell Non-Executive Director

Issued Capital

Recent examination of the Emu workings on the Gundagai Project has defined visible gold mineralisation at surface, with associated base metal (copper, lead, zinc) accessory sulphides.

Fully Paid Ordinary Shares 106,145,424

Unlisted options exercisable at $0.25 11,155,011

Ardea CEO Andrew Penkethman noted:

Directors/Employee Performance Rights 5,161,000

“Identification of gold grades of up to 37.9g/t at surface during first phase project assessment is an outstanding start to the Gundagai North exploration. Ardea’s Orange-based exploration team continue to assess our NSW projects and advance the understanding of these under-explored tenements. The large regionally significant land holding assembled by Ardea in NSW provides an exceptional platform for Godolphin to build upon as a dedicated NSW gold and base metals exploration and development company.”

ABN 30 614 289 342

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Gold workings at Gundagai and Lewis Ponds assessed

As Ardea moves towards an IPO and spinout of its NSW assets into Godolphin Resources Limited, project assessment continues. Several work streams are in progress and are planned to be finalised prior to the IPO. These include:

  • Resource upgrade at Lewis Ponds gold-zinc-silver-copper-lead project;

  • Maiden Resource for Mt Aubrey gold project; and

  • Resource for the Yeoval gold-copper project.

All resources will be completed following JORC Code (2012) guidelines.

In addition, field appraisal of the extensive ground position at and around Gundagai and Lewis Ponds continues, with new results described as follows.

Gundagai Gold Project

Emu Workings, Gundagai North

The Emu workings north of Gundagai show significant potential (Figure 1, Table 1).

Selective samples were taken to provide confirmation of gold mineralisation in the area and to define mineral associations at each site. These relationships are pivotal to defining the most appropriate and efficient exploration programs for each prospect. Such selective sampling is by no means representative of the overall grade of the prospects, which is expected to be better determined by Godolphin once listed.

Values as high as 37.90 g/t gold were recorded in sulphide-bearing quartz veins with visible gold (sample CL2816), whilst 20.90 g/t gold was recorded in quartz veins with ferruginous staining without visible gold (CL2811). All samples were collected from within and around the historic Emu workings north of Gundagai township. Encouragingly,

Figure 1 – Gold in rock chips at the Emu workings, Gundagai North. Projection: MGA 94 Zone 55.

elevated gold levels exceeding 1.0 g/t gold are evident in 7 of the 14 samples collected , with anomalous gold values present in most of the remainder.

2

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

==> picture [399 x 677] intentionally omitted <==

----- Start of picture text -----

Emu workings
Big Ben
----- End of picture text -----

Figure 2 –The Gundagai Project. The Emu workings and the Big Ben prospect are highlighted. Projection: MGA 94 Zone 55.

3

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Table 1 – Selected rock chipping results from the Emu workings at Gundagai North. Gold values in excess of 1 g/t (1ppm) are shown. All results are presented in Appendix 1. Samples were selected from mineralised rocks to confirm gold grades and mineral associations and should not be considered indicative of overall deposit grade or size. There is presently insufficient data to define resources or reserves at each project. Coordinates recorded in MGA 94 Zone 55.

Prospect Sample
number

Northing
(mN)

Easting
(mN)
Gold
(g/t)
Silver
(g/t)

As
(ppm)

Sb
(ppm)

Cu
(ppm)

Pb
(ppm)

Sample description
Emu CL2810 6128245 595819 1.68 0.07 5.2 1.22 22.5 44 Quartz veins, ferruginous staining
CL2811 6128226 595810 20.90 0.66 4.3 1.39 20.1 110 Quartz veins, ferruginous staining
CL2815 6128206 595812 1.62 0.30 9.0 1.25 41.3 42 Sheeted quartz vein set
CL2816 6128206 595812 37.90 7.93 3.6 1.54 28.5 2570 Quartz vein with sulphides andvisible gold
CL2817 6128116 595776 4.71 0.44 22.2 1.52 12.5 49 Quartz vein with sulphides
CL2818 6128166 595776 3.03 1.86 6.6 1.04 66.8 437 Quartz vein with sulphides
CL2820 6128290 595946 1.32 0.94 3.2 0.88 7.2 163 Quartz vein with sulphides
Big Ben CL2837 6111332 599417 4.43 0.31 2.3 0.32 20.9 195 Sheeted quartz vein set in porphyry
CL2838 6111346 599411 2.52 0.82 6.1 0.60 602.0 134 Porphyrywithquartz stockwork

Surface sampling at Big Ben, Gundagai South

At Gundagai South, a reconnaissance program aimed primarily at defining local rock types at the Big Ben prospect showed anomalism within sheeted quartz veins associated with a porphyry intrusive of 2.52 and 4.43 g/t gold (Figure 3). Big Ben is expected to be the first of many gold prospects to be assessed and explored by Godolphin once it lists later in 2019.

==> picture [286 x 415] intentionally omitted <==

Potential of the Gundagai Project

Appraisal of various projects also continues. Recently, the gap between the Gundagai North and Gundagai South tenements was pegged by Ardea, for Godolphin, to consolidate this highly prospective regional land holding. The area remains in application, but its pegging has led to a renewed assessment of the entire Gundagai project area.

Gundagai is a historic gold mining centre, with numerous 1800s vintage gold workings located around the historic town site. On currently granted tenure, there are 65 gazetted historic mine sites, deposits, and occurrences of gold and some minor base metals. The new application contains another 23 such sites, predominantly gold and copper, for a total in the Gundagai area of 88 gazetted localities (Figure 2).

Figure 3 – Gold in recent rock chip sampling at the Big Ben prospect at Gundagai South, showing only those samples in excess of 1 g/t Au.

4

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Each of these will be assessed by Godolphin upon listing, but more importantly, the abundance of mineralisation in the area points to untapped potential that will be targeted using modern exploration and modelling techniques.

Surface sampling at Lewis Ponds

==> picture [346 x 503] intentionally omitted <==

Sampling was completed at Lewis Ponds and constitutes the final phase of assay data gathering for Ardea resources on the NSW projects prior to the Godolphin IPO later this year.

The sampling was undertaken on the southern extensions of the Lewis Ponds project as part of a mapping exercise exploring the surface expression of a possible strike extension of the mineralisation. Significant gold anomalism is present. At Lewis Ponds, surface sampling continued to highlight values up to 3.22 g/t gold at the historic Toms workings, with gold anomalism spread along the full strike length of base metal mineralisation. With modelling of the new resource in its final stages, it is encouraging to find gold mineralisation is so common throughout the deposit at surface, justifying Ardea’s model that gold will be a significant product of any future mining operation at Lewis Ponds.

In addition to the gold results, silver (up to 329 g/t Ag ), copper (up to 12.45 % Cu ) and lead (up to 9.02 % Pb ) were also locally highly anomalous. Results for a

Figure 4 – Recent Lewis Ponds surface rock chip sampling results, showing the main Lewis Ponds area in the north, extending along near-continuous mineralisation to Little Bell Mount Mine in the south, around 1.7 km strike. Unlike previous studies of the project, this entire area and further along strike to the south is being appraised as part of the Lewis Ponds project. Projection: MGA 94 Zone 55.

representative suite of elements for all samples collected are presented in Appendix 1.

5

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Godolphin Resources spinout, late 2019

Ardea has incorporated a wholly owned subsidiary, Godolphin Resources Limited (Godolphin) for the spin out of its NSW projects, through an Initial Public Offering, as summarised in ASX release, “Godolphin Resources Limited a spin-out of Ardea’s NSW tenements”, 25 June 2019.

Godolphin’s development focus will be the Mount Aubrey epithermal gold and Lewis Ponds gold-zinc projects associated with the Lachlan Transverse Zone (LTZ) of the Lachlan Fold Belt (LFB) in central NSW.

The Proposed Transaction is subject to various conditions, including approval by Ardea shareholders at an Extraordinary General Meeting (EGM), in anticipation of listing in Q4 2019.

==> picture [506 x 356] intentionally omitted <==

Figure 5 – Locations of Ardea’s outcropping gold projects described in this announcement. Projection: MGA 94 Zone 55.

The Ardea Board is committed to unlocking the significant value held in the LFB assets and believes that this is best achieved through the ASX listing of a focused, standalone gold and base metal exploration and development company, with dedicated funding, board and management team.

Godolphin has been registered as a wholly-owned subsidiary of Ardea, with title to the NSW assets in the process of being transferred to Godolphin.

The derivation of the Godolphin name is from the Godolphin Fault, a crustal-scale structure that hosts significant mineral deposits along its entire strike length, including the 60km of strike held by Godolphin.

Since its listing in 2017, Ardea has become the second largest mineral tenement holder in NSW with Godolphin now holding some 3,216km[2] , with tenure being associated with the key LFB metallogenic

6

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

provinces being the LTZ and Gilmore Suture. This dominant land position has been acquired through detailed project scale and regional data compilation and analysis. This work has been carried out by the dedicated exploration team based in Orange. The work has highlighted the prospectivity of the Godolphin tenements and remarkably, the fact that this area is largely under explored by modern standards.

Work completed thus far by Ardea has advanced its NSW projects towards defining three separate JORCcompliant mineral resources. Work programs completed include land-holder access agreements, digitally capturing historic exploration data, geological mapping and soil auger geochemistry, leading to the definition of drill-ready targets across granted Godolphin tenure.

These newest results presented here will no doubt spur field programs in the Gundagai group of tenements and at Lewis Ponds.

7

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

About Ardea Resources

Ardea Resources (“Ardea” – ASX:ARL) is an ASX listed resources company, with 100% controlled Australian-based projects, prioritising a three-pronged value creation strategy which is:

  • development of the Goongarrie Nickel Cobalt Project, which is part of the Kalgoorlie Nickel Project, a globally significant series of nickel-cobalt-scandium deposits which host the largest nickel-cobalt resource in the developed world, coincidentally located as a cover sequence overlying fertile orogenic gold targets;

  • advanced-stage exploration at WA gold and nickel sulphide targets within the Eastern Goldfields world-class nickel-gold province; and

  • the Godolphin Resources Limited demerger of the NSW gold and base metal assets with planned in-specie share distribution, with all projects located within the Lachlan Fold Belt world-class goldcopper province, specifically within the Lachlan Transverse Zone (hosts McPhillamy’s Gold and Cadia and Northparkes copper-gold) and splay fault of the Gilmore Suture (hosts Cowal gold).

==> picture [511 x 336] intentionally omitted <==

For further information regarding Ardea, please visit www.ardearesources.com.au or contact:

Ardea Resources:

Andrew Penkethman

Chief Executive Officer, Ardea Resources Limited Tel +61 8 6244 5136

8

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release contains forward-looking statements and forward-looking information within the meaning of applicable Australian securities laws, which are based on expectations, estimates and projections as of the date of this news release.

This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to management’s expectations with respect to, among other things, the timing and ability to complete the Ardea spin-out, the timing and amount of funding required to execute the Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits, certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s properties, environmental risks, the availability of labour, the focus of the Company in the future, demand and market outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise funding privately or on a public market in the future, the Company’s future growth, results of operations, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking information is based on the opinions and estimates of management at the date the information is given, and on information available to management at such time. Forward-looking information involves significant risks, uncertainties, assumptions and other factors that could cause actual results, performance or achievements to differ materially from the results discussed or implied in the forward-looking information. These factors, including, but not limited to, the ability to complete the Ardea spin-out on the basis of the proposed terms and timing or at all, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls, regulations, political or economic developments in Australia or other countries in which the Company does business or may carry on business in the future, operational or technical difficulties in connection with exploration or development activities, employee relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, the Company. Prospective investors should not place undue reliance on any forward-looking information.

Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be consistent with such forwardlooking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

Competent Person Statement

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Dr Matthew Painter, a Competent Person who is a Member of the Australian Institute of Geoscientists. Dr Painter is a full-time employee of Ardea Resources Limited and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Painter consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

9

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Appendix 1 – Assay results

Ardea’s recent rock chip assay results from Gundagai and Lewis Ponds projects.

Abbreviations used: Au – gold, Ag – silver, As – arsenic, Sb – antimony, Cu – copper, Pb – lead, m – metre, g/t – grams per tonne, ppm – parts per million, bd – below detection.

Detection limits: Au – 0.001 g/t, Ag – 0.01 ppm, As – 0.2 ppm, Sb – 0.05 ppm, Cu – 0.2 ppm, Pb – 0.5 ppm

Gundagai Project field sampling results

Prospect Sample
number

Northing
(mN)

Easting
(mN)
Gold
(g/t)
Silver
(g/t)

As
(ppm)

Sb
(ppm)

Cu
(ppm)
Pb
(ppm)

Sample description
Emu CL2810 6128245 595819 1.68 0.07 5.2 1.22 22.5 44 Quartz veins, ferruginous staining
CL2811 6128226 595810 20.90 0.66 4.3 1.39 20.1 110 Quartz veins, ferruginous staining
CL2812 6128205 595811 0.16 0.39 4.4 1.36 35.5 53 Laminated quartz veins in felsic porphyry
CL2813 6128205 595811 0.04 0.54 3.6 1.12 19.0 174 Quartz veins, ferruginous staining
CL2814 6128206 595812 0.09 0.09 6.5 2.84 31.7 37 Ferruginous quartz vein from mullock
CL2815 6128206 595812 1.62 0.30 9.0 1.25 41.3 42 Sheeted quartz vein set
CL2816 6128206 595812 37.90 7.93 3.6 1.54 28.5 2570 Quartz vein with sulphides andvisible gold
CL2817 6128116 595776 4.71 0.44 22.2 1.52 12.5 49 Quartz vein with sulphides
CL2818 6128166 595776 3.03 1.86 6.6 1.04 66.8 437 Quartz vein with sulphides
CL2819 6128052 595768 0.01 0.19 1.9 0.48 11.4 12 Vuggy quartz and minor quartz vein with sulphides
CL2820 6128290 595946 1.32 0.94 3.2 0.88 7.2 163 Quartz vein with sulphides
CL2821 6128420 595891 0.84 21.10 9.2 3.68 101.5 5110 Quartz vein with galena
CL2822 6128420 595891 0.25 7.91 4.2 1.79 44.4 2680 Quartz vein with galena
CL2823 6128421 595892 0.01 1.43 1.2 0.76 32.8 445 Quartz vein with galena
Big Ben CL2824 6111220 599429 0.01 5.09 7.9 3.80 60.5 1240 Quartz vein with sulphides
CL2825 6111250 599447 0.00 0.24 2.8 0.50 26.1 53 Quartz vein with sooty pyrite
CL2826 6111233 599453 0.00 0.07 6.5 0.79 38.4 14 Laminated quartz vein with Fe and Mn oxides
CL2827 6111387 599365 0.02 0.18 22.6 0.55 365.0 27 Fault breccia
CL2828 6111375 599377 0.01 0.22 25.4 0.68 31.9 45 Fault breccia
CL2829 6111353 599389 0.00 0.10 7.7 0.45 10.4 21 Lithic sandstone
CL2830 6111347 599394 0.01 0.17 17.0 0.69 21.1 26 Fault breccia
CL2831 6111344 599397 0.01 0.12 9.1 1.27 28.4 27 Stockwork quartz veins in felsic porphyry
CL2832 6111340 599403 0.01 0.19 9.9 0.57 13.8 19 Conglomerate
CL2833 6111331 599408 0.01 0.14 12.8 1.07 35.3 68 Mass flow sandstone
CL2834 6111320 599413 0.01 0.18 4.7 0.46 71.5 23 Porphyry contact, Mn-bearing
CL2835 6111318 599415 0.02 0.12 5.0 0.89 48.5 30 Porphyry with quartz stockwork
CL2836 6111325 599422 0.01 0.05 4.2 0.55 19.3 22 Porphyry contact, weathered
CL2837 6111332 599417 4.43 0.31 2.3 0.32 20.9 195 Sheeted quartz vein set in porphyry
CL2838 6111346 599411 2.52 0.82 6.1 0.60 602.0 134 Porphyry with quartz stockwork
CL2839 6111308 599413 0.35 0.64 7.8 0.68 300.0 89 Porphyry with quartz veins
CL2840 6111307 599414 0.02 0.06 4.9 0.51 55.3 27 Porphyry
CL2841 6111449 599395 0.01 0.12 13.9 0.92 42.1 47 Porphyry with quartz veins
CL2842 6111453 599386 0.02 0.57 10.3 0.46 81.2 36 Porphyry with quartz veins
CL2843 6111458 599375 0.06 0.16 30.0 1.33 115.0 30 Porphyry with quartz veins
CL2844 6111461 599371 0.01 1.07 20.7 0.99 1820.0
29
Sandstone, Mn-bearing

10

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Lewis Ponds Project field sampling results

Prospect Sample
number
Northing
(mN)
Easting
(mN)
Gold
(g/t)
Silver
(g/t)
As
(ppm)
Sb
(ppm)
Cu
(%)
Pb
(%)
Sample description
Toms CL2784 6316189 710107 0.67 12.0 339 19 0.01 0.15 Sulphidic sinter
CL2785 6316197 710103 3.22 96.5 976 225 0.05 1.40 Quartz veins with sulphides
CL2786 6316189 710106 0.18 21.6 217 43 0.22 1.95 VMS host unit
CL2787 6316210 710107 0.22 19.5 552 27 0.41 1.17 VMS host unit
CL2788 6316222 710102 2.70 240.0 1710 431 0.18 9.02 Massive sulphides
CL2789 6316227 710099 2.72 135.0 1055 317 0.12 5.53 Massive sulphides
Summers CL2790 6315918 710259 0.34 1.9 314 67 0.06 0.35 Massive sulphides
CL2791 6315918 710255 0.69 18.6 477 46 0.09 0.54 Gossan
CL2792 6315917 710252 2.26 19.4 370 53 0.08 0.55 Gossan
CL2793 6315918 710259 0.20 9.3 307 31 0.01 0.59 Semi-massive pyrite, siliceous
CL2794 6315824 710336 0.08 9.0 6 1 1.46 0.02 Sulphide-rich selvedge to quartz vein
CL2795 6315819 710334 0.21 11.2 14 2 1.96 0.07 Quartz vein with chalcopyrite
CL2796 6315823 710334 0.33 21.0 30 4 5.72 0.04 Quartz vein with chalcopyrite
Little Bell north CL2797 6315598 710384 1.11 12.4 613 62 0.07 0.59 Mudstone
CL2798 6315570 710414 0.01 2.3 34 2 0.02 0.20 Felsic volcaniclastic
CL2799 6315598 710309 0.07 10.6 135 5 0.07 0.06 Massive sulphides
CL2800 6315532 710284 0.71 1.6 17 2 0.35 0.00 Breccia fault gouge with copper staining
CL2801 6315486 710332 0.77 21.0 344 17 0.23 0.02 Gossan
CL2802 6315533 710341 0.05 0.6 32 3 0.04 0.02 Ferruginous quartz vein
Little Bell CL2803 6315342 710342 0.04 7.3 22 1 3.13 0.00 Mica schist with malachite staining
CL2804 6315381 710334 0.61 44.3 131 12 1.62 0.05 Sulphidic quartz eye tuff
CL2805 6315390 710297 0.02 1.5 7 1 0.61 0.00 Copper staining of quartz eye tuff
CL2806 6315370 710245 0.02 1.1 1 0 1.39 0.00 Vein quartz in quartz eye tuff
CL2807 6315370 710245 1.07 20.5 3 1 12.45 0.01 Copper staining of quartz eye tuff
Main Shaft CL2849 6316681 709763 0.98 329.0 196 251 0.21 8.08 Massive sulphides

11

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Appendix 2 – JORC Code, 2012 Edition, Table 1 report

Section 1 Sampling Techniques and Data

(Criteria in this section applies to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information.
• Rocks were selectively sampled to ensure high-level representivity of various rock
and alteration types observed at each site. Samples collected were first-pass
reconnaissance samples to develop familiarity with each of the prospects studied.
Many were collected from historic dumps and around old workings, so were not strictly
in situ, but were clearly sourced from the historic workings. Sample type, style,
condition, and size were recorded for all samples collected by ARL.
• All results of each field program have been reported.
• Industry standard practice was used in the processing of samples for assay.
Drilling techniques Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
• Not applicable.
Drill sample recovery Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gainof fine/coarse material.
• Not applicable.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
• Not applicable
Sub-sampling
techniques and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
_duplicate/second-halfsampling. _
• All core and rock chip samples are crushed then pulverised in a ring pulveriser (LM5)
to a nominal 90% passing 75 microns. An approximately 250g pulp sub-sample is
taken from the large sample and residual material stored.
• A quartz flush (approximately 0.5 kilogram of white, medium-grained sand) is put
through the LM5 pulveriser prior to each new batch of samples. A number of quartz
flushes are also put through the pulveriser after each massive sulphide sample to
ensure the bowl is clean prior to the next sample being processed. A selection of this
pulverised quartz flush material is then analysed and reported by the lab to gauge the
potential level of contamination that may be carried through from one sample to the
next.

12

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For
geophysical
tools,
spectrometers,
handheld
XRF
instruments,
etc,
the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
• Sample preparation and assaying is being conducted through ALS Laboratories,
Orange, NSW with certain final analysis of pulps being undertaken at the ALS
Laboratory in Perth WA.
• Gold is determined by 30g fire assay fusion with ICP-AES analysis to 1ppb LLD.
• Other elements by mixed acid digestion followed by ICP-AES analysis.
• Laboratory quality control standards (blanks, standards and duplicates) are inserted
at a rate of 5 per 35 samples for ICP work.
• Ardea also insert blanks and standards at a frequency of 1 per 10 samples.
• All of the QAQC data has been statistically assessed. It has been determined that
levels of accuracy and precision relating to the samples are acceptable.
Verification of sampling
and assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.

An internal review of results was undertaken by Company personnel. No
independent verification was undertaken at this stage.

All field and laboratory data has been entered into an industry standard database
using a database administrator (DBA) in the Company’s Perth office. Validation of
both the field and laboratory data is undertaken prior to final acceptance and
reporting of the data.
• Quality control samples from both the Company and the Laboratory are assessed by
the DBA and reported to the Company geologists for verification. All assay data must
pass this data verification and quality control process before being reported.
Location of data points Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
• All samples were located using a handheld GPS system. The coordinates are stored
in the exploration database referenced to the MGA Zone 55 Datum GDA94.
• The grid system for all models is GDA94. Where historic data or mine grid data has
been used it has been transformed into GDA94 from its original source grid via the
appropriate transformation. Both original and transformed data is stored in the digital
database.
Data spacing and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been
_applied. _
• Not applicable
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Not applicable
Sample security The measures taken to ensure sample
security.
• All samples were collected and accounted for by ARL employees/consultants during
collection. All samples were bagged into calico bags and tied. Samples were
transported to Orange from the collecting site by ARL employees/ consultants and
submitted directly to ALS Orange.
• The appropriate manifest of sample numbers and a sample submission form
containing laboratory instructions were submitted to the laboratory. Any discrepancies
between sample submissions and samples received were routinely followed up and
accounted for.
Audits or reviews The results of any audits or reviews of
sampling techniques and data.
• No audit or review beyond normal operating procedures has yet been undertaken on
the Gundagai datasets. ARL has periodically conducted internal reviews of sampling
techniques relating to resultant exploration datasets, and larger scale reviews
capturing the data from multiple drilling programs.
• A review and assessment of the ALS laboratory procedures was under taken by
Company personnel in late 2016 and determined to be robust.

13

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Section 2 - Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
• The tenements on which the rock chip sampling was undertaken are
Gundagai North: EL8586.
o
The Gundagai North project is located immediately north of the town of
Gundagai in New South Wales and has an elevation between 200 m and
600 m above sea-level.
o
The exploration rights to the project are owned 100% by the Ardea
Resources through the granted exploration license EL8586.
Gundagai South: EL8061
o
The Gundagai south project is located immediately south of the town of
Gundagai in New South Wales and has an elevation between 200 m and
600 m above sea-level.
o
The exploration rights to the project are owned 100% by the Ardea
Resources through the granted exploration license EL8061.
Lewis Ponds: EL5583
o
The Lewis Ponds project is located 14km east-northeast of the city of
Orange, central New South Wales, and has an elevation of between 700 m
and 900 m above sea-level.
o
The exploration rights to the project are owned 100% by the Ardea
Resources through the granted exploration licence EL5583, which expires on
24 June 2022.
o
A capped (A$2M) royalty and finder’s fee is payable to a private third party if
the project is sold or commences production.
o
The project is on partly cleared private land, most of which is owned by
Ardea. Access agreements are in place for the private land surrounding the
main deposit area. There are no national parks, reserves or heritage sites
affecting the project area.
• Heritage surveys have not been carried out at each site.
Exploration done by
other parties
Acknowledgment and appraisal of exploration
by other parties.
• Each of the areas studied has undergone historic mining activities, presumably during
the latest 1800s and early 1900s. A systematic review of historic exploration has not
yet been undertaken at each of the prospects, however, some near-surface
exploration activities have occurred over the past few decades. None have been
explored to depth.
Lewis Ponds: EL5583
o
The Lewis Ponds deposit and surrounding workings were part of Australia’s
first recognised gold field, discovered 1835. Various surface and shallow
underground mining operations and associated processing and smelting
operations were present at various times between discovery and
approximately 1920. The detailed history for this period is presently the
subject of research.
o
Amax Exploration Australia Inc entered a Joint Venture Agreement which
Metals Investments Holdings NL and A.I. Consolidated Gold Pty Ltd held
with the owner of the title, Wentworth Mining Corporation Pty Ltd, over
ground which included the Lewis Ponds deposit. Amax drilled four DD holes
totalling 875 meters in 1971-1972 which contributed four intercepts above
7% ZnE to this Resource estimate. The only drilling done prior to Amax was
by Cominco in 1969. Three holes were abandoned after entering disused
workings at the Spicers Mine location, Lewis Ponds.
o
Subsequent drilling by Aquitaine Australia Minerals Pty Ltd in 1975-1976 was
under joint venture agreement with Amax and Shell Company of Australia.
10 (BOA series) holes were drilled totalling 2102 metres, which also
contributed four intercepts.
o
Between 1979 and 1981 a further 7 holes totalling 2274 metres (SLP series)
were drilled by Shell and Aquitaine under the JV agreement with Amax. This
drilling contributed five intercepts including one twinned in a wedge hole. In
total, other party exploration contributed 15 percent of the database which
now determines the geometry of potentially ore grade mineralisation for this
Resource estimate.
o
In 1987-1988, the Homestake subsidiary Sabminco drilled 33 RCP holes
totalling 2300 metres (LPRC series). This drilling contributed 21 intercepts
of the 230 used to interpret the Resource.
o
Prior to the acquisition of TriAusMin by Heron in August 2014, Tri Origin
Australia drilled 42232 metres in 124 holes, followed by Tri Origin Minerals
with 3812 metres in 30 holes.

14

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Geology Deposit type, geological setting and style of
mineralisation.
Gundagai North
EL 8586 covers part of the Tumut Trough in the Lachlan Fold Belt. The principal structural
features of the region appear to be controlled by two NNW-trending fault systems, the
Gilmore Suture and the Mooney Mooney Fault System but in the immediate area of EL
8586 the Gundagai and Cootamoondra faults play a more direct role. These two sub-
parallel fault systems are believed to have acted together as a major shear and this system
makes EL 8586 highly prospective for structurally controlled gold and base metal deposits.
The Frampton volcanics in the western section of the licence shows two structures, and a
concentration of historic gold workings seem to occur along this structure. The Gundagai
fault is in the eastern half of the licence and it too seems to have a congregation of
workings associated with it in the Wandeen formation and also further east of the Gundagai
fault. These tow structures combine to make EL8586 very prospective for structurally
controlled gold deposits.
The licence has several units come together in the south. The Jackalas slate, Jones Creek
Diorite, Gundagai Serpentinite, Jindalee group, Eurongilly Serpentinite and Frampton
volcanics all appear along the southern boundary of the licence.
Gundagai South
EL 8061 covers part of the Tumut Trough in the Lachlan Fold Belt. The principal structural
features of the region appear to be controlled by two NNW-trending fault systems, the
Gilmore Suture and the Mooney Mooney Fault System (see Figure 2 after Stuart-Smith,
P.G., 1991 and Figure 3). Several economically significant Cu-Au discoveries have been
associated with the Gilmore Suture which is regarded as a major deep crustal
discontinuity.
The eastern edge of the Gilmore Suture's structural domain occurs in the south of the
licence and the Mooney Mooney Fault zone (MMFZ) which lies approximately 14 km east
of Gundagai. These two sub-parallel fault systems are believed to have acted together as
a major shear and this system makes EL 8061 highly prospective for structurally controlled
gold and base metal deposits.
In the north, a belt of Cambrian Gundagai Serpentinite is associated with a NW-trending
structure in the Jackalass Slate area. A wedge of Silurian Frampton Volcanics also occurs
in the north. An outlier of Devonian Minjary Volcanics lies between the Jackalass Slate
and granites in the south.
The Cambrian and Silurian formations are unconformably overlain by the Early Devonian
Minjary Volcanics. Lithologies include rhyolitic ashflow tuffs, ignimbrites and polymictic
conglomerates. Intrusive phases of exploration interest are mainly of Late Silurian to Early
Devonian age and are generally considered to be contemporaneous with the Gatelee and
Minjary formations.
Lewis Ponds
The most recent statement of the Lewis Ponds geology by Dr Peter Gregory (2005) has
also built on much prior geological insight by other parties in the 1970s and 1980s, and
by geologists employed by predecessor companies to Tri Origin Minerals since 1992.
Also, between 1999 and 2003 a comprehensive Ph.D. study of the geology was made
(Agnew 2003). More recent work is resulting in a reinterpretation of the geology, controls
and style of mineralisation, which is presently in progress. A re-cast of Peter Gregory’s
summary is as follows:
• _Type:_Results of the study show that primary volcanogenic mineralisation of Late
Silurian age developed within an extensive axial zone over 1200m in a moderately
deep-water trough (extensional back arc). Mineralisation deposited at one horizon
close to and possibly on the seafloor within sediments and volcaniclastics and at the
end of a rhyolite-dacite volcanic episode involving lava domes. Tom’s Zone in the
south formed in a quieter sedimentary environment dominated by siltstones. Current
work by Ardea is showing that late-stage gold mineralisation overprints the earlier
VMS style mineralisation.
• _Setting:_The Lewis Ponds mineralised zone is located on the eastern limb of a major
regional F1 anticline and within several subsidiary anticlinal and synformal zones on
that limb. Plunges are variable with Main Zone plunging moderately northwest, but
there appears to be little or no plunge along other sections of the mineralised trend.
Various reverse faults probably emanating from a basal sole thrust at the contact of
the Ordovician basement and the Silurian rift succession cut the axial zones of several
of these folds and leave most volcanic sediment contacts as fault zones. The Lewis
PondsFault, a ductile and brittlefaultzone cuts a synformaxis andhas caused,

15

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
kinking and reorientation of cleavage and remobilisation of sulphides. An interpreted
southwest-northeast dip slip fault near 1220N is suggested to downfault the
mineralised package to the northwest
• _Style of mineralisation:_Main Zone mineralisation to the north is largely composed of
massive to semi-massive sulphide replacement as well as veining and dissemination
within the host polymict breccia-volcaniclastic-siltstone package. Mineralising fluids
emanating from syn-volcanic faults in the footwall porphyry moved laterally through
porous zones in the host package causing sulphide replacement. The mineralising
fluids may have exhaled on the seafloor at some stage based on the minor occurrence
of interpreted reworked sulphide clasts and interstitial bands of fine sulphide in some
carbonate dominated breccias. Tom’s Zone in the south consists of a narrow massive
sulphide stratiform zone in reasonable proximity to interpreted footwall feeder pyrite-
chalcopyrite stringers. Subsequent, possibly epithermal style precious metal
mineralisation is present though its relationship to the earlier, well-documented
mineralisation is not yet clear.
Drill hole Information A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
If the exclusion of this information is justified
on the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.

• Not applicable
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer
lengths of low-grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• Not applicable
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length,
true width not known’).
• Not applicable
Diagrams Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Not applicable.
Balanced reporting Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Not applicable to this report. All results are reported either in the text or in the
associated appendices. Examples of high-grade mineralisation are labelled as such.
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited
to):
geological
observations;
• No other data are, at this stage, known to be either beneficial or deleterious to
recovery of the metals reported.

16

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
geophysical survey results; geochemical
survey results; bulk samples size and method
of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating substances.
Further work The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
_commercially sensitive. _
• Further work is presently being assessed at each of the prospects discussed. Controls
on mineralisation will need to be determined in conjunction with defining areal and
down-dip extent at each prospect.

17