Shallow Gold Resource at Mount Aubrey, NSW

ASX & Media Release

28 August 2019

ASX Symbol

  • Initial JORC 2012 Inferred Mineral Resource at Mount Aubrey of 1.21 Mt at 1.61 g/t gold, (0.5 g/t Au cut off)

ARL

  • 62,400 oz contained gold metal .

Ardea Resources Limited

Suite 2 / 45 Ord St West Perth WA 6005

  • 120,000 t at 3.3 g/t gold was mined by BHP Gold (1989-91), with only shallow, soft, free-digging material removed. All hard rock gold mineralisation remains beneath backfilled pits (less than 40 m depth).

PO Box 1433 West Perth WA 6872

  • Significant potential for tonnage and grade increase as mineralisation is open in all directions.

Telephone

+61 8 6244 5136

  • Limited shallow historic drilling to 40 m depth only.

Email

  • Mapped vein system 7 km strike, initial soil auger geochemistry over 2 km strike highlights host vein sets which extend beyond historic drilling, anomaly open east and west.

[email protected]

Website

  • Alteration zonation consistent with expected increasing gold grades at depth in sulphidated vein zone.

www.ardearesources.com.au

Directors

  • Further drilling is of highest priority for rapid resource increases.

Katina Law Executive Chair

Ardea Resources Limited (Ardea or the Company) is pleased to announce an initial Inferred Mineral Resource estimate, following JORC Code 2012 guidelines, for its Mount Aubrey epithermal gold deposit in the Lachlan Fold Belt, central New South Wales. A summary of the Mineral Resource estimate is:

Ian Buchhorn Technical Executive Director

Wayne Bramwell Non-Executive Director

Table 1: JORC 2012 Inferred Mineral Resource estimate for the Mount Aubrey deposit (0.5 g/t Au cut-off). All figures rounded to appropriate significant figures reflecting certainty of data.

Issued Capital

Fully Paid Ordinary Shares 110,661,853

Resource
category
Cut-off
Au g/t
Tonnes
(Mt)
Gold
(g/t)
Contained gold
(oz)
Inferred
≥ 0.50
1.21
1.61
62,400

Unlisted options exercisable at $0.25 6,638,582

Ardea CEO, Andrew Penkethman commented:

Directors/Employee Performance Rights 5,161,000

“The Mount Aubrey Gold Project is being vended into Godolphin Resources, Ardea’s planned IPO of its NSW gold and base metal assets. The maiden Mount Aubrey Inferred Mineral Resource is just the beginning for this project and only extends over one kilometre of a seven-kilometre epithermal vein system. With the limited drilling completed over this one kilometre only extending to an average depth of 40 metres, the mineral system is wide open and presents a compelling target for Godolphin Resources to start drilling on the day of listing.”

ABN 30 614 289 342

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Mount Aubrey Mineral Resource Summary

Mount Aubrey is a 1989-91 open pit gold mine (BHP Gold) located in central western NSW (Figure 1) that was backfilled and rehabilitated as agreed with the land holder upon completion of mining of near-surface mineralisation. Historic data collated by Ardea has enabled estimation of an Inferred Mineral Resource that will serve as the platform from which future exploration and resource definition by spinout Godolphin Resources will build upon.

==> picture [446 x 569] intentionally omitted <==

----- Start of picture text -----

Yeoval Project
12.8Mt at 0.38% Cu, 0.14g/t Au, 2.2g/t Ag, 120ppm Mo
Blue Hills prospect
Mount Aubrey Project
1.21Mt at 1.61g/t Au
Map area
----- End of picture text -----

Figure 1 – Mount Aubrey project location plan in central western NSW. Projection GDA 1994 MGA Zone 55.

2

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

This is the second in a series of announcements providing resource updates that mark the conclusion of Ardea’s extensive work programs on selected NSW projects in preparation for the Godolphin Resources IPO towards the end of 2019. These announcements will provide clarity to investors regarding the NSW portfolio and highlight the potential it holds, notably for the rapid definition of additional gold resources and development of open pit gold deposits.

Project Location

The Mount Aubrey project area is located approximately 40 km northeast of Parkes NSW, 32 km southeast of Peak Hill, and 30 km southwest of Yeoval NSW (Figure 1). The tenement is also located approximately 48 km southeast from the operating Tomingley Gold Mine.

The project is located within the Lachlan Fold Belt (LFB) which is Australia’s premier domain for porphyry and epithermal gold and base metal deposits. The resource area is readily accessible by well-maintained sealed and unsealed roads.

==> picture [505 x 344] intentionally omitted <==

Figure 2 – The Mount Aubrey project area, showing the distribution of mineralised veins, and the limited extent of this resource estimation. Projection GDA 1994 MGA Zone 55.

Geology and Geological Interpretation

The Mount Aubrey resource area is located at the northern margin of the highly prospective, WNWtrending Lachlan Transverse Zone of the Lachlan Fold Belt. The Transverse Zone is recognised as having a strong association with a number of other significant mineral deposits in Central NSW, such as the worldclass Cadia Ridgeway and Northparkes copper-gold mining operations.

3

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

The Mount Aubrey deposit is hosted by a volcano-sedimentary package of the Silurian-Devonian Dulladerry Volcanics. Most mineralisation is hosted by pillow-textured, subaqueous amygdaloidal basalt that is up to 130 m thick. It is both overlain and underlain by pyroclastic rhyolitic ignimbrites that are variably interbanded with sedimentary units. The rhyolites commonly contain pervasive sericite alteration. Nearby, the Yeoval Batholith to the northeast is spatially and genetically associated with Cu-Au-Mo mineralisation.

This Cu-Au-Mo-fertile Yeoval intrusive complex consists of a suite of calc-alkaline granite and adamellite, intermediate and basic intrusive rocks with associated andesitic volcanic rocks. The batholith formed during a Late Silurian to Early Devonian melting and rifting event that split the Ordovician to Early Silurian Macquarie Arc. Continued extension resulted in accumulation of significant thicknesses of sedimentary and volcanic rocks during the Middle to Late Devonian Dulladerry Rift. Most if not all of the epithermal style gold mineralisation at and around Mount Aubrey is related to this extensional phase during the Middle to Late Devonian.

The entire sequence is overlain by much younger, locally thick Tertiary-aged gravels.

Mineralisation Style

The Mount Aubrey deposit is located within a WNW-trending quartz vein system with a strike extent of at least 7 km. The main mineralised vein pinches and swells, often bifurcating into parallel veins and some associated stockwork veins hosted within basaltic and felsic rocks of the Dulladerry Volcanics. The mineralisation style is well suited to open pit mining, including bulk tonnage style operations (which characterise the LFB).

==> picture [254 x 198] intentionally omitted <==

The highest gold grades at Mount Aubrey are developed where epithermal-style quartz veins are hosted by basaltic rocks. Limited exploration suggests that overlying felsic ignimbrite volcanic rocks and underlying felsic volcanics and interbedded sediments generally contain less

Figure 3 – Bladed carbonate texture (replaced by silica), indicative of boiling of fluids in an epithermal regime. Float from Mount Aubrey.

well-developed vein systems, but this impression could be a function of poor sample representation outside the known mineralised zones.

The WNW orientation of mineralised vein systems within the thick volcano-sedimentary pile at Mount Aubrey may be partly controlled by the underlying Lachlan Transverse zone. A similar WNW structural regime is well-developed in the Yeoval Batholith to the north and is visible in most of the geophysical imagery throughout the region.

The partially outcropping Mount Aubrey deposit is considered to be a low-sulphidation, silica-rich epithermal deposit. However, the source of the gold-bearing fluids is not clear, and could either be granitic, structurally-controlled orogenic, or magmatic (related to the accumulation of the Dulladerry Volcanics).

4

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

History

==> picture [326 x 181] intentionally omitted <==

The Mount Aubrey gold deposit was discovered and defined by BHP-UTAH and mined by BHP Gold Mines in 1989-91. Ore was treated at the London-Victoria Mine near Parkes. The Aubrey Mine consisted of three small open cut pits that extended over one kilometre of strike, within a much larger mineral system occurring over a 7 km east-west trending vein system. These pits were backfilled at the request of

Figure 4 – The infilled main pit at Mt Aubrey looking east towards the Emu Swamp Prospect. The low relief and areas of cover are apparent in this image.

the then-landowner upon completion of mining operations in 1991.

BHP was curtailed in their mining operations by an agreement with the landowner that there would be no drilling or blasting during the operation of the project which precluded pit cut-backs to recover ore in the base of pits (Ardea and Godolphin are fortunate that the current landowners are supportive). As such, the BHP operation was a free-dig one limited by the abilities of the then-available excavators.

The high-grade nature of the near-surface mineralisation and the low operation costs offset the low, sub$400 (US) gold prices of the time. BHP reportedly recovered 120,000 tonnes at 3.3 g/t gold for 12,700 oz of gold. No mill reconciliation data is available.

Gold mineralisation was originally discovered around 1880-1890 by the Hodges family, and was worked on a small scale at varying stages through to 1939.

Sampling and Sub-Sampling Techniques

The Mount Aubrey Resource data comprises several decades’ data from 219 drill holes for a total of 9,382 m. Reverse circulation (RC) drilling, diamond drilling (DD), rotary air blast (RAB) drilling and aircore drilling have contributed to the Mount Aubrey resource database. Average downhole depth was 42.8 m. Most sampling was undertaken at 1 m intervals.

The Resource is based on sub-surface samples obtained by the above drilling. Earliest drilling tested the delineated mineralized quartz veins and anomalous soils forming the Mount Aubrey deposit. This progressed into drilling on grid sections to test the mineralisation at intervals appropriate for improving confidence in mineralised continuity and mostly on a 20m spacing.

Two main periods of data collection were as follows:

  • 1987-1990 (BHP Gold) – Diamond, RC and RAB drilling, with samples analysed at Australia Analytical Laboratory (AAL), Orange. Gold assayed by fire assay. Selected base metals and path finders including Ag, As, Cu, Pb, Zn, Sb, W assayed by atomic absorption spectrometry (AAS).

  • 2007-2011 (YTC Resources) – Diamond, RC, and RAB drilling, with samples analysed either at the SGS laboratory, West Wyalong, and/or the ALS laboratory, Orange. Gold assayed by fire assay. Multi-element suites were assayed using inductively coupled plasma mass spectrometry (ICP-MS).

5

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Figure 5 – Plan view of each of the main parts of the Mount Aubrey resource model. Vein models are shown faded but represent coherent gold mineralisation at >0.5 g/t Au. Greyed polygons are the historic BHP Gold pit shells (now back-filled, but determined by groundpenetrating radar). Projection GDA 1994 MGA Zone 55.

==> picture [397 x 183] intentionally omitted <==

==> picture [396 x 189] intentionally omitted <==

==> picture [495 x 193] intentionally omitted <==

6

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Drilling Techniques

The resource is largely constructed from the results of percussive drilling. In summary, percussive drilling techniques used at Mount Aubrey are as follows:

  • 28 Aircore holes were drilled by YTC resources using a 90mm aircore blade bit.

  • 31 RAB holes were drilled by BHP Gold with limited information on drill rig configuration given except that a standard RAB open hole with RAB blade bit were used. Drill chips were retrieved from the drill hole and collected in bulk bags through the use of a drill rig-mounted cyclone.

  • 157 RC holes were drilled by BHP and YTC Resources. In both cases a standard reverse circulation drilling configuration was used with a hammer and drill bit of 150mm size (approximate) used. Drill chips were retrieved from the drill hole and collected in bulk bags through the use of a drill rig-mounted cyclone.

Several diamond holes were also drilled. In total there were four such holes, though only three were used in the resource due to loss of historic data from one hole (MAD001 – BHP Gold). Drill holes MAD002,003 and 004 were drilled by YTC Resources using triple tubed HQ and NQ diameter core from surface and were oriented using an orientation tool and a downhole camera.

Most drill holes were drilled towards the NNE (mostly bearing 018˚) and at an inclination of -60˚. Drill collars were picked up by a surveyor or using a handheld GPS, providing adequate spatial control.

Resource Classification

The entire Mount Aubrey resource estimate is classified as an Inferred Mineral Resource under JORC 2012 criteria. The Inferred Resource is estimated to be 1.21 Mt at 1.61 g/t gold , when using a 0.5 g/t Au cut off. The Resource is estimated to contain approximately 62,400 oz gold metal .

The grade sensitivity of the Inferred Mineral Resource, based on various Au cut-off grades, is shown below.

Table 1 – Inferred resource estimate and cut-off sensitivity for the Mount Aubrey deposit, reported above different Au cut-off values. The base case estimate uses a 0.50 g/t Au cut-off. The tonnage figures have been rounded down to the nearest one hundred thousand. Au grades rounded to the nearest second decimal. Contained gold is rounded to the nearest 100 oz.

Cut-off
Au g/t
Tonnes
Grade
Au g/t
Contained gold (oz)
Inferred
Resource
≥ 0.25
2,140,000
1.07
73,600
≥ 0.50
1,208,000
1.61
62,400
≥ 0.75
894,000
1.96
56,300
≥ 1.00
679,000
2.30
50,300

In making this classification, numerous factors have been considered, including:

  • Drill data spacing of 20m x 20m and coordinate accuracy are sufficient for the style of mineralisation (could potentially be Indicated to Measured status but downgraded to Inferred to reflect old historic data and relying on Ground Penetrating Radar for pit void shapes as opposed to a pit survey).

  • The continuity of gold mineralisation along modelled veins is generally very good.

  • The domains that have been constructed seem appropriate in relation to the information available and currently understood epithermal model of formation of the gold mineralisation.

7

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

The result of this estimation does reflect the competent person’s view of the deposit based on the information available. The domains are consistent with historic reports of the mined veins and modelling has constrained strike extensions of geology so as not to extend far beyond data limits. The model grades also reflect the raw composite grades and is not over-estimating the grade in the deposit. Details of the Resource Classification are presented in Table 1.

==> picture [489 x 305] intentionally omitted <==

----- Start of picture text -----

313° Strike
300° Strike
305° Strike
285° Strike
----- End of picture text -----

Figure 6 – The four domains of the Mount Aubrey Inferred Resource. These are defined on vein orientation, with each domain shown in different colours. Historic BHP Gold pit shells are shown in red for reference. Projection GDA 1994 MGA Zone 55.

==> picture [503 x 195] intentionally omitted <==

Figure 7 – Mount Aubrey cross section through the main (southern-most) pit, looking northwest and showing the mineralised domains and drilling colour coded for gold content (NB: ppm = g/t). Note the extensive mineralisation outside of the historic pit shell within several veins. Projection GDA 1994 MGA Zone 55.

8

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

==> picture [500 x 194] intentionally omitted <==

Figure 8 – Mount Aubrey cross section through the smaller pits, showing extensive gold mineralisation beneath the historically mined pit shell. Looking northwest. Projection GDA 1994 MGA Zone 55.

Sample Analysis and Estimation Methodology

Resource modelling of the Mount Aubrey Project deposit is based on estimating grades for gold by inverse distance using LeapFrog Edge software. Search parameters were based on the variogram models with ellipsoid searches being used to set a maximum of 20 and minimum of 10 samples for each interpolation.

The distribution of gold was reviewed for the project area. Mineralised domains were defined based on a 0.5 g/t gold threshold and varying vein distributions and orientations. No top cuts were applied.

In total, four separate domains were defined by implicit modelling in Leapfrog, with each domain containing sub-parallel sets of epithermal veins. A resource for each set of parallel veins was individually estimated, with individual estimation neighbourhoods to ensure tailored criteria for optimal results.

Grades were interpolated using inverse distance estimation.

A sub-blocked block model was built using the quartz veins and a digital terrain model of the surface. Only the quartz veins were domained and modelled. The parent cell of 5m x 10m x 10m in the X, Y and Z dimensions was chosen to reflect observed 2–8m vein width. This also reflects the drill hole intercept spacing of 20m x 20m for a significant portion of the deposit. The parent blocks were sub-celled to 1m x 1m x 1m to accurately estimate the volume of material inside each lens domain.

The specific gravity used for the estimation was 2.7 t/m[3] . This is the density of quartz (2.65 t/m[3] ) plus an additional allowance for sulphides such as pyrite, which are present within the mineralised host rock. The specific gravity used in the resource estimate is therefore considered appropriate. It is expected that increasing gold grade would increase the SG beyond 2.7 t/m[3] and thus this estimate would represent the lower end of the tonnage spectrum for this resource. Bulk density calculations are planned on the core produced from the first/next diamond drill program.

Validation of outputs was conducted against historic production reports.

9

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

Cut-off Grade

There are presently no extreme outlier values in the Mount Aubrey dataset, with the maximum gold grade (over 1 m composite) being 16.5 g/t Au. Therefore, for the Mount Aubrey resource estimate, it is considered that at this stage no top cuts to gold grades are required in this study.

Mining and Metallurgical Methods and Parameters and Other Modifying Factors

There have been no geotechnical or metallurgical studies completed on drill samples from the Mount Aubrey project area. However, given the historic operations, it has been assumed that the mineralisation would be amenable to conventional open pit mining and mineral processing as per other low-sulphidation epithermal gold deposits of the Lachlan Fold Belt.

Project Potential and Work Planned

Significant scope exists for expansion of the Mount Aubrey resource. The resource is open in all directions and is clearly part of a much larger set of veins that extent for over 7 km strike in outcrop, subcrop, and the subsurface. Most of these veins have not been drilled.

Mount Aubrey is a typical low-sulphidation epithermal gold system. Such systems commonly display well documented, predictable vertical zonation patterns related to temperature and pressure zonation. At Mount Aubrey, most alteration in the mined, topmost 40 m is silicification. Some examples of quartz-illite±adularia alteration have been documented at depth, consistent with the vertical zonation expected, and it is this alteration assemblage that is commonly associated with high-grade gold (and silver) mineralisation.

==> picture [506 x 275] intentionally omitted <==

Figure 9 – Grade-metre gold abundance long section for Mount Aubrey (top) and Vera-Nancy at Pajingo, Queensland. Vertical zonation of alteration assemblages is present at both deposits and is shown superimposed on the Mount Aubrey long section. Commonly, quartz-illite±adularia alteration corresponds with higher gold (and silver if present) grades, suggesting targeting at Mount Aubrey should be below the current extent of most drilling. Similar alteration distributions at Pajingo correspond directly with extensive high-grade gold-silver mineralisation.

10

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

It is appropriate to draw parallels to the Pajingo gold deposit of northern Queensland. On the Vera-Nancy orebodies, similar grades and mineralisation distributions to those at Mount Aubrey were encountered near surface. Higher-grade, more extensive gold and silver mineralisation corresponds to quartzillite±adularia alteration at depth. By comparison, it is clear that future drilling at Mount Aubrey must be targeted below the current depth of most historic drilling to target high-grade gold.

The work undertaken by Ardea on the Mount Aubrey gold project has set Godolphin Resources up with a well-defined gold resource that represents a walk-up drill target where additional ounces are expected to be defined quickly and cost effectively. Historically, only one kilometre of a seven-kilometre mineral system has been tested by drilling. Drilling of this compelling target is set to commence immediately after Godolphin resources lists on the ASX.

==> picture [246 x 327] intentionally omitted <==

==> picture [245 x 326] intentionally omitted <==

Figure 10 - Silica-replaced bladed calcite textured quartz sulphide vein cross cutting earlier chalcedonic vein in chlorite-silica altered amygdaloidal basalt.

Figure 11 - Brecciated amygdaloidal basalt and clasts of silica-replaced bladed calcite cemented by chlorite-silica-pyrite.

11

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

About Ardea Resources

Ardea Resources (“Ardea” – ASX:ARL) is an ASX listed resources company, with 100% controlled Australian-based projects, prioritising a three-pronged value creation strategy which is:

  • development of the Goongarrie Nickel Cobalt Project, which is part of the Kalgoorlie Nickel Project, a globally significant series of nickel-cobalt deposits which host the largest nickel-cobalt resource in the developed world, coincidentally located as a cover sequence overlying fertile orogenic gold targets;

  • advanced-stage exploration at WA gold and nickel sulphide targets within the Eastern Goldfields world-class nickel-gold province; and

  • the Godolphin Resources Limited demerger of the NSW gold and base metal assets with planned in-specie share distribution, with all projects located within the Lachlan Fold Belt world-class goldcopper province, specifically within the Lachlan Transverse Zone (hosts McPhillamy’s gold and Cadia and Northparkes copper-gold) and splay fault of the Gilmore Suture (hosts Cowal gold).

==> picture [527 x 346] intentionally omitted <==

For further information regarding Ardea, please visit www.ardearesources.com.au or contact:

Ardea Resources:

Andrew Penkethman

Chief Executive Officer, Ardea Resources Limited Tel +61 8 6244 5136

12

==> picture [37 x 842] intentionally omitted <==

==> picture [174 x 23] intentionally omitted <==

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release contains forward-looking statements and forward-looking information within the meaning of applicable Australian securities laws, which are based on expectations, estimates and projections as of the date of this news release.

This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to management’s expectations with respect to, among other things, the timing and ability to complete the Ardea spin-out of Godolphin Resources Limited, the timing and amount of funding required to execute the Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits, certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s properties, environmental risks, the availability of labour, the focus of the Company in the future, demand and market outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise funding privately or on a public market in the future, the Company’s future growth, results of operations, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking information is based on the opinions and estimates of management at the date the information is given, and on information available to management at such time.

Forward-looking information involves significant risks, uncertainties, assumptions and other factors that could cause actual results, performance or achievements to differ materially from the results discussed or implied in the forward-looking information. These factors, including, but not limited to, the ability to complete the Ardea spin-out of Godolphin Resources Limited on the basis of the proposed terms and timing or at all, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls, regulations, political or economic developments in Australia or other countries in which the Company does business or may carry on business in the future, operational or technical difficulties in connection with exploration or development activities, employee relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, the Company. Prospective investors should not place undue reliance on any forward-looking information.

Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be consistent with such forwardlooking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

Competent Person Statement

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled or reviewed by Johan Lambrechts, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Lambrechts is a full-time employee of Ardea Resources Limited and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Lambrechts consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

13

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

JORC Code, 2012 Edition – Table 1 report for the Mount Aubrey Resource, NSW

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling(eg cut channels, The following report details the historical data, checks, validation and methodology used to generate the Mineral Resource Estimates (MRE) for the Mount Aubrey gold
random chips, or specific specialised industry standard deposit. The majority of the data used for the MRE was collected during multiple drilling campaigns by BHP Gold and YTC Resources.
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
Reverse Circulation Percussion drilling (RC), Diamond core drilling (DD), Rotary Air Blast drilling (RAB) and Aircore
resource database.
drilling have contributed to the Mount Aubrey
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
The Mount Aubrey Resource data consists of 219 drill holes over several decades with a total of 9,382m distributed as follows:
sampling.
Include referenceto measures taken to ensure
Year
Company
No. holes + type
Metres
% of total metres
sample representivityand the appropriate calibration 1987
BHP Gold (BHP UTAH)
62 RC holes
1,327
14%
of any measurement tools or systems used. 1988
BHP Gold
45 RC holes
2,611
28%
Aspects of the determination of mineralisationthat
are Material to the Public Report.
1989
BHP Gold
50 RC holes
2,208
24%
In cases where ‘industry standard’ work has been done 1990
BHP Gold
31 RAB holes
1,586
17%
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).

2007
YTC Resources
3 Diamond holes
916.9
10%
2009
YTC Resources
28 Aircore holes
733.5
8%
In other cases more explanation may be required, such
as where there is coarse gold that has inherent
TOTAL
219 drillholes
9,382
100%
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
o
The RC holes used were sampled at 1m intervals in most cases.
o
The Aircore holes were sampled at 1m intervals. The RAB holes used were sampled at 1m intervals. Many of the RAB drill hole intervals were not
assayed.
o
The Diamond Drill holes were geologically and geotechnically logged before sampling. Diamond drill core was generally cut and half core sampled at 1m
intervals. Some intervals of 0.5m to 2m length were also taken to accommodate changes in geology and mineralisation.
The Resource is based on sub-surface samples obtained by the above drilling. Earliest drilling tested the delineated mineralized quartz veins and anomalous
soils forming the Mt Aubrey deposit. This progressed into drilling on grid sections to test the mineralisation at intervals appropriate for improving confidence in
mineralised continuity and mostly on a 20m spacing.
The earliest drilling completed by BHP was completed using a Warman 1000 drill rig and using reverse circulation drilling. Drill hole azimuth and declination was
supervised by the on site geologist. Down hole surveying was not used at that time. Drill collars were surveyed by the use of a registered surveyor. The BHP drill
hole MAD001 was down hole surveyed using an Eastman down hole camera. Further BHP drilling programs includes reverse circulation and RAB drilling. Drill
hole azimuth and declination was supervised by the on site geologist.
Diamond drill holes completed by YTC Resources were down hole surveyed using a Reflex down hole camera. Collar coordinated were surveyed using a
differential GPS generally giving <10cm accuracy. Aircore and RC drill holes completed by YTC Resources were not down hole surveyed. Collars were picked up
using a Garmin hand-held GPS giving 3m accuracy.
Drilling techniques Drill type (eg core, reverse circulation, open-hole Percussive drilling techniques:
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,


28 Aircore holes were drilled by YTC resources using a 90mm aircore blade bit.
31 Percussion Rotary Air Blast Drill were drilling by BHP Gold with limited information on drill rig configuration given
except that a standard RAB open hole with

14

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
whether core is oriented and if so, by what method, etc). RAB blade bit used. Drill chips were retrieved from the drill hole and collected in bulk bags through the use of a drill rig-mounted cyclone.
157 Reverse Circulation drill were drilled by BHP and YTC Resources. In both cases a standard reverse circulation drilling configuration was used with a hammer
and drill bit of 150mm size (approximate) used. Drill chips were retrieved from the drill hole and collected in bulk bags through the use of a drill rig-mounted
cyclone.
Core drilling Techniques
4 Diamond Drill holes (only 3 used in the resource due to loss of historic data from one. (MAD001))
MAD001 was drilled with a 60m RC pre collar with the rest of the hole being drilled by NQ diameter core with a single tube. MAD002,003 and 004 were drilled
using HQ and NQ diameter core from the surface and used triple tube.
A search of the historic data reveals that the BHP diamond hole MAD001 was orientated as well as being down hole surveyed. The methods for core orientation
were not mentioned in reports. MAD001 was pre collared using reverse circulation and then drilled by NQ diameter coring using a single barrel. YTC drill holes
MAD002,003 and 004 were drilled by a combination of HQ and NQ diameter drilling using triple tube and orientated core. Core orientation was achieved using a
Reflex orientation tool. The drill holes were down hole surveyed using a Reflex down hole camera. Core samples are matched with orientation data. Diamond core
is reconstructed into continuous runs on an angle iron cradle for orientation. Orientation quality is noted between orientation marks based on a tolerance.
Systematic failures are immediately raised with the drilling contractor.
Drill sample recovery Method of recording and assessing core and chip Diamond Drilling:
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Geotechnical data including core recoveries were recorded for both the BHP and YTC diamond drill holes. Core recovery was generally good to excellent in most
cases. Core recovery over mineralized intervals was excellent and did not produce bias in subsequent sampling and assaying.
Whether a relationship exists between sample recovery Percussive Drilling
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.

Drilling completed by BHP was completed using several drilling techniques. The bulk of the resource drilling over the Mt Aubrey deposit was drilling using reverse
circulation drilling. Drilling methods generally gave good sample recoveries as mentioned in historic reports. Drilling completed by YTC Resources generally gave
excellent recoveries. Samples were collected into 1m bulk bags at the drill rig cyclone and later composited. Intervals with poor recovery were generally noted on
the drill logs. Wet samples were also noted on the logs.
RAB Drilling
BHP drilled a number of RAB holes mostly looking for extensions to mineralisation in the vicinity of the initial Mt Aubrey resource and mine areas. Limited
information is available on sample recovery. RAB drill holes were drilled to shallow depths and generally to refusal. Sample and assay data from some of the BHP
RAB holes at Mt Aubrey have been lost.
Aircore Drilling
YTC Resources used aircore drilling to test for extensions to the Mt Aubrey deposit. Aircore holes were drilled to refusal and generally did not test fresh rock.
Samples were collected into 1m bulk bags at the drill rig cyclone and later composited. Sample recovery was noted as being adequate during the program with
any poor recovery intervals noted on the drill logs.
Logging Whether core and chip samples have been geologically RC, RAB, Aircore Chips
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
The drill chips were geologically logged at 1m intervals with generally good to detailed recording of lithology, alteration, mineralisation and other observations such
as colour, moisture and recovery. Drill chips were collected and sieved before being placed into reference chip trays for visual logging at 1m intervals. Hard copy
drill logs were mostly scanned and included in annual reports. BHP completed hard copy cross sections and plans of all drill holes showing lithology and assay
results.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.

BHP completed petrological analysis, XRD and metallurgical test work on drill chips and bilk samples. Gold identified in samples was reported to be relatively fine.
Metallurgical recoveries were stated to be high suggesting that the fine gold was free and not refractory.
The BHP reference chip trays from Mt Aubrey were stored at the London Victoria Mine after being removed from the site. No photographic reference could be
found. The location of these materials is currently unknown.
YTC Resources completed magnetic susceptibility on all drill samples and photographed all reference chip trays.
100% ofthe chipintervalswerelogged.

15

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
All YTC reference chip trays and diamond core are stored at Ardea’s Orange premises. Diamond drill hole MAD004 is stored at the core library located at
Londonderry.
Diamond Drill Core
The diamond drill core was geologically logged with the logging intervals being determined by the geology in the core. Geologically logging included weathering,
lithology, alteration, mineralisation and structure. The assay intervals do not straddle geological intervals and thus the assay represents the grade within the
geological unit. The data collected produced enough detail to support a mineral resource estimate.
100% of the drill core was logged.
The BHP diamond drill hole MAD004 from Mt Aubrey was stored at the London Victoria Mine after being removed from the site. No photographic reference could
be found. The location of this core is currently unknown
YTC Resources completed structural logging of diamond drill holes MAD002,003 and 004. Where core samples are orientated, drill core is logged for geotechnical
and structural information by measuring alpha and beta angles including details of the structure, width and mineralisation.
YTC Resources collected magnetic susceptibility readings at 1m intervals and photographed diamond drill hole core from MAD002,003 and 004 wet and dry
before cutting and sampling.
AYTC diamond drill hole MAD002 and 003 core is stored at Ardea’s Orange premises. Diamond drill hole MAD004 is stored at the core library located at
Londonderry.
Sub-sampling If core, whether cut or sawn and whether quarter, half or
RC-RAB-AC Chips
techniques and
sample preparation



all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, thenature, quality and
appropriateness of the sample preparation
technique.
Quality control proceduresadopted for all sub-
sampling stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.



The historic reports do not all specifically mention sub-sampling techniques, but it is assumed that the RC, RAB and aircore drilling rigs were equipped with a cone
or multitier riffle splitter attached to the cyclone, or a separate multitier riffle splitter was used alongside the drill rig by BHP and YTC field staff. The splitter
generally provided one bulk sample of approximately 10-20kg and a sub-sample of 2- 4kg per metre drilled.
Bulk samples were collected in plastic bulk bags, with the sub-samples collected placed in calico sample bags. The drilling technique was sufficient to keep the
majority of bulk samples collected dry and sufficiently representative of the intervals being drilled. Any wet samples or poor recovery were noted on the logs that
were updated at the drill rig by the supervising geologist.
The drill chips from the RC, RAB and aircore holes were mostly riffle split at the rig with the sample bagged for transport to the analytical laboratory. Some spear
sampling may have been completed for moist and wet samples. Sample splitting was considered to give a satisfactory representative sample of the bulk bags.
The quality of the split sample is assumed appropriate based on the reputation of the companies performing the sampling including BHP Gold Mines and YTC
Resources. Both BHP and YTC Resources used qualified geologists at the drill rig during drilling and sampling ensuring a high standard of work.
Sample size was not reported for all intervals drilled and collected, however satisfactory considering the level of supervision. Records were kept of poor recovery
and wet samples.
Whether sample sizes are appropriate to the grain size
of the material being sampled. Diamond Core
Diamond drill core is generally cut and sampled at 1m intervals. The diamond drill core has been cut longitudinally in half and at 1cm below the core orientation
line. Where an orientation line was not present the supervising geologist placed a cut line that was sufficient to allow for representative sampling of the core.
Sampling was undertaken at predominantly 1m intervals with a range of 0.5m length to 2m lengths to accommodate changes in geology and mineralisation.
Cutting and sampling of the core was supervised by a geologist. Samples core was consistently taken from one side of the cut core down the hole to avoid biased
samples.
Quality of assay data
The nature, quality and appropriateness of the assaying
1987-1990 data:
and laboratory tests and laboratory procedures used and whether the
technique is considered partial or total.
Selected base metals and path finders including Ag, As, Cu, Pb, Zn, Sb, W, Atomic Absorption Spectrometry (AAS). Not all intervals were assayed for these
elements
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,

Au by Fire Assay. All intervals were assayed for gold.
Samples were submitted to the Australian Analytical Laboratory (AAL) Orange NSW.
reading times, calibrations factors applied and their 2007-2011 data:
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory

Crush entire sample nominal >70% passing 6mm;
If sample > 3kg, Riffle split sample to maximum of 3.2Kg and pulverise split in LM5 to 85% passing 75 μm. Retain and bag un-pulverised reject (bulk master). If

16

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
checks) and whether acceptable levels of accuracy (ie sample < 3.2kg, entire sample is pulverised;
lack of bias) and precision have been established. Multi element suite using laboratory techniques ME-ICP41, ME-ICP61
Au by Fire Assay Au-AA25
Samples from the 2007 program were submitted to the SGS Laboratory West Wyalong NSW. All other samples were submitted to the ALS laboratory in Orange
NSW.
ALS and SGS laboratories undertake internal QC checks to monitor performance. Laboratory duplicates and standards were deemed to be suitable for laboratory
QA/QC at that time. No records of field duplicates, standards or blanks could be found.
Verification of The verification of significant intersections by either All results from the BHP drilling programs including significant intersections were reviewed and analysed by senior BHP staff and reported in mandatory six-
sampling and independent or alternative company personnel. monthly and annual reports.
assaying
The use of twinned holes.
Documentation of primary data, data entry procedures,

No twinning of holes was completed.
All drilling completed by BHP was logged in the field onto hard copy paper logs. Logs were validated after the completion of the programs and receipt of assay
data verification, data storage (physical and electronic) data. Geological and sample logs were updated with analysis results when received. Composite samples returning 0.2ppm Au were then assayed at 1m intervals.
protocols. Geological logs, survey data and assay results were used to draft scale plans of all drilling and cross sections. The majority of land and cross sections were
Discuss any adjustment to assay data. included in six-monthly and annual reports to the Mines Department. Paper logs were copied and included in regular six-monthly and annual reports. Hard copy
data including geological logs, samples sheets, survey and assay data, drilling plans and cross sections were stored at BHP Gold’s London Victoria Mine.
All drilling completed by YTC Resources was logged in the field using paper logs and later digitized, validated and inserted into the YTC Resources database.
This data was checked on receipt of assay results with some re assaying of composite intervals undertaken where Au results were anomalous.
Location of data Accuracy and quality of surveys used to locate drill Collar Survey
points
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Drill collars completed by BHP were surveyed using a registered surveyor located in Parkes NSW. All collars were surveyed using the data of the time and
included easting, northing and RL. Most historic drill collars were reported in projected coordinate system AGD 1966 AMG Zone 55. The accuracy of the surveyed
holes was not reported. YTC surveyed the diamond holes MAD002,003 and 004 using a differential GPS reporting at <10cm accuracy. All other drill holes were
surveyed with a hand-held Garmin GPS with reported 2-3m accuracy. YTC used the projected coordinate system GDA1004 MGA Zone 55.
Down Hole Survey
Methods used to downhole survey the BHP drill hole MAD001 were reported to be an Eastman downhole camera device. The survey intervals were not
mentioned but were expected to be sufficient. YTC down hole surveyed the diamond holes MAD002,003 and 004 using a Reflex downhole camera with readings
for azimuth and dip recorded at 30m intervals. YTC down hole surveyed their RC holes using a Reflex down hole camera lowered within the rods and readings for
azimuth and dip taken at 30m intervals. A stainless-steel rod was used in the drill string allowing for accurate recording.
Collar Survey Validation:
The collar locations in the database was physically validated on the ground by using a Trimble Juno 5 professional GPS unit with accuracy on the day of 1.5m.
Many of the drill collars were destroyed by the mining of the open cut in 1990, and later by cultivating the field surrounding the historic mine for cropping. The
collars in the hanging wall of the two satellite pits were validated by finding 4 undestroyed collars. These were found to be accurate to within 2m. The collar in the
hanging wall of the main pit was validated by finding 8 collar locations. The collars in this part of the resource were found to have an error of 2.24m East and -
5.64m North. The error margin for the collar surveys can only be confirmed in these two locations and is considered acceptable for an inferred resource. Further
drilling is planned for the near future and these collars will be surveyed via differential GPS. The data obtained from this and other future drill programs will be
used to further validate historic data.

17

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary

18

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Topography

Topography for the resource was sourced from the Intergovernmental Committee on Surveying and Mapping.https://elevation.fsdf.org.au/. 1 metre elevation
point cloud data was downloaded and used to validate MRE area RL.
NOTE: Due to the lack of high definition surface elevation plans, a small discrepancy exists between the collar elevations and the DTM used for the resources.
Data spacing and Data spacing for reporting of Exploration Results. The majority of the BHP RC resource drill holes were drilled on the 20x20m grid. Wider spacing occurs at the extremities and at depth in the MRE area.
distribution Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

A total of 8 costeans totaling 150 metres were excavated across traverses of known mineralized areas at the Mount Aubrey deposit. Costeans were dug to sufficient
depth to allow for geological logging of lithology, quartz veining and mineralisation and channel sampling to be undertaken. The assay results from the costeans
compared favorably with the drill intercepts. NOTE; Data from the costeans were not used for the mineral Resource estimation.
Whether sample compositing has been applied.

19

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Orientation of data in
Whether the orientation of sampling achieves unbiased Sample Orientation
relation to geological
structure
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this

The nature and controls on mineralisation at the Mount Aubrey deposit are considered to be well understood in the area of the MRE.

The drilling and sampling was mostly completed at an azimuth and dip sufficient for effective testing of the steeply dipping and NW striking mineralized vein
system at Mt Aubrey. The drill hole azimuth and dip was generally consistent and reflects a vein system with a n relatively uniform steep dip and NW trend over its
known extent. Most drill holes were drilled at a dip of -60 degrees and an azimuth of between 18 and 22 degrees magnetic making them perpendicular to the vein
orientation.
should be assessed and reported if material.
•Based on the current understanding sampling is considered to be unbiased with respect to drill hole orientation versus strike and dip of mineralisation.
Sample security The measures taken to ensure sample security. The samples and Resource estimate are of historic nature. Sample security is presumed adequate.
Audits or reviews The results of any audits or reviews of sampling No Audits have been conducted on the historic data to our knowledge.
techniques and data. The collar and survey data was visually validated for this estimation and found in order.

20

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement Type, reference name/number, location The Mount Aubrey prospect, on which this resource was calculated lies on Exploration License number 8532 and is held by Ardea Exploration PTY LTD.
and land tenure and ownership including agreements or The land is owned by Private land holders South of the township of Baldry.
status material issues with third parties such as There is no Joint venture or any other arrangements pertaining to this project, and also no native title claims over the area.
joint ventures, partnerships, overriding The security deposit payed by Ardea Resources for EL8532 is $10,000.
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Exploration done Acknowledgment and appraisal of EL 8532 was granted to Ardea Resources Ltd on 7th March 2017 as a 67 graticular block tenement for a period of 3 years.
by other parties exploration by other parties. Small scale historical workings consisting of shallow pits and shafts are readily observed along quartz loads to the east and west of the Mt Aubrey mine. Elsewhere in the tenement small
exploration shafts and pits looking for copper in and around the Yeoval Intrusive Complex can be found in the northern portion of the licence area.
More recently, 14 companies have undertaken exploration in the area (Error! Reference source not found.), predominantly for gold, but also for base metals. Work undertaken by
previous companies include geological mapping, stream sediment, soil and rock chip sampling, ground based geophysical surveys (IP) and RAB/RC & Diamond drilling.
Table: Previous exploration over EL 8532
Tenement
Company
Start date End date Elements Units
EL1952
Samedan Oil Corporation
1 October 1982 1 October 1983 Cu Pb Zn 650
EL2275
Austamax Gold Pty Lim Ted
1 October 1984 1 June 1985 Au 396
EL2771
BHP Gold Mines Limited
1 November 1989 1 October 1990 Au 87
EL3934
Peko Wallsend Operations Limited
1 June 1999 1 April 1993 Au Cu Bi W 15
EL764
Compass Resources NL
4 January 1995 4 May 1995 Au Ag 9
EL5126
PMW Gold Mining Co Pty Limited
1 October 1996 1 October 1998 Au 8
EL5221
Mount Conqueror Minerals NL
11 February 1997 10 February 1999 Au 53
EL5322
LFB Resources NL
15 July 1997 14 July 1999 Au 12
EL5380
Plato Mining Ltd
10 November 1997 9 November 1997 Au 78
EL5507
Alkane Exploration NL
13 August 1998 12 August 2000 Au 20
EL6311
Augur Resources Ltd
27 September 2004 26 September 2016
Au Cu
24
EL6673
Defiance Resources Pty Ltd
5 December 2006 4 December 2015 Au Ag Cu 16
EL6931
Bulldozer Prospecting Pty Ltd
1 November 2007 1 November 2009 Au 106
EL7036
Crystal Minerals Pty Ltd
24 January 2008 22 October 2014 Cu Au Pb Zn Ag 134
Geology Deposit type, geological setting and style
Project Geology
of mineralisation. EL8532 is located within the Lachlan Orogen with rocks belonging predominantly to Middle Devonian Dulladerry Volcanics, some mafic volcanic rocks of the Devonian Early-Middle
Devonian Cuga Burga Volcanics, intrusive rocks belonging to the Middle-Late Devonian Yeoval Batholith and sedimentary rocks belonging to the Late Devonian Harvey Range Group.
The Mt Aubrey area is dominated by rocks of the Dulladerry Volcanics and thick accumulations of tertiary and quaternary alluvium including gravels. The Tertiary gravels, forming sheet-
like deposits over the Mt Aubrey Mine area and surrounds are likely derived from the erosion of elevated areas composed of felsic volcanics and siliciclastic sediments.
More mafic rocks in the project area including andesitic and basaltic lavas, with cappings of welded rhyolitic ignimbrites, are not conclusively identified as belonging to the Dulladerry
Volcanics. These mafic volcanic rocks including basalts sporadically mapped in the area and extending north towards Yeoval have historically been included in the Dulladerry Volcanics,
however more recent geochemical studies have identified them as belonging to the Cuga Burga Volcanics

21

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
Mineralisation
Mineralisation within the Dulladerry Volcanics is restricted to epithermal gold style mineralisation, with the best example being the Mt Aubrey gold deposit which lies on the southern
edge of EL8532. The Mt Aubrey deposit was mined by BHP Gold, later Newcrest as a satellite operation to the Parkes Gold Mine between 1989-1991.
Gold mineralisation at Mt Aubrey is hosted within chalcedonic quartz veins, which is in turn hosted by amygdaloidal to coarsely porphyritic basalt. The main host quartz vein at Mt Aubrey
strikes WNW, dips sub-vertically with a maximum thickness of 9m, with significant pinch and swell variations along strike. To the east the vein breaks down into a quartz stockwork zone.
The basalt in the Mt Aubrey Mine area have acted as a chemical trap allowing for the deposition of the quartz hosted epithermal gold mineralisation at this location. Moderate, pervasive
propylitic alteration (epidote-calcite-quartz) in constrained to the host basalt in the immediate deposit area. Finely disseminated pyrite in varying concentrations up to 5% of the rock
mass is common.
The three open pits which formed the Mt Aubrey Mine have been backfilled and re-habilitated following completion of mining, the mine area is now utilised for cropping and grazing.
Drill hole A summary of all information material to The Mount Aubrey area has been subject to a large number of drilling programs with the majority of Mount Aubrey resource drilling being completed using reverse circulation drilling.
Information the understanding of the exploration Later resource extension programs used RAB drilling and were more exploratory in nature. Many of the RAB drill collars were completed some distance from the Mt Aubrey mine area
results including a tabulation of the including the Blue Hills Prospect a short distance to the west and have not be included in the resource drilling database. Other companies completed exploration drilling away from the
following information for all Material drill Mount Aubrey mine area. YTC Resources completed diamond drilling beneath the historic open pit mines at Mt Aubrey and explored for extensions to the deposit using aircore and
holes: reverse circulation drilling methods. YTC Resources also completed aircore and reverse circulation drilling on targets more distal from the Mt Aubrey mine area. Some historic drill
o easting and northing of the drill hole
records including assay results have been lost and have not materially contributed to the MRE.
o
o
o
o
collar
elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
dip and azimuth of the hole
down hole length and interception
depth
hole length.
Hole ID
MAAC024
MAAC025
MAAC026
MAAC027
MAD001
MAD002
MAD003
MGA EAST
634778
634725
634699
634673
634167
634214
634050
MGA NORTH
6353616
6353617
6353567
6353649
6353931
6353831
6354076

RL m
509
509
508
510
501
502
498
End of Hole m
33
39
42
44
240
351
288
Azi (mag)
19
19
19
18
18
20
19
Dip
-60
-60
-60
-60
-60
-60
-62
Drill Type
AC
AC
AC
AC
RC/DD
DD
DD
Company
YTC
YTC
YTC
YTC
BHP Gold
YTC
YTC
If the exclusion of this information is MAD004 634748 6353663 504 279 18 -61 DD YTC
justified on the basis that the information MAR001 634335 6353851 514 60 18 -60 RC BHP Gold
is not Material and this exclusion does MAR002 634344 6353864 515 20 18 -60 RC BHP Gold
not detract from the understanding of the MAR003 634350 6353875 516 20 18 -60 RC BHP Gold
report, the Competent Person should MAR004 634717 6353718 508 61 354 -60 RC BHP Gold
clearly explain why this is the case. MAR005 634271 6353938 512 66 8 -60 RC BHP Gold
MAR006 634285 6353962 511 72 17 -60 RC BHP Gold
MAR007 634305 6353995 509 72 18 -60 RC BHP Gold
MAR008 634325 6354030 508 72 18 -60 RC BHP Gold
MAR010 634090 6354000 505 61 19 -60 RC BHP Gold
MAR011 634248 6353912 510 72 17 -60 RC BHP Gold
MAR012 634218 6353850 507 72 17 -60 RC BHP Gold
MAR013 634238 6353884 509 102 18 -60 RC BHP Gold
MAR014 634204 6353823 507 60 18 -60 RC BHP Gold
MAR015 634231 6354021 508 72 19.5 -60 RC BHP Gold
MAR016 634217 6354007 509 71 18 -60 RC BHP Gold
MAR017 634238 6354040 507 56 18 -60 RC BHP Gold
MAR018 634194 6353967 507 61 18 -60 RC BHP Gold
MAR019 634184 6353950 507 51 18 -60 RC BHP Gold
MAR020 634173 6353932 506 56 18 -60 RC BHP Gold
MAR021 634182 6354026 507 61 18 -60 RC BHP Gold
MAR022 634193 6354044 506 44 18 -60 RC BHP Gold
MAR023 634199 6354051 506 56 18 -60 RC BHP Gold

22

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
MAR024 634209 6354068 506 56 18 -60
RC
BHP Gold
MAR025 634251 6353986 510 56 24 -60
RC
BHP Gold
MAR026 634262 6354003 509 51 18 -60
RC
BHP Gold
MAR027 634272 6354017 508 56 18 -60
RC
BHP Gold
MAR028 634255 6353929 511 71 18 -60
RC
BHP Gold
MAR029 634288 6353968 511 51 18 -60
RC
BHP Gold
MAR030 634295 6353881 513 61 18 -60
RC
BHP Gold
MAR031 634429 6353811 514 51 18 -60
RC
BHP Gold
MAR032 634513 6353758 510 51 18 -60
RC
BHP Gold
MAR033 634594 6353737 508 51 355 -60
RC
BHP Gold
MAR034 634709 6353694 509 61 355 -60
RC
BHP Gold
MAR035 634720 6353733 507 61 355 -60
RC
BHP Gold
MAR036 634705 6353674 510 91 355 -60
RC
BHP Gold
MAR037 634747 6353687 508 56 355 -60
RC
BHP Gold
MAR038 634751 6353706 507 56 355 -60
RC
BHP Gold
MAR039 634755 6353728 506 51 355 -60
RC
BHP Gold
MAR040 634667 6353698 509 51 355 -60
RC
BHP Gold
MAR041 634670 6353717 508 51 355 -60
RC
BHP Gold
MAR042 634672 6353739 507 51 355 -60
RC
BHP Gold
MAR043 634538 6353606 506 47 18 -60
RC
BHP Gold
MAR044 634424 6353881 514 51 18 -60
RC
BHP Gold
MAR045 634435 6353898 513 51 18 -60
RC
BHP Gold
MAR046 634207 6353990 508 121 18 -60
RC
BHP Gold
MAR047 634090 6353795 509 101 198 -60
RC
BHP Gold
MAR048 633994 6353944 500 51 198 -60
RC
BHP Gold
MAR049 634072 6354078 503 51 198 -60
RC
BHP Gold
MAR050 634082 6354095 503 51 198 -60
RC
BHP Gold
MAR051 634031 6354245 498 76 18 -60
RC
BHP Gold
MAR052 634043 6354266 499 51 198 -60
RC
BHP Gold
MAR058 633982 6354281 496 50 18 -60
RC
BHP Gold
MAR059 634163 6354077 504 50 19 -60
RC
BHP Gold
MAR060 634175 6354095 504 50 18 -60
RC
BHP Gold
MAR061 634185 6354112 503 50 18 -60
RC
BHP Gold
MAR063 634204 6354061 506 25 18 -60
RC
BHP Gold
MAR064 634262 6354003 509 5 18 -60
RC
BHP Gold
MAR065 634256 6353995 509 25 18 -60
RC
BHP Gold
MAR066 634726 6353732 507 51 175 -60
RC
BHP Gold
MAR067 634761 6353741 506 64 175 -60
RC
BHP Gold
MAR068 634236 6353982 505 50 106 -60
RC
BHP Gold
MAR069 634254 6353972 510 57 108 -60
RC
BHP Gold
MAR070 634211 6354038 507 45 17 -60
RC
BHP Gold
MAR071 634201 6354021 507 69 17 -60
RC
BHP Gold
MAR072 634241 6354010 500 33 19 -60
RC
BHP Gold
MAR073 634231 6353993 508.9 63 17 -60
RC
BHP Gold
MAR074 634270 6353981 110 33 18 -60
RC
BHP Gold
MAR075 634139 6354116 503 39 21 -60
RC
BHP Gold
MAR076 634129 6354098 504 63 18 -60
RC
BHP Gold
MAR077 634069 6354226 499 33 18 -60
RC
BHP Gold

23

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
MAR078 634056 6354211 498 57 17 -60
RC
BHP Gold
MAR079 634671 6353727 548 55 355 -60
RC
BHP Gold
MAR080 634632 6353730 508 56 355 -60
RC
BHP Gold
MAR081 634791 6353683 507 52 19 -60
RC
BHP Gold
MAR082 634781 6353667 507.9 75 19 -60
RC
BHP Gold
MAR083 634799 6353695 507 51 19 -60
RC
BHP Gold
MAR084 634807 6353708 506 51 18 -60
RC
BHP Gold
MAR085 634846 6353694 506 75 18 -60
RC
BHP Gold
MAR086 634835 6353678 506 75 20 -60
RC
BHP Gold
MAR087 634825 6353661 507 81 18 -60
RC
BHP Gold
MAR088 634813 6353643 508 60 17 -60
RC
BHP Gold
MAR089 634670 6353788 506 60 18 -60
RC
BHP Gold
MAR090 634312 6353907 514 39 198 -60
RC
BHP Gold
MAR091 634028 6354340 499 60 18 -60
RC
BHP Gold
MAR092 634018 6354323 498 60 18 -60
RC
BHP Gold
MAR093 634008 6354307 498 60 18 -60
RC
BHP Gold
MAR094 634096 6354198 500 60 18 -60
RC
BHP Gold
MAR095 634086 6354181 500 60 18 -60
RC
BHP Gold
MAR096 634124 6354165 501 57 18 -60
RC
BHP Gold
MAR097 634113 6354147 501 60 18 -60
RC
BHP Gold
MAR098 634103 6354131 502 75 18 -60
RC
BHP Gold
MAR099 634005 6354261 497 50 18 -60
RC
BHP Gold
MAR102 634516 6353766 510 33 18 -60
RC
BHP Gold
MAR103 634555 6353751 509 57 18 -60
RC
BHP Gold
MAR104 634468 6353781 512 46 18 -60
RC
BHP Gold
MAR105 634717 6353748 505 57 355 -60
RC
BHP Gold
MAR106 634628 6353798 506 51 18 -60
RC
BHP Gold
MAR107 634899 6353709 504 75 18 -60
RC
BHP Gold
MAR108 634890 6353692 505 57 18 -60
RC
BHP Gold
MAR109 634880 6353675 506 57 18 -60
RC
BHP Gold
MAR110 634869 6353658 506 63 18 -60
RC
BHP Gold
MAR111 634021 6354259 498 50 18 -60
RC
BHP Gold
MAR112 634013 6354246 497 50 18 -60
RC
BHP Gold
MAR113 634144 6354123 500 30 18 -60
RC
BHP Gold
MAR114 634050 6354241 498 50 18 -60
RC
BHP Gold
MAR115 634043 6354229 498 50 18 -60
RC
BHP Gold
MAR116 634079 6354211 499 50 18 -60
RC
BHP Gold
MAR117 634072 6354198 499 50 18 -60
RC
BHP Gold
MAR118 634110 6354183 500 50 18 -60
RC
BHP Gold
MAR119 634102 6354170 500 30 18 -60
RC
BHP Gold
MAR120 634135 6354143 502 20 18 -60
RC
BHP Gold
MAR121 634128 6354131 502 50 18 -60
RC
BHP Gold
MAR122 634157 6354107 503 20 18 -60
RC
BHP Gold
MAR123 634149 6354094 504 40 18 -60
RC
BHP Gold
MAR124 634187 6354078 505 20 18 -60
RC
BHP Gold
MAR125 634180 6354064 505 55 18 -60
RC
BHP Gold
MAR126 634222 6353940 509 50 18 -60
RC
BHP Gold
MAR127 634214 6353927 508 60 18 -60
RC
BHP Gold

24

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
MAR128 634290 6353926 512 50 198 -60
RC
BHP Gold
MAR129 634283 6353913 512 24 198 -60
RC
BHP Gold
MAR130 634313 6353933 513 25 198 -60
RC
BHP Gold
MAR131 634331 6353886 515 24 198 -60
RC
BHP Gold
MAR132 634338 6353898 515 55 198 -60
RC
BHP Gold
MAR133 634383 6353855 516 30 198 -60
RC
BHP Gold
MAR134 634391 6353868 516 55 198 -60
RC
BHP Gold
MAR135 634497 6353775 511 18 18 -60
RC
BHP Gold
MAR136 634489 6353762 510 50 18 -60
RC
BHP Gold
MAR137 634502 6353744 509.8 60 18 -60
RC
BHP Gold
MAR138 634531 6353753 509 50 18 -60
RC
BHP Gold
MAR140 634650 6353727 508 30 18 -60
RC
BHP Gold
MAR141 634643 6353716 508 60 18 -60
RC
BHP Gold
MAR142 634687 6353724 508 40 18 -60
RC
BHP Gold
MAR143 634680 6353712 508 60 18 -60
RC
BHP Gold
MAR144 634734 6353714 507 30 18 -60
RC
BHP Gold
MAR145 634726 6353701 508 64 18 -60
RC
BHP Gold
MAR146 634785 6353713 506 55 18 -60
RC
BHP Gold
MAR147 634777 6353700 507 56 18 -60
RC
BHP Gold
MAR148 634769 6353687 508 40 18 -60
RC
BHP Gold
MAR149 634166 6354043 506 55 18 -60
RC
BHP Gold
MAR149A 634172 6354051 506 10 18 -60
RC
BHP Gold
MAR150 634305 6353920 513 50 18 -60
RC
BHP Gold
MAR151 634523 6353740 509 55 18 -60
RC
BHP Gold
MAR152 634633 6353813 506 50 18 -60
RC
BHP Gold
MAR153 634660 6353777 506 55 18 -60
RC
BHP Gold
MAR154 634635 6353703 508 45 18 -60
RC
BHP Gold
MAR155 634672 6353699 508 54 18 -60
RC
BHP Gold
MAR156 634722 6353763 506 20 18 -60
RC
BHP Gold
MAR157 634713 6353706 508 50 355 -60
RC
BHP Gold
MAR158 634744 6353731 506 56 198 -60
RC
BHP Gold
MAR159 634792 6353726 506 52 198 -60
RC
BHP Gold
MAR160 634783 6353710 507 55 18 -60
RC
BHP Gold
RAB019 634130 6354178 500 50 18 -60
RAB
BHP Gold
RAB020 634120 6354162 501 50 18 -60
RAB
BHP Gold
RAB021 634110 6354145 501 50 18 -60
RAB
BHP Gold
RAB027 634189 6354121 503 50 18 -60
RAB
BHP Gold
RAB028 634178 6354104 504 50 18 -60
RAB
BHP Gold
RAB038 634259 6354082 505 50 18 -60
RAB
BHP Gold
RAB042 634051 6353625 498 50 RAB BHP Gold
RAB101 634859 6353681 505 42 18 -60
RAB
BHP Gold
RAB102 634849 6353664 505 56 18 -60
RAB
BHP Gold
RAB103 634825 6353701 506 35 18 -60
RAB
BHP Gold
RAB104 634815 6353684 506 53 18 -60
RAB
BHP Gold
RAB105 634775 6353736 497 33 18 -60
RAB
BHP Gold
RAB106 634766 6353719 497 50 18 -60
RAB
BHP Gold
RAB107 634706 6353776 498 40 18 -60
RAB
BHP Gold
RAB108 634696 6353758 502 55 18 -60
RAB
BHP Gold

25

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
RAB110 634679 6353768 503 54 18 -60
RAB
BHP Gold
RAB111 634657 6353810 505 32 18 -60
RAB
BHP Gold
RAB112 634647 6353793 505 52 18 -60
RAB
BHP Gold
RAB113 634560 6353883 507 49 18 -60
RAB
BHP Gold
RAB114 634550 6353866 508 65 18 -60
RAB
BHP Gold
RAB115 634366 6353947 511 51 18 -60
RAB
BHP Gold
RAB116 634356 6353930 513 48 18 -60
RAB
BHP Gold
RAB117 634377 6353966 509 58 18 -60
RAB
BHP Gold
RAB118 634441 6353917 511 51 18 -60
RAB
BHP Gold
RAB119 634451 6353934 510 52 18 -60
RAB
BHP Gold
RAB120 634570 6353900 506 52 18 -60
RAB
BHP Gold
RAB122 634310 6353970 510 46 18 -60
RAB
BHP Gold
RAB123 634300 6353952 512 58 18 -60
RAB
BHP Gold
RAB124 634327 6353960 511 49 18 -60
RAB
BHP Gold
RAB125 634317 6353942 512 49 18 -60
RAB
BHP Gold
RAB126 634611 6353850 506 40 18 -60
RAB
BHP Gold
RAB127 634607 6353843 506 57 18 -60
RAB
BHP Gold
RAB128 634624 6353834 506 40 18 -60
RAB
BHP Gold
RAB129 634617 6353821 506 59 18 -60
RAB
BHP Gold
RAB130 634592 6353859 506 40 18 -60
RAB
BHP Gold
RAB158 634177 6354019 506 95 18 -60
RAB
BHP Gold
RAB159 634228 6353967 509 78 18 -60
RAB
BHP Gold
Data aggregation In reporting Exploration Results, No exploration results are being reported in this report.
methods weighting averaging techniques, No top cuts were applied
maximum and/or minimum grade No Aggregate intercepts were created.
truncations (eg cutting of high grades) No metal equivalent was used
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
Relationship These relationships are particularly The holes were drilled predominantly at -60-degree dip and an azimuth of between 18-20 degrees magnetic and consistent with testing the mineralisation at a suitable angle.
between important in the reporting of Exploration The mineralisation is modeled as being near vertical with a slight dip toward the south west.
mineralisation Results. NOTE: The mineralisation is not being stated as a grade per meter statement, but rather as an interpolated resource block model which alleviates the risk of misrepresenting the
widths and
intercept lengths
If the geometry of the mineralisation with
respect to the drill hole angle is known,
its nature should be reported.
mineralisation due to acute intersection angles between the drill hole and the mineralized unit resulting in exaggerated intersection lengths.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect(eg ‘down

26

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
_hole length, true width not known’). _
Diagrams Appropriate maps and sections (with Plans (full resource area)
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.

27

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Plans (historic pit areas)

28

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Main historic pit (cross section)

29

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Main historic pit (long section)
Satellite historic pits (cross section)

30

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Satellite historic pits (long section
Area between historic pits (long section)

31

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Balanced Where comprehensive reporting of all The Reporting of this resource is considered balanced since
reporting Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of



Sample results were composited to 1m intervals/composites.
Inverse Distance estimation method was used
No top cuts were used
Exploration Results.
Other substantive Other exploration data, if meaningful and
Multiple companies have held the exploration license over Mount Aubrey over the years and lots of work has been done on it. An IP study was completed in 2010
exploration data material, should be reported including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Further work The nature and scale of planned further The mineralisation is open in all directions and exploration efforts for the near future would include:
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas


Strike extensional drill targeting
Depth extensional drill targeting
Next phase – Resource definition below defined targets from phase one.
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially sensitive.

32

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary

33

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation Commentary Commentary
Database integrity Measures taken to ensure that data has not been The data used for this resource estimate is historic in nature.
corrupted by, for example, transcription or keying errors, Physical aspects of the database were validated on the ground by Ardea Resources personnel and include:
between its initial collection and its use for Mineral o The collar data was visually checked using leapfrog software and locations validated using historic maps and reports.
Resource estimation purposes. o The competent person also validated the collar locations on site using a Trimble Juno 5 GPS unit. Some minor discrepancies were identified.
Data validation procedures used.
The collar data surrounding the two satellite
pits validated within 2m.
1.5m Discrepancy
2m Discrepancy
1m discrepancy

34

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
The collar data South of the main pit showed a larger error margin. The discrepancy
is 2.24m East and 5.64m North (See image below.). This error could be validated
using eight (8) collars still available in the area, but the remainder have all been
destroyed by the mining of the open pit, or by agricultural activities such as
ploughing the field to the south of the pit for cultivating crops. The resultant potential
shift in the mineralization due to the shift in collar location has been checked in three
dimensions and is deemed insignificant relative to the scale of the interpreted
geology (See image below). It’s localized status also increased the confidence
instating the overall impact on the geology interpretation and thus the resource.

35

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary

==> picture [474 x 325] intentionally omitted <==

  • The down hole survey data was visually checked and validated and found in order.

  • o The assay data could not be validated with lab certificates since none have been found in the historic records.  The average grade represented by the assay data however corresponds well with the historically reported grade of the mine during operation, giving increased confidence in the integrity of the data.

  • o RAB Holes:  During the Mount Aubrey Resource Estimation 31 RAB holes were used as part of the geological modelling and estimation phase. The RAB hole were drilled in 1990 and targeted the Main Pit mineralised veins predominantly. The mining of the historic pit effectively depleted the RAB intersections (See table below), but due to the low number of RC drill intercepts in vicinity of the RAB holes in the North Western part of the pit especially (See Image below), and the relatively small number of RAB holes compared to the 157 RC holes, the RAB holes were used during the estimation process.

36

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Hole_ID
MGA_E
MGA_N
RL
Total_
Depth
RAB115
634366
6353947
511
51
RAB116
634356
6353930
513
48
RAB117
634377
6353966
509
58
RAB118
634441
6353917
511
51
RAB119
634451
6353934
510
52
RAB121
634638
6354528
493
72
RAB122
634310
6353970
511
46
RAB123
634300
6353952
512
58
RAB124
634327
6353960
511
49
RAB125
634317
6353942
512
49
RAB130
634592
6353859
507
40
RAB158
634177
6354019
506
95
RAB159
634228
6353967
509
78
57
Average Depth
Hole_ID MGA_E MGA_N RL Total_
Depth
Hole_ID MGA_E MGA_N RL Total_
Depth
RAB101 634859 6353681 505 42 RAB115 634366 6353947 511 51
RAB102 634849 6353664 505 56 RAB116 634356 6353930 513 48
RAB103 634825 6353701 506 35 RAB117 634377 6353966 509 58
RAB104 634815 6353684 506 53 RAB118 634441 6353917 511 51
RAB105 634775 6353736 497 33 RAB119 634451 6353934 510 52
RAB106 634766 6353719 497 50 RAB121 634638 6354528 493 72
RAB107 634706 6353776 498 40 RAB122 634310 6353970 511 46
RAB108 634696 6353758 502 55 RAB123 634300 6353952 512 58
RAB110 634679 6353768 503 54 RAB124 634327 6353960 511 49
RAB111 634657 6353810 505 32 RAB125 634317 6353942 512 49
RAB112 634647 6353793 505 52 RAB130 634592 6353859 507 40
RAB113 634560 6353883 507 49 RAB158 634177 6354019 506 95
RAB114 634550 6353866 508 65 RAB159 634228 6353967 509 78
RAB120 634570 6353900 506 52 Average Depth 57
RAB126 634611 6353850 506 40
RAB127 634607 6353843 506 57
RAB128 634624 6353834 506 40
RAB129 634617 6353821 506 59
Average Depth 48
Site visits

Comment on any site visits undertaken by the
Competent Person and the outcome of those visits.

If no site visits have been undertaken indicate why this
is the case.
The competent person has visited the Mount Aubrey mine site multiple times and has taken soil and rock chip samples of the area. He also personally validated the
collar locations of available and remaining historic drill collars and found the surface quartz float locations and orientations to coincide with the historic mapped quartz
veins. He has a good understanding of the local geology as well as the characteristics of the deposit.

37

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

==> picture [760 x 454] intentionally omitted <==

----- Start of picture text -----

|||||
|---|---|---|---|
|Criteria|JORC Code explanation|Commentary|
|Geological|•|Confidence in (or conversely, the uncertainty of ) the|Historic reports and discussions with geologists that worked on the project during its exploration and operational phase confirmed that the gold was/is confined within|
|interpretation|geological interpretation of the mineral deposit.|the quartz veins with varying width of between two (2) and eight (8) meters. Comments were also made regarding gold grade being associated with quartz veins found|
|•|Nature of the data used and of any assumptions made.|in a Basaltic host.|
|•|The effect, if any, of alternative interpretations on|
|Mineral Resource estimation.|
|•|The use of geology in guiding and controlling Mineral|
|Resource estimation.|
|•|The factors affecting continuity both of grade and|Pit|
|geology.|Outline|
|Pit|
|Outline|
|Mapped|
|Veins|
|(Yellow)|
|Modelled|
|veins|
|(Green)|
|Very few historic holes have associated geology logs and the only information available for those holes is Collar location, DH trace (Survey) and Assay values. The|
|three diamond holes drilled in 2007 have geology logs.|
|Due to the lack of geology logs, the gold assay grade was used for identifying the quarts veins. Assay intervals with elevated gold grade over their surrounding|
|intervals were coded as veins. The mapped quarts veins on surface and their associated dip and dip directions were used as guide to identify and connect adjacent|
|coded assay intervals into continuous 3D quartz veins.|
|The data acquired from reports stating the 2-8m variability of the quartz vein thickness was also used as guides for the geological interpretation.|

----- End of picture text -----

38

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

==> picture [760 x 457] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code explanation Commentary
Due to the sparse data available along strike and down dip of the historic pits, the veins were also pinched if no data was available within 40m of the last data point.
Section
Line
Section Looking West
Green Vein Interpretations
DH intersections above 0.25g/t Au highlighted
Pit shell shown

Section
Line
Section Looking West
Green Vein Interpretations
DH intersections above 0.25g/t Au 40m depth
highlighted contour
Satellite pit shown
----- End of picture text -----

39

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Dimensions The extent and variability of the Mineral Resource Geological Model Dimensions:
expressed as length (along strike or otherwise), plan Strike: 1158m
width, and depth below surface to the upper and lower
limits of the Mineral Resource.

Width: The veins range from 2m -8m wide individually, but the total mineralized suite of veins can be as wide as 140m
Depth: 115m

40

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

==> picture [760 x 437] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code explanation Commentary
Section
Line
Section
Line
----- End of picture text -----

41

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Estimation and The nature and appropriateness of theestimation Estimation Technique:Inverse Distance
modelling techniques technique(s) appliedandkey assumptions, including
treatment of extreme grade values,domaining,
interpolation parametersandmaximum distance of
extrapolation from data points. If a computer assisted
Extreme grades:No grade capping was
employed during this estimation.
Software:LeapFrog Edge
313°Strike
estimation method was chosen include a description of Modelling Techniques – Domains
computer software and parameters used. Domain wireframes have been created

The availability of check estimates, previous estimates
and/or mine production records and whether the Mineral
Resource estimate takes appropriate account of such
data.
The assumptions made regarding recovery of by-
using Leapfrog.
The domain wireframes were created using
assay grade due to the low percentage
geology intervals logged and available. The
domains vein models were created in
products. Leapfrog using implicit modeling
Estimation of deleterious elements or other non-grade techniques.
300°Strike
variables of economic significance (eg sulphur for acid
mine drainage characterisation).
Due to the changing strike directions
throughout the deposit and the need to
305°Strike
In the case of block model interpolation, the block size group vein models with similar strike so as
in relation to the average sample spacing and the to be able to use appropriate search criteria
search employed. for each set of parallel veins, the interpreted
285°Strike
Any assumptions behind modelling of selective mining vein models were split into four (4) separate
units. groups.
Any assumptions about correlation between variables. Each set of parallel veins were individually
Description of how the geological interpretation was estimated with individual estimation
used to control the resource estimates. neighborhoods to ensure tailored criteria for
Discussion of basis for using or not using grade cutting optimal results.
or capping.
The process of validation, the checking process used,
Modelling Techniques – Block Model Creation
the comparison of model data to drill hole data, and use A sub blocked block model was built using the quartz veins and a digital terrain model of the surface. Only the quartz veins had been domained and modelled.
of reconciliation data if available. Waste material was not subdivided into different geological units for this model.
The parent cell of 5m x 10m x 10m in the X, Y and Z dimensions was chosen to reflect 2-8m vein width. This also reflects the drill hole intercept spacing of 20m x
20m for a significant portion of the deposit.
The parent blocks were sub-celled to 1m x 1m x 1m to accurately estimate the volume of material inside each lens domain.
The block model creation, and subsequent block interpolation and post processing was completed in LeapFrog Edge.
Validation of outputs was conducted against historic production reports
Estimation of Grades
Each individual group of parallel veins was interpolated separately. Lens boundaries are soft for the purposes of compositing and grade estimation with a range of
between 0.12 and 0.43m from the hard vein boundary.
For resource modelling purposes adjustments were made to assay data during prior to modelling;
o
No top cuts were applied
Semi-variogram models for Au were created for each of the four vein groups. These geostatistical models are considered to be robust but a lack of data in the
down dip direction is noted and may affect the down dip variogram range. The nugget indicated is low and may corroborate the reported fine gold grain.
The inverse distance exponent factor was set to 0.1 which would increase the weighting for samples nearest the centroid of the block. This aims to prevent
inappropriate grade smearing during this estimation.
The maximum number of samples per drill hole was limited to five (5). This was done the ensure that a single hole would not be allowed to produce an
interpolated block and in so doing ensure a more robust estimation of the grade in the resource.
Grades were interpolated usinginverse distance estimation usingLeapFrogEdge software. Searchparameters were based on the variogram models with

42

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
ellipsoid searches being used to set a maximum of 20 and minimum of 10 samples for each interpolation. Three interpolation passes were generated with the first
matching the variogram range dimensions, the second multiplying those ranges by 1.5 and the third being twice the range of the variogram model. This was done
to ensure the maximum number blocks were filled by the third search and were orientated to match the variography. The minimum number of samples of 10 also
ensured that blocks without sufficient support would not meat eh estimation criteria and would thus not be populated with grade.
The resource was sated above a cut off grade of 0.5g/t Au.
Interpolation parameters are shown below.

43

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Previous estimates:
No previous JORC resource estimates could be found in the literature, but a reserve was stated prior to the commencement of mining in 1990.
BHP Gold reserve statement, circa 1990
Recovery of byproducts:None
Estimation of deleterious elements:None
Block size vs. average sample spacing
Block size
o
Parent - 5m x 10m x 10m
o
Sub-Cell – 1m x 1m x 1m
Drill spacing – 20m
Validation: Composite Mean BM Mean
The primary validation tools used were domain statistics. The mean estimated grades In Situ - Vein285 1.21 0.97
generally compare favorably with the mean grade of the composites for each domain. In Situ - Vein300 1.13 1.34
In Situ - Vein305 0.38 0.40
In Situ - Vein313 1.72 1.35 Variance
1.11 1.01 -8.7%

44

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
In addition, “on screen” checks were completed to compare estimated block grades with the 1.0m composite Au grades. There were no issues identified during
this review process.

45

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary

46

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary

47

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
Moisture Whether the tonnages are estimated on a dry basis or The tonnage was estimated on a dry tonnage basis.
with natural moisture, and the method of determination
of the moisture content.
Cut-off parameters The basis of the adopted cut-off grade(s) or quality Cut-off grades of 0.5 g/t Au have been used to constrain the Mineral Resources reported.
parameters applied. At this stage no detailed mining studies and economic evaluations have been completed so it is not possible to provide detailed supporting information for the cut-
off grades that have been used.

48

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
Mining factors or Assumptions made regarding possible mining methods, No detailed mining studies have been completed.
assumptions minimum mining dimensions and internal (or, if
applicable, external) mining dilution. It is always
necessary as part of the process of determining
reasonable prospects for eventual economic extraction
to consider potential mining methods, but the
assumptions made regarding mining methods and
parameters when estimating Mineral Resources may
not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of
the mining assumptions made.
Metallurgical factors The basis for assumptions or predictions regarding There have been no metallurgical studies completed on this project.
or assumptions metallurgical amenability. It is always necessary as part
of the process of determining reasonable prospects for
eventual economic extraction to consider potential
metallurgical methods, but the assumptions regarding
metallurgical treatment processes and parameters
made when reporting Mineral Resources may not
always be rigorous. Where this is the case, this should
be reported with an explanation of the basis of the
metallurgical assumptions made.
Environmental Assumptions made regarding possible waste and There have been no studies or assumptions made regarding environmental factors.
factors or process residue disposal options. It is always necessary
assumptions as part of the process of determining reasonable
prospects for eventual economic extraction to consider
the potential environmental impacts of the mining and
processing operation. While at this stage the
determination of potential environmental impacts,
particularly for a greenfields project, may not always be
well advanced, the status of early consideration of these
potential environmental impacts should be reported.
Where these aspects have not been considered this
should be reported with an explanation of the
environmental assumptions made.
Bulk density Whether assumed or determined. If assumed, the basis No bulk density studies have been completed on the Mount Aubrey project.
for the assumptions. If determined, the method used, The SG used for the estimation was 2.7 t/m3. This is the density of Quartz, which is the mineralized host and therefore considered appropriate. It is expected that
whether wet or dry, the frequency of the measurements, increasing gold grade would increase the SG beyond 2.7t/m3 and thus this estimate would represent the lower end of the tonnage spectrum for this resource.
the nature, size and representativeness of the samples. Bulk density calculations are planned on the core produced from the first/next diamond drill program.
The bulk density for bulk material must have been
measured by methods that adequately account for void
spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.
Discuss assumptions for bulk density estimates used in
the evaluationprocess of the different materials.
Classification The basis for the classification of the Mineral Resources The entire estimated Mount Aubrey resource has been classified as anInferred Mineral Resource. In making this classification, the following factors have been
into varying confidence categories. considered.
Whether appropriate account has been taken of all Data integrity

49

==> picture [37 x 596] intentionally omitted <==

==> picture [173 x 23] intentionally omitted <==

Criteria JORC Code explanation Commentary
relevant factors (ie relative confidence in tonnage/grade o
The data is of sufficient quantity and quality for an Inferred Mineral Resource classification with drill data spacing of 20m x 20m.
estimations, reliability of input data, confidence in o
Accuracy of collar and down hole surveys are sufficient for the spatial location of the drill holes. Please note discussion of collar accuracy stated earlier in
continuity of geology and metal values, quality, quantity this table one.
and distribution of the data).
Geological modelling and grade continuity
Whether the result appropriately reflects the Competent o
The estimation domains that have been constructed seem appropriate in relation to the currently understood model of formation of the mineralization,
Person’s view of the deposit. being an epithermal vein gold deposit.
o
The estimation was conducted in three passes. The first having the range of the variogram model in each direction as its distance parameters, the second
has 1.5 times that range and the third has twice the range distance as search ellipse. The minimum number of samples for each pass is 10 and the
maximum is 20. In addition, each drill hole could only contribute 5 samples to the estimation of any block resulting in the required use of at least two drill
holes with 5 samples each to the estimation of grade for any block. No top cuts were applied. The inverse distance interpolator was also set to assign
maximum weight to samples closes to the centroid of the estimated block, thus preventing grade smearing.
o
The majority of the drill data is in close proximity to the historic open pit mines and data density becomes sparse as one moves away from them. The
modeled ore body (Vein) solids were created using a max distance of 40m away from any data point, thus preventing the overestimation of both geology
and grade away form sample data. The depth of the interpreted veins was clipped at 115m below surface. The bulk of the drill intercepts are at 40m depth
below surface, but several deeper intercepts exist. Due to the weighting assigned to the proximity of the samples to the centroid of the estimated block,
samples at depth with less sample support will receive low estimation weights and thus estimate lower grades in an attempt to prevent the overstatement
of grade in areas of lower sample support.
The result of this estimation does reflect the competent person’s view of the deposit. The domains are consistent with historic reports of the mined veins and modeling
has constrained strike extensions of geology so as not to extend far beyond data limits. The model grades also reflect the raw composite grades and is not over-
estimating the grade in the deposit.
Audits or reviews The results of any audits or reviews of Mineral No audits have been performed on this resource.
Resource estimates.
Discussion of relative
Where appropriate a statement of the relative accuracy The Mount Aubrey resource is considered accurate and appropriate to represent the inferred category of resource estimates.
accuracy/ confidence and confidence level in the Mineral Resource estimate
using an approach or procedure deemed appropriate by
the Competent Person. For example, theapplication of
statistical or geostatistical procedures to quantify
the relative accuracy of the resource within stated
confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and
The data integrity has been validated to the best of the geology teams ability using all available methods and means, for example, the physical validation of collar
locations in the field and discussions with members of the geology team that worked on the deposit during its initial exploration and production phase in the 1980s and
early 1990s.
The geological interpretation is also considered appropriate as it considers the geological data collected from the drill programs and does not extend long distances
away from the data points, thus mitigating the possibility of overestimating the volume of the deposit. The search criteria and variography for the estimation were
determined by statistical methods using the data associated with the deposit and is considered relevant. The estimated block model grades correlate well with the raw
composite data indicating that it reflects the raw data and is thus considered accurate relative to the inferred classification thereof.
confidence of the estimate. The resource is considered local and is based on the local data associated with the Mount Aubrey information available.
The statement should specify whether it relates to The reported mined ounces from historic reports indicate a total of 12,000 Oz mined from the combined open pits. This estimation calculates the mined/depleted
globalor local estimates, and, if local, state the ounces to be 11,495 Oz, thus correlating well with the historic reports and adding a further form of validation.
relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation
should include assumptions made and the procedures
used.
These statements of relative accuracy and confidence
of the estimate should be compared with production
data, where available.

50