Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARCHER MATERIALS LIMITED Capital/Financing Update 2020

Feb 2, 2020

64478_rns_2020-02-02_4956bbac-e4ae-4aa6-a70c-5b717d52e8fb.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

3 February 2020

==> picture [29 x 29] intentionally omitted <==

ASX Announcement (ASX:AXE)

Drilling to commence at Eyre Peninsula HalloysiteKaolin Project

Highlights

  • Aircore drilling to start this week at the Eyre Peninsula Kaolin-Halloysite Project (“EP Project”).

  • The drilling is expected to confirm the extent and quality of the kaolin and halloysite mineralisation.

  • Assay and drill results from the EP Project are expected during the next 4-6 weeks.

  • Results from previous drilling completed at the Franklyn Halloysite-Kaolin project expected in February 2020.

Archer Materials Limited (“Archer”, “Company”) is pleased to announce that aircore drilling on the Company’s 100% owned Eyre Peninsula Halloysite-Kaolin Project (“EP Project”) is expected to commence this week. The EP Project is located 115km west of the Whyalla Port, South Australia (Fig. 1).

The drilling program will focus on the Kelly Tank, Balumbah and Bunora prospects (Fig. 2 ) within the larger EP Project area. The drilling aims to confirm the areal extent of the kaolin mineralisation (an alumina-based clay, see Industry Background ) and to collect a bulk sample for advanced testing of the kaolin and halloysite materials’ properties. Samples will be wet screened, then have their chemistries analysed, after which samples will be submitted for X-ray Diffraction (“XRD”) analyses to determine the presence of Halloysite.

In addition to the aircore drilling, Archer’s field crew will also visit other prospective locations to collect samples. The Company anticipates that the results from drilling would confirm the extent of increases to the area of known mineralisation on the EP Project.

Commenting on the drilling, Archer Executive Chairman Greg English said , “We have developed a large Exploration Target on the EP Project and expect this drill program to validate and expand the Exploration Target. We like the EP Project because it is located close to existing infrastructure and easily accessed by existing roads and tracks thereby making exploration easier and relatively low cost”.

“In addition to the presence of a large kaolin Exploration Target, the confirmation of the presence of high-value mineral halloysite would increase the potential of the EP Project.”

“Drilling will take about five days to complete with results to be reported during the next 4 to 6 weeks” said Mr English.

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

Background

In Q1 and Q2 the Company announced a significant kaolin Exploration Target for both the EP Project (ASX announcement 19/08/19) and Franklyn Project (ASX announcement 7/11/19) (Table 1).

Project Tonnes Grade
Franklyn Project 45 - 91 million 30 – 36% Al2O3(-45 µm size fraction)
EP Project 55 - 135 million 33 – 36% Al2O3(-53 µm size fraction)

Table 1. EP Project and Franklyn Project Exploration Targets

The potential quantity and grade of the Exploration Targets reported are conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource for the EP Project or Franklyn Project.

Historical reports for the EP Project by Pechiney (Australia) Exploration Pty Ltd (“Pechiney”) in the 1970s identified the presence of halloysite in composite sampling work undertaken at both Bunora and Kelly Tank. The results of this historic drilling were used in the calculation of the EP Project Exploration Target.

==> picture [435 x 323] intentionally omitted <==

Fig. 1. Location of EP Project and Franklyn Project.

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

==> picture [452 x 256] intentionally omitted <==

Fig. 2. Location of holes to be drilled (red) on EP Project

Next Steps

The drilling at the EP Project is expected to be completed within five days. Drill samples will then be submitted for wet screening and XRD testing will follow to determine the presence of halloysite. The test work is expected to take 4-6 weeks with the results being disclosed once they become available.

In addition to the EP Project drill results, the Company expects to report further results from the Franklyn Project drilling (ASX announcement 4/12/19) in late Feb 2020.

Industry Background

Kaolin and halloysite are alumina-based clays, that can naturally occur intermixed, and are part of a larger A$3 billion construction materials industry in Australia[†] . These materials have recently emerged as a potential feedstock in processing high-value and hard-to-substitute highpurity alumina (HPA)[‡ ] that could be used in deep-tech applications such as light-emitting diodes and lithium-ion batteries; with halloysite having a nanostructure that may allow its use as an efficient catalyst in the petrochemicals industry.

† https://www.ibisworld.com.au/industry-trends/market-research-reports/mining/rock-limestone-claymining.html

‡ https://www.qut.edu.au/news?news-id=153588

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

About Archer

Archer provides shareholders exposure to financial returns from innovative technologies and the materials that underpin them. The Company’s strategy is to build an industry-leading Materials Technology company, that delivers maximum value to shareholders through the commercialisation of assets at various stages of the materials lifecycle. Archer has strong intellectual property, broad-scope mineral tenements, world-class in-house expertise, a diverse advanced materials inventory, and access to over $300 million of R&D infrastructure.

Competent Person Statement

The information in this announcement that relates to Exploration Results is based on information compiled by Mr Wade Bollenhagen, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and is a full-time employee of Archer Materials Limited.

Mr Bollenhagen has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Bollenhagen consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

For further information, please contact:

The Board of Archer authorised this For more information about Archer’s activities, announcement to be given to ASX. please visit our: General Enquiries Website https://archerx.com.au/ Mr Greg English Executive Chairman Twitter: https://twitter.com/archerxau?lang=en Dr Mohammad Choucair Chief Executive Officer YouTube: https://bit.ly/2UKBBmG Tel: +61 8 8272 3288 Medium: https://medium.com/@ArcherX Sign up to our Newsletter: http://eepurl.com/dKosXI

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

JORC Code, 2012 Edition – Table 1 Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code Explanation Commentary
Sampling
Techniques

Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as downhole gamma sondes, or handheld XRF instruments, etc.). These examples
should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases, more explanation may
be required, such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information.

No sampling being reported.
Drilling
Techniques

Drill type (e.g. core, reverse circulation, open hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc.).

No drilling being reported.
Drill Sample
Recovery

Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.

No drilling being reported.

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.

The total length and percentage of the relevant intersections logged.

No drilling being reported.
Sub-Sampling
Techniques
and Sample
Preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or
dry.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity
of samples.

Measures taken to ensure that the sampling is representative of the in-situ material
collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

No drilling being reported..
Quality of
Assay Data
and
Laboratory
Tests

The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and
precision have been established.

No chemistry being reported.

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Verification of
Sampling and
Assaying

The verification of significant intersections by either independent or alternative company
personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.

No drilling being reported.
Location of
Data Points

Accuracy and quality of surveys used to locate drillholes (collar and downhole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

No drilling being reported.

Planned hole locations are shown in images.
Data Spacing
and
Distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.

No drilling being reported.
Orientation of
Data in
Relation to
Geological
Structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.

No drilling being reported.

Planned holes will be drilled vertically.

The types of rocks that have been weathered to
produce the kaolin cover very large aerial
extents, far beyond the areas deemed
exploration targets.

Faults and other fracture type systems can
enhance local weathering, i.e. deepen the system,
it is unknown what influence if any these have
played in the kaolin development,
Sample
Security

The measures taken to ensure sample security.

No drilling being reported.

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

Mineral Exploration

Halloysite-Kaolin

Criteria JORC Code Explanation Commentary
Audits or
Reviews

The results of any audits or reviews of sampling techniques and data.

No audits undertaken.

One review by the SA government in 1993 and
summarised in Report book 93/57.

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

Mineral Exploration Halloysite-Kaolin

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code Explanation Commentary
Mineral
Tenement and
Land Tenure
Status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.

Tenement status confirmed on SARIG

All work being reported is from EL 5815 and ELA
2019/102, Archer Energy & Resources Pty Ltd (a
subsidiary of AXE) owns the tenement.

The granted tenement is in good standing with
no known impositions.

It is unknown when the ELA will be granted, an
offer by the govt has been made and AXE has
accepted the conditions.
Exploration
Done by Other
Parties

Acknowledgment and appraisal of exploration by other parties.

Pechiney (1968 - 1971) and CSR (1971 – 1973).

WMC (CRA) mid 1980’s, exploring for base
metals.

Other explorers have held exploration licences
over the ground up till the current date.
Exploration has been for precious metals
Geology
Deposit type, geological setting and style of mineralisation.

Deep weathering of the Cleve Uplands, south of
Kimba on northern Eyre Peninsula, has resulted in
widespread kaolinisation of early Proterozoic
Hutchinson Group schist and Lincoln Complex.

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Drillhole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:

Easting and northing of the drill hole collar

Elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar

Dip and azimuth of the hole

Downhole length and interception depth

Hole length

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.

No drilling being reported.
Data
Aggregation
Methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.

No drilling being reported.
Relationship
Between
Mineralisation
Widths and
Intercept
Lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.

If it is not known and only the downhole lengths are reported, there should be a clear
statement to this effect (e.g. ‘downhole length, true width not known’).

No drilling being reported.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported. These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.

No drilling being reported.
Balanced
Reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleadingreportingof Exploration Results.

The reporting is considered to be balanced.

Mineral Exploration Halloysite-Kaolin

ACN: 123 993 233

==> picture [29 x 29] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Other
Substantive
Exploration
Data

Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminatingsubstances.

None to report at this stage of the review.
Further Work
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.

Exploration work is required to confirm the
historical work and advance the projects towards
a more certain nature, which will hopefully lead to
a confidence level where resources can be
estimated.