Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARCHER MATERIALS LIMITED Capital/Financing Update 2019

Jan 24, 2019

64478_rns_2019-01-24_5f11bb79-fede-41ce-b5b5-81ed6a68c320.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

ASX Announcement (ASX: AXE )

25 January 2019

Large intrusive style copper-gold alteration at Blue Hills

Highlights

  • RC drilling program completed at Hood at Blue Hills Copper Gold Project.

  • Drilling to date appears to confirm the conceptual model of Hood as an intrusive style copper gold mineralised system.

  • RC drilling of soil anomalies and ground EM conductors at the Hood prospect has intersected:

  • Multiple phases of alteration, with veins comprising quartz-carbonatehematite and sulphide mineralisation observed in rock chips, are very favourable indicators that the target intrusive has the capacity to host copper-gold mineralisation, which will be tested with additional drilling.

  • Magnetite, pyrite, and chalcopyrite at the depths expected in the EM model. This is considered very encouraging for subsequent down-hole EM surveying and targeting of the larger system.

  • This maiden drill program at Hood will provide a very important vector into the target zone to be tested with subsequent drill holes.

  • Hood assay results expected in next 2 – 3 weeks.

  • Drilling at Katniss and Hawkeye to be completed over the next 2-3 weeks with assay results expected mid-February.

Archer Exploration Limited (“Archer”, the “Company”) (ASX:AXE) is pleased to provide an update of the reverse circulation (RC) drilling program (Program) at the Hood prospect, which is part of Archer’s Blue Hills Copper-gold Project, located approximately 240 km north of Adelaide, South Australia (see About Blue Hills). The aim of the wider drill program involving Hood, Katniss and Hawkeye prospects is to test large areas of coincident copper-gold mineralisation targets identified from geochemical, rotary air blast (RAB) and electromagnetic (EM) surveys conducted by Archer at Blue Hills.

Archer’s Executive Chairman, Greg English, said “We have had an excellent start to our maiden exploration program at Hood, which is part of the larger Blue Hills Project. The early drilling results at Hood confirm what could potentially be a very large copper gold system.”

“The spatial alteration and zonation pattern of large intrusive copper gold systems is well understood, and what we have seen at Hood so far is consistent with this style of mineralisation.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

In terms of the wider potential, it is also important to note that Hood is only a small part of our overall project area, with the larger North Burra project covering an area more than 3,000km[2] ” said Mr English.

==> picture [214 x 259] intentionally omitted <==

==> picture [199 x 259] intentionally omitted <==

Figure 1. Images showing the area of the three prospects discovered to date at Blues Hills (Hood, Hawkeye and Katniss) compared to the size of the Sydney CBD (left) and Melbourne CBD (right). The Hood target alone covers an area of approximately 8km[2] .

Observations

The three holes drilled so far at Hood (HDRC10-001 to 003) confirm that the rocks at Hood are different to the surrounding geology and that Hood has been subjected to a large-scale alteration event. The results to date (see below) confirm that the alteration at Hood is consistent with the type of alteration associated with intrusive style copper gold deposits.

Drill hole HDRC19-001

A highly altered sequence of Tapley Hill Formation (THFm) was intersected over the hole; alteration observed includes silicification (± carbonate) which has led to bleaching of the rocks. Potential propylitic alteration evinced by the vein styles.

  • 0 to 29m downhole depth - highly oxidised shale with hematite veinlets was observed. Rock chip samples indicate these are typically mineralised.

  • 29 to 60m - weathered THFm.

  • 60 to 69m - minor zones of bleaching encountered. Most of the rock was completely recrystalised with all sedimentary textures obliterated.

  • 85 to 115m end of hole (EOH) - variably altered dolomite comprising chlorite±hematite veinlets. The hole was stopped due to the collapsing nature of the ground.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Drill hole HDRC19-002

A weakly graphitic altered sequence of Tapley Hill Formation (THFm) was intersected at the top of the hole until alteration was encountered at 79m downhole to the end of the hole (127m).

  • 0 to 79m downhole depth - sequence of weakly graphitic THFm was encountered. It is interpreted that the presence of graphite is due to heating of the highly carbonaceous rocks to a point where the carbon becomes graphite. Quartz (qtz)-carbonate (cb) ± hematite (he) (ex magnetite (mt)) veinlets observed throughout this interval, with the frequency increasing towards the bottom of the interval, where trace chalcopyrite (cpy) is observed.

  • 79 to 105m - variably altered dolomite was intersected with veining comprising qtz-cbhe-cpy. The chlorite content increases towards the end of the interval. Minor breccias observed in some rock fragments.

  • 105 to 127m (EOH) - chlorite becomes a common mineral throughout the rock, with qtzcb-he(mt) ± cpy also observed.

Drill hole HDRC19-003

A weathered sequence of Tapley Hill Formation (THFm) was intersected at the top of the hole until alteration was encountered at 48m downhole to the end of the hole (61m).

  • 0 to 48m downhole depth - a sequence of weakly graphitic and strongly oxidised THFm was intersected, with minor qtz-cb-he veinlets encountered.

  • 48 to 57m - variably weathered and altered dolomite intersected.

  • 57 to 61m (EOH) - chlorite becomes a common alteration mineral throughout the rock; veinlets of py-mt are observed.

In addition to the results from the three Hood RC drill holes, Archer geologists have discovered albitite (a sodium rich rock) as float in the Hood area and also in situ between Hawkeye and Katniss (Image 1). The vein nature of this material could be a “high level” type of rock/mineral, which exists above the actual granite intrusion. The presence of albitite supports the intrusive model being proposed for the large-scale mineralising system at Blue Hills.

Next Steps

Archer has been systematically progressing exploration at Blue Hills with the objective of discovering copper-gold mineralisation associated with intrusive system. The three holes drilled at Hood have supported the application of this mineralisation model. Further drilling and analysis will take place at Katniss and Hawkeye during February 2019.

While all the observations described in this announcement are considered to be very encouraging, investors are advised that it is only when laboratory assays are received (expected within a few weeks) that the gold-copper grades will be known. Assay results from all holes drilled at Hood are expected in the next 2-3 weeks.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Petrology is required to fully characterise the lithology, alteration and mineralisation seen at Hood. Potential remains for intrusive style copper gold project at this stage, although the test work may show that other styles are also possible, such as porphyry style.

==> picture [291 x 194] intentionally omitted <==

Image 1. Cut piece of Blue Hills albitite, with voids after carbonate.

==> picture [168 x 204] intentionally omitted <==

==> picture [270 x 202] intentionally omitted <==

Image 2. Program at Hood for hole HDRC19-001.

  • Ends

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

For further information, please contact:

Contact Details

Mr Greg English Executive Chairman

Dr Mohammad Choucair Chief Executive Officer Tel: +61 8 8272 3288

Shareholders

For more information about Archer’s activities, please visit our:

Website https://archerx.com.au/ Twitter https://twitter.com/archerxau?lang=en

Competent Person Statement

The information in this announcement that relates to Exploration Results is based on information compiled by Mr Wade Bollenhagen, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and is a full-time employee of Archer Exploration Limited.

Mr Bollenhagen has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Bollenhagen consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

About Blue Hills

Archer’s 100% owned Blue Hills copper gold project is part of the larger North Burra project area which covers an area of more than 3,000km[2] . Blue Hills is located approximately 240 km north of Adelaide, South Australia and within 50 km of the Moomba to Adelaide Gas Pipeline, the Hallet 203 MW gas power station, the trans Australia railway line, Barrier Highway, high voltage power line, known aquifers and the established townships of Peterborough and Jamestown.

Archer has discovered three large gold and copper in soils anomalies at Blue Hills, namely Hood, Hawkeye and Katniss. Regional exploration programs have identified multiple other targets which are yet to be tested by Archer (Figure 2).

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

==> picture [405 x 483] intentionally omitted <==

Figure 2. The Blue Hills Project Area and the location of infrastructure and the Archer exploration licences.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code Explanation Commentary
Sampling
Techniques

Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as downhole gamma sondes, or
handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the
Public Report.

In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.

Samples comprise that were submitted due to alteration and
proximity to alteration observed by the geologist during
geological interpretation.

Sampling was guided by Archer’s protocols as the program was
exploratory in nature. No standards were submitted by the
company during analyses.

All samples were sent to ALS laboratory in Adelaide for
preparation and forwarded to Peth for multi-element analyses.

All samples are crushed using LM2 mill to –4 mm and pulverised
to nominal 80% passing –75 µm.
Drilling
Techniques

Drill type (e.g. core, reverse circulation, open hole hammer, rotary air
blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc.).

The drill type is a Reverse Circulation (RC) with a 5.25 inch face
sampling hammer bit. The samples are collected after passing
through a 2 tier splitter attached underneath the mounted
cyclone. The drill company was B&T Lehmann.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Drill Sample
Recovery

Method of recording and assessing core and chip sample recoveries and
results assessed.

Measures taken to maximise sample recovery and ensure representative
nature of the samples.

Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.

No assessment of recoveries was documented.

All efforts were made to ensure that the sample was
representative.

No relationship is believed to exist, but no work has been done to
confirm this.
Logging
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc.) photography.

The total length and percentage of the relevant intersections logged.

All samples were geologically logged, as the hole collars were
never accurately surveyed (a hand-held GPS was used) no data
can be used for mineral resource estimation.

Logging was qualitative and quantitative, i.e. percentages of vein
material and host rock were estimated as well as noted.
Sub-Sampling
Techniques
and Sample
Preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc. and whether
sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample
preparation technique.

Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.

Measures taken to ensure that the sampling is representative of the in-
situ material collected, including for instance results for field
duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material
being sampled.

All drilling was Reverse Circulation (RC), with a face sampling
hammer bit.

All samples were riffle split on a 2-tiered splitter, except for
those that are wet, these were speared in the bag, by laying it on
the side and taking a cross cutting representative sample.

Samples from 55m onwards have been wet as the volume of
water is considered to be significant.

Initial samples submitted for assay are composites, this material
is collected from the individual split sample.

No additional quality control measures were taken for the
sample submission.

The sample sizes are considered appropriate for the material
being sampled.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Quality of
Assay Data
and
Laboratory
Tests

The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc., the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their derivation,
etc.

Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have been established.

Certified standards were used in the assessment of the analyses.

Analyses was by ALS Perth using their ME-MS61 technique for
multi-elements.

The laboratory uses their own certified standards during
analyses.
Verification of
Sampling and
Assaying

The verification of significant intersections by either independent or
alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.

Discuss any adjustment to assay data.

No verification of sampling, no use of twinned holes.

Data is exploratory in nature and exists as excel spread sheets.

No data adjustment.
Location of
Data Points

Accuracy and quality of surveys used to locate drillholes (collar and
downhole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

MGA94 Zone 54 grid coordinate system is used.

A hand-held GPS was used to identify the sample location

Quality and adequacy is appropriate for this level of exploration

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Data Spacing
and
Distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.

Whether sample compositing has been applied.

There is no pattern to the sampling, the spacing is random, the
location of the holes was determined by the land surface as no
clearing was undertaken for the drill rig so many sites were
unsuitable to drill. Some of these may have produced different
results to the one being reported, some of the more significant
electro-magnetic responses have not yet been drill tested.

Data spacing and distribution are sufficient to establish the
degree of geological and grade continuity for future drill
planning, but not for resource reporting.
Orientation of
Data in
Relation to
Geological
Structure

Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.

If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.

It is unknown whether the drill holes have interested the
mineralisation in a perpendicular manner. The mineralised
horizon is obscured by a veneer of transported material, from
observations of the strike of outcrop it was believed that the
mineralised structure was being drilled perpendicularly.

Bedding in the area dips to the SE (about 30ᵒ), there is a high
angle foliation to this in places (striking NNE) in places. The soil
anomaly at Hood (topic of release) is orthogonal to the direction
being drilled (roughly striking 135ᵒ).

It is believed there is no bias has been introduced.
Sample
Security

The measures taken to ensure sample security.

It is assumed that best practices were undertaken at the time

All residual sample material (pulps) are stored securely.
Audits or
Reviews

The results of any audits or reviews of sampling techniques and data.

None undertaken.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code Explanation Commentary
Mineral
Tenement and
Land Tenure
Status

Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.

Tenement status confirmed on SARIG.

All work being reported is from EL 5794 (owned by SA
Exploration Pty Ltd, a subsidiary of AXE).

The tenement is in good standing with no known impediments.
Exploration
Done by Other
Parties

Acknowledgment and appraisal of exploration by other parties.

No exploration has been undertaken by any other parties
Geology
Deposit type, geological setting and style of mineralisation.

The mineralisation style indicates that it was emplaced by fluids
(e.g. an intrusive source).

The strike appears to be NNE.

18km to the east is the Bendigo Granite, which is reported as
being Cu-Mo mineralised and under gazette by the SA govt for
further work.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Drillhole
Information

A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:

Easting and northing of the drill hole collar

Elevation or RL (Reduced Level – elevation above sea level in metres)
of the drill hole collar

Dip and azimuth of the hole

Downhole length and interception depth

Hole length

If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly
explain why this is the case.
Refer to announcement to which this document is attached, in
particular tables titled:

“Summary of drill hole information”
Data
Aggregation
Methods

In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high grades)
and cut-off grades are usually Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should
be clearly stated.

No assays are being reported.
Relationship
Between
Mineralisation
Widths and
Intercept
Lengths

These relationships are particularly important in the reporting of
Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.

If it is not known and only the downhole lengths are reported, there
should be a clear statement to this effect (e.g. ‘downhole length, true
width not known’).

No assays are being reported.

All assay intervals will be down hole length, the true width not
known.

The mineralisation is interpreted to be steeply dipping. Drill holes
have been angled to intercept the mineralisation as close to
perpendicular as possible.

Down hole intercepts are not being reported. True widths are
likely to be 60-70% of the down hole widths.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported. These
should include, but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.

See main body of report.
Balanced
Reporting

Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades and/or
widths should be practiced to avoid misleading reporting of Exploration
Results.

The reporting is considered to be balanced.
Other
Substantive
Exploration
Data

Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminatingsubstances.

Nothing to report at this stage
Further Work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including
the main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.

Further drilling is required along strike.

Figures in the body of this report highlight the gaps in the data.

ACN: 123 993 233

==> picture [157 x 28] intentionally omitted <==

Annexure 1

Summary of drill hole information at Hood

The following table provides information on RC drilling results undertaken by Archer in January 2019 in relation to the Program at Hood.

Hole ID Easting Northing RL (m) Final Depth
(m)
**Dip (ᵒ) ** **Azimuth (ᵒ) **
HDRC19-01 339492 6322081 293 115 -60 030
HDRC19-02 339464 6322044 283 127 -60 030
HDRC19-03 339511 6322121 283 60 -60 030