ARCHER MATERIALS LIMITED Capital/Financing Update 2016

Apr 11, 2016

64478_rns_2016-04-11_63ac3a60-5f4d-4c07-b485-9de8a96fdd80.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ABN 64 123 993 233

ASX Announcement

12 April 2016

Mount Hutton Central JORC 2012 Resource

Highlights

  • Mount Hutton Central Mineral Resource upgraded to JORC 2012 standard in preparation for development of the Leigh Creek Magnesite Project.

  • No material change in Mineral Resource estimates – reflects the quality and uniformity of the magnesite deposit and the work done by Archer and SAMAG.

  • Leigh Creek Magnesite Project rapidly moving toward production.

Archer Exploration Limited (ASX: “AXE”) is pleased to announce that it has updated the Mineral Resource for its Mount Hutton Central Deposit in accordance with JORC 2012 code. The Mount Hutton Central Deposit, sits within the 100% owned Mount Hutton Magnesite Project which itself is part of the much larger Leigh Creek Magnesite Project, located approximately 20 kilometres northwest of Leigh Creek Township, South Australia (Figure 1).

The Mount Hutton Central Mineral Resource previously reported under the JORC 2004 code has undergone a comprehensive review by Archer for reporting under the JORC 2012 requirements. Archer has elected to upgrade its reporting for Mount Hutton Central to the new standard in preparation for the next phase of the continuing development of the Leigh Creek Magnesite Project. The JORC 2012 Mineral Resource at Mount Hutton Central is reported below as:

JORC 2012 Mineral Resource JORC 2012 Mineral Resource JORC 2012 Mineral Resource
Classification Tonnes
(kt)
Mg
(%)
MgO
(%)
Measured
Indicated
12,059
5,460
24.2
24.3
40.1
40.3
Total 17,523 24.2 40.2

Table 1: Mount Hutton Central Mineral Resource

The underlying assumptions and method used to upgrade the Mount Hutton Central Mineral Resource to 2012 JORC standard are contained in Table 1 and Attachment A annexed to this announcement.

Archer Exploration Limited Level 1, 28 Greenhill Rd Wayville SA 5034 www.archerexploration.com.au

==> picture [596 x 79] intentionally omitted <==

A key result of the review is that there has been no material change to the Mineral Resource Estimate reported by SAMAG Limited on (3/09/1999 (ASX: PAL).

Project Overview

The Leigh Creek Magnesite Project comprises the Mount Hutton South, Mount Hutton Central, Mt Playfair, Pug Hill, Termination and Witchelina deposits. The Mineral Resources for each deposit are shown below. It is expected that the Mount Hutton Central deposit will first be the first area developed, as such the remaining deposits have not yet been upgraded to 2012 JORC code requirements on the basis that the supporting information available regarding these deposits has not materially changed since they were last reported.

==> picture [452 x 438] intentionally omitted <==

Figure 1. Location of the Mt Hutton Central Resource and nearby magnesite deposits

The Mt Hutton Central Project represents only part of the total Leigh Creek Magnesite Project which has a Mineral Resource of 434Mt @ 41.4% MgO (refer to table 2 below).

==> picture [596 x 79] intentionally omitted <==

Therefore, potential exists to greatly increase the life and scale of the Leigh Creek Magnesite Project.

Deposit
Measured
(Mt)
Indicated
(Mt)
Inferred
(Mt)
Total
(Mt)
MgO
(%)
JORC 2012 Mineral Resources
Mount
Hutton
Central
12.0
5.5
0.0
17.5
40.1
JORC 2004 Mineral Resources
Mount
Hutton
South
72.0
53.0
125
42.9
Mount Playfair
0.0
21.0
23.0
44.0
42.5
Pug Hill
0.0
10.0
10.0
20.0
42.7
Termination Hill
4.0
5.0
20.0
29.0
42.8
Witchelina
23.7
94.0
99.0
216.7
40.0
Total
27.7
202
205
434.7
41.4

Table 2: Leigh Creek Magnesite Project Mineral Resources

For further information please contact:

Mr Greg English Mr Gerard Anderson Chairman Managing Director Archer Exploration Limited Archer Exploration Limited Tel: (08) 8272 3288 Tel: (08) 8272 3288

The information in this report that relates to the Mt Hutton Central JORC 2012 Mineral Resource estimation has been prepared by Mr W. Bollenhagen who is a Member of the AusIMM. Mr Bollenhagen is a full time employee of Archer Exploration Ltd., and has more than five years’ experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Bollenhagen has consented in writing to the inclusion in this announcement of the Mineral Resource estimation information in the form and context in which it appears. This information was prepared and first disclosed under the JORC Code 2012.

Mr. Bollenhagen is a Member of the Australasian Institute of Mining and Metallurgy who has more than twenty years’ experience in the field of activity being reported. Mr Bollenhagen has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” relating to the reporting of Exploration Results.

This document also contains Mineral Resources which were reported under the 2004 JORC code as there has been no Material Change or Re-estimation of those Mineral Resources since the introduction of the 2012 JORC Code. Future estimations will be prepared in accordance with 2012 JORC Code.

==> picture [596 x 79] intentionally omitted <==

ATTACHMENT A – MATERIAL INFORMATION SUMMARY

The Mount Hutton Central Project is deemed a material mining project and the Company provides the following information in accordance with ASX Listing Rule 5.8, which is material to understanding the reported Mount Hutton Central Project Mineral Resource.

The Leigh Creek magnesite deposits were formerly owned by a succession of related companies including SAMAG, Pima Mining and Magnesium Development Limited and Magnesium International Limited. For simplicity all reference to historic information will be attributed to SAMAG. The JORC 2012 Resource estimate comprises a new interpolation of the high quality drilling, chemical and metallurgical data from work in 1999-2001 (SAMAG) that led to the estimation of a JORC 1999 global Mineral Resource for the Leigh Creek magnesite deposits of 453 million tonnes grading 41.4% MgO and new information generated by Archer in the period 2011-2016 (AXE).

Mount Hutton Central Geology and Interpretation

Mapping, completed in 1999, over a strike length of 4.7 km was undertaken to define the stratigraphy, geological structures and associated deformational features within the Mount Hutton deposit ( Deposit ). The mapping was carried out by ground traversing the Deposit and recording geological structures onto a series of 1:5,000 scale maps. Structures were recorded relative to previously surveyed marker beds, creeks and topographic landmarks. Significant structures were located using DGPS.

Creeks that traverse the Deposit provide good outcrop exposure. Quartzitic dolomite marker beds are exposed on the flats in between creeks more dominantly than magnesite beds. Offsets are well defined by breaks in marker beds and individual marker beds are distinguishable over tens of kilometres.

SAMAG commissioned a detailed (1:10,000 scale) aerial photography and photogrammetric survey of the Deposit in August 1999. The accurately located digital photographs and contours were combined with geological DGPS mapping to form a comprehensive Geographical Information Systems ( GIS ) dataset.

Marker beds HU1, HU2, 7MK, 14MK, HMU, HML (described below) were identified in outcrop and distinguished in core over the length of the Deposit. They were used during geological logging for identifying individual beds and stratigraphic position within the sequence.

Hutton Upper 1 (HU1)

Thin (30 cm), carbonaceous, dolomite quartz sand, interbedded between a sequence of dolomite silts and muds, between Bed 2 and 3A.

  • Hutton Upper 2 (HU2)

60 cm wide, sequence of finely laminated dolomite silts, with interbedded fine dolomite mud laminations, bounding carbonaceous dolomite quartz sand. A Dolomite/Magnesite gravel conglomerate is occasionally found at the base.

==> picture [596 x 79] intentionally omitted <==

  • Bed 7 Marker (7M) A strongly carbonaceous, 1.70 m wide laminated dolomite mud, with occasionally laminated dolomite silts or muds at the base forms a distinctive unit between Beds 6 and 7.

  • Bed 14 Marker (14M) A strongly carbonaceous, thinly (55 cm), laminated dolomite mud, with rare laminated dolomite silt at base forms a distinctive unit between Beds 14 and 14A.

  • Hutton Middle Upper (HMU) A strongly carbonaceous, thinly (38 cm) laminated dolomite mud, with rare laminated dolomite mud at the base, a distinctive unit between Bed 15 and HML and Bed 16.

  • Hutton Middle Lower (HML)

  • Thin (38 cm), carbonaceous, dolomite quartz sand, occasionally with thin laminated dolomite silt layer at the base forms a distinctive unit between HMU and Bed 16.

Figures 1 to 3 below show the stratigraphic column between Beds1 and 17 and the marker beds.

==> picture [281 x 397] intentionally omitted <==

Figure 1: Stratigraphic column Bed 1 (unit 1) to Bed 7 (unit 7)

==> picture [596 x 79] intentionally omitted <==

==> picture [417 x 602] intentionally omitted <==

Figure 2: Stratigraphic column Bed 8 (unit 8) to Bed 14B (unit 14B)

==> picture [596 x 79] intentionally omitted <==

==> picture [375 x 543] intentionally omitted <==

Figure 3: Stratigraphic column Bed 15 (unit 15) to Bed 17 (unit 17)

==> picture [596 x 79] intentionally omitted <==

Deposit Geology

The youngest stratigraphic magnesite bed intersected was Upper 7 (U7) and the ‘lowest’ bed, Lower 5 (L5). Between these beds, up to 86 interbedded magnesite and dolomite units form the Mount Hutton magnesite sequence. Magnesite Beds 1-17, were targeted for resource definition and are positioned in the middle of the sequence. The unique textural characteristics within each individual magnesite bed render the beds identifiable along strike in drill holes and from outcrop to outcrop (Figure 4).

==> picture [470 x 408] intentionally omitted <==

Figure 4: Location of the Upper and lower beds with resource drill holes

Drilling Techniques

In total, 56 NQ2 diamond drill holes were drilled at Mount Hutton during 1998 and 1999 for an aggregate of 3,539.69 m.

Based on the low variance of grade data measured in the initial drill program, a traverse spacing of 250 m was selected for the infill-drilling program. The beds with the lowest stripping ratio and lowest calcium content were selected for resource drilling, namely Beds 1- 17. Beds stratigraphically above Bed 1 are thin and high in calcium. Beds, immediately below Bed 17, occur in a thick dolomite sequence with few high-grade magnesite interbeds. Holes were drilled on the 250m spaced sections on a nominal drill hole spacing of 20 metres.

==> picture [596 x 79] intentionally omitted <==

- Sampling, Sub Sampling techniques & Analyses

Only material identified as magnesite (MgCO3) was selected for analyses, the dolomite interbeds were not assayed. Geological logging was completed for all holes on site. The lithology, colour, weathering, alteration and structural characteristics of core were logged. Logging was both qualitative and quantitative depending on field being logged. From the detailed geological logging each magnesite bed was allocated a number so that beds could be matched between drill holes at the interpretation stage. All diamond core was logged and photographed. All core material was logged by the geologist on site.

Quarter core was recovered using a diamond saw. The geologist nominated the intervals for analyses and the core placed in a pre-numbered calico bag and recorded on a submission. Sample preparation at the Amdel laboratory involved the sample being weighed on receipt then dried at 120° C for up to 12 hours. The sample was then crushed through to nominal - 5mm in a two stage crushing process. The entire sample was pulverized to 90% passing 75 micron in an LM5 bowl, with the same grinding time and equipment used for all samples. A sub sample of 200-300g was taken for analyses. Two duplicate samples were prepared, on a 1 in 20 basis, from the pulverized material at the same time as the removal of the assay sample.

Whole Rock Analysis

Initial drill hole samples from all the magnesite deposits were analysed for their whole rock components. Resource grade estimates were estimated using whole rock values.

Major rock forming components (Mg, Ca, Si, Fe, Al, K, Na, Mn, P, Ti) and minor elements (Mo, Ba, Cr) and loss on ignition (LOI) were measured by Inductively Coupled Plasma (ICP), and total carbon and sulphur by Leco furnace and infra-red cell.

High precision measurements of boron and of trace metals (Cu, Ni, Se, and Zn) were taken by digesting samples with aqua regia and presenting the solution to an ICP unit for quantification.

Major rock forming components were presented as oxides and total carbon as carbonate.

Partial Digest Leach Analysis

Partial leach analyses were used for resource definition at Mount Hutton. MIL (formerly Pima Mining NL (SAMAG)), in conjunction with a consultant at Amdel, developed a method specifically for the preparation and partial digestion of magnesite samples. Samples were analysed by ICP and the acid insoluble residue gravimetrically determined. This process was designed as a repeatable representation of the leach conditions associated with the preparation of magnesium chloride brine, thus measuring the suitability of a magnesite sample as feedstock for magnesium metal production.

The Partial Leach process required the entire sample (~750 g) to be crushed (nominal 5mm) and ground (90%<75 micron) and a sub-sample (250gm) taken for analysis. This subsample was then leached in hot hydrochloric acid (32% w/v). The liquor was filtered from the residue and then the digested solution read by ICPAES. The remaining insoluble residue was washed, dried and weighed. Residues were composited and assayed.

==> picture [596 x 79] intentionally omitted <==

Duplicates

A duplicate pulverised sample of 1 in 20 samples was prepared and supplied to the secondary laboratory (Assaycorp Pty. Ltd, Pine Creek, Northern Territory) for verification. Amdel coordinated duplicate preparation with the routine assay of a second split of the sample pulp.

Repeats

The assay of two randomly selected samples in each run of 50 samples was routinely repeated.

Reference Samples

Reference samples were supplied to Amdel (labelled EPL in assay data). The composition of these reference samples had been established by titration (Mg only) by another reputable laboratory.

Blanks

Two blank samples were included in each run of fifty samples to monitor sample preparation hygiene and to establish the level of background laboratory hygiene.

Micromine reviewed the blank samples submitted and concluded from geostatistical analysis that each commodity registered a modest grade increase but well within the limits for the laboratory. The author was confident that there was no undue sample preparation or laboratory contamination.

Independent Analysis

Duplicate pulps from 1 in 20 samples were collected by Amdel and delivered to Assaycorp. Assaycorp carried out its analysis using a similar partial leach procedure to that used by Amdel. Table 1 below presents the collar data for the diamond drill holes used in the estimation.

Density

A total of 328 individual density readings were made on the deposit, with 228 in ore and 100 in the dolomite waste. Each bed had an average density assigned to it based on an average of at least 7 density measurements per bed. The method used was the Archimedes method. Density was assigned to domains (beds) rather than estimated.

==> picture [596 x 79] intentionally omitted <==

DH_NAME GDA Easting GDA Northing
zone

RL
DEPTH
DATE
MHDDH01 236640.626
6628411.41

54

194.21

100

1/02/1999
MHDDH02 236605.091
6628364.076

54

196.23

95

1/02/1999
MHDDH03 238393.172
6626845.468

54

220.38

100

1/02/1999
MHDDH04 238349.9568
6626805.672

54

222.98

95

1/02/1999
MHDDH05 239845.5293
6625311.162

54

241.68

108

1/02/1999
MHDDH06 239800.9013
6625275.092

54

244.36

95

1/02/1999
MHDDH07 238412.3455
6626863.504

54

219.27

50

1/02/1999
MHDDH15 236776.3001
6628265.905

54

198.13

45

1/02/1999
MHDDH16 236794.396
6628289.23

54

198.33

69

1/02/1999
MHDDH17 236805.0882
6628302.781

54

197.97

53.4

1/02/1999
MHDDH18A
237023.0551

6628090.109

54

202.67

50

1/02/1999
MHDDH19 237039.8462
6628112.417

54

202.46

66

1/02/1999
MHDDH20 237049.1472
6628124.699

54

202.11

50

1/02/1999
MHDDH21 237219.0791
6627926.61

54

204.42

44.9

1/03/1999
MHDDH22 237238.7522
6627948.11

54

202.98

70

1/03/1999
MHDDH23 237249.7642
6627960.381

54

202.78

51

1/03/1999
MHDDH24 237404.2371
6627763.014

54

206.24

45

1/03/1999
MHDDH25 237423.5131
6627783.582

54

205.68

71

1/03/1999
MHDDH26 237434.0202
6627795.374

54

205.41

51

1/03/1999
MHDDH27 237584.7411
6627595.058

54

211.32

45

1/03/1999
MHDDH28 237604.5841
6627613.567

54

210.92

70.09

1/03/1999
MHDDH29 237616.0691
6627624.511

54

210.57

51

1/03/1999
MHDDH30 237789.191
6627398.764

54

213.08

44

1/03/1999
MHDDH31 237809.3461
6627418.768

54

212.33

70

1/03/1999
MHDDH32 237820.9081
6627430.278

54

211.86

50

1/03/1999
MHDDH33 237958.347
6627237.14

54

214.24

45

1/03/1999
MHDDH34 237978.683
6627256.441

54

213.25

72

1/03/1999
MHDDH35 237990.097
6627267.45

54

212.72

51

1/03/1999
MHDDH36 238137.7019
6627068.712

54

218.03

45

1/04/1999
MHDDH37 238160.11
6627089.418

54

217.93

70

1/04/1999
MHDDH38 238170.864
6627100.19

54

218.14

50

1/04/1999
MHDDH39 238583.8838
6626583.147

54

226.54

48

1/04/1999
MHDDH40 238605.9418
6626599.84

54

225.83

70

1/04/1999
MHDDH41 238618.1678
6626609.056

54

225.2

51

1/04/1999
MHDDH42 238774.5067
6626398.801

54

223.27

48.2

1/04/1999
MHDDH43 238795.9338
6626416.224

54

222.75

65

1/04/1999
MHDDH44 238813.4078
6626430.537

54

223.14

56

1/04/1999

==> picture [596 x 79] intentionally omitted <==

DH_NAME GDA Easting GDA Northing
zone

RL
DEPTH
DATE
MHDDH45 238928.2386
6626208.41

54

228.47

45

1/04/1999
MHDDH46 238953.7357
6626226.296

54

227.47

72

1/04/1999
MHDDH47 239169.4936
6626011.385

54

231.39

41.3

1/04/1999
MHDDH47A
238965.5627

6626235.128

54

226.96

51

1/04/1999
MHDDH48 239191.3137
6626028.701

54

230.62

89

1/04/1999
MHDDH51 239311.2295
6625840.649

54

236.22

45

1/05/1999
MHDDH52 239331.6056
6625859.348

54

235.51

71.9

1/05/1999
MHDDH53 239342.9886
6625869.919

54

235.08

51

1/05/1999
MHDDH54 239460.6675
6625665.397

54

238.06

51

1/05/1999
MHDDH55 239481.5475
6625684.973

54

236.82

70

1/05/1999
MHDDH56 239494.6655
6625696.824

54

236.75

62.3

1/05/1999
MHDDH57 239662.7054
6625467.811

54

236.44

45

1/05/1999
MHDDH58 239682.5514
6625483.764

54

236.27

72

1/05/1999
MHDDH59 239695.3215
6625492.216

54

236.67

51

1/05/1999
MHDDH60 239053.4646
6626114.326

54

231.14

73.6

1/05/1999
MHDDH61 239270.1336
6625951.762

54

232.41

72

1/05/1999
MHDDH62 236567.423
6628311.268

54

196.98

105

19/07/1999
MHDDH63 238313.6888
6626772.214

54

224.54

101

19/07/1999
MHDDH64 239159.8136
6626004.017

54

231.97

60

1/05/1999

Table 1: Drill hole co-ordinates in MGA Zone 54

Modifying Factors

Crushing and Screening Lump Ore

A series of crushing, grinding and screening tests were conducted on lump magnesite ore to determine size distribution and analyses by size distribution.

Crush sizes ranged from 53 mm to 1.7 mm. Grind sizes ranged from 1.18 mm to 0.15 mm. Little grade change was measured between size fractions except for a slightly higher concentration of silica in the fines.

ROM Ore

During a mining campaign at Myrtle Springs quarry, in July 2001, SAMAG undertook a preliminary screening exercise using a 40 mm grizzly screen. A significant increase in talc (Si), and to a lesser degree dolomite (Ca), was noted in the fines (Table 2). The Bed 5 material used during this test was not sampled representatively but is indicative of possible magnesite mining material.

Based on this significant grade differential “SAMAG” conducted a study designed to measure the size distribution of ore components at 300 mm, 75 mm and 5 mm sizes.

==> picture [596 x 79] intentionally omitted <==

Units Mg
(%)
Ca
(%)
Fe
(ppm)
B
(ppm)
Insoluble
(%)
+40mm bed 5
-40mm bed 5
24.3
18.9
1.64
2.52
600
1,200
100
70
11.50
29.60

Table 2: Summary of Partial Leach Analyses of screened Bed 5 magnesite

Assay by size distribution tests were carried out using representative portions of the uncrushed Mount Hutton Bulk Sample. The individual samples were screened using √2 series sieves with apertures ranging from 200 mm to 4.75 mm for the minus 300 mm sample, 76 mm to 0.85 mm for the minus 75 mm sample and 4.75 mm to 0.038 for the minus 5 mm sample. For each sample a representative portion of each size fraction was analysed. Insoluble material (talc) and trace metals (including nickel) were significantly concentrated in the lower grade fines. However, the lump ore was not significantly upgraded with respect to magnesium and calcium.

Table 3 shows the difference in grade on uncrushed material (with a 300 mm top size) using 4.75 mm separation size.

Unit Wt
(%)
Mg
(%)
Ca
(%)
Fe
(ppm)
Si
(ppm)
B
(ppm)
Insoluble
(%)
+4.75 mm fraction
-4.75 mm fraction
Calc head
85.5
14.5
100.0
24.4
20.6
23.9
2.0
2.6
2.1
2,154
2,800
2,248
1,891
4,896
2,328
107
85
104
9.9
20.9
11.5

Table 3: Uncrushed magnesite at -4.75mm screen cut off Partial Leach Analyses

These tests demonstrated the value of screening out the primary fines formed at the work face during the mining operation. Screening could be done over a grizzly at a sensible, practical size (about 40mm).

Trial Mine Bulk Sample

SAMAG extracted a 100 tonne sample of magnesite from beds 1 to 17 in a trial pit at the Deposit in 2000 (Figure 5).

The material mined formed a bulk sample for test work at Amdel in Adelaide, with residual material left at the site.

==> picture [596 x 79] intentionally omitted <==

==> picture [460 x 250] intentionally omitted <==

Figure 5: Trial Mine at Northern end of Mt Hutton Central

Metallurgical Extraction

Combined beds of magnesite from Mt Hutton Central have been successfully calcined to at various temperatures to produce both monolithic dead burned magnesia (DBM) and caustic calcined magnesia (CCM).

Estimation Methodology

Ordinary Kriging was the method of estimating the magnesium into the cells. A search ellipse of 300 (Y) by 100 (X) by 40 (Z) was used for estimation. A single pass was used in the estimation. Other elements (Ca, B, Si, B, S, Al, Fe and Insolubles) were estimated using ID2 methodology with a search distance of 300m.

Classification

The Mount Hutton Central resource is reported as both Measured and Indicated. The tonnes and grade are reported above the 150RL, being consistent with reasonable prospects of eventual extraction.

No cells from the block model below the 150RL are reported.

All cells South of 6,626,000N (MGA Zone 54) are reported as Indicated due to the presence of cross faults and slight offsets in the stratigraphy. North of 6,626,000N the cells are classified as Measured due to the extreme consistency of the magnesite beds being estimated and the low variance in the raw population data of those beds.

The material being classified can be mined by traditional open cut methodologies (Figure 6) and the ore selectively extracted to produce calcined products. This is currently being done at the Myrtle Springs mine located 4.5km to the North of the resource.

==> picture [596 x 79] intentionally omitted <==

==> picture [500 x 251] intentionally omitted <==

Figure 6: Cross section of conceptual pit design.

Previous Reporting of Mount Hutton Central

In 1999 tonnes and grade were first reported to JORC guidelines. Subsequently in 2000 and 2001 tonnes and grade were reported again to update and maintain compliancy for the time. No material changes have occurred to the data since the last estimation in 2001. Table 4 (below) presents the tonnes and grades reported for those years for the Mount Hutton Central Resource.

Year Tonnes (kt) Mg% Ca% B ppm Si ppm Insolubles %
1999
2000
2001
19,050
18,975
16,532
23.9
23.9
23.7
2.13
1.99
2.09
101
108
103
4128
3924
11.2
10.54
10.99

Table 4: Previous reported tonnes and grade for the Mt Hutton Central Deposit.

Exploration Potential

Surface mapping and regional drilling shows there are significant additional resources at depth and along strike, both to the north and to the south of the Mt Hutton Central Resource area.

Archer has confidence that given the remarkable geologic consistency of the magnesite beds over many tens of kilometres, the previously reported SAMAG JORC 1999 Resource estimate of 434 million tonnes grading 41.4% MgO for the greater Leigh Creek magnesite deposits owned by Archer will in time be translated into a similar sized JORC 2012 Resource estimate.

JORC Code, 2012 Edition – Mount Hutton Central Table 1

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (e.g. cut channels, random chips, or
Diamond Drilling was performed by the company SAMAG (Pima
techniques specific specialised industry standard measurement tools appropriate Mining-PAL) in 1999 and documented in accordance with the JORC
to the minerals under investigation, such as down hole gamma guidelines at the time. Generally, HQ3 was drilled in the first 3
sondes, or handheld XRF instruments, etc.). These examples should metres of oxidized material, followed by NQ2 sized core to the EOH.
not be taken as limiting the broad meaning of sampling. Sampling was guided by SAMAG protocols and QAQC procedures
Include reference to measures taken to ensure sample representivity as per industry standards, these procedures are documented in
and the appropriate calibration of any measurement tools or systems accordance with JORC 2012 guidelines
used. DD core was cut in half using a core saw and with ¼ core submitted
Aspects of the determination of mineralisation that are Material to the for assay.
Public Report. All samples were sent Amdel laboratory in Adelaide for preparation
and analyses.
All field samples were crushed to -5mm and pulverised via LM5 to
nominal 90% passing -75pm.
Drilling Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
The Mt Hutton Central deposit was sampled by 56 double tubed
techniques blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc.).


diamond drill (DD-NQ2) holes (3,539m).
DD holes were drilled in an orientation so as to intersect the
mineralisation at right angles. Down hole surveys were taken at the
collar (6m) and at 15m to 30m increments to the EOH using an
Eastman single shot camera.
Core orientation was performed by spear for structural purposes,
detailed structural readings were generated from this procedure and
reported.
Drill sample
Method of recording and assessing core and chip sample recoveries

Core recovery was routinely measured and recorded on structural
recovery and results assessed.
Measures taken to maximise sample recovery and ensure
Log Sheets. In 100 magnesite intervals recovery was below 90%
and in 32 of those it was below 80%.
representative nature of the samples. Site geologists were present at all times to ensure the procedures
were followed.

16

  • Criteria JORC Code explanation CommentaryWhether a relationship exists between sample recovery and grade  No bias is perceived to exist due to the nature of the material being and whether sample bias may have occurred due to preferential sampled (magnesite) which is a homogeneous material with little loss/gain of fine/coarse material. variance in the element being reported (Mg).

  • LoggingWhether core and chip samples have been geologically and  Geological logging was completed for all holes on site with coding. Geological logging was completed for all holes on site with coding. geotechnically logged to a level of detail to support appropriate  The The lithology, colour, weathering, alteration, and structural

  • Mineral Resource estimation, mining studies and metallurgical studies. characteristics of core were logged.

    • Geological logging was completed for all holes on site with coding. Geological logging was completed for all holes on site with coding.  The The lithology, colour, weathering, alteration, and structural characteristics of core were logged.

    • All structural data was logged separately from the geology.

  • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.) photography.

  • Logging is both qualitative and quantitative depending on field being logged.

  •  From the detailed geological logging each magnesite bed was allocated a number so that beds could be effectively matched between drill holes at the interpretation stage.

  • The total length and percentage of the relevant intersections logged.

  • All diamond core was logged and photographed. The photos are retained.

  • All core material was logged by the geologist on site.

  • All core is stored with Department of State Development (DSD) in South Australia.

  • Sub-If core, whether cut or sawn and whether quarter, half or all core  Quarter core was recovered using a diamond saw. sampling taken.  The geologist nominated the interval for analyses, this was sampled techniquesIf non-core, whether riffled, tube sampled, rotary split, etc. and and placed in a pre-numbered calico bag and recorded on a and sample whether sampled wet or dry. submission. preparationFor all sample types, the nature, quality and appropriateness of the  Sample preparation at the Amdel laboratory involved the original sample preparation technique. sample being dried at 120° for up to 12 hours and weighed on submission to laboratory. Sample is then crushed through to nominal

  • Quality control procedures adopted for all sub-sampling stages to -5mm in a two stage crushing process. The entire sample was

  • maximise representivity of samples. pulverized to 90% passing 75 micron in an LM5 bowl, with the same

  • Measures taken to ensure that the sampling is representative of the in grinding time and equipment used for all samples. A sub sample of situ material collected, including for instance results for field 200-300g was taken for analyses duplicate/second-half sampling.

17

  • Criteria JORC Code explanation CommentaryWhether sample sizes are appropriate to the grain size of the material  Two duplicate samples were prepared, on a 1 in 20 basis, from the being sampled. pulverized material at the same time as the removal of the assay sample.

  • Sample sizes are representative of the grain sizes being assayed for.

  • Quality ofThe nature, quality and appropriateness of the assaying and assay data laboratory procedures used and whether the technique is considered and partial or total. laboratoryFor geophysical tools, spectrometers, handheld XRF instruments, tests etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

  • Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.

  • Initial drill holes MHDD01 to 007 were analysed using whole rock chemistry.

  • Major rock forming elements (Mg, Ca, Si, Fe, Al, K, Na, Mn, P & Ti), minor elements (Mo, Ba & Cr) were analysed by ICP. Total Carbon and sulphur by LECO furnace. Loss on Ignition (LOI) was recorded separately.

  • A partial leach was used for the remaining holes MHDD13 to 61, this was repeated for the sampled intervals in holes 001 to 007. On average Mg grade reported 3% lower in the partial leach than the whole rock analyses.

  • This method was developed by AMDEL specifically for the preparation of magnesite samples. Samples are analysed by ICPAES and the acid insoluble residue gravimetrically determined. This process was designed as a rigorous representation of the leach conditions associated with the preparation of magnesium chloride brine. Thus, measuring the suitability of a magnesite sample as feedstock for magnesium metal production.

  • The Partial Leach process required the entire sample (~750 g) to be crushed (nominal 5mm) and ground (90%<75 micron) and a subsample (250gm) taken for analysis. This sub-sample was then leached in hot hydrochloric acid (32% w/v). The liquor was filtered from the residue and then the digested solution read by ICPAES. The remaining insoluble residue was washed, dried and weighed.

  • Internal certified laboratory QA/QC is undertaken by Amdel.

  • It is felt that the partial leach of a carbonate mineral that has been ground to 75 micron, when added to hot HCl will have its carbonate dissolved freeing up the bound element, in this case Mg. Mg not associated with carbonate reports to the insoluble, i.e. talc

18

Criteria JORC Code explanation Commentary
Duplicates (1 in 20) were prepared and supplied to a secondary
laboratory for verification (AssayCorp). Blank samples were
submitted by SAMAG as a routine (1 in 25 samples).
Mass balance was used to make an empirical verification of the
assay values. Where the major rock components were converted into
mineral species, which then had their molecular weights added to the
insoluble portion of the rock. % Mass Balance = (Mg x 3.467) + (Ca
x 2.497) + (Fe/10000 x 2.074) + (Mn/10000 x 2.092) + (Al/10000 x
1.889) + (Si/10000 x 2.1391) + (S/10000 x 2.996) + % Acid Insoluble.
This assumes that all Mg, Ca, Fe & Mn are present as carbonates, Al
as Albite, remaining Si as Talc and S as Sulphate. Mass balances
for each batch of samples had to meet the following QC criteria: 95%
of the mass balance results were between 98% and 102%, and all
results were between 96% and 104%. Samples that did not meet
these criteria were re-assayed.
QAQC data analysis has been completed for all drill hole data and
demonstrates sufficient accuracy and precision for use in Mineral
Resource Estimation.
Verification The verification of significant intersections by either independent or
Significant intersections have been verified by alternative company
of sampling
alternative company personnel.
personnel.
and The use of twinned holes. No drill hole twins exist.
assaying Documentation of primary data, data entry procedures, data
Primary data are captured on paper in the field and then re-entered
verification, data storage (physical and electronic) protocols. into spread sheet format by the supervising geologist, to then be
Discuss any adjustment to assay data. loaded into the company’s database.
No adjustments are made to any assay data.
Location of
Accuracy and quality of surveys used to locate drill holes (collar and

MGA94 Zone 54 grid coordinate system is used.
data points down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.

All holes comprising the resource (MH prefixed) have had their
surface locations surveyed for Northing, Easting and RL. Easting
Specification of the grid system used. and Northing were determined using a differential GPS (±. 30cm). A
Quality and adequacy of topographic control. co-ordinate transformation was applied to the data from the old AMG
to MGA zone. .
Down hole surveys collected by single shot camera.

19

Criteria JORC Code explanation Commentary
Topographic control is considered to be high (within 0.05m).
Data Data spacing for reporting of Exploration Results. Hole locations are at a nominal 250m (Y) by 20m (X) pattern.
spacing and
distribution

Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral


Data spacing and distribution are sufficient to establish the high
degree of geological and grade continuity.
Resource
and
Ore
Reserve
estimation
classifications applied.
procedure(s) and
The material being estimated does outcrop and has been mapped
over the 5km within and outside of the resource area. The material
Whether sample compositing has been applied. being estimated is currently being mined 4.5km North of the drilled
area (Myrtle Springs) and has been mined for over 30 years at a low
production figure.
No sample compositing has been applied.
Orientation Whether the orientation of sampling achieves unbiased sampling of
All holes have been orientated towards an azimuth so as to be able
of
data
in
possible structures and the extent to which this is
known, considering
intersect the magnesite beds as close to perpendicular as possible.
relation to
the deposit type.
All DD holes were drilled at a dip of -55° to define the depth extent of
geological If the relationship between the drilling orientation and the orientation
the magnesite beds.
structure of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Sample The measures taken to ensure sample security. All samples were under company supervision from the rig to the
security Adelaide Amdel laboratory.
All residual sample material was stored securely in sealed bags.
Audits or
The results of any audits or reviews of sampling techniques and data.

Audits were performed at the time of the drilling (1999) in line with
reviews due diligence studies for magnesium metal production and reporting
compliance (AusIMM guidelines). Some questions were raised
concerning a number of issues and these were all addressed by
SAMAG. The issues raised are listed below;
Alternative Resource Estimation- The auditors used alternative
methods to previous resource estimators to derive volume, by
extrapolating sectional interpretations and secondly, using average
bed widths and estimating volumes on a bench by bench basis. It is
the Competent Persons belief that wireframes are the most
appropriate form of volume constraint.

20

Criteria JORC Code explanation Commentary
Geological Model- The auditors raised concerns about geological
continuity in the southern part of the estimated area (south of
6,626,000N) due to the presence of cross faulting and that any
estimation south of here should be of a lower classification to that of
the North.
Resource Classification- South of 6,626,000N the classification
should be lower due to the presence of the cross faulting which has
resulted in the displacement of the continuous beds. The drill holes
north of this location are unaffected. The Competent Person agrees
with this.

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral Type, reference name/number, location and ownership including
All work being reported is from EL 5730 (owned by Leigh Creek
tenement agreements or material issues with third parties such as joint
Magnesite Pty Ltd – a wholly owned subsidiary of Archer Exploration
and
tenure
status
land
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.


Limited).
The tenement is in good standing with no known impositions.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Exploration Acknowledgment and appraisal of exploration by other parties. The tenement has had significant historical exploration and mine
done
by
other parties
development work completed on it. The South Australian Government
and private companies have worked on magnesite (MgCO3) –
magnesia (MgO) – magnesium (Mg) potential of the exposed beds
since 1996.
This report is based upon the extensive work performed by one
company Pima Mining (SAMAG historical ASX code PAL) over the
magnesite beds that outcrop and sub crop throughout the strike of the
tenement.
In 1996, a proposal was initiated between the South Australian
Government (PIRSA) and Hatch Associates Consultants Inc. for a
pre-feasibilitystudyon magnesium metalproduction from magnesite

21

Criteria JORC Code explanation Commentary
in areas north-west of Leigh Creek. Hatch delivered the Pre-
Feasibility study in early 1998.
PIRSA also commissioned Kinhill to produce a pre-feasibility report
on mining 200,000t per/annum of magnesite from deposits near Leigh
Creek. As a part of this project CSIRO carried out mineralogical and
chemical study of the magnesite ore. Conclusions were that a high
grade resource could be mined and transported to Port Augusta for
magnesium metal production.
In 1997, PIRSA began a mapping program of the magnesite deposits
in the Wilouran and Northern Flinders Ranges. Three areas were
mapped using a DGPS, these were Mt Hutton, Termination Hill and
Screechowl Creek.
Additional mapping was undertaken by Pima Mining in 1999 when
they commenced drilling at Mt Hutton.
The initial pass of drilling was 2.5 km covering the entirety of the Mt
Hutton area (which has the excised Myrtle Spring Mine within it).
Subsequently, the Mt Hutton Central area was drilled at line spacing
of 250m with holes drilled at approximately 20 m spacing to cover the
first 17 beds of the 86 magnesite beds identified from mapping.
A resource estimate was announced to the ASX on the 30th
September 1999 for the Mt Hutton Deposit by PAL.
In 2000 a test pit was dug in the northern end of the resource and 100
tonnes of material representing beds 1 to 17 were removed for test
work. The average grade of the bulk sample reported Mg 0.2%
higher than the expected grade of the time (23.7% Mg). It was
reported that the grade estimates of the day were considered reliable
for this type of deposit.
A 25 tonne sub sample was crushed to -2mm and sampled to confirm
grades, 10 samples
Geotechnical studies were completed for pit designs which supported
a feasibility study into magnesium metal production from magnesite
sourced at Mt Hutton Central.

22

Criteria JORC Code explanation Commentary
Geology Deposit type, geological setting and style of mineralisation. The magnesite deposit comprises a steeply dipping sequence of
magnesite and dolomite interbeds which outcrop continuously
throughout the tenement. These beds strike northwest-southeast
and dip between 60˚ and 70˚ to the northeast. A total of eighty-six
individual beds have been identified extending over a strike length of
24.5 km. The deposit represents the south western limb of a
regional syncline, which includes the Camel Flat, Mount Hutton,
Myrtle Springs, and Mount Playfair magnesite deposits.
The youngest stratigraphic magnesite bed intercepted was Upper 7
(U7) and the ‘lowest’ bed, Lower 5 (L5). Between these beds, up to
86 interbedded magnesite and dolomite units form the Mount Hutton
magnesite sequence. Magnesite Beds 1-17, these beds were
targeted during resource definition and are positioned in the middle
of the sequence4.7. The unique textural characteristics within each
individual magnesite bed render the beds identifiable along strike
and from outcrop to outcrop.
The beds 1 to 17 with the lowest stripping ratio and lowest calcium
content were selected for resource drilling. Beds stratigraphically
above Bed 1 are thin, high calcium beds and, immediately below Bed
17, there is a sequence of thick dolomite beds with few high-grade
magnesite interbeds.
Marker beds HU1, HU2, 7MK, 14MK, HMU, HML were identified in
outcrop and distinguished in core over the length of the deposit. They
were used during geological logging for identifying individual beds
and stratigraphic position within the sequence.
The Mount Hutton Deposit is structurally simple. Burra Group
sediments in the study area strike northwest southeast and dip
between 60˚ and 70˚ to the northeast. Virtually no folding disturbs the
bedding and the dip is only subject to minor variation. Dip direction
changes by 25˚ over 4.7 km and the total thickness varies by less
than 10%.

23

Criteria Criteria JORC Code explanation Commentary
Drill hole A summary of all information material to the understanding of the
No exploration results to report.
Information exploration results including a tabulation of the following information
for all Material drill holes:

All drill hole data are publicly available through the South Australian
Government, the custodians of exploration data of the State.
o easting and northing of the drill hole collar All data and reports have been publicly available since the surrender
o elevation or RL (Reduced Level – elevation above sea level in
of the ground by the previous licence holder.
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
Data In reporting Exploration Results, weighting averaging techniques,
No exploration results are being reported.
aggregation
methods
maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be stated.

No metal equivalents are being reported.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Relationship These relationships are particularly important in the reporting of
No exploration drill holes are being reported.
between Exploration Results.
mineralisation If the geometry of the mineralisation with respect to the drill hole
widths and
angle is known, its nature should be reported.
intercept
lengths
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole length,

true width not known’).
Diagrams Appropriate maps and sections (with scales) and tabulations of
See current release.
intercepts should be included for any significant discovery being

24

  • Criteria JORC Code explanation Commentary reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

  • BalancedWhere comprehensive reporting of all Exploration Results is not  No exploration results are being reported. reporting practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

  • OtherOther exploration data, if meaningful and material, should be reported  Considerable and exhaustive work has been completed by previous substantive including (but not limited to): geological observations; geophysical operators into studies of mining the magnesite for the purpose of survey results; geochemical survey results; bulk samples – size and creating a commercial product as currently being performed to the

  • exploration method of treatment; metallurgical test results; bulk density, North of the Resource.

  • data groundwater, geotechnical and rock characteristics; potential  Resource estimation were completed by 3 different consultants in

  • deleterious or contaminating substances. 1999, 2000 and 2001, with each estimation based on the exact same data set. The outcomes of this previous work are tabulated below.

Year tonnes
(kt)
Mg
(%)
Ca
(%)
B
(ppm)
Si
(ppm)
Insolubles
(%)
1999 19,050
23.86
2.13 101 4128 11.2
2000 18,975
23.9
1.99 108 3924 10.54
2001 16,532
23.7
2.09 103 10.99
  - Trial mining and processing of 100t of material from the North end of Mt Hutton in 2000.
  • Further workThe nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or large-scale step-out drilling).

  • Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

  • A full feasibility study was completed in 2000 for the production of magnesium metal. With escalating power costs, the proposal was modified over time, including transporting the raw material to Egypt to access cheap power. Ultimately no project advanced.

  •  Additional trial mining to research products that can be created from the raw magnesite.

  • Additional metallurgical evaluation of caustic calcined magnesia and monolithic deadburn magnesia are ongoing. See maps in the document highlighting possible extensions.

25

Section 3 Estimation and Reporting of Mineral Resources

Criteria JORC Code explanation Commentary
Database Measures taken to ensure that data has not been corrupted by, for
No SQL data base was used for the electronic data. All data received
integrity example, transcription or keying errors, between its initial collection
and its use for Mineral Resource estimation purposes.

from the laboratory (ALS) was copied and pasted into Excel fields,
hence removing any transcription errors during the duplication.
Data validation procedures used. Similarly, survey data received for collars and down hole surveys
were copied and pasted into relevant fields, i.e. Northing Easting, RL,
Depth, Dip and Azimuth.
Standard validation practices are used to confirm that overlapping
intervals do not occur, collars are surveyed and not missing, and
standards perform within expectations.
Site visits Comment on any site visits undertaken by the Competent Person
Site visits were regular to ensure that procedures for drill data
and the outcome of those visits. collection were being performed. Geologists oversaw the collection
If no site visits have been undertaken indicate why this is the case. of the drilling and the data.
The Competent Person has visited the site, has seen the magnesite
beds and the marker units defining the magnesite beds.
Geological Confidence in (or conversely, the uncertainty of ) the geological
The geological model is simple, at the time of logging the magnesite
interpretation interpretation of the mineral deposit.
Nature of the data used and of any assumptions made.
units intersected were numbered depending on their position, this
numbering is from 1 to 17 (with a 2A, 14A & 14B units included to
differentiate facies changes within the individual magnesite beds).
The effect, if any, of alternative interpretations on Mineral Resource
These bed numbers are used to create individual bed wireframes
estimation. over the length of the drilled area. The confidence of the positioning
The use of geology in guiding and controlling Mineral Resource
estimation.

of the beds correlates with the transformed mapping of the surface
exposures of the beds. This gives good support that the beds are in
the correct positions and have true widths expressed appropriately in
The factors affecting continuity both of grade and geology. the wireframe model.
The drill density is sufficient that a geological interpretation for the
purpose of creating estimation domains can occur. Bed 11A was
excluded from the estimation as it was deemed that there was
insufficient data for confident interpolation. The remaining individual
bed domains are satisfactory for mineral resource estimation.
The variance of the estimated element (Mg) is very low owing to the
depositional nature of the magnesite beds.

26

Criteria JORC Code explanation Commentary
Internal dilution is constrained within the domains, units of thin
dolomite (waste) intercalated with the basal section of some
magnesite beds (beds 3a, 10 & 13) are included into the population
used for estimating the magnesite. They were not excluded from the
estimation.
Dimensions The extent and variability of the Mineral Resource expressed as
Mt Hutton Central Resource measures some 4,800m in length along
length (along strike or otherwise), plan width, and depth below
strike, comprising 17 identifiable magnesite beds.
surface to the upper and lower limits of the Mineral Resource. The ore is mapped at the surface over the strike of the modelled area,
the resource is reported to the 150 RL some 55 to 70m in depth from
the surface. The surface RL in the North is close to 205m AHD and is
around 220m AHD in the South. The magnesite beds are modelled
to the 120 RL (depending on depth of drill holes).
Estimation The nature and appropriateness of the estimation technique(s)
The estimation domains are geological representations of the
and applied and key assumptions, including treatment of extreme grade
individual magnesite beds identified from surface mapping and drill
modeling
techniques
values, domaining, interpolation parameters and maximum distance
of extrapolation from data points. If a computer assisted estimation
method was chosen include a description of computer software and



hole logging.
A total of 17 domains were estimated,
parameters used. MineMap was used for the interpretation, block modelling and grade
The availability of check estimates, previous estimates and/or mine
estimation.
production records and whether the Mineral Resource estimate takes
Ordinary Kriging was used for the estimation of magnesium. ID2 was
appropriate account of such data. used for the estimation of other elements (Ca, B, S, Si, Al, Fe, Mn, Sr
The assumptions made regarding recovery of by-products. and Insolubles)
Estimation of deleterious elements or other non-grade variables of
economic significance (e.g. sulphur for acid mine drainage


Previous Inverse Distance Squared (ID2) estimations (1999, 2000 &
2001) provide adequate checks for the estimation being reported.
characterisation). Considerable metallurgical work has been performed to determine
In the case of block model interpolation, the block size in relation to
recoverable products, only Magnesium is being reported.
the average sample spacing and the search employed. Other elements such as Ca, Al, Fe, Mn, B, Sr, S, Si & Insolubles have
Any assumptions behind modelling of selective mining units. been estimated, but not reported. From multi-element data collected
to date from drilling, no deleterious levels of elements can be reported
Any assumptions about correlation between variables. in the magnesite material.
Description of how the geological interpretation was used to control
Drill hole line spacing is 250m apart over the strike of the orebody,
the resource estimates. holes are spaced roughly 25 to 30m apart. Block model cell

27

Criteria JORC Code explanation Commentary
Discussion of basis for using or not using grade cutting or capping. dimensions are 0.5m (z), 0.5m (x) and 10m (y).
The process of validation, the checking process used, the
SMU are 2.5m³ which translates to approximately 7.5t.
comparison of model data to drill hole data, and use of reconciliation
data if available.

No assumption of correlation between variables has been made, i.e.
grade (Mg%) vs. SG.
Samples reporting above 20% Insoluble were deemed unsatisfactory
for estimation purposes as the high Insoluble value indicated that the
assay is unreliable. Eleven percent of the data was not used, leaving
962 samples used in the estimation.
Geological wireframes were used as the constraining domain for data
extraction for statistical parameters and estimation of each individual
magnesite bed.
No grade cuts were used to manipulate the data prior to estimation.
The data points that could be considered as extreme (<20%Mg) were
left in the estimation. Ultimately due to the search distances any
influence of these points would be smoothed out.
The block model was viewed in section and plan, with drill hole data.
Moisture Whether the tonnages are estimated on a dry basis or with natural
Tonnages are based on wet tonnes.
moisture, and the method of determination of the moisture content. Tonnage estimation was derived from SG (Specific Gravity) data
collected over the diamond drill holes. Diamond core was weighed in
air and then weighed in water (Archimedes method)
Cut-off The basis of the adopted cut-off grade(s) or quality parameters
The resource is reported with no cut-offs applied, as test work
parameters applied. indicates that blending (Mg) can create a commercial magnesium
product.
Mining Assumptions made regarding possible mining methods, minimum
It is assumed that mining of the material will be by open cut, dilution
factors or mining dimensions and internal (or, if applicable, external) mining
from the HW and FW will be minimal due to the physical appearance
assumptions dilution. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider


of the ore body, i.e., colour. The same ore body is currently being
mined (Myrtle Springs Mine) in a selective manner to the North of the
potential mining methods, but the assumptions made regarding
resource being reported. It has been mined in this manner since the
mining methods and parameters when estimating Mineral Resources
1980’s, demonstrating that selective mining is economical.
may not always be rigorous. Where this is the case, this should be
reported with an explanation of the basis of the mining assumptions


No water was encountered whilst drilling.
made.

28

Criteria JORC Code explanation Commentary
Metallurgical The basis for assumptions or predictions regarding metallurgical
Test work by Archer is being constantly updated to the market, as the
factors or amenability. It is always necessary as part of the process of
product definition process is refined during a scaling up process from
assumptions determining reasonable prospects for eventual economic extraction
to consider potential metallurgical methods, but the assumptions
regarding metallurgical treatment processes and parameters made
when reporting Mineral Resources may not always be rigorous.




bench scale test work to larger volume samples.
Calcined Magnesia products can be made from the various beds
estimated at Mt Hutton Central.
Where this is the case, this should be reported with an explanation of
Marketing of these products will occur after a planned toll treating
the basis of the metallurgical assumptions made. program using a third party shaft kiln to determine a product value for
reserve purposes.
Environment Assumptions made regarding possible waste and process residue
It is assumed that material considered as waste (dolomite) is a
al factors or disposal options. It is always necessary as part of the process of
chemically benign nature, this is assumed from multi-element
assumptions determining reasonable prospects for eventual economic extraction
to consider the potential environmental impacts of the mining and


chemistry reported from drilling. This same dolomite material is used
extensively as road base by another operator to the North of the
processing operation. While at this stage the determination of
resource.
potential environmental impacts, particularly for a greenfields project,
may not always be well advanced, the status of early consideration of
these potential environmental impacts should be reported. Where



The area surrounding the resource has subtle topography and does
not reflect recent erosion associated with heavy rainfall.
these aspects have not been considered this should be reported with
Extensive environmental studies were completed on the immediate
an explanation of the environmental assumptions made. area around the resource to support the plan to mine 200kt per
annum of magnesite. This work was completed by various consulting
firms for SAMAG in the year 2000.
Environmental studies may need minor updating to allow for formal
mining submissions to the State Government (DSD).
Bulk density Whether assumed or determined. If assumed, the basis for the
On average there are 7 density measurements per bed, a total of 328
assumptions. If determined, the method used, whether wet or dry,
individual readings were made on the deposit, with 228 in ore and
the frequency of the measurements, the nature, size and
100 in the dolomite waste. Each bed has an average density
representativeness of the samples. assigned to it from the raw data.
The bulk density for bulk material must have been measured by
The method used was the Archimedes method.
methods that adequately account for void spaces (vugs, porosity,
etc.), moisture and differences between rock and alteration zones
within the deposit.


Density was assigned to domains (beds) rather than estimated, the
assigned densities are as below:
Discuss assumptions for bulk density estimates used in the
evaluation process of the different materials.

29

Criteria
JORC Code explanation
Commentary
Bed Number Density Bed Number Density
Bed 1 3.03 Bed 11 2.94
Bed 2 2.94 Bed 11a
Bed 3 2.94 Bed 12 2.95
Bed 3a 2.93 Bed 13 2.95
Bed 4 2.93 Bed 14 2.96
Bed 5 2.98 Bed 14a 2.94
Bed 6 2.96 Bed 14b 2.97
Bed 7 3.02 Bed 15 2.96
Bed 8 2.94 Bed 16 2.95
Bed 9 3.01 Bed 17 2.90
Bed 10 2.95 Dolomite 2.86
Classification
The basis for the classification of the Mineral Resources into varying
confidence categories.
Whether appropriate account has been taken of all relevant factors
(i.e. relative confidence in tonnage/grade estimations, reliability of
input data, confidence in continuity of geology and metal values,
quality, quantity and distribution of the data).
Whether the result appropriately reflects the Competent Person’s
view of the deposit.
The mineral resource for Mount Hutton Central has been classified
into Indicated and Measured categories. These categories were
based upon the following criteria, strong geological and grade
continuity (strata bound and strata form chemical precipitate beds
within the Skillogalee Dolomite), the quality of the data and the
confidence of the estimation. Cells south of 6626000N are classified
as Indicated in line with previous Audit recommendations due to the
presence of faulting. Cells to the north of 6626,000N and above the
150RL are classified as Measured. Cells below the 150 RL of the
block model are omitted from the Resource Classification.
Appropriate account has been taken of all the relevant criteria
including data integrity, data quality, geological continuity, data
continuity, and magnesia product creation..
The Mineral Resource estimate appropriately reflects the view of the
magnesite deposit at Mount Hutton Central by the Competent Person.

30

Criteria JORC Code explanation Commentary
Audits or The results of any audits or reviews of Mineral Resource estimates. This estimation has not been audited. it is the fourth estimation for the
reviews Mount Hutton Central Area. No changes have occurred to the data
set since the first estimation in 1999. The purpose of this report it to
bring the resource into compliance with JORC 2012. The quality of
the work and reporting at the time is compliant with JORC 2012 and
can be reported as such.
Discussion of Where appropriate a statement of the relative accuracy and
The Mineral Resource accuracy is communicated through the
relative confidence level in the Mineral Resource estimate using an approach
classification assigned to this Mineral Resource.
accuracy/
confidence
or procedure deemed appropriate by the Competent Person. For
example, the application of statistical or geostatistical procedures to
quantify the relative accuracy of the resource within stated
confidence limits, or, if such an approach is not deemed appropriate,
a qualitative discussion of the factors that could affect the relative





The Mineral Resource estimate has been classified in accordance
with the JORC Code 2012 Edition using a qualitative approach. All
factors
that
have
been
considered
have
been
adequately
communicated in Section1 and Section 3 of this Table.
accuracy and confidence of the estimate. The statement relates to global estimate of tonnes and grade of
The statement should specify whether it relates to global or local
estimates, and, if local, state the relevant tonnages, which should be


Magnesium. Grade estimates have been made for each cell of the
block model.
relevant to technical and economic evaluation. Documentation
A 100 tonne trial mining sample showed close correlation to grades
should include assumptions made and the procedures used. predicted from drill hole data. No additional production data is
These statements of relative accuracy and confidence of the
available for Mount Hutton Central.
estimate should be compared with production data, where available. Kiln trials are scheduled to confirm refractory potential.

31

Wireframes used for Mount Hutton Central

==> picture [662 x 442] intentionally omitted <==

32

33