12 April 2016
Mount Hutton Central JORC 2012 Resource
Highlights
-
Mount Hutton Central Mineral Resource upgraded to JORC 2012 standard in preparation for development of the Leigh Creek Magnesite Project.
-
No material change in Mineral Resource estimates – reflects the quality and uniformity of the magnesite deposit and the work done by Archer and SAMAG.
-
Leigh Creek Magnesite Project rapidly moving toward production.
Archer Exploration Limited (ASX: “AXE”) is pleased to announce that it has updated the Mineral Resource for its Mount Hutton Central Deposit in accordance with JORC 2012 code. The Mount Hutton Central Deposit, sits within the 100% owned Mount Hutton Magnesite Project which itself is part of the much larger Leigh Creek Magnesite Project, located approximately 20 kilometres northwest of Leigh Creek Township, South Australia (Figure 1).
The Mount Hutton Central Mineral Resource previously reported under the JORC 2004 code has undergone a comprehensive review by Archer for reporting under the JORC 2012 requirements. Archer has elected to upgrade its reporting for Mount Hutton Central to the new standard in preparation for the next phase of the continuing development of the Leigh Creek Magnesite Project. The JORC 2012 Mineral Resource at Mount Hutton Central is reported below as:
| JORC 2012 Mineral Resource | JORC 2012 Mineral Resource | JORC 2012 Mineral Resource | |
|---|---|---|---|
| Classification | Tonnes (kt) |
Mg (%) |
MgO (%) |
| Measured Indicated |
12,059 5,460 |
24.2 24.3 |
40.1 40.3 |
| Total | 17,523 | 24.2 | 40.2 |
Table 1: Mount Hutton Central Mineral Resource
The underlying assumptions and method used to upgrade the Mount Hutton Central Mineral Resource to 2012 JORC standard are contained in Table 1 and Attachment A annexed to this announcement.
Archer Exploration Limited Level 1, 28 Greenhill Rd Wayville SA 5034 www.archerexploration.com.au
==> picture [596 x 79] intentionally omitted <==
A key result of the review is that there has been no material change to the Mineral Resource Estimate reported by SAMAG Limited on (3/09/1999 (ASX: PAL).
Project Overview
The Leigh Creek Magnesite Project comprises the Mount Hutton South, Mount Hutton Central, Mt Playfair, Pug Hill, Termination and Witchelina deposits. The Mineral Resources for each deposit are shown below. It is expected that the Mount Hutton Central deposit will first be the first area developed, as such the remaining deposits have not yet been upgraded to 2012 JORC code requirements on the basis that the supporting information available regarding these deposits has not materially changed since they were last reported.
==> picture [452 x 438] intentionally omitted <==
Figure 1. Location of the Mt Hutton Central Resource and nearby magnesite deposits
The Mt Hutton Central Project represents only part of the total Leigh Creek Magnesite Project which has a Mineral Resource of 434Mt @ 41.4% MgO (refer to table 2 below).
==> picture [596 x 79] intentionally omitted <==
Therefore, potential exists to greatly increase the life and scale of the Leigh Creek Magnesite Project.
| Deposit Measured (Mt) Indicated (Mt) Inferred (Mt) Total (Mt) MgO (%) |
|
|---|---|
| JORC 2012 Mineral Resources | |
| Mount Hutton Central 12.0 5.5 0.0 17.5 40.1 |
|
| JORC 2004 Mineral Resources | |
| Mount Hutton South 72.0 53.0 125 42.9 |
|
| Mount Playfair 0.0 21.0 23.0 44.0 42.5 |
|
| Pug Hill 0.0 10.0 10.0 20.0 42.7 |
|
| Termination Hill 4.0 5.0 20.0 29.0 42.8 |
|
| Witchelina 23.7 94.0 99.0 216.7 40.0 |
|
| Total 27.7 202 205 434.7 41.4 |
Table 2: Leigh Creek Magnesite Project Mineral Resources
For further information please contact:
Mr Greg English Mr Gerard Anderson Chairman Managing Director Archer Exploration Limited Archer Exploration Limited Tel: (08) 8272 3288 Tel: (08) 8272 3288
The information in this report that relates to the Mt Hutton Central JORC 2012 Mineral Resource estimation has been prepared by Mr W. Bollenhagen who is a Member of the AusIMM. Mr Bollenhagen is a full time employee of Archer Exploration Ltd., and has more than five years’ experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Bollenhagen has consented in writing to the inclusion in this announcement of the Mineral Resource estimation information in the form and context in which it appears. This information was prepared and first disclosed under the JORC Code 2012.
Mr. Bollenhagen is a Member of the Australasian Institute of Mining and Metallurgy who has more than twenty years’ experience in the field of activity being reported. Mr Bollenhagen has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” relating to the reporting of Exploration Results.
This document also contains Mineral Resources which were reported under the 2004 JORC code as there has been no Material Change or Re-estimation of those Mineral Resources since the introduction of the 2012 JORC Code. Future estimations will be prepared in accordance with 2012 JORC Code.
==> picture [596 x 79] intentionally omitted <==
ATTACHMENT A – MATERIAL INFORMATION SUMMARY
The Mount Hutton Central Project is deemed a material mining project and the Company provides the following information in accordance with ASX Listing Rule 5.8, which is material to understanding the reported Mount Hutton Central Project Mineral Resource.
The Leigh Creek magnesite deposits were formerly owned by a succession of related companies including SAMAG, Pima Mining and Magnesium Development Limited and Magnesium International Limited. For simplicity all reference to historic information will be attributed to SAMAG. The JORC 2012 Resource estimate comprises a new interpolation of the high quality drilling, chemical and metallurgical data from work in 1999-2001 (SAMAG) that led to the estimation of a JORC 1999 global Mineral Resource for the Leigh Creek magnesite deposits of 453 million tonnes grading 41.4% MgO and new information generated by Archer in the period 2011-2016 (AXE).
Mount Hutton Central Geology and Interpretation
Mapping, completed in 1999, over a strike length of 4.7 km was undertaken to define the stratigraphy, geological structures and associated deformational features within the Mount Hutton deposit ( Deposit ). The mapping was carried out by ground traversing the Deposit and recording geological structures onto a series of 1:5,000 scale maps. Structures were recorded relative to previously surveyed marker beds, creeks and topographic landmarks. Significant structures were located using DGPS.
Creeks that traverse the Deposit provide good outcrop exposure. Quartzitic dolomite marker beds are exposed on the flats in between creeks more dominantly than magnesite beds. Offsets are well defined by breaks in marker beds and individual marker beds are distinguishable over tens of kilometres.
SAMAG commissioned a detailed (1:10,000 scale) aerial photography and photogrammetric survey of the Deposit in August 1999. The accurately located digital photographs and contours were combined with geological DGPS mapping to form a comprehensive Geographical Information Systems ( GIS ) dataset.
Marker beds HU1, HU2, 7MK, 14MK, HMU, HML (described below) were identified in outcrop and distinguished in core over the length of the Deposit. They were used during geological logging for identifying individual beds and stratigraphic position within the sequence.
Hutton Upper 1 (HU1)
Thin (30 cm), carbonaceous, dolomite quartz sand, interbedded between a sequence of dolomite silts and muds, between Bed 2 and 3A.
- Hutton Upper 2 (HU2)
60 cm wide, sequence of finely laminated dolomite silts, with interbedded fine dolomite mud laminations, bounding carbonaceous dolomite quartz sand. A Dolomite/Magnesite gravel conglomerate is occasionally found at the base.
==> picture [596 x 79] intentionally omitted <==
-
Bed 7 Marker (7M) A strongly carbonaceous, 1.70 m wide laminated dolomite mud, with occasionally laminated dolomite silts or muds at the base forms a distinctive unit between Beds 6 and 7.
-
Bed 14 Marker (14M) A strongly carbonaceous, thinly (55 cm), laminated dolomite mud, with rare laminated dolomite silt at base forms a distinctive unit between Beds 14 and 14A.
-
Hutton Middle Upper (HMU) A strongly carbonaceous, thinly (38 cm) laminated dolomite mud, with rare laminated dolomite mud at the base, a distinctive unit between Bed 15 and HML and Bed 16.
-
Hutton Middle Lower (HML)
-
Thin (38 cm), carbonaceous, dolomite quartz sand, occasionally with thin laminated dolomite silt layer at the base forms a distinctive unit between HMU and Bed 16.
Figures 1 to 3 below show the stratigraphic column between Beds1 and 17 and the marker beds.
==> picture [281 x 397] intentionally omitted <==
Figure 1: Stratigraphic column Bed 1 (unit 1) to Bed 7 (unit 7)
==> picture [596 x 79] intentionally omitted <==
==> picture [417 x 602] intentionally omitted <==
Figure 2: Stratigraphic column Bed 8 (unit 8) to Bed 14B (unit 14B)
==> picture [596 x 79] intentionally omitted <==
==> picture [375 x 543] intentionally omitted <==
Figure 3: Stratigraphic column Bed 15 (unit 15) to Bed 17 (unit 17)
==> picture [596 x 79] intentionally omitted <==
Deposit Geology
The youngest stratigraphic magnesite bed intersected was Upper 7 (U7) and the ‘lowest’ bed, Lower 5 (L5). Between these beds, up to 86 interbedded magnesite and dolomite units form the Mount Hutton magnesite sequence. Magnesite Beds 1-17, were targeted for resource definition and are positioned in the middle of the sequence. The unique textural characteristics within each individual magnesite bed render the beds identifiable along strike in drill holes and from outcrop to outcrop (Figure 4).
==> picture [470 x 408] intentionally omitted <==
Figure 4: Location of the Upper and lower beds with resource drill holes
Drilling Techniques
In total, 56 NQ2 diamond drill holes were drilled at Mount Hutton during 1998 and 1999 for an aggregate of 3,539.69 m.
Based on the low variance of grade data measured in the initial drill program, a traverse spacing of 250 m was selected for the infill-drilling program. The beds with the lowest stripping ratio and lowest calcium content were selected for resource drilling, namely Beds 1- 17. Beds stratigraphically above Bed 1 are thin and high in calcium. Beds, immediately below Bed 17, occur in a thick dolomite sequence with few high-grade magnesite interbeds. Holes were drilled on the 250m spaced sections on a nominal drill hole spacing of 20 metres.
==> picture [596 x 79] intentionally omitted <==
- Sampling, Sub Sampling techniques & Analyses
Only material identified as magnesite (MgCO3) was selected for analyses, the dolomite interbeds were not assayed. Geological logging was completed for all holes on site. The lithology, colour, weathering, alteration and structural characteristics of core were logged. Logging was both qualitative and quantitative depending on field being logged. From the detailed geological logging each magnesite bed was allocated a number so that beds could be matched between drill holes at the interpretation stage. All diamond core was logged and photographed. All core material was logged by the geologist on site.
Quarter core was recovered using a diamond saw. The geologist nominated the intervals for analyses and the core placed in a pre-numbered calico bag and recorded on a submission. Sample preparation at the Amdel laboratory involved the sample being weighed on receipt then dried at 120° C for up to 12 hours. The sample was then crushed through to nominal - 5mm in a two stage crushing process. The entire sample was pulverized to 90% passing 75 micron in an LM5 bowl, with the same grinding time and equipment used for all samples. A sub sample of 200-300g was taken for analyses. Two duplicate samples were prepared, on a 1 in 20 basis, from the pulverized material at the same time as the removal of the assay sample.
Whole Rock Analysis
Initial drill hole samples from all the magnesite deposits were analysed for their whole rock components. Resource grade estimates were estimated using whole rock values.
Major rock forming components (Mg, Ca, Si, Fe, Al, K, Na, Mn, P, Ti) and minor elements (Mo, Ba, Cr) and loss on ignition (LOI) were measured by Inductively Coupled Plasma (ICP), and total carbon and sulphur by Leco furnace and infra-red cell.
High precision measurements of boron and of trace metals (Cu, Ni, Se, and Zn) were taken by digesting samples with aqua regia and presenting the solution to an ICP unit for quantification.
Major rock forming components were presented as oxides and total carbon as carbonate.
Partial Digest Leach Analysis
Partial leach analyses were used for resource definition at Mount Hutton. MIL (formerly Pima Mining NL (SAMAG)), in conjunction with a consultant at Amdel, developed a method specifically for the preparation and partial digestion of magnesite samples. Samples were analysed by ICP and the acid insoluble residue gravimetrically determined. This process was designed as a repeatable representation of the leach conditions associated with the preparation of magnesium chloride brine, thus measuring the suitability of a magnesite sample as feedstock for magnesium metal production.
The Partial Leach process required the entire sample (~750 g) to be crushed (nominal 5mm) and ground (90%<75 micron) and a sub-sample (250gm) taken for analysis. This subsample was then leached in hot hydrochloric acid (32% w/v). The liquor was filtered from the residue and then the digested solution read by ICPAES. The remaining insoluble residue was washed, dried and weighed. Residues were composited and assayed.
==> picture [596 x 79] intentionally omitted <==
Duplicates
A duplicate pulverised sample of 1 in 20 samples was prepared and supplied to the secondary laboratory (Assaycorp Pty. Ltd, Pine Creek, Northern Territory) for verification. Amdel coordinated duplicate preparation with the routine assay of a second split of the sample pulp.
Repeats
The assay of two randomly selected samples in each run of 50 samples was routinely repeated.
Reference Samples
Reference samples were supplied to Amdel (labelled EPL in assay data). The composition of these reference samples had been established by titration (Mg only) by another reputable laboratory.
Blanks
Two blank samples were included in each run of fifty samples to monitor sample preparation hygiene and to establish the level of background laboratory hygiene.
Micromine reviewed the blank samples submitted and concluded from geostatistical analysis that each commodity registered a modest grade increase but well within the limits for the laboratory. The author was confident that there was no undue sample preparation or laboratory contamination.
Independent Analysis
Duplicate pulps from 1 in 20 samples were collected by Amdel and delivered to Assaycorp. Assaycorp carried out its analysis using a similar partial leach procedure to that used by Amdel. Table 1 below presents the collar data for the diamond drill holes used in the estimation.
Density
A total of 328 individual density readings were made on the deposit, with 228 in ore and 100 in the dolomite waste. Each bed had an average density assigned to it based on an average of at least 7 density measurements per bed. The method used was the Archimedes method. Density was assigned to domains (beds) rather than estimated.
==> picture [596 x 79] intentionally omitted <==
| DH_NAME | GDA Easting | GDA Northing | zone |
RL |
DEPTH | DATE |
|---|---|---|---|---|---|---|
| MHDDH01 | 236640.626 | 6628411.41 |
54 |
194.21 |
100 |
1/02/1999 |
| MHDDH02 | 236605.091 | 6628364.076 |
54 |
196.23 |
95 |
1/02/1999 |
| MHDDH03 | 238393.172 | 6626845.468 |
54 |
220.38 |
100 |
1/02/1999 |
| MHDDH04 | 238349.9568 | 6626805.672 |
54 |
222.98 |
95 |
1/02/1999 |
| MHDDH05 | 239845.5293 | 6625311.162 |
54 |
241.68 |
108 |
1/02/1999 |
| MHDDH06 | 239800.9013 | 6625275.092 |
54 |
244.36 |
95 |
1/02/1999 |
| MHDDH07 | 238412.3455 | 6626863.504 |
54 |
219.27 |
50 |
1/02/1999 |
| MHDDH15 | 236776.3001 | 6628265.905 |
54 |
198.13 |
45 |
1/02/1999 |
| MHDDH16 | 236794.396 | 6628289.23 |
54 |
198.33 |
69 |
1/02/1999 |
| MHDDH17 | 236805.0882 | 6628302.781 |
54 |
197.97 |
53.4 |
1/02/1999 |
| MHDDH18A | 237023.0551 |
6628090.109 |
54 |
202.67 |
50 |
1/02/1999 |
| MHDDH19 | 237039.8462 | 6628112.417 |
54 |
202.46 |
66 |
1/02/1999 |
| MHDDH20 | 237049.1472 | 6628124.699 |
54 |
202.11 |
50 |
1/02/1999 |
| MHDDH21 | 237219.0791 | 6627926.61 |
54 |
204.42 |
44.9 |
1/03/1999 |
| MHDDH22 | 237238.7522 | 6627948.11 |
54 |
202.98 |
70 |
1/03/1999 |
| MHDDH23 | 237249.7642 | 6627960.381 |
54 |
202.78 |
51 |
1/03/1999 |
| MHDDH24 | 237404.2371 | 6627763.014 |
54 |
206.24 |
45 |
1/03/1999 |
| MHDDH25 | 237423.5131 | 6627783.582 |
54 |
205.68 |
71 |
1/03/1999 |
| MHDDH26 | 237434.0202 | 6627795.374 |
54 |
205.41 |
51 |
1/03/1999 |
| MHDDH27 | 237584.7411 | 6627595.058 |
54 |
211.32 |
45 |
1/03/1999 |
| MHDDH28 | 237604.5841 | 6627613.567 |
54 |
210.92 |
70.09 |
1/03/1999 |
| MHDDH29 | 237616.0691 | 6627624.511 |
54 |
210.57 |
51 |
1/03/1999 |
| MHDDH30 | 237789.191 | 6627398.764 |
54 |
213.08 |
44 |
1/03/1999 |
| MHDDH31 | 237809.3461 | 6627418.768 |
54 |
212.33 |
70 |
1/03/1999 |
| MHDDH32 | 237820.9081 | 6627430.278 |
54 |
211.86 |
50 |
1/03/1999 |
| MHDDH33 | 237958.347 | 6627237.14 |
54 |
214.24 |
45 |
1/03/1999 |
| MHDDH34 | 237978.683 | 6627256.441 |
54 |
213.25 |
72 |
1/03/1999 |
| MHDDH35 | 237990.097 | 6627267.45 |
54 |
212.72 |
51 |
1/03/1999 |
| MHDDH36 | 238137.7019 | 6627068.712 |
54 |
218.03 |
45 |
1/04/1999 |
| MHDDH37 | 238160.11 | 6627089.418 |
54 |
217.93 |
70 |
1/04/1999 |
| MHDDH38 | 238170.864 | 6627100.19 |
54 |
218.14 |
50 |
1/04/1999 |
| MHDDH39 | 238583.8838 | 6626583.147 |
54 |
226.54 |
48 |
1/04/1999 |
| MHDDH40 | 238605.9418 | 6626599.84 |
54 |
225.83 |
70 |
1/04/1999 |
| MHDDH41 | 238618.1678 | 6626609.056 |
54 |
225.2 |
51 |
1/04/1999 |
| MHDDH42 | 238774.5067 | 6626398.801 |
54 |
223.27 |
48.2 |
1/04/1999 |
| MHDDH43 | 238795.9338 | 6626416.224 |
54 |
222.75 |
65 |
1/04/1999 |
| MHDDH44 | 238813.4078 | 6626430.537 |
54 |
223.14 |
56 |
1/04/1999 |
==> picture [596 x 79] intentionally omitted <==
| DH_NAME | GDA Easting | GDA Northing | zone |
RL |
DEPTH | DATE |
|---|---|---|---|---|---|---|
| MHDDH45 | 238928.2386 | 6626208.41 |
54 |
228.47 |
45 |
1/04/1999 |
| MHDDH46 | 238953.7357 | 6626226.296 |
54 |
227.47 |
72 |
1/04/1999 |
| MHDDH47 | 239169.4936 | 6626011.385 |
54 |
231.39 |
41.3 |
1/04/1999 |
| MHDDH47A | 238965.5627 |
6626235.128 |
54 |
226.96 |
51 |
1/04/1999 |
| MHDDH48 | 239191.3137 | 6626028.701 |
54 |
230.62 |
89 |
1/04/1999 |
| MHDDH51 | 239311.2295 | 6625840.649 |
54 |
236.22 |
45 |
1/05/1999 |
| MHDDH52 | 239331.6056 | 6625859.348 |
54 |
235.51 |
71.9 |
1/05/1999 |
| MHDDH53 | 239342.9886 | 6625869.919 |
54 |
235.08 |
51 |
1/05/1999 |
| MHDDH54 | 239460.6675 | 6625665.397 |
54 |
238.06 |
51 |
1/05/1999 |
| MHDDH55 | 239481.5475 | 6625684.973 |
54 |
236.82 |
70 |
1/05/1999 |
| MHDDH56 | 239494.6655 | 6625696.824 |
54 |
236.75 |
62.3 |
1/05/1999 |
| MHDDH57 | 239662.7054 | 6625467.811 |
54 |
236.44 |
45 |
1/05/1999 |
| MHDDH58 | 239682.5514 | 6625483.764 |
54 |
236.27 |
72 |
1/05/1999 |
| MHDDH59 | 239695.3215 | 6625492.216 |
54 |
236.67 |
51 |
1/05/1999 |
| MHDDH60 | 239053.4646 | 6626114.326 |
54 |
231.14 |
73.6 |
1/05/1999 |
| MHDDH61 | 239270.1336 | 6625951.762 |
54 |
232.41 |
72 |
1/05/1999 |
| MHDDH62 | 236567.423 | 6628311.268 |
54 |
196.98 |
105 |
19/07/1999 |
| MHDDH63 | 238313.6888 | 6626772.214 |
54 |
224.54 |
101 |
19/07/1999 |
| MHDDH64 | 239159.8136 | 6626004.017 |
54 |
231.97 |
60 |
1/05/1999 |
Table 1: Drill hole co-ordinates in MGA Zone 54
Modifying Factors
Crushing and Screening Lump Ore
A series of crushing, grinding and screening tests were conducted on lump magnesite ore to determine size distribution and analyses by size distribution.
Crush sizes ranged from 53 mm to 1.7 mm. Grind sizes ranged from 1.18 mm to 0.15 mm. Little grade change was measured between size fractions except for a slightly higher concentration of silica in the fines.
ROM Ore
During a mining campaign at Myrtle Springs quarry, in July 2001, SAMAG undertook a preliminary screening exercise using a 40 mm grizzly screen. A significant increase in talc (Si), and to a lesser degree dolomite (Ca), was noted in the fines (Table 2). The Bed 5 material used during this test was not sampled representatively but is indicative of possible magnesite mining material.
Based on this significant grade differential “SAMAG” conducted a study designed to measure the size distribution of ore components at 300 mm, 75 mm and 5 mm sizes.
==> picture [596 x 79] intentionally omitted <==
| Units | Mg (%) |
Ca (%) |
Fe (ppm) |
B (ppm) |
Insoluble (%) |
|---|---|---|---|---|---|
| +40mm bed 5 -40mm bed 5 |
24.3 18.9 |
1.64 2.52 |
600 1,200 |
100 70 |
11.50 29.60 |
Table 2: Summary of Partial Leach Analyses of screened Bed 5 magnesite
Assay by size distribution tests were carried out using representative portions of the uncrushed Mount Hutton Bulk Sample. The individual samples were screened using √2 series sieves with apertures ranging from 200 mm to 4.75 mm for the minus 300 mm sample, 76 mm to 0.85 mm for the minus 75 mm sample and 4.75 mm to 0.038 for the minus 5 mm sample. For each sample a representative portion of each size fraction was analysed. Insoluble material (talc) and trace metals (including nickel) were significantly concentrated in the lower grade fines. However, the lump ore was not significantly upgraded with respect to magnesium and calcium.
Table 3 shows the difference in grade on uncrushed material (with a 300 mm top size) using 4.75 mm separation size.
| Unit | Wt (%) |
Mg (%) |
Ca (%) |
Fe (ppm) |
Si (ppm) |
B (ppm) |
Insoluble (%) |
|---|---|---|---|---|---|---|---|
| +4.75 mm fraction -4.75 mm fraction Calc head |
85.5 14.5 100.0 |
24.4 20.6 23.9 |
2.0 2.6 2.1 |
2,154 2,800 2,248 |
1,891 4,896 2,328 |
107 85 104 |
9.9 20.9 11.5 |
Table 3: Uncrushed magnesite at -4.75mm screen cut off Partial Leach Analyses
These tests demonstrated the value of screening out the primary fines formed at the work face during the mining operation. Screening could be done over a grizzly at a sensible, practical size (about 40mm).
Trial Mine Bulk Sample
SAMAG extracted a 100 tonne sample of magnesite from beds 1 to 17 in a trial pit at the Deposit in 2000 (Figure 5).
The material mined formed a bulk sample for test work at Amdel in Adelaide, with residual material left at the site.
==> picture [596 x 79] intentionally omitted <==
==> picture [460 x 250] intentionally omitted <==
Figure 5: Trial Mine at Northern end of Mt Hutton Central
Metallurgical Extraction
Combined beds of magnesite from Mt Hutton Central have been successfully calcined to at various temperatures to produce both monolithic dead burned magnesia (DBM) and caustic calcined magnesia (CCM).
Estimation Methodology
Ordinary Kriging was the method of estimating the magnesium into the cells. A search ellipse of 300 (Y) by 100 (X) by 40 (Z) was used for estimation. A single pass was used in the estimation. Other elements (Ca, B, Si, B, S, Al, Fe and Insolubles) were estimated using ID2 methodology with a search distance of 300m.
Classification
The Mount Hutton Central resource is reported as both Measured and Indicated. The tonnes and grade are reported above the 150RL, being consistent with reasonable prospects of eventual extraction.
No cells from the block model below the 150RL are reported.
All cells South of 6,626,000N (MGA Zone 54) are reported as Indicated due to the presence of cross faults and slight offsets in the stratigraphy. North of 6,626,000N the cells are classified as Measured due to the extreme consistency of the magnesite beds being estimated and the low variance in the raw population data of those beds.
The material being classified can be mined by traditional open cut methodologies (Figure 6) and the ore selectively extracted to produce calcined products. This is currently being done at the Myrtle Springs mine located 4.5km to the North of the resource.
==> picture [596 x 79] intentionally omitted <==
==> picture [500 x 251] intentionally omitted <==
Figure 6: Cross section of conceptual pit design.
Previous Reporting of Mount Hutton Central
In 1999 tonnes and grade were first reported to JORC guidelines. Subsequently in 2000 and 2001 tonnes and grade were reported again to update and maintain compliancy for the time. No material changes have occurred to the data since the last estimation in 2001. Table 4 (below) presents the tonnes and grades reported for those years for the Mount Hutton Central Resource.
| Year | Tonnes (kt) | Mg% | Ca% | B ppm | Si ppm | Insolubles % |
|---|---|---|---|---|---|---|
| 1999 2000 2001 |
19,050 18,975 16,532 |
23.9 23.9 23.7 |
2.13 1.99 2.09 |
101 108 103 |
4128 3924 |
11.2 10.54 10.99 |
Table 4: Previous reported tonnes and grade for the Mt Hutton Central Deposit.
Exploration Potential
Surface mapping and regional drilling shows there are significant additional resources at depth and along strike, both to the north and to the south of the Mt Hutton Central Resource area.
Archer has confidence that given the remarkable geologic consistency of the magnesite beds over many tens of kilometres, the previously reported SAMAG JORC 1999 Resource estimate of 434 million tonnes grading 41.4% MgO for the greater Leigh Creek magnesite deposits owned by Archer will in time be translated into a similar sized JORC 2012 Resource estimate.
JORC Code, 2012 Edition – Mount Hutton Central Table 1
Section 1 Sampling Techniques and Data
| Criteria | JORC Code explanation | Commentary | |
|---|---|---|---|
| Sampling | Nature and quality of sampling (e.g. cut channels, random chips, or | |
Diamond Drilling was performed by the company SAMAG (Pima |
| techniques | specific specialised industry standard measurement tools appropriate | Mining-PAL) in 1999 and documented in accordance with the JORC | |
| to the minerals under investigation, such as down hole gamma | guidelines at the time. Generally, HQ3 was drilled in the first 3 | ||
| sondes, or handheld XRF instruments, etc.). These examples should | metres of oxidized material, followed by NQ2 sized core to the EOH. | ||
| not be taken as limiting the broad meaning of sampling. | | Sampling was guided by SAMAG protocols and QAQC procedures | |
| Include reference to measures taken to ensure sample representivity | as per industry standards, these procedures are documented in | ||
| and the appropriate calibration of any measurement tools or systems | accordance with JORC 2012 guidelines | ||
| used. | | DD core was cut in half using a core saw and with ¼ core submitted | |
| Aspects of the determination of mineralisation that are Material to the | for assay. | ||
| Public Report. | | All samples were sent Amdel laboratory in Adelaide for preparation | |
| and analyses. | |||
| | All field samples were crushed to -5mm and pulverised via LM5 to | ||
| nominal 90% passing -75pm. | |||
| Drilling | Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air | |
The Mt Hutton Central deposit was sampled by 56 double tubed |
| techniques | blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc.). |
|
diamond drill (DD-NQ2) holes (3,539m). DD holes were drilled in an orientation so as to intersect the mineralisation at right angles. Down hole surveys were taken at the |
| collar (6m) and at 15m to 30m increments to the EOH using an | |||
| Eastman single shot camera. | |||
| | Core orientation was performed by spear for structural purposes, | ||
| detailed structural readings were generated from this procedure and | |||
| reported. | |||
| Drill sample | Method of recording and assessing core and chip sample recoveries |
|
Core recovery was routinely measured and recorded on structural |
| recovery | and results assessed. Measures taken to maximise sample recovery and ensure |
Log Sheets. In 100 magnesite intervals recovery was below 90% and in 32 of those it was below 80%. |
|
| representative nature of the samples. | | Site geologists were present at all times to ensure the procedures | |
| were followed. |
16
-
Criteria JORC Code explanation Commentary Whether a relationship exists between sample recovery and grade No bias is perceived to exist due to the nature of the material being and whether sample bias may have occurred due to preferential sampled (magnesite) which is a homogeneous material with little loss/gain of fine/coarse material. variance in the element being reported (Mg).
-
Logging Whether core and chip samples have been geologically and Geological logging was completed for all holes on site with coding. Geological logging was completed for all holes on site with coding. geotechnically logged to a level of detail to support appropriate The The lithology, colour, weathering, alteration, and structural
-
Mineral Resource estimation, mining studies and metallurgical studies. characteristics of core were logged.
-
Geological logging was completed for all holes on site with coding. Geological logging was completed for all holes on site with coding. The The lithology, colour, weathering, alteration, and structural characteristics of core were logged.
-
All structural data was logged separately from the geology.
-
-
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.) photography.
-
Logging is both qualitative and quantitative depending on field being logged.
-
From the detailed geological logging each magnesite bed was allocated a number so that beds could be effectively matched between drill holes at the interpretation stage.
-
The total length and percentage of the relevant intersections logged.
-
All diamond core was logged and photographed. The photos are retained.
-
All core material was logged by the geologist on site.
-
All core is stored with Department of State Development (DSD) in South Australia.
-
Sub- If core, whether cut or sawn and whether quarter, half or all core Quarter core was recovered using a diamond saw. sampling taken. The geologist nominated the interval for analyses, this was sampled techniques If non-core, whether riffled, tube sampled, rotary split, etc. and and placed in a pre-numbered calico bag and recorded on a and sample whether sampled wet or dry. submission. preparation For all sample types, the nature, quality and appropriateness of the Sample preparation at the Amdel laboratory involved the original sample preparation technique. sample being dried at 120° for up to 12 hours and weighed on submission to laboratory. Sample is then crushed through to nominal
-
Quality control procedures adopted for all sub-sampling stages to -5mm in a two stage crushing process. The entire sample was
-
maximise representivity of samples. pulverized to 90% passing 75 micron in an LM5 bowl, with the same
-
Measures taken to ensure that the sampling is representative of the in grinding time and equipment used for all samples. A sub sample of situ material collected, including for instance results for field 200-300g was taken for analyses duplicate/second-half sampling.
17
-
Criteria JORC Code explanation Commentary Whether sample sizes are appropriate to the grain size of the material Two duplicate samples were prepared, on a 1 in 20 basis, from the being sampled. pulverized material at the same time as the removal of the assay sample.
-
Sample sizes are representative of the grain sizes being assayed for.
-
Quality of The nature, quality and appropriateness of the assaying and assay data laboratory procedures used and whether the technique is considered and partial or total. laboratory For geophysical tools, spectrometers, handheld XRF instruments, tests etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.
-
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.
-
Initial drill holes MHDD01 to 007 were analysed using whole rock chemistry.
-
Major rock forming elements (Mg, Ca, Si, Fe, Al, K, Na, Mn, P & Ti), minor elements (Mo, Ba & Cr) were analysed by ICP. Total Carbon and sulphur by LECO furnace. Loss on Ignition (LOI) was recorded separately.
-
A partial leach was used for the remaining holes MHDD13 to 61, this was repeated for the sampled intervals in holes 001 to 007. On average Mg grade reported 3% lower in the partial leach than the whole rock analyses.
-
This method was developed by AMDEL specifically for the preparation of magnesite samples. Samples are analysed by ICPAES and the acid insoluble residue gravimetrically determined. This process was designed as a rigorous representation of the leach conditions associated with the preparation of magnesium chloride brine. Thus, measuring the suitability of a magnesite sample as feedstock for magnesium metal production.
-
The Partial Leach process required the entire sample (~750 g) to be crushed (nominal 5mm) and ground (90%<75 micron) and a subsample (250gm) taken for analysis. This sub-sample was then leached in hot hydrochloric acid (32% w/v). The liquor was filtered from the residue and then the digested solution read by ICPAES. The remaining insoluble residue was washed, dried and weighed.
-
Internal certified laboratory QA/QC is undertaken by Amdel.
-
It is felt that the partial leach of a carbonate mineral that has been ground to 75 micron, when added to hot HCl will have its carbonate dissolved freeing up the bound element, in this case Mg. Mg not associated with carbonate reports to the insoluble, i.e. talc
18
| Criteria | JORC Code explanation | Commentary | |
|---|---|---|---|
| Duplicates (1 in 20) were prepared and supplied to a secondary | |||
| laboratory for verification (AssayCorp). Blank samples were | |||
| submitted by SAMAG as a routine (1 in 25 samples). | |||
| Mass balance was used to make an empirical verification of the | |||
| assay values. Where the major rock components were converted into | |||
| mineral species, which then had their molecular weights added to the | |||
| insoluble portion of the rock. % Mass Balance = (Mg x 3.467) + (Ca | |||
| x 2.497) + (Fe/10000 x 2.074) + (Mn/10000 x 2.092) + (Al/10000 x | |||
| 1.889) + (Si/10000 x 2.1391) + (S/10000 x 2.996) + % Acid Insoluble. | |||
| This assumes that all Mg, Ca, Fe & Mn are present as carbonates, Al | |||
| as Albite, remaining Si as Talc and S as Sulphate. Mass balances | |||
| for each batch of samples had to meet the following QC criteria: 95% | |||
| of the mass balance results were between 98% and 102%, and all | |||
| results were between 96% and 104%. Samples that did not meet | |||
| these criteria were re-assayed. | |||
| QAQC data analysis has been completed for all drill hole data and | |||
| demonstrates sufficient accuracy and precision for use in Mineral | |||
| Resource Estimation. | |||
| Verification | The verification of significant intersections by either independent or | Significant intersections have been verified by alternative company |
|
| of sampling | alternative company personnel. |
personnel. | |
| and | The use of twinned holes. | No drill hole twins exist. | |
| assaying | Documentation of primary data, data entry procedures, data | Primary data are captured on paper in the field and then re-entered |
|
| verification, data storage (physical and electronic) protocols. | into spread sheet format by the supervising geologist, to then be | ||
| Discuss any adjustment to assay data. | loaded into the company’s database. | ||
| No adjustments are made to any assay data. | |||
| Location | of | Accuracy and quality of surveys used to locate drill holes (collar and |
MGA94 Zone 54 grid coordinate system is used. |
| data points | down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. |
All holes comprising the resource (MH prefixed) have had their surface locations surveyed for Northing, Easting and RL. Easting |
|
| Specification of the grid system used. | and Northing were determined using a differential GPS (±. 30cm). A | ||
| Quality and adequacy of topographic control. | co-ordinate transformation was applied to the data from the old AMG to MGA zone. . |
||
| Down hole surveys collected by single shot camera. |
19
| Criteria | JORC Code explanation | Commentary | |||
|---|---|---|---|---|---|
| Topographic control is considered to be high (within 0.05m). | |||||
| Data | Data spacing for reporting of Exploration Results. | Hole locations are at a nominal 250m (Y) by 20m (X) pattern. | |||
| spacing and distribution |
Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral |
Data spacing and distribution are sufficient to establish the high degree of geological and grade continuity. |
|||
| Resource and Ore Reserve estimation classifications applied. |
procedure(s) | and | The material being estimated does outcrop and has been mapped over the 5km within and outside of the resource area. The material |
||
| Whether sample compositing has been applied. | being estimated is currently being mined 4.5km North of the drilled | ||||
| area (Myrtle Springs) and has been mined for over 30 years at a low | |||||
| production figure. | |||||
| No sample compositing has been applied. | |||||
| Orientation | Whether the orientation of sampling achieves unbiased sampling of | All holes have been orientated towards an azimuth so as to be able |
|||
| of data |
in | possible structures and the extent to which this is |
known, considering | intersect the magnesite beds as close to perpendicular as possible. |
|
| relation | to | the deposit type. |
All DD holes were drilled at a dip of -55° to define the depth extent of | ||
| geological | If the relationship between the drilling orientation | and the orientation | the magnesite beds. |
||
| structure | of key mineralised structures is considered to | have introduced a | |||
| sampling bias, this should be assessed and reported if material. | |||||
| Sample | The measures taken to ensure sample security. | All samples were under company supervision from the rig to the | |||
| security | Adelaide Amdel laboratory. | ||||
| All residual sample material was stored securely in sealed bags. | |||||
| Audits | or | The results of any audits or reviews of sampling techniques and data. |
Audits were performed at the time of the drilling (1999) in line with |
||
| reviews | due diligence studies for magnesium metal production and reporting | ||||
| compliance (AusIMM guidelines). Some questions were raised | |||||
| concerning a number of issues and these were all addressed by | |||||
| SAMAG. The issues raised are listed below; | |||||
| Alternative Resource Estimation- The auditors used alternative | |||||
| methods to previous resource estimators to derive volume, by | |||||
| extrapolating sectional interpretations and secondly, using average | |||||
| bed widths and estimating volumes on a bench by bench basis. It is | |||||
| the Competent Persons belief that wireframes are the most | |||||
| appropriate form of volume constraint. |
20
| Criteria | JORC Code explanation | Commentary | |
|---|---|---|---|
| | Geological Model- The auditors raised concerns about geological | ||
| continuity in the southern part of the estimated area (south of | |||
| 6,626,000N) due to the presence of cross faulting and that any | |||
| estimation south of here should be of a lower classification to that of | |||
| the North. | |||
| | Resource Classification- South of 6,626,000N the classification | ||
| should be lower due to the presence of the cross faulting which has | |||
| resulted in the displacement of the continuous beds. The drill holes | |||
| north of this location are unaffected. The Competent Person agrees | |||
| with this. |
Section 2 Reporting of Exploration Results
| Criteria | JORC Code explanation | Commentary | |
|---|---|---|---|
| Mineral | Type, reference name/number, location and ownership including | All work being reported is from EL 5730 (owned by Leigh Creek |
|
| tenement | agreements or material issues with third parties such as joint | Magnesite Pty Ltd – a wholly owned subsidiary of Archer Exploration |
|
| and tenure status |
land | ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. |
Limited). The tenement is in good standing with no known impositions. |
| The security of the tenure held at the time of reporting along with any | |||
| known impediments to obtaining a licence to operate in the area. | |||
| Exploration | Acknowledgment and appraisal of exploration by other parties. | The tenement has had significant historical exploration and mine | |
| done by other parties |
development work completed on it. The South Australian Government and private companies have worked on magnesite (MgCO3) – magnesia (MgO) – magnesium (Mg) potential of the exposed beds |
||
| since 1996. | |||
| This report is based upon the extensive work performed by one | |||
| company Pima Mining (SAMAG historical ASX code PAL) over the | |||
| magnesite beds that outcrop and sub crop throughout the strike of the | |||
| tenement. | |||
| In 1996, a proposal was initiated between the South Australian | |||
| Government (PIRSA) and Hatch Associates Consultants Inc. for a | |||
| pre-feasibilitystudyon magnesium metalproduction from magnesite |
21
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| in areas north-west of Leigh Creek. Hatch delivered the Pre- | ||
| Feasibility study in early 1998. | ||
| PIRSA also commissioned Kinhill to produce a pre-feasibility report | ||
| on mining 200,000t per/annum of magnesite from deposits near Leigh | ||
| Creek. As a part of this project CSIRO carried out mineralogical and | ||
| chemical study of the magnesite ore. Conclusions were that a high | ||
| grade resource could be mined and transported to Port Augusta for | ||
| magnesium metal production. | ||
| In 1997, PIRSA began a mapping program of the magnesite deposits | ||
| in the Wilouran and Northern Flinders Ranges. Three areas were | ||
| mapped using a DGPS, these were Mt Hutton, Termination Hill and | ||
| Screechowl Creek. | ||
| Additional mapping was undertaken by Pima Mining in 1999 when | ||
| they commenced drilling at Mt Hutton. | ||
| The initial pass of drilling was 2.5 km covering the entirety of the Mt | ||
| Hutton area (which has the excised Myrtle Spring Mine within it). | ||
| Subsequently, the Mt Hutton Central area was drilled at line spacing | ||
| of 250m with holes drilled at approximately 20 m spacing to cover the | ||
| first 17 beds of the 86 magnesite beds identified from mapping. | ||
| A resource estimate was announced to the ASX on the 30th | ||
| September 1999 for the Mt Hutton Deposit by PAL. | ||
| In 2000 a test pit was dug in the northern end of the resource and 100 | ||
| tonnes of material representing beds 1 to 17 were removed for test | ||
| work. The average grade of the bulk sample reported Mg 0.2% | ||
| higher than the expected grade of the time (23.7% Mg). It was | ||
| reported that the grade estimates of the day were considered reliable | ||
| for this type of deposit. | ||
| A 25 tonne sub sample was crushed to -2mm and sampled to confirm | ||
| grades, 10 samples | ||
| Geotechnical studies were completed for pit designs which supported | ||
| a feasibility study into magnesium metal production from magnesite | ||
| sourced at Mt Hutton Central. |
22
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Geology | Deposit type, geological setting and style of mineralisation. | The magnesite deposit comprises a steeply dipping sequence of |
| magnesite and dolomite interbeds which outcrop continuously | ||
| throughout the tenement. These beds strike northwest-southeast | ||
| and dip between 60˚ and 70˚ to the northeast. A total of eighty-six | ||
| individual beds have been identified extending over a strike length of | ||
| 24.5 km. The deposit represents the south western limb of a | ||
| regional syncline, which includes the Camel Flat, Mount Hutton, | ||
| Myrtle Springs, and Mount Playfair magnesite deposits. | ||
| The youngest stratigraphic magnesite bed intercepted was Upper 7 | ||
| (U7) and the ‘lowest’ bed, Lower 5 (L5). Between these beds, up to | ||
| 86 interbedded magnesite and dolomite units form the Mount Hutton | ||
| magnesite sequence. Magnesite Beds 1-17, these beds were | ||
| targeted during resource definition and are positioned in the middle of the sequence4.7. The unique textural characteristics within each |
||
| individual magnesite bed render the beds identifiable along strike | ||
| and from outcrop to outcrop. | ||
| The beds 1 to 17 with the lowest stripping ratio and lowest calcium | ||
| content were selected for resource drilling. Beds stratigraphically | ||
| above Bed 1 are thin, high calcium beds and, immediately below Bed | ||
| 17, there is a sequence of thick dolomite beds with few high-grade | ||
| magnesite interbeds. | ||
| Marker beds HU1, HU2, 7MK, 14MK, HMU, HML were identified in | ||
| outcrop and distinguished in core over the length of the deposit. They | ||
| were used during geological logging for identifying individual beds | ||
| and stratigraphic position within the sequence. | ||
| The Mount Hutton Deposit is structurally simple. Burra Group | ||
| sediments in the study area strike northwest southeast and dip | ||
| between 60˚ and 70˚ to the northeast. Virtually no folding disturbs the | ||
| bedding and the dip is only subject to minor variation. Dip direction | ||
| changes by 25˚ over 4.7 km and the total thickness varies by less | ||
| than 10%. | ||
23
| Criteria | Criteria | JORC Code explanation | Commentary |
|---|---|---|---|
| Drill | hole | A summary of all information material to the understanding of the | No exploration results to report. |
| Information | exploration results including a tabulation of the following information for all Material drill holes: |
All drill hole data are publicly available through the South Australian Government, the custodians of exploration data of the State. |
|
o easting and northing of the drill hole collar |
All data and reports have been publicly available since the surrender | ||
o elevation or RL (Reduced Level – elevation above sea level in |
of the ground by the previous licence holder. |
||
| metres) of the drill hole collar | |||
o dip and azimuth of the hole |
|||
o down hole length and interception depth |
|||
o hole length. |
|||
| If the exclusion of this information is justified on the basis that the | |||
| information is not Material and this exclusion does not detract from | |||
| the understanding of the report, the Competent Person should clearly | |||
| explain why this is the case. | |||
| Data | In reporting Exploration Results, weighting averaging techniques, | No exploration results are being reported. |
|
| aggregation methods |
maximum and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated. |
No metal equivalents are being reported. |
|
| Where aggregate intercepts incorporate short lengths of high grade | |||
| results and longer lengths of low grade results, the procedure used | |||
| for such aggregation should be stated and some typical examples of | |||
| such aggregations should be shown in detail. | |||
| The assumptions used for any reporting of metal equivalent values | |||
| should be clearly stated. | |||
| Relationship | These relationships are particularly important in the reporting of | No exploration drill holes are being reported. |
|
| between | Exploration Results. | ||
| mineralisation | If the geometry of the mineralisation with respect to the drill hole | ||
| widths | and | angle is known, its nature should be reported. |
|
| intercept lengths |
If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (e.g. ‘down hole length, |
||
| true width not known’). | |||
| Diagrams | Appropriate maps and sections (with scales) and tabulations of | See current release. |
|
| intercepts should be included for any significant discovery being |
24
-
Criteria JORC Code explanation Commentary reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.
-
Balanced Where comprehensive reporting of all Exploration Results is not No exploration results are being reported. reporting practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.
-
Other Other exploration data, if meaningful and material, should be reported Considerable and exhaustive work has been completed by previous substantive including (but not limited to): geological observations; geophysical operators into studies of mining the magnesite for the purpose of survey results; geochemical survey results; bulk samples – size and creating a commercial product as currently being performed to the
-
exploration method of treatment; metallurgical test results; bulk density, North of the Resource.
-
data groundwater, geotechnical and rock characteristics; potential Resource estimation were completed by 3 different consultants in
-
deleterious or contaminating substances. 1999, 2000 and 2001, with each estimation based on the exact same data set. The outcomes of this previous work are tabulated below.
| Year | tonnes (kt) |
Mg (%) |
Ca (%) |
B (ppm) |
Si (ppm) |
Insolubles (%) |
|---|---|---|---|---|---|---|
| 1999 | 19,050 | 23.86 |
2.13 | 101 | 4128 | 11.2 |
| 2000 | 18,975 | 23.9 |
1.99 | 108 | 3924 | 10.54 |
| 2001 | 16,532 | 23.7 |
2.09 | 103 | 10.99 |
- Trial mining and processing of 100t of material from the North end of Mt Hutton in 2000.
-
Further work The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or large-scale step-out drilling).
-
Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.
-
A full feasibility study was completed in 2000 for the production of magnesium metal. With escalating power costs, the proposal was modified over time, including transporting the raw material to Egypt to access cheap power. Ultimately no project advanced.
-
Additional trial mining to research products that can be created from the raw magnesite.
-
Additional metallurgical evaluation of caustic calcined magnesia and monolithic deadburn magnesia are ongoing. See maps in the document highlighting possible extensions.
25
Section 3 Estimation and Reporting of Mineral Resources
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Database | Measures taken to ensure that data has not been corrupted by, for | No SQL data base was used for the electronic data. All data received |
| integrity | example, transcription or keying errors, between its initial collection and its use for Mineral Resource estimation purposes. |
from the laboratory (ALS) was copied and pasted into Excel fields, hence removing any transcription errors during the duplication. |
| Data validation procedures used. | Similarly, survey data received for collars and down hole surveys | |
| were copied and pasted into relevant fields, i.e. Northing Easting, RL, | ||
| Depth, Dip and Azimuth. | ||
| Standard validation practices are used to confirm that overlapping | ||
| intervals do not occur, collars are surveyed and not missing, and | ||
| standards perform within expectations. | ||
| Site visits | Comment on any site visits undertaken by the Competent Person | Site visits were regular to ensure that procedures for drill data |
| and the outcome of those visits. | collection were being performed. Geologists oversaw the collection | |
| If no site visits have been undertaken indicate why this is the case. | of the drilling and the data. | |
| The Competent Person has visited the site, has seen the magnesite | ||
| beds and the marker units defining the magnesite beds. | ||
| Geological | Confidence in (or conversely, the uncertainty of ) the geological | The geological model is simple, at the time of logging the magnesite |
| interpretation | interpretation of the mineral deposit. Nature of the data used and of any assumptions made. |
units intersected were numbered depending on their position, this numbering is from 1 to 17 (with a 2A, 14A & 14B units included to differentiate facies changes within the individual magnesite beds). |
| The effect, if any, of alternative interpretations on Mineral Resource | These bed numbers are used to create individual bed wireframes |
|
| estimation. | over the length of the drilled area. The confidence of the positioning | |
| The use of geology in guiding and controlling Mineral Resource estimation. |
of the beds correlates with the transformed mapping of the surface exposures of the beds. This gives good support that the beds are in the correct positions and have true widths expressed appropriately in |
|
| The factors affecting continuity both of grade and geology. | the wireframe model. | |
| The drill density is sufficient that a geological interpretation for the | ||
| purpose of creating estimation domains can occur. Bed 11A was | ||
| excluded from the estimation as it was deemed that there was | ||
| insufficient data for confident interpolation. The remaining individual | ||
| bed domains are satisfactory for mineral resource estimation. | ||
| The variance of the estimated element (Mg) is very low owing to the | ||
| depositional nature of the magnesite beds. |
26
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Internal dilution is constrained within the domains, units of thin | ||
| dolomite (waste) intercalated with the basal section of some | ||
| magnesite beds (beds 3a, 10 & 13) are included into the population | ||
| used for estimating the magnesite. They were not excluded from the | ||
| estimation. | ||
| Dimensions | The extent and variability of the Mineral Resource expressed as | Mt Hutton Central Resource measures some 4,800m in length along |
| length (along strike or otherwise), plan width, and depth below | strike, comprising 17 identifiable magnesite beds. |
|
| surface to the upper and lower limits of the Mineral Resource. | The ore is mapped at the surface over the strike of the modelled area, | |
| the resource is reported to the 150 RL some 55 to 70m in depth from | ||
| the surface. The surface RL in the North is close to 205m AHD and is | ||
| around 220m AHD in the South. The magnesite beds are modelled | ||
| to the 120 RL (depending on depth of drill holes). | ||
| Estimation | The nature and appropriateness of the estimation technique(s) | The estimation domains are geological representations of the |
| and | applied and key assumptions, including treatment of extreme grade | individual magnesite beds identified from surface mapping and drill |
| modeling techniques |
values, domaining, interpolation parameters and maximum distance of extrapolation from data points. If a computer assisted estimation method was chosen include a description of computer software and |
hole logging. A total of 17 domains were estimated, |
| parameters used. | MineMap was used for the interpretation, block modelling and grade | |
| The availability of check estimates, previous estimates and/or mine | estimation. |
|
| production records and whether the Mineral Resource estimate takes | Ordinary Kriging was used for the estimation of magnesium. ID2 was |
|
| appropriate account of such data. | used for the estimation of other elements (Ca, B, S, Si, Al, Fe, Mn, Sr | |
| The assumptions made regarding recovery of by-products. | and Insolubles) | |
| Estimation of deleterious elements or other non-grade variables of economic significance (e.g. sulphur for acid mine drainage |
Previous Inverse Distance Squared (ID2) estimations (1999, 2000 & 2001) provide adequate checks for the estimation being reported. |
|
| characterisation). | Considerable metallurgical work has been performed to determine | |
| In the case of block model interpolation, the block size in relation to | recoverable products, only Magnesium is being reported. |
|
| the average sample spacing and the search employed. | Other elements such as Ca, Al, Fe, Mn, B, Sr, S, Si & Insolubles have | |
| Any assumptions behind modelling of selective mining units. | been estimated, but not reported. From multi-element data collected to date from drilling, no deleterious levels of elements can be reported |
|
| Any assumptions about correlation between variables. | in the magnesite material. | |
| Description of how the geological interpretation was used to control | Drill hole line spacing is 250m apart over the strike of the orebody, |
|
| the resource estimates. | holes are spaced roughly 25 to 30m apart. Block model cell |
27
| Criteria | JORC Code explanation | Commentary | |
|---|---|---|---|
| Discussion of basis for using or not using grade cutting or capping. | dimensions are 0.5m (z), 0.5m (x) and 10m (y). | ||
| The process of validation, the checking process used, the | SMU are 2.5m³ which translates to approximately 7.5t. |
||
| comparison of model data to drill hole data, and use of reconciliation data if available. |
No assumption of correlation between variables has been made, i.e. grade (Mg%) vs. SG. |
||
| Samples reporting above 20% Insoluble were deemed unsatisfactory | |||
| for estimation purposes as the high Insoluble value indicated that the | |||
| assay is unreliable. Eleven percent of the data was not used, leaving | |||
| 962 samples used in the estimation. | |||
| Geological wireframes were used as the constraining domain for data | |||
| extraction for statistical parameters and estimation of each individual | |||
| magnesite bed. | |||
| No grade cuts were used to manipulate the data prior to estimation. | |||
| The data points that could be considered as extreme (<20%Mg) were | |||
| left in the estimation. Ultimately due to the search distances any | |||
| influence of these points would be smoothed out. | |||
| The block model was viewed in section and plan, with drill hole data. | |||
| Moisture | Whether the tonnages are estimated on a dry basis or with natural | Tonnages are based on wet tonnes. |
|
| moisture, and the method of determination of the moisture content. | Tonnage estimation was derived from SG (Specific Gravity) data | ||
| collected over the diamond drill holes. Diamond core was weighed in | |||
| air and then weighed in water (Archimedes method) | |||
| Cut-off | The basis of the adopted cut-off grade(s) or quality parameters | The resource is reported with no cut-offs applied, as test work |
|
| parameters | applied. | indicates that blending (Mg) can create a commercial magnesium product. |
|
| Mining | Assumptions made regarding possible mining methods, minimum | It is assumed that mining of the material will be by open cut, dilution |
|
| factors | or | mining dimensions and internal (or, if applicable, external) mining | from the HW and FW will be minimal due to the physical appearance |
| assumptions | dilution. It is always necessary as part of the process of determining reasonable prospects for eventual economic extraction to consider |
of the ore body, i.e., colour. The same ore body is currently being mined (Myrtle Springs Mine) in a selective manner to the North of the |
|
| potential mining methods, but the assumptions made regarding | resource being reported. It has been mined in this manner since the |
||
| mining methods and parameters when estimating Mineral Resources | 1980’s, demonstrating that selective mining is economical. |
||
| may not always be rigorous. Where this is the case, this should be reported with an explanation of the basis of the mining assumptions |
No water was encountered whilst drilling. |
||
| made. |
28
| Criteria | JORC Code explanation | Commentary | |
|---|---|---|---|
| Metallurgical | The basis for assumptions or predictions regarding metallurgical | Test work by Archer is being constantly updated to the market, as the |
|
| factors | or | amenability. It is always necessary as part of the process of | product definition process is refined during a scaling up process from |
| assumptions | determining reasonable prospects for eventual economic extraction to consider potential metallurgical methods, but the assumptions regarding metallurgical treatment processes and parameters made when reporting Mineral Resources may not always be rigorous. |
bench scale test work to larger volume samples. Calcined Magnesia products can be made from the various beds estimated at Mt Hutton Central. |
|
| Where this is the case, this should be reported with an explanation of | Marketing of these products will occur after a planned toll treating |
||
| the basis of the metallurgical assumptions made. | program using a third party shaft kiln to determine a product value for | ||
| reserve purposes. | |||
| Environment | Assumptions made regarding possible waste and process residue | It is assumed that material considered as waste (dolomite) is a |
|
| al factors | or | disposal options. It is always necessary as part of the process of | chemically benign nature, this is assumed from multi-element |
| assumptions | determining reasonable prospects for eventual economic extraction to consider the potential environmental impacts of the mining and |
chemistry reported from drilling. This same dolomite material is used extensively as road base by another operator to the North of the |
|
| processing operation. While at this stage the determination of | resource. |
||
| potential environmental impacts, particularly for a greenfields project, may not always be well advanced, the status of early consideration of these potential environmental impacts should be reported. Where |
The area surrounding the resource has subtle topography and does not reflect recent erosion associated with heavy rainfall. |
||
| these aspects have not been considered this should be reported with | Extensive environmental studies were completed on the immediate |
||
| an explanation of the environmental assumptions made. | area around the resource to support the plan to mine 200kt per | ||
| annum of magnesite. This work was completed by various consulting | |||
| firms for SAMAG in the year 2000. | |||
| Environmental studies may need minor updating to allow for formal | |||
| mining submissions to the State Government (DSD). | |||
| Bulk density | Whether assumed or determined. If assumed, the basis for the | On average there are 7 density measurements per bed, a total of 328 |
|
| assumptions. If determined, the method used, whether wet or dry, | individual readings were made on the deposit, with 228 in ore and |
||
| the frequency of the measurements, the nature, size and | 100 in the dolomite waste. Each bed has an average density |
||
| representativeness of the samples. | assigned to it from the raw data. | ||
| The bulk density for bulk material must have been measured by | The method used was the Archimedes method. |
||
| methods that adequately account for void spaces (vugs, porosity, etc.), moisture and differences between rock and alteration zones within the deposit. |
Density was assigned to domains (beds) rather than estimated, the assigned densities are as below: |
||
| Discuss assumptions for bulk density estimates used in the | |||
| evaluation process of the different materials. |
29
| Criteria JORC Code explanation |
Commentary | ||||
|---|---|---|---|---|---|
| Bed Number | Density | Bed Number | Density | ||
| Bed 1 | 3.03 | Bed 11 | 2.94 | ||
| Bed 2 | 2.94 | Bed 11a | |||
| Bed 3 | 2.94 | Bed 12 | 2.95 | ||
| Bed 3a | 2.93 | Bed 13 | 2.95 | ||
| Bed 4 | 2.93 | Bed 14 | 2.96 | ||
| Bed 5 | 2.98 | Bed 14a | 2.94 | ||
| Bed 6 | 2.96 | Bed 14b | 2.97 | ||
| Bed 7 | 3.02 | Bed 15 | 2.96 | ||
| Bed 8 | 2.94 | Bed 16 | 2.95 | ||
| Bed 9 | 3.01 | Bed 17 | 2.90 | ||
| Bed 10 | 2.95 | Dolomite | 2.86 | ||
| Classification The basis for the classification of the Mineral Resources into varying confidence categories. Whether appropriate account has been taken of all relevant factors (i.e. relative confidence in tonnage/grade estimations, reliability of input data, confidence in continuity of geology and metal values, quality, quantity and distribution of the data). Whether the result appropriately reflects the Competent Person’s view of the deposit. |
The mineral resource for Mount Hutton Central has been classified into Indicated and Measured categories. These categories were based upon the following criteria, strong geological and grade continuity (strata bound and strata form chemical precipitate beds within the Skillogalee Dolomite), the quality of the data and the confidence of the estimation. Cells south of 6626000N are classified as Indicated in line with previous Audit recommendations due to the presence of faulting. Cells to the north of 6626,000N and above the 150RL are classified as Measured. Cells below the 150 RL of the block model are omitted from the Resource Classification. Appropriate account has been taken of all the relevant criteria including data integrity, data quality, geological continuity, data continuity, and magnesia product creation.. The Mineral Resource estimate appropriately reflects the view of the magnesite deposit at Mount Hutton Central by the Competent Person. |
||||
30
| Criteria | JORC Code explanation | Commentary | |
|---|---|---|---|
| Audits | or | The results of any audits or reviews of Mineral Resource estimates. | This estimation has not been audited. it is the fourth estimation for the |
| reviews | Mount Hutton Central Area. No changes have occurred to the data | ||
| set since the first estimation in 1999. The purpose of this report it to | |||
| bring the resource into compliance with JORC 2012. The quality of | |||
| the work and reporting at the time is compliant with JORC 2012 and | |||
| can be reported as such. | |||
| Discussion | of | Where appropriate a statement of the relative accuracy and | The Mineral Resource accuracy is communicated through the |
| relative | confidence level in the Mineral Resource estimate using an approach | classification assigned to this Mineral Resource. |
|
| accuracy/ confidence |
or procedure deemed appropriate by the Competent Person. For example, the application of statistical or geostatistical procedures to quantify the relative accuracy of the resource within stated confidence limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the factors that could affect the relative |
The Mineral Resource estimate has been classified in accordance with the JORC Code 2012 Edition using a qualitative approach. All factors that have been considered have been adequately communicated in Section1 and Section 3 of this Table. |
|
| accuracy and confidence of the estimate. | The statement relates to global estimate of tonnes and grade of | ||
| The statement should specify whether it relates to global or local estimates, and, if local, state the relevant tonnages, which should be |
Magnesium. Grade estimates have been made for each cell of the block model. |
||
| relevant to technical and economic evaluation. Documentation | A 100 tonne trial mining sample showed close correlation to grades |
||
| should include assumptions made and the procedures used. | predicted from drill hole data. No additional production data is | ||
| These statements of relative accuracy and confidence of the | available for Mount Hutton Central. |
||
| estimate should be compared with production data, where available. | Kiln trials are scheduled to confirm refractory potential. |
31
Wireframes used for Mount Hutton Central
==> picture [662 x 442] intentionally omitted <==