ASX ANNOUNCEMENT / MEDIA RELEASE
17[th] July 2012
==> picture [182 x 123] intentionally omitted <==
OUTSTANDING HIGH GRADE GRAPHITE INTERCEPTS CONTINUE IN RESOURCE DRILLING AT CAMPOONA
Highlights
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 14] intentionally omitted <==
-
Resource Drilling at Campoona Shaft has been completed with 28 RC holes drilled for 2,588 drill metres resulting in 50m x 20m sectional drill coverage.
-
The first assays from the Resource Drilling reported outstanding wide high grade graphite intervals including 27m @ 18.5%TGC from 60m in hole CSRC12_041; 20m @ 13.3%TGC from 31m in CSRC12_042; and 28m @ 17.1%TGC from 18m in CSRC12_048.
-
Diamond drill hole CSDD12_003 (drilled at 80[o] on an azimuth of 120[o] ), intersected 82.5m of intense graphite mineralisation from 24m to the end of hole at 106.5m.
-
Diamond drill hole CSDD12_004 drilled 150m south of CSDD12_003 intersected 99m of intense graphite mineralisation from 16m to the end of hole at 115m.
-
Four further diamond drill holes are planned to be completed by mid-August 2012 to provide the metallurgical inputs to support a JORC Measured and Indicated Resource expected in the December 2012 quarter.
-
Further announcements with results from the RC and diamond drilling programme will be made over the coming weeks.
____________
Archer Exploration Limited (“Archer”) advises that the RC component of resource drilling over the Campoona Shaft portion of the Campoona Graphite Deposit has been completed. The Company’s 100% owned Campoona Graphite Project is located approximately 12km north of the township of Cleve on Eyre Peninsula, South Australia.
Drilling in February and again in April 2012 confirmed the presence of a discrete intense graphitic shear zone hosted in lower grade graphitic proto-gneiss. The high grade graphite unit averages from 10m to over 40m in true width with the hangingwall section particularly high grade averaging over 15% graphitic carbon and carrying visible flake.
The latest RC drilling program was designed to drill out the Campoona Shaft portion of the deposit at a 50m x 20m drill nominal spacing to a vertical depth of 100 metres.
Results received to date from the resource drilling program are consistent with the previous exploration programs and reinforce the Ccompany’s confidence in the Campoona Graphite deposit. The intersection 27m @ 18.5%TGC in hole CSRC12_041 is the highest grade intercept recorded in drilling to date at the project.
1
==> picture [342 x 318] intentionally omitted <==
Figure 1. Campoona Shaft interpreted graphite horizons
The first assays results from the RC drilling confirm previous observations regarding the thickness and grade of the graphite mineralisation. Results included:
| Drill Hole CSRC12_041 incl CSRC12_042 incl CSRC12_048 incl CSRC12_050 incl CSRC12_050 CSRC12_053 incl CSRC12_061 incl CSRC12_061 incl |
From To 54 118 60 87 29 75 31 51 11 67 18 46 30 62 33 51 70 81 32 79 61 75 0 29 1 12 75 101 76 85 |
Interval 64 27 46 20 56 28 32 18 11 47 14 29 11 26 9 |
%TGC |
|---|---|---|---|
| 11.8 18.5 9.3 13.3 10.6 17.1 9.3 12.8 8.3 6.7 10.6 9.7 12.2 6.3 9.4 |
2
==> picture [199 x 422] intentionally omitted <==
Figure 2. Campoona Shaft Cross Section showing %TGC assay results for RC holes CSRC12_008 -CSRC12_010 and CSRC12_041. TGC above 15% is coloured magenta. Also shown is the first diamond drill hole trace (CSDD12_003) that is yet to be assayed.
3
==> picture [433 x 152] intentionally omitted <==
Plate1. RC Drilling hole at CSRC12_045
Diamond Drilling
A program of HQ diamond drill holes commenced on 27[th] June 2012 over the Campoona Shaft. Six to eight diamond drill holes are planned in order to provide samples across the length, breadth and depth of the deposit for metallurgical test work. The test work will define the basis of product type and product recovery needed to support JORC Measured and Indicated Resources and JORC Reserves.
==> picture [433 x 166] intentionally omitted <==
Plate 2. Photo showing diamond drilling in progress for hole CSDD12_003
Two diamond drill holes have been completed.
The first diamond drill hole, CSDD12_003, drilled at -80[o] on an azimuth of 120[o] to a depth of 106.5m, intersected intense graphite mineralisation from 24m to the base of the drill hole at 106.5m. The graphite intercept included one small interval of graphitic gneiss. The hole was terminated in graphite due to drilling difficulties.
4
==> picture [357 x 476] intentionally omitted <==
Plate 3. HQ drill core of highly graphitic schist in hole CSDD12_003
5
==> picture [346 x 260] intentionally omitted <==
Plate 4. Drill sump prepared for diamond drill hole CSDD12_003 showing thin overburden overlying intense graphite mineralisation.
==> picture [348 x 261] intentionally omitted <==
Plate 5. Close up of the drill sump for diamond drill hole CSDD12_003 showing massive intense graphite mineralisation.
6
The second diamond drill hole, CSDD12_004, was completed on 16[th] July 2012. The hole was located 150m south of CSDD12_003 and intersected intense graphite mineralisation from 16m to the end of hole at 115m. This hole was terminated as a precautionary measure as it intersected the same pronounced graphitic kaolinised shear that caused the drilling problems in hole CSDD12_003.
The diamond drill program is expected to take a further 3-4 weeks to complete. Progressive announcements will be made as and when results come to hand.
The airborne EM survey commenced but was postponed due to equipment malfunction. The survey is expected to recommence on the 18[th] July 2012 and be completed within 7-10 days.
For further information please contact:
Greg English Chairman Archer Exploration Limited +61 8 82723288
Gerard Anderson Managing Director Archer Exploration Limited +61 8 82723288
The exploration results reported herein, insofar as they relate to mineralisation, are based on information compiled by Mr. Wade Bollenhagen, Exploration Manager of Archer Exploration Limited. Mr. Bollenhagen is a Member of the Australasian Institute of Mining and Metallurgy who has more than eighteen years experience in the field of activity being reported. Mr. Bollenhagen consents to the inclusion in the report of matters based on his information in the form and context in which it appears.
7