Open in viewer

Opens in your device viewer

ASX Announcement

Monthly NdPr and Rare Earth Price Update

15 November 2017

==> picture [78 x 90] intentionally omitted <==

Arafura Resources Limited ( ASX: ARU ) ( Arafura ) is pleased to provide an update on rare earth prices.

The latest pricing information has neodymium-praseodymium (NdPr) oxide FOB China at US$58/kg, a decline of 13% over the past month. Price softening has occurred in recent weeks with traders selling NdPr on the spot market after NdFeB magnet manufacturers had restocked their NdPr inventories in the lead up to the month-long mandated shutdown of rare earth processing operations during October across China.

NdPr is the main product Arafura anticipates producing from its 100%-owned Nolans project and the NdPr price is the key driver of Nolans project economics.

– Figure 1: NdPr Oxide China FOB Pricing and Nolans OPEX[ 1, 2 ]

==> picture [460 x 304] intentionally omitted <==

==> picture [595 x 115] intentionally omitted <==

----- Start of picture text ----- Arafura Resources Limited T : +61 8 6210 7666ABN: 22 080 933 455 W : www.arultd.comE : [email protected]Level 3, 263 Adelaide Terrace, Perth WA 6000PO Box 5773, St Georges Terrace, Perth WA 6831----- End of picture text -----

15 November 2017 | ASX Announcement

Monthly NdPr and Rare Earth Price Update

==> picture [39 x 45] intentionally omitted <==

About NdPr

NdPr is in short supply globally and is the critical raw material in the manufacture of ultra-strong, highperformance NdFeB permanent magnets, which are used extensively in the automotive industry for electric components such as seats, mirrors, wipers, steering and braking.

Importantly, the compound has also emerged as a key enabler of hybrid and electric vehicles as highperformance magnets play a key role in electric traction motors. While traditional petrol or diesel combustion engine motor vehicles each use approximately 0.7 kg of NdPr oxide, electric or hybrid vehicles require an additional 1 kg.

The increasing shift towards hybrid and electric drivetrain technologies among the world’s leading automotive manufacturers is expected to continue to positively influence market fundamentals for NdPr.

The demand for NdPr oxide is expected to grow at 8% per annum to 2025 from current global consumption of 33,340 tonnes.

About Arafura’s Nolans NdPr Project

Arafura’s Nolans NdPr project, located 135 kilometres north-north-west of Alice Springs in Australia’s Northern Territory, is supported by Mineral Resources of 56 million tonnes grading 2.6% total rare earth oxide (TREO) that contain approximately 382,000 tonnes of NdPr oxide. The project is forecast to produce 14,000 tonnes of TREO per annum, including 3,600 tonnes of NdPr oxide per annum, over a 30+ year mine life.

- ENDS -

For further information contact: Media enquiries: Gavin Lockyer Luke Forrestal Managing Director Media and Capital Partners T: +61 8 6210 7666 M: +61 411 479 144

1 Market price information sourced from independent price reporting agency.

2 Refer Arafura Resources ASX release 7 June 2017 for additional and qualifying information on the Mineral Resources that underpin the production target and provides the material assumptions on which the production target is based. Arafura confirms that all material assumptions underpinning the forecast financial information derived from its 14,000 tpa TREO production target and the production target itself, continue to apply and have not materially changed since the 7 June 2017 release.

==> picture [595 x 15] intentionally omitted <==

www.arultd.com

2

15 November 2017 | ASX Announcement

Monthly NdPr and Rare Earth Price Update

==> picture [39 x 45] intentionally omitted <==

Table 1: Mineral Resources for the Nolans Bore deposit as at 7 June 2017 using a 1% TREO Cut-Off Grade.

Resources Tonnes (Millions) Rare Earths TREO % Phosphate P2O5 % NdPr Enrichment %
Measured 4.9 3.2 13 26.1
Indicated 30 2.7 12 26.4
Inferred 21 2.3 10 26.5
Total 56 2.6 11 26.4

Note: Numbers may not compute due to rounding. “NdPr Enrichment” is the proportion of TREO comprising Nd2O3 and Pr6O11.

Competent Persons Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Kelvin Hussey, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Hussey is a full-time employee of Arafura Resources Limited. Mr Hussey has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves. Mr Hussey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

==> picture [595 x 15] intentionally omitted <==

www.arultd.com