Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Alkane Resources Capital/Financing Update 2022

Mar 29, 2022

48579_rns_2022-03-29_b10dc6e6-da77-4af0-87e9-c9b4c4bb4aac.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX and MEDIA RELEASE

30 March 2022

==> picture [150 x 111] intentionally omitted <==

Final Results Received for Boda Resource Drilling Initial Resource Estimation Underway

  • Results have been received from the final ten drill holes of the first stage of resource drilling at Boda. A maiden resource calculation for the central zone of Au-Cu mineralisation at Boda has begun and is expected to be completed in April.

  • The resource drilling has defined Au-Cu mineralisation centred around a 500m by 300m vertically extensive intrusive monzodiorite breccia stock, within a larger mineralised alteration zone. The north-westernmost drilling traverse has defined a bornite cemented breccia suggesting the system plunges and remains open to the north-west and at depth.

  • Recent assays from the north-western traverse that intersected a bornite cemented breccia include:

BOD080 361m grading 0.27g/t Au, 0.15% Cu from 719.7m incl 36m grading 0.72g/t Au, 0.40% Cu from 878m incl 7m grading 1.44g/t Au, 0.63% Cu from 880m also 2m grading 1.01g/t Au, 1.92% Cu from 911m also 5m grading 1.74g/t Au, 0.12% Cu from 1025m

  • KSRC040D 210.8m grading 0.28g/t Au, 0.14% Cu from 612m incl 6.3m grading 2.35g/t Au, 0.35% Cu from 645.7m

  • Other significant assays from the initial completed Boda resource drilling include:

  • BOD072 2m grading 4.51g/t Au, 0.13% Cu from 179m and 529m grading 0.31g/t Au, 0.04% Cu from 334m (gold flanking zone) incl 1m grading 8.45g/t Au, 0.06% Cu from 557m also 4m grading 2.77g/t Au, 0.19% Cu from 825m and 11m grading 0.23g/t Au, 0.16% Cu from 1014m and 19.7m grading 0.23g/t Au, 0.15% Cu from 1238m BOD077 664m grading 0.23g/t Au, 0.11% Cu from surface incl 163m grading 0.30g/t Au, 0.05% Cu from surface (gold flanking zone) also 30m grading 0.54g/t Au, 0.16% Cu from 506m

  • Initial broad spaced drilling of approximately 30,000m of the extensive mineralisation at Boda Two/Three is also complete. Further drilling, targeting zones of high grade breccia mineralisation will commence once the current drilling results have been received in Q2 2022.

CONTACT INVESTORS MEDIA

  • : NIC EARNER, MANAGING DIRECTOR, ALKANE RESOURCES LTD, TEL +61 8 9227 5677

  • : NATALIE CHAPMAN, CORPORATE COMMUNICATIONS MANAGER, TEL +61 418 642 556

: PAUL RYAN, CITADEL-MAGNUS, TEL +61 409 296 511

Level 4, 66 Kings Park Rd, West Perth WA 6005, AUSTRALIA (PO Box 768, West Perth WA 6872, AUSTRALIA) Telephone: +61 8 9227 5677 Facsimile: +61 8 9227 8178 www.alkane.com.au [email protected]

==> picture [57 x 27] intentionally omitted <==

  • Two RC drilling rigs have completed approximately 8,000m of a 13,000m drilling program at Kaiser-Duke, using a 100m x 100m drill hole grid sequence to 300m vertical depth for the purpose of a separate initial resource estimate of the near-surface material.

  • Induced Polarisation (IP) with Magnetotellurics (MT) survey has been completed over the north-west structural corridor area, extending 5km north-west of Kaiser. Results are expected next month.

Alkane Resources Limited (ASX: ALK) announces the final set of results from its initial resource drilling program at the Company’s Boda Prospect in Central New South Wales. Boda is a landmark porphyry gold-copper system, within the Northern Molong Porphyry Project, which the Company believes has the potential to be a large, tier one gold-copper project.

Alkane also operates the nearby Tomingley Gold Operations (‘Tomingley’).

Alkane Managing Director, Nic Earner, said: “The completion of the resource drilling program is a major milestone for us as we consider our options for Boda.

“We have a significant volume of data to work with, which will allow us to finalise the initial Boda resource in April.

“We are also well advanced in a shallower drilling program at Kaiser-Duke that may enable an initial resource to be confirmed there.

“Alkane is planning further drilling in the northwest corridor of the Boda-Kaiser-Duke complex and will also be targeting higher grade zones at Boda Two and Three, once we receive our latest results. We look forward to discussing the initial Boda resource with investors shortly.”

2/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

Northern Molong Porphyry Project (NMPP) Alkane Resources Ltd 100%

The Project is located in central west NSW at the northern end of the Molong Volcanic Belt of the Macquarie Arc and is considered highly prospective for large scale porphyry and epithermal gold-copper deposits.

Exploration in the NMPP has identified five discrete magnetic/intrusive complexes – Kaiser, Boda, Comobella, Driell Creek and Finns Crossing – within a 15km northwest trending corridor. The corridor is defined by intermediate intrusives, lavas and breccias, extensive alteration and widespread, low-grade,

gold-copper mineralisation.

==> picture [443 x 444] intentionally omitted <==

A major RC and diamond core drilling program commenced in July 2020, designed to test the dimensions and extensions to the large low-grade mineralised envelope as well as any internal high-grade zones at Boda. In addition, the drill program is testing other known gold-copper mineralisation occurrences and co-incident IP anomalies within the 15 km monzonite intrusive corridor that extends from Boda Three to Finns Crossing.

Assays were received from the drilling designed to assist with the estimating a maiden resource at Boda, comprising the final three RC drill holes and seven diamond core drill holes for a total of 7,133 metres.

3/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

Boda Prospect

The Boda gold-copper porphyry system is a series of near vertical, northwest striking, intrusive related breccias hosted within a thick sequence of shallowly east dipping andesite lavas. These magmatic breccias tend to hydrothermal with a matrix comprising of calcite-quartz ± actinolite ± magnetite ± chalcopyrite ± pyrite, zoning to higher gold-copper grade when associated with a chalcopyrite ± pyrite dominant cement.

Drilling was recently completed testing the higher-grade, northwest trending mineralisation at Boda with 50m spaced southwest orientated drilling traverses with nominal 100m spaced drill holes. The drilling has defined gold-copper mineralisation centred over a 500m by 300m vertically extensive intrusive monzodiorite breccia stock, within a larger mineralised alteration zone. Assay results were recently received for three RC drill holes (918 metres) and seven diamond core drill holes including a diamond tail of previously announced KSRC040 (6,215 metres) for a total of 7,133 metres. Significant intercepts from the drilling include:

BOD072 2m grading 4.51g/t Au, 0.13% Cu from 179m and 529m grading 0.31g/t Au, 0.04% Cu from 334m (gold flanking zone) incl 1m grading 8.45g/t Au, 0.06% Cu from 557m also 4m grading 2.77g/t Au, 0.19% Cu from 825m and 11m grading 0.23g/t Au, 0.16% Cu from 1014m and 19.7m grading 0.23g/t Au, 0.15% Cu from 1238m BOD076 114m grading 0.33g/t Au, 0.12% Cu from 337m incl 19m grading 0.91g/t Au, 0.24% Cu from 342m incl 3.2m grading 2.22g/t Au, 0.46% Cu from 351.8m and 11m grading 0.20g/t Au, 0.11% Cu from 667m and 32m grading 0.38g/t Au, 0.17% Cu from 785m BOD077 664m grading 0.23g/t Au, 0.11% Cu from surface incl 163m grading 0.30g/t Au, 0.05% Cu from surface (gold flanking zone) also 2m grading 0.61g/t Au, 1.00% Cu from 229m also 2.2m grading 0.78g/t Au, 1.06% Cu from 393.8m also 30m grading 0.54g/t Au, 0.16% Cu from 506m BOD081 53m grading 0.29g/t Au, 0.09% Cu from 256m incl 2m grading 1.35g/t Au, 0.23% Cu from 272m and 143m grading 0.24g/t Au, 0.18% Cu from 365m incl 25m grading 0.61g/t Au, 0.42% Cu from 467m and 118m grading 0.21g/t Au, 0.10% Cu from 562m and 122.8m grading 0.16g/t Au, 0.16% Cu from 790m BOD082 313m grading 0.20g/t Au, 0.10% Cu from surface and 14m grading 0.56g/t Au, 0.21% Cu from 387m and 15m grading 2.09g/t Au, 0.11% Cu from 460m incl 2.6m grading 12.0g/t Au, 0.66% Cu from 471.4m and 23m grading 0.25g/t Au, 0.08% Cu from 652m and 10.2m grading 0.41g/t Au, 0.13% Cu from 744m BOD088 66m grading 0.51g/t Au, 0.37% Cu from 157m incl 4m grading 1.37g/t Au, 2.17% Cu from 172m

4/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

At least four mineralised intrusive breccias had been identified central to the Boda system. A fifth intrusive breccia, together with a bornite component to its cement, was recently intersected by drilling on the north-westernmost section of the resource drill out (see drill section attached). Drill holes BOD080 and a diamond tail of RC drill hole KSRC040 both intersected the bornite cemented breccia (see photograph following) with significant results of:

BOD080 71m grading 0.22g/t Au from 2m (gold only flanking zone) and 2m grading 0.49g/t Au, 0.05% Cu from 166m and 17m grading 0.18/t Au, 0.11% Cu from 175m and 10m grading 0.25g/t Au, 0.17% Cu from 219m and 35m grading 0.35g/t Au, 0.09% Cu from 242m incl 1m grading 5.18g/t Au, 0.26% Cu from 253m and 361m grading 0.27g/t Au, 0.15% Cu from 719.7m incl 1m grading 9.21g/t Au, 0.06% Cu from 815m also 36m grading 0.72g/t Au, 0.40% Cu from 878m incl 7m grading 1.44g/t Au, 0.63% Cu from 880m also 2m grading 1.01g/t Au, 1.92% Cu from 911m also 5m grading 1.74g/t Au, 0.12% Cu from 1025m

KSRC040D 210.8m grading 0.28g/t Au, 0.14% Cu from 612m incl 6.3m grading 2.35g/t Au, 0.35% Cu from 645.7m

==> picture [333 x 346] intentionally omitted <==

BOD080 – 2m grading 1.01g/t Au, 1.92% Cu from 911m within a zone of 36m grading 0.72g/t Au, 0.40% Cu from 878m – Bornite-chalcopyrite cemented breccia of calc-potassic altered volcanics.

5/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

The recent identification of bornite within a newly defined sulphide cemented breccia intersected on the north-western edge of the drilling infers the Boda system remains open down plunge to the north-west. Step out drilling is underway between the Korridor prospect (200m to the northwest) and the Boda prospect, including re-entry of existing RC holes that may have drilled over the inferred north-westerly plunge of the Boda mineralisation.

The maiden resource calculation for Boda is underway and expected to be announced in April 2022.

Planned Exploration Programs

The Duke Zone within the Kaiser Prospect is estimated from drilling to be approximately 250m wide and striking over 800m. 13,000 metres of RC drilling using a nominal 100m x 100m drill hole grid sequence to a 300m vertical depth commenced in January for the purpose of estimating a shallow resource. Approximately 8,000 metres of drilling is now completed, and the first batch of assays are expected in April.

The initial phase of widely spaced drilling for approximately 30,000m has been completed at Boda Two and Three and demonstrates many encouraging similarities to Boda, including the existence of low-grade gold-copper mineralised breccias that may zone to high grading intervals as defined at Boda. Processing and sampling of core has commenced and when results are received (approximately 2 – 3 months), a geological review will commence with the purpose of targeting higher grade zones for a second phase of drilling in the second half of 2022.

Drilling at the Korridor prospect comprising of five drill holes for a total of approximately 2,900m has been sampled and final assay results are expected in April/May.

Other exploration is focused on delineating additional intrusive and mineralising centres within the 15km long northwest corridor from Boda Three to Finns Crossing. Induced Polarisation (IP) and Magnetotellurics (MT) geophysical surveys are completed northwest of Kaiser within a 5km section of the northwest structural corridor that includes the Driell Creek Magnetic Complex. Additionally, a drone aero-magnetic survey has commenced over a similar area to improve the structural interpretation of the Boda corridor. Results from both these surveys are expected in April.

6/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

==> picture [466 x 685] intentionally omitted <==

==> picture [24 x 10] intentionally omitted <==

----- Start of picture text -----

7/20
----- End of picture text -----

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

==> picture [426 x 627] intentionally omitted <==

8/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

==> picture [466 x 684] intentionally omitted <==

9/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

Table 1 – Boda Drilling Significant Results – March 2022 (>0.2g/t Au and/or >0.1% Cu)

Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu)
Hole ID Easting Northing RL Dip Azimuth Total Interval Interval Intercept Au Cu
(MGA) (MGA) (Grid) Depth From (m) To (m) (m) (g/t) (%)
BOD072 690337 6411472 483 -61 227 1257.7 179 181 2 4.51 0.13
and 225 230 5 0.31 -
and 334 863 529 0.31 0.04
incl 557 558 1 8.45 0.06
also 607 653 46 0.65 -
also 825 829 4 2.77 0.19
and 891 896 5 0.23 0.05
and 931 937 6 0.25 0.11
and 965 991 26 0.14 0.10
and 1014 1025 11 0.23 0.16
and 1069 1074 5 0.15 0.14
and 1091 1133 42 0.10 0.10
and 1149 1184 35 0.12 0.10
and 1238 1257.7 19.7 0.23 0.15
BOD076 690540 6411248 489 -61 228 879.8 15 16 1 0.81 -
and 337 451 114 0.33 0.12
incl 342 361 19 0.91 0.24
incl 351.8 355 3.2 2.22 0.46
and 504 517 13 0.09 0.11
and 525 527 2 0.26 0.14
and 634 653 19 0.14 0.10
and 667 678 11 0.20 0.11
and 687 690 3 0.34 0.09
and 785 817 32 0.38 0.17
BOD077 690443 6411093 486 -60 230 741.8 0 664 664 0.23 0.11
incl 0 163 163 0.30 0.05
also 229 231 2 0.61 1.00
also 393.8 396 2.2 0.78 1.06
also 506 536 30 0.54 0.16
BOD080 690186 6411330 479 -61 228 1080.8 2 73 71 0.22 -
and 129 131 2 0.28 0.08
and 166 168 2 0.49 0.05
and 175 192 17 0.18 0.11
and 219 229 10 0.25 0.17
and 242 277 35 0.35 0.09
incl 253 254 1 5.18 0.26
and 719.7 1080.8 361.1 0.27 0.15
incl 815 816 1 9.21 0.06
also 878 916 36 0.72 0.40
incl 880 887 7 1.44 0.63
also 911 913 2 1.01 1.92
also 1025 1030 5 1.74 0.12
BOD081 690574 6411146 488 -61 228 912.8 189 195 6 0.23 -
and 256 309 53 0.29 0.09

10/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

Table 1 – Boda Drilling Significant Results – March 2022 (>0.2g/t Au and/or >0.1% Cu)

Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu) Table 1 – Boda Drilling Significant Results – March 2022(>0.2g/t Au and/or >0.1% Cu)
Hole ID Easting Northing RL Dip Azimuth Total Interval Interval Intercept Au Cu
(MGA) (MGA) (Grid) Depth From (m) To (m) (m) (g/t) (%)
incl 272 274 2 1.35 0.23
and 365 508 143 0.24 0.18
incl 467 25 0.61 0.42
and 562 680 118 0.21 0.10
and 717 719 2 0.80 0.24
and 750 773 23 0.21 0.05
and 790 912.8 122.8 0.16 0.16
BOD082 690442 6410964 484 -61 228 759.3 19 332 313 0.20 0.10
and 387 401 14 0.56 0.21
incl 387 388 1 3.92 0.09
also 398 401 3 0.79 0.66
and 460 475 15 2.09 0.11
incl 471.4 474 2.6 12.0 0.66
and 528 529 1 2.12 -
and 621 627 6 0.17 0.21
and 642 646 4 0.14 0.17
and 652 675 23 0.25 0.08
incl 667 669 2 1.25 0.16
and 744 754.2 10.2 0.41 0.13
BOD083 690110 6411133 477 -60 231 304 3 13 10 0.30 -
and 44 47 3 0.20 0.05
and 139 140 1 0.36 -
BOD087 690246 6410983 480 -60 229 274 8 18 10 0.18 0.10
and 25 69 44 0.25 0.10
incl 32 46 14 0.50 0.15
and 94 100 6 0.24 0.09
and 133 273 140 0.14 0.17
BOD088 690333 6410860 483 -60 229 340 69 76 7 0.09 0.11
and 157 223 66 0.51 0.37
incl 172 194 22 0.78 0.81
incl 172 176 4 1.37 2.17
and 246 259 13 0.06 0.16
and 292 300 8 0.17 0.11
KSRC040D 690043 6411205 476 -66 225 822.8 612 822.8 210.8 0.28 0.14
incl 645.7 652 6.3 2.35 0.35
also 766 776 10 0.40 0.26
also 800 821 21 0.43 0.22

Gold and copper intercepts are calculated using a lower cut of 0.1g/t Au and 0.05% Cu respectively. Internal dilution (< cut off) is less than 16% of reported intercepts. True widths are estimated as approximately 50% of intersected width.

11/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [57 x 27] intentionally omitted <==

Competent Person

Unless otherwise advised above or in the Announcements referenced, the information in this report that relates to exploration results, mineral resources and ore reserves is based on information compiled by Mr David Meates, MAIG, (Exploration Manager NSW) who has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Meates consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Previous Information

The information in this report that relates to exploration results is extracted from the Company’s ASX announcements noted in the text of the announcement and are available to view on the Company’s website. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original announcements and that the form and context in which the Competent Person’s findings are presented have not been materially altered.

Disclaimer

This report contains certain forward looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed or implied by these forward looking statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities.

This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geoscientists.

This document has been authorised for release to the market by Nic Earner, Managing Director.

ABOUT ALKANE ‐ www.alkane.com.auASX: ALK

Alkane Resources is poised to become Australia’s next multi-mine gold producer.

The Company’s current gold production is from the Tomingley Gold Operations in Central West New South Wales, where it has been operating since 2014 and is currently expediting a development pathway to extend the mine’s life beyond 2030.

Alkane has an enviable exploration track record and controls several highly prospective gold and copper tenements. Its most advanced exploration projects are in the tenement area between Tomingley and Peak Hill, which have the potential to provide additional ore for Tomingley’s operations.

Alkane’s exploration success includes the landmark porphyry gold-copper mineralisation discovery at Boda in 2019. With a major drill program ongoing at Boda, Alkane is confident of further consolidating Central West New South Wales’ reputation as a significant gold production region.

Alkane’s gold interests extend throughout Australia, with strategic investments in other gold exploration and aspiring mining companies, including ~9.7% of Calidus Resources (ASX: CAI).

==> picture [251 x 370] intentionally omitted <==

12/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [58 x 26] intentionally omitted <==

The following tables are provided to ensure compliance with the JORC Code (2012) edition requirements for the reporting of exploration results.

JORC Code, 2012 Edition – Table 1 NORTHERN MOLONG PORPHYRY PROJECT – March 2022 Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.

Diamond core drilling was undertaken by Ophir Drilling Pty Ltd

DD sample intervals were defined by geologist during logging to honour geological
boundaries, cut in half by diamond saw, with half core sent to ALS Laboratories

RC drilling was undertaken by Strike Drilling Pty Ltd

RC samples are collected at one metre intervals via a cyclone on the rig. The cyclone
is cleaned regularly to minimise any contamination

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.

Sampling and QAQC procedures are carried out using Alkane protocols as per industry
best practice

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.

Core was laid out in suitably labelled core trays. A core marker (core block) was placed
at the end of each drilled run (nominally 3m) and labelled with the hole number, down
hole depth, length of drill run. Core was aligned and measured by tape, comparing
back to this down hole depth consistent with industry standards. Half core is sampled
with a Corewise automatic core saw.

RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic
bag which is retained for future use if required. A sub-sample of approximately 1kg is
spear sampled from each plastic bag and composited to make a 3 metres sample
interval. If strong mineralisation is observed by the site geologist this is sampled as a
final 1m interval instead. The 1m intervals forming composite samples assaying ≥0.10
g/t Au or ≥0.10 % Cu are re-split using a cone splitter on the rig into a separate calico
at the time of drilling and re-submitted to the laboratory for re-assay.

Gold was determined by fire assay fusion of a 50g charge with an AAS analytical finish

A multi-element suite was determined using a multi-acid digest with a ICP Atomic
Emission Spectrometry or ICP Mass Spectrometry analytical finish.
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).

Reverse circulation (RC) drilling using 110mm rods 144mm face sampling hammer

Triple tube diamond drilling with PQ3/HQ3 wireline bit producing 83mm diameter (PQ3) and
61.1mm diameter (HQ3) sized orientated core. The wedge holes were completed using NQ3
wireline bit producing 45mm diameter sized orientated core.

13/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation Commentary
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.

DD - core loss was identified by drillers and calculated by geologists when logging.
Generally ≥99% was recovered with any loss usually in portions of the oxide zone.

Triple tube coring was used at all times to maximise core recovery with larger diameter
(PQ3) core or RC precollars used in the oxide zones.

RC sample quality is assessed by the sampler by visual approximation of sample
recovery and if the sample is dry, damp or wet.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Sample quality is qualitatively logged

Core drilling completed using HQ triple tube where possible to maximise core recovery.

A high capacity RC rig was used to enable dry samples collected. Drill cyclone is
cleaned between rod changes and after each hole to minimise cross-hole
contamination.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.

There is no known relationship between sample recovery and grade
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Each one metre interval is geologically logged for characteristics such as lithology,
weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage)

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography

Mostly logging was qualitative with visual estimates of the various characteristics. In
addition, magnetic susceptibility data (quantitative) was collected as an aid for logging

All drill holes were geologically logged into Geobank Mobile, followed by validation
before importing into Alkane’s central Geobank database

All drill holes were logged by qualified and experienced geologists

The total length and percentage of the relevant intersections logged

All drill holes were logged in full
Sub-sampling
techniques
and sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

Core sawn with half core samples submitted for analysis

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.

Each one metre interval is spear sampled with 3m composite samples collected in a
calico sample bag and forwarded to the laboratory. Where strong mineralisation is
observed by the site geologist, instead of compositing, this is individually sampled
from the cone splitter on the RC rig as a 1 metre interval into a calico bag and
forwarded to the laboratory.

The 1m intervals forming composite samples assaying ≥0.10 g/t Au or ≥0.10 % Cu are
resplit using a cone splitter on the rig during the time of drilling and re-submitted to the

14/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation Commentary
laboratory for re-assay.

Laboratory Preparation – the entire sample (~3kg) is dried and pulverised in an LM5
(or equivalent) to ≥85% passing 75µm. Bulk rejects for all samples are discarded. A
pulp sample (±100g) is stored for future reference.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Samples were delivered by Alkane personnel to ALS Minerals Laboratory, Orange
NSW. Crushed with 70% <2mm (ALS code CRU-31), split by riffle splitter (ALS code
SPL-21), and pulverised 1000grm to 85% <75um (ALS code PUL-32). Crushers and
pulverisers are washed with QAQC tests undertaken (ALS codes CRU-QC, PUL-QC).

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples

Internal QAQC system in place to determine accuracy and precision of assays

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling

Non-biased core cutting using an orientation line marked on the core

Duplicate RC samples are collected for both composite intervals and re-split intervals.

Whether sample sizes are appropriate to the grain size of the material being sampled.

Sample are of appropriate size
Quality of
assay data
and
laboratory
tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.

All samples were analysed by ALS Minerals

Gold is determined using a 50g charge fused at approximately 1100°C with alkaline
fluxes, including lead oxide. The resultant prill is dissolved in aqua regia with gold
determined by flame AAS.

Other geochemical elements, samples are digested by near-total mixed acid digest with
each element determined by ICP Atomic Emission Spectrometry or ICP Mass
Spectrometry. RC samples that are re-split are digested by aqua regia with a ICP
Atomic Emission Spectrometry for Cu only

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

No geophysical tools were used to determine any element concentrations

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.

Full QAQC system in place including certified standards and blanks of appropriate
matrix and concentration levels
Verification
of sampling

The verification of significant intersections by either independent or alternative
company personnel.

Drill data is compiled, collated, and reviewed by senior staff. External consultants do not
routinely verify exploration data until resource estimation procedures are deemed
necessary

15/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation Commentary
and assaying
The use of twinned holes.

No twinned holes have been drilled at this early stage of exploration

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.

All drill hole logging and sampling data is entered directly into Geobank Mobile in the field
for validation, transfer, and storage into Geobank database with verification protocols in
place

All primary assay data is received from the laboratory as electronic data files which are
imported into sampling database with verification procedures in place. QAQC analysis
is undertaken for each laboratory report

Discuss any adjustment to assay data.

No adjustments made
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.

Drillholes are laid out using hand-held GPS (accuracy ±2m) then DGPS surveyed
accurately (± 0.1m) by licenced surveyors on completion

Specification of the grid system used.

GDA94, MGA (Zone 55)

Quality and adequacy of topographic control.

Drillhole collars DGPS surveyed accurately (± 0.1m) by licenced surveyors on
completion
Data spacing
and
distribution

Data spacing for reporting of Exploration Results..

At Boda drill spacing is on nominal 100m x 50m grid. For all other prospects too early
an exploration stage, and the data spacing is variable with focus on identifying new
zones of mineralisation.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied

No Mineral Resource estimation procedure and classifications apply to the exploration
data being reported.

Whether sample compositing has been applied

RC – each one metre interval is spear sampled with 3m composite samples collected in
a calico sample bag and forwarded to the laboratory. Where strong mineralisation is
observed by the site geologist, instead of compositing, this is individually sampled from
the cone splitter on the RC rig as a 1 metre interval into a calico bag and forwarded to
the laboratory.
The 1m intervals forming composite samples assaying ≥0.10 g/t Au or ≥0.10 % Cu are
re-split using a cone splitter on the rig during the time of drilling and re-submitted to the
laboratory for re-assay. Composite samples may be reported if re-split assays were not
received in time for announcement.

DD – Sample intervals are based on alteration and lithology but ingeneral are 1m. No

16/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation Commentary
interval was less than 0.3m or greater than 1.3m.
Orientation of
data in
relation to
geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.

Drilling suggests a broadly sub vertical geometry

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material

Estimated true intervals are ~50% of downhole lengths
Sample
security

The measures taken to ensure sample security.

All samples are bagged into tied calico bags, before being grouped into polyweave
bags and transported ~1hr to ALS Minerals Laboratory in Orange by Alkane personnel.
All sample submissions are documented via ALS tracking system with results reported
via email
Sample pulps are returned to site and stored for an appropriate length of time
(minimum 3 years).
The Company has in place protocols to ensure data security.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.

No audits or reviews have been conducted at this stage

17/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [58 x 26] intentionally omitted <==

Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
Geology

Deposit type, geological setting and style of mineralisation.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
Geology

Deposit type, geological setting and style of mineralisation.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
Geology

Deposit type, geological setting and style of mineralisation.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

All four licences (EL4022, EL6209, EL8261 and EL8887) in the Northern Molong
Porphyry Project are owned 100% by Alkane.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.

All exploration licences are in good standing. EL4022 expires on 13 August 2026.
EL6209 expires on 11 March 2023. EL8887 expires on 6 February 2026. EL8261
expires on 30 April 2023.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.

Significant historical drilling activity has been conducted within the bounds of EL4022.
BODA PROSPECT: CRA Exploration/Rio Tinto completed a small IP survey and
several reconnaissance RC holes in the Boda Prospect area in 1995. The results
identified sporadic, shallow low-grade intervals of gold mineralisation hosted within a
sequence of monzonites, diorites and intermediate volcanics. Sampling was
performed by collecting spear composites from 3m drill runs, assayed by aqua regia
digest and fire assay-AAS and ICP finishes.
Amax Mining Inc/Woodsreef Mines grid sampled the residual soil profile and analysed
for Cu, Pb and Zn. A coherent +250 ppm Cu soil anomaly was outlined with a strike
length of over 1000m and a maximum of 1.25% Cu, in the -80-mesh sieve fraction.
Grid based rock chip sampling produced up to 5.4% Cu and 42ppm Au.
KAISER PROSPECT: Under-reporting of historical exploration drill results from the
Kaiser Prospect is suggested by preliminary metallurgical test work by previous
explorers and is supported by a drill hole (KSRC001) completed by Alkane. This can
be partly explained by the partial digests and analogue equipment commonly used in
the 1970s.
EL6209 (Kaiser) historical records show 14 AC (170m), 78 RC (7591m) and 45 DD
holes (7833m) = 15,594m.
Geology
Deposit type, geological setting and style of mineralisation.

The area is located at the northern extent of the Molong Volcanic Belt, a geological
region considered highly prospective for and host to several economically important
examples of porphyry Au-Cu mineralisation e.g. Cadia Valley alkalic porphyry cluster.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.

See body of announcement

18/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation Commentary

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.

All drill holes have been reported in this announcement.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.

Exploration results reported for uncut gold grades, grades calculated by length
weighted average

Where aggregate intercepts incorporate short lengths of high-grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

Reported intercepts are calculated using a broad lower cut of 0.1g/t Au and/or 0.05%
Cu although grades lower than this may be present internally (internal dilution).
Internal dilution can be significant because of the type of bulk mining techniques used
to extract this style of mineralisation but are limited to <16% for the purpose of
calculation.
No top cut has been used.
Short intervals of high grades that have a material impact on overall intersection are
reported as separate (included) intervals
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).

It is apparent on the sections and the report descriptions that the overall geometry of
the porphyry mineralisation at Boda prospect is subvertical.
True intervals are likely to be ~50% of downhole lengths
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.

Plans showing geology with drill collars are included in the body of the announcement.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.

Comprehensive reporting has been undertaken with all holes listed in the included
table.
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.

Recently completed downhole EM was a trial and results were not considered
meaningful enough to assist interpretation. Further trialling of downhole EM is planned
and any material response will be reported.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).

It is recommended that further drilling is undertaken at Boda and Kaiser prospects to
define their resource potential. Other drilling targeting Boda Two and Three and the
Korridor prospects will be undertaken within the Project. Regional exploration
comprising of IP, MT and soilgeochemistry surveys are alsoplanned.

19/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation Commentary

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive

See figures included in the announcement.

20/20

Alkane Resources Ltd – Northern Molong Porphyry Drilling – 30 March 2022