Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Alkane Resources Capital/Financing Update 2018

Oct 7, 2018

48579_rns_2018-10-07_78012ede-9b86-418b-97e5-315b7b7741d4.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX and MEDIA RELEASE

8 October 2018

==> picture [150 x 111] intentionally omitted <==

Tomingley Resource and Reserve Statements FY18

  • Mineral Resources and Ore Reserves for the Tomingley Gold Operations have been reestimated to account for depletion, increased geological knowledge with depth and actual operating costs and conditions:

  • Total Mineral Resources

    • 6.78Mt grading 1.5g/t Au (437,000oz)
  • Total Ore Reserves 2.21Mt grading 1.8g/t Au (144,000oz)

  • Total Ore Reserves includes the Underground Reserve

  • Underground Ore Reserves 0.73Mt grading 3.1g/t Au (74,000oz)

  • FY18 gave another strong operating performance with 78,533 ounces of gold produced for A$128.8 million revenue at an all in sustaining cost (AISC) of A$1,002 per ounce.

  • TGO FY18 operating pre-tax cash flow after development costs was A$39.7 million.

  • Due to the completion of open cut mining in Q3 FY19, guidance for FY19 is production of 30,000 to 35,000 ounces of gold at an AISC of A$1,300 to A$1,400 per ounce. Included in this is budgeted expenditure of $5M on rehabilitation.

  • Development of underground operation at Wyoming One approved 24 September. First ore release from the development is anticipated Q1FY20.

  • Regional near-mine exploration program continued between Tomingley and Peak Hill with a number of targets identified and follow up drilling is about to commence.

  • A review of the potential of underground resource at Peak Hill is in progress with follow up drilling planned for the coming months.

: HILL KNOWLTON STRATEGIES, CONTACT: IAN WESTBROOK, TEL +61 2 9286 1225 OR +61 407 958 137

CONTACT INVESTORS MEDIA

: NIC EARNER, MANAGING DIRECTOR, ALKANE RESOURCES LTD, TEL +61 8 9227 5677 : NATALIE CHAPMAN, CORPORATE COMMUNICATIONS MANAGER, TEL +61 418 642 556

Ground Floor, 89 Burswood Road, Burswood WA 6100, AUSTRALIA (PO Box 4384, Victoria Park WA 6979, AUSTRALIA) Telephone: +61 8 9227 5677 Facsimile: +61 8 9227 8178 www.alkane.com.au [email protected]

==> picture [57 x 26] intentionally omitted <==

Mineral Resource and Ore Reserve Estimates as at 30 June 2018

The Company reports Ore Reserves and Mineral Resources for the Tomingley Gold Operations as at 30 June 2018 in accordance with the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012).

The TGO has been operating since January 2014 and consequently the geology, mineralisation style, metallurgy, recovery, mining parameters and modifying factors have previously been well documented and reported. To ensure the resources have ‘reasonable prospects of eventual economic extraction’ the open pittable resources have been restricted by an indicative optimistic pit shell estimated at a gold price of $2000 per ounce with the potential open pittable component assessed at ≥0.5g/t gold cut off. The underground resource is restricted to material below the current final pit design, below the highest Stope level currently designed, with potential for eventual extraction by underground mining methods assessed at ≥2.5g/t gold

These estimates take into account ore depleted by mining during the 2018 financial year and are set out in the tables below.

Mineral Resources

TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018)
DEPOSIT MEASURED INDICATED INFERRED TOTAL Total Gold
Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade
(Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz)
Open Pittable Resource s (cut off 0.50g/t Au)
Wyoming One 410 1.6 991 1.7 137 0.7 1,538 1.6 79
Wyoming Three 86 2.0 16 1.3 33 1.4 135 1.7 8
Caloma 895 1.6 1,016 1.2 824 1.2 2,735 1.3 116
Caloma Tw o 71 2.1 824 1.98 26 1.4 921 2.0 59
Sub Total 1,462 1.6 2,847 1.73 1,020 1.3 5,329 1.5 262
Underground Resource s (cut off 2.50g/t Au)
Wyoming One 0 0.0 866 4.0 110 3.2 976 3.9 122
Wyoming Three 10 3.6 6 3.1 4 3.1 20 3.4 2
Caloma 82 3.8 35 3.4 47 3.0 164 3.5 18
Caloma Tw o - 0.0 218 3.6 76 3.2 294 3.5 33
Sub Total 92 3.6 1,125 3.9 237 3.2 1,454 3.7 175
TOTAL 1,554 1.8 3,972 1.9 1,257 1.7 6,783 1.8 437

Apparent arithmetic inconsistencies are due to rounding

These Mineral Resources are wholly inclusive of Ore Reserves.

Full details are given in Appendix 1 (Table1, Sections 1-3; JORC 2012).

Ore Reserves

As with the Mineral Resource estimates, the Ore Reserves take into account ore depleted by mining during the 2018 financial year and are set out in the tables below. A block cut-off grade of 0.5g/t Au has been applied to the resource block model in calculating this Ore Reserve. The cut has been selected with consideration to mine ability, and incremental cash operating margins (i.e. processing costs). The cut-off has been calculated based upon,

  • a $1550 per ounce gold price excluding royalties,

  • using process recoveries based on actual achieved for the past reporting year, and

  • estimated processing and administration costs for the life of mine plan, based upon achieved costs for the past financial year.

2/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [57 x 26] intentionally omitted <==

TOMINGLEY GOLD OPERATIONS ORE RESERVES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS ORE RESERVES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS ORE RESERVES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS ORE RESERVES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS ORE RESERVES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS ORE RESERVES(as at 30 June 2018) TOMINGLEY GOLD OPERATIONS ORE RESERVES(as at 30 June 2018)
DEPOSIT PROVED PROBABLE TOTAL Total Gold
Tonnage Grade Tonnage Grade Tonnage Grade
(Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz)
Open Pittable Reserves (cut off 0.50g/t Au)
Wyoming One 193 1.7 4 2.3 197 1.7 11
Wyoming Three 0 0.0 0 0.0 0 0.0 0
Caloma 0 0.0 0 0.0 0 0.0 0
Caloma Tw o 18 1.8 2 1.5 20 1.8 20
Stockpiles 1,257 1.0 0 0 1,257 1.0 39
Sub Total 211 1.6 6 1.7 1,474 1.5 70
Underground Reserves (cut off 2.50g/t Au)
TGO underground 45 2.7 688 3.2 732 3.1 74
Sub Total 45 2.7 688 3.2 732 3.1 74
TOTAL 256 1.8 694 1.9 2,206 1.8 144

Apparent arithmetic inconsistencies are due to rounding

Full details are given in Appendix 2 (Table1, Section 4; JORC 2012). The Underground Reserves* were advised in the ASX Announcements of 4 and 11 June 2018.

Underground Resources and Reserves

A revised estimate of underground resources and reserves was completed in the year to take in to account additional sub-pit core drilling. This study was reported (ASX Announcements 4 and 11 June 2018) and is incorporated into the above tables.

Approval for the underground development was advised in the ASX Announcement 24 September 2018 and first ore release is anticipated Q1FY20.

The tables below compares the Mineral Resources and Ore Reserves year on year with 2017 as per the current reporting requirements.

Comparison of 2016 / 2017 TGO Mineral Resources and Ore Reserves

TGO COMPARATIVE TOTAL OPEN PIT RESOURCES TGO COMPARATIVE TOTAL OPEN PIT RESOURCES TGO COMPARATIVE TOTAL OPEN PIT RESOURCES TGO COMPARATIVE TOTAL OPEN PIT RESOURCES TGO COMPARATIVE TOTAL OPEN PIT RESOURCES TGO COMPARATIVE TOTAL OPEN PIT RESOURCES TGO COMPARATIVE TOTAL OPEN PIT RESERVES TGO COMPARATIVE TOTAL OPEN PIT RESERVES TGO COMPARATIVE TOTAL OPEN PIT RESERVES TGO COMPARATIVE TOTAL OPEN PIT RESERVES TGO COMPARATIVE TOTAL OPEN PIT RESERVES TGO COMPARATIVE TOTAL OPEN PIT RESERVES TGO COMPARATIVE TOTAL OPEN PIT RESERVES
DEPOSIT 2017 2018 DEPOSIT 2017 2018
Tonnage (Kt) Grade (g/t
Au)
Gold (koz) Tonnage
(Kt)
Grade (g/t Au) Gold (koz) Tonnage (Kt) Grade (g/t
Au)
Gold (koz) Tonnage
(Kt)
Grade (g/t Au) Gold (koz)
Wyoming One 2,741 1.6 137 1,538 1.6 79 Wyoming One 1,167 1.6 63 197 1.7 11
Wyoming Three 135 1.7 8 135 1.7 8 Wyoming Three 0 0.0 0 0 0.0 0
Caloma 2,794 1.3 120 2,735 1.3 116 Caloma 58 2.2 4 0 0.0 0
Caloma Tw o 1,883 1.6 96 921 2.0 59 Caloma Tw o 167 2.7 15 20 1.8 20
Stockpiles 762 1.0 23 1,257 1.0 39 Stockpiles 762 0.9 22 1,257 1.0 39
TOTAL 8,315 1.4 384 6,586 1.4 301 TOTAL 2,154 1.6 104 1,474 1.5 70

Apparent arithmetic inconsistencies are due to rounding

TGO COMPARATIVE TOTAL UNDERGROUND RESERVES TGO COMPARATIVE TOTAL UNDERGROUND RESERVES TGO COMPARATIVE TOTAL UNDERGROUND RESERVES TGO COMPARATIVE TOTAL UNDERGROUND RESERVES TGO COMPARATIVE TOTAL UNDERGROUND RESERVES TGO COMPARATIVE TOTAL UNDERGROUND RESERVES TGO COMPARATIVE TOTAL UNDERGROUND RESERVES
SOURCE Tonnage (Kt)
Grade (g/t
Au)
Gold (koz)
2015
2018
Grade (g/t
Au)
Gold (koz) Tonnage
(Kt)
Grade (g/t Au) Gold (koz)
Proven 223.9 4.03 29 45 2.7 4
Probable 301 3.38 32.6 688 3.2 70
TOTAL 524 3.7 62 732 3.1 74

Apparent arithmetic inconsistencies are due to rounding

3/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [57 x 26] intentionally omitted <==

The primary differences from 2017 to 2018 are:

  • Ore mined from Caloma One, Caloma Two and Wyoming One during the period.

  • Caloma One mining completion.

  • Update of geological models and Block model estimations.

  • Increase in grade control removing almost all inferred material in all remaining pits.

  • Completion of the underground study and feasibility based upon substantial infill core drilling at the Wyoming One deposit.

The current life of mine plan sees the open cut pits finishing in Q3 FY2019. A small cutback of the Caloma One pit to the north east utilising smaller equipment has been designed and whilst not scheduled is an option for TGO should the economics allow it in the future. Low grade stockpiles of approximately 1,257,000 tonnes are also available for milling, but are at present not scheduled until the potential underground material is available to be blended with it.

Regional Exploration

A major regional air core, RC and core drilling is in progress testing an initial area from the southern boundary of TGO mine site to the Cemetery target just north of the Peak Hill mine site

Three major target zones, Roswell, San Antonio and El Paso have been identified and recent drilling results are being compiled. Follow up drilling has been scheduled.

At Peak Hill, a review of the Mineral Resource potential based on the historic drilling data base is in progress.

==> picture [466 x 313] intentionally omitted <==

4/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [57 x 26] intentionally omitted <==

Competent Person

The information in this report that relates to the Mineral Resource and Ore Reserve estimate is based on, and fairly represents, information which has been compiled by Mr Craig Pridmore, Geology Superintendent Tomingley Gold Operations, who is a Member of the Australasian Institute of Mining and Metallurgy and an employee of Alkane Resources Ltd. Mr Pridmore has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Pridmore consents to the inclusion in this report of the matters based on his information in the form and context in which they appear.

The underground Ore Reserve (fully reported 4 and 11 June 2018) is based on, and fairly represents, information which has been compiled by Mr Christopher Hiller (Hiller Enterprises Pty Ltd), an independent consultant, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Hiller has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hiller consents to the inclusion in this report of the matters based on his information in the form and context in which they appear.

ABOUT ALKANE - www.alkane.com.au - ASX: ALK and OTCQX: ANLKY

Alkane is a multi-commodity company focused in the Central West region of NSW, Australia. Currently Alkane has two advanced projects - the Tomingley Gold Operations (TGO) and the nearby Dubbo Project (DP). Tomingley commenced production early 2014. Cash flow from TGO has provided the funding to maintain the project development pipeline and has assisted with the pre-construction development of the DP.

The DP is a large in-ground resource of zirconium, hafnium, niobium, yttrium and rare earth elements. As it is an advanced poly-metallic project outside China, it is a potential strategic and independent supply of critical minerals for a range of sustainable technologies and future industries. It has a potential mine life of 75+ years. The DP is development ready, subject to financing, with the mineral deposit and surrounding land acquired and all major State and Federal approvals in place.

Alkane’s most advanced gold copper exploration projects are at the 100% Alkane owned Bodangora, Wellington, Rockley and Elsienora prospects. Wellington has a small copper-gold deposit which can be expanded, while at Bodangora a large monzonite intrusive complex has been identified with porphyry style gold copper mineralisation. Gold and base metal mineralisation has been identified at Rockley and Elsienora.

==> picture [228 x 336] intentionally omitted <==

5/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

APPENDIX 1

JORC Code, 2012 Edition – Table 1 report – Wyoming One Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.
The Wyoming One area has been evaluated using air core (AC), reverse circulation (RC) and
diamond drilling (DD) techniques between May 2001 and June 2018 although not all of this
drilling lies within the current resource outline.
AC - 185 holes for 14593.8m – inclusive of 3 pre-collars totaling 294.2m
RC - 150 holes for 25356m – inclusive of 29 pre-collars totaling 4552.9m
RC Grade Control – 1062 hole for 28,366m
DD - 83 holes totaling 29,469m
AC samples were collected in large plastic bags at one metre intervals via a cyclone
RC samples were collected at one metre intervals via a cyclone.
DD sample intervals were defined by geologist during logging to honour geological
boundaries.
The resource model includes Grade Control holes drilled within the Wyoming 1 pit. These
RC Grade control holes have limited impact on the Wyoming 1 Underground estimation, but
were essential to the creation of the entire geological model..

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
AC and RC drilling completed to industry standards.
Core was laid out in suitably labelled core trays. A core marker (core block) was placed at the
end of each drilled run (nominally 3 or 6m) and labelled with the hole number, down hole
depth, length of drill run. Core was aligned and measured by tape, comparing back to this
down hole depth consistent with industry standards.

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
AC drilling samples collected at 1m intervals via a cyclone into large plastic bags.
RC Drilling – the entire RC sample was collected at 1m intervals and delivered into a large plastic
bag via a cyclone.
DD Drilling – sample intervals were defined by geologists during logging to honour geological
boundaries and cut in half with a saw.
All samples sent to the laboratory were crushed and/or pulverised to produce a ~100g pulp
for assay process.
All 1m RC & AC samples and core samples were fire assayed using a 50g charge and all RC
and AC composite samples fire assayed using a 30g charge.
Visible gold was occasionally observed in both core and AC/RC samples
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
Initial reconnaissance drilling was completed to fresh rock using 75mm or 100mm air core
with follow-up and deeper drilling completed by RC (usually 126 - 140mm diameter). Detailed
resource definition drilling was completed primarily by RC techniques using a 130mm or
140mm diameter face sampling hammer. DD holes were pre-collared using either RC
techniques or un-oriented PQ3 (83mm diameter) core drilling. Pre-collars were completed to
competent material, with holes cased off and completed to depth using HQ3 (61mm diameter)
core. The 2016/2017 Diamond drillingwas collared with PQ3 and were reduced to HQ3 when

6/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
the ground became competent. The HQ3 core was oriented using the ‘BallMark’, ‘EzyMark’ or
‘Ace’ (Reflex Act) core orientation tool depending upon the contractor and time period of when
the drill program was drilled.
Within the resource area drilling was comprised of:
10% RC - 150 holes totalling 25,356 m (inclusive of 29 pre-collars totalling 4552.9m)
6% DD - 83 holes totalling 29469m
72% RC Grade Control – 1062 hole for 28,366m
o
13% AC – 185 holes totalling 14593.8m
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.
AC and RC - sample recovery was visually estimated and was generally very good (>90%)
aided by the use of oversized shrouds through oxide material. Samples were even in size.
Samples were rarely damp or wet. Sample quality was assessed by the sampler by visual
approximation of sample recovery and if the sample was dry, damp or wet. A riffle splitter
were used to ensure a representative sample was achieved for 1 metre samples.
DD - core loss was identified by drillers and calculated by geologists when logging. Generally
≥95% was recovered and any loss was usually in portions of the oxide zone. Triple tube Large
diameter, triple tube core (PQ3) was used through the oxide material to ensure the greatest
recovery.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.
RC drilling was completed using oversized shrouds to maintain sample return in oxide zone
and all samples were split using riffle or cone splitters. Use of RC rigs with high air capacity
assists in keeping samples dry.
Triple tube coring was used at all times to maximise core recovery with larger diameter (PQ3)
core used in the oxide and saprolite zones.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
There is no known relationship between sample recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
AC & RC - each one metre interval was geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage).
DD - all core was laid out in core trays and geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage). A brief geotechnical
log was also undertaken collecting parameters such as core recovery, RQD, fracture count,
and fracture type and orientation.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
All logging was qualitative with visual estimates of the various characteristics. Magnetic
susceptibility data is quantitative.
AC & RC - A representative sample of each one metre interval is retained in chip trays for
future reference.
DD - Core was photographed and all unsampled core is retained for reference purposes.

The total length and percentage of the relevant intersections logged.
All DD core and AC/RC chip samples have been geologically and geotechnically logged by
qualified geologists.

7/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques
and sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.
DD - zones of visual mineralisation and/or alteration were marked up by the geologist and
cut in half using an Almonté (or equivalent) core cutting saw. Samples submitted for analysis
were collected from the same side in all cases to prevent bias. Sampling intervals were
generally based on geology, were predominantly over 1m intervals but do not exceed 1.2
metres in length. All mineralised zones were sampled, plus ≥2m of visibly barren wall rock.
Laboratory Preparation – drill core was oven dried prior to crushing to <6mm using a jaw
crusher, split to 3kg if required then pulverised in an LM5 (or equivalent) to ≥85% passing
75µm. Bulk rejects for all samples were discarded. A pulp packet (±100g) is stored for future
reference

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
AC/RC – samples were collected at 1m intervals via a cyclone into large plastic bags. Spear
samples were collected from each 1m sample and composited to 3m for initial analysis.
Individual 1m samples from all composites assaying ≥0.2g/t Au were riffle split and
resubmitted for analysis.
Rare damp or wet samples were recorded by the sampler.
Laboratory Preparation – the entire RC sample (3kg) was dried and pulverised in an LM5 (or
equivalent) to ≥85% passing 75µm. Bulk rejects for all samples were discarded. A pulp
packet (±100g) is stored for future reference.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
Alkane (ALK) sampling techniques are of industry standard and considered adequate.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
AC – field duplicate samples were not regularly submitted for reconnaissance AC drilling
RC – field duplicate samples collected at every stage of sampling to control procedures.
DD – external laboratory duplicates used.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
RC - Duplicate samples were riffle split from bulk sample.
Duplicates show generally
excellent repeatability, indicating a negligible “nugget” effect.

Whether sample sizes are appropriate to the grain size of the material being sampled.
Sample sizes are industry standard and considered appropriate.
Quality of
assay data
and laboratory
tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.
For all 1m samples used in the resource estimate gold was determined using a 50g charge
fused at approximately 1100°C with alkaline fluxes, including lead oxide. The resultant prill
was dissolved in aqua regia and gold determined by flame AAS. For 3m composite samples
gold was determined using a 30g charge (more rarely 50g charge).
For other geochemical elements, samples were digested in aqua regia with each element
concentration determined by ICP Atomic Emission Spectrometry or ICP Mass Spectrometry.
These additional elements were generally only used for geological interpretation purposes,
are not of economic significance and are not routinely reported.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Not applicable to this report or deposit.

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Commercially prepared Certified Reference Materials (CRM) and blanks were inserted at 1 in
50 samples. CRM’s were not identifiable to the laboratory.

8/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Field duplicate samples were inserted at 1 in 50 samples (alternate to CRM’s) for RC drilling
programs.
Laboratory QAQC sampling includes insertion of CRM samples, internal duplicates and
screen tests. This data was reported for each sample submission.
Failed standards result in re-assaying of portions of the affected sample batches.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.
Drill data was compiled and collated, and reviewed by senior staff. External consultants do
not routinely verify exploration data until resource estimation procedures are deemed
necessary.

The use of twinned holes.
Twinned holes have not been used at Wyoming One as twinning provides verification only for
extremely limited areas of a deposit.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
All drill hole logging and sampling data was hard keyed into Excel spreadsheet for transfer
and storage in an access database with verification protocols in place.
All primary assay data was received from the laboratory as electronic data files which were
imported into sampling database with verification procedures in place. QAQC analysis was
undertaken for each laboratory report.
Digital copies of Certificates of Analysis (COA) are stored in a central database with regular
(daily) backup. Original survey data is stored on site.
Data was also verified on import into mining related software.

Discuss any adjustment to assay data.
No assay data was adjusted.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Drill holes were laid out using hand held GPS (accuracy ± 2m) then surveyed accurately (±
0.1m) by licensed surveyors on completion.
RC & AC drill holes were surveyed using a single shot electronic camera at a nominal 30m
down hole intervals.
DD holes were surveyed at nominal 30m down hole during drilling to maintain drilling direction
and then at 6m intervals on retrieval of rod string using a multi shot electronic camera.

Specification of the grid system used.
All drill holes were originally laid out in AMG66 grid however since mining commenced in
February 2014 have been transformed to MGA94 grid system to conform with reporting
requirements for mine operations.

Quality and adequacy of topographic control.
The area is very flat. A site based digital terrain model was developed from accurate (± 0.1m)
survey control by licenced surveyors.
Data spacing
and
distribution

Data spacing for reporting of Exploration Results.
The majority of drilling at Wyoming One within the open pit was completed along east-west
lines spaced 25m apart. However once the east-west lode orientation was confirmed for the
‘376’ zone (this zone is the high grade mineralisation on the eastern contact of the porphyry
intrusive contact) this portion of the deposit was assessed by south drilled holes was
completed along north-south sections spaced 25m apart.
The Underground infill drilling during the 2016/2017 campaign was drilled to ensure the drill
hole intercept spacing within each lode was covered to a nominal 30m pattern. The drilling
direction of these holes was optimised best as practical to the orientation of the mineralisation
and geology to remove/reduce any potential sample bias for the estimation.

9/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
The drill hole spacing is similar to that used at other Tomingley deposits and has been
established to be sufficient.
Grade control drilling has been undertaken during mining on a 10m x 10m grid to a nominal
20 vertical metres.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
The drill hole spacing has been shown to be appropriate by the visible continuity of
mineralisation between drill holes.

Whether sample compositing has been applied.
Sample compositing was not applied until resource estimation stage.
RC & AC – samples were composited to 3m with 1m resamples assayed if the composite
returned a gold value of >0.2g/t gold. One metre samples override 3m composites in the
database.
DD – core was sampled to geology.
Orientation of
data in
relation to
geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
Much care was given to attempt to intersect mineralisation at an optimal angle but in complex
ore bodies this can be difficult. As noted above, drilling at Wyoming One was completed
along both east-west and north-south lines, depending upon which portion of the deposit was
being assessed.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
It is not thought that drilling direction will bias assay data at Wyoming One however east-west
drilling will not provide optimum intersection of the ‘376’ lode structures. The recent
2016/2017 drilling campaign specifically targeted the High grade mineralisation associated
with the previously known “376” structure (now referred to as the High Grade porphyry lode).
These holes were orientated to intersect this mineralisation at an optimal angle and to confirm
the mineralisation thickness.
Sample
security

The measures taken to ensure sample security.
All samples were bagged in tied numbered calico bags, grouped into larger tied polyweave
bags and transported to the laboratory in Orange by Alkane personnel or courier. S ample
submission sheets were delivered with the samples and also emailed to the laboratory. All
sample submissions were documented via ALS tracking system and all assays were reported
via email.
Sample pulps were returned to site and were stored for an appropriate length of time
(minimum 3 years).
The Company has in place protocols to ensure data security.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.
The Company does not routinely have external consultants verify exploration data until
resource estimation procedures are deemed necessary.
The Wyoming data was reviewed in 2010 and 2011 by Behre Dolbear (BDA) as part of the
due diligence phase of the development of the project. BDA did not express any specific
concerns with respect to the data other than to recommend the completion of some round
robin assaying and completion of additional density determinations, both of which were
undertaken for the Caloma Two and Wyoming 1 resource drilling.

Section 2 Reporting of Exploration Results

10/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The Wyoming One deposit lies within ML 1684 which is held in the name of Tomingley Gold
Operations Pty Ltd, a wholly owned subsidiary of Alkane Resources Ltd.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
ML1684 expires on 11 February 2034.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
All reported drilling has been completed by ALK.
Geology
Deposit type, geological setting and style of mineralisation.
Geological nature of the Tomingley Deposits is well documented elsewhere.
Mineralisation is associated with quartz veining and alteration focused within sub-volcanic
basaltic-andesite sills and adjacent volcaniclastic sediments. The deposits appear to have
formed as the result of a rheological contrast between the porphyritic sub-volcanic sills and
the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the
sediments ductile deformation, and have many similarities to well documented orogenic - lode-
style gold deposits.
Mineralisation at Wyoming One is developed within a number of different zones which have
been domained based on the geology, style of mineralisation and continuity of high
mineralisation that can be separated:
Porphyry– mineralisation hosted by a quartz stockwork within the carapace of a sub-volcanic
sill with dimensions roughly 60m x 150m. High grade mineralisation
is developed along
the eastern and northern contact of the sediment and porphyry. This High Grade
mineralisation on the contact has been domained separately for the estimation and is
currently referred known as the “High Grade porphyry lode” mentioned below. Within the
main porphyry body there appears to be structures that dip 45° to the NE which is only evident
through the location and continuity of grade in this orientation from the close spaced open pit
RC Grade control drilling.
Hangingwall– a linear zone of mineralisation situated approximately 30m to
hanging
wall of the ‘porphyry’ mineralisation and hosted within quartz veins within silicified fine
grained sediments and a brecciated carbonaceous mudstone. This zone is is lithologically
constrained with these fine grained sediment package which folds around the northern end
of the porphyry (northern_zone);
‘High Grade Porphyry Lode”’–This zone was previously known as the ‘376” structure
interpreted to be a bounding structure and primary fluid conduit. This High Grade zone of
mineralisation is developed at the eastern and northern
contact of the porphyry and
incorporates some of the contact metasediments which were impacted by the mineralisation.
o
_Footwall
– a low grade zone located in a similar stratigraphic position to the
hangingwall zone but footwall to the porphyry
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
_easting and northing of the drill hole collar _
Too numerous and not practical to summarise all drill hole data used. All drilling results have
been reported previously

11/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Exclusion of drill hole data will not detract from the understanding of this report. All drill data
has been previously reported, holes are close spaced and in an operating mine area.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Previously reported results have been –
o
For uncut gold grades;
o
Intercepts were defined (bounded) by 0.5g/t gold outer limit and may contain some
internal waste;
o
Only intervals grading ≥1 g/t gold were reported;
o
Grades were calculated by length weighted average.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
Exploration results have been previously reported as length weighted average grades with
internal high grade intercepts reported separately.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.
o
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
o
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Previously reported exploration results include the drilled width and an estimate of true width.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Cross sections and a plan showing geology with drill collars were included with previously
reported exploration results. A typical plan and cross section are included below.

12/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Data relating to all exploration drill holes has been reported in previous documentation of
exploration results.
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No additional or new drilling results are being reported at this time.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
An assessment of mining the higher grade portions of the ‘hangingwall’, ‘High Grade
Porphyry” zones by underground methods has been completed as part of the feasibility study
and ore from this has been included in the long term mining schedule.
Additional drilling may be completed to compliment this assessment of mining resources
below the open pit.Additional drilling may be completed to compliment this assessment of
mining resources below the open pit.

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
The upper portions of the Wyoming One deposit is well constrained by drilling however the
high grade structures remain open at depth.

13/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
commercially sensitive. Resource limiting pit shell
Ore potentially mineable by
underground methods – open at
depth
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in section 1,and where relevant in section 2,also applyto this section.)
Criteria
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.
Logging data was entered into Excel via drop down menus. All raw data was loaded directly
to the Access database from the assay, logging and survey derived files.

Data validation procedures used.
There are validation checks to avoid duplications of data.
The data were further validated for consistency when loaded into Datashed and desurveyed.
An extensive check on the consistency and adequacy of down-hole survey data was carried
out in 2009. This has continued through to the completion of the 2017 Diamond Drill
campaign
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
(If no site visits have been undertaken indicate why this is the case.)
No site visit has been undertaken by an external consultant since the release of the previous
2014 Underground release. Since the last release the geological/structural model of the
Wyoming 1 deposit has been updated based on the mapping of the geology exposed within
the openpit. The model also reflects the evaluation and interpretation of the in RC Grade

14/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
control drilling and 2016/2017 Diamond drilling campaign. All geostatistical analysis for the
resource estimation was undertaken by Cube Consultancy who are based in Perth.
The quoted resources were compiled by Mr Craig Pridmore, Geology Superintendent,
Tomingley Gold Operations Pty Ltd, who has worked at TGO site since March 2015..
Geological
interpretation

Confidence in (or conversely, the uncertainty of ) the geological interpretation of the
mineral deposit.
The geological model was built on structural data from core lithological logging, in pit Grade
control logging, and pit mapping. The domain wireframes were built by the Alkane geologists
most familiar with the deposit.

Nature of the data used and of any assumptions made.
Structural measurements from oriented drill core were used to assist in the
geological
interpretation along with lithological, alteration and mineralisation logging of RC chips and drill
core

The effect, if any, of alternative interpretations on Mineral Resource estimation.
The Wyoming One deposit was been drilled at a close-spacing in several different drilling
campaigns and in several different drilling directions, reducing the likelihood that the
geological interpretation will change significantly.

The use of geology in guiding and controlling Mineral Resource estimation.
Geological (lithological) logging was used to develop a geological model. Alteration and
mineralisation estimates along with grade guided the interpretation of the ore envelope
wireframes at a nominal 0.25g/t Au lower cut-off..
Gold mineralisation at Wyoming One has a close spatial relationship to feldspar porphyry
which intrudes into andesitic volcaniclastic rocks near their western contact with a more
pelitic sequence. Mineralisation is associated with extensive alteration and quartz veining of
the porphyry and volcanic rocks.
In pit mapping has generally verified the geological interpretation on a macroscopic scale.

The factors affecting continuity both of grade and geology.
Mineralisation is directly associated with alteration and quartz veining.
Dimensions
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
The mineralisation occurs in several zones within a NNW-striking corridor 300m long and
220m wide. Mineralisation extends from about 25m below the surface for more than 400m
vertical depth.
Estimation
and modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
parameters used.
Five mineralised wireframes (domains) were interpreted by the Alkane geologists most
familiar with the deposit to constrain the estimation. This includes an enclosing background
domain which was modelled to capture minor mineralization outside the main domains. Four
surfaces were also used to separate material types - topography, alluvium, saprolite and
base of oxidation surfaces. The material type classification was used to allocate density
values.
The drill hole data were flagged by the domain wireframes in priority order, to prevent double
use the data in the intersecting zones.
The samples were composited to 1m, the most common sample length and flagged by the
topography, alluvium, saprolite and base of oxidation surfaces. Top-cuts were selected for
each domain based on histograms, probability plots and cutting statistic plots. The top-cuts
ranged from 7g/t gold to 40.0 g/t gold. After top-cutting, the maximum coefficient of variation
for the mineralized domains ranged from 1.21 to 3.64 indicating that the estimation would not
be difficult.

15/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
In January 2017 Cube consultancy reviewed the drill data in Wyoming 1. The composite gold
grades were first transformed to Standard Gaussian space in order to elucidate the
underlying spatial structure. A Gaussian Variogram was then produced before back-
transformed to real space for use in in Wyoming 1 DOK process. Reasonably robust
variogram models were obtained for all estimation domains. Each domain used in the
estimation had its own variogram model.
The Underground Resource model incorporates the entire Wyoming 1 project and includes
the estimation for the open pit. The Estimation technique used was Ordinary Kriging.
A check estimate was made using the Inverse Distance Squared method. The minimum
samples, maximum samples and search parameters used in the ID2 check estimate are were
the same as the Kriged estimation values.
Surpac was used for estimation. The orientation of the search ellipse for each domain was
controlled by a Dynamic Anisotropy model that provided a unique dip and dip-azimuth for
each block.
Grade control drilling data is incorporated with exploration data and a new block model
generated using the same parameters as the resource model for that sector of the ore body
subject to the grade control drilling.

The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.
The estimates were compared to those of previous published resource estimate made by
Alkane. The variance between the models is based on modifications to the geological
domains and mineralised domains which have been updated. These modifications were
based on the in-pit geological mapping, greater definition through Grade control drilling and
an additional 31 extra diamond holes drilled into the Underground resource in 2016 and 2017.

The assumptions made regarding recovery of by-products.
No assumptions made - Estimates were made for gold, arsenic and copper; only gold is of
economic significance.

Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).
No deleterious elements identified for estimation

In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.
The primary block size was unrotated (2.5mE x 5mN x 2.5mRL) because of the narrow
steeply dipping nature of the mineralized zones. Sub-blocking of 2.5mE x 2.5mN x 2.5mRl
was also used were estimated. These block sizes were employed in the open pit based on
the practical mining considerations and the fact he variogram nugget effects are low.
These block sizes were used in the underground resource estimate below the open pit.
The maximum search radius used was 60m with a search radius ratio of 4:1

Any assumptions behind modelling of selective mining units.
No assumptions were made.

Any assumptions about correlation between variables.
No assumptions made

Description of how the geological interpretation was used to control the resource
estimates.
Only data from the same domain were used to make estimates. No soft boundaries were
used between domains

16/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Discussion of basis for using or not using grade cutting or capping.
The top-cut analysis was undertaken by using a combination of histograms, log-probability
plots of composite gold grade and cutting statistic plots (plots of cut-off grade against
Coefficient of Variation (CV) and total metal).
Using the statistical information above the top cuts were picked using the following criteria
1)
By visual inspection of the log-probability plots of composite gold grade, with a
view towards identifying the point at the upper tail where the robustness of the
distribution breaks down and where the plot goes off trend.
2)
By visual 3D inspection of the spatial location of the grade outliers and the spatial
relationship to neighbouring values.
While the principal estimate was made using top-cuts, a check estimate was made without
top-cutting.

The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
The estimates were verified using several different techniques and checked for local
variability by comparing the estimated block grades with the average of the top-cut
composites in each block.
Moisture
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
The tonnages were estimated on a dry tonnage basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality parameters applied.
The cut-off grade (0.50 g/t Gold) for open pittable resources is relevant for the current mining
operation for similar material in the adjacent deposits.
Mining factors
or
assumptions

Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
Mining of ore from the Wyoming One ore body commenced in 2016 and to date
reconciliations, save for poorly defined inferred mineralisation in the background domain,
have been as expected. The main part of the Wyoming One deposit is currently being mined
by open pit methods. No dilution factors in the resource model were applied
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
The metallurgy of the Tomingley deposits is well studied. The upper portion of the Wyoming
1 deposit is currently being mined through open pit mining methods. A total of 1.8K tonnes
have been mined up to June 2018, with 1.1K tonnes of Wyoming 1 having been processed.
During this time no metallurgical issues have arisen, with recoveries ranging between 92-
94%.Althogh further met test work is planned for the Hanging Wall lode and High Porphyry
lode as the mine looks at transitioning to underground.
Environmental
factors or
assumptions

Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
Project approval for the TGP was granted in July 2012 for mining from three open pits
(Wyoming One, Wyoming Three and Caloma) and underground from Wyoming One deposit.
Mining from the Wyoming Three and Caloma open pits commenced in December 2013 with
processing of ore in February 2014. Mining of ore from the Wyoming One open pit
commenced in January 2016 and is currently ongoing.

17/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Bulk density
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.
Specific gravity measurements were completed by commercial laboratories on DD core
samples of the different material types (alluvium, saprolite, totally oxidized and fresh).
Oxidation was far more important than variations in lithology or alteration.
The specific gravity measurements were applied on a dry basis.
In December 2015 a large in-house density analysis campaign occurred on all the deposits
with over 3,182 additional measurements taken. Using wet/dry density methods.
All diamond hole drilled in the 2016/2017 campaign had SG measurements undertaken using
the wet/dry method (SG = Mass of object/ (Mass of object) – (Mass of object in water).
All measurements in the fresh material were constrained to each geological domain. The
average Specific gravity reading was applied to each domain and used in the estimation

The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.
SG measurements completed on all material types – see above.

Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
No assumptions made – SG determined and individual values applied to each material type
based on wire-framed surfaces
Classification
The basis for the classification of the Mineral Resources into varying confidence
categories.
The resources were classified using drill density, geological confidence and mineralisation
continuity. The actual break-points for the different resource classes were chosen by
inspection of the model in relation to the drilling density. Any blocks outside the main
mineralised/geological domains were classified as Inferred.

Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).
Wyoming One resource model which includes Grade control RC was estimated using high
proportion of Reverse Circulation (RC) drill hole data. The Underground portion of the
resource below the Open pit has been predominantly drilled using diamond drilling
techniques

Whether the result appropriately reflects the Competent Person’s view of the deposit.
The classification reflects the Competent Persons view of the deposit and its supporting data
Audits or
reviews

The results of any audits or reviews of Mineral Resource estimates.
No external reviews undertaken. Although all estimation geostatistical parameters used in
the Block model estimation were generated by Cube consulting
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.
The Wyoming One deposit consists of 8 mineralisation zones;
Reasonable robust variogram models were obtained for all estimation domains (undertaken
by Cube consultancy).
The variograms show clear evidence of a relatively low nugget effect (between 14% and
20%), with exception of the footwall lode which does not impact on the underground. This
coupled with a rapid deterioration in continuity over a distance of several meters, as indicated
by the first spherical structure ranges and sills. These features are evident when the
composite gold values are visually inspected, with gold values generally being similar within
a distance of 2m to 3m but then changing rapidly at greater distances. As a consequence,
the second sphericalstructures doesnot exercise greatinfluence overanOKestimate,

18/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
generally having low sill values, with the exception of the hanging wall lode which is more
continuous that the rest.
No statistical or geostatistical method (non-linear or simulation) apart from ID2 estimation
checks were used to quantify the relative accuracy of the estimate within confidence limits.
Accuracy of the estimate is strongly dependent on:
accuracy of the interpretation and geological domaining;
accuracy of the drill hole data (location and values);
orientation of local anisotropy; and
o
Estimation parameters which are reflected in the global resource classification

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.
The quoted resources are global, being based on close spaced grade control drill hole data to
exploration spacing. The resources have been depleted based on mining to end of June
2018. To ensure the resources have ‘reasonable prospects of eventual economic extraction’,
the open pittable resources have been restricted by an indicative optimistic pit shell estimated
at a gold price of $2000 per ounce with the potential open pittable component assessed at
≥0.5g/t gold cut off.The Underground Resource is restricted to material below the current
final pit design,below the highest Stope level currently designed, with potential for eventual
extraction by underground mining methods assessed at ≥2.5g/t gold.

These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.
Mining of ore from the Wyoming One ore body commenced in 2016 and to date
reconciliations have shown that the original resource model was performing within
expectations, Save for poorly defined inferred mineralisation in the background domain.
Reconciled Tonnes, grade and total ounces mined are all within ~10% of the original resource
model prediction with and overall increase in ounces.
Over the period of mining the Block Estimation model has been modified and improved, with
the Open pit and Underground run simultaneously and captured within the same Block model
The estimation method has been changed from ID2 (original resource model estimate) to
Ordinary Kriging. Close spaced Grade control drilling has been ongoing since the start of the
open pit. This additional data collected with the mapping justified a change in modelling
parameters and estimation techniques from ID2 to Ordinary Kriging. This change in
estimation method has been used for the underground resource model which is an extension
of the current open pit grade control block model.
Comparisons between the reconciled mined tonnes and grade, the Grade control model
(same as the Underground Resource model) have shown that the reconciled mined tonnes
are +16%, grade -3% with an overall increase of+13% ounces. This indicates the model
being implemented does have a reasonable high level of accuracy.

19/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

APPENDIX 1 (continued)

JORC Code, 2012 Edition – Table 1 report – Caloma One Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.
The Caloma area has been evaluated using air core (AC), reverse circulation (RC) and
diamond drilling (DD) techniques between August 2004 and June2016 although not all of this
drilling lies within the current resource outline. In addition RC grade control drilling is
undertaken on a campaign basis to assist in ore mark-up in the pit.
o
AC - 342 holes for 19,955.4m
o
RC - 335 holes for 37337.5 m – inclusive of 12 pre-collars totalling 453m
o
RC Grade Control – 2739 holes for 74260 metres
o
DD - 25 holes totalling 8036.2m
AC samples were collected in large plastic bags at one metre intervals via a cyclone
RC samples were collected at one metre intervals via a cyclone and riffle or cone splitter.
DD sample intervals were defined by geologist during logging to honour geological
boundaries.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
AC and RC drilling completed to industry standards.
Core was laid out in suitably labelled core trays. A core marker (core block) was placed at the
end of each drilled run (nominally 3 or 6m) and labelled with the hole number, down hole
depth, length of drill run. Core was aligned and measured by tape, comparing back to this
down hole depth consistent with industry standards.

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
AC drilling samples collected at 1m intervals via a cyclone into large plastic bags.
RC Drilling – prior to November 2007, the entire RC sample was collected at 1m intervals and
delivered into a large plastic bag via a cyclone. For resource definition drilling since Nov 2007
and all grade control drilling, approximately 12.5% (2-4kg) of total sample was delivered via
cone or riffle splitter into a calico bag (for shipment to laboratory if required) with the remaining
sample delivered into a large plastic bag and retained for future use if required.
DD Drilling – sample intervals were defined by geologists during logging to honour geological
boundaries and cut in half with a saw.
All samples sent to the laboratory were crushed and/or pulverised to produce a ~100g pulp
for assay process.
All 1m RC & AC samples and core samples were fire assayed using a 50g charge and all RC
and AC composite samples fire assayed using a 30g charge.
Visible gold was occasionally observed in both core and AC/RC samples
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
Initial reconnaissance drilling was completed to fresh rock using 75mm or 100mm air core
with follow-up and deeper drilling completed by RC (usually 130 - 140mm diameter). Detailed
resource definition drilling was completed primarily by RC techniques using a 130mm or
140mm diameter face sampling hammer. DD holes were pre-collared using either RC
techniques or un-oriented PQ3(83mm diameter)core drilling. Pre-collars were completed to

20/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
competent material, with holes cased off and completed to depth using HQ3 (61mm diameter)
core. HQ3 core was oriented using the “Ace” (Reflex Act) core orientation tool.
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.
AC and RC - sample recovery was visually estimated and was generally very good (>90%)
aided by the use of oversized shrouds through oxide material. Samples were even in size.
Samples were rarely damp or wet. Sample quality was assessed by the sampler by visual
approximation of sample recovery and if the sample was dry, damp or wet. Riffle and cone
splitters were used to ensure a representative sample was achieved for 1 metre samples.
DD - core loss was identified by drillers and calculated by geologists when logging. Generally
≥95% was recovered and any loss was usually in portions of the oxide zone. Triple tube Large
diameter, triple tube core (PQ3) was used through the oxide material to ensure the greatest
recovery.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.
RC drilling was completed using oversized shrouds to maintain sample return in oxide zone
and all samples were split using riffle or cone splitters. Use of RC rigs with high air capacity
assists in keeping samples dry.
Triple tube coring was used at all times to maximise core recovery with larger diameter (PQ3)
core used in the oxide and saprolite zones.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
There is no known relationship between sample recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
AC & RC - each one metre interval was geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage).
DD - all core was laid out in core trays and geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage). A brief geotechnical
log was also undertaken collecting parameters such as core recovery, RQD, fracture count,
and fracture type and orientation.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
All logging was qualitative with visual estimates of the various characteristics. Magnetic
susceptibility data is quantitative. Magnetic susceptibility data is not collected for grade
control drilling.
AC & RC - A representative sample of each one metre interval is retained in chip trays for
future reference.
DD - Core was photographed and all unsampled core is retained for reference purposes.

The total length and percentage of the relevant intersections logged.
All DD core and AC/RC chip samples have been geologically and geotechnically logged by
qualified geologists.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.
DD - zones of visual mineralisation and/or alteration were marked up by the geologist and cut
in half using an Almonté (or equivalent) core cutting saw. Samples submitted for analysis
were collected from the same side in all cases to prevent bias. Sampling intervals were
generally based on geology, were predominantly over 1m intervals but do not exceed 1.2
metres in length. All mineralised zones were sampled, plus ≥2m of visibly barren wall rock.
Laboratory Preparation – drill core was oven dried prior to crushing to <6mm using a jaw
crusher, split to 3kgif required thenpulverisedinan LM5 (orequivalent) to≥85% passing

21/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
75µm. Bulk rejects for all samples were discarded. A pulp packet (±100g) is stored for future
reference

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
AC/RC – for drilling completed prior to Nov 2007 spear samples were collected from each 1m
sample and composited to 3m for initial analysis. Individual 1m samples from all composites
assaying ≥0.2g/t Au were riffle split and resubmitted for analysis.
For resource definition drilling completed since Nov 2007, for intervals with visual mineralisation
and/or alteration the calico sample bag (1m samples) were numbered and submitted to the
laboratory for analysis. Intervals without visual mineralisation and/or alteration were spear
sampled and composited over three metres. For composited intervals returning grades
>0.2g/t Au the calico bags were retrieved for assay of the individual1mintervals. Rare damp
or wet samples were recorded by the sampler.
All grade control drill holes are sampled at 1m intervals with all samples forwarded to the
laboratory for analysis.
Laboratory Preparation – the entire RC sample (3kg) was dried and pulverised in an LM5 (or
equivalent) to ≥85% passing 75µm. Bulk rejects for all samples were discarded. A pulp
packet (±100g) is stored for future reference.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
Alkane (ALK) sampling techniques are of industry standard and considered adequate.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
RC and grade control – field duplicate samples collected at every stage of sampling to control
procedures.
DD – external laboratory duplicates used.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
RC - Duplicate samples were riffle split from the riffle/conical split calico from the drill rig.
Duplicates show generally excellent repeatability, indicating a negligible “nugget” effect.
For grade control drilling duplicate samples are split at the drilling rig.

Whether sample sizes are appropriate to the grain size of the material being sampled.
Sample sizes are industry standard and considered appropriate.
Quality of
assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.
For all 1m samples used in the resource estimate gold was determined using a 50g charge
fused at approximately 1100°C with alkaline fluxes, including lead oxide. The resultant prill
was dissolved in aqua regia and gold determined by flame AAS. For 3m composite samples
gold was determined using a 30g charge (more rarely 50g charge).
For other geochemical elements, samples were digested in aqua regia with each element
concentration determined by ICP Atomic Emission Spectrometry or ICP Mass Spectrometry.
These additional elements were generally only used for geological interpretation purposes,
are not of economic significance and are not routinely reported.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Not applicable to this report or deposit.

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Commercially prepared Certified Reference Materials (CRM) and blanks were inserted at 1 in
50 samples. CRM’s were not identifiable to the laboratory.
Field duplicate samples were inserted at 1 in 50 samples (alternate to CRM’s).

22/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Laboratory QAQC sampling includes insertion of CRM samples, internal duplicates and
screen tests. This data was reported for each sample submission.
Failed standards result in re-assaying of portions of the affected sample batches.
Screen fire assay checks (75µm mesh) were undertaken on 110 drill core samples. Screen
fire assay data overrides all other methods.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.
Drill data was compiled and collated, and reviewed by senior staff. External consultants do
not routinely verify exploration data until resource estimation procedures are deemed
necessary.

The use of twinned holes.
Twinned holes have not been used at Caloma Two as twinning provides verification only for
extremely limited areas of a deposit.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
All resource definition drill hole logging and sampling data was hard keyed into Excel
spreadsheet for transfer and storage in an access database with verification protocols in
place. All grade control drilling data at Tomingley is stored in a “Datashed” Microsoft SQL
database.
All primary assay data was received from the laboratory as electronic data files which were
imported into sampling database with verification procedures in place. QAQC analysis was
undertaken for each laboratory report.
Digital copies of Certificates of Analysis (COA) are stored in a central database with regular
(daily) backup. Original survey data is stored on site.
Data was also verified on import into mining related software.

Discuss any adjustment to assay data.
No assay data was adjusted. Screen fire assays take precedence over all other assay
techniques.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Drill holes were laid out using hand held GPS (accuracy ± 2m) then surveyed accurately (±
0.1m) by licensed surveyors on completion.
RC & AC drill holes were surveyed using a single shot electronic camera at a nominal 30m
downhole intervals. Grade control drill holes complete since March 2015 which are greater
than 24m in depth are surveyed down hole.
DD holes were surveyed at nominal 30m down hole during drilling to maintain drilling direction
and then at 6m intervals on retrieval of rod string using a multi shot electronic camera.

Specification of the grid system used.
All drill holes were originally laid out in AMG66 grid however since mining commenced in
February 2014 have been transformed to MGA94 grid system to conform with reporting
requirements for mine operations. Grade control drill holes laid out in MGA.

Quality and adequacy of topographic control.
The area is very flat. A site based digital terrain model was developed from accurate (± 0.1m)
survey control by licenced surveyors.
Data spacing
and distribution

Data spacing for reporting of Exploration Results.
Drilling was completed on east-west sections spaced nominally 20m apart with holes spaced
at 20m intervals along the lines. The line spacing was increased to a nominal 40m in zones
thought peripheral to the main ore body and to the north. Grade control drilling is completed
on a pattern ensuring a minimum of 10m x 10m pattern when combined with resource
definition drill holes.

23/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
The drill hole spacing is similar to that used at other Tomingley deposits and has been
established to be sufficient.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
A Simulation Study for optimal drill spacing has been undertaken. There is a case to reduce
the spacing from 10x10 to 10x8. With the minimal mine life and visual continuity of
mineralisation between drill holes and when on the ground the 10x10 drill spacing has been
deemed appropriate,

Whether sample compositing has been applied.
Sample compositing was not applied until resource estimation stage.
RC & AC -exploration and resource definition drilling samples with no visible mineralisation or
alteration were composited to 3m with 1m resamples assayed if the composite returned a
gold value of >0.2g/t gold. One metre samples override 3m composites in the database. All
grade control sample assayed at 1m intervals
DD – core was sampled to geology.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
Much care was given to attempt to intersect mineralisation at an optimal angle but in complex
ore bodies this can be difficult. A number of drilling directions were used in the early drilling
phases in an attempt to optimise the intersection angle.
The chosen drilling direction (east at inclination of -60°) appears optimal based on
reconciliation from the early mining periods.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
It is not thought that drilling direction will bias assay data at Caloma.
Sample
security

The measures taken to ensure sample security.
All samples were bagged in tied numbered calico bags, grouped into larger tied polyweave
bags and transported to the laboratory in Orange by Alkane personnel or courier. S ample
submission sheets were delivered with the samples and also emailed to the laboratory. All
sample submissions were documented via ALS tracking system and all assays were reported
via email.
Sample pulps were returned to site and were stored for an appropriate length of time
(minimum 3 years).
The Company has in place protocols to ensure data security.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.
The Company does not routinely have external consultants verify exploration data until
resource estimation procedures are deemed necessary.
The Caloma data was reviewed in 2010, 2011 and 2014 by Behre Dolbear (BDA) as part of
the due diligence phase of the development of the project and bank financing. BDA did not
express any specific concerns with respect to the data other than to recommend the
completion of some round robin assaying and completion of additional
density
determinations, both of which were undertaken for the Caloma Two resource drilling. A
density campaign on all deposits using drill core was undertaken in December 2015. A total
of 3,182 density measurements were taken The aim of the review was to assess variability
from fresh rock density values applied in previous Resource and Grade Control models. Data
measurement was restricted to materials below the fresh rock transition. Average density
values recorded for fresh rock materials within each of the deposits weregenerallybetween 1 -

24/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
2% higher than the current assigned value. These new density values have been assigned to the
latestCaloma resource model.
Section 2 Reporting of Exploration Results
(Criteria listed in theprecedingsection also applyto this section.)
Criteria JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The Caloma Deposit lies within ML 1684 which is held in the name of Tomingley Gold
Operations Pty Ltd, a wholly owned subsidiary of Alkane Resources Ltd.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
ML1684 expires on 11 February 2034.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
All reported drilling has been completed by ALK.
Geology
Deposit type, geological setting and style of mineralisation.
Geological nature of the Tomingley Deposits is well documented elsewhere.
Mineralisation is associated with quartz veining and alteration focused within sub-volcanic
basaltic-andesite sills and adjacent volcaniclastic sediments. The deposits appear to have
formed as the result of a rheological contrast between the porphyritic sub-volcanic sills and
the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the
sediments ductile deformation, and have many similarities to well documented orogenic - lode-
style gold deposits.
Mineralisation at Caloma is developed within a series of stacked ‘quartz lodes’ which dip
shallowly to the west and hosted dominantly within the sub-volcanic sills. The lodes are
cross cut by a number of barren post mineralisation dolerite dykes.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
Too numerous and not practical to summarise all drill hole data used. All drilling results have
been reported previously

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Exclusion of drill hole data will not detract from the understanding of this report. All drill data
has been previously reported, holes are close spaced and in an operating mine area.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Previously reported results have been –
o
For uncut gold grades;
o
Intercepts were defined (bounded) by 0.5g/t gold outer limit and may contain some
internal waste;

25/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
o
Only intervals grading ≥1 g/t gold were reported;
o
Grades were calculated by length weighted average.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
Exploration results have been previously reported as length weighted average grades with
internal high grade intercepts reported separately.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.
o
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
o
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Previously reported exploration results include the drilled width and an estimate of true width.
At Caloma the true width is approximately 80% of the drilled width.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Cross section and a plan showing geology with drill collars were included with previously
reported exploration results. Typical plan and cross section included below.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Data relating to all exploration drill holes has been reported in previous documentation of
exploration results.

26/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No additional or new drilling results are being reported at this time.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Mining within the Caloma open pit commenced in February 2014.
Additional drilling may be completed to compliment an assessment of mining resources
below the open pit by underground methods.

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
Caloma Two
Caloma
Ore potentially mineable by
underground methods – open at
depth
Resource Limiting Pit

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.
Logging data was entered into Excel via drop down menus. All raw data was loaded directly
to the Access database from the assay, logging and survey derived files.

Data validation procedures used.
There are validation checks to avoid duplications of data.
The data were further validated for consistency when loaded into Surpac and desurveyed.
An extensive check on the consistency and adequacy of down-hole survey data for
exploration and resource definition drill holes was carried out in 2009.

27/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
(If no site visits have been undertaken indicate why this is the case.)
The Caloma Resource Model was developed by Mr Craig Pridmore who has been working
at the site since March 2015.
The quoted resources have been compiled by Mr Craig Pridmore, Geological
Superintendent, Tomingley Gold Operations Pty Ltd.
Geological
interpretation

Confidence in (or conversely, the uncertainty of ) the geological interpretation of the
mineral deposit.
The initial geological model was built on structural data from core and lithological logging with
extensive pit mapping formed the backbone of the Geological/Structural model currently
being implemented. The domain wireframes were built by the Alkane geologists most familiar
with the deposit.
The geological model is continuously being modified and improved as mining progresses.
The broad geological model remains much as interpreted however the sub-volcanic sills have
been separated into three individual units and constraints on the ore outlines tighten in line
with the additional data available.

Nature of the data used and of any assumptions made.
Structural measurements from oriented drill core were used to assist in the
geological
interpretation for the resource model along with lithological, alteration and mineralisation
logging of RC chips and drill core. Mapping within the open pit has greatly assisted with the
refinement of the interpretation of the geology.

The effect, if any, of alternative interpretations on Mineral Resource estimation.
The Caloma deposit was been drilled at a close-spacing in several different drilling
campaigns, reducing the likelihood that the geological interpretation will change significantly.
Drill holes were predominantly inclined to the east with some holes inclined to the north or
west (early drilling).
Reconciliation with grade control drilling and mining confirms this broad interpretation.

The use of geology in guiding and controlling Mineral Resource estimation.
Geological (lithological) logging was used to develop a geological model. Alteration and
mineralisation estimates along with grade guided the interpretation of the ore envelope
wireframes at a nominal 0.25g/t Au lower cut-off.
The Caloma deposit consists of a series of moderate to shallow west-dipping mineralised
structures within the steep west dipping feldspar porphyritic host which is bounded by several
thin volcaniclastic sediment lenses. These structures trend north-south over a strike length
of 500 metres and range in width from a few metres to in excess of 20 metres. The
mineralised structures have been displaced and offset by numerous east-west barren post-
mineralisation dolerite dykes. Mineralisation is associated with extensive alteration and
quartz veining of the porphyry and volcanic rocks.

The factors affecting continuity both of grade and geology.
Mineralisation is directly associated with silica, sericite, arsenopyrite, pyrite alteration and quartz
veining.
Dimensions
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
The mineralisation occurs in several west-dipping zones within a north-striking corridor 460m
long and 420m wide. Mineralisation extends from about 5m below the surface for more than
350m vertical depth.
Estimation and
modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
The resource model has used all the exploration drill data (RC/ DD) and the grade control
RC drilling. Grade control drill design was undertaken on a nominal 10m x 10m spacing.
The resource model has incorporated sub-domaining of the main geological units and
mineralised lodes. This sub-domaining has been incorporated into the resource model based
onelementsidentified through in-pitmapping andincreased drilldensity throughthe grade

28/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
parameters used. control drilling. There are nine Geological domains, these are comprised of the cotton
formation, the cross cutting barren dolerites, and the three sub-volcanic sill domains
(Feldspar Porphyry’s) which are separated by thin volcaniclastic sediments. There are 8
mineralised domains which define the main high grade ore lenses of the deposit and two
enclosing background domains to capture minor mineralisation outside the main domains.
Four surfaces were also used to separate material types - topography, alluvium, saprolite
and base of oxidation surfaces. The material type classification was used to allocate density
values.
The drill hole data were flagged by the domain wireframes in priority order, to prevent double
use of the data in any intersecting zones.
The samples were composited to 1m, the most common sample length and flagged by the
topography, alluvium, saprolite and base of oxidation surfaces. Top-cuts were selected for
each domain based on histograms, probability plots and cutting statistic plots. The top-cuts
ranged from 10g/t gold to 30.0 g/t gold for the mineralised zones. After top-cutting, the
maximum coefficient of variation for the mineralised domains ranged from 1.11 to 4.81
indicating that the estimation would not be difficult.
The principal estimation was made using Ordinary Kriging with Inverse Distance Squared
checks made.
The number of drill hole composites have significantly increased since the original exploration
resource model release allowing for reliable variography to be undertaken in the main ore
lodes. These variogram models have been incorporated in the resource block model. The
orientation of the search ellipse for each domain was controlled by dynamic anisotropy, which
uses the bounding mineralised surfaces of the lodes and discrete wireframes for the
unconstrained mineralisation. This method provided a unique dip and dip-direction for each
block.
The principal estimation using Surpac software was ordinary kriging with ID2 checks using
the same dynamic anisotropy. A parent block size of 5m x 2.5m x 2.5m with 1.25m sub-
blocking was used in the block model.
All blocks constrained within the dolerite wireframe domain were classified as waste with a
grade of 0 g/t assigned to the blocks.

The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.
Mining has been ongoing from the Caloma open pit since January 2014. In June 2015, a new
geological/structural model was generated based on detailed inpit mapping, relogging of
Diamond core holes and logging of Grade control holes. The estimation method was changed
from ID2 to Ordinary Kriging and the reconciliation process was reviewed and modified. The
geological model has been updated routinely over the past 2 years. Since the change
Caloma pit Grade control Model has reconciled very well with the new estimation process.
With +7% tonnes, -5% grade for +1% increase in ounces over the past 12 months.

The assumptions made regarding recovery of by-products.
No assumptions made - Estimates were made for gold, arsenic and copper; only gold is of
economic significance.

Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).
No deleterious elements identified for estimation

29/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.
The primary block size for the resource model is 5m x 2.5m x 2.5m, with sub-blocking of 2.5m
x 1.25m x 1.25m. The primary search on each domain is variable based on the variograms
with a range from 30m to 60m with a Major/Semi ratio of 1 and a Major/Minor ratio of 5.

Any assumptions behind modelling of selective mining units.
Block size of 5mN x 2.5mE x 2.5m has been used for the following reasons:
1. A rule of thumb is that the block dimensions for OK should not be less than a third to half
of the informing data spacing. This increased length in the northing direction would mean
that only the easting dimension does not strictly meet this criterion. This should translate to
an improvement in estimation accuracy and precision, and therefore also the accuracy of ore
allocation.
2. A 5mN x 2.5mE x 2.5mRL block equates to about 80t of fresh rock, which would essentially
be a single haul truck load.
3. The continuity of mineralisation in the north-south orientation has a longer range no matter
what the dip of the high grade lodes and so there will be only a minor impact on grade
resolution for ore block definition.

Any assumptions about correlation between variables.
No assumptions made

Description of how the geological interpretation was used to control the resource
estimates.
Hard boundaries on all domains within the resource model were used.

Discussion of basis for using or not using grade cutting or capping.
The top cuts were selected using a combination of histograms, probability plots and cutting
statistic plots (plots of cut-off grade against Coefficient of Variation (CV) and total metal).

The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
Estimates were made using Ordinary Kriging with Inverse Distance checks. The model was
compared to previous grade control models and the resource model. A variety of checks
were used to identify variability between models and also the estimated block grades. Each
step of the process has validation steps to ensure estimation validity. Some of the checks
incorporated comparison of composites to actual raw drill hole data, 2.5m level comparison
checks using various grade cuts. Visual checks of the block estimation against composite
and raw drill hole data both on plan and section.
Moisture
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
The tonnages were estimated on a dry tonnage basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality parameters applied.
The cut-off grade (0.50 g/t Gold) for open pittable resources is relevant for the current mining
operation of this deposit.
Mining factors
or assumptions

Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
The main part of the Caloma deposit is being mined by open pit methods. No dilution has
been applied to the resource model.
The resources are depleted for production.

30/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
The Caloma deposit is currently being mined and processed with no significant differences
in metallurgical recoveries from those estimated in the feasibility study.
Environmen-tal
factors or
assumptions

Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
Project approval for the TGP was granted in July 2012 for mining from three open pits
(Wyoming One, Wyoming Three and Caloma) and underground from Wyoming One deposit.
Mining from the Wyoming Three and Caloma open pits commenced in December 2013 with
processing of ore in February 2014.
Bulk density
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.
Specific gravity measurements for the original resource model were completed by
commercial laboratories on drill core samples of the different material types (alluvium,
saprolite, totally oxidised and fresh). Oxidation was far more important than variations in
lithology or alteration.
The specific gravity measurements were applied on a dry basis.
In December 2015 a large in-house density analysis campaign occurred on all the deposits
with over 3,182 additional samples taken. The results were combined the original exploration
density data and used in the current resource estimate.

The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.
SG measurements completed on all material types – see above.

Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
No assumptions made – SG determined and individual values applied to each material type
based on wire framed surfaces
Classification
The basis for the classification of the Mineral Resources into varying confidence
categories.
Resource Model
The resources were classified based on drilling density, geological confidence and grade
continuity. The actual break-points for the different resource classes were chosen by
inspection of the model in relation to the drilling density. As a general rule all areas with a
10m x 10m drill spacing was classified as measured. Zones with a nominal drill spacing of
20m x 25m has been classified as indicated, material that has been drilled to a 30m x 40m
spacing is in the inferred category. The classifications are based on the confidence of ounce
conversion. Measured would have a 90% conversion probability, indicated would have a 75%
confidence level and inferred a 50% confidence in ounce conversion if mined.

Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).
Caloma was estimated using high proportion of Reverse Circulation (RC) drill hole data. The
RC drilling was conducted using industry-standard methods and was not affected by high
water flows, so there is no reason not to accept the RC results. Statistical studies showed
that theRC drillingwas ofsimilargrade to the diamond drilling. Reconciliation has shown

31/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
that the current estimation methods and modelling parameters are performing adequately
with the reconciled ounces within 1% of the block model over the past 12 months

Whether the result appropriately reflects the Competent Person’s view of the deposit.
The classification reflects the Competent Persons view of the deposit and its supporting data
Audits or
reviews

The results of any audits or reviews of Mineral Resource estimates.
No external audits have been carried out on the resource estimation.
Cube Consultants have been used to review and update the estimation parameters for the
Caloma pit. The scope of work was:
1.Undertake exploratory data analysis on the 1m gold composites provided by Alkane. This
included making top cut recommendations as well as an assessment of the suitability of
the current estimation methodology.
2. Undertake a spatial structural analysis, for representative high and low grade domains,
resulting in the modelling of gold grade variograms for use in the DOK estimation runs.
3. Undertake search neighbourhood analyses to assist with the choice of DOK search
parameters. This included a consideration of tightly sampled grade control areas (10mN x
10mE) drilling to more widely sampled areas covered only by resource holes.
4. Deliver an opinion on the suitability of the current 10mN x 10mE grade control drill pattern.
5. Update the estimation parameter file for use in the DOK routine.
6. Produce a technical summary note explaining the process followed by Cube and briefly
discussing the new estimation parameters.

Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.
No statistical or geostatistical method (non-linear or simulation) was used to quantify the
relative accuracy of the grade control estimate within confidence limits. Accuracy of the
estimate is strongly dependent on:
o
accuracy of the interpretation and geological domaining;
o
accuracy of the drill hole data (location and values);
o
orientation of local anisotropy; and
o
estimation parameters which are reflected in the variogram model used and the
parameters used that follow the resource model relatively closely.

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.
The resources are global, being based on drill hole data at exploration spacing.
To ensure the resources have ‘reasonable prospects of eventual economic extraction’ the
resources have been restricted by an indicative optimistic pit shell estimated at a gold price
of $2000 per ounce with the potential open pittable component assessed at ≥0.5g/t gold cut
off and material outside of the indicative pit with potential for eventual extraction by
underground mining methods assessed at ≥2.5g/t gold.

These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.
Reconciliation of the Caloma pit has shown the current geological model and estimation
process is performing very well, with minor improvements being made to the model as more
information is gathered.
Over the past 27 months the reconciled tonnes versus the Model are +1%, +3% grade for -
+4%increase in ounces. Based on the reconciled results and mining practices being
implemented the resource model is deemed to have a high level of accuracy.

32/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

33/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

APPENDIX 1 (continued)

JORC Code, 2012 Edition – Table 1 report – Caloma Two Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.
The Caloma Two area has been evaluated using air core (AC), reverse circulation (RC) and
diamond drilling (DD) techniques between May 2007 (early reconnaissance) and March
2012. Not all of this drilling lies within the current resource outline, there is some overlap in
drilling with the southern end of Caloma (although there is no overlap in resources) and none
of the air core drilling samples were used in the resource calculation.
o
AC - 105 holes for 7,367.5m
o
RC - 201 holes for 29,078m (inclusive of 2 pre-collar totalling 72m)
o
RC Grade Control – 435hole for 15,073
o
DD - 21 holes totalling 4,405.45m
RC samples were collected at one metre intervals via a cyclone and riffle or cone splitter.
DD sample intervals were defined by geologist during logging to honour geological
boundaries.
During the 2015 4 Geotech diamond holes were drilled into the Caloma Two deposit. These
are included in the total DD holes drilled.
Note: the resource model does not include Grade Control holes as the model predates the
Grade control Drilling.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
RC drilling completed to industry standards.
Core was laid out in suitably labelled core trays. A core marker (core block) was placed at the
end of each drilled run (nominally 3 or 6m) and labelled with the hole number, down hole
depth, length of drill run. Core was aligned and measured by tape, comparing back to this
down hole depth consistent with industry standards.

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
RC Drilling - approximately 10% (3-4kg) of total sample was delivered via cone or riffle splitter
into a calico bag (for shipment to laboratory if required) with the remaining sample delivered
into a large plastic bag and retained for future use if required.
DD Drilling – sample intervals defined were by geologists during logging to honour geological
boundaries and cut in half with a saw.
All samples sent to laboratory were crushed and/or pulverised to produce a ~100g pulp for
assay process.
All RC and core samples were fire assayed using a 50g charge.
Visible gold was occasionally observed in both core and RC samples
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
The resource is based on 195 RC drill holes totalling 28,260 metres and 17 diamond core drill
(DD) holes totalling 3,631 metres. The in-pit grade control RC drilling was also used in the
resource estimation.

34/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Detailed resource definition drilling was completed by RC techniques using a 130mm or
140mm diameter face sampling hammer.
DD holes were pre-collared using either RC techniques or un-oriented PQ3 (83mm diameter)
core drilling. Pre-collars were completed to competent material, with holes cased off and
completed to depth using HQ3 (61mm diameter) core. HQ3 core was oriented using the “Ace”
(Reflex Act) core orientation tool.
Drilling data used in the establishment of resource wireframes and the resource calculation
is comprised of:
o
88% RC – 187 holes totalling 27,345m (inclusive of 1 pre-collar totalling 42m)
o
12% DD – 16 holes totalling 3,848.0m
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.
RC sample recovery was visually estimated and was generally very good (>90%) aided by the
use of oversized shrouds through oxide material. Samples were even in size. Samples were
rarely damp or wet. Sample quality was assessed by the sampler by visual approximation of
sample recovery and if the sample was dry, damp or wet. Riffle and cone splitters were used
to ensure a representative sample was achieved for 1 metre samples.
DD - core loss was identified by drillers and calculated by geologists when logging. Generally
≥95% was recovered and any loss was usually in portions of the oxide zone. Triple tube Large
diameter, triple tube core (PQ3) was used through the oxide material to ensure the greatest
recovery.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.
RC drilling was completed using oversized shrouds to maintain sample return in oxide zone
and all samples were split using riffle or cone splitters. Use of RC rigs with high air capacity
assists in keeping samples dry.
Triple tube coring was used at all times to maximise core recovery with larger diameter (PQ3)
core used in the oxide and saprolite zones.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
There is no known relationship between sample recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
RC - each one metre interval was geologically logged for characteristics such as lithology,
weathering, alteration (type, character and intensity), veining (type, character and intensity)
and mineralisation (type, character and volume percentage).
DD - all core was laid out in core trays and geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage). A brief geotechnical
log was also undertaken collecting parameters such as core recovery, RQD, fracture count,
and fracture type and orientation.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
All logging was qualitative with visual estimates of the various characteristics. Magnetic
susceptibility data is quantitative.
RC - A representative sample of each one metre interval is retained in chip trays for future
reference.
DD - Core was photographed and all unsampled core is retained for reference purposes.

35/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary

The total length and percentage of the relevant intersections logged.
All DD core and RC chip samples have been geologically and geotechnically logged by
qualified geologists.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.
DD - zones of visual mineralisation and/or alteration were marked up by the geologist and cut
in half using an Almonté (or equivalent) core cutting saw. Samples submitted for analysis
were collected from the same side in all cases to prevent bias. Sampling intervals were
generally based on geology, were predominantly over 1m intervals but do not exceed 1.2
metres in length. All mineralised zones were sampled, plus ≥2m of visibly barren wall rock.
Laboratory Preparation – drill core was oven dried prior to crushing to <6mm using a jaw
crusher, split to 3kg if required then pulverised in an LM5 (or equivalent) to ≥85% passing
75µm. Bulk rejects for all samples were discarded. A pulp packet (±100g) is stored for future
reference

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
RC – for intervals with visual mineralisation and/or alteration, the calico sample bag (1m
samples) were numbered and submitted to the laboratory for analysis. Intervals without visual
mineralisation and/or alteration were spear sampled and composited over three metres. For
composited intervals returning grades >0.2g/t Au the calico bags were retrieved for assay of
the individual1mintervals. Rare damp or wet samples were recorded by the sampler.
Laboratory Preparation – the entire RC sample (3kg) was dried and pulverised in an LM5 (or
equivalent) to ≥85% passing 75µm. Bulk rejects for all samples were discarded. A pulp
packet (±100g) is stored for future reference.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
Alkane (ALK) sampling techniques are of industry standard and considered adequate.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
RC – field duplicate samples collected at every stage of sampling to control procedures.
DD – external laboratory duplicates used.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
RC - Duplicate samples were riffle split from the riffle/conical split calico from the drill rig.
Duplicates show generally excellent repeatability, indicating a negligible “nugget” effect.

Whether sample sizes are appropriate to the grain size of the material being sampled.
Sample sizes are industry standard and considered appropriate.
Quality of
assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.
Gold was determined using a 50g charge fused at approximately 1100°C with alkaline fluxes,
including lead oxide. The resultant prill was dissolved in aqua regia and gold determined by
flame AAS.
For other geochemical elements, samples were digested in aqua regia with each element
concentration determined by ICP Atomic Emission Spectrometry or ICP Mass Spectrometry.
These additional elements were generally only used for geological interpretation purposes,
are not of economic significance and are not routinely reported.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Not applicable to this report or deposit.

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Commercially prepared Certified Reference Materials (CRM) and blanks were inserted at 1 in
50 samples. CRM’s were not identifiable to the laboratory.

36/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Field duplicate samples were inserted at 1 in 50 samples (alternate to CRM’s).
Laboratory QAQC sampling includes insertion of CRM samples, internal duplicates and
screen tests. This data was reported for each sample submission.
Failed standards result in re-assaying of portions of the affected sample batches.
Screen fire assay checks (75µm mesh) were undertaken on 110 drill core samples. Screen
fire assay data overrides all other methods.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.
Drill data was compiled and collated, and reviewed by senior staff. External consultants do
not routinely verify exploration data until resource estimation procedures are deemed
necessary.

The use of twinned holes.
Twinned holes have not been used at Caloma Two as twinning provides verification only for
extremely limited areas of a deposit.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
All drill hole logging and sampling data was hard keyed into Excel spreadsheet for transfer
and storage in an access database with verification protocols in place.
All primary assay data was received from the laboratory as electronic data files which were
imported into sampling database with verification procedures in place. QAQC analysis was
undertaken for each laboratory report.
Digital copies of Certificates of Analysis (COA) are stored in a central database with regular
(daily) backup. Original survey data is stored on site.
Data was also verified on import into mining related software.

Discuss any adjustment to assay data.
No assay data was adjusted. Screen fire assays take precedence over all other assay
techniques.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Drill holes were laid out using hand held GPS (accuracy ± 2m) then surveyed accurately (±
0.1m) by licensed surveyors on completion.
RC drill holes were surveyed using a single shot electronic camera at a nominal 30m down
hole intervals.
DD holes were surveyed at nominal 30m down hole during drilling to maintain drilling direction
and then at 6m intervals on retrieval of rod string using a multi shot electronic camera.

Specification of the grid system used.
All drill holes were originally laid out in AMG66 grid however since mining commenced in
February 2014 have been transformed to MGA94 grid system to conform with reporting
requirements for mine operations.

Quality and adequacy of topographic control.
The area is very flat. A site based digital terrain model was developed from accurate (± 0.1m)
survey control by licenced surveyors.
Data spacing
and distribution

Data spacing for reporting of Exploration Results.
Drilling was completed on north-south sections spaced nominally 20m apart with holes
spaced at 20m intervals along the lines. The line spacing was increased to a nominal 40m
in zones thought peripheral to the main ore body and to the east.
The drill hole spacing is similar to that used at other Tomingley deposits and has been
established to be sufficient.

37/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
The drill hole spacing has been shown to be appropriate by the visible continuity of
mineralisation between drill holes.

Whether sample compositing has been applied.
Sample compositing was not applied until resource estimation stage.
RC samples with no visible mineralisation or alteration were composited to 3m with 1m
resamples assayed if the composite returned a gold value of >0.2g/t gold. One metre
samples override 3m composites in the database.
DD – core was sampled to geology.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
Much care was given to attempt to intersect mineralisation at an optimal angle but in complex
ore bodies this can be difficult. The chosen drilling direction (south at inclination of -60°) is
consistent with structural measurements obtained from oriented drill core.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
It is not thought that drilling direction will bias assay data at Caloma Two.
Sample
security

The measures taken to ensure sample security.
All samples were bagged in tied numbered calico bags, grouped into larger tied polyweave
bags and transported to the laboratory in Orange by Alkane personnel or courier. S ample
submission sheets were delivered with the samples and also emailed to the laboratory. All
sample submissions were documented via ALS tracking system and all assays were reported
via email.
Sample pulps were returned to site and were stored for an appropriate length of time
(minimum 3 years).
The Company has in place protocols to ensure data security.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.
The Company does not routinely have external consultants verify exploration data until
resource estimation procedures are deemed necessary.
The Caloma Two data has not been audited nor reviewed by external parties however the
data for other deposits within the TGP was reviewed in 2010 and 2011 by Behre Dolbear
(BDA). BDA did not express any specific concerns with respect to the data other than to
recommend the completion of some round robin assaying and completion of additional
density determinations, both of which were undertaken for the Caloma Two resource drilling.
Section 2 Reporting of Exploration Results
(Criteria listed in theprecedingsection also applyto this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The Caloma Two Deposit lies within ML 1684 which is held in the name of Tomingley Gold
Operations Pty Ltd, a wholly owned subsidiary of Alkane Resources Ltd.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
ML1684 expires on 11 February 2034.

38/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
All reported drilling has been completed by ALK.
Geology
Deposit type, geological setting and style of mineralisation.
Geological nature of the Tomingley Deposits is well documented elsewhere.
Mineralisation is associated with quartz veining and alteration focused within sub-volcanic
basaltic-andesite sills and adjacent volcaniclastic sediments. The deposits appear to have
formed as the result of a rheological contrast between the porphyritic sub-volcanic sills and
the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the
sediments ductile deformation, and have many similarities to well documented orogenic - lode-
style gold deposits.
Mineralisation at Caloma Two is developed within a series of ‘quartz lodes’ which dip north
at flat to moderate angles and hosted dominantly within the sub-volcanic sills. Mineralisation
is also developed along a sediment contact zone which appears to be a potential linking
structure with the Caloma mineralisation to the north. There is also evidence for the
development of an inverted saddle reef at depth. The lodes are cross cut by a number of
post mineralisation dolerite dykes.
Drill hole
Information
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
Too numerous and not practical to summarise all drill hole data used. All drilling results have
been reported previously
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Exclusion of drill hole data will not detract from the understanding of this report. All drill data
has been previously reported, holes are close spaced and in an operating mine area.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Previously reported results have been –
For uncut gold grades;
Intercepts were defined (bounded) by 0.5g/t gold outer limit and may contain some internal
waste;
Only intervals grading ≥1 g/t gold were reported;
Grades were calculated by length weighted average.
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
Exploration results have been previously reported as length weighted average grades with
internal high grade intercepts reported separately.
The assumptions used for any reporting of metal equivalent values should be clearly
stated.
No metal equivalents are reported.

39/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in the reporting of Exploration Results.
o
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
o
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Previously reported exploration results include the drilled width and an estimate of true width.
The mineralisation is structurally complex and true widths are variable depending on the ore
zone intersected however range between 60% and 80% of drill intersection.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Cross section and a plan showing geology with drill collars were included with previously
reported exploration results. A typical plan and cross section are included below.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Data relating to all drill holes has been reported in previous documentation of exploration
results.
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No additional or new drilling results are being reported at this time.

40/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
No further work is planned in the short term however drilling to test the continuation of
mineralised structures at depth for an underground resource definition will be contemplated.

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
A pit design has been established and material has been included in the mining schedule.
Caloma Two
Caloma
Ore potentially mineable by
underground methods – open at
depth
Resource Limiting Pit

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.
Logging data is entered into Excel via drop down menus. All raw data is loaded directly to
the Access database from the assay, logging and survey derived files.

Data validation procedures used.
There are validation checks to avoid duplications of data.
The data are further validated for consistency when loaded into Datamine and desurveyed.
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
(If no site visits have been undertaken indicate why this is the case.)
The quoted resources were compiled by Mr Craig Pridmore, Geology Superintendant,
Tomingley Gold Operations Pty Ltd, who has worked at TGO site since March 2015.

Confidence in (or conversely, the uncertainty of ) the geological interpretation of the
mineral deposit.
The geological model is built on structural data from core and lithological logging. The lode
strike orientations are similar to Wyoming Three which sits in a similar structural position.

41/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Geological
interpretation

Nature of the data used and of any assumptions made.
Structural measurements from oriented drill core were used to assist in the
geological
interpretation along with lithological, alteration and mineralisation logging of RC chips and drill
core.

The effect, if any, of alternative interpretations on Mineral Resource estimation.
A steep dipping interpretation was initially proposed however this was inconsistent with
structural measurements obtained from oriented drill core.

The use of geology in guiding and controlling Mineral Resource estimation.
Geological (lithological) logging was used to develop a geological model. Alteration and
mineralisation estimates along with grade guided the interpretation of the ore envelope
wireframes at a nominal 0.25g/t Au lower cut-off.
The majority of mineralisation is hosted by a quartz veined and altered feldspar ± augite
porphyritic andesite of probable sub-volcanic origin.
Dolerite dykes post-date mineralisation and all mineralised lodes are terminated at the
dolerite contacts.

The factors affecting continuity both of grade and geology.
Mineralisation is directly associated with alteration and quartz veining.
Dimensions
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
Strike length ~ 360m
Width ~ 100m
Depth ~ 20m from below surface to ~ 250m below surface from deepest drilling intercept.
Estimation and
modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
parameters used.
17 mineralisation wireframes (domains) and 5 dolerite wireframes were interpreted and used
as constraints for the resource modelling. Four surfaces were also used to separate material
types - topography, alluvium, saprolite and base of oxidation surfaces.
The drill hole data were flagged by dolerite and mineralised domain wireframes in priority
order, to prevent double use the data in the intersecting zones. The samples immediately
outside the mineralised zones were re-flagged, if they contained more than 0.25 g/t gold, in
order to prevent any overestimation that could be caused by use of assay boundaries. This
re-flagging is also useful for the RC samples that are not broken at barren dyke boundaries.
The samples were composited to 1m, the most common sample length and flagged by the
topography, alluvium, saprolite and base of oxidation surfaces.
The top-cut declustered data had Coefficient of Variation (CV’s) of less than 1.7 for the
mineralised zones, allowing use of Ordinary Kriging for estimation.
Average variogram models were fitted for the mineralised zones and dolerite dykes.
Estimates were by Inverse Distance Squared (ID2) and Nearest Neighbour methods.
Datamine Studio 3 V22 was used.
The resources are limited by an indicative pit design to ensure they have reasonable
prospects for eventual economic extraction.

The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.
There are no previous estimates or any production data to provide any validation.

The assumptions made regarding recovery of by-products.
No assumptions made - Estimates were made for gold, arsenic and copper; only gold is of
economic significance.

42/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).
No deleterious elements identified for estimation

In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.
The primary block size was small (2.5m x 2.5m x 5m) because of the narrow dipping nature
of the mineralisation zones.
The average drill hole spacing was 20m and variogram ranges 22m x 26m x 3.5m.
The primary search was equal to the variogram ranges; secondary searches were made
using 2x and 3x the primary search. Only the material estimated in the primary and secondary
searches were included in the resources.
Sub-blocks were estimated but these were regularized to 2.5m x 2.5m x 2.5m blocks in March
2014 as this is more compatible with the mine planning software currently in use at the mine
and the proposed mining methodology.

Any assumptions behind modelling of selective mining units.
No assumptions were made.

Any assumptions about correlation between variables.
No assumptionsweremade

Description of how the geological interpretation was used to control the resource
estimates.
Only data form the same domain were used to make estimates.

Discussion of basis for using or not using grade cutting or capping.
The drill hole data were declustered using the polygonal method for statistical analysis and
determination of top-cuts.
The top cuts were selected using a combination of histograms, probability plots and cutting
statistic plots (plots of cut-off grade against Coefficient of Variation (CV) and total metal).

The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
Estimates were made by Ordinary Kriging, with check estimates by Inverse Distance
Squared (ID2) and Nearest Neighbour methods.
The estimates were verified using several different techniques and checked for local and
global variability. The checks included comparison with estimates made by different
estimation methods, and against the declustered composites.
Moisture
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
The tonnages were estimated on a dry tonnage basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality parameters applied.
The cut-off grade (0.50 g/t Gold) for open pittable resources is being used for the other
Tomingley deposits. This takes into account current mining costs and metallurgical recovery
for similar material.
Mining factors
or assumptions

Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
Mining of ore from the Caloma 2 ore body commenced in 2017 and to date reconciliations,
save for poorly defined inferred mineralisation in the background domain, have been grade
positive. The main part of the Caloma 2 deposit is currently being mined by open pit methods.

43/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
Metallurgical test work on Caloma Two material has not been undertaken to date however,
the metallurgy of the other Tomingley deposits is well studied. It is likely that Caloma Two
will have similar metallurgical characteristics.
The Caloma deposit is currently being mined and processed with no significant differences
in metallurgical recoveries from those estimated in the feasibility study.
Environmental
factors or
assumptions

Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
Project approval for the TGP was granted in July 2012 for mining from three open pits
(Wyoming One, Wyoming Three and Caloma) and underground from Wyoming One deposit.
Mining from the Wyoming Three and Caloma open pits commenced in December 2013 with
processing of ore in February 2014. Development approval for the Caloma Two open pit
was granted in July 2016. The Environmental Protection Licence for the works is still awaited.
Bulk density
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.
Specific gravity measurements were completed by commercial laboratories on DD core
samples.
At least 5 samples if possible were selected for each of the 8 categories; weathered porphyry,
weathered mineralised porphyry, fresh porphyry, fresh mineralised porphyry, weathered
sediment, weathered mineralised sediment, fresh sediment, and fresh mineralised sediment.
The specific gravity measurements were applied on a dry basis.
In December 2015 a large in-house density analysis campaign occurred on all the deposits
with over 3,182 additional measurements taken.

The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.
SG measurements completed on all material types – see above.

Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
No assumptions made – SG determined and individual values applied to each material type
based on wire-framed surfaces
Classification
The basis for the classification of the Mineral Resources into varying confidence
categories.
The resources were classified using the search pass; only estimates made within the defined
mineralisation zones in the first search pass were classified as Indicated Resources. The
dimensions of the search pass were based on the variogram ranges.
No Measured Resources were defined, because of some uncertainly in the geological
interpretation of the mineralisation zones, and the use of a high proportion of Reverse
Circulation drilling (RC) for exploration.

Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).
The use of RC drilling limits the amount of geological information that can be logged, and
boundaries of mineralisation zones cannot be precisely located.

Whether the result appropriately reflects the Competent Person’s view of the deposit.
The classification reflects the Competent Persons view of the deposit and its supporting data

44/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Audits or
reviews

The results of any audits or reviews of Mineral Resource estimates.
As this is the first mineral resource estimation for this deposit, there have not been any audits
or reviews.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.
The Caloma Two deposit consists of 17 narrow mineralisation zones; consequently there are
relatively few drill hole data in each zone. This has limited the accuracy of any fitted variogram
model and forced the use of average variogram models. The use of an approximate
variogram model does not greatly affect the accuracy of kriged grades as kriging is a very
robust estimation process. It does, however, limit the accuracy of the variance of the
estimates and any confidence limits that might be statistically inferred.
No statistical or geostatistical method (non-linear or simulation) was used to quantify the
relative accuracy of the estimate within confidence limits. Accuracy of the estimate is strongly
dependent on:
o
accuracy of the interpretation and geological domaining;
o
accuracy of the drill hole data (location and values);
o
orientation of local anisotropy; and
o
estimation parameters which are reflected in the global resource classification.

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.
The quoted resources are global, being based on close spaced grade control drill hole data to
exploration spacing. The resources have been depleted based on mining to end of June
2018. To ensure the resources have ‘reasonable prospects of eventual economic extraction’,
the open pittable resources have been restricted by an indicative optimistic pit shell estimated
at a gold price of $2000 per ounce with the potential open pittable component assessed at
≥0.5g/t gold cut off.The Underground Resource is restricted to material below the current
final pit design,below the highest Stope level currently designed, with potential for eventual
extraction by underground mining methods assessed at ≥2.5g/t gold.

These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.
Mining of ore from the Caloma 2 ore body commenced in 2017 and to date reconciliations
have shown that the original resource model was performing within expectations, Save for
poorly defined inferred mineralisation in the background domain. Reconciled Tonnes, against
the original exploration resource model with in line with each other. The reconciled grade
was 32% higher than predicted with an overall total ounces mined increase of 32%.
Over the period of mining the Block Estimation model has been modified and improved, with
the Open pit and Underground run simultaneously and captured within the same Block model
The estimation method has remained as ID2 (original resource model estimate). Close
spaced Grade control drilling has been ongoing since the start of the open pit. This additional
data collected with the mapping has justified a review change in modelling parameters and
estimation techniques from ID2 to Ordinary Kriging. This change in estimation method has
will be used for the underground resource model which is an extension of the current open
pit grade control block mode going forward.
Comparisons between the reconciled mined tonnes and grade, the Grade control model have
shown that the reconciled mined tonnes are +7%, grade +8% with an overall increase of
+15% ounces. This indicates the model being implemented does have a reasonable high
level of accuracy although is slightly conservative..

45/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

46/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

APPENDIX 2

JORC Code, 2012 Edition – Table 1 report Section 4 Estimation and Reporting of Ore Reserves

(Criteria listed in section 1, and where relevant in sections 2 and 3, also apply to this section.)

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Mineral
Resource
estimate for
conversion to
Ore Reserves

Description of the Mineral Resource estimate used as a basis for the conversion to an
Ore Reserve.
The Mineral Resource estimate that this reserve is based upon has been compiled by Mr
Craig Pridmore, Geological Superintendent for Alkane Resources Ltd. Mr Pridmore is
employed at the Tomingley Gold Operation. The mineral resource estimates have been
completed using block models developed by Mr Craig Pridmore for Caloma One, Caloma 2,
Wyoming 3 and Wyoming 1, using data supplied by Alkane Resources Ltd (Alkane).
The models produced incorporated all mineralisation in the Wyoming One, Caloma One and
Caloma Two deposits to permit reconciliation of production to date. The depletion of these
resource models utilised surveyed data from the end of month production records in June
2018.
The following table comprises the Mineral Resources for the Tomingley Gold Project which
were compiled by Mr Craig Pridmore, Geology Superintendent for Alkane, based on the
resource models mentioned above.
DEPOSIT
Tonnage
Grade
Tonnage
Grade
Tonnage
Grade
Tonnage
Grade
(Kt)
(g/t Au)
(Kt)
(g/t Au)
(Kt)
(g/t Au)
(Kt)
(g/t Au)
(Koz)
Wyoming One
410
1.6
991
1.7
137
0.7
1,538
1.6
79
Wyoming Three
86
2.0
16
1.3
33
1.4
135
1.7
8
Caloma
895
1.6
1,016
1.2
824
1.2
2,735
1.3
116
Caloma Tw o
71
2.1
824
1.98
26
1.4
921
2.0
59
Sub Total
1,462
1.6
2,847
1.73
1,020
1.3
5,329
1.5
262
Wyoming One
0
0.0
866
4.0
110
3.2
976
3.9
122
Wyoming Three
10
3.6
6
3.1
4
3.1
20
3.4
2
Caloma
82
3.8
35
3.4
47
3.0
164
3.5
18
Caloma Tw o
-
0.0
218
3.6
76
3.2
294
3.5
33
Sub Total
92
3.6
1,125
3.9
237
3.2
1,454
3.7
175
TOTAL
1,554
1.8
3,972
1.9
1,257
1.7
6,783
1.8
437
TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES(as at 30 June 2018)
MEASURED
INDICATED
INFERRED
TOTAL
Total Gold
Open Pittable Resources (cut off 0.50g/t Au)
Underground Resources (cut off 2.50g/t Au)
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
The Competent Person for the Ore Reserves, Mr. Craig Pridmore full time Geology
Superintend at Tomingley Gold Operations Pty Ltd (TGO), a whole owned subsidiary of
Alkane.

47/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

(If no site visits have been undertaken indicate why this is the case.)
Study status
The type and level of study undertaken to enable Mineral Resources to be converted to
Ore Reserves.
(The Code requires that a study to at least Pre-Feasibility Study level has been undertaken
to convert Mineral Resources to Ore Reserves. Such studies will have been carried out and
will have determined a mine plan that is technically achievable and economically viable,
and that material Modifying Factors have been considered.)
The Tomingley Gold Mine is an operational open pit mine and CIP processing plant. The
mine is based on the extraction and treatment of ore from three operational open pits –
Caloma One, Caloma Two, and Wyoming One. Wyoming Three pit has been completed to
current economic limits. Mining is currently occurring at Wyoming One, Caloma One and
Caloma Two Pits. Caloma One Pit is expected to be complete in the third quarter of 2017.
The TGO processing plant utilises two stage crushing, single stage grinding and a gravity/CIL
gold recovery circuit. The plant has a designated throughput of 1.25mtpa of oxide ore and
1.0mtpa of fresh (sulphide) ore. The plant has been operational since February 2014.
The Tomingley Gold Mine was subject to a Definitive Feasibility Study including the
estimation of an initial Mineral Resource and Ore Reserve for the Wyoming One, Wyoming
Three and Caloma open pits (2009, 2009 and 2012 respectively). Caloma Two has been
subsequently optimized and designed using Whittle and Surpac software by Proactive Mining
Solutions and in-house personnel. The current Ore Reserve has been calculated by the
Competent Person using the designed pits and associated depletion as at the end of 30 June
2018.
The Site has been operational since January 2014 and is achieving the design objectives set
out in the DFS.
This Reserves Statement is based upon well understood costs and physicals from what is
now a mature operation. Cost modelling has been completed to a budget level.
The end of June 2018 mine survey information has been used to differentiate material mined
from in-situ material.
Cut-off
parameters

The basis of the cut-off grade(s) or quality parameters applied.
A lower block cut-off grade of 0.5g/t Au has been applied to the resource block model in
calculating this Ore Reserve. The lower cut has been selected with consideration to mine
ability, and incremental cash operating margins (i.e. processing costs).
The lower cut-off has been calculated based upon,
o
a $1550 per ounce gold price excluding royalties,
o
using process recoveries based on actual achieved for the past reporting year, and
o
estimated processing and administration costs for the life of mine plan, based upon
achieved costs for the past financial year.
The cut-off grade has been verified by using costs and metallurgical recoveries from the past
financial year, and expected Gold Price. The calculated lower block cut off of 0.5g/t is
conservative when historic costs and processing recoveries are applied.
Mining factors
or assumptions

The method and assumptions used as reported in the Pre-Feasibility or Feasibility
Study to convert the Mineral Resource to an Ore Reserve (i.e. either by application of
appropriate factors by optimisation or by preliminary or detailed design).
Open cut truck excavator mining, with some free dig material in the upper oxide zones and
drill and blast in the lower oxide and fresh materials.

The choice, nature and appropriateness of the selected mining method(s) and other
mining parameters including associated design issues such as pre-strip, access, etc.
Equipment size and methods selected typical of moderate scale open pit gold mining. 120
tonne class excavators, 90 tonne mechanical drive haul trucks.
Wyoming 1 pit has been stripped using the operator’s dry hire fleet by using a staged mining
design. Caloma Two Stage 1 pit has been mined, and the subsequent stages will also be
stripped using the dry hire fleet according to the Life Of Mine plan.

48/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Dual lane in pit ramps at 24 m wide and 1:8.5 gradient for the majority of the pits. Single lane
ramps at 15m wide have been designed to access the final stages of the mine. These have
shown to be successful for the mine so far.
Mining is on five metre high benches and is mined in two, two and a half metre high flitches,
to reduce mining dilution. These flitch heights are typical for gold mining and match the size
of mining equipment selected.

The assumptions made regarding geotechnical parameters (e.g. pit slopes, stope
sizes, etc), grade control and pre-production drilling.
In Pit ore boundaries are defined by Reverse Circulation Grade control drilling on 10 metre
by 10 metre to 10 metre by 5 metre patterns depending on the size and quality of the
mineralisation being grade controlled.
Geotechnical parameters as advised by specialised geotechnical consultants for Wyoming
One, Caloma One, and Caloma Two. Site visits are conducted regularly by the consultants,
and parameters reviewed. Any modifications to wall design are addressed in design.

The major assumptions made and Mineral Resource model used for pit and stope
optimisation (if appropriate).
Pit Optimisation parameters have been confirmed to an appropriate level of accuracy through
subsequent mining operations, along with reconciliation of actual performance to date.
Parameters have been applied directly to designs, and these designs have then been
subjected to financial analysis, to confirm profitability. This process has been applied to all
the mining pits.

The mining dilution factors used.
Wyoming One
The open pit Reserve is based on a sub blocked resource model that does not incorporate
any dilution.
On comparison with actual mined to date, reconciled contained ounces are 13% higher than
the model has predicted, which is within limits.
No dilution factor has been applied.
Caloma One (open pit)
N/A
Caloma Two
The open pit Reserve is based on a sub blocked grade control resource model.
On comparison with actual mined to date, reconciled contained ounces are 15% more than
the model has predicted. No dilution factor has been applied.
Underground Assumptions:
These assumptions have been reported in the 4thJune 2018 Tomingley Underground
Resource, Reserve & Development announcement.

The mining recovery factors used.
Assumed 100% recovery of the models, due to acceptable reconciliation to date.

Any minimum mining widths used.
Pit Design has been limited to a minimum working width of 24 metres.

The manner in which Inferred Mineral Resources are utilised in mining studies and the
sensitivity of the outcome to their inclusion.
Inferred resources contained in the mineralised ore wireframes are included in the current
life of mine schedule. All of the remaining in pit resource contained within the life of mine
plan at the end of June 2018 is Is classified as measured
Reconciliations to date for Wyoming 1 show the models are generally under reporting tonnes,
and with a similar grade. Resulting in a total increase of 13% for contained ounces against
mill feed. This is based upon 85% of the original pit ore being mined so far,.

49/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Reconciliations to date for Caloma Two show the models are generally under reporting
tonnes by 7 %, and under reporting grade by 8%. This results in Mill feed over reporting 15%
contained metal against the model and is based upon 90% of the original pit ore being mined
so far.

The infrastructure requirements of the selected mining methods.
All required infrastructure is currently in place.
Metallurgical
factors or
assumptions

The metallurgical process proposed and the appropriateness of that process to the
style of mineralisation.
Ore from the Tomingley Project will be treated at the Tomingley Gold Plant which is described
above.

Whether the metallurgical process is well-tested technology or novel in nature.
The technology is well tested

The nature, amount and representativeness of metallurgical test work undertaken, the
nature of the metallurgical domaining applied and the corresponding metallurgical
recovery factors applied.
The DFS plan uses 96% metallurgical recovery for oxide and 91% for fresh for an overall
recovery of 93%. Each pit, except Caloma Two, has had specific metallurgical test work
undertaken for the DFS which is made up of leach and gravity recovery. The metallurgical
test work is representative of all material types and areas of the ore bodies. The range of
recoveries used are within the parameters of the individual pit recoveries. Processing of ores
thus far, including those from Caloma Two, have shown process recoveries to fall within
these limits.

Any assumptions or allowances made for deleterious elements.
No deleterious elements extracted

The existence of any bulk sample or pilot scale test work and the degree to which such
samples are considered representative of the ore body as a whole.
Process recovery for the 2016/2017 financial year averaged 91.47%. A blend of 24% oxide
and 76% fresh material was processed for the year. This results in process recovery being
1% less than the LOM Plan.

For minerals that are defined by a specification, has the ore reserve estimation been
based on the appropriate mineralogy to meet the specifications?
N/A – no minerals defined by a specification.
Environmental
The status of studies of potential environmental impacts of the mining and processing
operation. Details of waste rock characterisation and the consideration of potential
sites, status of design options considered and, where applicable, the status of
approvals for process residue storage and waste dumps should be reported.
All environmental approvals are in place for operating within the Wyoming One, Wyoming
Three and Caloma pits.
Development approvals were obtained during 2015 for the commencement of the Caloma
Two open pit.
The waste dump for Caloma Two will be incorporated into WRE3, Caloma’s waste dump, for
Stage One. Stages Two and Three will backfill the original Stage One pit. The Caloma Two
operation is within the existing granted mining lease.
There is sufficient volume in the RSF design to allow for all the material in the LOM, including
Caloma Two.
Infrastructure
The existence of appropriate infrastructure: availability of land for plant development,
power, water, transportation (particularly for bulk commodities), labour,
accommodation; or the ease with which the infrastructure can be provided, or
accessed.
Infrastructure has already been constructed for open pit mining and processing. Works to
site included access road, a water pipeline, a 66 KV power line, site drainage, topsoil
stockpiling, waste dump construction, Residue Storage Dams, Process Water Dams,
associated offices, workshops, fuel and laydown areas. Sufficient site infrastructure has been
constructed to process ore at 1.25 MTPA.
All surface drainage works for Caloma Two have been carried out.
The site relies upon local employment drawing employees from Tomingley, Peak Hill, Dubbo
and Parkes Region.

50/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Costs
The derivation of, or assumptions made, regarding projected capital costs in the study.
The economic analysis is based on total cash costs. Projected All In Sustaining Costs have
been calculated from the LOM Plan and are less than the predicted realised gold price,
leaving margin.

The methodology used to estimate operating costs.
Operating costs – Mining and Process
o
Current wage rates.
o
Projected fuel price for 2017/2018
o
Current contract rates for equipment hire, drilling contractor and explosive supplier.
o
Current explosives costs and estimates of requirements for blast hole drilling,
blasting, excavation and processing based on the varying rock types.
o
Current work rates and OEM specs for excavator productivity.
o
Truck hours based on OEM specs and projected haul cycles from mine plan.
o
Contract Prices for Processing Consumables
o
Current contract prices for power and estimated usage
o
Associated onsite administration cost and a portion of head office costs.
Total operating and capital costs for 2016/2017 financial year were 4% lower than the
anticipated plan for the year, with 5% higher than anticipated gold ounces mined.

Allowances made for the content of deleterious elements.
N/A – No deleterious elements extracted

The source of exchange rates used in the study.
Gold price is expressed in Australian dollars and no exchange rate is required.

Derivation of transportation charges.
No transportation charges have been applied in economic analysis as these are included in
the mining costs. Ore will be delivered directly from the pit to the ROM beside the existing
plant within estimated mining costs. Gold transportation costs to the Mint are included in the
refining component of the milling charges assumed in the study.

The basis for forecasting or source of treatment and refining charges, penalties for
failure to meet specification, etc.
Processing operating costs outlined above.

The allowances made for royalties’ payable, both Government and private.
Royalties payable at rate of 4% ex-mine value to the NSW State Government have been
considered. There are no other royalties’ due.
Revenue
factors

The derivation of, or assumptions made regarding revenue factors including head
grade, metal or commodity price(s) exchange rates, transportation and treatment
charges, penalties, net smelter returns, etc.
Assume 100% ore mining recovery of the regularised Model.
Selling costs and Royalties included in costs to give a net revenue per ounce.
No deleterious metals present that incur smelter penalties.
A base gold price of AUD$ 1550 /Oz excluding royalties in this ore reserve assessment.
Exchange rates, royalties and transport charges dealt with above.

The derivation of assumptions made of metal or commodity price(s), for the principal
metals, minerals and co-products.
No assumptions made

The demand, supply and stock situation for the particular commodity, consumption
trends and factors likely to affect supply and demand into the future.
There is a transparent quoted derivative market for the sale of gold;

51/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Market
assessment
The Dore Gold is sent to the Perth Mint at commercial rates for refining. The Tomingley Gold
Operations Pty Ltd sell the gold into the open market.
Gold sold outside of the hedge book will be sold to the spot market.

A customer and competitor analysis along with the identification of likely market
windows for the product.
N/A There is a transparent quoted derivative market for the sale of gold

Price and volume forecasts and the basis for these forecasts.
N/A There is a transparent quoted derivative market for the sale of gold

For industrial minerals the customer specification, testing and acceptance requirements
prior to a supply contract.
N/A – not assessing industrial minerals
Economic
The inputs to the economic analysis to produce the net present value (NPV) in the
study, the source and confidence of these economic inputs including estimated
inflation, discount rate, etc.
The operation is currently operating at a processing rate of 1.1 MTPA and has built up 3
months of ore grade stockpile.
The preliminary analysis carried out did not estimate the NPV but rather simple cash flow
based on a variety of possible gold prices; or
For all deposits, the optimal pit shell was chosen as that with the highest discounted cash
flow from the Whittle Four-X pit Optimisation. The pits were designed from the chosen shell.
The Whittle optimisation have low variations across the AUD1200-1600 Revenue range. Pit
designs where then back calculated for undiscounted return using the whittle input costs to
ensure profitability within limits.

NPV ranges and sensitivity to variations in the significant assumptions and inputs.
Sensitivity analysis was included in the Whittle optimization and simple cash flow analysis.
As noted above there were very low variations in the Whittle optimisations for gold prices
ranging from $1200 - 1600
Social
The status of agreements with key stakeholders and matters leading to social licence to
operate.
The TGO site is located on flat farm land with the Newell Highway separating Caloma and
the Wyoming (pits and processing) side of operations. Surrounding the site is the village of
Tomingley (600 m to the north) and local operating farms.
All key stakeholder agreements are in place, including a Voluntary Planning Agreement
(VPA) with the Narromine Shire Council. The Company has close working relationships with
the local communities.
Other
To the extent relevant, the impact of the following on the project and/or on the
estimation and classification of the Ore Reserves:

Any identified material naturally occurring risks.

The status of material legal agreements and marketing arrangements.

The status of governmental agreements and approvals critical to the viability of the
project, such as mineral tenement status, and government and statutory approvals.
There must be reasonable grounds to expect that all necessary Government approvals
will be received within the timeframes anticipated in the Pre-Feasibility or Feasibility
A risk analysis was undertaken as part of the Feasibility Study and Environmental
Assessment and no naturally occurring risks were identified.
Majority of production is sold into the spot gold market.
The operation is situated on a granted Mining Lease which expires in 2034. All statutory and
government approvals have been obtained. The required development approvals for Caloma
Two and the Caloma Cutback have been granted. EPL licence is still outstanding for Caloma
Two however this is anticipated to be complete prior to end of Q2 this financial year.

52/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

study. Highlight and discuss the materiality of any unresolved matter that is dependent on a third party on which extraction of the reserve is contingent.

study. Highlight and discuss the materiality of any unresolved matter that is dependent
on a third party on which extraction of the reserve is contingent.
Classification
The basis for the classification of the Ore Reserves into varying confidence categories.
The classification of the Tomingley Gold Project Ore Reserve (June 2016) has been carried
out in accordance with the recommendations of the JORC code 2012.

Whether the result appropriately reflects the Competent Person’s view of the deposit.
Yes. The Wyoming One, Caloma One and Caloma Two deposits are robust at current gold
prices and this has been proven over past three years of operations.

The proportion of Probable Ore Reserves that have been derived from Measured
Mineral Resources (if any).
No probable reserves have been derived from Measured Resources – all measured
resources converted to Proved Reserves.
Audits or
reviews

The results of any audits or reviews of Ore Reserve estimates.
The Caloma Cutback was reviewed by site personnel since publication of the 2016 Ore
Reserves. The following is a summary of activities undertaken.
o
Additional infill drilling aimed at the base of the cutback. This was with the intention
to raise inferred material to indicated for the in-pit resource.
o
Inclusion of the drilling in the resource model, cl1_210217.mdl. This model has
subsequently been updated with the current data in the latest model cl1_200717.
The model was then interpolated for grade using two methodologies.
o
The attributes were labelled au_krig (ordinary kriging of gold assays) and au_sched.
The au_sched process removes all the blocks that have limited drilling data to
support mining, or blocks that are smaller than the current SMU. This is done by
creating ore block solids that represent a mining ore block, and an average grade for
the solid is then calculated using the au_krig attribute. This method reduces the
grade of the high grade material, and dilutes with the low grade material within the
block. It produces block physicals that closely represent mining SMU.
o
The au_krig attribute is considered as a best case model. The au_sched attribute
was considered as a worst-case model, but indicative of results seen in Caloma One
mining to date. The worst case reduced contained gold by approximately 5,600
ounces.
o
Optimisation of the two attributes showed a difference of approximately 25% in
cashflow, at a gold price of $1600 per ounce.
o
Mining equipment was reviewed and different options investigated, including the use
of small articulated dump trucks and 120 tonne excavators.
o
Design versions were tested for viability using Life of Mine schedules and cost
forecasts. Costs were applied to alternative equipment from suppliers, and
production rates applied through benchmarking of similar operations.
o
Extensive iterations on pit design, equipment cost and schedules were completed.
o
At the applied gold price of $1550 per ounce the project became breakeven at best,
and a return on expenditure of -5.6% at worst.
o
Major contributing factors that resulted in the project being unfinancial were gold
price per ounce (excluding royalties) of $1550 versus $1650 in 2016 Ore Reserves,
increase in drilling density increased confidence and reduced contained gold, and
revised modelling method to smooth grades within the ore boundaries for small block
sizes.

53/54

Alkane Resources Ltd – Tomingley Resources and Reserves xx October 2018

==> picture [58 x 26] intentionally omitted <==

Consequently, the project has been removed from the 2017 Ore Reserves and this decision
has been carried forward into the 2018 Ore reserves.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the Ore
Reserve estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the reserve within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors which could affect the relative accuracy and confidence of the estimate.

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.

Accuracy and confidence discussions should extend to specific discussions of any
applied Modifying Factors that may have a material impact on Ore Reserve viability, or
for which there are remaining areas of uncertainty at the current study stage.
The resource block models from which the mining reserve has been derived was based on
a geostatistical estimation completed by Craig Pridmore who were satisfied with the resource
categories quoted
The material included in the LOM schedule is only material that has been estimated inside
of designated ore zones. The estimated material outside of the ore zones has not been
included.
Reconciliation of Proved and Probable versus mined for Wyoming One and Caloma Two
indicates that approximately 100% of inferred in pit resource is transferring to actual mined
ore tonnes.
The assumption that the high grade (plus 1 g/t) and the low grade (0.5-1.0 g/t) could be wholly
separated has not been proved, although low grade material is being recovered. This has
resulted in more high-grade material and less low-grade material than as predicted in the
resource models. A revised technique using grade control drilling and modelling a separate
attribute called au_sched has shown some improvement for this. The estimation technique
used essentially smooths the grade and allows for low grade within the high grade mineable
ore blocks.
The materials mined and processed for the year ending June 30, 2018 have included oxide
and fresh materials. Approximately 85% of mill feed for the year has been fresh material. Mill
performance has been within limits for the fresh material fed to date.
Indications to date are that the Reserve should be conservative in both tonnes and grade. It
is likely that the pits will recover more tonnes and possibly grade than what is contained in
the Proved and Probable Reserve.

It is recognised that this may not be possible or appropriate in all circumstances. These
statements of relative accuracy and confidence of the estimate should be compared
with production data, where available.

54/54