ASX and MEDIA RELEASE

10 December 2015

==> picture [151 x 113] intentionally omitted <==

Maiden Underground Ore Reserve

Tomingley Gold Operations

  • Maiden underground ore reserve estimated at 524,400 tonnes grading 3.66g/t gold for 61,600 ounces

  • These reserves are within the total project resource of 11.25 million tonnes grading 1.9g/t gold (687,000 ounces)

  • Open pit operations have been converting around 100% of Inferred Resource ounces to mine reserves

  • Estimate only accesses ore from Wyoming One and Caloma Two

  • Potential exists to include Caloma with additional drilling to upgrade the resource category

  • Further drilling from underground developments has the potential to extend the overall resource base at depth

  • Highlights the potential of the Tomingley Gold deposits to sustain a long term underground mining operation

==> picture [480 x 117] intentionally omitted <==

CONTACT : IAN CHALMERS, MANAGING DIRECTOR, ALKANE RESOURCES LTD, TEL +61 8 9227 5677

INVESTORS : NATALIE CHAPMAN, CORPORATE COMMUNICATIONS MANAGER, TEL +61 418 642 556 MEDIA : HILL KNOWLTON STRATEGIES, CONTACT: IAN WESTBROOK, TEL +61 2 9286 1225 OR +61 407 958 137

Ground Floor, 89 Burswood Road, Burswood WA 6100, AUSTRALIA (PO Box 4384, Victoria Park WA 6979, AUSTRALIA) Telephone: +61 8 9227 5677 Facsimile: +61 8 9227 8178 www.alkane.com.au [email protected]

==> picture [62 x 29] intentionally omitted <==

TOMINGLEY GOLD OPERATIONS (TGO)

Alkane 100%

Alkane Resources is pleased to report the maiden underground Ore Reserve for the Tomingley Gold Operations.

Table 1 – Ore Reserve Summary

SOURCE Tonnes(Kt) Au(g/t) Au(Koz)
Proven 223.9 4.03 29.0
Probable 300.5 3.38 32.6
TOTAL ORE RESERVE 524.4 3.66 61.6

*apparent arithmetic inconsistencies are due to rounding

As part of the pre‐feasibility study which resulted in this Ore Reserve, a mining options study was undertaken to assess the most technically and financially viable mining methods. Six options were investigated with ore being accessed from some or all of the known deposits with decline portals in the Wyoming Three and/or Caloma open pits. The option chosen accesses ore within the Wyoming One and Caloma Two deposits from a portal in the Caloma open pit.

==> picture [453 x 210] intentionally omitted <==

----- Start of picture text -----

Caloma
Caloma Two
Wyoming One
----- End of picture text -----

Tomingley Gold Operations Underground Design (Reserves)

The mining assessment demonstrated that a combination of long‐hole open stoping and Avoca type stoping was the most viable option for an underground operation. The mining method was selected for each area after consideration of geotechnical constraints, ore width, cost and financial benefit of each method, number and location of accesses, and speed / timing of ore extraction.

Development will be undertaken by conventional and well understood drill and blast excavation techniques that are common in Australian underground metalliferous mines. All stoping will be done by conventional long‐hole drill and blast.

The underground mine was assessed as an owner operator mining operation utilizing well maintained, low hour second hand equipment which would be maintained by staff maintenance personnel.

To enable mine development and stope designs, an initial financial analysis was undertaken using available site processing and administration cost information and benchmarked mining costs from similar sized Australian underground mines to determine the correct cut‐off grades to use for the study. This determined that the stoping and development cut‐off grades were 2.5 g/t Au and 1.0 g/t Au respectively. A breakdown of the ore reserve material into stope derived and development ore is shown in Table 2.

2/61

Alkane Resources Ltd – TGO update 10 December 2015

==> picture [62 x 29] intentionally omitted <==

Table 2 – Ore Reserve Detail

SOURCE Tonnes(Kt) Au(g/t) Au(Koz)
Proven
Development 36.9 4.10 4.9
Stoping 187.0 4.01 24.1
Sub‐total Proven 223.9 4.03 29.0
Probable
Development 52.0 3.14 5.2
Stoping 248.5 3.43 27.4
Sub‐Total Probable 300.5 3.38 32.6
TOTAL ORE RESERVE 524.4 3.66 61.6

The mining assessment indicates that ore production would commence nine months after the start of development and continue for 33 months (2.75 years). During this production period it is anticipated that the higher grade underground ore would be blended with stockpiled low grade ore from the open pits and used to supplement open pit mill feed to maintain a consistent ore throughput and feed grade, thus extending the life of the Tomingley operations.

The reserve assessment is conservative in that all inferred resource material included in stope designs was set to zero grade prior to undertaking the financial assessment. Accordingly, as part of the options study, an underground design was also completed using the entire mining inventory (measured, indicated and inferred resource categories). This design economically extracts an additional 47.7Koz of gold from similar development. Although this additional material cannot be included in a reserve, it should be noted that the current open pit operations have been converting around 100% of inferred resource ounces to mined reserves in the Caloma open pit and some 41% additional ounces were mined from the Wyoming Three open pit compared to the resource block model.

The geological controls to mineralisation at Tomingley are well understood and it is anticipated that further drilling from underground developments will continue to expand the potential resource base. The design used for this reserve estimate extracts ore from Wyoming One over a vertical extent of 180 metres between the +80m RL (15 metres below the designed open pit) and the ‐100m RL. The study highlights the potential of the Tomingley gold deposits to sustain a long term underground mining operation.

The underground ore reserve lies wholly within the Mineral Resource estimates which were subject of an announcement to the ASX on 21 September 2015.

Table 3 – Mineral Resources

TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015) TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015) TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015) TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015) TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015) TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015) TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015) TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015)
DEPOSIT MEASURED INDICATED INFERRED TOTAL Total Gold
Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade
(Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz)
Open Pittable Resources(cut off 0.50g/t Au)
Wyoming One 2,171 1.7 442 1.5 735 1.1 3,348 1.5 167
Wyoming Three 206 1.7 122 1.7 2 1.1 330 1.7 18
Caloma 2,163 1.8 582 1.7 2,008 1.5 4,753 1.7 254
Caloma Two 1,085 2.4 704 1.3 1,789 2.0 112
Sub Total 4,540 1.8 2,231 2.0 3,450 1.4 10,220 1.7 551
Underground Resources(cut off 2.50g/t Au)
Wyoming One 168 4.8 205 4.4 361 4.2 735 4.4 104
Wyoming Three 12 3.6 20 4.5 25 3.3 57 3.8 7
Caloma 0 3.1 4 2.9 81 3.2 84 3.2 9
Caloma Two 92 3.5 63 3.2 155 3.3 17
Sub Total 180 4.7 321 4.1 530 3.9 1,031 4.1 136
TOTAL 4,720 1.9 2,552 2.3 3,979 1.7 11,251 1.9 687

*apparent arithmetic inconsistencies are due to rounding

3/61

Alkane Resources Ltd – TGO update 10 December 2015

==> picture [62 x 29] intentionally omitted <==

Prior to this release, Ore Reserves were defined (as at 30 June 2015) for the open pits only and the detail released to the ASX on 21 September 2015.

Table 4 – Open Pit Ore Reserves

TOMINGLEY GOLD PROJECT OPEN PIT ORE RESERVES(as at 30 June 2015) TOMINGLEY GOLD PROJECT OPEN PIT ORE RESERVES(as at 30 June 2015) TOMINGLEY GOLD PROJECT OPEN PIT ORE RESERVES(as at 30 June 2015) TOMINGLEY GOLD PROJECT OPEN PIT ORE RESERVES(as at 30 June 2015) TOMINGLEY GOLD PROJECT OPEN PIT ORE RESERVES(as at 30 June 2015) TOMINGLEY GOLD PROJECT OPEN PIT ORE RESERVES(as at 30 June 2015) TOMINGLEY GOLD PROJECT OPEN PIT ORE RESERVES(as at 30 June 2015) TOMINGLEY GOLD PROJECT OPEN PIT ORE RESERVES(as at 30 June 2015)
PROVED PROBABLE TOTAL Total Gold
DEPOSIT Tonnage Grade Tonnage Grade Tonnage Grade
(Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz)
Wyoming One 1,665 1.6 202 1.3 1,867 1.5 94
Wyoming Three 173 1.6 5 1.4 178 1.5 9
Caloma 1,247 1.9 72 1.5 1,319 1.8 80
Caloma Cut Back 222 1.5 66 1.4 288 1.4 14
Caloma Two 243 3.5 243 3.5 27
Stockpiles 468 0.8 468 0.8 12
TOTAL 3,775 1.6 588 2.2 4,363 1.6 235

*apparent arithmetic inconsistencies are due to rounding

==> picture [114 x 10] intentionally omitted <==

----- Start of picture text -----

TGO Site layout June 2015
----- End of picture text -----

==> picture [477 x 421] intentionally omitted <==

4/61

Alkane Resources Ltd – TGO update 10 December 2015

==> picture [62 x 29] intentionally omitted <==

Competent Persons

The Information in this report relating to Ore Reserves is based on work undertaken by Mr Michael Leak and supervised by Mr Sean Buxton, both of whom are Members of the Australasian Institute of Mining and Metallurgy. This report has been compiled by Mr Michael Leak who is a casual employee of Tomingley Gold Operations Pty Ltd. Mr Sean Buxton and Mr Michael Leak both have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Sean Buxton and Mr Michael Leak consent to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Mineral Resource estimates is based on, and fairly represents, information which has been compiled by Mr Terry Ransted, who is a Member of the Australasian Institute of Mining and Metallurgy and an employee of Alkane Resources Ltd. Mr Ransted has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Ransted consents to the inclusion in this report of the matters based on his information in the form and context in which they appear.

Disclaimer

This report may contain certain forward looking statements and forecasts, including possible or assume, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed or implied by these forward looking statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities.

This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geosciences.

ABOUT ALKANE ‐ www.alkane.com.au ‐‐ ASX: ALK and OTCQX: ANLKY

Alkane is a multi‐commodity company focused in the Central West region of NSW, Australia. Currently Alkane has two advanced projects ‐ the Tomingley Gold Operations (TGO) and the nearby Dubbo Zirconia Project (DZP). Tomingley commenced production early 2014. Cash flow from the TGO will provide the funding to maintain the project development pipeline and will assist with the pre‐construction development of the DZP.

The DZP Environmental Impact Statement has been completed and development consent granted by the Planning Assessment Commission. Financing is in progress and this project will make Alkane a strategic and significant world producer of zirconium products, hafnium and heavy rare earths when it commences production in 2018.

Alkane’s most advanced gold copper exploration projects are at the 100% Alkane owned Wellington and Bodangora prospects, and Elsienora farm‐in. Wellington has a small copper‐gold deposit which can be expanded, while at Bodangora a large 12km[2 ] monzonite intrusive complex has been identified with porphyry style gold copper mineralisation. Encouraging gold mineralisation was recently drilled at Elsienora.

==> picture [207 x 305] intentionally omitted <==

5/61

Alkane Resources Ltd – TGO update 10 December 2015

APPENDIX 1

JORC Code, 2012 Edition – Table 1 report – Wyoming One Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
The Wyoming One area has been evaluated using air core (AC), reverse circulation (RC)
and diamond drilling (DD) techniques between May 2001 and December 2005 although not
all of this drilling lies within the current resource outline.
AC - 118 holes for 9322m – inclusive of 3 pre-collars totalling 294.2m
RC - 157 holes for 27,108.9m – inclusive of 29 pre-collars totalling 4552.9m
DD - 35 holes totalling 7,951.6m
AC samples were collected in large plastic bags at one metre intervals via a cyclone
RC samples were collected at one metre intervals via a cyclone.
DD sample intervals were defined by geologist during logging to honour geological
boundaries.
AC and RC drilling completed to industry standards.
Core was laid out in suitably labelled core trays. A core marker (core block) was placed at
the end of each drilled run (nominally 3 or 6m) and labelled with the hole number, down
hole depth, length of drill run. Core was aligned and measured by tape, comparing back to
this down hole depth consistent with industry standards.
AC drilling samples collected at 1m intervals via a cyclone into large plastic bags.
RC Drilling – the entire RC sample was collected at 1m intervals and delivered into a large
plastic bag via a cyclone.
DD Drilling – sample intervals were defined by geologists during logging to honour
geological boundaries and cut in half with a saw.
All samples sent to the laboratory were crushed and/or pulverised to produce a ~100g pulp
for assay process.
All 1m RC & AC samples and core samples were fire assayed using a 50g charge and all
RC and AC composite samples fire assayed using a 30g charge.
Visible gold was occasionally observed in both core and AC/RC samples
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
Initial reconnaissance drilling was completed to fresh rock using 75mm or 100mm air core
with follow-up and deeper drilling completed by RC (usually 126 - 140mm diameter).
Detailed resource definition drilling was completed primarily by RC techniques using a
130mm or 140mm diameter face sampling hammer. DD holes were pre-collared using
either RC techniques or un-oriented PQ3 (83mm diameter) core drilling. Pre-collars were
completed to competent material, with holes cased off and completed to depth using HQ3
(61mm diameter) core. HQ3 core was oriented using the ‘BallMark’, ‘EzyMark’ or ‘Ace’
(Reflex Act) core orientation tool depending upon the contractor.
Within the resource area drilling was comprised of:
66% RC - 152 holes totalling 26,440.9 m (inclusive of 29 pre-collars totalling 4552.9m)
20% DD - 34 holes totalling 7819.8m
14% AC – 66 holes totalling 5,794.4m

6/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
AC and RC - sample recovery was visually estimated and was generally very good (>90%)
aided by the use of oversized shrouds through oxide material. Samples were even in size.
Samples were rarely damp or wet. Sample quality was assessed by the sampler by visual
approximation of sample recovery and if the sample was dry, damp or wet. A riffle splitter
were used to ensure a representative sample was achieved for 1 metre samples.
DD - core loss was identified by drillers and calculated by geologists when logging.
Generally ≥95% was recovered and any loss was usually in portions of the oxide zone.
Triple tube Large diameter, triple tube core (PQ3) was used through the oxide material to
ensure the greatest recovery.
RC drilling was completed using oversized shrouds to maintain sample return in oxide zone
and all samples were split using riffle or cone splitters. Use of RC rigs with high air capacity
assists in keeping samples dry.
Triple tube coring was used at all times to maximise core recovery with larger diameter
(PQ3) core used in the oxide and saprolite zones.
There is no known relationship between sample recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.

The total length and percentage of the relevant intersections logged.
AC & RC - each one metre interval was geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage).
DD - all core was laid out in core trays and geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage). A brief geotechnical
log was also undertaken collecting parameters such as core recovery, RQD, fracture count,
and fracture type and orientation.
All logging was qualitative with visual estimates of the various characteristics. Magnetic
susceptibility data is quantitative.
AC & RC - A representative sample of each one metre interval is retained in chip trays for
future reference.
DD - Core was photographed and all unsampled core is retained for reference purposes.
All DD core and AC/RC chip samples have been geologically and geotechnically logged by
qualified geologists.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.
DD - zones of visual mineralisation and/or alteration were marked up by the geologist and
cut in half using an Almonté (or equivalent) core cutting saw. Samples submitted for
analysis were collected from the same side in all cases to prevent bias. Sampling intervals
were generally based on geology, were predominantly over 1m intervals but do not exceed
1.2 metres in length. All mineralised zones were sampled, plus ≥2m of visibly barren wall
rock.
Laboratory Preparation – drill core was oven dried prior to crushing to <6mm using a jaw
crusher, split to 3kg if required then pulverised in an LM5 (or equivalent) to ≥85% passing
75µm. Bulk rejects for all samples were discarded. A pulp packet (±100g) is stored for
future reference

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
AC/RC – samples were collected at 1m intervals via a cyclone into large plastic bags.
Spear samples were collected from each 1m sample and composited to 3m for initial
analysis. Individual 1m samples from all composites assaying ≥0.2g/t Au were riffle split

7/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.
and resubmitted for analysis.
Rare damp or wet samples were recorded by the sampler.
Laboratory Preparation – the entire RC sample (3kg) was dried and pulverised in an LM5
(or equivalent) to ≥85% passing 75µm. Bulk rejects for all samples were discarded. A pulp
packet (±100g) is stored for future reference.
Alkane (ALK) sampling techniques are of industry standard and considered adequate.
AC – field duplicate samples were not regularly submitted for reconnaissance AC drilling
RC – field duplicate samples collected at every stage of sampling to control procedures.
DD – external laboratory duplicates used.
RC - Duplicate samples were riffle split from bulk sample. Duplicates show generally
excellent repeatability, indicating a negligible “nugget” effect.
Sample sizes are industry standard and considered appropriate.
Quality of
assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
For all 1m samples used in the resource estimate gold was determined using a 50g charge
fused at approximately 1100°C with alkaline fluxes, including lead oxide. The resultant prill
was dissolved in aqua regia and gold determined by flame AAS. For 3m composite
samples gold was determined using a 30g charge (more rarely 50g charge).
For other geochemical elements, samples were digested in aqua regia with each element
concentration determined by ICP Atomic Emission Spectrometry or ICP Mass
Spectrometry. These additional elements were generally only used for geological
interpretation purposes, are not of economic significance and are not routinely reported.
Not applicable to this report or deposit.
Commercially prepared Certified Reference Materials (CRM) and blanks were inserted at 1
in 50 samples. CRM’s were not identifiable to the laboratory.
Field duplicate samples were inserted at 1 in 50 samples (alternate to CRM’s) for RC
drilling programs.
Laboratory QAQC sampling includes insertion of CRM samples, internal duplicates and
screen tests. This data was reported for each sample submission.
Failed standards result in re-assaying of portions of the affected sample batches.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.

The use of twinned holes.
Drill data was compiled and collated, and reviewed by senior staff. External consultants do
not routinely verify exploration data until resource estimation procedures are deemed
necessary.
Twinned holes have not been used at Wyoming One as twinning provides verification only
for extremely limited areas of a deposit.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
All drill hole logging and sampling data was hard keyed into Excel spreadsheet for transfer
and storage in an access database with verification protocols in place.
All primary assay data was received from the laboratory as electronic data files which were
imported into sampling database with verification procedures in place. QAQC analysis was
undertaken for each laboratory report.

8/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Discuss any adjustment to assay data.
Digital copies of Certificates of Analysis (COA) are stored in a central database with regular
(daily) backup. Original survey data is stored on site.
Data was also verified on import into mining related software.
No assay data was adjusted.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Drill holes were laid out using hand held GPS (accuracy ± 2m) then surveyed accurately (±
0.1m) by licensed surveyors on completion.
RC & AC drill holes were surveyed using a single shot electronic camera at a nominal 30m
down hole intervals.
DD holes were surveyed at nominal 30m down hole during drilling to maintain drilling
direction and then at 6m intervals on retrieval of rod string using a multi shot electronic
camera.
All drill holes were originally laid out in AMG66 grid however since mining commenced in
February 2014 have been transformed to MGA94 grid system to conform with reporting
requirements for mine operations.
The area is very flat. A site based digital terrain model was developed from accurate (±
0.1m) survey control by licenced surveyors.
Data spacing
and distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.
The majority of drilling at Wyoming One was completed along east-west lines spaced 25m
apart however once the east-west lode orientation was confirmed for the ‘376’ zone this
portion of the deposit was assessed by south drilled holes was completed along north-
south sections spaced 25m apart. Hole were drilled at a nominal 20m interval along
sections. Both east-west and north-south drill holes have been used in the resource
calculation.
The drill hole spacing is similar to that used at other Tomingley deposits and has been
established to be sufficient.
The drill hole spacing has been shown to be appropriate by the visible continuity of
mineralisation between drill holes.
Sample compositing was not applied until resource estimation stage.
RC & AC – samples were composited to 3m with 1m resamples assayed if the composite
returned a gold value of >0.2g/t gold. One metre samples override 3m composites in the
database.
DD – core was sampled to geology.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
Much care was given to attempt to intersect mineralisation at an optimal angle but in
complex ore bodies this can be difficult. As noted above, drilling at Wyoming One was
completed along both east-west and north-south lines, depending upon which portion of the
deposit was being assessed.
It is not thought that drilling direction will bias assay data at Wyoming One however east-
west drilling will not provide optimum intersection of the ‘376’ lode structures.
Sample
security

The measures taken to ensure sample security.
All samples were bagged in tied numbered calico bags, grouped into larger tied polyweave
bags and transported to the laboratory in Orange by Alkane personnel or courier. Sample
submission sheets were delivered with the samples and also emailed to the laboratory. All

9/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
sample submissions were documented via ALS tracking system and all assays were
reported via email.
Sample pulps were returned to site and were stored for an appropriate length of time
(minimum 3 years).
The Company has in place protocols to ensure data security.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.
The Company does not routinely have external consultants verify exploration data until
resource estimation procedures are deemed necessary.
The Wyoming data was reviewed in 2010 and 2011 by Behre Dolbear (BDA) as part of the
due diligence phase of the development of the project. BDA did not express any specific
concerns with respect to the data other than to recommend the completion of some round
robin assaying and completion of additional density determinations, both of which were
undertaken for the Caloma Two resource drilling.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The Wyoming One deposit lies within ML 1684 which is held in the name of Tomingley
Gold Operations Pty Ltd, a wholly owned subsidiary of Alkane Resources Ltd.
ML1684 expires on 11 February 2034.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
All reported drilling has been completed by ALK.
Geology
Deposit type, geological setting and style of mineralisation.
Geological nature of the Tomingley Deposits is well documented elsewhere.
Mineralisation is associated with quartz veining and alteration focused within sub-volcanic
basaltic-andesite sills and adjacent volcaniclastic sediments. The deposits appear to have
formed as the result of a rheological contrast between the porphyritic sub-volcanic sills and
the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the
sediments ductile deformation, and have many similarities to well documented orogenic -
lode-style gold deposits.
Mineralisation at Wyoming One is developed within a number of different zones:
porphyry– mineralisation hosted by a quartz stockwork within the carapace of a sub-
volcanic sill with dimensions roughly 60m x 150m. High grade mineralisation is
developed along the eastern contact of the zone (‘contact’ zone);
hangingwall– a linear zone of mineralisation situated approximately 30m to
hangingwall of the ‘porphyry’ mineralisation and hosted within silicified and brecciated
carbonaceous mudstone. This zone is interpreted to fold around the northern end of
the porphyry (northern_zone);
‘376’_– east west zone of high grade mineralisation developed at the northern contact
of the porphyry. Interpreted to be a bounding structure and primary fluid conduit.
Other highgrade east-west structures e.g. ‘831’ appear to be developed en-echelon

10/61

Criteria JORC Code explanation Commentary
and to the south of the ‘376’ zone;
footwall– a low grade zone located in a similar stratigraphic position to the
hangingwall zone but footwall to the porphyry
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
hole length.

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Too numerous and not practical to summarise all drill hole data used. All drilling results
have been reported previously
Exclusion of drill hole data will not detract from the understanding of this report. All drill data
has been previously reported, holes are close spaced and in an operating mine area.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Previously reported results have been –
For uncut gold grades;
Intercepts were defined (bounded) by 0.5g/t gold outer limit and may contain some
internal waste;
Only intervals grading ≥1 g/t gold were reported;
Grades were calculated by length weighted average.
Exploration results have been previously reported as length weighted average grades with
internal high grade intercepts reported separately.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.
o
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
o
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Previously reported exploration results include the drilled width and an estimate of true
width.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Cross sections and a plan showing geology with drill collars were included with previously
reported exploration results. A typical plan and cross section are included below.

11/61

Criteria JORC Code explanation Commentary
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Data relating to all drill holes has been reported in previous documentation of exploration
results.
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No additional or new drilling results are being reported at this time.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
An open pit has been designed for the Wyoming One deposit and mining is scheduled to
commence in 2015.
An assessment of mining the higher grade portions of the ‘hangingwall’, ‘376’ and ‘831’
zones by underground methods was completed as part of the feasibility study and ore from
this has been included in the long term mining schedule.

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
The upper portions of the Wyoming One deposit is well constrained by drilling however the
high grade structures remain open at depth.

12/61

Criteria JORC Code explanation Commentary
Resource limiting pit shell
Ore potentially mineable by
underground methods – open at
depth

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.

Data validation procedures used.
Logging data was entered into Excel via drop down menus. All raw data was loaded directly
to the Access database from the assay, logging and survey derived files.
There are validation checks to avoid duplications of data.
The data were further validated for consistency when loaded into Datamine and
desurveyed.
An extensive check on the consistency and adequacy of down-hole survey data was
carried out in 2009.
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
(If no site visits have been undertaken indicate why this is the case.)
No site visit was undertaken by Mr Lewis prior to the initial resource estimations as the
deposit is covered by a sequence of alluvial material and there is nothing to see at surface.
Mr Lewis did visit the site on 25 July 2014 when he was able to view mineralisation in the
open pit, view mineralisation and alteration in drill core and assess the drill sampling and
QAQC techniques.
The quoted resources were compiled by Mr Terry Ransted, Chief Geologist, Alkane
Resources Ltd, who has been involved with the project since 2001.

13/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Geological
interpretation

Confidence in (or conversely, the uncertainty of) the geological interpretation of the
mineral deposit.

Nature of the data used and of any assumptions made.

The effect, if any, of alternative interpretations on Mineral Resource estimation.

The use of geology in guiding and controlling Mineral Resource estimation.

The factors affecting continuity both of grade and geology.
The geological model was built on structural data from core and lithological logging. The
domain wireframes were built by the Alkane geologists most familiar with the deposit.
Structural measurements from oriented drill core were used to assist in the geological
interpretation along with lithological, alteration and mineralisation logging of RC chips and
drill core
The Wyoming One deposit was been drilled at a close-spacing in several different drilling
campaigns and in several different drilling directions, reducing the likelihood that the
geological interpretation will change significantly.
Geological (lithological) logging was used to develop a geological model. Alteration and
mineralisation estimates along with grade guided the interpretation of the ore envelope
wireframes at a nominal 0.25g/t Au lower cut-off..
Gold mineralisation at Wyoming One has a close spatial relationship to feldspar porphyry
which intrudes into andesitic volcaniclastic rocks near their western contact with a more
pelitic sequence. Mineralisation is associated with extensive alteration and quartz veining of
the porphyry and volcanic rocks.
Mineralisation is directly associated with alteration and quartz veining.
Dimensions
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
The mineralisation occurs in several zones within a NNW-striking corridor 300m long and
220m wide. Mineralisation extends from about 25m below the surface for more than 400m
vertical depth.
Estimation and
modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
parameters used.
Eight mineralisation wireframes (domains) were interpreted by the Alkane geologists most
familiar with the deposit to constrain the estimation. An enclosing background domain was
modelled by Lewis Mineral Resource Consulting Pty Ltd (LMRC) to capture minor
mineralization outside the main domains. Four surfaces were also used to separate
material types - topography, alluvium, saprolite and base of oxidation surfaces. The
material type classification was used to allocate density values.
The drill hole data were flagged by the domain wireframes in priority order, to prevent
double use the data in the intersecting zones. The samples immediately outside the
mineralised zones were re-flagged, if they contained more than 1.0 g/t gold, in order to
capture mineralized samples that would otherwise not be used for estimation. This re-
flagging is also useful for the fixed-length RC and AC samples. It also captures samples
lost because the wire-framing was carried out in a different mining software package.
The samples were composited to 1m, the most common sample length and flagged by the
topography, alluvium, saprolite and base of oxidation surfaces. Top-cuts were selected for
each domain based on histograms, probability plots and cutting statistic plots. The top-cuts
ranged from 7g/t gold to 45.0 g/t gold. After top-cutting, the maximum coefficient of
variation for the mineralized domains ranged from 0.84 to 2.25 indicating that the
estimation would not be difficult.
The number of drill hole composites in all but one of the domains was less than 600, too
few for reliable variography. The one domain with more data (the porphyry domain) had a
variety of continuity directions, again making variography uncertain. For this reason,
estimation was made by inverse distance squared (ID2). A kriged estimate was made using
a nominal variogram to provide a measure of the availability of drill hole data during
estimation.
A check estimate was made using the Nearest Neighbour method.
Datamine Studio 3 was used for estimation. The orientation of the search ellipse for each

14/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.

The assumptions made regarding recovery of by-products.

Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).

In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.

Any assumptions behind modelling of selective mining units.

Any assumptions about correlation between variables.

Description of how the geological interpretation was used to control the resource
estimates.

Discussion of basis for using or not using grade cutting or capping.

The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
domain was controlled by a Dynamic Anisotropy model that provided a unique dip and dip-
azimuth for each block.
The estimates were compared to those of a previous estimate made by Alkane. The grade
of the new estimate was slightly higher; tonnes were also higher because an additional
domain was estimated.
There has not yet been any production from Wyoming One
No assumptions made - Estimates were made for gold, arsenic and copper; only gold is of
economic significance.
No deleterious elements identified for estimation
The primary block size was small (2.5m x 2.5m x 5m) because of the narrow dipping nature
of the mineralized zones. Due to the two directions of drilling, the drillhole spacing is locally
much less than 25m. Sub-blocks were estimated. This model was regularized to 2.5m x
2.5m x 2.5m for new reporting as this is more compatible with the mine planning software
currently in use at the mine and the mining methodology.
The drill hole spacing was 20-25m with both WE and NS holes drilled. The primary search
used (50m x 50m in the long directions and 5m or 10m in the short direction) reflects the
continuity on the mineralization as seen in section and plan. .
Any blocks not estimated in the primary search were re-estimated using a secondary
search twice the size of the primary search.
No assumptions were made.
No assumptions made
Only data form the same domain were used to make estimates.
The drill hole data were declustered using the polygonal method for statistical analysis and
determination of top-cuts.
The top-cuts were selected using a combination of histograms, probability plots and cutting
statistic plots (plots of cut-off grade against Coefficient of Variation (CV) and total metal).
While the principal estimate was made using top-cuts, a check estimate was made without
top-cutting.
Estimates were made using Inverse Distance Squared (ID2) and checked using the
Nearest Neighbour method. Estimates were also compared to a previous Alkane block
model.
The estimates were verified using several different techniques and checked for local
variability by comparing the estimated block grades with the average of the top-cut
composites in each block.
Moisture
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
The tonnages were estimated on a dry tonnage basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality parameters applied.
The cut-off grade (0.50 g/t Gold) for open pittable resources is relevant for the current
mining operation for similar material in the adjacent deposits.

15/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Mining factors
or assumptions

Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
The main part of the Wyoming One deposit is likely to be mined by open pit methods.
Some dilution was added when the estimated sub-block model was regularized; this
reduced the gold grade above 0.50 g/t cut-off by 5%. More dilution may need to be added
as part of the mining reserve process.
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
The metallurgy of the Tomingley deposits is well studied.
Environmental
factors or
assumptions

Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
Project approval for the TGP was granted in July 2012 for mining from three open pits
(Wyoming One, Wyoming Three and Caloma) and underground from Wyoming One
deposit. Mining from the Wyoming Three and Caloma open pits commenced in December
2013 with processing of ore in February 2014.
Bulk density
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.

The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.

Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
Specific gravity measurements were completed by commercial laboratories on DD core
samples of the different material types (alluvium, saprolite, totally oxidized and fresh).
Oxidation was far more important than variations in lithology or alteration.
The specific gravity measurements were applied on a dry basis.
SG measurements completed on all material types – see above.
No assumptions made – SG determined and individual values applied to each material type
based on wire-framed surfaces
Classification
The basis for the classification of the Mineral Resources into varying confidence
categories.

Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).
The resources were classified using kriging variance; this provides a relative measure of
the availability of data during estimation. It also takes into account the clustering of the
data. The actual break-points for the different resource classes were chosen by inspection
of the model in relation to the drilling density. Any blocks outside the main mineralized
domains were classified as Inferred.
Wyoming One was estimated using high proportion of Reverse Circulation (RC) drill hole
data. Comparisons with Diamond Drill hole data (DD) showed that the RC data were
slightly higher in grade than the DD data for this deposit. The most likely reason for this is
the presence of some coarse free gold that is better handled by the larger sample size of
the RC drilling. The RC drilling was conducted using industry-standard methods and was
not affected by high water flows so there is no reason not to accept the RC results.
The classification reflects the Competent Persons view of the deposit and its supporting
data

Whether the result appropriately reflects the Competent Person’s view of the deposit.

16/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Audits or
reviews

The results of any audits or reviews of Mineral Resource estimates.
The Wyoming One resource estimate was reviewed by Behre Dolbear in January 2012.
The review raised some questions about the method of resource classification. The
classification scheme was justified in a subsequent LMRC memo to Alkane in February
2012. This reviewed the resources classes in relation to the anisotropic distance to the
nearest sample. For almost all the Measured Resources, the nearest sample was at less
than half the anisotropic search distance of the first estimation pass with a mean of 23% of
the search distance. For Indicated Resources, the nearest sample was no more than 87%
of the maximum anisotropic search distance with a mean of 46% of the search distance..
All Measured and Indicated Resources were estimated in the first search pass.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.
The Wyoming One deposit consists of 8 mineralisation zones; consequently there are
relatively few drill hole data in most zones. Only one domain (porphyry) has more than 600
drill hole composites. This has limited the accuracy of any fitted variogram models. The use
of an approximate variogram model does not greatly affect the accuracy of the kriged
grades as kriging is a very robust estimation process. It does, however, limit the accuracy
of the variance of the estimates and any confidence limits that might be statistically
inferred.
No statistical or geostatistical method (non-linear or simulation) was used to quantify the
relative accuracy of the estimate within confidence limits. Accuracy of the estimate is
strongly dependent on:
accuracy of the interpretation and geological domaining;
accuracy of the drill hole data (location and values);
orientation of local anisotropy; and
estimation parameters which are reflected in the global resource classification.
The resources are global, being based on drill hole data at exploration spacing.
To ensure the resources have ‘reasonable prospects of eventual economic extraction’ the
resources have been restricted by an indicative optimistic pit shell estimated at a gold price
of $2000 per ounce with the potential open pittable component assessed at ≥0.5g/t gold cut
off and material outside of the indicative pit with potential for eventual extraction by
underground mining methods assessed at ≥1.75g/t gold.
There has not been any production from Wyoming One to date.

These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.

17/61

JORC Code, 2012 Edition – Table 1 report – Wyoming Three Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
The Wyoming Three area has been evaluated using air core (AC), reverse circulation (RC)
and diamond drilling (DD) techniques between June 2002 and October 2003 although not
all of this drilling lies within the current resource outline.
AC - 189 holes for 12,855.1m
RC - 86 holes for 12,886.3 m – inclusive of 3 pre-collars totalling 269.3m
DD - 3 holes totalling 398.7m
AC samples were collected in large plastic bags at one metre intervals via a cyclone
RC samples were collected at one metre intervals via a cyclone.
DD sample intervals were defined by geologist during logging to honour geological
boundaries.
AC and RC drilling completed to industry standards.
Core was laid out in suitably labelled core trays. A core marker (core block) was placed at
the end of each drilled run (nominally 3 or 6m) and labelled with the hole number, down
hole depth, length of drill run. Core was aligned and measured by tape, comparing back to
this down hole depth consistent with industry standards.
AC drilling samples collected at 1m intervals via a cyclone into large plastic bags.
RC Drilling – the entire RC sample was collected at 1m intervals and delivered into a large
plastic bag via a cyclone.
DD Drilling – sample intervals were defined by geologists during logging to honour
geological boundaries and cut in half with a saw.
All samples sent to the laboratory were crushed and/or pulverised to produce a ~100g pulp
for assay process.
All 1m RC & AC samples and core samples were fire assayed using a 50g charge and all
RC and AC composite samples fire assayed using a 30g charge.
Visible gold was occasionally observed in both core and AC/RC samples
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
Initial reconnaissance drilling was completed to fresh rock using 75mm or 100mm air core
with follow-up and deeper drilling completed by RC (usually 126 - 140mm diameter).
Detailed resource definition drilling was completed primarily by RC techniques using a
130mm or 140mm diameter face sampling hammer. DD holes were pre-collared using
either RC techniques or un-oriented PQ3 (83mm diameter) core drilling. Pre-collars were
completed to competent material, with holes cased off and completed to depth using HQ3
(61mm diameter) core. HQ3 core was oriented using the ‘BallMark’, ‘EzyMark’ or ‘Ace’
(Reflex Act) core orientation tool depending upon the contractor.
Within the resource area drilling was comprised of:
62% RC - 77 holes totalling 11,874.3 m (inclusive of 3 pre-collars totalling 269.3m)
2% DD - 3 holes totalling 398.7m
36% AC – 107 holes totalling 6,772.6m
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.
AC and RC - sample recovery was visually estimated and was generally very good (>90%)
aided by the use of oversized shrouds through oxide material. Samples were even in size.
Samples were rarely damp or wet. Sample quality was assessed by the sampler by visual

18/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
approximation of sample recovery and if the sample was dry, damp or wet. A riffle splitter
were used to ensure a representative sample was achieved for 1 metre samples.
DD - core loss was identified by drillers and calculated by geologists when logging.
Generally ≥95% was recovered and any loss was usually in portions of the oxide zone.
Triple tube Large diameter, triple tube core (PQ3) was used through the oxide material to
ensure the greatest recovery.
RC drilling was completed using oversized shrouds to maintain sample return in oxide zone
and all samples were split using riffle or cone splitters. Use of RC rigs with high air capacity
assists in keeping samples dry.
Triple tube coring was used at all times to maximise core recovery with larger diameter
(PQ3) core used in the oxide and saprolite zones.
There is no known relationship between sample recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.

The total length and percentage of the relevant intersections logged.
AC & RC - each one metre interval was geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage).
DD - all core was laid out in core trays and geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage). A brief geotechnical
log was also undertaken collecting parameters such as core recovery, RQD, fracture count,
and fracture type and orientation.
All logging was qualitative with visual estimates of the various characteristics. Magnetic
susceptibility data is quantitative.
AC & RC - A representative sample of each one metre interval is retained in chip trays for
future reference.
DD - Core was photographed and all unsampled core is retained for reference purposes.
All DD core and AC/RC chip samples have been geologically and geotechnically logged by
qualified geologists.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
DD - zones of visual mineralisation and/or alteration were marked up by the geologist and
cut in half using an Almonté (or equivalent) core cutting saw. Samples submitted for
analysis were collected from the same side in all cases to prevent bias. Sampling intervals
were generally based on geology, were predominantly over 1m intervals but do not exceed
1.2 metres in length. All mineralised zones were sampled, plus ≥2m of visibly barren wall
rock.
Laboratory Preparation – drill core was oven dried prior to crushing to <6mm using a jaw
crusher, split to 3kg if required then pulverised in an LM5 (or equivalent) to ≥85% passing
75µm. Bulk rejects for all samples were discarded. A pulp packet (±100g) is stored for
future reference
AC/RC – samples were collected at 1m intervals via a cyclone into large plastic bags.
Spear samples were collected from each 1m sample and composited to 3m for initial
analysis. Individual 1m samples from all composites assaying ≥0.2g/t Au were riffle split
and resubmitted for analysis.
Rare damp or wet samples were recorded by the sampler.
Laboratory Preparation – the entire RC sample (3kg) was dried and pulverised in an LM5

19/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.
(or equivalent) to ≥85% passing 75µm. Bulk rejects for all samples were discarded. A pulp
packet (±100g) is stored for future reference.
Alkane (ALK) sampling techniques are of industry standard and considered adequate.
AC – field duplicate samples were not regularly submitted for reconnaissance AC drilling
RC – field duplicate samples collected at every stage of sampling to control procedures.
DD – external laboratory duplicates used.
RC - Duplicate samples were riffle split from bulk sample. Duplicates show generally
excellent repeatability, indicating a negligible “nugget” effect.
Sample sizes are industry standard and considered appropriate.
Quality of
assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
For all 1m samples used in the resource estimate gold was determined using a 50g charge
fused at approximately 1100°C with alkaline fluxes, including lead oxide. The resultant prill
was dissolved in aqua regia and gold determined by flame AAS. For 3m composite
samples gold was determined using a 30g charge (more rarely 50g charge).
For other geochemical elements, samples were digested in aqua regia with each element
concentration determined by ICP Atomic Emission Spectrometry or ICP Mass
Spectrometry. These additional elements were generally only used for geological
interpretation purposes, are not of economic significance and are not routinely reported.
Not applicable to this report or deposit.
Commercially prepared Certified Reference Materials (CRM) and blanks were inserted at 1
in 50 samples. CRM’s were not identifiable to the laboratory.
Field duplicate samples were inserted at 1 in 50 samples (alternate to CRM’s) for RC
drilling programs.
Laboratory QAQC sampling includes insertion of CRM samples, internal duplicates and
screen tests. This data was reported for each sample submission.
Failed standards result in re-assaying of portions of the affected sample batches.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.

The use of twinned holes.
Drill data was compiled and collated, and reviewed by senior staff. External consultants do
not routinely verify exploration data until resource estimation procedures are deemed
necessary.
Twinned holes have not been used at Wyoming Three as twinning provides verification only
for extremely limited areas of a deposit.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
All drill hole logging and sampling data was hard keyed into Excel spreadsheet for transfer
and storage in an access database with verification protocols in place.
All primary assay data was received from the laboratory as electronic data files which were
imported into sampling database with verification procedures in place. QAQC analysis was
undertaken for each laboratory report.
Digital copies of Certificates of Analysis (COA) are stored in a central database with regular
(daily) backup. Original survey data is stored on site.
Data was also verified on import into mining related software.

20/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Discuss any adjustment to assay data.
No assay data was adjusted.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Drill holes were laid out using hand held GPS (accuracy ± 2m) then surveyed accurately (±
0.1m) by licensed surveyors on completion.
RC & AC drill holes were surveyed using a single shot electronic camera at a nominal 30m
down hole intervals.
DD holes were surveyed at nominal 30m down hole during drilling to maintain drilling
direction and then at 6m intervals on retrieval of rod string using a multi shot electronic
camera.
All drill holes were originally laid out in AMG66 grid however since mining commenced in
February 2014 have been transformed to MGA94 grid system to conform with reporting
requirements for mine operations.
The area is very flat. A site based digital terrain model was developed from accurate (±
0.1m) survey control by licenced surveyors.
Data spacing
and distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.
Early drilling at Wyoming Three was completed along east-west lines spaced 25m apart
assuming stratigraphy and lode orientation was similar to the earlier drilled Wyoming One
prospect. Once the east-west lode orientation was confirmed all subsequent drilling was
completed along north-south sections spaced 25m apart with holes at 20m intervals along
sections. Both east-west and north-south drill holes have been used in the resource
calculation.
The drill hole spacing is similar to that used at other Tomingley deposits and has been
established to be sufficient.
The drill hole spacing has been shown to be appropriate by the visible continuity of
mineralisation between drill holes.
Sample compositing was not applied until resource estimation stage.
RC & AC – samples were composited to 3m with 1m resamples assayed if the composite
returned a gold value of >0.2g/t gold. One metre samples override 3m composites in the
database.
DD – core was sampled to geology.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
Much care was given to attempt to intersect mineralisation at an optimal angle but in
complex ore bodies this can be difficult. As noted above early drilling at Wyoming Three
was completed along east-west sections assuming stratigraphy and lode orientation was
similar to the earlier drilled Wyoming One prospect. Once the east-west lode orientation
was confirmed all subsequent drilling was completed along north-south sections.
The chosen drilling direction (south at inclination of -60°) appears optimal based on
reconciliation from the early mining periods.
It is not thought that drilling direction will bias assay data at Wyoming Three however east-
west drilling will not provide optimum intersection of the lode structures.
Sample
security

The measures taken to ensure sample security.
All samples were bagged in tied numbered calico bags, grouped into larger tied polyweave
bags and transported to the laboratory in Orange by Alkane personnel or courier. Sample
submission sheets were delivered with the samples and also emailed to the laboratory. All
sample submissions were documented via ALS trackingsystem and all assays were

21/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
reported via email.
Sample pulps were returned to site and were stored for an appropriate length of time
(minimum 3 years).
The Company has in place protocols to ensure data security.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.
The Company does not routinely have external consultants verify exploration data until
resource estimation procedures are deemed necessary.
The Wyoming data was reviewed in 2010 and 2011 by Behre Dolbear (BDA) as part of the
due diligence phase of the development of the project. BDA did not express any specific
concerns with respect to the data other than to recommend the completion of some round
robin assaying and completion of additional density determinations, both of which were
undertaken for the Caloma Two resource drilling.
Section 2 Reporting of Exploration Results
(Criteria listed in theprecedingsection also applyto this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The Wyoming Three deposit lies within ML 1684 which is held in the name of Tomingley
Gold Operations Pty Ltd, a wholly owned subsidiary of Alkane Resources Ltd.
ML1684 expires on 11 February 2034.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
All reported drilling has been completed by ALK.
Geology
Deposit type, geological setting and style of mineralisation.
Geological nature of the Tomingley Deposits is well documented elsewhere.
Mineralisation is associated with quartz veining and alteration focused within sub-volcanic
basaltic-andesite sills and adjacent volcaniclastic sediments. The deposits appear to have
formed as the result of a rheological contrast between the porphyritic sub-volcanic sills and
the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the
sediments ductile deformation, and have many similarities to well documented orogenic -
lode-style gold deposits.
Mineralisation at Wyoming Three is developed within a series of sub-parallel, sub-vertical
‘quartz lodes’ which dip steeply to the north and hosted dominantly within the sub-volcanic
sills.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
Too numerous and not practical to summarise all drill hole data used. All drilling results
have been reported previously

22/61

Criteria JORC Code explanation Commentary

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Exclusion of drill hole data will not detract from the understanding of this report. All drill data
has been previously reported, holes are close spaced and in an operating mine area.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Previously reported results have been –
For uncut gold grades;
Intercepts were defined (bounded) by 0.5g/t gold outer limit and may contain some
internal waste;
Only intervals grading ≥1 g/t gold were reported;
Grades were calculated by length weighted average.
Exploration results have been previously reported as length weighted average grades with
internal high grade intercepts reported separately.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.
o
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
o
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Previously reported exploration results include the drilled width and an estimate of true
width.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Cross sections and a plan showing geology with drill collars were included with previously
reported exploration results. A typical plan and cross section are included below.

23/61

Criteria JORC Code explanation Commentary
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Data relating to all drill holes has been reported in previous documentation of exploration
results.
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No additional or new drilling results are being reported at this time.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Mining within the Wyoming Three open pit commenced in February 2014.

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
The Wyoming Three deposit is well constrained by drilling. Two deeper core holes
completed in 2012 indicated limited potential for underground resources.

24/61

Criteria JORC Code explanation Commentary
Resource limiting pit shell
Ore potentially mineable by
underground methods – open at
depth

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.

Data validation procedures used.
Logging data was entered into Excel via drop down menus. All raw data was loaded directly
to the Access database from the assay, logging and survey derived files.
There are validation checks to avoid duplications of data.
The data were further validated for consistency when loaded into Datamine and
desurveyed.
An extensive check on the consistency and adequacy of down-hole survey data was
carried out in 2009.
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
(If no site visits have been undertaken indicate why this is the case.)
No site visit was undertaken by Mr Lewis prior to the initial resource estimations as the
deposit is covered by a sequence of alluvial material and there is nothing to see at surface.
Mr Lewis did visit the site on 25 July 2014 when he was able to view mineralisation in the
Caloma and Wyoming Three open pits, view mineralisation and alteration in drill core and
assess the drill sampling and QAQC techniques.
The quoted resources were compiled by Mr Terry Ransted, Chief Geologist, Alkane
Resources Ltd, who has been involved with the project since 2001.
Geological
interpretation

Confidence in (or conversely, the uncertainty of ) the geological interpretation of the
mineral deposit.

Nature of the data used and of any assumptions made.

The effect, if any, of alternative interpretations on Mineral Resource estimation.
The geological model was built on structural data from core and lithological logging. The
domain wireframes were built by the Alkane geologists most familiar with the deposit.
Structural measurements from oriented drill core were used to assist in the geological
interpretation along with lithological, alteration and mineralisation logging of RC chips and
drill core
The Wyoming Three deposit was been drilled at a close-spacing in several different drilling
campaigns, reducing the likelihood that the geological interpretation will change
significantly.

25/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

The use of geology in guiding and controlling Mineral Resource estimation.

The factors affecting continuity both of grade and geology.
Reconciliation with grade control drilling and early mining confirms the interpretation.
Geological (lithological) logging was used to develop a geological model. Alteration and
mineralisation estimates along with grade guided the interpretation of the ore envelope
wireframes at a nominal 0.25g/t Au lower cut-off.
The Wyoming Three deposit consists of several sub-parallel, steeply dipping mineralised
zones within a feldspar porphyry host and located close to a major NW-SE trending
regional structure. These mineralised zones trend east-west over a strike length of 260
metres and range from a few metres to about 10 metres in width. Flat dipping linking
structures between the steeper zones are evidenced but difficult to model accurately.
Mineralisation is associated with extensive alteration and quartz veining of the feldspar
porphyry and volcanic rocks.
Mineralisation is directly associated with alteration and quartz veining.
Dimensions
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
The mineralisation occurs in several zones within an east-west striking corridor 260m long
and 115m wide. Mineralisation extends from about 12m below the surface for more than
260m vertical depth.
Estimation and
modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
parameters used.
Four mineralisation wireframes (domains) were interpreted by the Alkane geologists most
familiar with the deposit to constrain estimation. An enclosing background domain was
modelled by LMRC to capture minor mineralisation outside the main domains. Four
surfaces were also used to separate material types - topography, alluvium, saprolite and
base of oxidation surfaces. The material type classification was used to allocate density
values.
The drill hole data were flagged by the domain wireframes in priority order, to prevent
double use the data in the intersecting zones. The samples immediately outside the
mineralised zones were re-flagged, if they contained more than 1.0 g/t gold, in order to
capture mineralised samples that would otherwise not be used for estimation. This re-
flagging is also useful for the fixed-length RC and AC samples. It also captures samples
lost because the wireframing was carried out in a different mining software package..
The samples were composited to 1m, the most common sample length and flagged by the
topography, alluvium, saprolite and base of oxidation surfaces. Top-cuts were selected for
each domain based on histograms, probability plots and cutting statistic plots. The top-cuts
ranged from 10g/t gold to 30.0 g/t gold. Even before top-cutting, the maximum coefficient of
variation for the mineralized domains ranged from 1.83 to 2.0, indicating that the estimation
would not be difficult.
The number of drill hole composites in all domains were too few for reliable variography.
For this reason, estimation was made by inverse distance squared (ID2). A kriged estimate
was made using a nominal variogram to provide a measure of the availability of drill hole
data during estimation.
A check estimate was made using the Nearest Neighbour method.
Datamine Studio 3 was used for estimation. The orientation of the search ellipse for each
domain was controlled by a Dynamic Anisotropy model that provided a unique dip and dip-
azimuth for each block.

The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.
The estimates were compared to those of a previous estimate made by Alkane. The grade
of the new estimate was slightly lower but tonnes were similar.
Pre-stripping of waste from Wyoming Three (and Caloma) commenced in late 2013 with
mining of ore in February 2014. Alkane reported on 6
thJune, 2014 that mine to mill

26/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

The assumptions made regarding recovery of by-products.

Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).

In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.

Any assumptions behind modelling of selective mining units.

Any assumptions about correlation between variables.

Description of how the geological interpretation was used to control the resource
estimates.

Discussion of basis for using or not using grade cutting or capping.

The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
reconciliation for the combined Wyoming Three and Caloma production has been positive
for both tonnes and grade.
No assumptions made - Estimates were made for gold, arsenic and copper; only gold is of
economic significance.
No deleterious elements identified for estimation.
The primary block size was small (2.5m x 2.5m x 5m) because of the narrow dipping nature
of the mineralized zones. Due to the two directions of drilling, the drillhole spacing is locally
much less than 25m. Sub-blocks were estimated. This model was regularized to 2.5m x
2.5m x 2.5m for new reporting as this is more compatible with the mine planning software
currently in use at the mine and the mining methodology.
The drill hole spacing was 20-25m with both WE and NS holes drilled. The primary search
used (50m x 50m in the long directions and 5m in the short direction) reflects the continuity
on the mineralization as seen in section and plan. .
Any blocks not estimated in the primary search were re-estimated using a secondary
search twice the size of the primary search.
No assumptions were made.
No assumptions made
Only data form the same domain were used to make estimates.
The drill hole data were declustered using the polygonal method for statistical analysis and
determination of top-cuts. The maximum un-cut gold composite grade was 79.75g/t.
The top-cuts were selected using a combination of histograms, probability plots and cutting
statistic plots (plots of cut-off grade against Coefficient of Variation (CV) and total metal). A
check estimate was made without use of top-cutting.
Estimates were made using Inverse Distance Squared (ID2) and checked using the
Nearest Neighbour method. Estimates were also compared to a previous Alkane block
model.
The estimates were verified using several different techniques and checked for local
variability by comparing the estimated block grades with the average of the top-cut
composites in each block.
Moisture
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
The tonnages were estimated on a dry tonnage basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality parameters applied.
The cut-off grade (0.50 g/t Gold) for open pittable resources is relevant for the current
mining operation.
Mining factors
or assumptions

Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the
The Wyoming Three deposit is currently being mined by open pit methods. Some dilution
was added when the estimated sub-block model was regularized; this reduced the gold
grade above 0.50 g/t cut-off by 10%. More dilution may need to be added as part of the
mining reserve process.

27/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
basis of the mining assumptions made.
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
The metallurgy of the Tomingley deposits is well studied. It is likely that Wyoming Three will
have similar metallurgical characteristics. Production to date has not revealed any
unexpected metallurgical problems.
Environmental
factors or
assumptions

Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
Project approval for the TGP was granted in July 2012 for mining from three open pits
(Wyoming One, Wyoming Three and Caloma) and underground from Wyoming One
deposit. Mining from the Wyoming Three and Caloma open pits commenced in December
2013 with processing of ore in February 2014.
Bulk density
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.

The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.

Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
No specific gravity measurements were completed on Wyoming Three material however
the lithologies and mineralisation is very similar to that at Wyoming One where numerous
specific gravity measurements were undertaken by commercial laboratories on drill core
samples of the different material types (alluvium, saprolite, totally oxidised and fresh).
Oxidation was far more important than variations in lithology or alteration.
The specific gravity measurements were applied on a dry basis.
SG measurements completed on all material types – see above.
No assumptions made – SG determined and individual values applied to each material type
based on wire-framed surfaces
Classification
The basis for the classification of the Mineral Resources into varying confidence
categories.

Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).

Whether the result appropriately reflects the Competent Person’s view of the deposit.
The resources were classified using kriging variance; this provides a relative measure of
the availability of data during estimation. It also takes into account the clustering of the
data. The actual break-points for the different resource classes were chosen by inspection
of the model in relation to the drilling density. Any blocks outside the main mineralised
domains were classified as Inferred.
Wyoming Three was estimated using high proportion if Reverse Circulation (RC) drill hole
data. Comparisons with Diamond Drill hole data (DD) showed that the RC data were
slightly lower in grade than the DD data for this deposit. The RC drilling was conducted
using industry-standard methods and was not affected by high water flows so there is no
reason not to accept the RC results.
The classification reflects the Competent Persons view of the deposit and its supporting
data
Audits or
reviews

The results of any audits or reviews of Mineral Resource estimates.
The Wyoming resource estimates were reviewed by Behre Dolbear in January 2012. The
review raised some questions about the method of resource classification. The
classification scheme was justified in a subsequent LMRC memo to Alkane in February
2012. This reviewed the Wyoming One resource classes in relation to the anisotropic
distance to the nearest sample and concluded that the classification wasjustified bythe

28/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
data support. Wyoming Three being a smaller resource has not been further studied.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.
The Wyoming Three deposit is relatively small and consists of 4 mineralisation zones;
consequently there are relatively few drill hole data in most zones. This has limited the
accuracy of any fitted variogram models. The use of an approximate variogram model does
not greatly affect the accuracy of the kriged grades as kriging is a very robust estimation
process. It does, however, limit the accuracy of the variance of the estimates and any
confidence limits that might be statistically inferred.
No statistical or geostatistical method (non-linear or simulation) was used to quantify the
relative accuracy of the estimate within confidence limits. Accuracy of the estimate is
strongly dependent on:
accuracy of the interpretation and geological domaining;
accuracy of the drill hole data (location and values);
orientation of local anisotropy; and
estimation parameters which are reflected in the global resource classification.
The resources are global, being based on drill hole data at exploration spacing.
To ensure the resources have ‘reasonable prospects of eventual economic extraction’ the
resources have been restricted by an indicative optimistic pit shell estimated at a gold price
of $2000 per ounce with the potential open pittable component assessed at ≥0.5g/t gold cut
off.
Production from Wyoming Three (and Caloma) commenced in early 2014. Alkane reported
on 6
thJune, 2014 that mine to mill reconciliation for the combined Wyoming Three and
Caloma production has been positive for both tonnes and grade.

These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.

29/61

JORC Code, 2012 Edition – Table 1 report – Caloma Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
The Caloma area has been evaluated using air core (AC), reverse circulation (RC) and
diamond drilling (DD) techniques between August 2004 and August 2011 although not all of
this drilling lies within the current resource outline.
AC - 342 holes for 19,955.4m
RC - 327 holes for 35,907.5 m – inclusive of 12 pre-collars totalling 453m
DD - 26 holes totalling 7976.1m
AC samples were collected in large plastic bags at one metre intervals via a cyclone
RC samples were collected at one metre intervals via a cyclone and riffle or cone splitter.
DD sample intervals were defined by geologist during logging to honour geological
boundaries.
AC and RC drilling completed to industry standards.
Core was laid out in suitably labelled core trays. A core marker (core block) was placed at
the end of each drilled run (nominally 3 or 6m) and labelled with the hole number, down
hole depth, length of drill run. Core was aligned and measured by tape, comparing back to
this down hole depth consistent with industry standards.
AC drilling samples collected at 1m intervals via a cyclone into large plastic bags.
RC Drilling – prior to November 2007, the entire RC sample was collected at 1m intervals
and delivered into a large plastic bag via a cyclone. For drilling since Nov 2007,
approximately 12.5% (3-4kg) of total sample was delivered via cone or riffle splitter into a
calico bag (for shipment to laboratory if required) with the remaining sample delivered into a
large plastic bag and retained for future use if required.
DD Drilling – sample intervals were defined by geologists during logging to honour
geological boundaries and cut in half with a saw.
All samples sent to the laboratory were crushed and/or pulverised to produce a ~100g pulp
for assay process.
All 1m RC & AC samples and core samples were fire assayed using a 50g charge and all
RC and AC composite samples fire assayed using a 30g charge.
Visible gold was occasionally observed in both core and AC/RC samples
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
Initial reconnaissance drilling was completed to fresh rock using 75mm or 100mm air core
with follow-up and deeper drilling completed by RC (usually 130 - 140mm diameter).
Detailed resource definition drilling was completed primarily by RC techniques using a
130mm or 140mm diameter face sampling hammer. DD holes were pre-collared using
either RC techniques or un-oriented PQ3 (83mm diameter) core drilling. Pre-collars were
completed to competent material, with holes cased off and completed to depth using HQ3
(61mm diameter) core. HQ3 core was oriented using the “Ace” (Reflex Act) core
orientation tool.
Within the resource area, drilling was comprised of:
72% RC - 323 holes totalling 35,457.5 m (inclusive of 12 pre-collars totalling 453m)
16% DD -26 holes totalling 7976.1m
11% AC – 100 holes totalling 5,550m

30/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
AC and RC - sample recovery was visually estimated and was generally very good (>90%)
aided by the use of oversized shrouds through oxide material. Samples were even in size.
Samples were rarely damp or wet. Sample quality was assessed by the sampler by visual
approximation of sample recovery and if the sample was dry, damp or wet. Riffle and cone
splitters were used to ensure a representative sample was achieved for 1 metre samples.
DD - core loss was identified by drillers and calculated by geologists when logging.
Generally ≥95% was recovered and any loss was usually in portions of the oxide zone.
Triple tube Large diameter, triple tube core (PQ3) was used through the oxide material to
ensure the greatest recovery.
RC drilling was completed using oversized shrouds to maintain sample return in oxide zone
and all samples were split using riffle or cone splitters. Use of RC rigs with high air capacity
assists in keeping samples dry.
Triple tube coring was used at all times to maximise core recovery with larger diameter
(PQ3) core used in the oxide and saprolite zones.
There is no known relationship between sample recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.

The total length and percentage of the relevant intersections logged.
AC & RC - each one metre interval was geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage).
DD - all core was laid out in core trays and geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage). A brief geotechnical
log was also undertaken collecting parameters such as core recovery, RQD, fracture count,
and fracture type and orientation.
All logging was qualitative with visual estimates of the various characteristics. Magnetic
susceptibility data is quantitative.
AC & RC - A representative sample of each one metre interval is retained in chip trays for
future reference.
DD - Core was photographed and all unsampled core is retained for reference purposes.
All DD core and AC/RC chip samples have been geologically and geotechnically logged by
qualified geologists.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.
DD - zones of visual mineralisation and/or alteration were marked up by the geologist and
cut in half using an Almonté (or equivalent) core cutting saw. Samples submitted for
analysis were collected from the same side in all cases to prevent bias. Sampling intervals
were generally based on geology, were predominantly over 1m intervals but do not exceed
1.2 metres in length. All mineralised zones were sampled, plus ≥2m of visibly barren wall
rock.
Laboratory Preparation – drill core was oven dried prior to crushing to <6mm using a jaw
crusher, split to 3kg if required then pulverised in an LM5 (or equivalent) to ≥85% passing
75µm. Bulk rejects for all samples were discarded. A pulp packet (±100g) is stored for
future reference

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
AC/RC – for drilling completed prior to Nov 2007 spear samples were collected from each
1m sample and composited to 3m for initial analysis. Individual 1m samples from all
composites assaying ≥0.2g/t Au were riffle split and resubmitted for analysis.

31/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.
For drilling completed since Nov 2007, for intervals with visual mineralisation and/or
alteration the calico sample bag (1m samples) were numbered and submitted to the
laboratory for analysis. Intervals without visual mineralisation and/or alteration were spear
sampled and composited over three metres. For composited intervals returning grades
>0.2g/t Au the calico bags were retrieved for assay of the individual 1m intervals. Rare
damp or wet samples were recorded by the sampler.
Laboratory Preparation – the entire RC sample (3kg) was dried and pulverised in an LM5
(or equivalent) to ≥85% passing 75µm. Bulk rejects for all samples were discarded. A pulp
packet (±100g) is stored for future reference.
Alkane (ALK) sampling techniques are of industry standard and considered adequate.
RC – field duplicate samples collected at every stage of sampling to control procedures.
DD – external laboratory duplicates used.
RC - Duplicate samples were riffle split from the riffle/conical split calico from the drill rig.
Duplicates show generally excellent repeatability, indicating a negligible “nugget” effect.
Sample sizes are industry standard and considered appropriate.
Quality of
assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
For all 1m samples used in the resource estimate gold was determined using a 50g charge
fused at approximately 1100°C with alkaline fluxes, including lead oxide. The resultant prill
was dissolved in aqua regia and gold determined by flame AAS. For 3m composite
samples gold was determined using a 30g charge (more rarely 50g charge).
For other geochemical elements, samples were digested in aqua regia with each element
concentration determined by ICP Atomic Emission Spectrometry or ICP Mass
Spectrometry. These additional elements were generally only used for geological
interpretation purposes, are not of economic significance and are not routinely reported.
Not applicable to this report or deposit.
Commercially prepared Certified Reference Materials (CRM) and blanks were inserted at 1
in 50 samples. CRM’s were not identifiable to the laboratory.
Field duplicate samples were inserted at 1 in 50 samples (alternate to CRM’s).
Laboratory QAQC sampling includes insertion of CRM samples, internal duplicates and
screen tests. This data was reported for each sample submission.
Failed standards result in re-assaying of portions of the affected sample batches.
Screen fire assay checks (75µm mesh) were undertaken on 110 drill core samples. Screen
fire assay data overrides all other methods.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.

The use of twinned holes.
Drill data was compiled and collated, and reviewed by senior staff. External consultants do
not routinely verify exploration data until resource estimation procedures are deemed
necessary.
Twinned holes have not been used at Caloma Two as twinning provides verification only for
extremely limited areas of a deposit.

32/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.
All drill hole logging and sampling data was hard keyed into Excel spreadsheet for transfer
and storage in an access database with verification protocols in place.
All primary assay data was received from the laboratory as electronic data files which were
imported into sampling database with verification procedures in place. QAQC analysis was
undertaken for each laboratory report.
Digital copies of Certificates of Analysis (COA) are stored in a central database with regular
(daily) backup. Original survey data is stored on site.
Data was also verified on import into mining related software.
No assay data was adjusted. Screen fire assays take precedence over all other assay
techniques.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Drill holes were laid out using hand held GPS (accuracy ± 2m) then surveyed accurately (±
0.1m) by licensed surveyors on completion.
RC & AC drill holes were surveyed using a single shot electronic camera at a nominal 30m
down hole intervals.
DD holes were surveyed at nominal 30m down hole during drilling to maintain drilling
direction and then at 6m intervals on retrieval of rod string using a multi shot electronic
camera.
All drill holes were originally laid out in AMG66 grid however since mining commenced in
February 2014 have been transformed to MGA94 grid system to conform with reporting
requirements for mine operations.
The area is very flat. A site based digital terrain model was developed from accurate (±
0.1m) survey control by licenced surveyors.
Data spacing
and distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.
Drilling was completed on east-west sections spaced nominally 20m apart with holes
spaced at 20m intervals along the lines. The line spacing was increased to a nominal 40m
in zones thought peripheral to the main ore body and to the north.
The drill hole spacing is similar to that used at other Tomingley deposits and has been
established to be sufficient.
The drill hole spacing has been shown to be appropriate by the visible continuity of
mineralisation between drill holes.
Sample compositing was not applied until resource estimation stage.
RC & AC – samples with no visible mineralisation or alteration were composited to 3m with
1m resamples assayed if the composite returned a gold value of >0.2g/t gold. One metre
samples override 3m composites in the database.
DD – core was sampled to geology.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
Much care was given to attempt to intersect mineralisation at an optimal angle but in
complex ore bodies this can be difficult. A number of drilling directions were used in the
early drilling phases in an attempt to optimise the intersection angle.
The chosen drilling direction (east at inclination of -60°) appears optimal based on
reconciliation from the early mining periods.

33/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
It is not thought that drilling direction will bias assay data at Caloma.
Sample
security

The measures taken to ensure sample security.
All samples were bagged in tied numbered calico bags, grouped into larger tied polyweave
bags and transported to the laboratory in Orange by Alkane personnel or courier. Sample
submission sheets were delivered with the samples and also emailed to the laboratory. All
sample submissions were documented via ALS tracking system and all assays were
reported via email.
Sample pulps were returned to site and were stored for an appropriate length of time
(minimum 3 years).
The Company has in place protocols to ensure data security.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.
The Company does not routinely have external consultants verify exploration data until
resource estimation procedures are deemed necessary.
The Caloma data was reviewed in 2010 and 2011 by Behre Dolbear (BDA) as part of the
due diligence phase of the development of the project. BDA did not express any specific
concerns with respect to the data other than to recommend the completion of some round
robin assaying and completion of additional density determinations, both of which were
undertaken for the Caloma Two resource drilling.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The Caloma Deposit lies within ML 1684 which is held in the name of Tomingley Gold
Operations Pty Ltd, a wholly owned subsidiary of Alkane Resources Ltd.
ML1684 expires on 11 February 2034.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
All reported drilling has been completed by ALK.
Geology
Deposit type, geological setting and style of mineralisation.
Geological nature of the Tomingley Deposits is well documented elsewhere.
Mineralisation is associated with quartz veining and alteration focused within sub-volcanic
basaltic-andesite sills and adjacent volcaniclastic sediments. The deposits appear to have
formed as the result of a rheological contrast between the porphyritic sub-volcanic sills and
the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the
sediments ductile deformation, and have many similarities to well documented orogenic -
lode-style gold deposits.
Mineralisation at Caloma is developed within a series of stacked ‘quartz lodes’ which dip
shallowly to the west and hosted dominantly within the sub-volcanic sills. The lodes are
cross cut by a number of post mineralisation dolerite dykes.

34/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Too numerous and not practical to summarise all drill hole data used. All drilling results
have been reported previously
Exclusion of drill hole data will not detract from the understanding of this report. All drill data
has been previously reported, holes are close spaced and in an operating mine area.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Previously reported results have been –
For uncut gold grades;
Intercepts were defined (bounded) by 0.5g/t gold outer limit and may contain some
internal waste;
Only intervals grading ≥1 g/t gold were reported;
Grades were calculated by length weighted average.
Exploration results have been previously reported as length weighted average grades with
internal high grade intercepts reported separately.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.
o
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
o
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Previously reported exploration results include the drilled width and an estimate of true
width.
At Caloma the true width is approximately 80% of the drilled width.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Cross section and a plan showing geology with drill collars were included with previously
reported exploration results. Typical plan and cross section included below.

35/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Data relating to all drill holes has been reported in previous documentation of exploration
results.
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No additional or new drilling results are being reported at this time.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Mining within the Caloma open pit commenced in February 2014.
Additional drilling may be completed to compliment an assessment of mining resources
below the open pit by underground methods.

36/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
Caloma Two
Caloma
Ore potentially mineable by
underground methods – open at
depth
Resource Limiting Pit

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.

Data validation procedures used.
Logging data was entered into Excel via drop down menus. All raw data was loaded directly
to the Access database from the assay, logging and survey derived files.
There are validation checks to avoid duplications of data.
The data were further validated for consistency when loaded into Datamine and
desurveyed.
An extensive check on the consistency and adequacy of down-hole survey data was
carried out in 2009.
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
(If no site visits have been undertaken indicate why this is the case.)
No site visit was undertaken by Mr Lewis prior to the initial resource estimations as the
deposit is covered by a sequence of alluvial material and there is nothing to see at surface.
Mr Lewis did visit the site on 25 July 2014 when he was able to view mineralisation in the
open pit, view mineralisation and alteration in drill core and assess the drill sampling and
QAQC techniques.
The quoted resources were compiled by Mr Terry Ransted, Chief Geologist, Alkane
Resources Ltd, who has been involved with the project since 2001.
Geological
interpretation

Confidence in (or conversely, the uncertainty of ) the geological interpretation of the
mineral deposit.
The geological model was built on structural data from core and lithological logging. The
domain wireframes were built by the Alkane geologists most familiar with the deposit.

Nature of the data used and of any assumptions made.
Structural measurements from oriented drill core were used to assist in the geological
interpretation along with lithological, alteration and mineralisation logging of RC chips and

37/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

The effect, if any, of alternative interpretations on Mineral Resource estimation.

The use of geology in guiding and controlling Mineral Resource estimation.

The factors affecting continuity both of grade and geology.
drill core.
The Caloma deposit was been drilled at a close-spacing in several different drilling
campaigns, reducing the likelihood that the geological interpretation will change
significantly. Drill holes were predominantly inclined to the east with some holes inclined to
the north or west (early drilling).
Reconciliation with grade control drilling and early mining confirms the interpretation.
Geological (lithological) logging was used to develop a geological model. Alteration and
mineralisation estimates along with grade guided the interpretation of the ore envelope
wireframes at a nominal 0.25g/t Au lower cut-off.
The Caloma deposit consists of a series of shallow west-dipping mineralised structures
within the steep west dipping feldspar porphyry host. These structures trend north-south
over a strike length of 500 metres and range in width from a few metres to in excess of 20
metres, and appear to extend across the full width of the porphyry. Mineralisation is
associated with extensive alteration and quartz veining of the porphyry and volcanic rocks.
The mineralisation is interrupted by a series of barren post-mineralisation dolerite dykes.
Mineralisation is directly associated with alteration and quartz veining.
Dimensions
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
The mineralisation occurs in several west-dipping zones within a north-striking corridor
460m long and 420m wide. Mineralisation extends from about 5m below the surface for
more than 350m vertical depth.
Estimation and
modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
parameters used.
17 mineralisation wireframes (domains) were interpreted by the Alkane geologists most
familiar with the deposit to constrain estimation. Six, cross cutting, barren dolerite
wireframes were also modelled. An enclosing background domain was modelled by LMRC
to capture minor mineralization outside the main domains.
Four surfaces were also used to separate material types - topography, alluvium, saprolite
and base of oxidation surfaces. The material type classification was used to allocate
density values.
The drill hole data were flagged by the domain wireframes in priority order, to prevent
double use of the data in any intersecting zones. The samples immediately outside the
mineralised zones were re-flagged, if they contained more than 1.0 g/t gold, in order to
capture mineralized samples that would otherwise not be used for estimation. This re-
flagging is also useful for the fixed-length RC and AC samples. It also captures samples
lost because the wireframeing was carried out in a different mining software package..
The samples were composited to 1m, the most common sample length and flagged by the
topography, alluvium, saprolite and base of oxidation surfaces. Top-cuts were selected for
each domain based on histograms, probability plots and cutting statistic plots. The top-cuts
ranged from 7g/t gold to 45.0 g/t gold for the mineralised zones. After top-cutting, the
maximum coefficient of variation for the mineralised domains ranged from 0.88 to 1.88
indicating that the estimation would not be difficult.
The number of drill hole composites in all but one of the mineralised domains was less than
700, too few for reliable variography. The one domain with more data (ore06a) was
irregular in shape and orientation. A longer range variogram model was fitted despite
evidence of some shorter range structures, possibly caused by the changes in orientation.
The variogram for this domain was used for all the mineralised domains. Separate
variogram models were fitted for the dolerite and background domains. The principal
estimation was made using inverse distance squared (ID2), but kriged and a nearest-

38/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.

The assumptions made regarding recovery of by-products.

Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).

In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.

Any assumptions behind modelling of selective mining units.

Any assumptions about correlation between variables.

Description of how the geological interpretation was used to control the resource
estimates.

Discussion of basis for using or not using grade cutting or capping.

The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
neighbour estimates were also made.
An additional kriged estimate was made using the name nominal variogram for all domains
to provide a measure of the availability of drill hole data during estimation.
Datamine Studio 3 was used for estimation. The orientation of the search ellipse for each
domain was controlled by a Dynamic Anisotropy model that provided a unique dip and dip-
azimuth for each block.
The estimates were compared to those of a previous estimate made by Alkane. The grade
of the new estimate was slightly higher; tonnes were also higher because an additional
domain was estimated.
Pre-stripping of waste commenced from Caloma and Wyoming Three in late 2013 and the
mining of ore in February 2014.
No assumptions made - Estimates were made for gold, arsenic and copper; only gold is of
economic significance.
No deleterious elements identified for estimation
The primary block size was small (2.5m x 2.5m x 5m) because of the narrow dipping nature
of the mineralized zones. Due to multiple directions of drilling, the drill hole spacing is
locally much less than 25m. Sub-blocks were estimated. This model was regularised to
2.5m x 2.5m x 2.5m for new reporting as this is more compatible with the mine planning
software currently in use at the mine and the mining methodology.
The drill hole spacing was 20-25m with both WE and NS holes drilled. The primary search
used (50m x 50m in the long directions and 5m in the short direction) reflects the continuity
on the mineralisation as seen in section and plan. .
Any blocks not estimated in the primary search were re-estimated using a secondary
search twice the size of the primary search.
No assumptions were made. As part of the validation process, the variability of the
estimates was compared to that calculated from the data and the variogram using the
Indirect Lognormal Correction. This showed that the estimates for the domains with most
data were over-smoothed, but the ID2 model was better than the kriged model. This is not
unusual for deposits drilled at exploration spacing. During mining, tonnes may be less and
grades higher.
No assumptions made
Soft boundaries were used between the dismembered parts of domains that were
intersected by later barren dolerite dykes.
The drill hole data were declustered using the polygonal method for statistical analysis and
determination of top-cuts.
The top cuts were selected using a combination of histograms, probability plots and cutting
statistic plots (plots of cut-off grade against Coefficient of Variation (CV) and total metal).
Estimates were made using Inverse Distance Squared (ID2) and checked using Kriging
and the Nearest Neighbour method. Estimates were also compared to a previous Alkane
block model.
The estimates were verified using several different techniques and checked for local
variabilitybycomparingthe estimated blockgrades with the average of the top-cut

39/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
composites in each block.
Moisture
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
The tonnages were estimated on a dry tonnage basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality parameters applied.
The cut-off grade (0.50 g/t Gold) for open pittable resources is relevant for the current
mining operation of this deposit.
Mining factors
or assumptions

Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
The main part of the Caloma deposit is being mined by open pit methods. Some dilution
was added when the estimated sub-block model was regularised; this reduced the gold
grade above 0.50 g/t cut-off by 11%. The cross-cutting barren dolerite dykes increase the
dilution.
The resources are depleted for production and limited to above RL 35m.
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
The metallurgy of the Caloma deposit was well studied in the Feasibility Study.
The Caloma deposit is currently being mined and processed with no significant differences
in metallurgical recoveries from those estimated in the feasibility study.
Environmen-tal
factors or
assumptions

Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
Project approval for the TGP was granted in July 2012 for mining from three open pits
(Wyoming One, Wyoming Three and Caloma) and underground from Wyoming One
deposit. Mining from the Wyoming Three and Caloma open pits commenced in December
2013 with processing of ore in February 2014.
Bulk density
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.

The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.

Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
Specific gravity measurements were completed by commercial laboratories on drill core
samples of the different material types (alluvium, saprolite, totally oxidised and fresh).
Oxidation was far more important than variations in lithology or alteration.
The specific gravity measurements were applied on a dry basis.
SG measurements completed on all material types – see above.
No assumptions made – SG determined and individual values applied to each material type
based on wire framed surfaces
Classification
The basis for the classification of the Mineral Resources into varying confidence
categories.
The resources were classified using kriging variance and search pass; this provides a
relative measure of the availability of data during estimation. It also takes into account the
clustering of the data. The actual break-points for the different resource classes were
chosen by inspection of the model in relation to the drilling density. Any blocks outside the
main mineralised domains were classified as Inferred. Measured resources were further
restricted to the first search pass.

40/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).

Whether the result appropriately reflects the Competent Person’s view of the deposit.
Caloma was estimated using high proportion of Reverse Circulation (RC) drill hole data.
The RC drilling was conducted using industry-standard methods and was not affected by
high water flows, so there is no reason not to accept the RC results. Statistical studies
showed that the RC drilling was of similar grade to the diamond drilling.
The classification reflects the Competent Persons view of the deposit and its supporting
data
Audits or
reviews

The results of any audits or reviews of Mineral Resource estimates.
The Wyoming and Caloma resource estimates were reviewed by Behre Dolbear in January
2012 as part of a financing due diligence process. The review raised some questions about
the method of resource classification.
The Caloma classification scheme was justified in a subsequent LMRC memo to Alkane in
February 2012 which reviewed the resource classes in relation to the anisotropic distance
to the nearest sample:.

For almost all the Measured Resources, the nearest sample was at less than half the
anisotropic search distance of the first estimation pass and the mean anisotropic
distance was 20% of the search distance.

For Indicated Resources, the nearest sample was no more than 87% of the maximum
anisotropic search distance and the mean anisotropic search distance was 40% of the
search distance.

The mean number of samples used for estimation was 23.4 for Measured Resources,
17 for Indicated Resources and 10.7 for Inferred Resources.

All Measured and Indicated Resources were estimated in the first search pass.

The resources are in fact estimated using an adequate amount of data.
Subsequent to the Behre Dolbear review, Hellman and Schofield (H&SC) were
commissioned by Alkane (at the request of Behre Dolbear) to review the resource
categorisation. Their draft report of 14 May, 2012 stated: “H&SC cannot endorse the
classification of the published resource because of the risk associated with the geological
interpretations of the mineralised domains as well as the classification method. It is
recommended that an alternative estimation approach be adopted that uses fewer and
larger domains with larger blocks combined with increased data points. The current
classification does not adequately reflect the risk associated with the subdivision of the
deposit into numerous domains some of which are thin and irregularly shaped and whose
continuity appear highly uncertain. In H&SC's view the quoted resource estimates are likely
to overstate the grade and understate the tonnage though the contained metal may be
similar.”
The mineralised zone domains and barren dolerite domains used by LMRC for the
estimation were modelled by Alkane geologists most familiar with Tomingley mineralisation.
Behre Dolbear in their review of the Tomingley deposits stated that: “Although all deposits
occur below surficial cover and the database is predominantly open hole drilling, the Alkane
interpretations of mineralised boundaries appear generally reasonable”. The mineralised
zones are narrow and dipping and this in conjunction with the cross-cutting later barren
dolerite dykes required that a small block size be used. Some dilution was added when the
sub-block model was regularised to 2.5m x 2.5m x 2.5m blocks. As discussed in the section
on classification of the resource estimate, the resource classes are supported by the data
spacing and number of data used.

41/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.
The Caloma deposit consists of 17 mineralisation zones and 6 barren dolerite dyke
domains; consequently there are relatively few drill hole data in most zones. Several of the
mineralised domains are parts of the same domain, separated by barren dolerite dyke.
Only one domain had an adequate number of composites for variography (1421). The
variogram for this domain was used for all mineralised domains. This has limited the
accuracy of any fitted variogram models. The use of an approximate variogram model does
not greatly affect the accuracy of the kriged grades as kriging is a very robust estimation
process. It does, however, limit the accuracy of the variance of the estimates and any
confidence limits that might be statistically inferred.
No statistical or geostatistical method (non-linear or simulation) was used to quantify the
relative accuracy of the estimate within confidence limits. Accuracy of the estimate is
strongly dependent on:
accuracy of the interpretation and geological domaining;
accuracy of the drill hole data (location and values);
orientation of local anisotropy; and
estimation parameters which are reflected in the global resource classification.
The resources are global, being based on drill hole data at exploration spacing.
To ensure the resources have ‘reasonable prospects of eventual economic extraction’ the
resources have been restricted by an indicative optimistic pit shell estimated at a gold price
of $2000 per ounce with the potential open pittable component assessed at ≥0.5g/t gold cut
off and material outside of the indicative pit with potential for eventual extraction by
underground mining methods assessed at ≥1.75g/t gold.
Production of ore commenced from Caloma (and Wyoming Three) in February 2014. Initial
mine to mill reconciliation has been positive for both tonnes and grade for the combined
production.

These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.

42/61

JORC Code, 2012 Edition – Table 1 report – Caloma Two Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
The Caloma Two area has been evaluated using air core (AC), reverse circulation (RC)
and diamond drilling (DD) techniques between May 2007 (early reconnaissance) and
March 2012. Not all of this drilling lies within the current resource outline, there is some
overlap in drilling with the southern end of Caloma (although there is no overlap in
resources) and none of the air core drilling samples were used in the resource calculation.
AC - 105 holes for 7,367.5m
RC - 201 holes for 29,078m (inclusive of 2 pre-collar totalling 72m)
DD - 17 holes totalling 4,097.60m
RC samples were collected at one metre intervals via a cyclone and riffle or cone splitter.
DD sample intervals were defined by geologist during logging to honour geological
boundaries.
RC drilling completed to industry standards.
Core was laid out in suitably labelled core trays. A core marker (core block) was placed at
the end of each drilled run (nominally 3 or 6m) and labelled with the hole number, down
hole depth, length of drill run. Core was aligned and measured by tape, comparing back to
this down hole depth consistent with industry standards.
RC Drilling - approximately 10% (3-4kg) of total sample was delivered via cone or riffle
splitter into a calico bag (for shipment to laboratory if required) with the remaining sample
delivered into a large plastic bag and retained for future use if required.
DD Drilling – sample intervals defined were by geologists during logging to honour
geological boundaries and cut in half with a saw.
All samples sent to laboratory were crushed and/or pulverised to produce a ~100g pulp for
assay process.
All RC and core samples were fire assayed using a 50g charge.
Visible gold was occasionally observed in both core and RC samples
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
The resource is based on 195 RC drill holes totalling 28,260 metres and 17 diamond core
drill (DD) holes totalling 3,631 metres.
Detailed resource definition drilling was completed by RC techniques using a 130mm or
140mm diameter face sampling hammer.
DD holes were pre-collared using either RC techniques or un-oriented PQ3 (83mm
diameter) core drilling. Pre-collars were completed to competent material, with holes cased
off and completed to depth using HQ3 (61mm diameter) core. HQ3 core was oriented
using the “Ace” (Reflex Act) core orientation tool.
Drilling data used in the establishment of resource wireframes and the resource calculation
is comprised of:
88% RC – 187 holes totalling 27,345m (inclusive of 1 pre-collar totalling 42m)
12% DD – 16 holes totalling 3,848.0m
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.
RC sample recovery was visually estimated and was generally very good (>90%) aided by
the use of oversized shrouds through oxide material. Samples were even in size. Samples
were rarely damp or wet. Sample quality was assessed by the sampler by visual

43/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
approximation of sample recovery and if the sample was dry, damp or wet. Riffle and cone
splitters were used to ensure a representative sample was achieved for 1 metre samples.
DD - core loss was identified by drillers and calculated by geologists when logging.
Generally ≥95% was recovered and any loss was usually in portions of the oxide zone.
Triple tube Large diameter, triple tube core (PQ3) was used through the oxide material to
ensure the greatest recovery.
RC drilling was completed using oversized shrouds to maintain sample return in oxide zone
and all samples were split using riffle or cone splitters. Use of RC rigs with high air capacity
assists in keeping samples dry.
Triple tube coring was used at all times to maximise core recovery with larger diameter
(PQ3) core used in the oxide and saprolite zones.
There is no known relationship between sample recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.

The total length and percentage of the relevant intersections logged.
RC - each one metre interval was geologically logged for characteristics such as lithology,
weathering, alteration (type, character and intensity), veining (type, character and intensity)
and mineralisation (type, character and volume percentage).
DD - all core was laid out in core trays and geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage). A brief geotechnical
log was also undertaken collecting parameters such as core recovery, RQD, fracture count,
and fracture type and orientation.
All logging was qualitative with visual estimates of the various characteristics. Magnetic
susceptibility data is quantitative.
RC - A representative sample of each one metre interval is retained in chip trays for future
reference.
DD - Core was photographed and all unsampled core is retained for reference purposes.
All DD core and RC chip samples have been geologically and geotechnically logged by
qualified geologists.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.
DD - zones of visual mineralisation and/or alteration were marked up by the geologist and
cut in half using an Almonté (or equivalent) core cutting saw. Samples submitted for
analysis were collected from the same side in all cases to prevent bias. Sampling intervals
were generally based on geology, were predominantly over 1m intervals but do not exceed
1.2 metres in length. All mineralised zones were sampled, plus ≥2m of visibly barren wall
rock.
Laboratory Preparation – drill core was oven dried prior to crushing to <6mm using a jaw
crusher, split to 3kg if required then pulverised in an LM5 (or equivalent) to ≥85% passing
75µm. Bulk rejects for all samples were discarded. A pulp packet (±100g) is stored for
future reference

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
RC – for intervals with visual mineralisation and/or alteration, the calico sample bag (1m
samples) were numbered and submitted to the laboratory for analysis. Intervals without
visual mineralisation and/or alteration were spear sampled and composited over three
metres. For composited intervals returning grades >0.2g/t Au the calico bags were
retrieved for assay of the individual 1m intervals. Rare damp or wet samples were
recorded by the sampler.

44/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.
Laboratory Preparation – the entire RC sample (3kg) was dried and pulverised in an LM5
(or equivalent) to ≥85% passing 75µm. Bulk rejects for all samples were discarded. A pulp
packet (±100g) is stored for future reference.
Alkane (ALK) sampling techniques are of industry standard and considered adequate.
RC – field duplicate samples collected at every stage of sampling to control procedures.
DD – external laboratory duplicates used.
RC - Duplicate samples were riffle split from the riffle/conical split calico from the drill rig.
Duplicates show generally excellent repeatability, indicating a negligible “nugget” effect.
Sample sizes are industry standard and considered appropriate.
Quality of
assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Gold was determined using a 50g charge fused at approximately 1100°C with alkaline
fluxes, including lead oxide. The resultant prill was dissolved in aqua regia and gold
determined by flame AAS.
For other geochemical elements, samples were digested in aqua regia with each element
concentration determined by ICP Atomic Emission Spectrometry or ICP Mass
Spectrometry. These additional elements were generally only used for geological
interpretation purposes, are not of economic significance and are not routinely reported.
Not applicable to this report or deposit.
Commercially prepared Certified Reference Materials (CRM) and blanks were inserted at 1
in 50 samples. CRM’s were not identifiable to the laboratory.
Field duplicate samples were inserted at 1 in 50 samples (alternate to CRM’s).
Laboratory QAQC sampling includes insertion of CRM samples, internal duplicates and
screen tests. This data was reported for each sample submission.
Failed standards result in re-assaying of portions of the affected sample batches.
Screen fire assay checks (75µm mesh) were undertaken on 110 drill core samples. Screen
fire assay data overrides all other methods.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.

The use of twinned holes.
Drill data was compiled and collated, and reviewed by senior staff. External consultants do
not routinely verify exploration data until resource estimation procedures are deemed
necessary.
Twinned holes have not been used at Caloma Two as twinning provides verification only for
extremely limited areas of a deposit.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
All drill hole logging and sampling data was hard keyed into Excel spreadsheet for transfer
and storage in an access database with verification protocols in place.
All primary assay data was received from the laboratory as electronic data files which were
imported into sampling database with verification procedures in place. QAQC analysis was
undertaken for each laboratory report.
Digital copies of Certificates of Analysis (COA) are stored in a central database with regular
(daily) backup. Original survey data is stored on site.
Data was also verified on import into mining related software.

45/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Discuss any adjustment to assay data.
No assay data was adjusted. Screen fire assays take precedence over all other assay
techniques.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Drill holes were laid out using hand held GPS (accuracy ± 2m) then surveyed accurately (±
0.1m) by licensed surveyors on completion.
RC drill holes were surveyed using a single shot electronic camera at a nominal 30m down
hole intervals.
DD holes were surveyed at nominal 30m down hole during drilling to maintain drilling
direction and then at 6m intervals on retrieval of rod string using a multi shot electronic
camera.
All drill holes were originally laid out in AMG66 grid however since mining commenced in
February 2014 have been transformed to MGA94 grid system to conform with reporting
requirements for mine operations.
The area is very flat. A site based digital terrain model was developed from accurate (±
0.1m) survey control by licenced surveyors.
Data spacing
and distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.
Drilling was completed on north-south sections spaced nominally 20m apart with holes
spaced at 20m intervals along the lines. The line spacing was increased to a nominal 40m
in zones thought peripheral to the main ore body and to the east.
The drill hole spacing is similar to that used at other Tomingley deposits and has been
established to be sufficient.
The drill hole spacing has been shown to be appropriate by the visible continuity of
mineralisation between drill holes.
Sample compositing was not applied until resource estimation stage.
RC samples with no visible mineralisation or alteration were composited to 3m with 1m
resamples assayed if the composite returned a gold value of >0.2g/t gold. One metre
samples override 3m composites in the database.
DD – core was sampled to geology.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
Much care was given to attempt to intersect mineralisation at an optimal angle but in
complex ore bodies this can be difficult. The chosen drilling direction (south at inclination of
-60°) is consistent with structural measurements obtained from oriented drill core.
It is not thought that drilling direction will bias assay data at Caloma Two.
Sample
security

The measures taken to ensure sample security.
All samples were bagged in tied numbered calico bags, grouped into larger tied polyweave
bags and transported to the laboratory in Orange by Alkane personnel or courier. Sample
submission sheets were delivered with the samples and also emailed to the laboratory. All
sample submissions were documented via ALS tracking system and all assays were
reported via email.
Sample pulps were returned to site and were stored for an appropriate length of time
(minimum 3 years).
The Company has in place protocols to ensure data security.

46/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.
The Company does not routinely have external consultants verify exploration data until
resource estimation procedures are deemed necessary.
The Caloma Two data has not been audited nor reviewed by external parties however the
data for other deposits within the TGP was reviewed in 2010 and 2011 by Behre Dolbear
(BDA). BDA did not express any specific concerns with respect to the data other than to
recommend the completion of some round robin assaying and completion of additional
density determinations, both of which were undertaken for the Caloma Two resource
drilling.
Section 2 Reporting of Exploration Results
(Criteria listed in theprecedingsection also applyto this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The Caloma Two Deposit lies within ML 1684 which is held in the name of Tomingley Gold
Operations Pty Ltd, a wholly owned subsidiary of Alkane Resources Ltd.
ML1684 expires on 11 February 2034.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
All reported drilling has been completed by ALK.
Geology
Deposit type, geological setting and style of mineralisation.
Geological nature of the Tomingley Deposits is well documented elsewhere.
Mineralisation is associated with quartz veining and alteration focused within sub-volcanic
basaltic-andesite sills and adjacent volcaniclastic sediments. The deposits appear to have
formed as the result of a rheological contrast between the porphyritic sub-volcanic sills and
the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the
sediments ductile deformation, and have many similarities to well documented orogenic -
lode-style gold deposits.
Mineralisation at Caloma Two is developed within a series of ‘quartz lodes’ which dip north
at flat to moderate angles and hosted dominantly within the sub-volcanic sills.
Mineralisation is also developed along a sediment contact zone which appears to be a
potential linking structure with the Caloma mineralisation to the north. There is also
evidence for the development of an inverted saddle reef at depth. The lodes are cross cut
by a number of post mineralisation dolerite dykes.
Drill hole
Information
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
Too numerous and not practical to summarise all drill hole data used. All drilling results
have been reported previously

47/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Exclusion of drill hole data will not detract from the understanding of this report. All drill data
has been previously reported, holes are close spaced and in an operating mine area.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Previously reported results have been –
For uncut gold grades;
Intercepts were defined (bounded) by 0.5g/t gold outer limit and may contain some
internal waste;
Only intervals grading ≥1 g/t gold were reported;
Grades were calculated by length weighted average.
Exploration results have been previously reported as length weighted average grades with
internal high grade intercepts reported separately.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in the reporting of Exploration Results.
o
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
o
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Previously reported exploration results include the drilled width and an estimate of true
width.
The mineralisation is structurally complex and true widths are variable depending on the
ore zone intersected however range between 60% and 80% of drill intersection.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Cross section and a plan showing geology with drill collars were included with previously
reported exploration results. A typical plan and cross section are included below.

48/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Data relating to all drill holes has been reported in previous documentation of exploration
results.
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No additional or new drilling results are being reported at this time.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
No further work is planned in the short term however drilling to test the continuation of
mineralised structures at depth for an underground resource definition will be
contemplated.
A pit design has been established and material has been included in the mining schedule.

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.

49/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Caloma Two
Caloma
Ore potentially mineable by
underground methods – open at
depth
Resource Limiting Pit

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.

Data validation procedures used.
Logging data is entered into Excel via drop down menus. All raw data is loaded directly to
the Access database from the assay, logging and survey derived files.
There are validation checks to avoid duplications of data.
The data are further validated for consistencywhen loaded into Datamine and desurveyed.
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
(If no site visits have been undertaken indicate why this is the case.)
No site visit was undertaken by Mr Lewis prior to the initial resource estimations as the
deposit is covered by a sequence of alluvial material and there is nothing to see at surface.
Mr Lewis did visit the site on 25 July 2014 when he was able to view mineralisation in the
open pit, view mineralisation and alteration in drill core and assess the drill sampling and
QAQC techniques.
The quoted resources were compiled by Mr Terry Ransted, Chief Geologist, Alkane
Resources Ltd, who has been involved with the project since 2001.
Geological
interpretation

Confidence in (or conversely, the uncertainty of ) the geological interpretation of the
mineral deposit.

Nature of the data used and of any assumptions made.
The geological model is built on structural data from core and lithological logging. The lode
strike orientations are similar to Wyoming Three which sits in a similar structural position.
Structural measurements from oriented drill core were used to assist in the geological
interpretation along with lithological, alteration and mineralisation logging of RC chips and
drill core.

The effect, if any, of alternative interpretations on Mineral Resource estimation.
A steep dipping interpretation was initially proposed however this was inconsistent with
structural measurements obtained from oriented drill core.

50/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

The use of geology in guiding and controlling Mineral Resource estimation.

The factors affecting continuity both of grade and geology.
Geological (lithological) logging was used to develop a geological model. Alteration and
mineralisation estimates along with grade guided the interpretation of the ore envelope
wireframes at a nominal 0.25g/t Au lower cut-off.
The majority of mineralisation is hosted by a quartz veined and altered feldspar ± augite
porphyritic andesite of probable sub-volcanic origin.
Dolerite dykes post-date mineralisation and all mineralised lodes are terminated at the
dolerite contacts.
Mineralisation is directly associated with alteration and quartz veining.
Dimensions
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
Strike length ~ 360m
Width ~ 100m
Depth ~ 20m from below surface to ~ 250m below surface from deepest drilling intercept.
Estimation and
modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
parameters used.

The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.

The assumptions made regarding recovery of by-products.

Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).
13 mineralisation wireframes (domains) and 5 dolerite wireframes were interpreted and
used as constraints for the resource modelling. Four surfaces were also used to separate
material types - topography, alluvium, saprolite and base of oxidation surfaces.
The drill hole data were flagged by dolerite and mineralised domain wireframes in priority
order, to prevent double use the data in the intersecting zones. The samples immediately
outside the mineralised zones were re-flagged, if they contained more than 0.25 g/t gold, in
order to prevent any overestimation that could be caused by use of assay boundaries. This
re-flagging is also useful for the RC samples that are not broken at barren dyke boundaries.
The samples were composited to 1m, the most common sample length and flagged by the
topography, alluvium, saprolite and base of oxidation surfaces.
The top-cut declustered data had Coefficient of Variation (CV’s) of less than 1.7 for the
mineralised zones, allowing use of Ordinary Kriging for estimation.
Average variogram models were fitted for the mineralised zones and dolerite dykes.
Estimates were made by Ordinary Kriging, with check estimates by Inverse Distance
Squared (ID2) and Nearest Neighbour methods.
Datamine Studio 3 V22 was used.
The resources are limited by an indicative pit design to ensure they have reasonable
prospects for eventual economic extraction.
There are no previous estimates or any production data to provide any validation.
No assumptions made - Estimates were made for gold, arsenic and copper; only gold is of
economic significance.
No deleterious elements identified for estimation

In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.
The primary block size was small (2.5m x 2.5m x 5m) because of the narrow dipping nature
of the mineralisation zones.
The average drill hole spacing was 20m and variogram ranges 22m x 26m x 3.5m.
The primary search was equal to the variogram ranges; secondary searches were made
using 2x and 3x the primary search. Only the material estimated in the primary and
secondary searches were included in the resources.

51/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Any assumptions behind modelling of selective mining units.

Any assumptions about correlation between variables.

Description of how the geological interpretation was used to control the resource
estimates.

Discussion of basis for using or not using grade cutting or capping.

The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
Sub-blocks were estimated but these were regularized to 2.5m x 2.5m x 2.5m blocks in
March 2014 as this is more compatible with the mine planning software currently in use at
the mine and the proposed mining methodology.
No assumptions were made.
No assumptions were made
Only data form the same domain were used to make estimates.
The drill hole data were declustered using the polygonal method for statistical analysis and
determination of top-cuts.
The top cuts were selected using a combination of histograms, probability plots and cutting
statistic plots (plots of cut-off grade against Coefficient of Variation (CV) and total metal).
Estimates were made by Ordinary Kriging, with check estimates by Inverse Distance
Squared (ID2) and Nearest Neighbour methods.
The estimates were verified using several different techniques and checked for local and
global variability. The checks included comparison with estimates made by different
estimation methods, and against the declustered composites.
Moisture
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
The tonnages were estimated on a dry tonnage basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality parameters applied.
The cut-off grade (0.50 g/t Gold) for open pittable resources is being used for the other
Tomingley deposits. This takes into account current mining costs and metallurgical
recovery for similar material.
Mining factors
or assumptions

Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
The main part of the Caloma Two deposit is likely to be mined by open pit methods. Some
dilution was added when the estimated sub-block model was regularised; this reduced the
gold grade above 0.50 g/t cut-off by 16% and increased tonnes by 17%. More dilution may
need to be added as part of the mining reserve process.
The resources were limited by an indicative pit design to ensure they have reasonable
prospects for eventual economic extraction.
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
Metallurgical test work on Caloma Two material has not been undertaken to date however,
the metallurgy of the other Tomingley deposits is well studied. It is likely that Caloma Two
will have similar metallurgical characteristics.
The Caloma deposit is currently being mined and processed with no significant differences
in metallurgical recoveries from those estimated in the feasibility study.
Environmental
factors or
assumptions

Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
Project approval for the TGP was granted in July 2012 for mining from three open pits
(Wyoming One, Wyoming Three and Caloma) and underground from Wyoming One
deposit. Mining from the Wyoming Three and Caloma open pits commenced in December
2013 with processing of ore in February 2014.
Separate environmental approval is required prior to the commencement of mining from the
Caloma Two deposit.

52/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Bulk density
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.

The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.

Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
Specific gravity measurements were completed by commercial laboratories on DD core
samples.
At least 5 samples if possible were selected for each of the 8 categories; weathered
porphyry, weathered mineralised porphyry, fresh porphyry, fresh mineralised porphyry,
weathered sediment, weathered mineralised sediment, fresh sediment, and fresh
mineralised sediment.
The specific gravity measurements were applied on a dry basis.
SG measurements completed on all material types – see above.
No assumptions made – SG determined and individual values applied to each material type
based on wire-framed surfaces
Classification
The basis for the classification of the Mineral Resources into varying confidence
categories.

Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).

Whether the result appropriately reflects the Competent Person’s view of the deposit.
The resources were classified using the search pass; only estimates made within the
defined mineralisation zones in the first search pass were classified as Indicated
Resources. The dimensions of the search pass were based on the variogram ranges.
No Measured Resources were defined, because of some uncertainly in the geological
interpretation of the mineralisation zones, and the use of a high proportion of Reverse
Circulation drilling (RC) for exploration.
The use of RC drilling limits the amount of geological information that can be logged, and
boundaries of mineralisation zones cannot be precisely located.
The classification reflects the Competent Persons view of the deposit and its supporting
data
Audits or
reviews

The results of any audits or reviews of Mineral Resource estimates.
As this is the first mineral resource estimation for this deposit, there have not been any
audits or reviews.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.
The Caloma Two deposit consists of 13 narrow mineralisation zones; consequently there
are relatively few drill hole data in each zone. This has limited the accuracy of any fitted
variogram model and forced the use of average variogram models. The use of an
approximate variogram model does not greatly affect the accuracy of the kriged grades as
kriging is a very robust estimation process. It does, however, limit the accuracy of the
variance of the estimates and any confidence limits that might be statistically inferred.
No statistical or geostatistical method (non-linear or simulation) was used to quantify the
relative accuracy of the estimate within confidence limits. Accuracy of the estimate is
strongly dependent on:
accuracy of the interpretation and geological domaining;
accuracy of the drill hole data (location and values);
orientation of local anisotropy; and
estimation parameters which are reflected in the global resource classification.

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.
The resources are global, being based on drill hole data at exploration spacing.
To ensure the resources have ‘reasonable prospects of eventual economic extraction’ the
resources have been restricted by an indicative optimistic pit shell estimated at a gold price
of $2000 per ounce with the potential open pittable component assessed at ≥0.5g/t gold cut

53/61

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
off and material outside of the indicative pit with potential for eventual extraction by
underground mining methods assessed at ≥1.75g/t gold.
There has not been any production from Caloma Two.

These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.

54/61

APPENDIX 2

Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves

APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
APPENDIX 2
Section 4 Estimation and Reporting of Ore Reserves - Tomingley Gold Operations Underground Ore Reserves
(Criteria listed in section 1,and where relevant in sections 2 and 3,also applyto this section.)
Criteria JORC Code explanation Commentary
Mineral
Resource
estimate for
conversion to
Ore Reserves

Description of the Mineral Resource estimate used as a basis for the conversion to an
Ore Reserve.
The mineral resources used as a basis for the conversion to the ore reserve are those
outlined in Appendix 1.
The following table comprises the Mineral Resources for the Tomingley Gold Project which
were compiled by Mr Terry Ransted, Chief Geologist for Alkane and released to the ASX
on 21 September 2015.
TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015)
DEPOSIT
MEASURED
INDICATED
INFERRED
TOTAL
Total Gold
Tonnage
Grade
Tonnage
Grade
Tonnage
Grade
Tonnage
Grade
(Kt)
(g/t Au)
(Kt)
(g/t Au)
(Kt)
(g/t Au)
(Kt)
(g/t Au)
(Koz)
Open Pittable Resources(cut off 0.50g/t Au)
WyomingOne
2,171
1.7
442
1.5
735
1.1
3,348
1.5
167
WyomingThree
206
1.7
122
1.7
2
1.1
330
1.7
18
Caloma
2,167
1.9
582
1.7
2,008
1.5
4,757
1.7
259
Caloma Two


1,085
2.4
704
1.3
1,789
2.0
112
Sub Total
4,543
1.8
2,231
2.0
3,450
1.4
10,224
1.7
556
Underground Resources(cut off 2.50g/t Au)
WyomingOne
168
4.8
205
4.4
361
4.2
735
4.4
104
WyomingThree
12
3.6
20
4.5
25
3.3
57
3.8
7
Caloma
0
3.1
4
2.9
81
3.2
84
3.2
9
Caloma Two


92
3.5
63
3.2
155
3.3
17
Sub Total
180
4.7
321
4.1
530
3.9
1,031
4.1
136
TOTAL
4,724
1.9
2,552
2.3
3,979
1.7
11,255
1.9
692
basis for the conversion to an
TOMINGLEY GOLD PROJECT MINERAL RESOURCES(as at 30 June 2015)
DEPOSIT MEASURED INDICATED INFERRED TOTAL l l
Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade Tota God
(Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz)
Open Pittable Resources(cut off 0.50g/t Au)
WyomingOne 2,171 1.7 442 1.5 735 1.1 3,348 1.5 167
WyomingThree 206 1.7 122 1.7 2 1.1 330 1.7 18
Caloma 2,167 1.9 582 1.7 2,008 1.5 4,757 1.7 259
Caloma Two 1,085 2.4 704 1.3 1,789 2.0 112
Sub Total 4,543 1.8 2,231 2.0 3,450 1.4 10,224 1.7 556
Underground Resources(cut off 2.50g/t Au)
WyomingOne 168 4.8 205 4.4 361 4.2 735 4.4 104
WyomingThree 12 3.6 20 4.5 25 3.3 57 3.8 7
Caloma 0 3.1 4 2.9 81 3.2 84 3.2 9
Caloma Two 92 3.5 63 3.2 155 3.3 17
Sub Total 180 4.7 321 4.1 530 3.9 1,031 4.1 136
TOTAL 4,724 1.9 2,552 2.3 3,979 1.7 11,255 1.9 692

Clear statement as to whether the Mineral Resources a
inclusive of, the Ore Reserves.
re reported additional to, or The Mineral Resources reported are inclusive of the Ore Reserves.
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome
those visits.
(If no site visits have been undertaken indicate why this is the case.)
of Sean Buxton is a full time staff member of Tomingley Gold Operations Pty Limited in his
role as Operations Manager, he is based on site at Tomingley Gold Operation.
Michael Leak is a casual employee of Tomingley Gold Operation and has visited site on
two occasions:

In March 2015 to conduct a site visit to gather the required data, understand the site
layout and limitations and discuss logistics with site operational personnel

In May 2015 to undertake a high level review of the work undertaken in the initial
options assessment, to ratify the assumptions made and ensure practicality of the
work undertaken.
Study status
The type and level of study undertaken to enable Mineral Resources to be converted to
Ore Reserves.
(The Code requires that a study to at least Pre-Feasibility Study level has been undertaken
to convert Mineral Resources to Ore Reserves. Such studies will have been carried out and
will have determined a mine plan that is technically achievable and economically viable,
and that material Modifying Factors have been considered.)
A prefeasibility study has been undertaken with respect to all underground mining options
for all deposits at Tomingley Gold Operations.
The Tomingley Gold Mine is an operational open pit mining operation with an operating CIP
processing plant based on the mining and treatment of ore from the Caloma open pit and
overburden is being mined from the Wyoming One open pit. Mining within the Wyoming
Three pit cease in November 2015. It is also planned to mine ore from a pit at the Caloma
Two deposit. The TGOprocessing plant utilises two stage crushing,single stagegrinding

55/61

and a gravity/CIL gold recovery circuit. The plant has a designated throughput of 1.25mtpa
of oxide ore and 1.0mtpa of fresh (sulphide) ore. The Site has been operational since
January 2014 and is achieving design objectives.
Cut-off
parameters

The basis of the cut-off grade(s) or quality parameters applied.
To enable mine development and stope designs to be undertaken, an initial financial
analysis was undertaken using available cost information and benchmarked costs from
similar sized Australian underground mines to determine the correct cut-off grades to use
for the study.
This determined that the correct cut-off grade (COG), based on benchmarked costs and
Alkane corporate guidance on Gold price was 2.5 g/t Au for stoping and 1 g/t Au for
incremental development ore.
Mining factors
or
assumptions

The method and assumptions used as reported in the Pre-Feasibility or Feasibility
Study to convert the Mineral Resource to an Ore Reserve (i.e. either by application of
appropriate factors by optimisation or by preliminary or detailed design).

The choice, nature and appropriateness of the selected mining method(s) and other
mining parameters including associated design issues such as pre-strip, access, etc.

The assumptions made regarding geotechnical parameters (eg pit slopes, stope sizes,
etc), grade control and pre-production drilling.

The major assumptions made and Mineral Resource model used for pit and stope
optimisation (if appropriate).

The mining dilution factors used.

The mining recovery factors used.

Any minimum mining widths used.
A mining method assessment was undertaken to define the best mining method for any
underground mining at TGO. Options assessed were:

Block or sublevel caving,

Cut and Fill,

Longhole open stoping,

Avoca Stoping.
This assessment, in conjunction with a 2010 geotechnical assessment, indicated that
longhole open stoping and areas of Avoca stoping would provide the best balance between
stability, recovery and cost.
In 2010, Mining One was commissioned to prepare a geotechnical assessment as part of
the Definitive Feasibility Study (DFS) into Underground Mining at Wyoming 1. The Mining
One Scope included:

Review and audit of geotechnical data from previous drilling, including borehole logs,
core photographs and laboratory testing results, as supplied by Alkane Resources,

Rock mass assessment based on drilling and testing data provided to Mining One and
assigning of rock mass quality parameters for geotechnical domains,

Structural assessment and assigning of major structural sets for geotechnical
domains,

Geotechnical design including, specification of stoping dimensions, ground support
requirements for development and the proposed in-pit portal and an assessment of
required crown pillar thickness,

Preparation of a report documenting the results and recommendations of the feasibility
study.
This study has used the Mining One recommendations as a basis and where, in the
author’s opinion, industry norms have become more conservative, a more conservative
approach to that recommended in 2010 has been used.
A detailed mine design was undertaken in Datamine and interrogated utilising Studio 5DP.
This was then exported to EPS for scheduling.
No set dilution factors were used; stopes were designed as diluted stope shapes with a
minimum of 0.5m of dilution material on both the hangingwall and footwall.
Mining Recovery for all stopes was set to 95%
A minimum mining width of 3.5m was included in the assessment.

The manner in which Inferred Mineral Resources are utilised in mining studies and the
sensitivity of the outcome to their inclusion.
No Inferred material is used in the assessment of ore reserves. The following was
undertaken to enable a design using only the geological confidence allowed for the
reporting of an Ore Reserve and to ensure adequate conservatism in the process:

56/61


The infrastructure requirements of the selected mining methods.

Stope shapes were designed on the basis of Measured and Indicated Resource
classifications only,

Stopes were evaluated and all Inferred grades were set to zero (no contained metal
from Inferred Resources),

Any stopes that fell below the stoping Cut-off grade due to the absence of Inferred
ounces were eliminated
The selected mining methods do not require any infrastructure above the standard:

Surface administrative and ablution facilities

Electrical reticulation

Portal

Ventilation infrastructure

Workshop facilities

As the mining methods predominantly leave stopes open or backfilled with loose rock
fill, the small portion of cemented rock fill is anticipated to be mixed underground in
stockpiles before delivery to the stopes, this method does not require any permanent
infrastructure.
Metallurgical
factors or
assumptions

The metallurgical process proposed and the appropriateness of that process to the
style of mineralisation.

Whether the metallurgical process is well-tested technology or novel in nature.

The nature, amount and representativeness of metallurgical test work undertaken, the
nature of the metallurgical domaining applied and the corresponding metallurgical
recovery factors applied.

Any assumptions or allowances made for deleterious elements.

The existence of any bulk sample or pilot scale test work and the degree to which such
samples are considered representative of the ore body as a whole.

For minerals that are defined by a specification, has the ore reserve estimation been
based on the appropriate mineralogy to meet the specifications?
TGO currently mines and processes fresh rock material from two active pits through a 1
Mtpa CIL plant (described above).
The metallurgical performance and processing costs are well known and tested at TGO.
This study assumes a metallurgical recovery of 92% in line with currently achieved
performance of the TGO mill.
No deleterious elements extracted
Operational recoveries for the last two months were 91.5% and 93.5% for material from
Caloma and Wyoming Three. No ore has been mined from Wyoming One or Caloma Two
however metallurgical testwork for the DFS indicated similar recoveries for all deposits.
N/A – no minerals defined by a specification
Environmen-
tal

The status of studies of potential environmental impacts of the mining and processing
operation. Details of waste rock characterisation and the consideration of potential
sites, status of design options considered and, where applicable, the status of
approvals for process residue storage and waste dumps should be reported.

TGO was subject to numerous environmental studies as part of the Environmental
Assessment (EA)for the Tomingley Gold Project during the approvals phase and all
required approvals were granted prior to the commencement of mining. The EA
included documentation regarding the proposed underground mine which is still
relevant today.

The only change to that documented in the EA is that the portal(s) would now be
located in the Caloma open pit, it is assumed that this minor change does not
constitute a change to the intent with respect to the EA and no further environmental
studies would be required.

Waste rock dumps storing fresh rock waste from open pit operations already exist and
no additional concerns are anticipated from placement of underground waste onto
these dumps if required.
Infrastructure
The existence of appropriate infrastructure: availability of land for plant development,
power, water, transportation (particularly for bulk commodities), labour,
accommodation; or the ease with which the infrastructure can be provided, or
accessed.

Infrastructure has already been constructed for open pit mining and processing. Works
to site included access road, a water pipeline, a 66 KV power line, site drainage,
topsoil stockpiling, waste dump construction, Residue Storage Dams, Process Water
Dams, associated offices, workshops, fuel and laydown areas. Sufficient site
infrastructure has been constructed to process ore at 1.25 MTPA.

Labour is sourced from Tomingley,Narromine,Dubbo and Parkes region and as such

57/61

the operation requires no accommodation or messing facilities.

Central NSW has many active mining operations within a short distance of TGO and
as such the ability to procure labour and infrastructure services for the operation
should not pose any major challenges.
Costs
The derivation of, or assumptions made, regarding projected capital costs in the study.

The methodology used to estimate operating costs.

Allowances made for the content of deleterious elements.

The source of exchange rates used in the study.

Derivation of transportation charges.

The basis for forecasting or source of treatment and refining charges, penalties for
failure to meet specification, etc.

The allowances made for royalties payable, both Government and private.
Mining capital estimates have been made using, wherever possible, budget pricing
obtained from reputable suppliers. The few instances where costs could not be obtained
from these sources, costs were obtained by benchmarking of similar sized Australian
mines.
The operating cost estimates have been derived from first principles estimating
consumables use combined with budget pricing from reputable suppliers for the cost
elements consumed in the mining process.
Labour costs have been derived from pay scales of similar sized, geographically relevant
underground mines in NSW. Maintenance and machinery productivity costs are based on
productivity estimates from reputable manufacturers and their estimate of maintenance
costs over the life of an asset.
No deleterious elements are modelled in the Mineral Resources Models nor has there been
any concern with this during the 18 months TGO has been producing gold dorè.
Gold price is expressed in Australian dollars and no exchange rate is required.
Transport charges for dorè to the Perth Mint are included in the refining charges and based
on historical charges incurred by TGo for open pit gold production..
Site treatment charges are well known due to the current processing of fresh rock ore
material from open pits.
Refining charges have been assumed to be $1.50 per ounce in accordance with historical
charges incurred by TGO by the Perth Mint.
A 4% New South Wales state royalty on the net value of Gold and Base metals. A royalty is
also payable to Golden Cross Operations Pty Ltd for that portion of ore mined within former
Exploration Licence 5830. This royalty is payable at 0.75 cents per tonne for the first
500,000 tonnes mined then 3% Net Smelter Return (NSR) on the next 150,000 ounces
produced and 5% NSR thereafter.This has been allowed for in the financial evaluation.
Revenue
factors

The derivation of, or assumptions made regarding revenue factors including head
grade, metal or commodity price(s) exchange rates, transportation and treatment
charges, penalties, net smelter returns, etc.

The derivation of assumptions made of metal or commodity price(s), for the principal
metals, minerals and co-products.
This study assumes a $AU 1,450 per ounce gold price for the base case. This is below the
current spot price which has been relatively steady at around $AU 1,500 for some time.
TGO 2015 budgets were all prepared based on a corporate view of gold being at $AU
1,450 per ounce for some time and as such this study has adopted that as the base case
price.
All costs are in AUD as all services are expected to be sourced in Australia, all revenues
are in AUD and as such no exchange rates are required.
No assumptions made
Market
assessment

The demand, supply and stock situation for the particular commodity, consumption
trends and factors likely to affect supply and demand into the future.

The gold market is driven by a number of factors and fluctuates dependant on physical
supply and demand, political tensions and global instability. In times of uncertainty
gold is seen to be a stable and safe “currency” and this has maintained its value for a
significant period of time.

Despite fluctuations in the gold price in USD, the price of gold in AUD has been
significantly more stable and is anticipated to continue to stay around $1,500 AUD for
some time.

58/61


A customer and competitor analysis along with the identification of likely market
windows for the product.

Price and volume forecasts and the basis for these forecasts.

For industrial minerals the customer specification, testing and acceptance requirements
prior to a supply contract.

TGO currently sells most of its gold at spot prices however also has contracts to sell
approximately 23,000 ounces around $1600 per ounce.

The Underground mine would contribute only a small portion of the overall volume of
output and is unlikely to have any impact on the market.
There is a transparent quoted derivative market for the sale of gold
There is a transparent quoted derivative market for the sale of gold
Not assessing industrial minerals
Economic
The inputs to the economic analysis to produce the net present value (NPV) in the
study, the source and confidence of these economic inputs including estimated
inflation, discount rate, etc.

NPV ranges and sensitivity to variations in the significant assumptions and inputs.
Economic Inputs to financial analysis:

Revenues from Gold sales,

Costs (described previously)

Discount rate of 10%
The Tomingley Underground Financial Evaluation uses the costs as well as the revenue
(gold sales), together with the mine schedule to calculate a net cashflow per month for the
duration of the project. This cashflow is then discounted to derive at the projects Net
Present value (NPV). This NPV excludes depreciation, amortisation and taxes.
No inflation of costs has been undertaken as there has been no forward speculation on
gold price. It is the net cashflow that drives NPV and this is assumed to remain consistent
(i.e. gold price and inflation move in the same direction).
Sensitivities have been undertaken for both the entire mining inventory and the reserve
version of the financial model. Due to the very conservative nature of eliminating all inferred
ounces from the ore reserve, only a 5% cost increase is required to negate the economic
benefit shown in this reserve. Conversely though, a mere 5% increase in gold price
increases the NPV 250%. As such, one could reasonable expect the project to have an
NPV of between 0 and $8.7M (based on a 10% increase from the assumed gold price.
Social
The status of agreements with key stakeholders and matters leading to social licence to
operate.
TGO has a set up a community consultation committee that meets quarterly to discuss the
activities on the mine, interaction with the local community and any concerns from local
residents, the committee includes:

Independent Chair Person,

TGO Environment and Community Manager,

TGO Operations Manager,

Narromine Shire Council Representative
,

3 x Community Representatives
,

An Aboriginal Community Representative.
Given that extensive mining operations already exist at TGO, and that the underground
operations would happen concurrently with open pit operations, the underground mine is
not expected to have any additional adverse effects on the local community.
Other
To the extent relevant, the impact of the following on the project and/or on the
estimation and classification of the Ore Reserves:
o
Any identified material naturally occurring risks.
This study utilises the DFS as a guideline with some conservatism built in based on
industry norms. Should however, the ability to leave some stopes unfilled not be realised,
and backfill required, this will increase the mining cost significantly, impacting the financial
return of the project.
The project is costed on the basis of buying second hand equipment. Alkane would directly
employ all underground operators, maintenance personnel, technical staff and

59/61

o
The status of material legal agreements and marketing arrangements.
o
The status of governmental agreements and approvals critical to the viability of the
project, such as mineral tenement status, and government and statutory approvals.
There must be reasonable grounds to expect that all necessary Government
approvals will be received within the timeframes anticipated in the Pre-Feasibility or
Feasibility study. Highlight and discuss the materiality of any unresolved matter that
is dependent on a third party on which extraction of the reserve is contingent.
management. Any inability to reach the desired production rates will increase the overall
costs as there is a large proportion of “Fixed” costs in this type of operating model. Using
an underground contractor would, without doubt, be a higher cost though less risk.
No material legal or marketing agreements in place save for the contract to sell
approximately 23,000 ounces of gold at around $1600 per ounce.
TGO undertook and Environmental Assessment (EA) as part of the feasibility study and
approvals for open pit mining. This assessment also looked at the impacts of underground
mining. Underground mining was part of the initial application by TGO when seeking
environmental approval and as such no other approvals from an environmental standpoint
are anticipated.
Underground mining would take place on an existingTGO mining lease, the only additional
requirement to this would be an amendment to the Mine Operating Plan that would require
submission to the NSW Government, Department of Industry, Skills and Regional
Development.
Classification
The basis for the classification of the Ore Reserves into varying confidence categories.

Whether the result appropriately reflects the Competent Person’s view of the deposit.

The proportion of Probable Ore Reserves that have been derived from Measured
Mineral Resources (if any).
Only ounces from Measured and Indicated Resources are reported in the Ore Reserve. As
resource classification is based on kriging variance, inferred ore blocks are interspersed
with material of other resource classes (Measured and Indicated) and cannot be completely
excluded from stope designs. The grade of all inferred ore blocks remaining in stopes was
set to zero for the financial analysis.
The result is in line with expectations given the low capital cost associated with the project
(as the site is already established) and due to the locality, the ability to source experience
labour locally and not have a requirement for accommodation or messing.
No probable reserves have been derived from Measured Resources - As most stopes
contain ounces from both Measured and Indicated Resource categories, the Measured
component was reported as a Proved Ore Reserve and the Indicated component reported
as a Probable Ore Reserve.
Audits or
reviews

The results of any audits or reviews of Ore Reserve estimates.
As this is the first underground ore reserve reported for TGO, it has undergone internal
reviews to ensure quality and consistency. No external reviews have been undertaken.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the Ore
Reserve estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the reserve within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors which could affect the relative accuracy and confidence of the estimate.
o
The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and
economic evaluation. Documentation should include assumptions made and the
procedures used.
Statistical quantification of the confidence level of the study is not deemed appropriate nor
commonly used in a pre-feasibility level study.
It is commonly accepted that a pre-feasibility study should have an accuracy of +/- 25%
and it is believed the work undertaken to derive this reserve conforms to that expectation.
o
Accuracy and confidence discussions should extend to specific discussions of any
applied Modifying Factors that may have a material impact on Ore Reserve
viability, or for which there are remaining areas of uncertainty at the current study
stage.
The main factors which could affect the confidence of the assessment include:

Stope stability, this has been assessed by a reputable geotechnical consultancy as
part of a previous, smaller feasibility study and remains relevant. Additional
conservatism has been added in this area reducing the overall extraction ratio of the
deposit.

Modifying factors, these are in line with industry accepted norms

Costs, cost have been sourced from budget estimates and benchmarking and the
author’s knowledge of numerous similarly sized and geologically and geographically
similar deposits.

60/61

==> picture [338 x 4] intentionally omitted <==

==> picture [338 x 4] intentionally omitted <==

  • Revenue, whilst this is beyond the control of the competent person, the revenue assumptions used in this study are in line with TGO expectations and gold price used below current spot prices,

  • There has been no production from underground at TGO.

==> picture [338 x 4] intentionally omitted <==

  • It is recognised that this may not be possible or appropriate in all circumstances. These statements of relative accuracy and confidence of the estimate should be compared with production data, where available.

61/61