Alkane Resources Capital/Financing Update 2013

Nov 11, 2013

48579_rns_2013-11-11_8552f672-81e9-4a2f-9e21-4c795552fcf4.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX and MEDIA RELEASE

12 November 2013

==> picture [160 x 79] intentionally omitted <==

RESOURCES LTD ABN 35 000 689 216

Tomingley Gold Project – Caloma Two Resource Upgrade brings Tomingley close to 1 million ounce gold resource

  • Caloma Two resource estimate increases gold inventory at Tomingley by 13.5%

  • The initial resource at Caloma Two is 1.7 million tonnes grading 2.0g/t gold for 109,300 ounces

  • Total resources within Tomingley Gold Project now 14.29 million tonnes grading 2.0g/t gold for 921,000 ounces

  • The development program remains on schedule and budget to commence production in February

TOMINGLEY GOLD PROJECT (TGP) – gold

Tomingley Gold Operations Pty Ltd (TGO) 100%

The TGP is based on three gold deposits (Wyoming One, Wyoming Three and Caloma) located 14 kilometres north of the Company’s Peak Hill Gold Mine, and approximately 50 kilometres south west of Dubbo (Figure 1). The Caloma Two deposit is located immediately to the south of Caloma and has been subject to extensive resource definition drilling in the last twelve months.

The Project received state development approval in July 2012 and Mining Lease granted in February 2013. Construction of the treatment plant and associated mine facilities are 85% complete with production due to commence on schedule in February 2014.

CONTACT : IAN CHALMERS, MANAGING DIRECTOR, ALKANE RESOURCES LTD, TEL +61 8 9227 5677

INVESTORS : NATALIE CHAPMAN, CORPORATE COMMUNICATIONS MANAGER, TEL +61 418 642 556 MEDIA : WESTBROOK COMMUNICATIONS, CONTACT: IAN WESTBROOK, TEL +61 2 9231 0922 OR +61 407 958 137

65 Burswood Road, Burswood WA 6100, AUSTRALIA (PO Box 4384, Victoria Park WA 6979, AUSTRALIA)

Telephone: +61 8 9227 5677 Facsimile: +61 8 9227 8178

www.alkane.com.au [email protected]

==> picture [57 x 30] intentionally omitted <==

Mineral Resources

A major drilling program consisting of 22,782 metres of RC drilling in 159 holes and 2,145 metres in 11 diamond core (DD) holes was completed at Caloma Two in late March 2013. The program was designed to confirm mineralisation outlined in broadly spaced drilling completed in 2010 and 2011 and to upgrade to resource status.

The geology, alteration and mineralisation at Caloma Two are very similar to those of the other Tomingley deposits . Economic mineralisation is associated with quartz veining, sulphide accumulation and alteration focused within sub-volcanic porphyritic feldspar porphyry sills and adjacent volcaniclastic sediments. The Wyoming and Caloma deposits appear to have formed as the result of a rheological competency contrast between the porphyritic sub-volcanic sills and the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the sediments ductile deformation. The deposits have many similarities to well documented orogenic-style gold deposits.

Stratigraphy at Caloma Two has a distinctive ESE-WNW orientation, in difference to a dominantly NS trend at the adjacent Caloma deposit. This orientation change is interpreted to result from the interaction of the major NW-SE trending fault that occurs immediately to the south of the deposit. The feldspar porphyry host is thought to form the core of a synformal structure bounded by thin sediment units. (Figure 2).

Like Caloma, mineralisation at Caloma Two is relatively complex. The orientation of the mineralised zones has been determined from the vein direction data obtained from oriented diamond drill core. Mineralisation lies dominantly within the feldspar porphyry where there are both flat (<20°) and moderately north dipping (40°-50°) zones (Figure 3). Other less well defined zones of mineralisation are interpreted to occur near the keel of the synform and interpreted as a reverse saddle and a discontinuous zone of mineralisation developed along the northern sediment horizon which is thought to form a link with the southern mineralised zones at Caloma.

Narrow steeply-dipping tholeiitic dolerite dykes, of slightly differing ages, crosscut the whole sequence and postdate mineralisation. The dykes usually have low gold grades except locally along their margins.

Mr Richard Lewis of Lewis Mineral Resource Consulting Pty Ltd (LMRC), who completed all of the previous resource estimates for the TGP, has compiled an initial resource assessment for Caloma Two. This assessment incorporates all past and current RC and DD drilling completed at Caloma Two (195 RC holes totalling 28,260m and 17 DD holes totalling 3,631m), and is based on interpretation of the mineralised zones completed by Alkane personnel (Figure 4).

The estimates were made using sub-blocks, a primary block size of 2.5m x 2.5m x 5m in X, Y, Z with grade interpolation by Ordinary Kriging. The final resource model is a regularized sub-block model that incorporates some dilution. The resources were limited by an optimum pit design (Figure 5) to ensure that there are reasonable prospects for eventual economic extraction. Further details of the methodology are included in the attached JORC Table (Appendix 1).

2/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [57 x 30] intentionally omitted <==

The resource at Caloma Two, as constrained by an optimum pit and at a cut-off grade of 0.75g/t gold, is 1.7 million tonnes grading 2.00 g/t gold for 109,300 ounces increasing the total resource inventory at Tomingley to 14.29 million tonnes grading 2.0g/t gold for 921,000 ounces .

Mineralisation that has been modelled but lies outside of the resource will be assessed by the Tomingley operations team for the potential extraction by underground mining methods (Figure 5).

Tomingley Gold Project Resources – November 2013

DEPOSIT
MEASURED
INDICATED
INFERRED
TOTAL
Tonnage
Grade
Tonnage
Grade
Tonnage
Grade
Tonnage
Grade
Gold
(Mt)
(g/t)
(Mt)
(g/t)
(Mt)
(g/t)
(Mt)
(g/t)
(koz)
This Report
Caloma Two ~~1~~
1.0
2.4
0.7
1.4
1.70
2.0
109.3
Previously Reported (29 March 2012)
Wyoming One ~~2~~
2.32
2.2
0.89
2.2
3.12
1.7
6.32
1.9
392.4
Wyoming Three ~~2~~
0.64
2.0
0.06
2.0
0.10
1.3
0.81
1.9
49.9
Caloma ~~2~~
2.69
2.3
0.57
2.1
2.19
1.9
5.45
2.1
369.4
Total
5.65
2.2
2.52
2.25
6.11
1.73
14.29
2.0
921.0

1 These Mineral Resources are based upon information compiled by Mr Richard Lewis FAusIMM (Lewis Mineral Resource Consulting Pty Ltd) who is a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Richard Lewis consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. The full details of methodology are given in Appendix 1 of this announcement.

2 These previously reported Mineral Resources are based upon information compiled by Mr Richard Lewis FAusIMM (Lewis Mineral Resource Consulting Pty Ltd) who is a Competent Person as defined in the 2004 Editions of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Richard Lewis consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. The details of methodology for estimating the Wyoming One and Wyoming Three resources are given in Appendix 2 and for the Caloma resources in Appendix 3 of this announcement.

Competent Person

Unless otherwise advised above, the information in this report that relates to exploration results, mineral resources and ore reserves is based on information compiled by Mr T W Ransted the Chief Geologist for Alkane Resources Ltd who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Ransted has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Terry Ransted consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Disclaimer

This report may contain certain forward looking statements and forecasts, including possible or assume, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed or implied by these forward looking statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities.

This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geosciences.

3/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [57 x 30] intentionally omitted <==

ABOUT ALKANE - www.alkane.com.au - ASX: ALK and OTCQX: ANLKY

Alkane is a multi-commodity company focused in the Central West region of NSW Australia. Currently Alkane has two projects heading towards production in 2014/2016 - the Tomingley Gold Project (TGP) and the nearby Dubbo Zirconia Project (DZP). Tomingley received project approval for its development early 2013 and is scheduled to commence production early 2014. Cash flow from the TGP will provide the funding to maintain the project development pipeline and will assist with the development of the DZP.

The DZP environmental impact statement has been completed and a development decision is anticipated early 2014. This project will make Alkane a strategic and significant world producer of zirconium products and heavy rare earths.

Alkane’s most advanced gold copper exploration projects are at the 100% Alkane owned Wellington and Bodangora prospects. Wellington has a small copper-gold resource which can be expanded, while at Bodangora a large 12km[2] monzonite intrusive complex has been identified with porphyry style copper-gold mineralisation. Encouraging gold-zinc mineralisation and alteration associated with a monzonite intrusive, has been identified at Cudal.

==> picture [321 x 473] intentionally omitted <==

4/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [525 x 800] intentionally omitted <==

----- Start of picture text -----

148° 15'E 148° 30'E
N a rro m in e
32° 15' S D u b b o
6420000 mN
E L 5 5 4 8
Dubbo
Zirconia
Project
Toongi Ore Body
32° 30' S
EL6085
EL5942 Tomingley
6400000 mN Two
Allendale
EL5942 Tomingley One Location Inset
T o m in g le y
Patons
M L1684 Tomingley Gold
Operations
EL5830 Sydney
Myall United
McLeans Canberra
0 500km
Smiths
EL5675
EL5942
EL5942
6380000 mN Peak Hill Mine Site O b l e y
P e a k 0 10
H ill
32° 45' S EL6 3 19 Y e o v a l
Black Snake
T O M I N G L E Y G O L D P R O J E C T
N E W S O U T H W A L E S
L o c a t i o n
Monte Carlo
Projection - AMG Zone 55 Fig u re N o . : 1
Datum (horizontal) - AGD66 32km to
Plan No: ALK TOM 1AL-008 Parkes
5/21
Little
River
M acquarie
Bogan
Highw ay
Highw ay
M itchell
Road
New ell
Gundong
River
disused
River
600000 mE
620000 mE 640000 mE
----- End of picture text -----

Alkane Resources Ltd - Caloma Two Resource 12 November 2013

==> picture [511 x 776] intentionally omitted <==

----- Start of picture text -----

614000 m E 148° 13'S 615000 m E
W y o m i n g C a l o m a
T h r e e
5.5M T @ 2.1g/t Au
0.8M T @ 1.9g/t Au
(370koz)
(50koz)
32° 35'S
6394000 m N
Wyoming Two Resource limiting pit outline
W y o m i n g
O n e
C a l o m a
6.3M T @ 1.9g/t Au T w o
(392koz) 1.7M T @ 2.0g/t Au
(109koz)
6393000 m N AM G
E L 5 6 7 5
M L 1684
Wyoming
One South
E L 5 8 3 0 E L 5 6 7 5
M cP h ails
Projection ‐ AM G Zone 55
Datum (horizontal) ‐ AGD66
Massive, well foliated pelitic siltstone
(Cotton Formation) Alkane Resources Ltd
Dolerite Mineralisation
Geological Sym bols and O rnam entation T O M I N G L E Y G O L D P R O J E C T
Feldspar porphyry
Fault, inferred W Y O M I N G a n d C A L O M A P R O S P E C T S
Undifferentiated volcaniclastic sediments Shear zone
Undifferentiated black graphitic shales and grey
foliated siltstones Geological boundary, inferred
Black graphitic shales Quartz zone
Quartz and volcaniclastic sandstone pebble S i t e G e o l o g y
conglomerate
Epidote altered volcanics and volcaniclastics
Feldspar ± hornblende phyric andesitic lava 0 500
Strongly sheared, chlorite‐talc schist Figure No.: 2
----- End of picture text -----

PLAN No. : ALK TOM 1GA-015

6/21 Alkane Resources Ltd - Caloma Two Resource 12 November 2013

==> picture [786 x 525] intentionally omitted <==

----- Start of picture text -----

6393600mN 6393700mN 6393800mN 6393900mN
7m @ 2.43g/t Au
2 50mRL
7m @ 1.29g/t Au
8m @ 5.18g/t Au
10m @ 2.53g/t Au
2 00mRL
8m @ 4.39g/t Au
17m @ 3.07g/t Au
incl 9m @ 4.99g/t Au
6m @ 4.63g/t Au
4m @ 2.35g/t Au
10m @ 3.79g/t Au
10m @ 4.5g/t Au
1 50mRL
28m @ 1.42g/t Au
incl 5m @ 3.03g/t Au
35m @ 2.68g/t Au
incl 4m @ 5.82g/t Au
5m @ 2.06g/t Au
25m @ 2.18g/t Au
1 00mRL
8m @ 1.49g/t Au 38m @ 2.95g/t Au
Alluvium 0 100
Dolerite 15m @ 1.79g/t Au
19m @ 2.82g/t Au
Pegmatite Alkane Resources Ltd
Feldspar phyric porphyry
T O M I N G L E Y G O L D P R O J E C T
5 0mRL Volcaniclastic sandstones, siltstones C A L O M A T W O P R O S P E C T
and minor conglomerates
35m @ 2.71g/t Au C r o s s S e c t i o n
Andesite incl 2m @ 9.59g/t Au
6 1 4 7 8 0 m E
Mineralised zone (window ±10m)
0 1 0 0 m
Figure: 3
Plan No.: ALK TOM 1XD-038
73m
81m
PE079
175m
301m
235m
252m
120m
115m
145m
139m
149m
175m
181m
181m
277m
211m
PE815 PE816 PE800D PE817 PE818 PE819 PE820 PE821 PE822 PE823 PE893 PE895 PE894
PE085
----- End of picture text -----

7/21 Alkane Resources Ltd - Caloma Two Resource 12 November 2013

==> picture [426 x 370] intentionally omitted <==

Figure 4 - Caloma Two ore zones showing drill holes and Caloma open pit (dolerites not shown)

==> picture [426 x 302] intentionally omitted <==

----- Start of picture text -----

Resource Limiting Pit
Block Model Cells
0.5 - 1.0g/t Au
1.0 - 2.5g/t Au
> 2.5g/t Au
----- End of picture text -----

Figure 5 - Caloma Two ore body block model showing potential underground mineralisation outside of the quoted resource

8/21 Alkane Resources Ltd - Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Appendix 1

JORC Code, 2012 Edition – Table 1 Report – Caloma Two Open Pit Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
The Caloma Two deposit has been evaluated using air core, reverse circulation and
diamond drilling techniques. Air core drilling samples were not used in the resource
calculation
Reverse Circulation (RC) samples are collected at one metre intervals via a cyclone and
riffle or cone splitter. Intervals outside of visual ore zones are composited to 3 metres.
Diamond Drill (DD). sample intervals defined by geologist during logging to honour
geological boundaries.
RC drilling completed to industry standards
Core is laid out in suitably labelled core trays. A core marker (core block) is placed at the
end of each drilled run (nominally 3 or 6m) and labelled with the hole number, down hole
depth, length of drill run. Core is aligned and measured by tape, comparing back to this
down hole depth consistent with industry standards.
RC Drilling - approximately 10% (3kg) of total sample is delivered via cone or riffle splitter
into a calico bag with the remaining sample delivered into a large plastic bag and retained
for future use if required.
DD Drilling – sample intervals defined by geologist during logging to honour geological
boundaries.
All samples sent to laboratory are crushed and or pulverised to produce a ~100g pulp for
assay process.
All samples are fire assayed using 50g charge.
Visible gold is occasionally observed in both core and RC samples
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
The resource is based on 195 RC drill holes totalling 28,260 metres and 17 diamond core
drill (DD) holes totalling 3,631 metres.
Conventional RC drilling using 100mm rods and 144mm face sampling hammer.
DD holes are pre-collared with un-oriented triple tube PQ3 (83mm diameter) core drilling
through to competent material averaging 70 metres depth and cased down to triple tube
HQ3 (61mm diameter) core tails. HQ3 core is oriented using the “Ace” core orientation
tool.
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.
RC - sample recovery is visually estimated and generally very good (>90%) aided by the
use of oversized shrouds through oxide material. Samples are even sized. Samples are
rarely damp or wet. Sample quality is assessed by the sampler by visual approximation of
sample recovery and if the sample is dry, damp or wet. Riffle and cone splitters were used
to ensure a representative sample was achieved on all 1 metre samples.
DD - core loss is identified by drillers and calculated by geologists when logging. Generally
≥95% was recovered and any loss is usually in portions of the oxide zone. Triple tube large
diameter PQ3 core is used through the oxide material to ensure the greatest recovery.

9/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
RC drilling completed using oversized shrouds to maintain sample return in oxide zone and
all samples are split using riffle or cone splitters. Use of RC rigs with high air capacity
assists in keeping samples dry.
Triple tube coring is used at all times to maximise core recovery with larger diameter PQ3
core used in the oxide and saprolite zones.
There is no known relationship between sample recovery and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.

The total length and percentage of the relevant intersections logged.
RC - each one metre interval is geologically logged for characteristics such as lithology,
weathering, alteration (type, character and intensity), veining (type, character and intensity)
and mineralisation (type, character and volume percentage).
DD - all core is laid out in core trays and geologically logged for characteristics such as
lithology, weathering, alteration (type, character and intensity), veining (type, character and
intensity) and mineralisation (type, character and volume percentage). A brief geotechnical
log is also undertaken collecting parameters such as core recovery, RQD, fracture count,
and fracture type and orientation.
All logging is qualitative with visual estimates of the various characteristics.
RC - A representative sample of each one metre interval is retained in chip trays for future
reference.
DD - Core is photographed and all unsampled core is retained for reference purposes.
All DD core and RC chip samples have been geologically and geotechnically logged by
qualified geologists.
Sub-sampling
techniques
and sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.
DD - zones of visual mineralisation and/or alteration are marked up by the geologist and
cut in half using an Almonté (or equivalent) core cutting saw. The right half is sampled to
sampling intervals that are generally based on geology but do not exceed 1.2 metres in
length. The left half is archived. All mineralised zones are sampled, plus >2m of visibly
barren wall rock.
Laboratory Preparation – drill core is oven dried prior to crushing to <6mm using a jaw
crusher, split to 3kg if required then pulverised in an LM5 (or equivalent) to ≥85% passing
75µm. Bulk rejects for all samples are discarded. A pulp packet (±100g) is stored for future
reference.

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
RC - for each one metre interval with visual mineralisation and/or alteration the calico
sample bag is numbered and submitted to the laboratory for analysis. Intervals without
visual mineralisation and/or alteration are spear sampled and composited over three
metres. Rare damp or wet samples are recorded by the sampler. For composited intervals
returning grades >0.2g/t Au the calico bags are retrieved for assay of the individual
intervals.
Laboratory Preparation – the entire RC sample (3kg) is dried and pulverised in an LM5 (or
equivalent) to ≥85% passing 75µm. Bulk rejects for all samples are discarded. A pulp
packet (±100g) is stored for future reference.

10/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.
Alkane (ALK) sampling techniques are of industry standard and considered adequate.
RC – field duplicate samples collected at every stage of sampling to control procedures
DD – external laboratory duplicates used.
RC - Duplicate samples are riffle split from the riffle/conical split calico from the drill rig.
Duplicates show generally excellent repeatability, indicating a negligible “nugget” effect.
Sample sizes are industry standard and considered appropriate.
Quality of
assay data
and
laboratory
tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
_and precision have been established. _
Gold is determined using a 50g charge fused at approximately 1100°C with alkaline fluxes,
including lead oxide. The resultant prill is dissolved in aqua regia and gold determined by
flame AAS.
For other geochemical elements samples are digested in aqua regia with each element
concentration determined by ICP Atomic Emission Spectrometry or ICP Mass
Spectrometry. These additional elements are generally only used for geological
interpretation purposes, are not of economic significance and are not routinely reported.
Not applicable to this report or deposit.
Commercially prepared Certified Reference Materials (CRM) are inserted at 1 in 50
samples. CRM’s are not identifiable to the laboratory.
Field duplicate samples are inserted at 1 in 50 samples (alternate to CRM’s).
Laboratory QAQC sampling includes insertion of CRM samples, internal duplicates and
screen tests. This data is reported for each sample submission.
Failed standards result in re-assaying of portions of the affected sample batches.
2% of samples were submitted for external laboratory checks establishing a deemed
satisfactory level of accuracy and precision.
Screen fire assaying (75µm mesh) was undertaken on 1.5% of samples deeming a
negligible “nugget” effect. Screen fire assay data overrides all other methods.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.

The use of twinned holes.
Drill data is compiled and collated, and reviewed by senior staff. External consultants do
not routinely verify exploration data until resource estimation procedures are deemed
necessary.
Twinned holes have not been used at Caloma Two as twinning provides verification only
for extremely limited areas of a deposit.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
All drill hole logging and sampling data is hard keyed into Excel spreadsheet for transfer
and storage in an access database with verification protocols in place.
All primary assay data is received from the laboratory as electronic data files which are
imported into sampling database with verification procedures in place. QAQC analysis is
undertaken for each laboratory report.

11/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary

Discuss any adjustment to assay data.
Digital copies of Certificates of Analysis (COA) are stored in a central database with regular
(daily) backup. Original survey data is stored on site.
Data is also verified on import into mining related software.
No assay data was adjusted. In the case of assay checks the original assay is utilised as
there was no statistical variability. Screen fire assays take precedence over all other assay
techniques.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Drill holes are laid out using hand held GPS (accuracy ± 2m) then surveyed accurately (±
0.1m) by licenced surveyors on completion.
RC drill holes are surveyed using a single shot electronic camera at a nominal 30m down
hole interval.
DD are surveyed at nominal 30m down hole during drilling to maintain drilling direction and
then at 6m intervals on retrieval of rod string using a multi shot electronic camera.
AMG66 grid was used.
The area is very flat. A site based digital terrain model was developed from accurate (±
0.1m) survey control by licenced surveyors.
Data spacing
and
distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.
Nominal drill hole spacing is 20m x 20m.
The data spacing is the same as used at defining the Caloma resource and was
established to be sufficient.
The drillhole spacing has been shown to be appropriate by variography.
Sample compositing is not applied until resource estimation stage.
RC – samples with no visible mineralisation or alteration are composited to 3m with 1m
resamples assayed if the composite returned a gold value of >0.2g/t gold. One metres
samples override 3m composites in the database.
DD – core is sampled to geology.
Orientation of
data in
relation to
geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
Much care is given to attempt to intersect structure at an optimal angle but in complex ore
bodies this can be difficult.
It is not thought that drilling direction will bias assay data at Caloma Two.
Sample
security

The measures taken to ensure sample security.
All samples are bagged in tied numbered calico bags, grouped into larger tied polyweave
bags and transported 30 minutes away to Parkes. The samples are placed in large sample
cages with a sample submission sheet and couriered to ALS in Orange via freight truck. All
sample submissions are documented via ALS tracking system and all assays are reported
via email.
Samplepulps are returned to site and stored for an appropriate length of time(minimum 3

12/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
years).
The Company has in place protocols to ensure data security.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.
The Company does not routinely have external consultants verify exploration data until
resource estimation procedures are deemed necessary.
The Caloma Two data has not been audited nor reviewed by external parties however the
data for other deposits within the TGP was reviewed in 2010 and 2011 by Behre Dolbear
(BDA). BDA did not express any specific concerns with respect to the data other than to
recommend the completion of some round robin assaying and completion of additional
density determinations, both of which were undertaken for the Caloma Two resource
drilling.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
EL5675 wholly owned by ALK with overlying ML 1684 in the name of Tomingley Gold
Operations Pty Ltd a wholly owned subsidiary of ALK. All drilling lies within the developing
Tomingley Gold Mine.
ML1684 is due to expire 11 February 2034.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
All reported drilling completed by ALK.
Geology
Deposit type, geological setting and style of mineralisation.
Geological nature of the Tomingley Deposits is well documented elsewhere.
Mineralisation is associated with quartz veining and alteration focused within sub-volcanic
basaltic-andesite sills and adjacent volcaniclastic sediments. The deposits appear to have
formed as the result of a rheological contrast between the porphyritic sub-volcanic sills and
the surrounding volcaniclastic sediments, with the sills showing brittle fracture and the
sediments ductile deformation, and have many similarities to well documented lode-style
gold deposits.
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
Too many, not practical to summarise all drill hole data used.
All material information has been previously reported in the following announcements:
16 August 2010, ASX Announcement;
17 August 2011, ASX Announcement;
26 November 2012, ASX Announcement;

13/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria JORC Code explanation Commentary
o
hole length.

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
11 February 2013, ASX Announcement;
7 March 2013, ASX Announcement;
31 March Quarterly Report (released 30 April, 2013);
30 June Quarterly (released 31 July, 2013).
Exclusion of drill hole data will not detract from the understanding of this report. All drill
data has been previously reported, holes are close spaced and in a developing mine area.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Exploration results previously reported –
for uncut gold grades;
Intercepts are defined (bounded) by 0.5g/t gold outer limit and may contain some
internal waste;
Only intervals grading ≥1 g/t gold are reported;
Grades are calculated by length weighted average.
Exploration results previously reported as length weighted average grades with internal
high grade intercepts reported separately.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results -
If the geometry of the mineralisation with respect to the drill hole angle is known,
its nature should be reported.
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Previously reported exploration results include an estimate of true width. The
mineralisation is structurally complex and true widths are variable depending on the ore
zone intersected however range between 60% and 80% of drill intersection.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Cross sections and a plan showing geology with drill collars were included with previously
reported exploration results.
Various plans and sections illustrating the modelled ore zones with all drill traces are
attached.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Data relating to all drill holes has been reported in previous documentation of exploration
results.

14/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
No additional or new drilling results are being reported at this time.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
No further work is planned in the short term however drilling to test the continuation of
mineralised structures at depth for an underground resource definition for Caloma Two will
be contemplated.

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
Preliminary pit design is needed before any planning for underground resource delineation
can be carried out. A figure showing the constrained mineral resource in relation to other
potential is attached.

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for Mineral
Resource estimation purposes.

Data validation procedures used.
Logging data is entered into Excel via drop down menus. All raw data is loaded directly to
the Access database from the assay, logging and survey derived files.
There are validation checks to avoid duplications of data.
The data are further validated for consistency when loaded into Datamine and desurveyed.
Site visits
Comment on any site visits undertaken by the Competent Person and the outcome of
those visits.
(If no site visits have been undertaken indicate why this is the case.)
No site visits have been undertaken. The Competent Person has visited the exploration
office for a geological discussion, viewing of the data and core photos. The deposit is
completely covered by 10m to 60m of barren alluvium and there is nothing to see on the
surface.
Geological
interpretation

Confidence in (or conversely, the uncertainty of ) the geological interpretation of the
mineral deposit.

Nature of the data used and of any assumptions made.

The effect, if any, of alternative interpretations on Mineral Resource estimation.

The use of geology in guiding and controlling Mineral Resource estimation.
The geological model is built on structural data from core and lithological logging. The lode
strike orientations are similar to Wyoming Three which sits in a similar structural position.
Structural measurements from oriented drill core drill core was used to assist in the
geological interpretation along with lithological, alteration and mineralisation logging of RC
chips
A steep dipping interpretation was initially proposed however this was inconsistent with
structural measurements obtained from oriented drill core.
Geological (lithological) logging was used to develop a geological model. Alteration and
mineralisation estimates along with grade guided the interpretation of the ore envelope
wireframes.
The majority of mineralisation is hosted by a quartz veined and altered feldspar ± augite
porphyritic andesite of probable sub-volcanic origin.

15/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

The factors affecting continuity both of grade and geology.
Dolerite dykes post-date mineralisation and all mineralised lodes are terminated at the
dolerite contacts.
Mineralisation is directly associated with alteration and veining.
Dimensions
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
Strike length ~ 360m
Width ~ 100m
Depth ~ 20m from below surface to ~ 250m below surface from deepest drilling intercept.
Estimation
and modelling
techniques

The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from data points. If a computer
assisted estimation method was chosen include a description of computer software and
parameters used.

The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate takes appropriate account of such data.

The assumptions made regarding recovery of by-products.

Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).
13 mineralisation wireframes (domains) and 5 dolerite wireframes were interpreted and
used as constraints for the resource modelling. Four surfaces were also used to separate
material types - topography, alluvium, saprolite and base of oxidation surfaces.
The drill hole data were flagged by dolerite and mineralised domain wireframes in priority
order, to prevent double use the data in the intersecting zones. The samples immediately
outside the mineralised zones were re-flagged, if they contained more than 0.25 g/t gold, in
order to prevent any overestimation that could be caused by use of assay boundaries. This
re-flagging is also useful for the RC samples that are not broken at barren dyke boundaries.
The samples were composited to 1m, the most common sample length and flagged by the
topography, alluvium, saprolite and base of oxidation surfaces.
The top-cut declustered data had Coefficient of Variation (CV’s) of less than 1.7 for the
mineralised zones, allowing use of Ordinary Kriging for estimation.
Average variogram models were fitted for the mineralised zones and dolerite dykes.
Estimates were made by Ordinary Kriging, with check estimates by Inverse Distance
Squared (ID2) and Nearest Neighbour methods.
Datamine Studio 3 V22 was used.
The resources are limited by an indicative pit design to ensure they have reasonable
prospects for eventual economic extraction.
There are no previous estimates or any production data to provide any validation.
No assumptions made - Estimates were made for gold, arsenic and copper; only gold was
of economic significance.
Estimates were made for gold, arsenic and copper; only gold was of economic significance.

In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.
The primary block size was small (2.5m x 2.5m x 5m) because of the narrow dipping nature
of the mineralisation zones.
The average drill hole spacing was 20m and variogram ranges 22m x 26m x 3.5m.
The primary search was equal to the variogram ranges; secondary search were made
using 2x and 3x the primary search.

16/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

Any assumptions behind modelling of selective mining units.

Any assumptions about correlation between variables.

Description of how the geological interpretation was used to control the resource
estimates.

Discussion of basis for using or not using grade cutting or capping.

The process of validation, the checking process used, the comparison of model data to
drill hole data, and use of reconciliation data if available.
Sub-blocks were estimated.
No assumptions made
No assumptions made
Only data form the same domain were used to make estimates.
The drill hole data were declustered using the polygonal method for statistical analysis and
determination of top-cuts.
The top cuts were selected using a combination of histograms, probability plots and cutting
statistic plots (plots of cut-off grade against Coefficient of Variation (CV) and total metal).
Estimates were made by Ordinary Kriging, with check estimates by Inverse Distance
Squared (ID2) and Nearest Neighbour methods.
The estimates were verified using several different techniques and checked for local and
global variability. The checks included comparison with estimates made by different
estimation methods, and against the declustered composites.
Moisture
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
The tonnages were estimated on a dry tonnage basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality parameters applied.
The cut-off grade (0.75 g/t Gold) is above the break-even cut-off calculated for the Caloma
deposit immediately to the north in 2012. This took into account likely mining costs and
metallurgical recovery for similar material.
Mining factors
or
assumptions

Assumptions made regarding possible mining methods, minimum mining dimensions
and internal (or, if applicable, external) mining dilution. It is always necessary as part of
the process of determining reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made regarding mining
methods and parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
The main part of the Caloma Two deposit is likely to be mined by open pit methods. Some
dilution was added when the estimated sub-block model was regularized; this reduced the
gold grade above 0.75 g/t cut-off by 14%. More dilution may need to be added as part of
the mining reserve process.
The resources were limited by an indicative pit design to ensure they have reasonable
prospects for eventual economic extraction.
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical amenability. It is
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment processes and parameters made when
reporting Mineral Resources may not always be rigorous. Where this is the case, this
should be reported with an explanation of the basis of the metallurgical assumptions
made.
The metallurgy of the nearby other Tomingley deposits is well studied. It is likely that
Caloma Two will have similar metallurgical characteristics.
Environmen-
Assumptions made regarding possible waste and process residue disposal options. It is
The Tomingley processplant is currentlybeingconstructed and the EISplan has been

17/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
tal factors or
assumptions
always necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider the potential environmental impacts of the
mining and processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential environmental impacts
should be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
approved.
Bulk density
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.

The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.

Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
Specific gravity measurements were completed by commercial laboratories on DD core
samples.
At least 5 samples if possible were selected for each of the 8 categories; weathered
porphyry, weathered mineralised porphyry, fresh porphyry, fresh mineralised porphyry,
weathered sediment, weathered mineralised sediment, fresh sediment, and fresh
mineralised sediment. The specific gravity measurements were applied on a dry basis.
SG measurements completed on all material types – see above.
No assumptions made – SG determined and individual values applied to each material type
based on wireframed surfaces
Classification
The basis for the classification of the Mineral Resources into varying confidence
categories.

Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the data).

Whether the result appropriately reflects the Competent Person’s view of the deposit.
The resources were classified using the search pass; only estimates made within the
defined mineralisation zones in the first search pass were classified as Indicated
Resources. The dimensions of the search pass were based on the variogram ranges.
No Measured Resources were defined, because of some uncertainly in the geological
interpretation of the mineralisation zones, and the use of a high proportion of Reverse
Circulation drilling (RC) for exploration.
The use of RC drilling limits the amount of geological information that can be logged, and
boundaries of mineralisation zones cannot be precisely located.
The classification reflects the Competent Persons view of the deposit and its supporting
data
Audits or
reviews

The results of any audits or reviews of Mineral Resource estimates.
As this is the first mineral resource estimation for this deposit, there have not been any
audits or reviews.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the
factors that could affect the relative accuracy and confidence of the estimate.
The Caloma Two deposit consists of 13 narrow mineralisation zones; consequently there
are relatively few drillhole data in each zone. This has limited the accuracy of any fitted
variogram model and forced the use of average variogram models. The use of an
approximate variogram model does not greatly affect the accuracy of the kriged grades as
kriging is a very robust estimation process. It does, however, limit the accuracy of the
variance of the estimates and any confidence limits that might be statistically inferred.
No statistical or geostatistical method (non-linear or simulation) was used to quantify the

18/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [58 x 30] intentionally omitted <==

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary

The statement should specify whether it relates to global or local estimates, and, if
local, state the relevant tonnages, which should be relevant to technical and economic
evaluation. Documentation should include assumptions made and the procedures
used.

These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.
relative accuracy of the estimate within confidence limits. Accuracy of the estimate is
strongly dependent on: accuracy of the interpretation and geological domaining, accuracy
of the drill hole data (location and values), orientation of local anisotropy and estimation
parameters which are reflected in the global resource classification.
The resources are global, being based on drillhole data at exploration spacing. They are
limited by an indicative pit design to ensure they have reasonable prospects for eventual
economic extraction.
There has not been any production from Caloma Two.

19/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [57 x 30] intentionally omitted <==

Appendix 2

Note 1 (JORC 2004) to Accompany Resource Statement for Wyoming One and Three deposits (previously reported 29 March 2012)

  • drilling technique – the resource is based on reverse circulation, air core and diamond core drill holes completed by Alkane between May 2001 and December 2007;

  • drilling density - drill holes completed on both EW and NS sections depending on the ore zone being evaluated. Sections are nominally spaced 25m apart with drill holes at a nominal 20m intervals along these sections;

  • drill locations - All drill hole collars are surveyed by DGPS to obtain X Y Z position to ±0.1m;

  • down hole surveys – most holes are surveyed down hole using a single shot camera. Air core holes were surveys at bottom of hole only however RC and diamond holes are surveyed at a nominal 50m down hole interval;

  • sampling technique - RC and air core samples are collected at one metre intervals and initially composited to 3m for initial assay. All composites returning grades of ≥0.2g/t Au are subsequently riffle split and appropriate sized samples bagged for despatch to the laboratory. NQ, HQ and PQ diamond drill core was halved;

  • sample recovery - RC sample recovery is usually very good (>80%). Samples are usually dry. Core recovery was usually very good;

  • assay technique – samples were submitted to commercial laboratories for preparation by drying, grinding and sub-sampling and then analysed by industry standard Fire Assay techniques. 3m composite RC and air core samples are analysed from a 30g charge whilst the 1m RC and AC resplits and half diamond core from a 50g charge;

  • specific gravity – specific gravity measurements were completed by commercial laboratories on core samples. Values recorded for Wyoming One are 2.75 t/m[3] fresh 2.18 t/m[3] oxide 1.72 t/m[3] saprolite 1.96 t/m[3] alluvials

estimation techniques - Estimations used a 3D pseudo-wireframe geological model as a basis for inverse distance squared grade extrapolation into a block model. Block size is 2.5m x 2.5m x 5.0m but sub-blocking was used (Wyoming One: 1.25m to 2.5m in X and Y and 0.25m to 5m in Z, Wyoming Three: 0.625m to 2.5m in X and Y and 0.25m to 5m in Z). Wireframes/ore zones are constrained by boundaries defined by geology, structure and a 0.25 g/t Au grade envelope. The estimation search filters were dynamically re-orientated to follow the changing orientations of the wireframes.

Comparative techniques such variable block size, Nearest Neighbour and Kriging, were used to generate additional estimates for validation of the quoted resources.

As sample intervals for Wyoming One ranged from 0.1m to 5.0m, assays were composited to 1m intervals for the modelling. A total of 16,716 samples are within the wireframe.

Sample intervals for Wyoming Three ranged from 0.2m to 4.0m, and these assays were composited to 1m intervals for the modelling. A total of 12,836 samples are within the wire frames;

top cut Top Cuts were selected for the 8 individual mineralized domains (ore zones) within Wyoming One using a combination of cutting plots, histograms and probability plots. Top Cuts ranged from 8g/t Au to 45g/t Au. For Wyoming Three there are 4 mineralized domains and Top Cuts ranged from 17g/t Au to 30g/t Au.

20/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013

==> picture [57 x 30] intentionally omitted <==

Appendix 3

Note 2 (JORC 2004) to Accompany Resource Statement for the Caloma deposit (previously reported 29 March 2012)

  • drilling technique –the resource is based on reverse circulation, air core and diamond core drill holes completed by Alkane between May 2006 and October 2011;

  • drilling density - drill holes completed on both EW nominally spaced 20m apart with drill holes at a nominal 20m intervals along these sections. In areas peripheral to the central part of the ore zone sections are nominally 40m apart with holes spaced at 40m along these lines. Several NS holes were completed to assist in the geological interpretation;

  • drill locations - All drill hole collars are surveyed by DGPS to obtain X Y Z position to ±0.1m;

  • down hole surveys – most holes are surveyed down hole using a single shot camera. Air core holes were surveys at bottom of hole only however RC and diamond holes are surveyed at a nominal 50m down hole interval;

  • sampling technique - RC and air core samples are collected at one metre intervals and initially composited to 3m for initial assay. All composites returning grades of ≥0.2g/t Au are subsequently riffle split and appropriate sized samples bagged for despatch to the laboratory. HQ and PQ diamond drill core was halved or quartered;

  • sample recovery - RC sample recovery is usually very good (>80%). Samples are usually dry. Core recovery was usually very good except in portions of the oxide zone where some core loss was observed;

  • assay technique – samples were submitted to commercial laboratories for preparation by drying, grinding and sub-setting and then analysed by industry standard Fire Assay techniques. 3m composite RC and air core samples are analysed from a 30g charge whilst the 1m RC and AC resplits and half diamond core from a 50g charge;

  • specific gravity – specific gravity measurements were completed by commercial laboratories on core samples. Values recorded are 2.78 t/m[3] fresh 2.38 t/m[3] oxide 1.72 t/m[3] saprolite 1.96 t/m[3] alluvials

  • estimation techniques - Estimations used a 3D pseudo-wireframe geological model as a basis for inverse distance squared grade extrapolation into a block model. Block size is 2.5m x 2.5m x 2.5m but sub-blocking was used (0.25m to 2.5m in X and 0.625m to 2.5m in Y and Z). Wireframes/ore zones are constrained by boundaries defined by geology, structure and a 0.25 g/t Au grade envelope. The estimation search filters were dynamically re-orientated to follow the changing orientations of the wireframes.

Comparative techniques such as Nearest Neighbour and Kriging, were used to generate additional estimates for validation of the quoted resources.

As sample intervals ranged from 0.2m to 6.0m, assays were composited to 1m intervals for the modelling. A total of 19,922 samples are within the wire frames;

  • top cut Top Cuts were selected for the 17 individual mineralized domains and sub-domains (ore zones) using a combination of cutting plots, histograms and probability plots. Top Cuts ranged from 4.5g/t Au to 40g/t Au.

21/21

Alkane Resources Ltd – Caloma Two Resource 12 November 2013