Alkane Resources Capital/Financing Update 2009

Aug 19, 2009

48579_rns_2009-08-19_1a27484a-dfd6-4c9e-9361-0e3ba9c2dfc1.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [114 x 57] intentionally omitted <==

==> picture [76 x 12] intentionally omitted <==

----- Start of picture text -----

RESOURCES LTD
ABN 35 000 689 216
----- End of picture text -----

ASX ANNOUNCEMENT – 20 August 2009

Corporate Profile

Alkane Board

J. S. F. Dunlop (Chairman) D. I. Chalmers (Managing Dir) A. D. Lethlean

DUBBO ZIRCONIA PROJECT CHINESE RARE EARTH EXPORT CONTROL

I. J. Gandel

I. R. Cornelius

L. A. Colless (Joint Secretary) K. E. Brown (Joint Secretary)

Contact

  • The Dubbo Zirconia Project (DZP) in New South Wales remains one of the world’s most advanced developments for zirconium, niobium, yttrium and rare earth production and is based upon a world class resource.

  • The Demonstration Pilot Plant (DPP) at Lucas Heights, south of Sydney, has been operating continuously since 2008 and has proven the flow sheet for the DZP. The Company is receiving a positive response to its sample products.

  • The Chinese Ministry of Industry and Information Technology has just released a draft plan “Rare Earth Industry and Development Plan in 2009 – 2015”. The plan would result in more stringent export quotas for rare earths and a total ban on export of some rare earths.

Ian Chalmers Managing Director 96 Parry Street PERTH WA 6000 Telephone +61 8 9328 9411 Facsimile +61 8 9227 6011 Email [email protected] Web – www.alkane.com.au

12 month share price range A$0.515 - $0.15

Market Cap 19 August 2009

~A$77 million

  • As a result, the DZP’s development would see the project become the most significant producer of yttrium, dysprosium and terbium outside of China.

ASX Code: ALK

244.6 million shares (Aug 09)

August 2009 Cash

~ $7.0 million No debt

Media Relations

Westbrook Communications Level 1, 17 Castlereagh Street SYDNEY NSW 2000 Telephone +61 2 9231 0922 Facsimile +61 2 9231 0131 Web – www.westbrookfin.com.au

Registered Office: 129 Edward Street Perth WA 6000 Telephone: 61 8 9227 5677 Facsimile: 61 8 9227 8178 PO Box 8178 Perth Business Centre Western Australia 6849 www.alkane.com.au [email protected]

==> picture [58 x 28] intentionally omitted <==

Background

Recently the Chinese Ministry of Industry and Information Technology released a draft plan entitled “Rare Earths Industry Plan in 2009 – 2015” (REIP). This plan submitted to the federal Chinese Government proposes to restructure the rare earth industry, eliminating many smaller mining enterprises and focussing the industry within 20 larger producers. China currently produces 95% of the world’s rare earth output.

The REIP would limit China’s production to 130,000 to 150,000 tonnes per annum, and would also restrict exports. Global consumption in 2008 was estimated at 124,000 tonnes and demand is anticipated to be around 184,000 tonnes by 2014, after a small drop in 2009.

The Development Plan recommends limiting Chinese exports to below 35,000 tonnes a year but very importantly will prohibit the export of yttrium (Y) and the heavy rare earths dysprosium (Dy), terbium (Tb), thullium (Tm) and lutetium (Lu). Current consumption of the latter two elements Tm and Lu is very small but Y and Tb have increasing demand in the phosphors for energy efficient lighting, while Dy is an important component of high temperature magnets used in electric motors in vehicles. Much of the new demand for these metals is driven by environmental legislation to ensure emissions minimisation and energy efficiency.

Dubbo Zirconia Project

The Dubbo Zirconia Project (DZP) is located 30 kilometres south of the large regional centre of Dubbo in the Central West Region of New South Wales (figure 1) . The DZP is based upon a large in-ground resource of the metals zirconium, hafnium, niobium, tantalum, yttrium and rare earth elements (see 2004 Annual Report for full details).

Over several years Alkane has developed a flow sheet consisting of sulphuric acid leach followed by solvent extraction recovery and refining to produce several products (figure 2). This flow sheet is currently being trialled by a Demonstration Pilot Plant (DPP) to recover a suite of zirconium chemicals, zirconia, a niobium-tantalum concentrate and yttrium-rare earth concentrates which are used in the expanding ceramic, catalyst, electronics, rechargeable batteries and permanent magnets, engineering ceramics, and specialty glasses and alloys industries, as well as the nuclear power industry.

==> picture [228 x 277] intentionally omitted <==

The DPP was constructed within the facilities of ANSTO Minerals, a business unit of the Australian Nuclear Science and Technology Organisation, and is one of Australia’s premier research facilities located at Lucas heights in the south of Sydney. The DPP was commissioned in 2008 and has operated several campaigns to date producing over 1,300kg of zirconium chemicals and nearly 250kg of niobium concentrate.

Test work to prove the recovery of yttrium and rare earths from the current flow sheet has continued in the laboratory at ANSTO and it is anticipated that addition of the YREE recovery flowsheet to the DPP circuit should be facilitated in the second half 2009.

2/6

Alkane Resources Ltd – ASX Announcement 20 August 2009

==> picture [58 x 28] intentionally omitted <==

Marketing activities are advanced with direct contact with potential customers in Japan, Europe and North America, and zirconium and niobium product samples being sent to Japan, China and Europe. Distribution of yttrium and rare earth samples is anticipated to commence later this year.

==> picture [455 x 340] intentionally omitted <==

Figure 2

Possible Production Scenario

As part of the feasibility study in 2002, the primary metal output was estimated to be the zirconium chemicals and a base case ore throughput of 200,000 tonnes per annum was chosen to establish a market presence of less that 7% of total world demand. Since that time the zirconium market has expanded and a greater throughput is possible. Also demand for the niobium concentrate and yttrium and rare earth products has increased dramatically, and support a larger start up capacity.

The defined resource is large enough so that even at the expanded rate the open pit mining would have a life in excess of 200 years.

Product 200,000 tpa 500,000 tpa
ZBS, ZOH, ZCO 9,000tpa(3ktpa ZrO2) 22,500tpa(7.5ktpa ZrO2)
Nb-Ta concentrate **1,000tpa(0.7ktpa Nb2O5) ** **2,500tpa(1.75ktpa Nb2O5) **
LREE concentrate 990tpa (REOs) 2,475tpa (REOs)
YHREE concentrate 301tpa (REOs) 753tpa (REOs)

ZBS = zirconium basic sulphate; ZOH = zirconium hydroxide; ZCO = zirconium carbonate; Equivalent ~99% ZrO2 + HfO2. Nb-Ta concentrate = ~77% Nb2O5; 1.0% Ta2O5 calcined basis

3/6

Alkane Resources Ltd – ASX Announcement

20 August 2009

==> picture [58 x 28] intentionally omitted <==

Yttrium - Rare Earth Individual Production (assumed 70% recovery)

Lanthanum
Cerium
Praseodymium
Neodymium
Samarium
REO
200,000tpa 500,000tpa
La2O3
252
630
CeO2
475
1188
Pr6O11
52
131
Nd2O3
182
456
Sm
2
O
3
28
71___
Total LREE
990tpa 2475tpa
Eu2O3
1
2
Gd2O3
28
69
Tb4O7
4
11
Dy2O3
26
66
Ho2O3
5
14
Er2O3
15
37
Tm2O3
2
5
Yb2O3
13
32
Lu2O3
2
5
Y
2
O
3
204
511___
Total YHREE
301tpa
753tpa
Total YREE
1291tpa 3228tpa
Light rare earths
Europium
Gadolinium
Terbium
Dysprosium
Holmium
Erbium
Thullium
Ytterbium
Lutecium
Yttrium
Y + heavy rare earths

These potential yttrium and heavy rare earth outputs would make the DZP production some of the largest in the world outside of China.

Current Program

The DPP operation was planned to confirm the process flow sheet, provide engineering data for capital and operating costs and also to generate substantial product for market evaluation. Data from the DPP and Letters of Intent from future customers will be incorporated in the current Definitive Feasibility Study. A development decision is anticipated by mid 2010, with production possible late 2011.

TZ Minerals International Pty Ltd in Perth are the program and feasibility study managers; a task they have been coordinating since the inception of the project

The DZP is the most advanced non-Chinese development for zirconium, niobium, yttrium and rare earth production. While the foci of Molycorp’s Mountain Pass operation in California and Lynas’ Mt Weld planned operations in Western Australia and Malaysia . are the production of light rare earths, Alkane is in a unique position to be the leading Western heavy rare earths producer over the next decade.

Identified Mineral Resources at 31 December 2008:

Toongi Tonnage ZrO2 HfO2 **Nb2O5 ** **Ta2O5 ** Y2O3 REO U3O8
Deposit (Mt) (%) (%) (%) (%) (%) (%) (%)
Measured 35.70 1.96 0.04 0.46 0.03 0.14 0.75 0.014
Inferred 37.50 1.96 0.04 0.46 0.03 0.14 0.75 0.014
TOTAL 73.20 1.96 0.04 0.46 0.03 0.14 0.75 0.014

These Mineral Resources are based upon information compiled by Mr Terry Ransted MAusIMM (Principal, Multi Metal Consultants Pty Ltd) who is a competent person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Terry Ransted consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The full details of methodology were given in the 2004 Annual Report.

4/6

Alkane Resources Ltd – ASX Announcement 20 August 2009

==> picture [58 x 28] intentionally omitted <==

BACKGROUND

Alkane is a multi commodity explorer and miner with its operations focussed in the Central West of New South Wales , centred about 400km northwest of Sydney. Over several years, including experience in developing the Peak Hill Gold Mine, Alkane has built a substantial resource base and is proceeding towards several developments:

The Tomingley Gold Project currently has a 840,000 ounce gold resource within the Wyoming and Caloma deposits , (full details 2008 Annual Report). A feasibility study for the development of the project with potential 50,000 to 60,000 ounce per annum production is anticipated to be completed before the end of 2009.

Near Orange, the Company has a joint venture ( ODEJV ) with Newmont, one of the world’s largest gold miners, which resulted in the discovery in 2006 of a potentially significant gold deposit at McPhillamys within the Moorilda Project . This discovery includes intersections of 123 metres grading 1.96g/t gold and 77 metres at 1.65g/t gold within a 600 metre by 200 metre mineralised zone. Recent diamond drilling has confirmed the potential of the project to host a major gold system with an intersection in KPD003 of 366 metres grading 1.85g/t gold.

Elsewhere within the region, Alkane has defined a 2 million tonne 1.00% copper Indicated Resource (details 2005 Annual Report) which is being reviewed for its development potential at Galwadgere within the Wellington Project , and several other advanced exploration projects with encouraging drill intercepts. New exploration targets have been identified at several other locations.

In Western Australia the Company holds 5 million shares (6%) of listed iron ore explorer BC Iron Limited and a diluting 23% residual interest in a nickel sulphide joint venture with Xstrata Nickel (Jubilee) near Leinster .

==> picture [213 x 314] intentionally omitted <==

Unless otherwise stated above, the information in this report that relates to exploration results, mineral resources and ore reserves is based on information compiled by Mr D I Chalmers, FAusIMM, FAIG, (director of the Company who has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Ian Chalmers consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

5/6

Alkane Resources Ltd – ASX Announcement

20 August 2009

Demonstration Pilot Plant Images:

==> picture [254 x 55] intentionally omitted <==

==> picture [233 x 55] intentionally omitted <==

==> picture [254 x 55] intentionally omitted <==

==> picture [233 x 55] intentionally omitted <==

==> picture [233 x 55] intentionally omitted <==

==> picture [254 x 55] intentionally omitted <==

Main DPP Shed

Internal Main Shed

==> picture [225 x 163] intentionally omitted <==

==> picture [228 x 109] intentionally omitted <==

==> picture [228 x 108] intentionally omitted <==

Primary filter

==> picture [244 x 163] intentionally omitted <==

==> picture [228 x 109] intentionally omitted <==

Rotary Kiln Solvent Extraction Circuit

==> picture [244 x 82] intentionally omitted <==

==> picture [244 x 82] intentionally omitted <==

==> picture [244 x 82] intentionally omitted <==

==> picture [244 x 82] intentionally omitted <==

Zirconium and Niobium Product Recovery

Zirconium Sulphate Filter

6/6