Alkane Resources — AGM Information 2024
Nov 25, 2024
48579_rns_2024-11-25_59420dc4-741d-4ab3-953e-e488aaf4b9dd.pdf
AGM Information
Open in viewerOpens in your device viewer
==> picture [161 x 127] intentionally omitted <==
Annual General Meeting
Nic Earner Managing Director
26 November 2024
==> picture [146 x 46] intentionally omitted <==
==> picture [145 x 46] intentionally omitted <==
==> picture [145 x 46] intentionally omitted <==
Disclaimer
==> picture [85 x 62] intentionally omitted <==
This presentation contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed or implied by these forward-looking statements depending on a variety of factors. Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities.
Alkane Resources Ltd cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this presentation will occur and investors are cautioned not to place any reliance on these forward-looking statements. Alkane Resources Ltd does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this presentation, except where required by applicable law and stock exchange listing requirements. This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other countries’ securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geosciences.
Previously reported information
The information in this presentation that relates to the combined mineral resources and ore reserves is drawn from the Company’s ASX announcement dated 13 September 2023, 27 February 2024. Exploration results are extracted from the Company’s ASX announcements noted in the text of the document and are available to view on the Company’s website. The information relating to the Tomingley Five Year Plan is drawn from the Company’s ASX Announcement dated 24 June 2024. The information relating to the Boda-Kaiser Scoping Study is drawn from the Company’s ASX Announcement dated 10 July 2024. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcement(s); in the case of estimates of mineral resources or ore reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed; and that the form and context in which the Competent Person’s findings are presented have not been materially altered.
Competent person
Unless otherwise advised above or in the Announcements referenced, the information in this presentation that relates to exploration results, mineral resources and ore reserves is based on information compiled by Mr D I Chalmers, FAusIMM, FAIG, (director of the Company) who has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Chalmers consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.
Company Snapshot
Tomingley Boda-Kaiser (20Mtpa) FY25: A$1.78B pre-production capital 70K-80K oz Au $2,400-$2,600 AISC Cu t 35,600 From FY27: Au oz 159,300 100K+ oz Au (pa) (pa for first 5yrs) $1,900-$2,100 AISC A$6.7B A$2.4B ~$115M free NPV (7%) cashflow capital for growth (pre-tax) Au @ A$4,000/oz over next 18 months 17yr+ mine life
==> picture [32 x 44] intentionally omitted <==
-
Tomingley 5yr plan (24 Jun 2024) - alkane.com.au/tomingley-five-year-plan
-
** Boda-Kaiser Scoping Study (10 July 2024) - alkane.com.au/boda-kaiser-scoping-study
==> picture [442 x 540] intentionally omitted <==
Hi ghlights from the last year
Increased Roswell Reserve
Commenced stope ore production at Roswell
Efficiency measures at Roswell implemented including new equipment, ore pass, UG crib, UG workshop and UG fuelling
RSF2 built and operational
Constructed the paste plant, constructed and commissioned the flotation and fine grind circuit
Moved to Indicated Resources at Boda Kaiser
Completed Scoping Study for Boda Kaiser including metallurgical testing and plant engineering
==> picture [355 x 540] intentionally omitted <==
Capital Structure
| Ordinary Shares | 603 million |
|---|---|
| Share Price (25 November 2024) | A$0.51 |
| Market Capitalisation | A$308M |
| 12 Month low/high | A$0.38/0.74 |
| Cash and Gold Bullion (30 September 2024) | ~A$51M |
| Interest Bearing Debt Drawn (30 September 2024) | ~A$65M |
| Total Liquidity (30 September 2024) | ~A$67M |
| Enterprise Value | ~A$322M |
| Average Daily Turnover (6 Months) | ~A$0.7M/day |
Share Register Profile (Sep 2024)
==> picture [374 x 100] intentionally omitted <==
----- Start of picture text -----
5%
13%
Domestic Institutions
Foreign Institutions
20%
Directors and Management
Retail & Other
62%
----- End of picture text -----
Broker Coverage
Share Price 2024
==> picture [492 x 245] intentionally omitted <==
HEDGING PUT OPTIONS DELIVERY Dec 2024 to 81,700 oz 132,180 oz at A$2,842 at A$3,000 Jun 2027
==> picture [374 x 80] intentionally omitted <==
Tomingley
Tomingley Operation
==> picture [52 x 38] intentionally omitted <==
~$115M capital for growth over next 18 mths
FY25-29: oz Au 455,000-505,000 $1,900-$2,100 AISC
==> picture [35 x 55] intentionally omitted <==
Mine life to 2030+
1.5M oz Au in resource
==> picture [36 x 34] intentionally omitted <==
==> picture [51 x 31] intentionally omitted <==
==> picture [569 x 264] intentionally omitted <==
==> picture [326 x 540] intentionally omitted <==
Capital Project Timing
==> picture [832 x 366] intentionally omitted <==
----- Start of picture text -----
Construction complete Commissioning complete
2024 2025 2025 2025 2025 2026 2026
Q4 Q1 Q2 Q3 Q4 Q1 Q2
Paste Plant
Flotation & Regrind
Open Cut Infrastructure
Open Cut Mining
Newell Highway
Kyalite Road
Process Plant Throughput
----- End of picture text -----
2024-2026: A Transformational Period
| Quarter ending: | Sep-24 | Dec-24 | Mar-25 | Jun-25 | Sep-25 | Dec-25 | Mar-26 | Jun-26 |
|---|---|---|---|---|---|---|---|---|
| Production Range(ozAu) | 18,418 | 17,000–19,500 | 17,500–20,000 | 19,000–21,500 | 20,000–22,500 | 21,000–23,500 | 21,000–23,500 | 23,000–25,500 |
| Milled Tonnes(kt) | 264,370 | 260–290 | 260–290 | 260–290 | 260–290 | 260–290 | 350–400 | 350–400 |
| Head Grade(g/t Au) | 2.44 | 2.1–2.3 | 2.1–2.3 | 2.5–2.7 | 2.5–2.7 | 2.6–2.8 | 2.2–2.4 | 2.2–2.4 |
| Recovery% | 84.8 | 82–87 | 88-93 | 90–94 | 90–94 | 90–94 | 90–94 | 90–94 |
| Sustaining Capital(A$m)* | 8.5 | 27–32 | 15–20 | |||||
| Expected AISC(A$/ozAu) | 2,182 | 2,400–2,600 | 1,800–2,000 | |||||
| Growth Capital(A$m)** | 14 | 60–65 | 55–60 |
-
Includes UG development capital
-
**Excluding mining equipment purchase and financing
==> picture [56 x 35] intentionally omitted <==
==> picture [39 x 39] intentionally omitted <==
==> picture [39 x 47] intentionally omitted <==
==> picture [43 x 50] intentionally omitted <==
==> picture [51 x 50] intentionally omitted <==
~20% increase Production
~5% increase Head Grade
~10% increase Recovery
~33% decrease ~25% decrease Sustaining & Growth AISC Capital
Roswell Underground
==> picture [584 x 423] intentionally omitted <==
Levels (looking west) 955 855 740
New Underground Equipment
==> picture [960 x 540] intentionally omitted <==
----- Start of picture text -----
Paste Plant
----- End of picture text -----
Road Network
Flotation & Fine Grind Circuit
Production Beyond Current Plan
==> picture [94 x 26] intentionally omitted <==
----- Start of picture text -----
Tomingley
----- End of picture text -----
-
Mining has project approval to 2032, this can be extended on application
-
Open cut reserves exist at San Antonio and Roswell
-
beyond current five-year plan
-
Resources are open at depth under Roswell, San Antonio and both Caloma pits; drilling ongoing
==> picture [104 x 42] intentionally omitted <==
----- Start of picture text -----
Production
Drive ~2.5km
----- End of picture text -----
-
Decision on which ore sources have best financial returns to be made in three to five years’ time
-
Regional exploration continues
==> picture [67 x 26] intentionally omitted <==
----- Start of picture text -----
Roswell
----- End of picture text -----
Boda-Kaiser
Geology & Resource
- ~15M oz Au eq. in resource
==> picture [575 x 348] intentionally omitted <==
ALKANE RESOURCES | ASX:ALK 35
Au @ A$4,000/oz Summary Scoping Study Metrics
==> picture [85 x 62] intentionally omitted <==
==> picture [39 x 47] intentionally omitted <==
==> picture [41 x 38] intentionally omitted <==
==> picture [48 x 55] intentionally omitted <==
20 Mtpa 17+ years Throughout (2 x 10 Mtpa) Life of Mine
A$1.8B Capex (pre-production)
==> picture [51 x 31] intentionally omitted <==
==> picture [50 x 50] intentionally omitted <==
35,611 tpa 159,334 oz pa Copper (first 5 years) Gold (first 5 years)
A$630.4 / oz AISC (with copper by-product credit)
==> picture [46 x 39] intentionally omitted <==
==> picture [44 x 44] intentionally omitted <==
==> picture [33 x 33] intentionally omitted <==
A$5.1B A$2.4B 10-Year Free Cashflow (pre-tax) NPV (7%)
29% IRR
ALKANE RESOURCES | ASX:ALK 36
For more detail refer to the Boda-Kaiser Scoping Study (10 July 2024) - alkane.com.au/boda-kaiser-scoping-study
Boda-Kaiser
-
Regional exploration opportunities (~$5m pa)
-
Environmental studies commenced
-
Further studies to reduce mining costs and assess potential for bulk-tonnage, underground mining
-
~15M oz Au eq. in resource
-
Engaging with potential partners
ALKANE RESOURCES | ASX:ALK 37
Looking Ahead
Commission the paste plant and incorporate into the mining sequence
Optimise the flotation and fine grind circuit together with ore throughput
Expand the Tomingley resource base through near mine and regional exploration
Finalise solar plant construction and supply agreement for Tomingley
Evaluate and pursue inorganic growth opportunities
Continue Boda Kaiser environmental data collection and studies
Continue regional exploration whilst evaluating partnering opportunities for Boda
==> picture [360 x 540] intentionally omitted <==
Company Summary
==> picture [46 x 33] intentionally omitted <==
==> picture [48 x 33] intentionally omitted <==
Tomingley
Substantial cash and increase gold production to 100,000 oz Au (pa)
~$115M capital for growth over next 18 months
Alkane
3 major projects approved in last 12 years
==> picture [38 x 147] intentionally omitted <==
Boda-Kaiser
tonnes Cu 35,600
oz Au 159,300 (pa for first 5yrs)
<4-year payback
Environmental studies continuing
Engaging with potential partners
Stock presents value opportunity for shareholders
==> picture [161 x 126] intentionally omitted <==
==> picture [86 x 62] intentionally omitted <==
==> picture [146 x 46] intentionally omitted <==
==> picture [21 x 21] intentionally omitted <==
==> picture [21 x 21] intentionally omitted <==
==> picture [21 x 20] intentionally omitted <==
@alkaneresources alkane-resources-ltd alkane.com.au
==> picture [202 x 140] intentionally omitted <==
Board and Management
==> picture [128 x 129] intentionally omitted <==
Ian Gandel
Non-Executive Chairman
==> picture [129 x 129] intentionally omitted <==
Dennis Wilkins
Joint Company Secretary
==> picture [129 x 129] intentionally omitted <==
Nic Earner
Managing Director
==> picture [128 x 129] intentionally omitted <==
Simon Parsons
Executive General Manager, Operations
==> picture [129 x 129] intentionally omitted <==
Ian Chalmers
Technical Director
==> picture [129 x 129] intentionally omitted <==
Rod Griffith
General Manager, Operations
==> picture [129 x 129] intentionally omitted <==
Gavin Smith
Non-Executive Director
==> picture [129 x 129] intentionally omitted <==
Mike Sutherland
General Manager, NSW
==> picture [129 x 129] intentionally omitted <==
Anthony Lethlean
Non-Executive Director
==> picture [129 x 129] intentionally omitted <==
Brendan Ward
General Manager, Legal & Commercial
==> picture [129 x 129] intentionally omitted <==
James Carter
CFO
==> picture [129 x 129] intentionally omitted <==
David Meates
Exploration Manager, NSW
ALKANE RESOURCES | ASX:ALK 41
Successful Explorers
-
Alkane draws on its extensive experience to create value through mineral resource discoveries
-
Long term well-resourced team
-
Comprehensive databases
-
Detailed regional knowledge
-
Successful at developing its discoveries and will also transact or joint venture for value
-
At Tomingley, regional programs seek to add further mine life, in context of approval times
-
On discovery, Alkane first increases knowledge and then increase drill density to produce a resource to de-risk projects
-
Continue to be very cost effective in discovery to development
-
San Antonio / Roswell cost <$20 per resource ounce
-
Boda / Kaiser cost <$4 per resource ounce (equivalent)
ALKANE RESOURCES | ASX:ALK 42
Tomingley Resources
TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024)
| TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS MINERAL RESOURCES (at 30 June 2024) |
|---|---|---|---|---|---|---|---|---|---|
| MEASURED | INDIC | ATED | INF | ERRED | TOT | AL | Total Gold |
||
| DEPOSIT | Tonnage | Grade | Tonnage | Grade | Tonnage | Grade | Tonnage | Grade | |
| (kt) | (g/t Au) | (kt) | (g/t Au) | (kt) | (g/t Au) |
(kt) | (g/t Au) | (koz) | |
| Open Pittable Re | sources (cut-off 0.40g/t Au) | ||||||||
| Caloma One | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 |
| Sub Total | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 |
| Underground Re | sources (cut-off 1.3g/t | Au) | |||||||
| Wyoming One | 1013 | 2.7 | 763 | 2.2 | 108 | 2.1 | 1,884 | 2.5 | 149 |
| Wyoming Three | 46 | 2.2 | 24 | 2.0 | 20 | 1.9 | 90 | 2.1 | 6 |
Caloma One |
602 | 2.2 | 916 | 2.0 | 469 | 2.0 | 1,987 | 2.1 | 132 |
| Caloma Two | 351 | 2.4 | 1261 | 2.4 | 462 | 1.8 | 2,074 | 2.3 | 153 |
| Sub Total | 2,012 | 2.5 | 2,964 | 2.2 | 1,059 | 1.9 | 6,035 | 2.3 | 444 |
| TOTAL | 2,012 | 2.5 | 2,964 | 2.2 | 1,059 | 2.1 | 6,035 | 2.3 | 441 |
TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES (at 30 June 2024)
| TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) | TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES(at 30 June 2024) |
|---|---|---|---|---|---|---|---|---|---|
| TOTAL | Total Gold |
||||||||
| MEASURED | INDICATED | INF | ERRED | ||||||
| DEPOSIT | Tonnage | Grade | Tonnage | Grade | Tonnage | Grade | Tonnage | Grade | |
| (kt) | (g/t Au) |
(g/t | (g/t | (g/t Au) |
(koz) | ||||
| (kt) | Au) |
(kt) | Au) |
(kt) | |||||
| Open Cut Resources (cut-off 0.4g/t Au Roswell and 0.5g/t Au San Antonio) | |||||||||
| Roswell | 3,900 | 1.7 | 0 | 0.0 | 3,900 | 1.7 | 213 | ||
| San Antonio | 5,930 | 1.8 | 1,389 | 1.3 | 7,319 | 1.7 | 406 | ||
| Sub Total | 0 | 0.0 | 9,830 | 1.8 | 1,389 | 1.3 | 11,219 | 1.7 | 619 |
| Underground Resources (cut-off 1.3 g/t Au and 1.3g/t Au McLeans) | |||||||||
| Roswell | 825 | 3.0 | 3,123 | 2.8 | 1,957 | 2.5 | 5,905 | 2.7 | 517 |
| McLeans | 0 | 0.0 | 870 | 2.5 | 870 | 2.5 | 70 | ||
| Sub Total | 825 | 3.0 | 3,123 | 2.8 | 2,827 | 2.5 | 6,775 | 2.7 | 587 |
| TOTAL | 825 | 3.0 | 12,953 | 2.0 | 4,216 | 2.1 | 17,994 | 2.1 | 1,206 |
| **TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES(at 30 June 2024) ** | **TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES(at 30 June 2024) ** | **TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES(at 30 June 2024) ** | **TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES(at 30 June 2024) ** | **TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES(at 30 June 2024) ** | **TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES(at 30 June 2024) ** | **TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES(at 30 June 2024) ** | |
|---|---|---|---|---|---|---|---|
| PROVED | PROBAB | LE | TOTAL | ||||
| DEPOSIT | Gold | ||||||
| Tonnage | Grade | Tonnage | Grade | Tonnage | Grade | ||
| (kt) | (g/t Au) | (kt) | (g/t Au) | (kt) | (g/t Au) | (koz) | |
| Open Pittable Reserves | |||||||
| (cut-off 0.40g/t Au) | |||||||
| Roswell | 0 | 0.0 | 3,900 | 1.7 | 3,900 | 1.7 | 213 |
| San Antonio | 0 | 0.0 | 4,100 | 1.6 | 4,100 | 1.6 | 214 |
| Sub Total | 0 | 8,000 | 1.6 | 8,000 | 1.6 | 427 | |
| Underground Reserves | (cut-off 1.6g/t Au) | ||||||
| Roswell | 881 | 2.4 | 2,202 | 2.4 | 3,082 | 2.4 | 236 |
| San Antonio* | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 |
| Sub Total | 881 | 2.4 | 2,202 | 2.6 | 3,082 | 2.5 | 236 |
| TOTAL | 881 | 2.4 | 10,202 | 1.8 | 11,082 | 1.9 | 663 |
- San Antonio UG Reserves not determined at this time
| TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) | TOMINGLEY GOLD OPERATIONS ORE RESERVES (at 30 June 2024) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PROVED | PROBABLE | TOTAL | |||||||||||
| DEPOSIT | Tonnage | Grade | Tonnage | Grade | Tonnage | Grade | Gold | ||||||
| (kt) | (g/t Au) | (kt) | (g/t Au) | (kt) | (g/t Au) | (koz) | |||||||
| Open Pittable Reserves(cut-off 040g/t Au) | |||||||||||||
| . Stockpiles 241 1.1 0 0 241 1.1 9 |
|||||||||||||
| Sub Total | 241 | 1.1 | 0 | 0.0 | 241 | 1.1 | 9 | ||||||
| Underground Reserves(cut-off 1.3g/t Au) | |||||||||||||
| Wyoming One | 87 | 1.9 | 105 | 1.7 | 192 | 1.8 | 11 | ||||||
| Caloma One | 86 | 1.8 | 105 | 1.8 | 190 | 1.8 | 11 | ||||||
| Caloma Two | 48 | 1.8 | 3 | 1.2 | 50 | 1.8 | 3 | ||||||
| Sub Total | 220 | 1.8 | 213 | 1.8 | 433 | 1.8 | 25 | ||||||
| TOTAL | 461 | 1.5 | 213 | 1.8 | 674 | 1.6 | 34 | ||||||
| PEAK HILL GOLD PROJECT MINERAL RESOURCES (30 June 2024) | |||||||||||||
| Deposit | Cut-Off | Tonnes (Mt) |
Gold | Copper Metal (%) |
|||||||||
| Gold Metal | |||||||||||||
| Resource C |
|||||||||||||
| Grade g/t | (Koz) | ||||||||||||
| ategory | |||||||||||||
| Proprietary U/G | Inferred | 2g/t Au | 1.02 | 3.29 | 108 | 0.15 | |||||||
| TOTAL | 1.02 | 0.15 | |||||||||||
| 3.29 | 108 | ||||||||||||
ALKANE RESOURCES | ASX:ALK 43
Boda-Kaiser Resource
==> picture [578 x 209] intentionally omitted <==
Total Boda-Kaiser Grade-Tonnage Curve
==> picture [572 x 245] intentionally omitted <==
ALKANE RESOURCES | ASX:ALK 44
==> picture [161 x 127] intentionally omitted <==
Exploration Presentation: FY24 AGM Ian Chalmers Technical Director
26 November 2024
==> picture [960 x 97] intentionally omitted <==
----- Start of picture text -----
© 2024 Alkane Resources
----- End of picture text -----
Disclaimer
==> picture [85 x 62] intentionally omitted <==
This presentation contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed or implied by these forward-looking statements depending on a variety of factors. Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities.
Alkane Resources Ltd cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this presentation will occur and investors are cautioned not to place any reliance on these forward-looking statements. Alkane Resources Ltd does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this presentation, except where required by applicable law and stock exchange listing requirements.
This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other countries’ securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geosciences.
Competent person
Unless otherwise advised above or in the Announcements referenced, the information in this presentation that relates to exploration results, mineral resources and ore reserves is based on information compiled by Mr Ian Chalmers, FAusIMM,FAIG, (Alkane Technical Director) who has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Chalmers consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.
==> picture [202 x 140] intentionally omitted <==
Previously reported information
==> picture [85 x 62] intentionally omitted <==
This document includes information that relates to previously reported results which were prepared in accordance with the requirements of the JORC Code (2012). This information was included in Alkane’s previous ASX announcements as follows:
-
*1 Annual Resources and Reserves Statement FY24 - 4 September 2024
-
*2 Tomingley Regional Exploration Update - 7 October 2024
-
*3 Near Mine Exploration at Tomingley Delivers Significant Intercepts - 16 September 2021
-
*4 Revised Kaiser Resource Estimate improves confidence and Grade of Resource Base at Boda District - 29 April 2024
-
*5 Boda-Kaiser Scoping Study - 10 July 2024
-
*6 NMPP Regional Update. Potential For New Au-Cu Porphyry Deposits Demonstrated - 21 June 2024
-
*7 Acquisition of Exploration Tenements in NSW Completed with Initial Tenement Review - 30 May 2023
-
*8 Large Cu-Zn-Pb-Ag Targets Confirmed at the Rockley Project - 8 August 2024
-
*9 High Grade Zones Intersected at Boda by Revised Drilling Orientation - 18 December 2020
-
*10 Continuity of High Grade Gold-Copper Breccia Intersected at Boda - 3 May 2021
-
*11 Mineralised system Continues to Grow at boda - 22 October 2021
-
*12 Significant High Grade Gold-Copper Mineralisation Intersected at Boda - 23 March 2020
The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcement(s); in the case of estimates of mineral resources or ore reserves, estimates are based on and fairly represents information and supporting documentation that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed; and that the form and context in which the Competent Person’s findings are presented have not been materially altered.
FY24 Exploration Summary
Tomingley Gold Project:
-
68,155m of underground grade control and resource expansion drilling at TGO. Inclusive of mining depletion, Resources and Reserves were lifted around 10%.[(*1)]
-
Exploration drilling completed at El Paso and Plains near-mine targets. Airborne gravity survey for structural/lithological definition.[(*2)]
-
Technical study at Peak Hill supports possible porphyry source at depth.
Northern Molong Porphyry Project:
-
55,100m of RC and Core drilling for resource classification and upgrade completed at Boda and Kaiser.[(*4)]
-
Airborne gravity survey for regional target definition, and limited Aircore-RC-Core drilling tested several regional targets.[(*6)]
-
Potential development Scoping Study delivered positive results.[(*5)]
Several promising targets identified within the South Junee Porphyry Project following data review and gravity survey.[(*7)]
Encouraging Au-Cu-Pb-Zn results from reconnaissance drilling at Apsley (Rockley Project).[(*8)]
==> picture [367 x 540] intentionally omitted <==
Tomingley Gold Project
==> picture [320 x 451] intentionally omitted <==
==> picture [287 x 420] intentionally omitted <==
==> picture [85 x 62] intentionally omitted <==
Tomingley Gold Operations
Total (M, I & I) Mineral Resources:
24.24Mt grading 2.16g/t Au (1,682,000oz)[(*1)]
Total (P &P) Ore Reserves:
11.76Mt grading 1.9g/t Au (705,000oz)[(*1)]
Regional Targets:
Gravity, Mag, Seismic, ANT, Drilling programs.[ (*2)]
El Paso: RC and core drilling (800m strike) EPP043 16m @ 2.69g/t Au incl 6m @ 6.14g/t Au.[(*3)] EPP049 9m @ 2.30g/t Au
EPD004 13m @ 1.79g/t Au incl 1.55m @ 9.95g/t Au EPD013 12m @ 1.50g/t Au incl 4m @ 2.55g/t Au
Plains: RC drilling (500m strike)[(*3)]
RWRC465 10m @ 1.59g/t Au incl 3m @ 4.18g/t Au RWRC482 6m @ 1.31g/t Au
Tomingley Two: RC and core drilling (800m strike) TORC005 11m @ 1.70g/t Au incl 4m @ 3.87g/t Au[(*3)]
Only 30% of the 20km corridor from Tomingley Two to Peak Hill has been explored in any detail. Another 30km south of Peak Hill.
ALKANE RESOURCES | ASX:ALK 49
Tomingley – Resource and Reserve Expansion
==> picture [85 x 62] intentionally omitted <==
==> picture [874 x 347] intentionally omitted <==
San Antonio ‘Deeps’ drilling commenced
Roswell down dip and north plunge extensions
Mcleans UG reserve drilling
Review of historic Myalls mining and drilling (70koz production)
Continued UG reserve drilling at Wyoming and Caloma, following mineralisation along strike and down dip.
ALKANE RESOURCES | ASX:ALK 50
TGO Underground Development
==> picture [85 x 62] intentionally omitted <==
Resource blocks with grade and underground development Resource Target
==> picture [699 x 398] intentionally omitted <==
ALKANE RESOURCES | ASX:ALK 51
Northern Molong Porphyry Project
Regional Geology
-
Regional airborne gravity survey confirmed that the volcanic sequence has been intruded by a number of monzonitic to dioritic complexes. As elsewhere in the belt, these intrusives are the cause of the extensive alteration and mineralisation.
-
The central part of the project is dominated by the Comobella Intrusive Complex (CIC), a 10 by 7km body with several peripheral mineralised targets (Driell Creek, Glen Hollow and Haddington) which have only been sporadically drilled.
-
Boda, Boda South and Kaiser form a linear fault bounded belt of intrusive complexes over 5km and are the hosts of the currently defined resources.
-
Limited work has been completed on the satellite Windora, Murga and Tompkins complexes.
==> picture [368 x 540] intentionally omitted <==
----- Start of picture text -----
ALKANE RESOURCES | ASX:ALK 52
----- End of picture text -----
Boda-Kaiser Geology
-
Alkane has completed over 240,000 metres of drilling within the NMPP since 2019.
-
Drilling has defined more than 3km of continuous calcpotassic alteration with Au-Cu mineralisation from Kaiser to Boda 2-3, up to 700m width.
-
Potassic pyrite zone (gold rich) occurs on the east and northeast flanks of the calc-potassic core.
-
Phyllic alteration overprints the northeast shoulder of Boda.
-
Imbricated west dipping thrusts dislocate the porphyry district.
-
Late NE faulting further dislocates.
ALKANE RESOURCES | ASX:ALK 53
Boda Geology and Mineralisation
Selected Intercepts in Section[(*9, 10 and 11)]
KSDD028 832m grading 0.38g/t Au, 0.17% Cu from 256m incl 266m grading 0.66g/t Au, 0.36% Cu from 764m incl 65m grading 1.98g/t Au, 1.13% Cu from 799m incl 25m grading 4.43g/t Au, 2.59% Cu from 838m KSDD031 383.2m grading 0.80g/t Au, 0.31% Cu from 775m and 204m grading 1.40g/t Au, 0.51% Cu from 776m incl 101m grading 2.47g/t Au, 0.83% Cu from 824m incl 70m grading 3.04g/t Au, 0.92% Cu from 829m
KSDD040 155m grading 0.26g/t Au from 110m and 848m grading 0.29g/t Au, 0.17% Cu from 337m incl 103m grading 0.77g/t Au, 0.41% Cu from 671m incl 19m grading 1.36g/t Au, 0.51% Cu from 701m also 14m grading 1.42g/t Au, 1.03% Cu from 753m
KSRC043 31m grading 2.94g/t Au, 0.97% Cu from surface incl 9m grading 9.43g/t Au, 2.65% Cu, 8g/t Ag from surface
Selected Intercepts in 45° Section (discovery)
KSDD007[(*12)] 1,167m @ 0.55g/t gold, 0.25% copper from 75m incl 512m @ 1.00g/t gold, 0.44% copper from 688m incl 376m @ 1.30g/t gold, 0.56% copper from 768m incl 96.8m @ 3.97g/t gold, 1.52% copper from 768m
Mineralisation dominantly pyrite, chalcopyrite and bornite
ALKANE RESOURCES | ASX:ALK 54
Boda-Kaiser Indicated and Inferred Resources[(*4)]
==> picture [85 x 62] intentionally omitted <==
==> picture [398 x 178] intentionally omitted <==
==> picture [399 x 242] intentionally omitted <==
==> picture [392 x 399] intentionally omitted <==
ASX Release 14 December 2023 & 29 April 2024. The equivalent calculation formula is AuEq(g/t) = Au(g/t) + Cu%/10031.1035*copper price
($/t)/gold price($/oz). 12-month average metal prices were used of US$1,950/oz gold and US$8,600/t copper, and A$:US$0.67. Recoveries are estimated at 87% for Cu and 81% for Au for Boda, and at 81% Cu and 71% Au for Kaiser from metallurgical studies.
ALKANE RESOURCES | ASX:ALK 55
Boda 2-3 Deposit and High Grade Target
==> picture [85 x 62] intentionally omitted <==
-
Boda 2-3 is classified as 10% Indicated and 90% Inferred
-
BOD159 (6) intercepted a chalcopyrite-cemented breccia of 65.5m @ 1.22g/t Au, 0.41% Cu from 1154.5m including 15.6m @ 4.37g/t Au, 1.31% Cu* and is positioned outside the Boda MRE. Earlier BOD094 returned a similar intercept.
-
3 major imbricate reverse faults dislocate the deposit thrusting deeper parts of the system over shallow and more preserved sections to the east.
-
Core drilling is scheduled for later 2024 to test this zone up-dip and along strike.
==> picture [296 x 434] intentionally omitted <==
----- Start of picture text -----
Section
----- End of picture text -----
==> picture [296 x 434] intentionally omitted <==
----- Start of picture text -----
ALKANE RESOURCES | ASX:ALK 56
----- End of picture text -----
NMPP District Exploration
Porphyry clusters at all (alteration) levels[(*6)]
Haddington
4022RA138 - 2m @ 2.9g/t Au, 0.51% Cu from 4m
NKRC3 - 18m @ 0.95g/t Au, 0.15% Cu from 64m, incl 2m @ 5.7g/t Au, 0.44% Cu
Glen Hollow
COMRC009 - 45m grading 0.87g/t Au, 0.24% Cu from 60m including 21m grading 1.51g/t Au, 0.41% Cu from 84m.
Driell Creek
- DRC004 - 130m grading 0.25g/t Au, 0.11% Cu from 174m to end of hole. DRC010 - 47.7m grading 0.12g/t Au, 0.15% Cu from 279.3m incl 7m grading 0.34g/t Au, 0.26% Cu from 320m and 2m grading 0.12g/t Au, 0.19% Cu from 333m and 54m grading 0.17g/t Au, 0.04% Cu from 463m and 5m grading 0.16g/t Au, 0.11% Cu from 539m
Follow up AC, RC and DD to commence before end of 2024
==> picture [350 x 514] intentionally omitted <==
ALKANE RESOURCES | ASX:ALK 57
South Junee Porphyry Project
==> picture [299 x 427] intentionally omitted <==
==> picture [298 x 423] intentionally omitted <==
==> picture [85 x 62] intentionally omitted <==
Acquired by Alkane in May 2023.
Work completed by Alkane includes review of magnetic, gravity and lithgeochem data from recon drilling.
New airborne gravity survey to assist target definition.
Existing drill results include:[(*7)]
Imola
CBD01 110m @ 0.64g/t Au, 0.01% Cu from 139m incl 6m @ 1.74g/t Au, 0.01% Cu from 141m also 34m @ 1.14g/t Au, 0.01% Cu from 197m CBD17 16m @ 1.71g/t Au, 0.04% Cu from 276m incl 3m @ 6.80g/t Au, 0.04% Cu from 289m
Silverstone and Catalunya
CBD08 74m @ 0.15% Cu, 0.02g/t Au from 226m incl 6m @ 0.39% Cu, 0.03g/t Au from 226m also 3m @ 0.71% cu, 0.08g/t Au from 297m CBD09 50m @ 0.15% Cu, 0.04g/t Au from 282m incl 9m @ 0.35% Cu, 0.05g/t Au from 323m
ALKANE RESOURCES | ASX:ALK 58
==> picture [161 x 126] intentionally omitted <==
==> picture [21 x 21] intentionally omitted <==
==> picture [21 x 21] intentionally omitted <==
==> picture [21 x 20] intentionally omitted <==
@alkaneresources alkane-resources-ltd alkane.com.au
==> picture [149 x 150] intentionally omitted <==
Tomingley Resources and Reserves (FY24)
==> picture [85 x 62] intentionally omitted <==
| TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) |
|---|---|---|---|---|---|---|---|---|---|
| MEASURED | INDICATED | INFERRED | TOTAL | Total Gold | |||||
| DEPOSIT | Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
|
| (Koz) | |||||||||
| Open Pittable Resources (cut off 0.40g/t Au) | |||||||||
| Caloma One | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 |
| Sub Total | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 |
| Underground Resources (cut off 1.3g/t Au) | |||||||||
| Wyoming One | 1013 | 2.7 | 763 | 2.2 | 108 | 2.1 | 1,884 | 2.5 | 149 |
| Wyoming Three | 46 | 2.2 | 24 | 2.0 | 20 | 1.9 | 90 | 2.1 | 6 |
| Caloma One | 602 | 2.2 | 916 | 2.0 | 469 | 2.0 | 1,987 | 2.1 | 132 |
| Caloma Two | 351 | 2.4 | 1261 | 2.4 | 462 | 1.8 | 2,074 | 2.3 | 153 |
| Sub Total | 2,012 | 2.5 | 2,964 | 2.2 | 1,059 | 1.9 | 6,035 | 2.3 | 441 |
| TOTAL | 2,012 | 2.5 | 2,964 | 2.2 | 1,059 | 1.9 | 6,035 | 2.3 | 441 |
| TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES (as at 30 June 2024) | |||||||||
| MEASURED | INDICATED | INFERRED | TOTAL | Total Gold | |||||
| DEPOSIT | Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
(Koz) |
| Total Resources(cut off 0.4g/t Au Roswell and 0.5g/t Au San Antonio) | |||||||||
| Roswell | 3,900 | 1.7 | 0 | 0.0 | 3,900 | 1.7 | 213 | ||
| San Antonio | 5,930 | 1.8 | 1,389 | 1.3 | 7,319 | 1.7 | 406 | ||
| Sub Total | 0 | 0.0 | 9,830 | 1.8 | 1,389 | 1.3 | 11,219 | 1.7 | 619 |
| Underground Resources (cut off 1.3 g/t Au and 1.3g/t Au McLeans) | |||||||||
| Roswell | 825 | 3.0 | 3,123 | 2.8 | 1,957 | 2.5 | 5,905 | 2.7 | 517 |
| McLeans | 0 | 0.0 | 870 | 2.5 | 870 | 2.5 | 70 | ||
| Sub Total | 825 | 3.0 | 3,123 | 2.8 | 2,827 | 2.5 | 6,775 | 2.7 | 587 |
| TOTAL | 825 | 3.0 | 12,953 | 2.0 | 4,216 | 2.1 | 17,994 | 2.1 | 1,206 |
| TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) | TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) |
|---|---|---|---|---|---|---|---|
| PROVED | PROBABLE | TOTAL | Total Gold |
||||
| DEPOSIT | Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
(Koz) |
| Open Pittable Reserves (cut off 0.40g/t Au) | |||||||
| Stockpiles | 241 | 1.1 | 0 | 0 | 241 | 1.1 | 9 |
| Sub Total | 241 | 1.1 | 0 | 0.0 | 241 | 1.1 | 9 |
| Underground Reserves (cut off 1.3g/t Au) | |||||||
| WyomingOne | 87 | 1.9 | 105 | 1.7 | 192 | 1.8 | 11 |
| Caloma One | 86 | 1.8 | 105 | 1.8 | 190 | 1.8 | 11 |
| Caloma Two | 48 | 1.8 | 3 | 1.2 | 50 | 1.8 | 3 |
| Sub Total | 220 | 1.8 | 213 | 1.8 | 433 | 1.8 | 25 |
| TOTAL | 461 | 1.5 | 213 | 1.8 | 674 | 1.6 | 34 |
| TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES (as at 30 June 2024) | |||||||
| PROVED | PROBABLE | TOTAL | Total Gold |
||||
| DEPOSIT | Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
Tonnage (Kt) |
Grade (g/t Au) |
(Koz) |
| Open Pittable Reserves (cut off 0.40g/t Au) | |||||||
| Roswell | 0 | 0.0 | 3,900 | 1.7 | 3,900 | 1.7 | 213 |
| San Antonio | 0 | 0.0 | 4,100 | 1.6 | 4,100 | 1.6 | 214 |
| Sub Total | 0 | 8,000 | 1.6 | 8,000 | 1.6 | 427 | |
| Underground Reserves (cut off 1.6g/t Au) | |||||||
| Roswell | 881 | 2.4 | 2,202 | 2.4 | 3,082 | 2.4 | 236 |
| San Antonio* | 0 | 0.0 | 0 | 0.0 | 0 | 0.0 | 0 |
| Sub Total | 881 | 2.4 | 2,202 | 2.4 | 3,082 | 2.4 | 236 |
| TOTAL | 881 | 2.4 | 10,202 | 1.8 | 11,082 | 1.9 | 663 |
ALKANE RESOURCES | ASX:ALK 60
*San Antonio Reserves not determined at this time.
Peak Hill – Lithogeochemical Study
==> picture [85 x 62] intentionally omitted <==
==> picture [194 x 253] intentionally omitted <==
==> picture [377 x 228] intentionally omitted <==
==> picture [374 x 236] intentionally omitted <==
Super heated fluids and gases rise through fractures from intruding magma, react with wall rocks and cool. Resultant minerals highlight fluid outflow areas and vector to porphyry source.
ALKANE RESOURCES | ASX:ALK 61
Boda – Kaiser Ounces per Vertical Metre
==> picture [85 x 62] intentionally omitted <==
Boda Kaiser Combined MRE 2024 AuEq (g/t) Vertical Profile
==> picture [463 x 316] intentionally omitted <==
----- Start of picture text -----
OPVM & METRES DRILLED
0 5000 10000 15000 20000 25000
0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750 OPVM
800
850
900 Drill Support
950
1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
DEPTH (METRES)
----- End of picture text -----
==> picture [309 x 370] intentionally omitted <==
DEG Hemi Gold Project Mineral Resource Estimate 2024 ASX 14 Nov 2024
ALKANE RESOURCES | ASX:ALK 62