Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Alkane Resources AGM Information 2024

Nov 25, 2024

48579_rns_2024-11-25_35a99ad0-9b2d-4177-af0a-45ef7c9912aa.pdf

AGM Information

Open in viewer

Opens in your device viewer

==> picture [161 x 127] intentionally omitted <==

Exploration Presentation: FY24 AGM Ian Chalmers Technical Director

26 November 2024

==> picture [960 x 97] intentionally omitted <==

----- Start of picture text -----

© 2024 Alkane Resources
----- End of picture text -----

Disclaimer

==> picture [85 x 62] intentionally omitted <==

This presentation contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed or implied by these forward-looking statements depending on a variety of factors. Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities.

Alkane Resources Ltd cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this presentation will occur and investors are cautioned not to place any reliance on these forward-looking statements. Alkane Resources Ltd does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this presentation, except where required by applicable law and stock exchange listing requirements.

This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other countries’ securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geosciences.

Competent person

Unless otherwise advised above or in the Announcements referenced, the information in this presentation that relates to exploration results, mineral resources and ore reserves is based on information compiled by Mr Ian Chalmers, FAusIMM,FAIG, (Alkane Technical Director) who has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Chalmers consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.

==> picture [202 x 140] intentionally omitted <==

Previously reported information

==> picture [85 x 62] intentionally omitted <==

This document includes information that relates to previously reported results which were prepared in accordance with the requirements of the JORC Code (2012). This information was included in Alkane’s previous ASX announcements as follows:

  • *1 Annual Resources and Reserves Statement FY24 - 4 September 2024

  • *2 Tomingley Regional Exploration Update - 7 October 2024

  • *3 Near Mine Exploration at Tomingley Delivers Significant Intercepts - 16 September 2021

  • *4 Revised Kaiser Resource Estimate improves confidence and Grade of Resource Base at Boda District - 29 April 2024

  • *5 Boda-Kaiser Scoping Study - 10 July 2024

  • *6 NMPP Regional Update. Potential For New Au-Cu Porphyry Deposits Demonstrated - 21 June 2024

  • *7 Acquisition of Exploration Tenements in NSW Completed with Initial Tenement Review - 30 May 2023

  • *8 Large Cu-Zn-Pb-Ag Targets Confirmed at the Rockley Project - 8 August 2024

  • *9 High Grade Zones Intersected at Boda by Revised Drilling Orientation - 18 December 2020

  • *10 Continuity of High Grade Gold-Copper Breccia Intersected at Boda - 3 May 2021

  • *11 Mineralised system Continues to Grow at boda - 22 October 2021

  • *12 Significant High Grade Gold-Copper Mineralisation Intersected at Boda - 23 March 2020

The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcement(s); in the case of estimates of mineral resources or ore reserves, estimates are based on and fairly represents information and supporting documentation that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed; and that the form and context in which the Competent Person’s findings are presented have not been materially altered.

FY24 Exploration Summary

Tomingley Gold Project:

  • 68,155m of underground grade control and resource expansion drilling at TGO. Inclusive of mining depletion, Resources and Reserves were lifted around 10%.[(*1)]

  • Exploration drilling completed at El Paso and Plains near-mine targets. Airborne gravity survey for structural/lithological definition.[(*2)]

  • Technical study at Peak Hill supports possible porphyry source at depth.

Northern Molong Porphyry Project:

  • 55,100m of RC and Core drilling for resource classification and upgrade completed at Boda and Kaiser.[(*4)]

  • Airborne gravity survey for regional target definition, and limited Aircore-RC-Core drilling tested several regional targets.[(*6)]

  • Potential development Scoping Study delivered positive results.[(*5)]

Several promising targets identified within the South Junee Porphyry Project following data review and gravity survey.[(*7)]

Encouraging Au-Cu-Pb-Zn results from reconnaissance drilling at Apsley (Rockley Project).[(*8)]

==> picture [367 x 540] intentionally omitted <==

Tomingley Gold Project

==> picture [320 x 451] intentionally omitted <==

==> picture [287 x 420] intentionally omitted <==

==> picture [85 x 62] intentionally omitted <==

Tomingley Gold Operations

Total (M, I & I) Mineral Resources:

24.24Mt grading 2.16g/t Au (1,682,000oz)[(*1)]

Total (P &P) Ore Reserves:

11.76Mt grading 1.9g/t Au (705,000oz)[(*1)]

Regional Targets:

Gravity, Mag, Seismic, ANT, Drilling programs.[ (*2)]

El Paso: RC and core drilling (800m strike) EPP043 16m @ 2.69g/t Au incl 6m @ 6.14g/t Au.[(*3)] EPP049 9m @ 2.30g/t Au

EPD004 13m @ 1.79g/t Au incl 1.55m @ 9.95g/t Au EPD013 12m @ 1.50g/t Au incl 4m @ 2.55g/t Au

Plains: RC drilling (500m strike)[(*3)]

RWRC465 10m @ 1.59g/t Au incl 3m @ 4.18g/t Au RWRC482 6m @ 1.31g/t Au

Tomingley Two: RC and core drilling (800m strike) TORC005 11m @ 1.70g/t Au incl 4m @ 3.87g/t Au[(*3)]

Only 30% of the 20km corridor from Tomingley Two to Peak Hill has been explored in any detail. Another 30km south of Peak Hill.

© 2024 ALKANE RESOURCES 5

Tomingley – Resource and Reserve Expansion

==> picture [85 x 62] intentionally omitted <==

==> picture [874 x 347] intentionally omitted <==

San Antonio ‘Deeps’ drilling commenced

Roswell down dip and north plunge extensions

Mcleans UG reserve drilling

Review of historic Myalls mining and drilling (70koz production)

Continued UG reserve drilling at Wyoming and Caloma, following mineralisation along strike and down dip.

© 2024 ALKANE RESOURCES 6

TGO Underground Development

==> picture [85 x 62] intentionally omitted <==

Resource blocks with grade and underground development Resource Target

==> picture [699 x 398] intentionally omitted <==

© 2024 ALKANE RESOURCES 7

Northern Molong Porphyry Project

Regional Geology

  • Regional airborne gravity survey confirmed that the volcanic sequence has been intruded by a number of monzonitic to dioritic complexes. As elsewhere in the belt, these intrusives are the cause of the extensive alteration and mineralisation.

  • The central part of the project is dominated by the Comobella Intrusive Complex (CIC), a 10 by 7km body with several peripheral mineralised targets (Driell Creek, Glen Hollow and Haddington) which have only been sporadically drilled.

  • Boda, Boda South and Kaiser form a linear fault bounded belt of intrusive complexes over 5km and are the hosts of the currently defined resources.

  • Limited work has been completed on the satellite Windora, Murga and Tompkins complexes.

==> picture [368 x 540] intentionally omitted <==

----- Start of picture text -----

© 2024 ALKANE RESOURCES 8
----- End of picture text -----

Boda-Kaiser Geology

  • Alkane has completed over 240,000 metres of drilling within the NMPP since 2019.

  • Drilling has defined more than 3km of continuous calcpotassic alteration with Au-Cu mineralisation from Kaiser to Boda 2-3, up to 700m width.

  • Potassic pyrite zone (gold rich) occurs on the east and northeast flanks of the calc-potassic core.

  • Phyllic alteration overprints the northeast shoulder of Boda.

  • Imbricated west dipping thrusts dislocate the porphyry district.

  • Late NE faulting further dislocates.

==> picture [368 x 540] intentionally omitted <==

----- Start of picture text -----

© 2024 ALKANE RESOURCES 9
----- End of picture text -----

Boda Geology and Mineralisation

Selected Intercepts in Section[(*9, 10 and 11)]

KSDD028 832m grading 0.38g/t Au, 0.17% Cu from 256m incl 266m grading 0.66g/t Au, 0.36% Cu from 764m incl 65m grading 1.98g/t Au, 1.13% Cu from 799m incl 25m grading 4.43g/t Au, 2.59% Cu from 838m KSDD031 383.2m grading 0.80g/t Au, 0.31% Cu from 775m and 204m grading 1.40g/t Au, 0.51% Cu from 776m incl 101m grading 2.47g/t Au, 0.83% Cu from 824m incl 70m grading 3.04g/t Au, 0.92% Cu from 829m

KSDD040 155m grading 0.26g/t Au from 110m and 848m grading 0.29g/t Au, 0.17% Cu from 337m incl 103m grading 0.77g/t Au, 0.41% Cu from 671m incl 19m grading 1.36g/t Au, 0.51% Cu from 701m also 14m grading 1.42g/t Au, 1.03% Cu from 753m

KSRC043 31m grading 2.94g/t Au, 0.97% Cu from surface incl 9m grading 9.43g/t Au, 2.65% Cu, 8g/t Ag from surface

Selected Intercepts in 45° Section (discovery)

KSDD007[(*12)] 1,167m @ 0.55g/t gold, 0.25% copper from 75m incl 512m @ 1.00g/t gold, 0.44% copper from 688m incl 376m @ 1.30g/t gold, 0.56% copper from 768m incl 96.8m @ 3.97g/t gold, 1.52% copper from 768m

Mineralisation dominantly pyrite, chalcopyrite and bornite

© 2024 ALKANE RESOURCES 10

Boda-Kaiser Indicated and Inferred Resources[(*4)]

==> picture [85 x 62] intentionally omitted <==

==> picture [398 x 178] intentionally omitted <==

==> picture [399 x 242] intentionally omitted <==

==> picture [392 x 399] intentionally omitted <==

ASX Release 14 December 2023 & 29 April 2024. The equivalent calculation formula is AuEq(g/t) = Au(g/t) + Cu%/10031.1035*copper price

($/t)/gold price($/oz). 12-month average metal prices were used of US$1,950/oz gold and US$8,600/t copper, and A$:US$0.67. Recoveries are estimated at 87% for Cu and 81% for Au for Boda, and at 81% Cu and 71% Au for Kaiser from metallurgical studies.

© 2024 ALKANE RESOURCES 11

Boda 2-3 Deposit and High Grade Target

==> picture [85 x 62] intentionally omitted <==

  • Boda 2-3 is classified as 10% Indicated and 90% Inferred

  • BOD159 (*6) intercepted a

chalcopyrite-cemented breccia of 65.5m @ 1.22g/t Au, 0.41% Cu from 1154.5m including 15.6m @ 4.37g/t Au, 1.31% Cu and is positioned outside the Boda MRE. Earlier BOD094 returned a similar intercept.

  • 3 major imbricate reverse faults dislocate the deposit thrusting deeper parts of the system over shallow and more preserved sections to the east.

  • Core drilling is scheduled for later 2024 to test this zone up-dip and along strike.

==> picture [296 x 434] intentionally omitted <==

----- Start of picture text -----

Section
----- End of picture text -----

==> picture [296 x 434] intentionally omitted <==

----- Start of picture text -----

© 2024 ALKANE RESOURCES 12
----- End of picture text -----

NMPP District Exploration

Porphyry clusters at all (alteration) levels[(*6)]

Haddington

4022RA138 - 2m @ 2.9g/t Au, 0.51% Cu from 4m

NKRC3 - 18m @ 0.95g/t Au, 0.15% Cu from 64m, incl 2m @ 5.7g/t Au, 0.44% Cu

Glen Hollow

COMRC009 - 45m grading 0.87g/t Au, 0.24% Cu from 60m including 21m grading 1.51g/t Au, 0.41% Cu from 84m.

Driell Creek

  • DRC004 - 130m grading 0.25g/t Au, 0.11% Cu from 174m to end of hole. DRC010 - 47.7m grading 0.12g/t Au, 0.15% Cu from 279.3m incl 7m grading 0.34g/t Au, 0.26% Cu from 320m and 2m grading 0.12g/t Au, 0.19% Cu from 333m and 54m grading 0.17g/t Au, 0.04% Cu from 463m and 5m grading 0.16g/t Au, 0.11% Cu from 539m

Follow up AC, RC and DD to commence before end of 2024

==> picture [350 x 514] intentionally omitted <==

© 2024 ALKANE RESOURCES 13

South Junee Porphyry Project

==> picture [299 x 427] intentionally omitted <==

==> picture [298 x 423] intentionally omitted <==

==> picture [85 x 62] intentionally omitted <==

Acquired by Alkane in May 2023.

Work completed by Alkane includes review of magnetic, gravity and lithgeochem data from recon drilling.

New airborne gravity survey to assist target definition.

Existing drill results include:[(*7)]

Imola

CBD01 110m @ 0.64g/t Au, 0.01% Cu from 139m incl 6m @ 1.74g/t Au, 0.01% Cu from 141m also 34m @ 1.14g/t Au, 0.01% Cu from 197m CBD17 16m @ 1.71g/t Au, 0.04% Cu from 276m incl 3m @ 6.80g/t Au, 0.04% Cu from 289m

Silverstone and Catalunya

CBD08 74m @ 0.15% Cu, 0.02g/t Au from 226m incl 6m @ 0.39% Cu, 0.03g/t Au from 226m also 3m @ 0.71% cu, 0.08g/t Au from 297m CBD09 50m @ 0.15% Cu, 0.04g/t Au from 282m incl 9m @ 0.35% Cu, 0.05g/t Au from 323m

© 2024 ALKANE RESOURCES 14

==> picture [161 x 126] intentionally omitted <==

==> picture [21 x 21] intentionally omitted <==

==> picture [21 x 21] intentionally omitted <==

==> picture [21 x 20] intentionally omitted <==

@alkaneresources alkane-resources-ltd alkane.com.au

==> picture [149 x 150] intentionally omitted <==

Tomingley Resources and Reserves (FY24)

==> picture [85 x 62] intentionally omitted <==

TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024) TOMINGLEY GOLD OPERATION MINERAL RESOURCES (as at 30 June 2024)
MEASURED INDICATED INFERRED TOTAL Total Gold
DEPOSIT Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
(Koz)
Open Pittable Resources (cut off 0.40g/t Au)
Caloma One 0 0.0 0 0.0 0 0.0 0 0.0 0
Sub Total 0 0.0 0 0.0 0 0.0 0 0.0 0
Underground Resources (cut off 1.3g/t Au)
Wyoming One 1013 2.7 763 2.2 108 2.1 1,884 2.5 149
Wyoming Three 46 2.2 24 2.0 20 1.9 90 2.1 6
Caloma One 602 2.2 916 2.0 469 2.0 1,987 2.1 132
Caloma Two 351 2.4 1261 2.4 462 1.8 2,074 2.3 153
Sub Total 2,012 2.5 2,964 2.2 1,059 1.9 6,035 2.3 441
TOTAL 2,012 2.5 2,964 2.2 1,059 1.9 6,035 2.3 441
TOMINGLEY GOLD EXTENSION PROJECT MINERAL RESOURCES (as at 30 June 2024)
MEASURED INDICATED INFERRED TOTAL Total Gold
DEPOSIT Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
(Koz)
Total Resources(cut off 0.4g/t Au Roswell and 0.5g/t Au San Antonio)
Roswell 3,900 1.7 0 0.0 3,900 1.7 213
San Antonio 5,930 1.8 1,389 1.3 7,319 1.7 406
Sub Total 0 0.0 9,830 1.8 1,389 1.3 11,219 1.7 619
Underground Resources (cut off 1.3 g/t Au and 1.3g/t Au McLeans)
Roswell 825 3.0 3,123 2.8 1,957 2.5 5,905 2.7 517
McLeans 0 0.0 870 2.5 870 2.5 70
Sub Total 825 3.0 3,123 2.8 2,827 2.5 6,775 2.7 587
TOTAL 825 3.0 12,953 2.0 4,216 2.1 17,994 2.1 1,206
TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024) TOMINGLEY GOLD OPERATION ORE RESERVES (as at 30 June 2024)
PROVED PROBABLE TOTAL Total
Gold
DEPOSIT Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
(Koz)
Open Pittable Reserves (cut off 0.40g/t Au)
Stockpiles 241 1.1 0 0 241 1.1 9
Sub Total 241 1.1 0 0.0 241 1.1 9
Underground Reserves (cut off 1.3g/t Au)
WyomingOne 87 1.9 105 1.7 192 1.8 11
Caloma One 86 1.8 105 1.8 190 1.8 11
Caloma Two 48 1.8 3 1.2 50 1.8 3
Sub Total 220 1.8 213 1.8 433 1.8 25
TOTAL 461 1.5 213 1.8 674 1.6 34
TOMINGLEY GOLD EXTENSION PROJECT ORE RESERVES (as at 30 June 2024)
PROVED PROBABLE TOTAL Total
Gold
DEPOSIT Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
Tonnage
(Kt)
Grade
(g/t Au)
(Koz)
Open Pittable Reserves (cut off 0.40g/t Au)
Roswell 0 0.0 3,900 1.7 3,900 1.7 213
San Antonio 0 0.0 4,100 1.6 4,100 1.6 214
Sub Total 0 8,000 1.6 8,000 1.6 427
Underground Reserves (cut off 1.6g/t Au)
Roswell 881 2.4 2,202 2.4 3,082 2.4 236
San Antonio* 0 0.0 0 0.0 0 0.0 0
Sub Total 881 2.4 2,202 2.4 3,082 2.4 236
TOTAL 881 2.4 10,202 1.8 11,082 1.9 663

© 2024 ALKANE RESOURCES 16

*San Antonio Reserves not determined at this time.

Peak Hill – Lithogeochemical Study

==> picture [85 x 62] intentionally omitted <==

==> picture [194 x 253] intentionally omitted <==

==> picture [377 x 228] intentionally omitted <==

==> picture [374 x 236] intentionally omitted <==

Super heated fluids and gases rise through fractures from intruding magma, react with wall rocks and cool. Resultant minerals highlight fluid outflow areas and vector to porphyry source.

© 2024 ALKANE RESOURCES 17

Boda – Kaiser Ounces per Vertical Metre

==> picture [85 x 62] intentionally omitted <==

Boda Kaiser Combined MRE 2024 AuEq (g/t) Vertical Profile

==> picture [463 x 316] intentionally omitted <==

----- Start of picture text -----

OPVM & METRES DRILLED
0 5000 10000 15000 20000 25000
0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750 OPVM
800
850
900 Drill Support
950
1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
DEPTH (METRES)
----- End of picture text -----

==> picture [309 x 370] intentionally omitted <==

DEG Hemi Gold Project Mineral Resource Estimate 2024 ASX 14 Nov 2024

© 2024 ALKANE RESOURCES 18