ANNUAL GENERAL MEETING
Sydney 16 May 2013
2012 FINANCIAL RESULTS
Revenue A$96.7M Profit A$66.5M Earnings $0.19 per share Net Assets A236.4M 1
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
-
Listed on ASX since 1969, also listed on OTCQX
-
Market cap $200M
-
6,100 shareholders (85% Australian)
-
Multi commodity explorer, miner and developer focused on Central West of NSW
-
Active in region for more than 20 years
-
Developed Peak Hill Gold Mine in 1996, operated to 2005
-
Tomingley Gold Mine construction underway, first gold production late 2013
-
World-class Dubbo Zirconia Project (DZP) feasibility and environmental assessment nearing completion
-
Successful ongoing exploration
Corporate Profile
==> picture [280 x 412] intentionally omitted <==
2
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
-
Two advanced projects
-
Dubbo Zirconia Project (DZP)
-
Tomingley Gold Project (TGP)
-
World supplier of zirconium, niobium and rare earths elements
-
MOUs and agreements for planned production from DZP
-
DZP to commence production Q1 2016
-
Gold production from TGP early 2014
-
Continued exploration success
Alkane Today
==> picture [300 x 200] intentionally omitted <==
==> picture [300 x 213] intentionally omitted <==
3
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Base case statistics
-
Project approval by NSW Department of Planning and Infrastructure late July 2012. Mining Lease approved February 2013
-
Resource – 12.6 Mt @ 2.0g/t (812,000oz)
-
CAPEX – A$107M
-
Throughput – 1.0Mtpa
-
Head Grade – 2.00g/t
-
Recoveries – 93%
-
Gold Production – average 50 - 60,000ozpa
-
Operating Costs – ~$980/oz
-
EBITDA - $166M (current spot at $1,450/oz)
-
Life – 7.5years (targeting +10 years)
-
Mine method – open cut & underground
-
Caloma Two resource estimate
Commissioning anticipated late 2013
Tomingley Gold Project
==> picture [331 x 417] intentionally omitted <==
4
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
TGP Construction Images
==> picture [277 x 185] intentionally omitted <==
Concrete footings for central plant systems
==> picture [268 x 185] intentionally omitted <==
Thickener foundations
==> picture [275 x 186] intentionally omitted <==
Water pipeline trencher
==> picture [274 x 186] intentionally omitted <==
Pipeline welding station
5
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
==> picture [327 x 418] intentionally omitted <==
TGP Resource Expansion
Geological Summary – Wyoming / Caloma
==> picture [53 x 23] intentionally omitted <==
Pelitic Sediments
==> picture [53 x 22] intentionally omitted <==
Feldspar porphyry
==> picture [53 x 23] intentionally omitted <==
Volcaniclastic sediments
==> picture [53 x 23] intentionally omitted <==
Graphitic mudstone Volcaniclastic conglomerate Epidote altered volcanics Chlorite-talc schist Andesitic volcanics
==> picture [53 x 23] intentionally omitted <==
==> picture [53 x 23] intentionally omitted <==
==> picture [53 x 23] intentionally omitted <==
==> picture [53 x 23] intentionally omitted <==
Mineralisation
Additional Resource Potential Caloma Two open pit and underground Expand Wyoming One underground Caloma underground Myalls underground Wyoming Two and Three underground McLeans
7
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
TGP Caloma Two Drilling
==> picture [563 x 372] intentionally omitted <==
Drill out on a 20x20m basis to define resources 159 RC holes 22,782m 11 core holes 2,145m
7
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
TGP Caloma Two Section
Recent Drill Results 9m @ 110g/t Au incl 1m @ 821g/t Au 13m @ 12.0g/t Au 39m @ 4.52g/t Au incl 5m @ 14.8g/t Au 8m @ 6.46g/t Au 18m @ 3.18g/t Au incl 9m @ 5.52g/t Au 16m @ 5.99g/t Au 70m @ 1.89g/t Au incl 42m @ 3.77g/t Au
==> picture [566 x 416] intentionally omitted <==
7
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
-
Located 30 km south of Dubbo
-
World class resource of zirconium, hafnium, niobium, tantalum, yttrium and light and heavy rare earths elements
-
DFS April 2013, DZP “technically and financially robust project”
-
Base case of 20 year mine life and 1Mtpa production gives NPV of $1.23 billion
-
Mine life to be in excess of 70 years
-
EIS lodged shortly with NSW Department of Planning and Infrastructure
-
Expected to start production Q1 2016
Dubbo Zirconia Project
==> picture [306 x 418] intentionally omitted <==
9
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
DZP Process Flow Sheet
– Demonstration Pilot Plant established 2008 – ANSTO Aust. Nuclear Science & Technology Organisation – Process unique & advanced – Optimization ongoing Simple open cut mining operation Crushing and grinding Sulphuric acid leach whole of ore Solvent extraction, separation & refining Chemical precipitation Zirconium products Niobium products Heavy RE product Light RE product
10
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Rare Earths
-
REEs a group of 17 elements in periodic table in two distinctive groups, LREEs and HREEs
-
Variable magnetic and chemical properties give rise to many applications
-
Used for energy efficiency, new energy sources and emissions minimisation
-
China currently produces about 95% of world’s REE
-
REEs are 54% of DZP revenue, 30% HREE and 24% LREE
DZP LREE US$/kg
==> picture [306 x 168] intentionally omitted <==
----- Start of picture text -----
$180
$160
$140
$120
$100
US$/kg
$80
$60
$40
$20
$-
4Q 2Q 4Q 1Q 2Q 3Q 4Q 1Q
2010 2011 2011 2012 2012 2012 2012 2013
DZP LREE DZP DFS LREE Concentrate
----- End of picture text -----
==> picture [333 x 215] intentionally omitted <==
----- Start of picture text -----
DZP YHREE US$/kg
$350
$300
$250
$200
US$/kg
$150
$100
$50
$-
4Q 2Q 4Q 1Q 2Q 3Q 4Q 1Q
2010 2011 2011 2012 2012 2012 2012 2013
DZP YHREE DZP DFS YHREE Concentrate
----- End of picture text -----
Source: IMCOA 11
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Niobium
==> picture [151 x 114] intentionally omitted <==
-
Niobium (Nb) is a soft, rare metal which strengthens alloys, superalloys and steel
-
Used in pipeline construction, jet engines, heat-resistant and combustion equipment
-
Makes vehicle chassis lighter, reducing overall vehicle weight by 10%, lower fuel consumption and reduces emissions
==> picture [354 x 183] intentionally omitted <==
==> picture [352 x 254] intentionally omitted <==
----- Start of picture text -----
•
•
•
----- End of picture text -----
-
DZP alternative global supplier and only Australian producer in 2016
-
Possible additional tantalum revenue
-
Nb is 16% of DZP revenue
12
Sources: IAMGOLD / TZMI
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Zirconium
-
Zirconium is a corrosion and heat resistant metal, many common uses
-
Multiple ceramic applications
-
Used in a range of components for vehicles, such as car exhausts
-
Many chemical applications eg Replaced lead as drying agent in paints
==> picture [138 x 105] intentionally omitted <==
==> picture [429 x 266] intentionally omitted <==
----- Start of picture text -----
Zirconium Price Trends US$/kg
12000
10000
8000
US$/T 6000
4000
2000
0
4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q
2009 2010 2010 2010 2010 2011 2011 2011 2011 2012 2012 2012 2012 2013
Zircon 65% ZrO2 Fused Zirconia 99.0% ZrO2
Chemical Zirconia 99.5% ZrO2 ZOC 36.0% ZrO2
----- End of picture text -----
-
China currently produces 90% of world downstream zirconium chemicals
-
DZP expected to produce 15,800tpa of zirconium products (ZrO2 units)
-
ZrO 2 is 31% of DZP
-
revenue
Averaged quarterly prices as compiled from multiple sources
Source: TCMS
13
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
-
Competitive advantage with unique flow sheet developed and proved at ANSTO
-
Production of light and heavy rare earths concentrates, value added processing by partner Shin-Etsu in Japan
-
25% of resource is high value HREE, less common and more valuable than LREE
-
US Department of Energy, five critical rare earth elements in short supply:
-
Four HREE (Yttrium, Dysprosium, Terbium and Europium)
-
One LREE (Neodymium)
-
All will be produced by DZP
DZP on the world stage
==> picture [310 x 221] intentionally omitted <==
==> picture [212 x 232] intentionally omitted <==
==> picture [85 x 57] intentionally omitted <==
----- Start of picture text -----
Source: US
Department of
energy, Critical
Materials strategy,
Dec 2010
----- End of picture text -----
14
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
DZP Marketing
Off-take
| Memorandums of Understandings (MOU’s) / Agreements | Memorandums of Understandings (MOU’s) / Agreements | Memorandums of Understandings (MOU’s) / Agreements |
|---|---|---|
| MOU | Product | Details |
| 1 | Zirconium | Leading Chemical Company to develop applications for zirconia produced by DZP |
| 2 | Zirconium | Australian Mintech Chemical Industries to produce zirconium oxychloride |
| 3 | Zirconium | European manufacturing / trading company to market DZP products |
| 4 | Niobium | European alloy manufacturer JV to produce and market ferro-niobium |
| 5 | YREE | Japan Shin-Etsu Toll treatment JV for separation and sale |
-
Separate project to produce chemical zirconia for ceramics industries ramped up by AZL
-
Primary filter cake contains ~ 200ppm Ta2O5. At 1Mtpa this equates to about 200tpa (>400,000lbs pa ).
-
A program has commenced to review recovery of this valuable Ta2O5 product
15
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
DZP Product Output
==> picture [514 x 342] intentionally omitted <==
----- Start of picture text -----
100%
4%
911t
$149.4M
90%
18% 3,997t 30%
80%
9% 1,967t
70%
$118.7M
60%
24%
50%
15,827t
$81.5M
40%
16%
70%
30%
20% $153.9M
31%
10%
0%
Production 22,702T Revenue A$503.5M
ZrO2 Nb metal LREO concentrate HREO concentrate
----- End of picture text -----
11
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
DZP Feasibility Study
| DUBBO ZIRCONIA PROJECT Financial Summary for 20 year life in A$ |
DUBBO ZIRCONIA PROJECT Financial Summary for 20 year life in A$ |
|---|---|
| Project Capacity | 1,000,000 tonnes pa |
| Capex – Plant | $396.8M |
| Sulphuric Acid Plant | $116.6M |
| Infrastructure + Owners | $253.4M |
| SUB TOTAL | $766.8M |
| EPCM | $63.5M |
| Contingency (20%) | $166.1M |
| TOTAL | $996.4M |
| Annual Revenue | $503.5M |
| Annual Operating Costs | $213.5M |
| Annual EBITDA | $290.0M |
| IRR* | 19.3% |
| NPV* | $1,235M |
*** 20 year life, pre-tax, 8% discount rate**
17
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Environmental Impact
Environmental Impact Statement – key areas of focus
- Existing land use (agriculture)
==> picture [479 x 330] intentionally omitted <==
-
Socio-economic
-
Air quality
-
Noise and vibration
-
Surface and ground water
-
Soil stability
-
Flora and fauna
-
Biodiversity
-
Visibility
-
Rail freight movements
-
Road traffic
-
Aboriginal and European heritage
-
Natural radioactivity
-
EIS scheduled to be lodged with NSW Dept of Planning and Infrastructure May 2013
18
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Financing
-
$1 billion DZP finance package being arranged by:
-
Credit Suisse (Australia)
-
Sumitomo Mitsui Banking Corporation
-
Petra Capital
-
Finance sources:
-
Possible sale of a strategic minority stake in DZP
-
International Government funding (ECA)
-
Commercial debt facility
-
Public equity raising
-
12 months timeline
-
Coincides with final project approvals, allowing construction to commence in Q2 2014.
19
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
• Bodangora gold-copper prospect
-
Alkane 100%, near Wellington, NSW
-
Exploration and drilling over 12 km²
-
Similarities to Newcrest’ nearby Cadia-Ridgeway gold-copper mine
• Galwadgere gold copper prospect
-
Alkane 100%, near Wellington, NSW
-
Estimated resource 2Mt @ 1.0 per cent copper and 0.3g/t gold
-
Drilling continues
• Cudal gold-zinc prospect
-
Alkane 100%, west of Orange, NSW
-
Best drill intercept 17m @ 1.2 g/t gold and 2.9% zinc
-
Interesting target, further drilling
Exploration
==> picture [301 x 370] intentionally omitted <==
20
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Outlook
Dubbo Zirconia Project
-
Global strategic significance – a long term project in the zirconium and heavy rare earth industries
-
Substantial cash flows – based on 20 year DFS – ~A$250Mpa
-
Actual mine life – DFS + 50 years
-
Production costs – spread across four products, insulation from price fluctuations
Tomingley Gold Project
-
Cash flow insurance against any DZP delays
-
Provides operating expertise
-
Cash flow – based on 7 year DFS – ~A$20-25Mpa
-
Actual mine life – DFS + 3 years
Exploration
- Tight geographical focus, exploration success, further development potential
Currently cash and RRL shares total ~$130 million
21
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Conclusion
-
Alkane transformation underway – long term investment opportunity
-
Development strategy of multi-commodity operations
-
Substantial emerging cash flow – ~A$275Mpa after 2016
-
Aspects of upside
-
Longer mine life at TGP and DZP
-
Higher recoveries
-
Potential recovery and sale of tantalum, not in DFS
-
Positive outcomes from joint ventures
-
Potential for exploration projects to convert to developments
-
Building capacity to pay dividends
22
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Board
-
John Stuart Ferguson Dunlop (Chairman). BE(Min), MEngSc(Min). Mining engineer with 40 years surface and underground mining experience in Australia and overseas. Former director of the Australian Institute of Mining and Metallurgy. Chairman of Alliance Resources and NonExdirector of Copper Strike Limited
-
David Ian Chalmers (Managing Director). MSc. Geologist with over 40 years experience in the mining and exploration industry in all facets of exploration through feasibility and development to the production phase in Australia and overseas. 30 years involvement in rare metal and rare earth exploration and development.
-
Ian Jeffrey Gandel (Director). LLB, BEc. Extensive experience in retail property and resource companies. Former Director of Gandel Retail Trust. Investor in the mining industry through Gandel Metals. Executive Director of Alliance Resources, and Chairman of Gippsland Ltd and Octagonal Resources Ltd.
-
Anthony Dean Lethlean (Director) BAppSc . Geologist with 10 years mining experience. Former resources analyst with various resource bankers and stockbrokers. Currently a director of Helmsec Global Capital Limited. Non-executive director of Alliance Resources Ltd .
Board & Management
Senior Management
-
Karen Brown (Joint Company Secretary) BEc
-
Lindsay Colless (Joint Company Secretary) CA
-
Michael Ball (Chief Financial Officer) CA BCom
-
Terry Ransted (Chief Geologist). BSc .
-
Michael Sutherland (General Manager NSW). BSc
-
Tony Wright (Commercial Manager).
-
Henry Kaye (TGP Project Manager) – Mechanical Engineer
-
Sean Buxton (TGP Operations Manager) – Mining Engineer
Senior Consultants
-
Fiona Morgan (TGP EPCM – Mintrex) – Mechanical Engineer
-
Greg Foster (TGP EPCM – Mintrex) – Mechanical Engineer
-
Steve Gilman (DZP - Consulting Director TZMI) – Metallurgist
-
Gavin Diener (DZP - Consulting Director TZMI) – Chemical Engineer
-
Alister MacDonald (DZP - Marketing TCMS) - Ceramic Engineer
-
Natalie Chapman (Corporate Communications Manager)
-
Westbrook Financial Services (Media Advisors)
23
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
DPP Video
==> picture [280 x 194] intentionally omitted <==
==> picture [264 x 185] intentionally omitted <==
Y and HREE refiningand recovery
DPP Filtration, PLS, SX, Zr and Nb recovery
==> picture [262 x 197] intentionally omitted <==
==> picture [295 x 196] intentionally omitted <==
Reverse osmosis and water recycle
Zirconium refiningand precipitation
Operating at ANSTO since 2008
24
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Disclaimer
Disclaimer
This presentation contains certain forward looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed of implied by these forward looking statements depending on a variety of factors. Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geosciences.
Competent Person
The information in this presentation that relates to mineral exploration, mineral resources and ore reserves is based on information compiled by Mr D I Chalmers, FAusIMM, FAIG, (director of the Company) has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Ian Chalmers consents to the inclusion in the presentation of the matters based on his information in the form and context in which it appears.
25
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Resource & Reserves: Dubbo + Galwadgere
Dubbo Zirconia Project – Mineral Resources
| Toongi | Tonnage | ZrO2 | HfO2 | **Nb2O5 ** | **Ta2O5 ** | Y2O3 | REO | U3O8 |
|---|---|---|---|---|---|---|---|---|
| Deposit | (Mt) | (%) | (%) | (%) | (%) | (%) | (%) | (%) |
| Measured | 35.70 | 1.96 | 0.04 | 0.46 | 0.03 | 0.14 | 0.75 | 0.014 |
| Inferred | 37.50 | 1.96 | 0.04 | 0.46 | 0.03 | 0.14 | 0.75 | 0.014 |
| Total | 73.20 | 1.96 | 0.04 | 0.46 | 0.03 | 0.14 | 0.75 | 0.014 |
These Mineral Resources are based upon information compiled by Mr Terry Ransted MAusIMM (Principal, Multi Metal Consultants Pty Ltd) who is a competent person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Terry Ransted consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The full details of methodology were given in the 2004 Annual Report.
Dubbo Zirconia Project – Ore Reserves
| Toongi | Tonnage | ZrO2 | HfO2 | Nb2O5 | Ta2O5 | Y2O3 | REO |
|---|---|---|---|---|---|---|---|
| Deposit | (Mt) | (%) | (%) | (%) | (%) | (%) | (%) |
| Proved | 8.07 | 1.91 | 0.04 | 0.46 | 0.03 | 0.14 | 0.75 |
| Probable | 27.86 | 1.93 | 0.04 | 0.46 | 0.03 | 0.14 | 0.74 |
| Total | 35.93 | 1.93 | 0.04 | 0.46 | 0.03 | 0.14 | 0.74 |
These Ore Reserves are based upon information compiled by Mr Terry Ransted MAusIMM (Alkane Chief Geologist) who is a competent person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The reserves were calculated at a1.5% combined ZrO2+Nb2O5+Y2O3+REO cut off using costs and revenues defined in the notes in ASX Announcement of16 November 2011. Terry Ransted consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Wellington – Galwadgere – Mineral Resources
| DEPOSIT | MEASURED | INDICATED | ||||
|---|---|---|---|---|---|---|
| 0.5% Cu cut off | Tonnage | Grade | Grade | Tonnage | Grade | Grade |
| (t) | (% Cu) | (g/t) | (t) | (% Cu) | (g/t) | |
| Galwadgere | - | - | 2,090,000 | 0.99 | 0.3 |
These Mineral Resources are based upon information compiled by Mr Terry Ransted MAusIMM (Principal, Multi Metal Consultants Pty Ltd) who is a competent person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Terry Ransted consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The full details of methodology were given in the 2005 Annual Report
20
==> picture [72 x 33] intentionally omitted <==
==> picture [130 x 31] intentionally omitted <==
Resource & Reserves: Tomingley + Peak Hill
Tomingley (TGP) – Mineral Resources
| DEPOSIT | MEASURED | MEASURED | INDICATED | INDICATED | INFERRED | INFERRED | TOTAL | ||
|---|---|---|---|---|---|---|---|---|---|
| Top Cut | Tonnage | Grade | Tonnage | Grade | Tonnage | Grade | Tonnage | Grade | Gold |
| 2.5x2.5x5.0m model | (t) | (g/t) | (t) | (g/t) | (t) | (g/t) | (t) | (g/t) | (koz) |
| Wyoming One | 2,316,550 | 2.2 | 890,340 | 2.2 | 3,117,350 | 1.7 | 6,324,240 | 1.9 | 392.4 |
| Wyoming Three | 642,470 | 2.0 | 63,225 | 2.0 | 102,820 | 1.3 | 808,510 | 1.9 | 49.9 |
| Caloma | 2,690,530 | 2.3 | 567,860 | 2.1 | 2,194,490 | 1.9 | 5,452,870 | 2.1 | 369.4 |
| Total | 5,649,550 | 2.2 | 1,521,420 | 2.1 | 5,414,660 | 1.8 | 12,585,630 | 2.0 | 811.7 |
These Mineral Resources are based upon information compiled by Mr Richard Lewis MAusIMM (Lewis Mineral Resource Consultng Pty Ltd) who is a competent person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Richard Lewis consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The full details of methodology are given in the ASX Reports dated 25 March 2009, 2 October 2010 and 29 March 2012.
Tomingley (TGP) – Ore Reserves
| DEPOSIT | PROVED | PROBABLE | TOTAL |
|---|---|---|---|
| Tonnage Grade |
Tonnage Grade |
Tonnage Grade Ounces |
|
| (t) (g/t) |
(t) (g/t) |
(t) (g/t) |
|
| Wyoming One | 1,700,000 1.6 |
200,000 1.3 |
1,900,000 1.6 94,500 |
| Wyoming Three | 500,000 1.6 |
0 0.0 |
500,000 1.6 28,100 |
| Caloma | 1,100,000 2.3 |
100,000 1.7 |
1,200,000 2.2 86,500 |
| Total | 3,300,000 1.8 |
300,000 1.5 |
3,600,000 1.8 209,100 |
These Ore Reserves are based upon information compiled under the guidance of Mr Dean Basile MAusIMM (Mining One Pty Ltd) who is a competent person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Reserves and Resources are estimated at an effective A$1,540 per ounce gold price. Dean Basile consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.
Peak Hill – Mineral Resources
| DEPOSIT | MEASURED | INDICATED | INFERRED | TOTAL |
|---|---|---|---|---|
| 0.5g/t gold | Tonnage Grade |
Tonnage Grade |
Tonnage Grade |
Tonnage Grade k Ounces |
| cut off | (t) (g/t) |
(t) (g/t) |
(t) (g/t) |
(t) (g/t) |
| Proprietary | 9,440,000 1.35 |
1,830,000 0.98 |
11,270,000 1.29 467.4 |
|
| 3.0g/t gold | Tonnage Grade |
Tonnage Grade |
Tonnage Grade |
Tonnage Grade k Ounces |
| cut off | (t) (g/t) |
(t) (g/t) |
(t) (g/t) |
(t) (g/t) |
| Proprietary P | 810,000 4.40 |
810,000 4.40 114.6 |
These Mineral Resources are based upon information compiled by Mr Terry Ransted MAusIMM (Principal, Multi Metal Consultants Pty Ltd) who is a competent person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Terry Ransted consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The full details of methodology were given in the 2004 Annual Report.
21