ALDORO RESOURCES LIMITED Capital/Financing Update 2020

Oct 28, 2020

64422_rns_2020-10-28_009bafda-6345-4410-b00d-5ce472810e4a.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [596 x 77] intentionally omitted <==

Major Ni-Cu-PGE Project - Narndee is Go!

Highlights

ASX Announcement 29 October 2020 ASX Code: ARN

Board

  • complex in Australia 100% owned by Aldoro

  • “Julimar-style” Ni-Cu-PGE potential, historic exploration shows working sulphide mineral system

  • Numerous gossans with up to 10.5m at 1.50% Ni from surface

  • Shallow sulphide intersections up to 0.70% Ni; 0.84% Cu; 0.21g/t Pt and 5.16g/t Pd[1] - with little or no follow up

  • Surface geochemical anomalies of up to 6,190ppm Ni, 672ppm Cu and 595ppb Pt+Pd in soil and maglag

  • Airborne VTEM[TM] Max survey by UTS Geophysics commencing in late November

Rhod Grivas

Non-Executive Chairman Dr Caedmon Marriott Managing Director Joshua Letcher Non-Executive Director

Capital Structure

Shares: 66.38m Options: 8.5m Share Price: $0.094 Market Cap: $6.24m Cash (30/06/20): $2.20m

==> picture [15 x 15] intentionally omitted <==

@aldororesources aldororesources Aldoro Resources

==> picture [15 x 15] intentionally omitted <==

==> picture [15 x 15] intentionally omitted <==

Aldoro Resources Limited (“Aldoro” or “Company”) is pleased to announce to shareholders the commencement of major exploration efforts at the Narndee Igneous Complex. This project will be a significant focus for the Company from now and into 2021.

Aldoro has been completing a thorough review of the project, and all available historic data, for several months and is now in a position to commence exploration work with an initial VTEM[TM] Max airborne electromagnetic (EM) survey scheduled to be flown in late November by UTS Geophysics. This will be followed up with ground geophysics, including gravity, EM and magnetics, and geochemical programs to define drill targets for later in 2021.

The Narndee-Windimurra Complex is the largest layered mafic-ultramafic complex in Australia. Aldoro holds 100% of the basal ultramafic portion of the complex around Narndee with tenements covering approximately 306km[2] . The Narndee Igneous Complex (NIC) has been historically explored by major companies such as INCO (1970’s), BHP (1980’s) and Falconbridge (2000’s), looking for PGE reef deposits following a Bushveld-model. Aldoro will apply modern exploration techniques and thinking to focus on magmatic nickel sulphide potential, looking for constrained magma conduit environments that host major Ni-Cu-PGE deposits such as Nova-Bollinger, Voisey’s Bay and the recent Julimar discovery.

Commenting on the Narndee Project Aldoro’s Managing Director Caedmon Marriott said:

“This is an incredible project for a small company like Aldoro to have ‘in the locker’. Historic exploration demonstrates a working sulphide mineral system but this exploration generally applied, and was hampered by, a rigid Bushveld-model, looking for PGE reef deposits in a passive magma environment. Aldoro will use modern thinking and exploration techniques, with the likes of the planned high-powered VTEM[™] Max survey, to focus on magmatic Ni-Cu sulphides and attempt to locate

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

possible constrained magma feeder conduits or chonoliths - host to deposits such as Nova-Bollinger, Voisey’s Bay and Julimar - in this type of layered mafic-ultramafic geology.

This is a genuine company making opportunity, all thanks to one person’s lifelong ambition to find a massive deposit at Narndee - that is now my ambition as well."

The Narndee Igneous Complex

The combined Narndee-Windimurra Complex is the largest layered mafic-ultramafic complex in Australia, located in the Murchison Region of WA, 400km north-northeast of Perth, and to the southeast of Mount Magnet. Aldoro’s Narndee Project comprises three exploration tenements (E59/2223, E59/2238 and E59/2258) covering approximately 306km[2] of the predominantly ultramafic portion of the Narndee Igneous Complex (NIC) ( note: Aldoro’s tenement application ELA59/2431 covers the only other known major ultramafic portion of the Narndee-Windimurra Complex at Mulyeron Hill ).

This type of layered mafic-ultramafic geology is host to a number of recent nickel sulphide discoveries, such as Chalice Gold Mine’s ( ASX:CHN ) Julimar discovery, as well as other globally significant deposits such as Nova-Bollinger ( ASX:IGO ) and Voisey’s Bay.

==> picture [438 x 386] intentionally omitted <==

Figure 1: Regional Location Map

www.aldororesources.com

E: [email protected]

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

Early work on the NIC by INCO in the 1970’s identified a number of nickel-sulphide gossans, just to the south of Milgoo Peak. They undertook mostly very shallow drilling with best results of 10.5m at 1.50% Ni from surface and 7.5m at 1.53% Ni from surface.

Subsequent work by BHP in the 1980’s and Falconbridge in the early 2000’s (in JV with Apex Minerals and Mark Creasy) focused on looking for stratiform PGE reef mineralisation using a Bushveld-model (largely because the Nardee-Windimurra Complex is one of the few rare examples in the world of comparable scale where this model could be invoked).

Falconbridge conducted geochemical surface sampling across the NIC finding widespread NiCu-PGE anomalies of up to 6,190ppm Ni, 672ppm Cu and 595ppb Pt+Pd in soil and magnetic lag samples (Figure 2). They conducted a 20 hole reverse circulation (RC) drilling program, the most comprehensive program to date within Aldoro’s under-explored 306km[2] project area - with only 37 holes deeper than 100m drilled within the Narndee Project area, including these Falconbridge holes.

Despite finding good indications of Ni-Cu mineralisation (e.g. NARC-03-19 8m at 0.51% Ni, 0.13% Cu and 0.12g/t Pt+Pd from 124m and NARC-03-15 1m at 0.61% Ni, 0.17% Cu and 1.1g/t Pt+Pd from 241m) in only disseminated sulphide units (trace to 15% sulphide minerals) no follow up work was conducted, being constrained by the PGE focus and Bushveld-model.

Ni-Cu-PGE Potential

A geological interpretation and review of the Ni-Cu-PGE prospectivity of the Narndee-Windimurra Complex by Bunting (2004)[2] presents the idea that “ the complexes, long considered separate, may be part of the same giant layered intrusion, with Narndee representing the lower, ultramaficbearing series of the intrusion and Windimurra the more gabbroic and anorthositic middle and upper parts ”. If this were the case then the implication is that the NIC would be unlikely to host Bushveld-like PGM reef deposits (with the lowest units of the Windimurra being prospective for this) and instead the NIC would be prospective for Ni-Cu-PGE sulphide mineralisation in basal zones of the complex and/or in constrained feeder conduits (chonoliths). However, only limited dedicated Ni-Cu-PGE sulphide exploration has been undertaken at Narndee to date .

Maximus Resources ( ASX:MXR ) held Aldoro’s current project area from 2005 to 2014. They flew an airborne REPTEM survey over the entire Narndee-Windimurra area and conducted some widely spaced ground Moving Loop EM (MLEM) lines across the NIC. Whilst this generated a number of EM targets, Maximus only drilled 8 RC holes across the NIC, intersecting evidence of Ni-Cu-PGE mineralisation, including MNRC0002 3m at 0.43% Ni, 0.50% Cu and 0.19g/t Pt+Pd from 99m in disseminated sulphide units, but with little to no follow up work.

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

==> picture [497 x 659] intentionally omitted <==

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

Exploration Strategy

Aldoro has spent several months completing a thorough review of the project, including collating all available historic data.

The management of the geophysical aspects of the project is being led by Russell Mortimer at Southern Geoscience Consultants (SGC). Russell has managed the EM and geophysical programs for a number of the recent major nickel sulphide discoveries in WA including Mawson ( Legend Mining, ASX:LEG ), Carr Boyd ( Estrella Resources, ASX:ESR ), Andover ( Azure Minerals, ASX:AZS ) and Sahara in the Western Grawler, SA ( Western Areas, ASX:WSA ).

Southern Geoscience have reprocessed the Maximus REPTEM survey. The data from this relatively low-powered technique was found to have high noise levels and as such SGC focused on looking for anomalies in mid channels and mid to late channels, rather than the noisier late channels. Over 50 REPTEM anomalies have been identified (Figure 3), many forming clusters of anomalies defining conductive trends, often associated with magnetic high features cross-cutting the prevailing layered stratigraphy, and with good correlation to historic maglag geochemical anomalies. However, the data quality makes it hard to determine if these are genuine bedrock conductors.

Aldoro have engaged UTS Geophysics to complete a VTEM[TM] Max airborne EM survey over the NIC to better define the EM anomalies. The Company considers this to be the best airborne EM system available, reflecting Aldoro’s exploration approach to the project. An approximately 900 line km survey at 150m spacing is planned covering the core 107km[2] (6.5km x 16.5km) area of the NIC. The VTEM[TM] Max system is currently being used for a major exploration program in the Paterson Region and then Aldoro is the next survey in line, currently scheduled for late November.

Targets arising from the VTEM[TM] Max survey will be followed up with ground-based geophysical surveys such as gravity and MLEM, in conjunction with geochemistry and structural interpretation, to gain a thorough understanding of the targets before drill testing. Aldoro will employ a methodical approach rather than simply wildcatting “hot spots”.

In parallel with the geophysical work Aldoro has reviewed historic geochemical surveys and is in the process of completing a geological and structural interpretation of the NIC with the aid of ASTER satellite imagery. Further geochemical survey work testing key areas is also planned. This multifaceted exploration approach aims to gain a thorough understanding of the NIC and its NiCu-PGE potential.

The Narndee Project will be a significant focus for Aldoro from now and into 2021. The Company looks forward to updating shareholders on the progress of our ongoing exploration activities in due course.

This Announcement has been approved for release by:

Caedmon Marriott Managing Director

1.

2. The Nickel-PGE Potential of the Narndee and Windimurra Intrusions, John Bunting, June 2004

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

==> picture [497 x 660] intentionally omitted <==

Figure 3: REPTEM Anomalies and Planned VTEM Max

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

About Aldoro Resources

Aldoro Resources Ltd is an ASX-listed ( ASX:ARN ) mineral exploration and development company. Aldoro has a collection of gold and nickel focused advanced exploration projects all located in Western Australia. The Company’s flagship gold project is the Penny South Gold Project, which is contiguous to Ramelius Resources ( ASX:RMS ) Penny West Project in the Youanmi Gold Mining District, in the Murchison Region of WA. Aldoro is also currently exploring Unaly Hill South (Au), the Narndee Igneous Complex (Ni-Cu-PGE) and Kiabye Well (Au). The Company’s other projects include the Cathedrals Belt Nickel Project, with a significant tenement holding surround St George Mining’s ( ASX:SGQ ) Mt Alexander Project, the Leinster Nickel Project (Ni), Windimurra Igneous Complex (Ni-Cu-PGE, Li) and Ryans Find (Au, Ni-Cu-PGE).

Competent Persons Statement

The information in this announcement that relates to Exploration Results and other technical information complies with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and has been compiled and assessed under the supervision of Dr Caedmon Marriott, Managing Director of Aldoro Resources Ltd. Caedmon is a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. He has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the JORC Code. Caedmon consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

Disclaimer

Some of the statements appearing in this announcement may be in the nature of forward looking statements. You should be aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and uncertainties include factors and risks specific to the industries in which Aldoro operates and proposes to operate as well as general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets, among other things. Actual events or results may differ materially from the events or results expressed or implied in any forward looking statement. No forward looking statement is a guarantee or representation as to future performance or any other future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies, many of which will be outside Aldoro’s control.

Aldoro does not undertake any obligation to update publicly or release any revisions to these forward looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions or conclusions contained in this announcement. To the maximum extent permitted by law, none of Aldoro, its Directors, employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information contained in this announcement. You are cautioned not to place undue reliance on any forward looking statement. The forward looking statements in this announcement reflect views held only as at the date of this announcement.

This announcement is not an offer, invitation or recommendation to subscribe for, or purchase securities by Aldoro. Nor does this announcement constitute investment or financial product advice (nor tax, accounting or legal advice) and is not intended to be used for the basis of making an investment decision. Investors should obtain their own advice before making any investment decision.

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

Hole Easting (MGA Z50) Northing (MGA Z50) Depth (m) Dip Azimuth By
NARC-03-15 610,900 6,806,000 250 -60 270 Falconbridge
NARC-03-19 606,660 6,807,800 233 -60 270 Falconbridge
NARC-03-20 609,550 6,803,300 251 -60 270 Falconbridge
ND001 609,710 6,803,113 70 -60 270 Wedgetail Resources
ND005 609,801 6,803,373 124 -60 270 Wedgetail Resources
MNRC0002 609,760 6,804,700 203 -70 270 Maximus Resources
Z11529 610,836 6,802,755 39 -90 0 INCO
Z11568 610,772 6,802,783 30 -90 0 INCO
Z11574 610,799 6,802,762 30 -90 0 INCO

Hole From (m) To (m) Intersection (m) Ni (%) Cu (%) Pt (ppb) Pd (ppb)
NARC-03-15 241 242 1 0.61 0.17 117 957
NARC-03-19 124 132 8 0.51 0.13 21 106
NARC-03-20 220 221 1 0.59 0.14 211 421
ND001 54 55 1 0.70 0.39 92 368
ND005 113 114 1 0.32 0.12 184 5,160
MNRC0002
including
99
100
102
101
3
1
0.50
0.64
0.43
0.84
18
30
167
185
Z11529 0 12 12 1.19 0.008 Not analysed Not analysed
Z11568 0 7.5 7.5 1.53 0.008 Not analysed Not analysed
Z11574 0 10.5 10.5 1.50 0.005 Not analysed Not analysed

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

Narndee

JORC Code, 2012 Edition - Table 1 Section 1: Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random
chips, or specifc specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fre assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
detailed information.
• Historical sampling over the project area in the
last 50 years has been various with the following
techniques noted: mapping and costeaning; rock
chip, stream and surface maglag/soil sampling;
ground and airborne magnetic surveys; RAB,
aircore, percussion, RC and limited diamond
drilling; ground and airborne EM surveys
• A list of previous explorers is given in Section 2
with their primary focus being on PGE
exploration within the layered complex
• Falconbridge collected approximately 9,500 soil,
stream and magnetic lag surface geochemical
samples across the Narndee Complex. They
trialled various preparation and digest techniques
(aqua regia, partial digest, micro cyanide and
four acid) in orientation surveys before settling on
aqua regia and multi-element ICP-M/OES for the
bulk of their surface geochemical work
• The latest REPTEM airborne EM survey by
Maximus Resources in 2008 was completed at
400m line spacing, totalling approximately 1400
line km, at a 30m loop height over the entire
Narndee-Windimurra Complex
• Given the lack of historic detail and inability to
verify the drill results from the various drilling
programs are indicative only
• Historic sampling and drilling by previous
explorers used best industry standards for that
time, results are considered indicative only with
limited ability to verify and audit these results
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
• Drilling techniques used by previous explorers
include RAB, aircore, percussion, RC and limited
diamond drilling
• Drilling used best practice for that time and
results are unable to be verifed
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fne/coarse material.
• There are no records available regarding sample
recoveries for the historic drilling programs
• No records are available
• Insufcient information available from public
records to review grade bias in relation to sample
recovery

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
• Geological logging was completed and is
available in hard copy format suitable for frst
pass exploration
• Logging is qualitative in nature
• All drill holes were geologically logged
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or
all core taken.
• If non-core, whether rifed, tube sampled, rotary split,
etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected, including
for instance results for feld duplicate/second-half
sampling.
• Whether sample sizes are appropriate to the grain size of
the material being sampled.
• No core is available for the project
• Sample preparation is considered suitable as a
frst pass exploration program to indicate zones
for further testing
• QAQC and sampling protocols for previous
percussion/RAB/RC drilling in the project area is
unknown
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
• No geophysical tools were noted in the historical
drilling programs
• There are no QAQC records relating to the
historical exploration
• No mention of QAQC issues afecting the results
were made but this cannot be verifed based on
available data
Verifcation of
sampling and
assaying
• The verifcation of signifcant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures,
data verifcation, data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• No verifcation by independent personnel
• No twin holes were noted
• All data from the programs is primarily stored in
hardcopy format
• It is not known whether any adjustments have
been made, but this cannot be verifed based on
available data
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
• Specifcation of the grid system used.
• Quality and adequacy of topographic control.
• Accuracy and precision of historic drill
coordinates are unknown. All later drill holes
were located using a handheld GPS with
accuracy of +/-3m
• Coordinates presented are in GDA94 Zone 50.
Some of the historic programs used local grids,
these local grids are temporary in nature and
conversion to GDA is based on factors which
may lead to a low level of accuracy
• There is no detailed documentation regarding the
accuracy of the topographic control

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

Criteria JORC Code explanation Commentary
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufcient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifcations applied.
• Whether sample compositing has been applied.



• Given the frst pass nature of the exploration
programs the spacing of the exploration drilling
is appropriate for understanding the exploration
potential and the identifcation of broad
anomalous zones
• Not applicable as frst pass exploration drilling
• Sampling compositing over 4m intervals was
applied in more recent RC drilling, with reassay
of 1m intervals for any signifcant intersections
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be
assessed and reported if material.





• The drilling orientation is variable through the drill
programs, no comment can be made at this
point on whether the azimuth and dip has
resulted in biased sampling due to insufcient
information
• There is no apparent bias in the drilling
orientation used that has been noted in public
records
Sample
security
• The measures taken to ensure sample security. • No records available on sample security
measures
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.

• No sampling techniques or data have been
independently audited

Section 2: Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness
or national park and environmental settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
• Tenements E59/2223, E59/2238 and E59/2258
• Held by Gunex Pty Ltd a 100% owned subsidiary
of Altilium Metals Pty Ltd which in turn is a 100%
owned subsidiary of Aldoro Resources Limited
• GSR to original tenement holder
• Tenement is in good standing, no native title
interests and no known historical or
environmentally sensitive areas with the tenement
areas
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other
parties.
Previous relevant exploration was undertaken by:
Westralian Nickel-INCO (1960s-70s)
BHP-Hunter Resources (1985-90)
Wedgetail Resources (2001)
Apex Minerals-Mark Creasy (2001-06)
Falconbridge-Apex-Mark Creasy (2002-03)
Maximus Resources (2005-14)

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

Criteria JORC Code explanation Commentary
Geology • Deposit type, geological setting and style of
mineralisation.
The Narndee Project is located within the Youanmi
Terrane of the Yilgarn Craton, close to a major
structural boundary between the Murchison and
Southern Cross Domains. Regional geology is
dominated by Archaean granite-greenstone
terranes (greenstone 2.8-3.0 billion years, granites
2.6-2.95 billion years) and the Windimurra Group of
layered mafc intrusions (2.847 billion +/- 71 million
years). These bodies represent the largest layered
mafc-ultramafc intrusive complex in Australia. The
Narndee Igneous Complex forms the primary
component of the Boodanoo Suite and is divided
into three broad units of stratigraphy: Ultramafc
Zone, Lower Zone and Main Zone. Historic
exploration has generally focused on stratiform
PGE-reef mineralisation whereas Aldoro’s focus will
be on massive magmatic nickel sulphide deposits
Drill hole
information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth hole length.
• If the exclusion of this information is justifed on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain
why this is the case.
• A listing of the historic drill hole information
material to the understanding of the historic
exploration results is provided in the body and
appendices of this announcement
• Historic drilling by previous explorers used best
practice for that time.
• The use of any data is recommended for
indicative purposes only in terms of potential Ni-
Cu-PGE mineralisation and for developing
exploration targets.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-of
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• Raw composited sample intervals have been
reported and aggregated where appropriate
• No metal equivalent values have been quoted
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this efect
(eg ‘down hole length, true width not known’).
• All results referenced are based on down-hole
lengths and may not refect true width of
mineralisation or thickness of host litholiges
which is unknown
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
signifcant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
• Appropriate maps and tabulations are presented
in the body of the announcement

E: [email protected]

www.aldororesources.com

T: +61 475 116 798

==> picture [596 x 77] intentionally omitted <==

Criteria JORC Code explanation Commentary
Balanced
reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
• Only selected drill intersections have been
mentioned and due to the nature of the drilling
and lack of adequate records and survey control,
they are considered indicative only and not
material
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• Falconbridge completed an airborne magnetic
and radiometric survey over the NIC using a fxed
wing aircraft and Scintrex Cesium Vapour CS-2
Magnetometer and Exploranium GR820
Spectrometer. Lines were fown E-W at 100m
spacing and 35m sensor height. This survey was
reprocessed by Southern Geoscience and forms
the base image for a number of fgures in this
announcement
Further work • The nature and scale of planned further work (eg tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
• Planned exploration will include a high-powered
VTEM Max airborne EM survey, followed by
ground geophysical surveys such as gravity,
magnetics and MLEM, and eventually followed
by drill testing
• Exploration is at an early stage and future work
will depend on results

E: [email protected]

www.aldororesources.com

T: +61 475 116 798