Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ALBRIGHT METALS LTD Capital/Financing Update 2018

Jul 4, 2018

64281_rns_2018-07-04_2a0ceed6-ac68-42ce-8dae-7517c6ce294d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement

5 July 2018

New Manganese Prospects Identified in Bryah Basin

HIGHLIGHTS

  • Reconnaissance mapping and sampling identifies high-grade manganese at two new prospects - Black Caviar and Devils Hill.

  • Surficial high-grade manganese recorded in rock chip sampling:

  • Black Caviar Prospect: 49.1%, 48.5%, 44.1% and 41.6% Mn, and

  • Devils Hill Prospect: 42.1% and 41.0% Mn.

  • Outcropping manganese mineralisation at Devils Hill has been mapped over a length of at least 600 metres and represents the largest unmined manganiferous area identified by the Company to date.

  • Drilling of Devils Hill, Black Caviar and Black Hill Prospects to commence following DMIRS works approvals and site clearances.

  • MLEM survey successfully completed over 6 copper-gold targets.

Bryah Resources Limited (“Bryah” or “the Company”) is pleased to provide an update on its exploration within its Bryah Basin Project in central Western Australia.

Follow-up reconnaissance mapping by Company personnel in May and June 2018 identified several areas which are prospective for manganese and collected rock chip samples. Laboratory results from these rock chip samples have now been received. Additional rock chip samples from other areas are still with the laboratory awaiting analysis.

Significant assay results were recorded from 2 new prospects named Black Caviar and Devils Hill (see Figure 1).

At the Black Caviar Prospect the results from a total of 4 samples collected were 49.1%, 48.5%, 44.1% and 41.6% Mn . At the Devils Hill Prospect the best assays recorded were 42.1% and 41.0% Mn from 13 samples collected over a significant area.

Details of these and other sample assay results are shown in Table 1 and in Figures 2 and 3.

Black Caviar Prospect

The Black Caviar Prospect consists of a manganese capped area and lies in the same stratigraphic position as the Black Hill Prospect which is located 6 km to the south (see Figure 1).

Address ASX Code: BYH Projects Level 1, 85 Havelock Street ABN: 59 616 795 245 Bryah Basin – Copper, Gold, West Perth WA 6005 Shares on issue: 56,350,120 Manganese Tel: +61 8 9321 0001 Latest Share Price: $0.11 Gabanintha – Gold, Copper Email: [email protected] Market Capitalisation: $6.2M bryah.com.au

==> picture [596 x 83] intentionally omitted <==

==> picture [452 x 575] intentionally omitted <==

Figure 1 – Bryah Basin Tenements and Regional Geology Map

There is no evidence of previous exploration or drilling of the Black Caviar Prospect, nor a number of other sampled manganese outcrops located to the east thereof (see Figure 2).

Address Level 1, 85 Havelock Street Page 2 of 11 West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

==> picture [459 x 319] intentionally omitted <==

Figure 2 – Satellite imagery showing Black Caviar Prospect, sample locations and results

Devils Hill Prospect

The Devils Hill Prospect lies immediately south of the historic Mudderwearie mining areas (see Figure 3). Outcropping manganese mineralisation (see Plates 1 and 2) has been mapped over a length of at least 600 metres and represents the largest unmined manganiferous area identified by the Company to date.

Clearing of lines for drilling has been undertaken by previous explorers (circa 2010) on parts of the prospect, however there is no evidence that any drilling was undertaken.

The area has been recently cleared by a heritage survey so the Company intends to drill test parts of this prospect as a priority once Department of Mines, Industry Regulation and Safety (DMIRS) Programme of Works approvals are received.

MLEM Survey

The ground-based Moving Loop Electromagnetic (MLEM) survey over 6 high priority coppergold target areas ( see ASX announcement dated 29 June 2018 ) has been completed. The Company is pleased to report that the MLEM survey has successfully confirmed the presence of conductors in all six locations. Conductor plate modelling is underway and should be completed next week. Final drill hole collar locations will be identified from the conductor plate modelling.

Address Level 1, 85 Havelock Street Page 3 of 11 West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

==> picture [469 x 324] intentionally omitted <==

Figure 3 – Satellite imagery showing Devils Hill Prospect, sample locations with earlier and latest results (BRYRK189-193 and BRYRK217-224).

Follow-up Exploration Activities

An exploration team will return to site shortly to undertake the following activities:

  • Site preparation ahead of drilling of copper-gold targets at the Aquarius Project area;

  • Additional reconnaissance, mapping and sampling of manganese exploration targets within the Company’s tenements and on areas secured under the Option Agreements with Peak Hill Manganese Pty Ltd ( see ASX announcement dated 7 May 2018 ).

  • Continuation of a soil geochemistry survey on a 500m x 500m grid over a large portion of the Company’s tenement package, which will assist in exploration for copper-gold and manganese deposits.

Drilling of manganese targets at the Black Hill, Black Caviar and Devils Hill Prospects is being planned to commence once all permitting and site clearances have been obtained.

Address Level 1, 85 Havelock Street Page 4 of 11 West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

==> picture [459 x 318] intentionally omitted <==

Plate 1 – Outcropping and scree Manganese at the Devils Hill Prospect

==> picture [459 x 286] intentionally omitted <==

Plate 2 – Outcropping and scree Manganese at the Devils Hill Prospect

Address Level 1, 85 Havelock Street Page 5 of 11 West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

Table 1 – Bryah Basin Project Manganese Samples - Laboratory Results

Sample ID Northing
mN
Easting
mE
Mn
%
Fe
%
Al2O3
%
SiO2
%
P
%
BRYRK189 7166597 666585 23.57 12.61 7.51 28.26 0.13
BRYRK190 7166542 666526 35.65 12.25 7.48 7.54 0.16
BRYRK191 7166483 666410 33.55 17.06 7.56 3.5 0.16
BRYRK192 7166546 666380 39.71 7.48 9.26 6.86 0.09
BRYRK193 7166511 666523 37.33 9.77 7.86 9.26 0.09
BRYRK194 7165696 665407 37.23 10.20 8.79 7.93 0.07
BRYRK195 7165690 665408 31.32 14.88 8.94 10.08 0.08
BRYRK217 7166540 666374 42.24 5.52 9.38 6.25 0.07
BRYRK218 7166520 666449 41.00 10.41 6.31 3.97 0.14
BRYRK219 7166541 666504 31.44 13.90 10.56 7.84 0.10
BRYRK220 7166690 666756 40.45 6.21 8.56 7.92 0.07
BRYRK221 7166653 666900 36.89 8.52 8.55 8.7 0.13
BRYRK222 7166636 666960 36.39 13.03 5.39 7.46 0.17
BRYRK223 7166693 667050 31.95 17.57 7.48 6.65 0.23
BRYRK224 7166668 667106 27.66 26.36 4.97 5.08 0.12
BRYRK226 7193840 645341 32.63 18.56 3.15 7.59 0.36
BRYRK227 7192840 645319 31.32 12.74 6.58 15.38 0.20
BRYRK228 7192843 645278 30.06 7.73 7.99 24.91 0.02
BRYRK229 7192970 644512 41.63 13.50 3.16 3.21 0.03
BRYRK230 7193000 644546 48.49 8.20 2.35 2.34 0.05
BRYRK231 7193010 644540 49.11 8.11 2.45 1.09 0.04
BRYRK232 7192945 644585 44.13 14.74 1.05 1.13 0.06
BRYRK237 7165760 667953 38.35 13.91 5.27 3.87 0.20
BRYRK238 7165727 667910 21.51 29.55 5.2 6.47 0.43
BRYRK239 7165712 667893 19.89 32.20 5.73 4.33 0.48

For Further Information, please contact

Neil Marston Managing Director

Tel: +618 9321 0001

Page 6 of 11

Address Level 1, 85 Havelock Street West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

About Bryah Resources Limited

In October 2017 Bryah Resources Limited was admitted to the official list on the Australian Securities Exchange (ASX). The Company is a copper-gold-manganese focused explorer with 2 projects located in central Western Australia, being the 718 km[2] Bryah Basin Project and the 202km[2] Gabanintha Project.

The Bryah Basin is host to the high-grade copper-gold mines at DeGrussa, discovered by Sandfire Resources NL in 2009, and at Horseshoe Lights, which was mined up until 1994. The Bryah Basin also has several historical and current manganese mines.

Bryah Resources Limited’s exploration strategy is:

  • to apply the best and latest exploration methods to evaluate the ground;

  • to use high resolution geophysics to identify deeper structures and potentially mineralised zones;

  • to drill test targets below the depth of previous drilling, and

  • to apply maximum funds on exploration activities.

At Gabanintha, Bryah holds the rights to all minerals except Vanadium/Uranium/Cobalt/Chromium/ Titanium/Lithium/Tantalum/Manganese & Iron Ore (Excluded Minerals). Australian Vanadium Limited retains 100% rights in the Excluded Minerals on the Gabanintha Project.

Competent Persons Statement

The information in this announcement that relates to Exploration Results is based on information compiled by Mr Rohan Williams, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Williams is an employee of Bryah Resources Limited (“the Company”). Rohan Williams has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Rohan Williams consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

Forward Looking Statements

This report may contain certain “forward-looking statements” which may not have been based solely on historical facts, but rather may be based on the Company’s current expectations about future events and results. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties, assumptions and other factors which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Readers should not place undue reliance on forward looking information. The Company does not undertake any obligation to release publicly any revisions to any “forward looking statement” to reflect events or circumstances after the date of this report, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

Page 7 of 11

Address Level 1, 85 Havelock Street West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [163 x 48] intentionally omitted <==

Manganese Exploration and Sampling

JORC Code, 2012 Edition – Table 1 Exploration Results

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting
the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the appropriate calibration of
any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed information.

Rock samples were collected with sample sizes of
between 2kg and 5kg from recorded locations.
Drilling
techniques

Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc).

No drilling undertaken in this programme.
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the samples.

Whether a relationship exists between sample recovery and grade and whether sample bias may have
occurred due to preferential loss/gain of fine/coarse material.

No drilling undertaken in this programme.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a level of detail to
support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

The total length and percentage of the relevant intersections logged.

No drilling undertaken in this programme.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

Measures taken to ensure that the sampling is representative of the in-situ material collected, including
for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

The sample sizes are considered appropriate to correctly
represent the surface manganese mineralisation.

Page 8 of 11

==> picture [163 x 48] intentionally omitted <==

Criteria JORC Code explanation Commentary
Quality of
assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and whether
the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
determining the analysis including instrument make and model, reading times, calibrations factors
applied and their derivation, etc.

Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been
established.

Laboratory checks and samples containing standards
were included in the analyses.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification, data storage (physical and
electronic) protocols.

Discuss any adjustment to assay data.

No drilling undertaken in this programme.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

All sample locations were located by the Field Geologist
using a conventional hand-held GPS.

The grid system for the Bryah Project is MGA_GDA94
Zone 50.
Data spacing
and distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.

Whether sample compositing has been applied.

As this programme was a reconnaissance programme
the sample results are indicative in nature and are not
necessarily representative of the surrounding geology.

Outcrop samples were not composited.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent
to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this should be assessed and reported if material.

No drilling undertaken in this programme, so the
relationship of samples collected to geological structures
is not known.
Sample
security

The measures taken to ensure sample security.

The samples collected were placed in calico bags and
transported to the relevant Perth laboratory by courier.

Sample security was not considered a significant risk.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.

The Company database has been compiled from primary
data by independent database consultants and was
based on original assay data and historical database
compilations.

A regular review of the data and sampling techniques is
carried out internally.

Page 9 of 11

==> picture [163 x 48] intentionally omitted <==

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or material issues with
third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical
sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any known impediments to obtaining
a licence to operate in the area.

The relevant tenements are 100% owned by Bryah
Resources Limited.

At the time of reporting, there are no known impediments
to obtaining a licence to operate in the area and the
tenements are in good standing.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.

The manganese deposits in the region were discovered
during the gold rush period between 1897 and 1911
however were of little interest to explorers at the time.

Mining operations between 1948 and 1967 received the
focus of early exploration.

Manganese exploration conducted by BHP Limited, King
Mining Corporation Ltd, Valiant Consolidated Ltd and
various others since the 1960’s was concentrated mainly
around the historic pits at Elsa Group, Millidie, Horseshoe
South, Mudderwearie and Ravelstone.

Tuart Resources Limited and Peak Hill Manganese Pty
Ltd undertook regional exploration over a large portion of
the Bryah and Padbury Basins in the period after 2000,
identifying numerous manganese anomalies from satellite
imagery and aerial photography. Only limited on-ground
exploration of many of these anomalies was undertaken.
Geology
Deposit type, geological setting and style of mineralisation.

These manganese occurrences are within the Lower
Proterozoic Bryah and Padbury Basins. Manganese
deposits are a product of prolonged weathering and
oxidation of sedimentary rocks and chemical
concentration and re-deposition of manganese within
ancient drainage systems. Most of the manganese
deposits are remnants of former drainage
palaeochannels. Although detailed surveys have not
been completed, the location of most manganese
deposits appears to be at about the elevation of the
former palaeosurface. These deposits are now left as
hilltop mesas or cappings (inverted relief).

Page 10 of 11

==> picture [163 x 48] intentionally omitted <==

Criteria JORC Code explanation Commentary
Drill hole
Information

A summary of all information material to the understanding of the exploration results including a
tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.

If the exclusion of this information is justified on the basis that the information is not Material and this
exclusion does not detract from the understanding of the report, the Competent Person should clearly
explain why this is the case.

No drilling undertaken in this programme.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low
grade results, the procedure used for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly stated.

No high-grade cuts have been applied to the reporting of
exploration results.

No metal equivalent values have been used.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be
reported.

If it is not known and only the down hole lengths are reported, there should be a clear statement to this
effect (e.g. ‘down hole length, true width not known’).

As this programme was a limited programme of
reconnaissance sampling no relationships can be
established.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any
significant discovery being reported These should include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.

See attached figures within this announcement.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of
both low and high grades and/or widths should be practiced to avoid misleading reporting of
Exploration Results.

All results are reported without any cut-off grades.
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but not limited to):
geological observations; geophysical survey results; geochemical survey results; bulk samples – size
and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating substances.

No other exploration data available.
Further work
The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or
large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially sensitive.

Drilling has been planned by the Company but not
undertaken to date.

Page 11 of 11