Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ALBRIGHT METALS LTD Capital/Financing Update 2018

Aug 26, 2018

64281_rns_2018-08-26_dfe76c55-4332-488e-ab6f-f49e7824d71e.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement

27 August 2018

Sulphides Intersected in Drilling at Jupiter Prospect

HIGHLIGHTS

  • Reverse Circulation (RC) drilling commenced at the Jupiter Prospect.

  • First hole (BBC007) drilled to test Moving Loop Electromagnetic (MLEM) conductor modelled at 225-275 metres down hole depth.

  • Sulphide rich zone over 13 metres intersected between 224 -237 metres down hole depth, interpreted to be part of the EM conductor.

  • Sulphide rich zone consists of coarse and fine-grained pyrite associated with quartz veining and disseminated pyrite in basalt with massive pyrite concentrations of up to 30% of the rock mass observed.

  • Samples in transit to laboratory - assay results pending.

  • Results at Jupiter provides great confidence to drill the 5 other EM anomalies recently identified by the various geophysical surveys.

  • Drilling is ongoing with the rig now drilling at Mars 1 EM target.

Bryah Resources Limited (“Bryah” or “the Company”) would like to provide an update on the Reverse Circulation (RC) drilling at its Aquarius Project at the Company’s Bryah Basin Project in central Western Australia.

Drilling commenced earlier this month at the Jupiter Prospect with the aim of testing six conductors identified by airborne (Variable Time Electromagnetic – VTEM) and ground (Moving Loop Electromagnetic - MLEM) surveys recently completed by the Company (see Figure 1).

The first deep (>200 metres) RC drill hole completed in this programme (BBC007) was designed to test an electromagnetic (EM) conductor, modelled by our consultant geophysicists to lie at a depth of 225-275 metres.

The Company is pleased to advise that the hole intersected a 13-metre-wide sulphide rich zone from 224-237 metres depth, which is considered to potentially be the source, or part thereof, of the EM conductor.

The sulphide material intersected consists of coarse and fine-grained massive, blebby and disseminated concentrations of pyrite associated with quartz veining in basalt. Massive sulphide pyrite concentrations of up to 30% of the rock mass were observed.

Address ASX Code:BYH Projects
Level 1, 85 Havelock Street ABN:59 616 795 245 Bryah Basin – Copper, Gold,
West Perth WA 6005 Shares on issue:56,350,120 Manganese
Tel:+61 8 9321 0001 Latest Share Price:$0.11 Gabanintha – Gold, Copper
Email:[email protected] Market Capitalisation:$6.2M bryah.com.au

==> picture [596 x 83] intentionally omitted <==

==> picture [459 x 584] intentionally omitted <==

Figure 1 – Bryah Basin Tenements and Regional Geology Map showing EM anomalies identified by recent EM surveys.

Address Level 1, 85 Havelock Street Page 2 of 15 West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

This hole was abandoned at a final depth of 246 metres (planned depth 300m) due to wet sample recovery. A significant amount of water was intersected throughout this hole from a depth of approximately 156 metres. A follow-up drill hole, BBC008, was collared 50 metres NE of BBC007 to test the up-dip extension of the sulphide zone intersected in BBC007 (see Figure 2).

However, hole BBC008 was also abandoned at 162 metres depth (planned depth 260m) due to water, before the expected target depth for the up-dip extension of the sulphide zone intersected in BBC007. Hole BBC008 was successfully cased with PVC in order to permit a Down Hole Electromagnetic (DHEM) survey to be undertaken.

Samples from hole BBC007 are being transported to an independent laboratory in Perth this week for priority analysis. The Company will report laboratory results as soon as possible.

Earlier, the Company drilled a line of 3 drill holes approximately 200 metres along geological strike to the NW of BBC007 (see Figure 2). All holes drilled (BBC004-BBC006) also encountered water and, due to the unavailability of additional auxiliary air, drillers struggled to maintain dry sample recovery. Despite some samples being wet, the geology observed in these holes was encouraging (see Table 2).

Drill hole BBC004 was drilled to 127 metres depth (planned depth 120m) and intersected water from 86m, with complete oxidation to 105m. Quartz – carbonate - sericite veins as well as chlorite, sericite and siliceous alteration was observed.

Drill hole BBC005 was drilled to 93 metres depth (planned depth 140m) and was abandoned due to wet samples from 80 metres. The hole ended in altered basalt with frequent quartz - carbonate veining.

Drill hole BBC006 was drilled to 124 metres depth (planned depth 160m) and was also abandoned due to wet samples. Quartz – carbonate – sericite veins as well as chlorite, sericite and siliceous alteration was observed. From 118m – 121m fine grained disseminated and blebby pyrite in a bleached alteration zone was observed with up to 6% of the rock mass consisting of pyrite. From 121 – 124m (EOH due to ingress of water) an estimate of 3% disseminated pyrite was observed. Samples from BBC004-BBC006 have also been sent to the laboratory for analysis.

The presence of so much water in the area of drill holes BBC004-BBC008 means the Company may have to switch to diamond drilling to improve sample recovery in this exciting area. A decision on this will be made as soon as the laboratory assays for BBC004-BBC007 are received. The Company will also endeavour to undertake a DHEM survey of BBC008 ahead of follow-up drilling.

The intersection of sulphide material in BBC007, which coincides with the modelled conductor plate gives the Company great confidence about drilling the other five high priority EM conductors at Mars 1, Mars 2, Mars 3, Peak Hill 1 and Peak Hill 2 (see Figure 1).

Address Level 1, 85 Havelock Street Page 3 of 15 West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

==> picture [452 x 538] intentionally omitted <==

Figure 2 – Jupiter Prospect Drill hole location plan overlain on VTEM image (Ch30 1vd NE sun)

Address Level 1, 85 Havelock Street Page 4 of 15 West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

The drill rig has been moved to the Mars 1 EM target and has commenced drilling the first 300 metre deep hole.

Drilling of EM targets at Jupiter and Mars is being co-funded with up to $150,000 from the Western Australian State Government under its Exploration Incentive Scheme ( refer to ASX Announcement dated 30 May 2018 ).

For Further Information, please contact

Neil Marston Managing Director

Tel: +61 9321 0001

Table 1 – Drill Hole Information

Jupiter Prospect Jupiter Prospect Jupiter Prospect
RC Drilling Programme
Drill Hole Information
Hole ID Northing
(m)
Easting
(m)
Planned
Azimuth
(degrees)
Planned
Dip
(degrees)
Planned
Hole
Depth
(m)
Actual
Hole
Depth
(m)
BBC001 7191420 659281 030 -60 120 121
BBC002 7191388 659261 030 -60 160 163
BBC003 7191330 659591 030 -60 160 100
BBC004 7190606 660567 045 -60 120 127
BBC005 7190530 660486 045 -60 140 93
BBC006 7190447 660406 045 -60 160 124
BBC007 7190325 660555 045 -60 300 246
BBC008 7190360 660590 045 -60 260 162

Page 5 of 15

Address Level 1, 85 Havelock Street West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

Table 2 – Summary Geology

Jupiter Prospect
RC Drilling Programme
Summary Geology
Hole From
(m)
To
(m)
Summary Geology
BBC001 0 28 Weathered Ravelstone Sediments
28 49 Slightly weathered volcaniclastics
49 59 Jasperoidal chert with trace sulphides (<0.1%) and up to 10% quartz-
carbonate veining
59 86 Slightly weathered Narracoota Mafic Volcanics and Sediments
86 121 Fresh Narracoota Mafic Volcanics and Sediments
BBC002 0 25 Slightly weathered Proterozoic Dolerite
25 163 Fresh Proterozoic Dolerite
BBC003 0 28 Slightly weathered Proterozoic Dolerite
28 100 Fresh Proterozoic Dolerite
BBC004 0 42 Strongly Weathered Mafic Narracoota Volcanics and Sediments with
localisedquartz – carbonate veining
42 86 Strongly Weathered Mafic Narracoota Volcanics and volcanogenic
sediments
86 121 Strongly Weathered Mafic Narracoota Volcanics and volcanogenic
sediments (intermittent wet samples 86-104m, 104-121m wet samples)
121 127 Slightly Weathered Mafic Narracoota Volcanics and volcanogenic
sediments (wet samples)
BBC005 0 27 Strongly Weathered Mafic Narracoota Volcanics and volcanogenic
sediments
27 76 Strongly Weathered Mafic Narracoota Volcanics and volcanogenic
sediments with localisedquartz – carbonate veining
76 81 Moderately Weathered Mafic Narracoota Volcanics and volcanogenic
sediments with regularquartz – carbonate veiningupto 75%
81 86 Slightly Weathered Mafic Narracoota Volcanics and volcanogenic
sediments with regular quartz – carbonate veining up to 10% (wet
samples)
86 87 Slightly Weathered Mafic Narracoota Volcanics with quartz – carbonate -
pyrite veiningof 50% (wet samples)
87 93 Slightly Weathered Mafic Narracoota Volcanics and volcanogenic
sediments with regular quartz – carbonate veining up to 10% (wet
samples)

Page 6 of 15

Address Level 1, 85 Havelock Street West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

Table 2 – Summary Geology (cont)

Jupiter Prospect
RC Drilling Programme
Summary Geology
Hole From
(m)
To
(m)
Summary Geology
BBC006 0 66 Strongly Weathered Mafic Narracoota Volcanics with localised quartz –
carbonate veining
66 106 Strongly Weathered Mafic Narracoota Volcanics and volcanogenic
sediments
106 118 Slightly Weathered Mafic Narracoota Volcanics with chlorite – sericite -
silica alteration
118 121 Slightly Weathered Mafic Narracoota Volcanics with chlorite – sericite -
silica alteration and 6% disseminated and blebby pyrite
121 124 Slightly Weathered Mafic Narracoota Volcanics with chlorite – sericite -
silica alteration and 3% disseminated and blebby pyrite (wet samples)
BBC007 0 60 Strongly Weathered Mafic Narracoota Volcanics
60 144 Slightly Weathered Mafic Narracoota Volcanics with localised quartz –
carbonate veining
144 156 Slightly Weathered Mafic Narracoota Volcanics with chlorite – sericite
alteration and localisedquartz veining
156 180 Slightly Weathered Mafic Narracoota Volcanics with chlorite – sericite
alteration and localisedquartz veining(intermittent wet samples)
180 224 Fresh Mafic Narracoota Volcanics with chlorite – sericite alteration with
up to 3% disseminated pyrite and quartz veining up to 15% (intermittent
wet/drysamples)
224 237 Fresh Mafic Narracoota Volcanics with epidote - chlorite – sericite - silica
alteration with up to 30% massive, disseminated and blebby pyrite and up
to 15%quartz veining(intermittent wet/drysamples)
237 246 Fresh Mafic Narracoota Volcanics with chlorite – sericite - silica alteration
with up to 3% disseminated pyrite and quartz veining up to 10%
(intermittent wet/moist samples)
BBC008 0 40 Strongly Weathered Mafic Narracoota Volcanics
40 49 Slightly Weathered Mafic Narracoota Volcanics with localised quartz –
carbonate veining
49 50 Slightly Weathered Mafic Narracoota Volcanics with 70% quartz –
carbonate veiningand 5% disseminatedpyrite
50 70 Moderately Weathered Mafic Narracoota Volcanics with very localised
quartz – carbonate veining
70 107 Moderately Weathered Mafic Narracoota Volcanics with very localised
quartz – carbonate veiningand veryminor disseminatedpyrite (0.5%)
107 117 Fresh Mafic Narracoota Volcanics with chlorite alteration
117 119 Fresh Mafic Narracoota Volcanics with chlorite alteration and minor
quartz veining (10%)and disseminatedpyrite(3%)
119 162 Fresh Mafic Narracoota Volcanics with chlorite alteration and localised
minor quartz veining (5%)

Page 7 of 15

Address Level 1, 85 Havelock Street West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [596 x 83] intentionally omitted <==

About Bryah Resources Limited

In October 2017 Bryah Resources Limited was admitted to the official list on the Australian Securities Exchange (ASX). The Company is a copper-gold-manganese focused explorer with 2 projects located in central Western Australia, being the 720 km[2] Bryah Basin Project and the 202km[2] Gabanintha Project. In addition, the Company holds a one-year option to acquire the historic Horseshoe South Manganese Mine and the Manganese mineral rights over a further 154km[2] of ground in the Bryah Basin.

The Bryah Basin is host to the high-grade copper-gold mines at DeGrussa, discovered by Sandfire Resources NL in 2009, and at Horseshoe Lights, which was mined up until 1994. The Bryah Basin also has several historical and current manganese mines.

Bryah Resources Limited’s copper-gold exploration strategy is:

  • to apply the best and latest exploration methods to evaluate the ground;

  • to use high resolution geophysics to identify deeper structures and potentially mineralised zones, and

  • to drill test targets below the depth of previous drilling.

At Gabanintha, Bryah holds the rights to all minerals except Vanadium/Uranium/Cobalt/Chromium/ Titanium/Lithium/Tantalum/Manganese & Iron Ore (Excluded Minerals). Australian Vanadium Limited retains 100% rights in the Excluded Minerals on the Gabanintha Project.

Competent Persons Statement

The information in this announcement that relates to Exploration Results is based on information compiled by Mr Rohan Williams, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Williams is an employee of Bryah Resources Limited (“the Company”). Rohan Williams has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Rohan Williams consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

Forward Looking Statements

This report may contain certain “forward-looking statements” which may not have been based solely on historical facts, but rather may be based on the Company’s current expectations about future events and results. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties, assumptions and other factors which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Readers should not place undue reliance on forward looking information. The Company does not undertake any obligation to release publicly any revisions to any “forward looking statement” to reflect events or circumstances after the date of this report, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

Page 8 of 15

Address Level 1, 85 Havelock Street West Perth WA 6005

Tel: +61 8 9321 0001 Email: [email protected]

==> picture [163 x 47] intentionally omitted <==

Appendix 1

JORC Code, 2012 Edition – Table 1 Exploration Results

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting
the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the appropriate calibration of
any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed information.

For this drilling programme Bryah Resources Limited
(Bryah Resources) is utilising angled Reverse Circulation
(RC) drill holes.

RC drilling was drilled to generally accepted industry
standard producing 1.0m samples which were collected
beneath the cyclone and then passed through a cone
splitter.

The splitter reject sample was collected into plastic
buckets and laid out on the ground in 20-40m rows.

The holes were sampled as initial 3m composites using a
PVC spear to produce an approximate representative 3kg
sample into pre-numbered calico sample bags.

Anomalous 3m composites will be individually assayed as
the 1m splits which were collected beneath the RC rig
cyclone and passed through the cone splitter.

The full length of each hole drilled was sampled.

All Bryah Resources samples collected are being
submitted to a contract commercial laboratory for drying,
crushing and homogenising the sample to produce a 50g
charge for fire assay and a separate sample for 4- acid
digest and 15 multi-element analysis using an Induced
Coupled Plasma Mass Spectrometer
Drilling
techniques

Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc).

Bryah Resources’ Reverse Circulation (RC) holes were
drilled with a contract RC drilling rig.

All RC holes were drilled using a 145mm (5.5in) face-
sampling drilling bit.
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the samples.

Whether a relationship exists between sample recovery and grade and whether sample bias may have
occurred due to preferential loss/gain of fine/coarse material.

The RC samples were not weighed or measured for
recovery.

To ensure maximum sample recovery and the
representivity of the samples, an experienced Company
geologist was present during drilling to monitor the
sampling process. Any issues were immediately rectified.

Sample recovery was recorded by the Company
geologist and this was based on how much of the sample

Page 9 of 15

==> picture [163 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary
is returned from the cyclone and cone splitter. This is
recorded as good, fair, poor or no sample.

Bryah Resources is satisfied that the RC holes have
taken a sufficiently representative sample of the interval
and minimal loss of fines has occurred in the RC drilling
resulting in minimal sample bias.

No twin RC drill holes have been completed to assess
sample bias.

At this stage no investigations have been made into
whether there is a relationship between sample recovery
and grade.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a level of detail to
support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

The total length and percentage of the relevant intersections logged.

All of the 1m RC samples were sieved and collected into
20m chip trays for geological logging of colour,
weathering, lithology, alteration and mineralisation for
potential Mineral Resource estimation and mining
studies.

RC logging is both qualitative and quantitative in nature.

All chip trays will be photographed both wet and dry.

The total length of the RC holes were logged. Where no
sample was returned due to cavities/voids it was
recorded as such.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

Measures taken to ensure that the sampling is representative of the in-situ material collected, including
for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

Sampling technique:
o
All RC samples were collected from the RC rig and
were collected beneath the cyclone and then
passed through the cone splitter.
o
The samples were generally dry and all attempts
were made to ensure the collected samples were
dry. However, on deeper portions of the drillholes
the samples were logged as moist and wet.
Following the return of up to 12m of wet samples
the holes were terminated.
o
The cyclone and cone splitter were cleaned with
compressed air at the end of every 6m RC drill rod.
o
The sample sizes were appropriate to correctly
represent the mineralisation based on the style of
mineralisation, the thickness and consistency of
intersections, the sampling methodology and
percent value assay ranges for the primary
elements.

Page 10 of 15

==> picture [163 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary

Quality Control Procedures
o
A duplicated sample was collected every 50 samples.
o
Certified Reference Material (CRM) samples were
inserted in the field every 50 samples containing a
range of gold and base metal values.
o
Blank washed sand material was inserted in the field
every 50 samples.
o
Overall QAQC insertion rate of 1:16.6 samples
o
Laboratory repeats taken and standards inserted at
pre-determined level specified by the laboratory.
o
Sample preparation in the Intertek (Maddington,
Western Australia) laboratory: The samples are
weighed dried for a minimum of 12 hours at 1000C,
then crushed to -2mm using a jaw crusher, and
pulverised by LM5 or disc pulveriser to -75 microns
for a 25g Lead collection fire assay to create a
homogeneous sub-sample. The pulp samples were
also analysed with 4 acid digest induced Coupled
Plasma Mass Spectrometer for 15 multi-elements
o
The sample sizes are considered appropriate to
correctly represent the mineralisation based on the
style of mineralisation, the thickness and consistency
of intersections, the sampling methodology and the
assay value ranges expected for both gold and
copper.
Quality of
assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and whether
the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
determining the analysis including instrument make and model, reading times, calibrations factors
applied and their derivation, etc.

Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been
established.

Duplicates and samples containing standards will be
included in the analyses.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification, data storage (physical and
electronic) protocols.

Discuss any adjustment to assay data.

Significant intersections have been independently verified
by alternative company personnel.

The use of twinned holes has not been implemented and
is not considered necessary at this stage of exploration.

The Competent Person has visited the site and

Page 11 of 15

==> picture [163 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary
supervised all the drilling and sampling process in the
field.

All primary data related to logging and sampling are
captured on paper logs and entered into Excel templates.

All paper copies of data have been stored.

All data will be sent to Perth and stored in the centralised
Access database with a Data Shed front end which is
managed by company geologists.

No adjustments or calibrations have been made to any
assay data, apart from resetting below detection values to
half positive detection.
Location of
data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

All collars were initially located by a Geologist using a
conventional hand-held GPS.

Following completion of the drilling the hole collars will be
independently surveyed by surveyors using a differential
GPS for accurate collar location and RL with the digital
data entered directly into the company Access database.

Downhole surveys are being completed on all the RC drill
holes by the drillers. They used a Reflex EZ-Shot
downhole multi-shot tool to collect the surveys every 30m
down the hole.

The grid system for the Bryah Basin prospect is
MGA_GDA94 Zone 50.

Topographic data is collected by a hand-held GPS.
Data spacing
and distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.

Whether sample compositing has been applied.

As this programme was a reconnaissance programme
there was considerable variation in the drill spacing and
drillhole orientation.

The drill spacing is not sufficient to establish the degree
of geological and grade continuity applied under the 2012
JORC code.

Sample compositing was been applied to this drilling
programme with 1m samples collected composited to 3m
composites or less if specified.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent
to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this should be assessed and reported if material.

The attitude of the lithological units is predominantly
south-westerly dipping to sub-vertical. Therefore, most
holes were drilled with an azimuth of 30 or 45 degrees to
intersect the structures at right angles to the orientation of
the lithological units. Some holes will be drilled in other
orientations to intersect specific mineralised structures,
but always with an attempt to drill orthogonal to the strike
of the interpreted structure. Due to locally varying

Page 12 of 15

==> picture [163 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary
intersection angles between drillholes and lithological
units all results are defined as downhole widths.

No drilling orientation and sampling bias has been
recognized at this time and it is not considered to have
introduced a sampling bias.
Sample
security

The measures taken to ensure sample security.

The samples collected were placed in calico bags and
transported to the relevant Perth laboratory by courier or
company contractor.

Sample security was not considered a significant risk.
Audits or
reviews

The results of any audits or reviews of sampling techniques and data.

The Company database has been compiled from primary
data by independent database consultants and was
based on original assay data and historical database
compilations.

A regular review of the data and sampling techniques is
carried out internally.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including agreements or material issues with
third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical
sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any known impediments to obtaining
a licence to operate in the area.

The relevant tenement (E52/3238) is 100% owned by
Bryah Resources Limited.

At the time of reporting, there are no known impediments
to obtaining a licence to operate in the area and the
tenement is in good standing.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.

Previous exploration in the Jupiter Prospect has been
undertaken by Barrack Exploration during the period
1986-1990 where programmes of aeromagnetic
surveying, geological mapping, soil sampling, vacuum
and RAB drilling were completed.

Sabminco NL undertook exploration programmes of
ground EM, shallow RAB and RC drilling in the area to
the east of Jupiter in 1993-1995.

Both explorers identified the prospectivity of the area
however exploration results were not generally followed
up due to external funding and land access factors.

Page 13 of 15

==> picture [163 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary
Geology
Deposit type, geological setting and style of mineralisation.

The Jupiter Prospect consists of a sequence of folded
sub-cropping Narracoota Formation within a series of
North-West trending, anticlinal domes. The Narracoota
Formation volcanics occupy the central axis position of
the interpreted dome structures. An overlying ridge
forming chert is strata-parallel and its distribution is
consistent with the dome structures and generally dips
away from the central fold axis. Overlying the chert
sequence and the underlying Narracoota Formation are
sediments of the Ravelstone Formation.

The primary exploration target at Jupiter is VMS
mineralisation similar to the nearby Horseshoe Lights
Copper-Gold Mine where mineralisation occurs in the
core of a NNW trending and SE plunging parasitic
anticline, that is overturned to produce intermediate SW
dips on western limbs and steep SW dips on eastern
limbs. The massive and disseminated sulphide envelope
of the deposit itself is also SW dipping and plunging to
the SSE (150o) and was likely folded. It sits within altered
basalt and mafic volcaniclastic units along the contact
withoverlyingfelsicvolcanic schist.
Drill hole
Information

A summary of all information material to the understanding of the exploration results including a
tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.

If the exclusion of this information is justified on the basis that the information is not Material and this
exclusion does not detract from the understanding of the report, the Competent Person should clearly
explain why this is the case.

Refer to Tables 1 and 2 of this ASX Announcement.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low
grade results, the procedure used for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly stated.

No high-grade cuts have been applied to the reporting of
exploration results.

No metal equivalent values have been used.

Page 14 of 15

==> picture [163 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be
reported.

If it is not known and only the down hole lengths are reported, there should be a clear statement to this
effect (e.g. ‘down hole length, true width not known’).

As this programme is on-going no relationships have
been established.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any
significant discovery being reported These should include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.

See attached figures within this announcement.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of
both low and high grades and/or widths should be practiced to avoid misleading reporting of
Exploration Results.

No assay results have been received or reported.
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be reported including (but not limited to):
geological observations; geophysical survey results; geochemical survey results; bulk samples – size
and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating substances.

No other exploration data available.
Further work
The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or
large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially sensitive.

Drilling is on-going.

Page 15 of 15