Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ALARA RESOURCES LIMITED Capital/Financing Update 2012

May 15, 2012

64461_rns_2012-05-15_c208c540-f6f6-43c7-a356-e698f04712fd.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Alara Resources Limited ABN 27 122 892 719 Level 14, The Forrest Centre 221 St Georges Terrace Perth, Western Australia 6000

Telephone | +61 8 9214 9787 Facsimile | +61 8 9322 1515 Web | www.alararesources.com E-mail | [email protected]

==> picture [124 x 82] intentionally omitted <==

ASX/MEDIA RELEASE

16 May 2012

Drilling Update – Khnaiguiyah Zinc Copper Project

Perth: Australian-based minerals exploration and development company Alara Resources Limited (ASX: AUQ) ( Alara ) is pleased to report the results from an ongoing drilling programme at its flagship Khnaiguiyah Zinc-Copper Project in Saudi Arabia.

The drilling results announced today confirm the presence of significant additional mineralisation to the maiden Khnaiguiyah JORC Resource announced on 21 February 2012[1] .

These results represent a progressive update on Alara’s 10,000m backlog of additional drilling, conducted since the drilling cut-off date of 22 November 2011 for the JORC Resource estimation.

The drilling results cover a total of 19 holes, including a third batch of results from Zone 1 comprising 8 holes and an additional 7 holes from Zone 2. These results are outside the previously defined JORC Resource area and confirm additional mineralisation in Zone 1 and Zone 2 (North extension). In addition to this, 4 holes from Zone 3 covered in this announcement are previously drilled geotechnical holes for which analysis was carried out after completing a related geotechnical study.

Assay results from completed drilling, together with results from drilling continuing in Zones 1 and 2 to confirm mineralised extensions, will be announced over the coming months.

DRILLING HIGHLIGHTS

ZONE 1:

Hole K1DD12_221 from 24–30.8m: 6.8m at 6.02% Zn; 0.49% CuHole K1DD12_222 from 63–66m: 3m at 7.51% Zn; 0.95% CuHole K1DD12_245 from 25.45–34m: 8.55m at 10.91% Zn; 0.19% Cu including 25.45–28m 2.55m at 21.80% Zn; 0.34% Cu and 42–47.1m: 5.1m at 10.97% Zn; 0.21% Cu including 45–46m: 1m at 31.56% Zn; 0.70% Cu

ZONE 2:

Hole K2DD12_233 from 80.8–86m: 5.2m at 7.15% Zn; 0.14% CuHole K2DD12_237 from 157–162m: 5m at 8.40% Zn; 0.38% CuHole K2DD12_239 from 177–188m: 11m at 6.42% Zn; 0.12% CuHole K2DD12_240 from 91–101m: 10m at 10.90% Zn; 0.31% Cu ZONE 2 (Copper Rich Zone):Hole K2DD12_237 from 164–168m: 4m at 1.09% CuHole K2DD12_238 from 193.4–203m: 9.6m at 1.47% Cu

ZONE 2 (Copper Rich Zone):

1 Refer AUQ market announcement dated 21 February 2012 entitled “Maiden JORC Resource - Khnaiguiyah ZincCopper Project”

Page 1 of 8

20120516 AUQ ASX Drilling Update - Khnaiguiyah Zinc Copper Project

ZONE 3:

Hole K3DD11_037 from 78–82m: 4m at 11.02% Zn; 0.07% Cu
Hole K3DD11_044 from 187–209.1m: 22.1m at 6.87% Zn; 0.14% Cu
and 214–221m: 7m at 6.69% Zn; 0.65% Cu
Hole K3DD11_052 from 20–31m: 11m at 5.62% Zn; 0.22% Cu

The results from Zone 1 continue to confirm mineralisation at shallow depths and similar in grade as that found in Zones 2 and 3. In particular, Hole K2DD12_240 drilled in the southernmost edge of Zone 2 intersected 10m at 10.90% Zn. This confirms the mineralisation open in a southern direction positioned along the shear zone.

A complete tabulation of intersection results along with maps indicating the location of these holes in Zones 1, 2 and 3 are attached (refer Appendix – Summary of Intersection Results and Drill-Hole Locations).

It is noted that drill intercepts are reported as drilled; true thicknesses will be calculated at the interpretation and resource modelling stage. The drill intersections are almost perpendicular to mineralisation and no significant difference is expected in true and intersection thickness.

Alara Resources’ Managing Director, Shanker Madan, said: “These latest results confirm the presence of additional mineralisation within Zones 1 to 3 and give us further confidence surrounding the feasibility and scale of the Khnaiguiyah Zinc Copper Project.”

“The Khnaiguiyah Definitive Feasibility Study (DFS) is nearing completion and is expected to be finalised by the end of June 2012. Once the DFS is complete, Alara will move to the design and construction phase of the Khnaiguiyah Project,” added Mr Madan.

DRILLING STATUS

Alara is continuing the infill and step-out drilling to extend mineralisation in Zone 1 and Zone 2 with a view to identifying additional mineralisation prior to the completion of the Khnaiguiyah DFS in Q2 2012. Since the commencement of the Khnaiguiyah Zinc-Copper Project drilling programme, Alara has completed a total of 290 holes to 35,155 metres.

– ENDS –

For further information, please contact:

Shanker Madan David Loch Managing Director Unicus T | +61 8 9214 9787 T | +61 3 9654 8300 / +61 411 144 787 E | [email protected] E | [email protected]

ABOUT ALARA RESOURCES

Alara Resources Limited (ASX: AUQ) is an Australian-based minerals exploration and development company with a diverse portfolio of projects in Saudi Arabia, Oman, Chile, and Australia.

With a strong pipeline of advanced and early stage projects, Alara is moving towards establishing itself as an emerging base and precious metals development company.

For more information, please visit: www.alararesources.com

Page 2 of 8

20120516 AUQ ASX Drilling Update - Khnaiguiyah Zinc Copper Project

APPENDIX – Summary of Intersection Results and Drill-Hole Locations

Figure 1: Drill-hole Locations in Mineralised Zone 1

==> picture [455 x 112] intentionally omitted <==

==> picture [455 x 111] intentionally omitted <==

==> picture [455 x 112] intentionally omitted <==

==> picture [455 x 111] intentionally omitted <==

==> picture [455 x 112] intentionally omitted <==

==> picture [455 x 111] intentionally omitted <==

Page 3 of 8

20120516 AUQ ASX Drilling Update - Khnaiguiyah Zinc Copper Project

Table 1: Summary of Intersection Results for Zone 1

MINERALISED ZONE 1(K1)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 1(K1)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 1(K1)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 1(K1)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 1(K1)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 1(K1)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 1(K1)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 1(K1)‐ SIGNIFICANT INTERSECTIONS
Significant Mineralization Zinc Rich Zone Copper Rich Zone
Drill Hole **Intersections ** From (m) To (m) Length (m) Zn% Included
Cu%
Cu% Included
Zn%
K1DD12_203 Primary 37.2 42 4.8 2.75 0.37
Primary 41 44 3 0.66 0.81
Inclusion 41 42 1 1.54 2.29
K1DD12_215 Primary 20.1 25 4.9 3.32 0.08
Inclusion 24 25 1 5.13 0.11
K1DD12_216 Primary 9 10 1 4.35 0.01
Primary 12 13 1 3.23 0.01
K1DD12_219 Primary 11.5 24 12.5 4.55 0.31
Inclusion 12 16 4 3.50 0.64
Inclusion 19 23 4 7.70 0.05
K1DD12_220 Primary 2 7 5 4.53 0.37
Inclusion 3 4 1 8.31 0.64
Primary 5 8.9 3.9 0.72 3.09
Inclusion 7 8 1 1.15 1.46
Primary 24 30.8 6.8 6.02 0.49
K1DD12_221 Inclusion 24 28 4 8.63 0.46
Inclusion 30 30.8 0.8 2.97 1.13
Primary 60 61.1 1.1 4.30 0.80
Primary 63 66 3 7.51 0.95
K1DD12_222 Inclusion 63 64 1 11.49 0.38
Primary 63 67 4 0.78 5.68
Inclusion 65 66 1 2.14 4.63
Primary 77 80 3 0.86 0.36
Inclusion 77 78 1 1.94 1.05
Primary 14 16 2 8.85 0.21
Primary 25.45 34 8.55 10.91 0.19
Inclusion 25.45 28 2.55 21.80 0.34
K1DD12_245 Inclusion 30 30.9 0.9 15.72 0.26
Primary 42 47.1 5.1 10.97 0.21
Inclusion 45 46 1 31.56 0.70

Note: Holes K1DD12_214 and K1DD12_225 have no significant mineralisation

Page 4 of 8

20120516 AUQ ASX Drilling Update - Khnaiguiyah Zinc Copper Project

Figure 2: Drill-hole Locations in Mineralised Zone 2

==> picture [455 x 111] intentionally omitted <==

==> picture [455 x 112] intentionally omitted <==

==> picture [455 x 111] intentionally omitted <==

==> picture [455 x 111] intentionally omitted <==

==> picture [455 x 111] intentionally omitted <==

==> picture [455 x 111] intentionally omitted <==

Page 5 of 8

20120516 AUQ ASX Drilling Update - Khnaiguiyah Zinc Copper Project

Table 2: Summary of Intersection Results for Zone 2

MINERALISED ZONE 2(K2)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 2(K2)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 2(K2)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 2(K2)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 2(K2)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 2(K2)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 2(K2)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 2(K2)‐ SIGNIFICANT INTERSECTIONS
Significant Mineralization Zinc Rich Zone Copper Rich Zone
Drill Hole **Intersections ** From (m) To (m) Length (m) Zn% Included
Cu%
Cu% Included
Zn%
K2DD12_226 Primary 152 157 5 4.66 0.22
Inclusion 155 157 2 6.13 0.12
K2DD12_230 Primary 143.3 150.25 6.95 4.05 0.04
Primary 159.8 162.45 2.65 5.26 0.01
Primary 162.45 166 3.55 0.62 0.05
Inclusion 165 166 1 1.08 0.04
Primary 80.8 86 5.2 7.15 0.14
K2DD12_233 Inclusion 84 85 1 10.32 0.14
Primary 87 97 10 0.87 0.04
Inclusion 92 94 2 1.59 0.05
Primary 157 162 5 8.40 0.38
K2DD12_237 Inclusion 160 161 1 13.62 0.34
Primary 164 168 4 1.09 0.16
K2DD12_238 Primary 176.6 179.95 3.35 4.81 0.34
Inclusion 176.6 178 1.4 7.86 0.29
Primary 193.4 203 9.6 1.47 0.46
Primary 177 188 11 6.42 0.12
K2DD12_239 Inclusion 180 183 3 8.47 0.25
Primary 91 101 10 10.90 0.31
K2DD12_240 Primary 109 110 1 3.02 0.05

Page 6 of 8

20120516 AUQ ASX Drilling Update - Khnaiguiyah Zinc Copper Project

Figure 3: Drill-hole Locations in Mineralised Zone 3

==> picture [456 x 112] intentionally omitted <==

==> picture [456 x 111] intentionally omitted <==

==> picture [456 x 112] intentionally omitted <==

==> picture [456 x 112] intentionally omitted <==

==> picture [456 x 111] intentionally omitted <==

==> picture [456 x 112] intentionally omitted <==

Page 7 of 8

20120516 AUQ ASX Drilling Update - Khnaiguiyah Zinc Copper Project

Table 3: Summary of Intersection Results for Zone 3

MINERALISED ZONE 3(K3)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 3(K3)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 3(K3)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 3(K3)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 3(K3)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 3(K3)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 3(K3)‐ SIGNIFICANT INTERSECTIONS MINERALISED ZONE 3(K3)‐ SIGNIFICANT INTERSECTIONS
Significant Mineralization Zinc Rich Zone Copper Rich Zone
Drill Hole **Intersections ** From (m) To (m) Length (m) Zn% Included
Cu%
Cu% Included
Zn%
Primary 67 68 1 3.16 0.01
Primary 78 82 4 11.02 0.07
K3DD11_037 Inclusion 80 81 1 23.85 0.10
Primary 86 89 3 2.47 0.01
Inclusion 88 89 1 5.11 0.02
Primary 187 209.1 22.1 6.87 0.14
Inclusion 198.75 201.1 2.35 18.94 0.28
Inclusion 203.5 209.1 5.6 13.83 0.33
K3DD11_044 Primary 214 221 7 6.69 0.65
Inclusion 218 220 2 15.15 2.00
Primary 225 227 2 0.89 0.44
K3DD11_047 Primary 154 156 2 6.01 0.11
Primary 169 172.85 3.85 2.22 0.02
Inclusion 171 172 1 3.57 0.03
Primary 0 9 9 4.68 0.11
Inclusion 6 8 2 7.39 0.32
Primary 11 16 5 3.22 0.05
Primary 20 31 11 5.62 0.22
K3DD11_052 Primary 50 52 2 2.81 0.07
Primary 54 55 1 3.18 0.02
Primary 57 59 2 2.54 0.01
Primary 64 66 2 6.05 0.12
Primary 79 80 1 0.70 0.76

Note: Hole K3DD11_048 has no significant mineralisation

NOTE

JORC Code Competent Person Statement

The information in this announcement that relates to Exploration Results pertaining to the Khnaiguiyah Project is based on information compiled by Mr Ravindra Sharma, who is a Chartered Professional Member of The Australasian Institute of Mining and Metallurgy. Mr Sharma is a principal consultant to Alara Resources Limited. Mr Sharma has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity they are undertaking to qualify as Competent Persons in terms of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2004 edition). Mr Sharma consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

Page 8 of 8