Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ADX ENERGY LTD Investor Presentation 2021

Jul 20, 2021

64308_rns_2021-07-20_8691c8f5-a288-44db-ad88-286500088296.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [175 x 120] intentionally omitted <==

ADX Energy Ltd – Investor Presentation Resources Roadhouse Investment Afternoon Perth 21 July 2021

==> picture [325 x 196] intentionally omitted <==

==> picture [388 x 196] intentionally omitted <==

A transformational, European focussed energy company (ASX:ADX)

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

1
----- End of picture text -----

DISCLAIMER STATEMENT (1)

==> picture [85 x 59] intentionally omitted <==

Important Notice

This document has been prepared by ADX Energy Ltd for the purpose of providing information to interested analysts/investors and shareholders. Any statements, opinions, projections, forecasts or other material contained in this document do not constitute any commitments, representations or warranties by ADX Energy Ltd or its directors, agents and employees.

Except as required by law, and only to the extent so required, directors, agents and employees of ADX Energy Ltd shall in no way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatsoever nature arising in any way out of, or in connection with, the information contained in this document. This document includes certain statements, opinions, projections, forecasts and other material, which reflect various assumptions. The assumptions may or may not prove to be correct. ADX Energy Ltd recommends that potential investors consult their professional advisor/s as an investment in the company is considered to be speculative in nature.

The information in this presentation is in summary form only and does not contain all the information necessary to fully evaluate any transaction or investment. It should be read in conjunction with ADX Energy Ltd’s other periodic and continuous disclosure announcements lodged with the ASX. This document does not constitute an offer, invitation or recommendation to subscribe for or purchase any securities and does not form the basis of any contract or commitment.

Persons compiling information about Hydrocarbons. Pursuant to the requirements of the ASX Listing Rule 5.31, the unaudited technical and reserves information contained in this presentation has been prepared under the supervision of Mr Paul Fink. Mr Fink is Technical Director of ADX Energy Ltd, is a qualified geophysicist with 23 years of technical, commercial and management experience in exploration for, appraisal and development of oil and gas resources. Mr. Fink has consented to the inclusion of this information in the form and context in which it appears. Mr. Fink is a member of the EAGE (European Association of Geoscientists & Engineers) and FIDIC (Federation of Consulting Engineers).

ERC Equipoise Pte Ltd (ERCE) has conducted an independent audit of the Gaiselberg & Zistersdorf Oil Fields developed Reserves and have previously consented to the inclusion of information specified as ERCE audited values in this presentation. ERCE is an independent London and Singapore based consultancy specialising in geoscience evaluation, engineering and economic assessment. The CPR has been prepared in accordance with the June 2018 SPE/WPC/AAPG/ SPEE/SEG/SPWLA/EAGE Petroleum Resources Management System (PRMS) as the standard for classification and reporting. ADX is not aware of any changes of economic assumptions, field operating costs, new information or technical data that materially affects the estimates announced on Reserves Reporting Date of 5/11/2020 for the Gaiselberg & Zistersdorf Oil Fields .

2

DISCLAIMER STATEMENT (2)

==> picture [85 x 59] intentionally omitted <==

PRMS Reserves Classifications used in this Report

Developed Reserves are quantities expected to be recovered from existing wells and facilities.

Developed Producing Reserves are expected to be recovered from completion intervals that are open and producing at the time of the estimate. Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access. Undeveloped Reserves are quantities expected to be recovered through future significant investments.

A. Proved Reserves (1P) are those quantities of Petroleum that, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable from known reservoirs and under defined technical and commercial conditions. If deterministic methods are used, the term “reasonable certainty” is intended to express a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will equal or exceed the estimate.

B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Proved Reserves but more certain to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus Probable Reserves (2P). In this context, when probabilistic methods are used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate.

C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are less likely to be recoverable than Probable Reserves. The total quantities ultimately recovered from the project have a low probability to exceed the sum of Proved plus Probable plus Possible (3P) Reserves, which is equivalent to the high-estimate scenario. When probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will equal or exceed the 3P estimate. Possible Reserves that are located outside of the 2P area (not upside quantities to the 2P scenario) may exist only when the commercial and technical maturity criteria have been met (that incorporate the Possible development scope). Standalone Possible Reserves must reference a commercial 2P project.

Contingent Resources : those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations but, for which the applied project(s) are not yet considered mature enough for commercial development due to one or more contingencies.

1C, 2C, 3C Estimates: in a probabilistic resource size distribution these are the P90 (90% probability), P50, and P10, respectively, for individual opportunities . Totals are by arithmetic summation as recommended under PRMS guidelines. This results in a conservative low case total and optimistic high case total.

Prospective Resources: those estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relatedto undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further explorations appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons. Low” means a conservative estimate of the quantity that will actually be recovered from the accumulation by the project; there is a 90% probability (P90) that the quantity actually recovered will equal or exceed the best estimate .“Best” means a best estimate of the quantity that will actually be recovered from the accumulation by the project; there is a 50% probability (P50) that the quantity actually recovered will equal or exceed the best estimate. “High” means an optimistic estimate of the quantity that will actually be recovered from the accumulation by the project; there is a 10% probability (P10) that the quantity actually recovered will equal or exceed the best estimate.

3

CORPORATE OVERVIEW

A transformational, European focussed energy company (ASX:ADX)

Directors

Financial information

==> picture [85 x 59] intentionally omitted <==

Financial information
Share price (19 July 2021) A$0.008
Number of shares
Number of Options
2,654m
211 m
Market capitalisation
Cash (31 March 2021)
A$21.2 m
A$4.6 m
Loan Notes (unsecured) and Austrian Loans (30 June 2021)
Minority Interest in Subsidiary (31 Dec 2020)
A$4.8 m
A$ 8.8 m
Enterprise value A$30.2 m

Company overview

Ian Tchacos (Executive Chairman)

  • Located Perth; petroleum engineer; production operations, commercial, corporate and management experience. (35 years)

Paul Fink (Technical Director / CEO)

  • Located Vienna; geophysicist; new ventures, exploration, production and management experience (30 Years)

Andrew Childs (Non-Executive Director)

  • Located Perth; geoscientist; exploration, HR and corporate experience (35 years)

Edouard Etienvre (Non-Executive Director)

  • Located London; finance executive; debt market, new ventures, commercial and management experience (15 years)

Over 115 years of relevant oil and gas experience

  • Corporate Headquarters in Perth Western Australia

  • Operations & technical teams in Austria

  • Focus on production & rapid cashflow growth fast track appraisal & development close to infrastructure

  • Decarbonisation and sustainability opportunities H2 storage, geothermal and CO2 storage

  • Asset positions in Austria onshore, Romania onshore and Italy offshore

  • Operate all assets. Only 3rd production operator in Austria. 2nd Exploration Operator

Company Secretaries (joint)

Peter Ironside and Amanda Sparks – extensive finance and corporate experience

ADX Vienna MD - Alan Reingruber – extensive engineering, government relations and operations experience

==> picture [375 x 128] intentionally omitted <==

----- Start of picture text -----

Zistersdorf Field – Vienna Basin
----- End of picture text -----

4

STRATEGIC FOCUS

==> picture [85 x 59] intentionally omitted <==

Focussed on becoming a leading European energy producer and the provider of energy solutions for a low carbon society

ADX is a rapidly growing European producer and explorer focusing on projects in Austria, Romania and Italy

We produce safe, low greenhouse gas emission energy now to the highest environmental standards while redeploying our assets, people and skills for transition to low carbon energy production and carbon abatement

We are also working on intelligent solutions to become a leading European energy producer and provider of solutions for a low carbon society to enhance value for shareholders and the communities in which we operate

We are well positioned to expand our oil and gas business and build a green energy business for exceptional growth

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

5
----- End of picture text -----

ASSET SUMMARY

==> picture [85 x 59] intentionally omitted <==

Production, exploration and renewable energy assets

Gaiselberg & Zistersdorf Oil Fields

( Operated, 100% equity) Vienna Basin, Austria

Stable, efficient, long-lived production

  • Hydrogen (H2) production & storage project

Iecea Mare Production License & Parta Exploration license (Operated, 49.2% equity ), Pannonian Basin, Romania

Upper Austria Appraisal & Exploration Licenses (Operated, 100% equity) Mollasse Basin, Austria

  • Large 3D seismic data base [Eur 100 MM]

  • Drill ready prospects with high success rate

  • Agreed infrastructure access

  • Geothermal reservoirs

  • Excellent prospectivity, good access to infrastructure and high gas demand

Nilde Oil Field Redevelopment Project Operated,100% equity) Sicily Channel, Italy [note 1]

  • 34.1 MMBBL (2C) Resource (CPR) prematurely abandoned

  • Moratorium being lifted

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

Note 1: Contingent Resources Reporting Date for Nilde 29/3/2018 6
----- End of picture text -----

==> picture [85 x 59] intentionally omitted <==

AUSTRIA IS A RARE BREAK THROUGH OPPORTUNITY

==> picture [123 x 73] intentionally omitted <==

----- Start of picture text -----

ADX Vienna Basin
Production
----- End of picture text -----

ASSET POSITION

  • 100% equity in oil production asset in Vienna Basin

  • H 2 production & storage project

  • 100% equity in appraisal and exploration acreage in Upper Austria

==> picture [128 x 101] intentionally omitted <==

----- Start of picture text -----

ADX Upper Austria
Exploration
----- End of picture text -----

  • Geothermal pilot project

  • Assets managed and operated by ADX local team

  • Production and exploration growth opportunities

COUNTRY FUNDAMENTALS

  • Excellent infrastructure for oil and gas processing and export – central European gas hub and 230,000 BPD refinery

  • High value received for oil and gas

UNIQUE COMPETITIVE POSITION

  • Break into a 75-year duopoly

  • World-class oil province ~1 billion barrels oil and 2.7 Tcf gas

  • ADX is one of 3 production and one of 2 exploration operators in country – a very privileged position that provides exceptional growth oportunities

  • Stable, predictable legal and licensing system

  • Favorable fiscal terms

  • Government support for hydrocarbons and transition projects to renewable technologies

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

7
----- End of picture text -----

SUMMARY OF RECENT HIGHLIGHTS

==> picture [85 x 59] intentionally omitted <==

Production

66% Increase 35% Increase in hedged oil and gas oil price production position for quarter

Exploration

Upper Preparation Austria for drilling exploration first award prospect

Renewable Energy

Vienna Basin Geothermal Hydrogen pilot project project initiation

New licenses in the Molasse Basin Upper Austria

==> picture [344 x 218] intentionally omitted <==

----- Start of picture text -----

Low emission, long life
production in the Vienna
Basin Oil Fields
----- End of picture text -----

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

8
----- End of picture text -----

==> picture [85 x 59] intentionally omitted <==

ZISTERSDORF FIELDS (Vienna Basin) - Asset Summary

==> picture [349 x 173] intentionally omitted <==

----- Start of picture text -----

Well work over operations
----- End of picture text -----

  • 100% equity purchased from RAG Austria AG (RAG) in December 2019

  • Low decline long lived production Current production rate of 320 BOEPD

  • Low emission production from state of the art facilities

==> picture [348 x 195] intentionally omitted <==

----- Start of picture text -----

Photograph showing ADX Gaiselberg and Zistersdorf
Field infrastructure proximal to large wind farms capable
of generating hydrogen for below ground storage
----- End of picture text -----

  • Ownership of 13.7 hectares agricultural land (Vineyards)

  • High value sweet crude oil (33° API – 7.9% discount to Brent)

  • Depleted gas reservoirs suitable for Hydrogen Storage

==> picture [354 x 87] intentionally omitted <==

----- Start of picture text -----

Multilayer 0.9 mmbbl Large
reservoir 2P developed appraisal
producing reserves from Flysch
since 1935 “Note 1” reservoirs
----- End of picture text -----

==> picture [340 x 88] intentionally omitted <==

----- Start of picture text -----

34 wells, 20 4,000 Pipeline to
producers, boepd Schwechat
14 injectors production refinery
capacity Vienna
----- End of picture text -----

9

Growth Strategy

==> picture [85 x 59] intentionally omitted <==

Utilising our existing assets and skills to transform our business into zero carbon energy production and emission reduction technology business

  • » Redeploying subsurface reservoirs for safe, cost effective energy storage or green energy production

  • » Utilising our operational geological, engineering and commercial skills

  • » Creating innovative partnerships to develop zero carbon ecosystems

  • » Leverage existing relationships with regulating authorities

  • » Source ESG investment

The compatibility between oil and gas operations, green energy production and emerging decarbonisation technologies enables us to make a strategic shift without diminishing our existing business

Geothermal Energy Upper Austria

Carbon Emission Reduction Projects

==> picture [91 x 90] intentionally omitted <==

Green Hydrogen Storage Vienna Basin

==> picture [67 x 65] intentionally omitted <==

Oil and Gas Exploration & Production

Transform profitable oil and gas assets now to future renewable energy production

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

10
----- End of picture text -----

VIENNA BASIN GREEN HYDROGEN PROJECT

==> picture [85 x 59] intentionally omitted <==

A potential lighthouse project in the European energy market with compelling attributes

1

Developing partnerships for the production and storage of hydrogen (H2) using depleted ADX gas reservoirs in the Vienna basin

2

Offering substantial storage capacity for renewable energy, essential for the decarbonisation of our society

3

Working with proven technologies that ensure environmentally safe operations, which is a key success factor

4

Through its unique asset position in Austria , which ADX operates with a favourable production concession in the Vienna basin including land ownership

5

Legislative changes and potential subsidies from the EU green deal for hydrogen projects make it the ideal time to start

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

11
----- End of picture text -----

A UNIQUE OPPORTUNITY FOR GREEN H 2 PRODUCTION

==> picture [85 x 59] intentionally omitted <==

Great Fundamentals

  • » Oversupply of green power in summer to generate H2

  • » Store produced H2 in depleted ADX reservoirs

  • » Low cost and high quality water feedstock for H2 electrolysis

  • » Sell H 2 in winter at premium pricing

  • » Store and sell O 2 into local market

Compelling Success Factors

  • » Multiple sources of wind power near to ADX fields

  • » Economical, industrial scale storage capacity

  • » Delivery of H2 into existing methane pipeline system

  • » Vienna hydrogen hub and EU hydrogen pipeline network planned for mid 2020’s

Austrian & EU Policy Support

==> picture [79 x 62] intentionally omitted <==

  • » Austrian policy to increase renewable energy by factor 6 by 2030

  • » Increasing funding available on favourable terms for renewable projects

  • » Large EU subsidies for hydrogen projects

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

12
----- End of picture text -----

VISION FOR GREEN H 2 PRODUCTION & STORAGE

==> picture [85 x 59] intentionally omitted <==

Opportunity to build a substantial, profitable & green H2 ecosystem for the energy sector at our Gaiselberg and Zistersdorf Fields

2030 Full ecosystem developed

  • 2025-26

  • Small ecosystem

  • 2023-24

  • Pilot project in operation

  • Today, 2021 Initiation » Integration of new

  • » Safe Hydrogen storage partners, forward in pilot reservoir in integration of ecosystem

  • » Initiation of pilot project Vienna basin operations » Additional capacity for

  • » Strategic partnerships » Energy from renewable electrolysis and storage

==> picture [87 x 77] intentionally omitted <==

100 MW

  • » Comprehensive scaling of ecosystem, also in Upper Austria

  • » Connection to future Hydrogen backbone in Austria

  • » Strategic partnerships with energy producers and gas grids

  • » Energy from renewable sources

  • » Securing funding and subsidies

Green H 2 production, starting with 1 MW electrolyser and storage pilot project and build up to an industrial scale system in excess of 30 MW

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

13
----- End of picture text -----

H 2 PROJECT STRUCTURE

==> picture [85 x 59] intentionally omitted <==

Phase 1 – Pilot Project to ADX position in the H2 value chain Phase 2 – Upscaling to Commercial Project when H2 infrastructure becomes available

Pilot Project (1 MW) >> Phase 2 Upscaling (30 MW +)

==> picture [736 x 291] intentionally omitted <==

----- Start of picture text -----

Energy H2 Processing Storage Transport and Use
Production Production
Partner Partner
Wind energy Regional &
Electricity Green H2 Green H2 National natural Heating
gas grid for
Pilot
Solar energy the
H2 production
(Electrolysis) n
Electricity
Blue Danube
Processing European H2
Transport
Network or
Vienna Hub Transport
for Phase II
upscaling
H * Grid infrastructure already established
2 storage
----- End of picture text -----*

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

14
----- End of picture text -----

LARGE SCALE PROFITABLE ENERGY STORAGE

==> picture [85 x 59] intentionally omitted <==

Illustrative Comparisons

AREA

ENERGY

COST

The subsurface hydrogen storage reservoir (“sponge”) is approx. 20 hectares in area and 10 metres thick, i.e. the size of 30 soccer fields or a bit larger than the London Serpentine Lake, Hyde Park. On the surface only a few well pad areas as in the picture below are required. That means that only a few hundred square meters are needed.

ADX can store in one large hydrogen underground reservoir approx. 500times the energy equivalent of the largest Tesla energy storage MegaPack (approx. 200 MWh).

Alternatively, our underground hydrogen storage solution could supply 20,000 households with electric energy equivalent for an entire year.

It costs Tesla approx. € 150 Million to build their “giant” 200 MWh battery storage. ADX can build the subsurface energy storage facility for a tenth of the Tesla battery cost and 2.500 times cheaper on an energy equivalent basis.

As the price of electrolysis comes down, this will be a much more cost efficient way to store energy, with a lot less valuable land required for the facility.

There is consensus that large scale energy storage will be needed for the green energy transition to succeed

==> picture [794 x 133] intentionally omitted <==

----- Start of picture text -----

London, Hyde Park Serpentine Lake area = Tesla Battery Storage, Australia,
area of H2 underground reservoirs (sponge) needs 10,000 m² of land ADX well site area, needs 100 m² of land
----- End of picture text -----

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

15
----- End of picture text -----

==> picture [85 x 59] intentionally omitted <==

GEOTHERMAL PILOT PROJECT

==> picture [267 x 248] intentionally omitted <==

----- Start of picture text -----

Drilling
----- End of picture text -----

A ground breaking Pilot Project with Siemens Energy and RED Drilling to evaluate a highly efficient new geothermal power generation technology.

Project execution

  • ADX responsible for all licensing, geological analysis, planning, subsurface engineering and execution

  • Siemens Energy to provide power generation technology

  • RED to provide drilling and well work services

Relevance of technology

  • Cutting edge 24/7 green energy production system

  • Potential to be 6 times more efficient than existing geothermal systems

==> picture [222 x 241] intentionally omitted <==

  • Utilisation of suitable oil and gas reservoirs for green power generation

Benefits for ADX

  • Potential deployment in ADX Upper Austria acreage where there is proven geothermal potential as well as other European onshore locations

  • Relationship development and collaboration with Siemens and RED

  • Develop skills and experience in geothermal power project development

Potential to deploy Siemen’s technology at commercial scale in areas of Europe with a very high geothermal gradient such as the Pannonian basin of Hungary and Romania where ADX has a wealth of experience.

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

16
----- End of picture text -----

MOLASSE BASIN (Upper Austria) – Exploration Summary

==> picture [85 x 59] intentionally omitted <==

==> picture [490 x 229] intentionally omitted <==

----- Start of picture text -----

Predictable licensing system and operational access
----- End of picture text -----

==> picture [304 x 227] intentionally omitted <==

----- Start of picture text -----

Source: RED
Extensive 3D Seismic Data Base
----- End of picture text -----

Excellent oil and gas infrastructure Access

“Drill ready prospect portfolio with infrastructure access, ministry and community support”

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

17
----- End of picture text -----

==> picture [85 x 59] intentionally omitted <==

UPPER AUSTRIA – EXPLORATION OVERVIEW

Agreements for 2 exploration, production and gas storage

Map of ADX licenses and infrastructure

==> picture [425 x 271] intentionally omitted <==

----- Start of picture text -----

New oil discoveries can be
directly tied into existing
facilities and piped to ZV
(Voitsdorf CPF)
ZR R
New oil discoveries can
be trucked to near by KTG
oilfield facilities and ZV
then piped to ZR BH SIER
(Ried CPF)
V
PK
HIER
----- End of picture text -----

concessions (AGS) in Upper Austria signed on 08 January 2021, 4 x 4 years period, highly efficient licensing system

3,650 km² of modern 3D seismic data coverage in the prolific Molasse foreland basin (220 mmboe produced in Upper Austria alone)

==> picture [39 x 36] intentionally omitted <==

Shallow (<1,000 m) to moderate (<3,000 m) drill depths and excellent reservoir productivity (~1,000 bopd)

==> picture [39 x 32] intentionally omitted <==

Targets with balanced oil and gas mix and very large upside

Portfolio close to infrastructure with access on agreed terms allowing rapid and cost effective monetisation

Proven geothermal sweet spot area and hydrogen storage possibilities

< 0.3 mmboe

81

2

48%

58 mmboe¹

Stand out of recoverable Prospects resources generate ready to drill with positive large upside economics (low break-even)

leads, prospects and appraisal targets

best technical resources for 10 matured explo. prospects

historical exploration success ratio

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

¹note : Original Resources Reporting Date: Upper Austria Exploration 30/11/2020, Resources revised from 42 mmboe on 18
30/11/2020 to 58 mmboe on 30/3/21
----- End of picture text -----

UPPER AUSTRIA – HISTORICAL SUCCESS RATE

==> picture [85 x 59] intentionally omitted <==

Recent exploration success rate utilising 3D seismic is 48%

==> picture [453 x 24] intentionally omitted <==

Large oil fields discovered No Oil Drilling on 3D.… to be continued by ADX + Partner on 2D seismic & gravity Exploration

Source: RAG (REP)

 Despite a strong focus on gas and the recent (ca. 2017) RAG shareholder decision to phase out exploration and appraisal drilling, an excellent success rate of 48% was achieved for oil discoveries  10 discoveries with 21 wells drilled

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

19
----- End of picture text -----

==> picture [85 x 59] intentionally omitted <==

UPPER AUSTRIA - DRILL READY & 3D SEISMIC MATURED

==> picture [653 x 374] intentionally omitted <==

----- Start of picture text -----

Gas
Oil
5.8 mmboe average
prospect size
Top 10 Matured Ready to Drill Prospects
----- End of picture text -----*

  • Note: appraisal portfolio not shown here

58 mmboe Best [Note] Excellent reservoir Balanced oil & Average prospect Technical Resources productivity (~1000 bopd); gas mix with risk in line with for 10 matured shallow (< 1000m) to moderate very large gas historical success Exploration prospects (< 3000m) drill depths upside rate of 48%

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

Note : Original Resources Reporting Date: Upper Austria Exploration 30/11/2020, Resources revised from 42 mmboe on
20
30/11/2020 to 58 mmboe on 30/3/21
----- End of picture text -----

UPPER AUSTRIA – Drill Ready Portfolio

==> picture [85 x 59] intentionally omitted <==

Two stand out prospects with follow up opportunities mapped on 3D seismic

PROSPECT NAME fluid Map Name Best Technical
Recoverable
[mmboe]
well TD
[m TVD]
Exploration
Well Cost
[MM Euro]
Σ HIGH IMPACT EXPLORATION
OHO gas (oil) OHO 20,4 4365 6,6
ZELL AM MOOS gas (oil) ZAM 14,6 5400 7,3
Σ
TREND EXPLORATION
LICHTENBERG gas LIC 2,7 3 010 3,6
IRRSDORF gas IRR 3,0 2950 2,9
TERNBERG oil TER 3,2 2890 5,0
WOLFSGRUB oil WOL 2,2 3150 5,1
PERGERN oil PER 2,5 1 790 2,2
ANSHOF oil ANS 6,6 2 250 1,8
ARD(LPgas only) gas ARD-BR 2,2 2 700 2,1
SIERNING IMB gas SIE 1,0 1 100 1,4
Σ APPRAISAL/ SIDE TRACK
STEYR3 (APPR) gas STE 0,5 1 270 1,5
BAD HALL - LIND(appr.) oil LIN 0,8 2 150 1,8
BAD HALL -STEIN(appr.) oil SGB 0,8 2 200 1,8
BRUNN(sidetrack) gas ARD-BR 0,8 2 100 1,2
KLE 1A(Sidetrack) oil KLE 0,6 2 260 1,3
TOTAL EXPLORATION [mmboe] 58
TOTAL [mmboe] 62

==> picture [37 x 36] intentionally omitted <==

==> picture [34 x 32] intentionally omitted <==

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

Note : Original Resources Reporting Date: Upper Austria Exploration 30/11/2020, Resources revised from
21
42 mmboe on 30/11/2020 to 58 mmboe on 30/3/21
----- End of picture text -----

==> picture [85 x 59] intentionally omitted <==

UPPER AUSTRIA – Drill Ready Prospects

Two stand out prospects with follow up opportunities mapped on 3D seismic

==> picture [727 x 450] intentionally omitted <==

----- Start of picture text -----

ADX AT-I prospects and leads, fields and pipelines including OHO
OHO
OHO
20.4 MMBOE
A large play opening prospect
ADX AT-II prospects and leads, fields and pipelines including Anshof
ANSHOF
ANSHOF
6.6 MMBOE
A rich prospect and appraisal portfolio next to infrastructure
----- End of picture text -----

==> picture [174 x 106] intentionally omitted <==

----- Start of picture text -----

OHO
20.4 MMBOE
A large play opening prospect
----- End of picture text -----

ADX AT-II prospects and leads, fields and pipelines including Anshof

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

Note : Original Resources Reporting Date: Upper Austria Exploration 30/11/2020, Resources revised from 42 mmboe
22
on 30/11/2020 to 58 mmboe on 30/3/21
----- End of picture text -----

==> picture [85 x 59] intentionally omitted <==

NEXT STEPS FOR AUSTRIAN EXPANSION

==> picture [321 x 218] intentionally omitted <==

----- Start of picture text -----

Gaiselberg & Zistersdorf Production
----- End of picture text -----

Vienna Basin Production

Enhance production, reserves and cash flow Reserves review results

Upper Austria Exploration

Anshof prospect drilling preparations underway Expand acreage for HC’s and geothermal

==> picture [323 x 207] intentionally omitted <==

----- Start of picture text -----

Gaiselberg and Zistersdorf infrastructure and large
wind farms behind
----- End of picture text -----

Zero Carbon Energy Projects Vienna Basin Hydrogen project formation Geothermal pilot project execution

==> picture [97 x 78] intentionally omitted <==

“Blend of compatible hydrocarbon and green energy production opportunities”

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

23
----- End of picture text -----

==> picture [85 x 59] intentionally omitted <==

For more information on our company contact

Executive Chairman : Ian Tchacos [email protected]

Chief Executive: Paul Fink [email protected]

Finance Manager and Company Secretary: Amanda Sparks [email protected]

==> picture [779 x 203] intentionally omitted <==

adxenergy.com.au

==> picture [794 x 45] intentionally omitted <==

----- Start of picture text -----

24
----- End of picture text -----