NEWS RELEASE
Release Time IMMEDIATE
Date 21 July 2008
ADMIRALTY RESOURCES NL PRESENTATION
The attached presentation will be provided to investors, potential customers and stockbrokers in Japan, China, the United States and Australia.
Yours sincerely,
==> picture [123 x 10] intentionally omitted <==
==> picture [123 x 10] intentionally omitted <==
==> picture [123 x 10] intentionally omitted <==
==> picture [123 x 10] intentionally omitted <==
Phillip Thomas Managing Director
Further information on Admiralty Resources NL can be found on our Internet site: www.ady.com.au
Australia
Investor Relations Tel: +61 3 9642 8787 Email: [email protected]
==> picture [781 x 68] intentionally omitted <==
==> picture [219 x 69] intentionally omitted <==
Admiralty Resources NL
==> picture [219 x 29] intentionally omitted <==
==> picture [402 x 40] intentionally omitted <==
==> picture [402 x 69] intentionally omitted <==
PRESENTATION July 2008
==> picture [279 x 12] intentionally omitted <==
==> picture [781 x 271] intentionally omitted <==
Company Overview
==> picture [781 x 69] intentionally omitted <==
ASX:ADY OTCBB:ARYRY (see www.adrbny.com) 1,133,457,841 shares on issue (at 30 June 2008)
==> picture [217 x 68] intentionally omitted <==
1,000,000 Non-Executive Director options (at 30 June 2008) 408 million held by the top 20 shareholders 36.04% (at 30 June 2008) 10,402 shareholders, 491 overseas (at 30 June 2008)
==> picture [217 x 51] intentionally omitted <==
Admiralty Resources NL
1. HSBC Custody Nominees (Australia) Ltd, A/C 2– 8.78%
2. ANZ Nominees Ltd – 5.81%
==> picture [114 x 158] intentionally omitted <==
3. HSBC Custody Nominees (Australia) Ltd – 4.47%
4. National Nominees Limited – 3.74% 5. Citicorp Nominees Pty Ltd – 2 91%.
Directors – 2.2%
Fortune Global Holdings Admiralty Resources Chile Ltda. 60% of Cia Minera Santa Barbara
100% Rincon Lithium Limited Argentina 100% Bulman Resources P/L Lead, Zinc
Pyke Hill Resources P/L Pyke Hill – Nickel 50% Int
100% ADY Investments P/L
==> picture [193 x 29] intentionally omitted <==
3
Key Personnel
Board of Directors
-
Prof. J Ross Harper CBE – LLB MA DUniv Chairman, legal background, London
-
- Phillip Thomas – BSc MBM AIG SIA Managing Director Admiralty Resources NL,, geology, investment,
-
marketing, Director Cia Minera Santa Barbara – located L14, 200 Queen Street, Melbourne - Michael Robert Clarke MSc – Managing Director Admiralty Resources Chile Ltda., Chairman of Cia Minera Santa Barbara, Director Admiralty Resources NL – Santiago, Chile - John Anderson – B Com MBA Non-executive Director - banking, mining management – Melbourne - Stephen Prior – B Com CPA – Company secretary, taxation, finance, audit - Melbourne
-
Technical
-
Dr Carlos Sorentino – PhD, MEnvSt, DipRadTech, BE(Chem),FAusIMM(CP), MMICA Technical Director, Rincón Salar (Sydney/Argentina)
-
Dr Rodrigo Frías – Representative, Legal Counsel (Salta, in argentina) - Dr an eD i l Galli – Pro ect j Director (San a vaS l dor e u uy, n rgent nad J j i A i )
-
- Dr Ricardo Alonso – Head of Exploration (Salta, in Argentina) Cia Minera Santa Bárbara Board of Directors Sen or ien or ii Management
Sen or ien or ii Management Fernando Pau – Finance Director Ricardo Gonzalez – Senior Geologist Claudio Ferrada – Head of Accounting, Tax, Audit Erwin Nordenflycht– Head of Operations
-
Michael Robert Clarke – President, Chile
-
Phillip Thomas – Director, Australia
-
Leonardo Farkas – Director, Chile
==> picture [193 x 29] intentionally omitted <==
4
Demerger
-
ADY – Propose to consolidate to < 150 million shares
-
Demerger proposal put to shareholders at EGM to be held 30
-
days after all approvals received
-
US SEC Tax and
-
Consider Directors Report, , Solvency,
-
Rincon Valuation Reports
-
For every (consolidated) Admiralty share, one share will be
-
issued in Rincon Lithium Limited (RLL)
-
RLL funding to come from Pre-sales agreement and note
==> picture [193 x 29] intentionally omitted <==
issue
Project Overview – Production, Shipping, Focus
Cia Minera Santa Bárbara
April 2007 – first shipment in WISCO 08 Sales agreement shipped
Nov 2007 – 30,000 tonnes per month, 500 hours per month, six shipments completed – 210,000 tonnes final product shipped 63.5% fines
July 2008 – final two shipments from Caldera Port shipped, 4 panamax shipments in 2009 to complete 06 contract
July 2008 – put in place sales contracts with Shougang and $40m funding facility
Sept 2008 – Commission drilling program, to cover existing 5 mines, 20 hectares per month
2009 – commission Mariposa , Mirador pits to expand production to 3 . 9m tonnes per annum - $50m investment
2009 – commission Panamax size port, and if successful Cape size port to increase shipping capacity by another 2.0m tonnes per annum (Caleta 0.9m, Cape T Port 2.4m, Panamax G Port 1.2m)
2010 – commission two more pits for production expansion to 7 million tonnes (Chilean Veijo , Primavera) 2010 – commission conveyor system to Punta Alcalde port and construct cape size port
==> picture [193 x 29] intentionally omitted <==
6
Key Statistics – Sánta Barbara
==> picture [781 x 403] intentionally omitted <==
----- Start of picture text -----
7,421 hectares of tenements at Japonesa Group Mine Vallenar
Caleta
3,500 hectares at Pampa Tolofo, near Las Colorados Port
JORC for 26m tonnes final product grading 18.0% at Japonesa
-
3 1960 stockpiles with 3 million tonnes fines at 14 16% Fe
T
8 geologists, topographers, mining engineers Port
16 staff quality control/laboratory
52 trucks to take ore to port each month
14 trucks to move ore to ship (500 metres) – 15,000 tonnes per day
Santa Barbara
SRK G eo og ca l i l C onsu t ng ey partner l i k Punta
Mines
Alcalde
Guacolda
Port
----- End of picture text -----
==> picture [193 x 29] intentionally omitted <==
7
10,000 Hectares in Iron Ore Belt
| New Tenements Existing Tenements (Japonesa Agreement) |
||||||
| New Tenements |
Existing Tenements (Japonesa Agreement) |
|||||
| N ame |
Si h t ze - ec ares |
Mi N ne ame |
Si h t ze - ec ares |
|||
| Leo 3 | 200 | *Japonesa | 34 | |||
| Leo 4 | 200 | *Japonesita | 96 | |||
| Leo 7 | 200 | *Mirador | 21 | |||
| Leo 8 | 300 | *Gibjiru | 41 | |||
| Leo 9 | 300 | Natasha | 50 | |||
| Leo 10 | 200 | Tatiana | 60 | |||
| Leo 11 |
200 |
Phil |
3 |
|||
| L 12 eo |
300 | P l ame a |
67 | |||
| Leo 13 | 300 | *Soberana | 25 | |||
| Leo 14 | 200 | *Negrita | 24 | |||
| Leo 15 | 300 | Total | 421 | |||
| Leo 16 | 200 | New Tenements | ||||
| Leo 18 | 200 | Leo Uno | 20 | |||
| Leo 19 | 100 | Leo | 35 | |||
| Leo 20 | 200 | Leo siete | 20 | |||
| Leo 100 |
300 |
Leo Cinco |
300 |
|||
| L 101 eo |
300 | L S i eo e s |
300 | |||
| Leo 102 | 300 | Leo Dos | 200 | |||
| Leo 103 | 300 | Tanati | 80 | |||
| Leo 104 | 300 | Tina | 181 | |||
| Leo 105 | 300 | Paco | 14 | |||
| Leo 106 *Existing mines opera |
300 ted in 1960’s |
Chilean Veijo | 50 | |||
| Leo 107 | 300 | Total | 8 1,200 |
|||
| Total | 5,800 | Grand Total | 7,421 |
Product Specification
Element Rejection Level % Contract Specification %
| Fe | 62.00 min | 63.5 | |
|---|---|---|---|
| Si02 | 6.0 max | 5.00 | Annual shipping Capacity 2008 |
| Al203 | 2.0 max | 1.2 | Caleta – 2 x 45,000 x 9 months = 0.81 million tonnes |
| P | 0.11 max | 0.07 | 1st half 2009 Port T - Caldera – 1 x 200,000 x 12 months = 2.4 million |
| S | 0.11 max | 0.07 | tonnes |
| Ca0 | 2 0 max . |
1 0 . |
2nd half 2009 |
| Mg0 | 2.0 max | 1.1 | Port G – Huasco – 1 x 200,000 x 12 months = 2.4m 2010 |
| K20+Na20 | 0.2 max | 0.05 | Punta Alcalde – 3 x 200,000 x 12 months = 7.2m tonnes |
| H20 | 2 0 max . |
1 0 . |
==> picture [193 x 29] intentionally omitted <==
9
==> picture [387 x 68] intentionally omitted <==
Santa Barbara Tenements
==> picture [781 x 406] intentionally omitted <==
==> picture [387 x 26] intentionally omitted <==
==> picture [193 x 29] intentionally omitted <==
10
Resource Estimates – Santa Bárbara 137 Million Tonnes Indicated and Inferred
Mine Tonnage Weighted Average Grade at 15% cut off Japonesa 42.0 million 13.7% ASX Release 10 Aug 07 Japonesita 47.0 million 19.4% ASX release 10 June 08 A,B Chilean Viejo* Mariposa 48.1 million 23.1% ASX release 10 June 08 C , *D Mirador F, Primavera* 11
Cia Minera Santa Bárbara Iron Ore Production
==> picture [781 x 204] intentionally omitted <==
==> picture [226 x 12] intentionally omitted <==
Port T at Caldera ** negotiations pending
==> picture [237 x 29] intentionally omitted <==
==> picture [218 x 11] intentionally omitted <==
18 tonne trucks taking ore to crusher
==> picture [215 x 29] intentionally omitted <==
==> picture [233 x 7] intentionally omitted <==
Waste stockpiles
==> picture [220 x 29] intentionally omitted <==
==> picture [781 x 136] intentionally omitted <==
Iron ore greater than 100m ready for crushing
Two 125 hour primary crushers
Port G at Huasco**
==> picture [193 x 29] intentionally omitted <==
12
Caleta, Caldera Port
==> picture [781 x 204] intentionally omitted <==
==> picture [244 x 20] intentionally omitted <==
==> picture [323 x 68] intentionally omitted <==
==> picture [167 x 27] intentionally omitted <==
Caleta Pier - handymax
==> picture [115 x 14] intentionally omitted <==
----- Start of picture text -----
Hopper ship loading
----- End of picture text -----
==> picture [215 x 6] intentionally omitted <==
==> picture [781 x 136] intentionally omitted <==
==> picture [215 x 14] intentionally omitted <==
Final product being loaded for truck transport to Caleta 230km away
==> picture [193 x 29] intentionally omitted <==
13
Port of Punta Alcalde
Estimated Cost – US$32-$40m Main road to pass site 14km road upgrade Conveyor transport system 300,000 tonne stockpile Container loading facility – Fruit Port Iron ore loading – Santa Bárbara Copper/Silver – Barrick Mines Coal unloading – Pascua Lama Power project Estimated Completion date June 2010 subject to funding
==> picture [366 x 35] intentionally omitted <==
==> picture [366 x 68] intentionally omitted <==
==> picture [366 x 69] intentionally omitted <==
==> picture [366 x 68] intentionally omitted <==
==> picture [366 x 69] intentionally omitted <==
==> picture [366 x 68] intentionally omitted <==
==> picture [366 x 7] intentionally omitted <==
==> picture [193 x 29] intentionally omitted <==
14
Rincón Salar - Argentina
==> picture [457 x 29] intentionally omitted <==
==> picture [457 x 68] intentionally omitted <==
==> picture [457 x 69] intentionally omitted <==
==> picture [457 x 68] intentionally omitted <==
==> picture [457 x 69] intentionally omitted <==
==> picture [457 x 29] intentionally omitted <==
-
Major, world-class, multi-element brine resource (Li, K,) located in the Salta Province of Argentina.
-
The 37 tenements cover an area in excess of 250 square kilometres.
-
Key resources are lithium chloride, lithium carbonate and potassium chloride (Potash).
-
Sodium Carbonate, sodium sulphate and boric acid also planned
-
R esou r ce due d ili ge n ce & e x t r act i o n methods for LiCl, LiOH, LiC03 KCl, have been finalised.
-
Ca ital ex enditure ro ram for p p p g
-
development of Rincón Salar has been established.
==> picture [193 x 29] intentionally omitted <==
15
Rincón Salar - Argentina
==> picture [293 x 41] intentionally omitted <==
==> picture [293 x 68] intentionally omitted <==
==> picture [293 x 69] intentionally omitted <==
==> picture [293 x 68] intentionally omitted <==
==> picture [293 x 69] intentionally omitted <==
==> picture [293 x 68] intentionally omitted <==
==> picture [293 x 20] intentionally omitted <==
The Resource
-
The Rincón Project is located in north-western Argentina near the Chilean border.
-
It is a hyper saline lake , brine enriched in lithium , magnesium and potash, with three rivers providing subterranean waters flowing into the salar through volcanic rocks.
-
� The project is situated at an elevation of 3,700 metres within the Antofalla-Pocitos volcanic rift valle y in the hi g h Andean Plains, with 50 salars closeby.
-
This ponded evaporate deposit is estimated to contain:
-
7.4m tonnes of LiCO3 equivalent
-
51.0m tonnes of KCl (Potash)
==> picture [193 x 29] intentionally omitted <==
16
Rincón Salar - Argentina
Lithium Concentrations from drill hole data
==> picture [781 x 338] intentionally omitted <==
==> picture [370 x 20] intentionally omitted <==
==> picture [266 x 20] intentionally omitted <==
==> picture [193 x 29] intentionally omitted <==
17
Key Advantages
-
Patented production process that removes magnesium early in the process, and crystallises final product at low ppm concentrations
-
Plant phase 1 of six now operating, 10,000 Na2SO4 per 14 days
-
Process takes 100 days so low evaporation capital
-
� All raw material is closeby and produced by Rincon Lithium keeping opex costs down
-
Funding available through project finance, note issue and pre-sales
-
All key staff hired
-
Expansion to 34,000 tonnes Li2CO3 relatively simple, substantial reserves of brine
-
Quality Assurance audit completed, new laboratory warehouse planned in Jujuy
==> picture [193 x 29] intentionally omitted <==
18
Reserve Calculation
==> picture [781 x 69] intentionally omitted <==
==> picture [651 x 68] intentionally omitted <==
==> picture [651 x 69] intentionally omitted <==
==> picture [651 x 68] intentionally omitted <==
==> picture [651 x 69] intentionally omitted <==
==> picture [651 x 68] intentionally omitted <==
==> picture [651 x 10] intentionally omitted <==
==> picture [193 x 29] intentionally omitted <==
19
Production, Observation Wells and Ponds
| Analysis | Mean, |
Relative |
||
| mg/L | dispersion from the mean |
|||
| Li+ |
394 |
±11% |
||
| K + Na+ Ca++ |
7 972 , 113,903 712 |
±9% ±5% ±65% |
||
| Mg++ Cl- |
3,667 195,067 |
±14% ±3% |
||
| SO~~4~~= | 12,334 | ±66% | ||
| B4O7= |
1,762 |
20 ±44% |
||
| CO H 386 ±17% |
Jujuy R&D and Rincon Plant Organization Chart
==> picture [781 x 406] intentionally omitted <==
----- Start of picture text -----
Dr. D. Galli Senior Management
P ro ec j t M anager
Ing. D. Humana
Ing. M.M. Otaiza Prof. A. Otaiza R. Santillan
Chief Chemist Engineering Administration Operations Phil Thomas
Manager Managing
Director
J.C. Caceres R. Miranda A. Zapata
Dr R Frias
Dr C Sorentino
Spectrometrist Systems Assistant Plant Supervisor Dr D Galli Legal and Dr R Alonso
Construction,
Production T ec h n ca i l S vcs Manager General Exploration
J. Miranda
C. Cachagua A. Aima
Maintenance &
Analyst Plant Maintenance
Security
J. Carlos D. Gordillo Plant Operators
Laboratory Maintenance & 3 shifts
Assistant Security 12 operators
S. Torres
J. Murillo
Kitchen &
XRF Operator
Housekeeping
----- End of picture text -----
==> picture [193 x 29] intentionally omitted <==
21
==> picture [781 x 68] intentionally omitted <==
----- Start of picture text -----
EVAPORATION IN SOLAR PONDS
Production of Li CO
----- End of picture text -----
==> picture [781 x 406] intentionally omitted <==
----- Start of picture text -----
PONDS A PONDS B PONDS C
α
KCl (Potash)
A = 460 Ha A = 36 Ha A = 27 Ha Concentrate
Brine
Volume: 32 L
Precipitate: α Precipitate: Precipitate:
α
NaCl NaCl - KCl NaCl - KCl
Salt: 278 kg/m [3] Salt: 18,5 kg/m [3] Salt: 14,5 kg/m [3]
----- End of picture text -----
22
Production of Crude Lithium Carbonate 98% and Lithium Carbonate 99 5%.
==> picture [781 x 394] intentionally omitted <==
----- Start of picture text -----
Concentrate Brine
Sodium Carbonate
1 m [3]
Precipitation of Ca [++]
and Mg [++] with
Sodium Carbonate
NaOH Ion change
Dilution
Sodium Carbonate Precipitation
Mother Liquor:
Centrifuge M: 2,050 Kg
Vol 1,8 m [3]
Fresh water Wash
Centrifuge
LITHIUM
CARBONATE
Mass: 40 Kg
Li [2] CO [3] 99.48%
To dry
----- End of picture text -----
==> picture [193 x 29] intentionally omitted <==
23
Product Specification
==> picture [293 x 25] intentionally omitted <==
==> picture [453 x 67] intentionally omitted <==
==> picture [453 x 69] intentionally omitted <==
==> picture [781 x 271] intentionally omitted <==
==> picture [290 x 18] intentionally omitted <==
==> picture [453 x 68] intentionally omitted <==
Lithium battery produced by A123 Systems
24
Lithium Applications – Lithium is not connected to the base metal market
- •The adjacent graph shows SQM view of Global Lithium Consumption.
Lithium Main Uses
==> picture [588 x 63] intentionally omitted <==
- There has been explosive growth in batteries, ~ 25% CAGR, (2000-05 Roskill) and Industrial Air Conditioning (as a desiccant)
==> picture [387 x 193] intentionally omitted <==
----- Start of picture text -----
4%
4%
Others
4%
23% Batteries
8%
Greases
Glass Colouring Beads (Frits)
9% Glass
A/C
Aluminium
20%
12%
Pharmaceutical
Polymer
16%
----- End of picture text -----
-
Traditional applications for Greases and Glazes continue with strong demand, eg European Cook Tops
-
Expanding Lithium Production may still not meet Global Demand
-
•Current market conditions suggest a 30% shortfall in supply
==> picture [193 x 29] intentionally omitted <==
25
Japanese Import Statistics – Lithium Carbonate
USD per tonne of Lithium Carbonate imported ni to apanJ
==> picture [781 x 296] intentionally omitted <==
----- Start of picture text -----
11,000
10 000,
9,000
8,000 price per
tonnage
tonne
Lithium
7,000
carbonate
6,000
5,000 CHINA 71,5 6,305.48
4,000
3,000 CHILE 707 6 , 491 . 09
2,000
1,000 ARGENTINA 180 7,046.78
0
Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08
CHINA USA CHILE ARGENTINA
----- End of picture text -----
==> picture [193 x 29] intentionally omitted <==
26
SEPTEMBER 2007
Global Lithium Supply & Pricing – an Opaque Oligopoly Admiralty Estimates a 30% Global Shortage of High Grade LCE ADY Fu ll Sca e Pro l d uction wi ll ave imite h l d im act on increasin rices p g p
| Admiralty Estimate |
Japanese Corporate |
Industrial Minerals |
Roskill |
SQM 2006 |
|||
|---|---|---|---|---|---|---|---|
| Admiralty | Estimate | Estimate | Report 2006 |
Estimate Annual Report |
|||
| Hombre Muerto FMC | 12-15,000 | 16,000 | 17,500 | 12,168 | |||
| Attacama / Silver Peak, Chemetall | 10-15,000 | 23,000 | 30,000 | ||||
| 44,140 | |||||||
| Attacama SQM3 | 25-28,000 | 28,000 | 27,800 | ||||
| • Est (Li |
|||||||
| Rincón Admiralty2 imates of Lithium Compounds Production from Brines N |
17,000 otes: 1 Chines |
17,000 e CITIC Prod |
17,000 uction is possi |
ble part brine | part | ||
| Other ~~thium Carbonate Equivalent - Tons)~~ |
10000 ~~Spodu~~ |
~~mene~~ |
14600 |
||||
| , 2 Full S CITIC1 3. SQM |
cale Productio have been adv |
n target mid 2 ising a capacit |
, 09 y increase to |
40,000 tons | pa | ||
| ~~China~~ for a num 4. Includ |
ber of years es Spodumen |
e, but ratios no | t disclosed | 27 |
SEPTEMBER 2007 Lithium Carbonate – The Purity / Value Equation
-
Approximate current Asian spot market,+/- $500 (Japan, China and now India), prices for Lithium Carbonate (Li 2 CO 3 )[ -] LCE at various purity levels:
-
99.0% purity (and slightly lower) $ 6,000 USD / ton 99 . 0+% purity , $ 6 500 USD / ton 99.9+% purity $ 8,250 USD / ton 99.99+% purity $ 13,200 USD / ton 99.999% purity $ 25,000 USD / ton Pure Lithium Metal $ 67,500 USD / ton
-
A lar e number of lon term contracts at much lower rices are endin allowin g g p g g
-
producers to substantially increase prices (SQM -2006 Annual Report), Chemetall price increase in July 2008.
Other Lithium Prices: Lithium Hydroxide (LiOH) $ 10,500 USD / ton Lithium Chloride (LiCl) $ 8,500 USD / ton Potassium Chloride (KCl – MOP) $ 550 - $750 USD / ton
==> picture [193 x 29] intentionally omitted <==
28
SEPTEMBER 2007
Admiralty Salar de Rincón Pilot Plant
==> picture [781 x 406] intentionally omitted <==
==> picture [494 x 6] intentionally omitted <==
==> picture [193 x 29] intentionally omitted <==
29
Bulman – Northern Territory
==> picture [254 x 40] intentionally omitted <==
- Zinc and Lead oxide, sulphide deposit located in southern Arnhem land in Australia's Northern Territory.
==> picture [254 x 68] intentionally omitted <==
==> picture [105 x 58] intentionally omitted <==
- ELA23814 – 250 sq kilometres
==> picture [254 x 69] intentionally omitted <==
==> picture [105 x 12] intentionally omitted <==
-
In the 1950’s CRA estimated there was substantial zinc sulphides from 11 drill holes.
-
A rea extens ve y i l covere d b y geop h ys cs i surveys and soil surveys.
==> picture [254 x 17] intentionally omitted <==
==> picture [249 x 34] intentionally omitted <==
� Further sampling and drilling work u ndertaken in 2008 in order to better define the leases and determine the areas acceptable for further exploration.
==> picture [249 x 69] intentionally omitted <==
==> picture [781 x 68] intentionally omitted <==
==> picture [249 x 18] intentionally omitted <==
==> picture [193 x 29] intentionally omitted <==
30
Bulman Exploration Licences
==> picture [781 x 69] intentionally omitted <==
==> picture [653 x 68] intentionally omitted <==
==> picture [653 x 69] intentionally omitted <==
==> picture [653 x 68] intentionally omitted <==
==> picture [653 x 69] intentionally omitted <==
==> picture [781 x 68] intentionally omitted <==
Proposed drill holes (red dots), K-Th-U (Red-Green-Blue) image, highlighting potassium anomalies (pink).
==> picture [193 x 29] intentionally omitted <==
31
Pyke Hill – Nickel Cobalt JV – Cougar Metals NL
==> picture [278 x 36] intentionally omitted <==
==> picture [278 x 68] intentionally omitted <==
==> picture [278 x 69] intentionally omitted <==
==> picture [278 x 68] intentionally omitted <==
==> picture [278 x 69] intentionally omitted <==
==> picture [278 x 64] intentionally omitted <==
-
The Pyke Hill Project is located approximately 40km southeast of the Murrin Murrin Nickel Operation, near Leonora, Western Australia.
-
Prospective for a high-grade nickel-cobalt lateritic resource. Estimated in-ground value $3.1b.
-
Aircore drilling undertaken by Cougar in FY2004 returned intersections including 7m @ 2.26% Ni, 6m @ 2.03% Ni and 8m @ 1.50% Ni.
-
In FY2005 Co u w gar completed t o additional drilling
-
programs at the project. A total of 25 holes for 896m were drilled, The second program was completed at the end of FY2005 and consisted of 31 Aircore drill holes for 1380m .
-
Results of the better intersections encountered ranged in thicknesses from 3m to 17m and averaged 7.5m. The depth to the top of mineralisation varied from 13m to a maximum of 23m . Grades averaged 1.48% Ni overall using a 1.2% Ni cut-off.
-
Joint venture provides Admiralty with A$0.20 cents er tonne of “run of mine” ore.
-
p
==> picture [193 x 29] intentionally omitted <==
32