AI assistant
ADMIRALTY RESOURCES NL. — Investor Presentation 2007
Nov 4, 2007
64309_rns_2007-11-04_1d891794-4a48-4223-a436-ab3e65a5460d.pdf
Investor Presentation
Open in viewerOpens in your device viewer
Adm rai lty esources R NL
==> picture [218 x 78] intentionally omitted <==
==> picture [218 x 78] intentionally omitted <==
==> picture [218 x 10] intentionally omitted <==
==> picture [402 x 46] intentionally omitted <==
==> picture [402 x 22] intentionally omitted <==
==> picture [402 x 53] intentionally omitted <==
==> picture [402 x 26] intentionally omitted <==
PRESENTATION November 2007
==> picture [780 x 232] intentionally omitted <==
Company Overview
==> picture [196 x 54] intentionally omitted <==
ASX:ADY OTCBB:ARYRY (see www.adrbny.com)
==> picture [196 x 78] intentionally omitted <==
973.875 million shares on issue (at 5 November 2007)
-
10.423 million unlisted options at 10 cents exercise price Nov 07 expiry
-
5.5 million employee options at 10 cents expire Nov 09
==> picture [196 x 17] intentionally omitted <==
988 million shares fully diluted
Admiralty Resources NL
433 million held by the top 20 shareholders 44.98%
==> picture [373 x 204] intentionally omitted <==
----- Start of picture text -----
Fortune Global Holdings
60% o f Ci a Mi nera anta ar S B b ara
100% ADY Resources Ltd
Argentina
100% B u man esources l R P/L
Lead, Zinc
Pyke Hill Resources P/L
Pyke Hill – Nickel 50% Int
100% ADY Investments P/L
----- End of picture text -----
10 , 472 shareholders , 396 overseas
-
ANZ Nominees – 28.19%
-
HSBC No 2 Nominees – 2.71%
-
3 . Citicorp Nominees – 2 . 22%
-
HSBC Nominees – 1.55%
-
Merrill Lynch – 1.40%
Directors – 13 . 7%
==> picture [192 x 26] intentionally omitted <==
2
Key Personnel
Board of Directors
Prof. J Ross Harper CBE – LLB MA DUniv Chairman, Scottish Coal, legal background, London Michael Robert Clarke MSc – Managing Director – Santiago, Chile Phillip Thomas – BSc MBM AIG SIA Director, geology, investment, marketing – located L14, 200 Queen Street, Melbourne
John Anderson – Non-executive - B Com MBA Director, banking, mining management – Melbourne
Anthony Blumberg – B Com ATT Non-executive Director – stockbroking, margin lending, - Melbourne
Stephen Prior – B Com CPA – Company secretary
Techn cai l Dr Carlos Sorentino – PhD, MEnvSt, DipRadTech, BE(Chem),FAusIMM(CP), MMICA Technical Director, Rincon Salar (Sydney/Argentina) Dr Rodrigo Frias – Representative in Argentina, Legal Counsel (Salta) Dr Daniel Galli – Project Director, Sodium Sulphate, Potash (Argentina)/Jujuy
Cia Minera Santa Barbara
Board of Directors
Leonardo Farkas – President, Santiago, Vallenar Phillip Thomas - Director
==> picture [192 x 26] intentionally omitted <==
3
Project Overview – Production Shipping Focus
Cia Minera Santa Barbara
Nov 2007 – 30,000 tonnes p er month, 500 hours p er month
Nov 2007 – sign port agreement with Phelps Dodge for Candelaria, 4.5 years with roll option
Jan 2008 - $3.0m of equipment installed – capacity increase to 100,000 tonnes per month (200 tonnes an hour)
Feb 2008 – stockpile will reach 200-300,000 tonnes
Feb 2008 – shipping commences – fulfil the 06 SPA agreement to WISCO CFR contract
Apr 2008 – commence 2008 contracts – shipping from Caleta – 4 x 45,000 per month FOB Contract basis 2007 benchmark + increase
Sept 2008 – commission Mariposa, Mirador pits to expand production to 3.6m tonnes per annum
Oct 2008 – commission Panamax size port to increase shipping capacity by another 2.0m tonnes per annum
June 2009 – commission two more pits for production expansion to 7 million tonnes
Jan 2010 – commission cape size port (maybe earlier subject to funding/permits etc).
==> picture [192 x 26] intentionally omitted <==
4
Production - Continued
Rincon Lithium Limited
Pilot Plant Construction and Commissioning
| Task | Duration, days |
Begins | Ends | ||
|---|---|---|---|---|---|
| Pilot Plant Assembly | |||||
| • Complete plant testing |
14 | 29 Oct | 15 Nov | ||
| • Transport to site |
3 | 16 Nov | 20 Nov | ||
| • Assembly, including electrics |
7 | 21 Nov | 29 Nov | ||
| • Complete plant building |
5 | 30 Nov | 06 Dec | ||
| • In situplant Testing |
14 | 30 Nov | 19 Dec | ||
| Evaporation Ponds construction | |||||
| • Geomembranes welding and testing |
14 | 29 Oct | 15 Nov | ||
| • Trucking of brines to ponds, |
50 | 16 Nov | 24 Jan´08 | ||
| Evaporation ponds | |||||
| • Evaporation |
108 | 16 Nov | 15 Apr ´08 | ||
| • Unrefined Li2CO3production |
16 Apr´08 |
Full scale production scheduled for June – Sep 2009 subject to evaporation
==> picture [192 x 26] intentionally omitted <==
5
Cia Minera Santa Barbara – history
� Joint venture signed 16 Feb 2005 between Wyndham Explorations and Fortune Global Holdings – Admiralty subsidiary
-
Production of small scale plant commenced 10 July 2006
-
Santa Barbara currently producing 30,000 tonne per month and increasing to 100 000 per month with new expanded plant commissioned in February, 2007 – dry operation, no overburden or stripping ratio
-
� SB acquires 30,000 tonnes per month from Santa Fe magnetite mines
-
US$67m CFR contract ($30m re gf i ht) o t Wuhan China, or f 700 000 t, onnes, 210,000 tonnes shipped in 2007.
-
� Candelaria Port (Panamax) and Caleta (Handymax) will serve Santa Fe over the coming years
-
Revenue estimate for 2008, 25-30% increase on 2007 benchmark price
==> picture [192 x 26] intentionally omitted <==
6
Key Statistics – Santa Barbara
==> picture [780 x 433] intentionally omitted <==
----- Start of picture text -----
7,421 hectares of tenements at Japonesa Group Mine Vallenar
3,100 hectares at Pampa Tolofo, near Las Colorados Caleta
Port
Santa Fe
10,000 metres drilling, 2.4m tonne capacity per annum (SB and SF)
Mine
JORC 41.0 m tonnes grading 13.7% at Japonesa Candelaria
Port
Mine head grade 22 . 3%
3 “fossil” stockpiles with 3 million tonnes fines at 14-16% Fe
457 staff operating plant –Besalco Staff
24 geologists, topographers, mining engineers
Punta
Santa Barbara
Alcalde
18 staff quality control/laboratory Mine
US$25m investment in plant – by Besalco
52 trucks to take ore to port each month
14 trucks to move ore to ship (500 metres) – 15,000 tonnes per day
SRK Geological Consulting key partner
7
----- End of picture text -----
10,000 Hectares in Iron Ore Belt
| New Tenements Existing Tenements (Japonesa Agreement) Name Size - hectares Mine Name Size - hectares Leo 3 200 Japonesa 34 **** |
|||||
| New Tenements | Existing Tenements (Japonesa Agreement) |
||||
| Name | Size - hectares | Mine Name | Size - hectares | ||
| Leo 3 |
200 |
Japonesa **** |
34 |
||
| Leo 4 | 200 | Japonesita | 96 | ||
| Leo 7 | 200 | *Mirador | 21 | ||
| Leo 8 | 300 | *Gibaiju | 41 | ||
| Leo 9 | 300 | Natasha | 50 | ||
| Leo 10 | 200 | Tatiana | 60 | ||
| Leo 11 | 200 | Phil | 3 | ||
| Leo 12 | 300 | Pamela | 67 | ||
| Leo 13 | 300 | *Soberana | 25 | ||
| Leo 14 | 200 | *Negrita | 24 | ||
| Leo 15 | 300 | Total | 421 | ||
| Leo 16 |
200 |
New Tenements |
|||
| L 18 eo |
200 | L U eo no |
20 | ||
| Leo 19 | 100 | Leo | 35 | ||
| Leo 20 | 200 | Leo siete | 20 | ||
| Leo 100 | 300 | Leo Cinco | 300 | ||
| Leo 101 | 300 | Leo Seis | 300 | ||
| Leo 102 | 300 | Leo Dos | 200 | ||
| Leo 103 | 300 | Tanati | 80 | ||
| Leo 104 | 300 | Tina | 181 | ||
| Leo 105 | 300 | Paco | 14 | ||
| Leo 106 | 300 | Chillan Veijo | 50 | ||
| Leo 107 | 300 | Total | 1,200 | ||
| Total | 5,800 | Grand Total | 7,421 |
==> picture [192 x 26] intentionally omitted <==
8
Current Production and Operations
Production (Tonnes) 2007 Japonesa --- Jan Feb 11,781 Mar 22,764 Apr 30,847 May 27,444 June 26 , 433 July 32,481 August 36,051 Sept 36,627 Oct 34,045
Santa Fe has grizzly, primary crusher, and high speed drums to install (Jan 08)
==> picture [482 x 60] intentionally omitted <==
==> picture [482 x 78] intentionally omitted <==
==> picture [482 x 78] intentionally omitted <==
==> picture [482 x 78] intentionally omitted <==
==> picture [482 x 71] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
9
Product Specification
| Element Penalty | Level % | Contract Specification | % |
| Fe | 62 00 min . |
63 5 **. ** |
Shipping P M th er on |
| Si02 | 6.0 max | 5.00 | Caleta Pier - three – four handymax 47,000 |
| Al203 | 2.0 max | 1.2 | tonnes Candelaria Pier - |
| P | 0.09 max | 0.07 | From Oct 2008 threepanamax 55 -78,000 |
| S | 0.09 max | 0.07 | tonnes |
| Ca0 | 2.0 max | 1.0 | |
| Mg0 K20 N 20 + a |
2.0 max 0 2 . max |
1.1 0 05 . |
-Punta Alcalde will provide 200,000 tonne cape size vessel capacity in Jan 2009 |
| H20 | 2.0 max | 1.0 |
Annual shipping Capacity C a e a – l t 4 x 45 , 000 x mon 9 th s = . 1 62 m illi on onnes t Candelaria – 4 x 78,000 x 12 months = 3.74 million tonnes Punta Alcalde – 4 x 160,000 x 12 months = 7.68m tonnes
==> picture [192 x 26] intentionally omitted <==
10
Reserves and Resource Estimates – Santa Barbara 41 Million Tonnes
Mine Tonnage Weighted Average Grade Japonesa 42.0 million 13.7% Japonesita* 47.0 million 21.6% Chilean Viejo Mariposa Mirador Viviana * Juanita Negrita Soberana Primavera Leo2
==> picture [239 x 10] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
==> picture [299 x 65] intentionally omitted <==
==> picture [299 x 78] intentionally omitted <==
==> picture [299 x 78] intentionally omitted <==
==> picture [299 x 78] intentionally omitted <==
==> picture [299 x 78] intentionally omitted <==
==> picture [299 x 44] intentionally omitted <==
11
Cia Minera Santa Barbara Iron Ore Production
==> picture [780 x 386] intentionally omitted <==
==> picture [294 x 33] intentionally omitted <==
==> picture [293 x 33] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
12
Santa Barbara - Operations
110,000 tonne capacity per month 4mm crush size (5.65mm diagonal) Process
75mm+ separated 75mm crushed to 25mm 25mm magnetically separated 25mm crushed to “3mm” Crushed fines separated Natural fines separated Fines was 50 mesh removed Low or no Sul hur p
==> picture [273 x 64] intentionally omitted <==
==> picture [273 x 78] intentionally omitted <==
==> picture [273 x 65] intentionally omitted <==
==> picture [273 x 78] intentionally omitted <==
==> picture [273 x 78] intentionally omitted <==
==> picture [273 x 35] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
13
Santa Barbara Plant Schematic
==> picture [780 x 415] intentionally omitted <==
----- Start of picture text -----
FLOW DIAGRAM CRUSHING PLANT PROJECT LA JAPONESA
buzón buzón
alimentador alimentador
vibratorio vibratorio
900 ton/hr 900 ton/hr FLUJOGRAMA IMANES PROYECTO LA JAPONESA
A
PRODUCTO EN PROCESO PRODUCTO EN PROCESO
507 ton/hr 451 ton/hr
C B + D
Rechazo Planta Rechazo Planta
X >= 2.5" 380 ton/hr 180 ton/hr
9.3%
168 ton/hrestéril RECHAZO PLANTA TOTAL560 ton/hr
PRODUCTO EN PROCESO
PRODUCTO EN PROCESO 271 ton/hr
127 ton/hr
producto terminado
X <= 5 mm226 ton/hr VSI harneros Rechazo Planta 36 ton/hr Rechazo Planta 68 ton/hr
RECHAZO PLANTA TOTAL
103 ton/hr
B 1"<= X <=2.5"198 ton/hr PRODUCTO EN PROCESO
cada cinta PRODUCTO EN PROCESO91 ton/hr 203 ton/hr
Rechazo Planta
X <= 1" X <= 1" Rechazo Planta 203 41 ton/hr
618 618 30 ton/hr
ton/hr ton/hr RECHAZO PLANTA TOTAL71 ton/hr
chancador
cono
PRODUCTO TERMINADO
Material Chancado <= 1"3 mm <= Mat. Natural <= 6 mm 61 ton/hr PRODUCTO TERMINADO162 ton/hr RECHAZO PLANTA TOTAL734 ton/hr
producto terminado
X < 3 mm507 ton/hr 6 mm <= X <= 1" PRODUCTO TERMINADO224 ton/hr
C
425 3 harneros
ton/hr
VSI
899 ton/hr
6 mm <= X <= 1"
225 ton/hr alimentación
+
200 ton/hr retorno
674 ton/hr
6 mm <= X <= 25mm
425 estéril
buzón ton/hr polea polea
transferencia magnética magnética
D 225 ton/hr
6 mm <= X <= 1"
X <= 6 mm
225 ton/hr
producto terminado harnero
----- End of picture text -----
==> picture [192 x 26] intentionally omitted <==
14
Caleta, Caldera Port
==> picture [780 x 155] intentionally omitted <==
==> picture [251 x 50] intentionally omitted <==
==> picture [248 x 45] intentionally omitted <==
==> picture [218 x 42] intentionally omitted <==
Candelaria Port - Panamax
Laser Picture of Iron ore stockpiled at Caleta Port
==> picture [256 x 6] intentionally omitted <==
==> picture [780 x 155] intentionally omitted <==
==> picture [244 x 32] intentionally omitted <==
Caleta Pier - handymax
==> picture [256 x 33] intentionally omitted <==
loading at Caldera
==> picture [167 x 33] intentionally omitted <==
15
Hopper ship loading
Santa Fe
==> picture [271 x 67] intentionally omitted <==
Located 75 km from Caleta, Caldera 100 m illi on tonnes o mater a extracte f i l d Fines very low phosphorous 110 , 000 tonne per month production Magnetite material Besalco o eratin lant p g p
==> picture [271 x 78] intentionally omitted <==
==> picture [271 x 61] intentionally omitted <==
==> picture [271 x 19] intentionally omitted <==
==> picture [780 x 155] intentionally omitted <==
==> picture [230 x 30] intentionally omitted <==
==> picture [265 x 31] intentionally omitted <==
==> picture [271 x 31] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
16
31 weeks to build panamax facility at Candelaria – $7.5m investment
==> picture [780 x 78] intentionally omitted <==
| Item | Descripción | Semanas | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ~~1~~.0 | INGENIERIA | ||||||||||||||||||||||||||||||||
| ~~1~~.2 | CIVIL-SANITARIA | 6 | |||||||||||||||||||||||||||||||
| ~~1~~.3 | ARQUITECTURA CONTENEDORES | 3 | |||||||||||||||||||||||||||||||
| ~~1~~.4 | MECANICA | 8 | |||||||||||||||||||||||||||||||
| ~~1~~.5 | ELECTRICIDAD E INSTRUMENTACION | 4 | |||||||||||||||||||||||||||||||
| ~~1~~.7 | PORTUARIA | 13 | |||||||||||||||||||||||||||||||
| ~~2~~.0 | CONSTRUCCION | ||||||||||||||||||||||||||||||||
| ~~2~~.1 | CIVIL-SANITARIA | ||||||||||||||||||||||||||||||||
| 2.1.1 | MOVIMIENTOS DE TIERRA MASIVOS | 8 | |||||||||||||||||||||||||||||||
| 2.1.2 | CAMINOS Y ACCESOS | 5 | |||||||||||||||||||||||||||||||
| 2.1.3 | SISTEMA SANITARIO | 4 | |||||||||||||||||||||||||||||||
| ~~2~~.2 | EDIFICACION CONTENEDORES | 5 | |||||||||||||||||||||||||||||||
| ~~2~~.3 | MECANICA | ||||||||||||||||||||||||||||||||
| 2.3.1 | EQUIPAMIENTO MECANICO AREA APILAMIENTO | 6 | |||||||||||||||||||||||||||||||
| ~~2~~.4 | ELECTRICIDAD | 6 | |||||||||||||||||||||||||||||||
| ~~2~~.5 | OBRAS PORTUARIAS NAVES DE 68,000 DWT | 15 | |||||||||||||||||||||||||||||||
| ~~2~~.6 | OBRAS PORTUARIAS NAVES DE 78,000 DWT | 21 | |||||||||||||||||||||||||||||||
| ~~3~~.0 | COMPRA EQUIPOS | ||||||||||||||||||||||||||||||||
| ~~3~~.1 | MECANICA | ||||||||||||||||||||||||||||||||
| 3.1.1 | EQUIPAMIENTO MECANICO AREA APILAMIENTO | 11 | |||||||||||||||||||||||||||||||
| ~~3~~.2 | DEFENSAS MARITIMAS(*) | 12 | |||||||||||||||||||||||||||||||
| ~~3~~.3 | PILOTES | 13 | |||||||||||||||||||||||||||||||
| ~~3~~.4 | TRANSPORTE DE PILOTES | 2 | |||||||||||||||||||||||||||||||
==> picture [192 x 26] intentionally omitted <==
17
Candelaria Port
==> picture [780 x 386] intentionally omitted <==
==> picture [278 x 30] intentionally omitted <==
==> picture [272 x 31] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
18
Port of Punta Alcalde
Estimated Cost – US$32m Main road to pass site 14km road upgrade 300,000 tonne stockpile Container loading facility – Fruit Port Iron ore loading – Santa Barbara Copper/Silver – Barrick Mines Coal unloading – Pascua Lama Power project Estimated Completion date Jan 2009 subject to funding
==> picture [366 x 54] intentionally omitted <==
==> picture [366 x 78] intentionally omitted <==
==> picture [366 x 78] intentionally omitted <==
==> picture [366 x 78] intentionally omitted <==
==> picture [366 x 78] intentionally omitted <==
==> picture [366 x 17] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
19
Rincon Salar - Argentina
==> picture [457 x 49] intentionally omitted <==
==> picture [457 x 78] intentionally omitted <==
==> picture [457 x 78] intentionally omitted <==
==> picture [457 x 78] intentionally omitted <==
==> picture [457 x 49] intentionally omitted <==
-
Major, world-class, multi-element brine resource (Li, K,) located in the Salta Province of Argentina.
-
The 37 tenements cover an area in excess of 250 square kilometres.
-
Key resources are lithium chloride, lithium carbonate and potassium chloride, (Potash).
-
Sodium Carbonate, sodium sulphate and boric acid also planned
-
Resource due diligence & extraction methods for LiCl, LiOH, LiC03 KCl, have been finalised.
-
Capital expenditure program for development of Rincon Salar has been established.
==> picture [192 x 26] intentionally omitted <==
20
Rincon Salar - Argentina
==> picture [293 x 61] intentionally omitted <==
==> picture [293 x 78] intentionally omitted <==
==> picture [293 x 78] intentionally omitted <==
==> picture [293 x 78] intentionally omitted <==
==> picture [293 x 78] intentionally omitted <==
==> picture [293 x 30] intentionally omitted <==
The Resource
-
The Rincon Pro j ect is located in north-western Argentina near the Chilean border.
-
It is a hyper saline lake, brine enriched in lithium, magnesium, potash, and boron, with three rivers prov idi ng su b terranean waters fl ow ng i i nto t h e salar through volcanic rocks.
-
The project is situated at an elevation of 3,700 -
-
metres within the Antofalla Pocitos volcanic rift valley in the high Andean Plains, with 50 salars closeby.
-
This ponded evaporate deposit is estimated to contain:
-
1.8m tonnes of LiCO3 equivalent
-
51.0m tonnes of KCl (Potash)
==> picture [192 x 26] intentionally omitted <==
21
Rincon Salar - Argentina
Lithium Concentrations from drill hole data
==> picture [370 x 22] intentionally omitted <==
==> picture [251 x 16] intentionally omitted <==
==> picture [780 x 309] intentionally omitted <==
==> picture [370 x 29] intentionally omitted <==
==> picture [251 x 27] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
22
JORC Reserve Calculation
==> picture [780 x 78] intentionally omitted <==
==> picture [695 x 78] intentionally omitted <==
==> picture [695 x 78] intentionally omitted <==
==> picture [695 x 78] intentionally omitted <==
==> picture [695 x 78] intentionally omitted <==
==> picture [695 x 20] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
23
Production, Observation Wells and Ponds
| Analysis | Mean, mg/L |
Relative dispersion |
||
| f th rom e mean |
||||
| Li+ | 394 | ±11% | ||
| K+ Na+ |
7,972 113,903 |
±9% ±5% |
||
| Ca++ Mg++ Cl- |
712 3,667 195,067 |
±65% ±14% ±3% |
||
| SO4= B4O7= CO3H- |
12,334 1,762 386 |
±66% ±44% ±17% |
||
==> picture [192 x 26] intentionally omitted <==
24
==> picture [452 x 78] intentionally omitted <==
Product Specification
==> picture [780 x 386] intentionally omitted <==
25
Pilot Ponds Construction and Laboratory
==> picture [780 x 386] intentionally omitted <==
==> picture [434 x 28] intentionally omitted <==
==> picture [308 x 27] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
26
Rincon Salar - Argentina
The Lithium Extraction Process
==> picture [474 x 69] intentionally omitted <==
==> picture [474 x 78] intentionally omitted <==
==> picture [474 x 78] intentionally omitted <==
c. Salt removed d. Magnesium removed d . Sodium sulphate removed d. Potash removed e. f. Lithium Chloride produced , then LiCO3 , LIOH
==> picture [780 x 78] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
27
Japanese Import Statistics – Lithium Carbonate
| USD Per tonne lithium Carbonate imported into Japan |
May-07 |
|||
| Lithium carbonate |
May-07 | |||
| 14,000 16,000 |
i t pr ce per onne |
|||
| CHINA | 7,325.51 | |||
| 10,000 12,000 |
CHINA CANADA |
GERMANY | 39,575.14 | |
| CANADA | 14,024.21 | |||
| 4000 6,000 8,000 |
USA CHILE ARGENTINA |
|||
| USA | 6,224.74 | |||
0 2,000 , |
CHILE | 6,038.49 | ||
| ARGENTINA | 6,448.66 | |||
| Jan-07 Feb-07 Mar-07 Apr-07 May-07 |
||||
==> picture [192 x 26] intentionally omitted <==
28
THE DEMAND FOR LITHIUM COMPOUNDS IS ABOUT TO SKY ROCKET
-
SQM Estimate of 00-06 CAGR – 6.8%, BUT; HEV, personal battery powered devices and other applications is causing accelerating growth in demand. -
-
Lithium Battery CAGR 2000 05; 25%
-
Car makers are now using Lithium-ion batteries to power Hybrid and full Electric Vehicles. Ford has the Escape and the 4WD Mercury Mariner, General Motors has the Sierra and the Saturn, Honda has the Accord.
-
Citroen announced at the 2007 Frankfurt Motor Show that all Citroen cars will be Hybrid Diesel-Electric by 2012
==> picture [263 x 20] intentionally omitted <==
- Lithium Ion Batteries only currently viable solution
==> picture [263 x 78] intentionally omitted <==
,
- Cost of Hydrogen infrastructure currently prohibitive for hydrogen fuel or hydrogen fuel cell
==> picture [263 x 78] intentionally omitted <==
- New battery technologies near market ready: Lithium Polymer (allows battery to be moulded like putty. Lithium Ceramic Anode – hi g her ener gy densit y / g reater number of recharges
Citroen’s new baby Diesel - Electric Hybrid ~~The C-Cactus with 1.4l Diesel backup~~
==> picture [192 x 26] intentionally omitted <==
29
Lithium Applications – Lithium is not connected to the base metal market
-
The adjacent graph shows SQM view of Global Lithium Consumption .
-
There has been explosive growth in batteries, ~ 25% CAGR, (2000‐05 Roskill) and Industrial Air Conditioning (as a desicant)
==> picture [450 x 55] intentionally omitted <==
==> picture [450 x 40] intentionally omitted <==
==> picture [450 x 39] intentionally omitted <==
23% Others 20% Batteries
-
16% Greases
-
Traditional applications for Greases
-
and Glazes continue with strong demand, eg European Cook Tops
-
12% F r ts i
-
9% Glass
-
8% A/C
-
4% Aluminium
-
Expan di ng L t i hi um Pro d uct on i may still not meet Global Demand
-
Current market conditions
-
suggest a 30% shortfall in supply
-
4% Pharmaceutical
-
4% Polymer
==> picture [450 x 38] intentionally omitted <==
==> picture [450 x 5] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
30
Global Lithium Supply & Pricing – an Opaque Oligopoly Admiralty Estimates a 30% Global Shortage of High Grade LCE
==> picture [119 x 11] intentionally omitted <==
----- Start of picture text -----
SEPTEMBER 2007
----- End of picture text -----
ADY Full Scale Production will have limited im act on increasin rices p g p
| Admiralty Estimate |
Japanese Corporate Estimate |
Industrial Minerals Estimate |
Roskill Report 2006 |
SQM 2006 Estimate |
|||
|---|---|---|---|---|---|---|---|
| Admiralty | Annual Report |
||||||
| Hombre Muerto FMC |
12-15,000 | 16,000 | 17,500 | 12,168 | |||
| Attacama / Silver Peak, Chemetall | 10-15,000 | 23,000 | 30,000 | 44,140 | |||
| Attacama SQM3 | 25-28,000 | 28,000 | 27,800 | ||||
| Ri Adilt2 | 17000 | 17000 | 17000 | ||||
| ncon mray | , |
, |
, |
||||
| Other | 10,000 CITIC1 China |
14,600 | |||||
| Total FMC+SQM+Chemetall (Andes Brines) | 57-68000 | 67000 | 75300 | 70908 | 838004 | ||
, |
, |
, |
, |
, |
|||
| Admiralty production as a percentage of total Brines | 29.8%- 25% |
25.4% | 22.6% | 23.9% | 20.3% |
- Estimates of Lithium Compounds Production from Brines (Lithium Carbonate Equivalent - Tons)
==> picture [192 x 26] intentionally omitted <==
Notes: 1 Chinese CITIC Production is possible part brine part Spodumene
-
2 Full Scale Production target mid 2009 3. SQM have been advising a capacity increase to 40,000 tons pa for a number of years 31
-
Includes Spodumene, but ratios not disclosed
SEPTEMBER 2007 Lithium Carbonate – The Purity / Value Equation
-
Approximate current Asian spot market,+/- $500 (Japan, China and now India), prices for Lithium Carbonate (Li2CO3) - LCE at various purity levels:
-
99.0% purity (and slightly lower) $ 6,000 USD / ton 99.5% purity $ 6,500 USD / ton 99.9+% purity $ 8,250 USD / ton 99.99% purity $ 13,200 USD / ton 99.999% purity $ 25,000 USD / ton Pure Lithium Metal $ 67,500 USD / ton
-
A large number of long term contracts at much lower prices are ending allowing producers to substantially increase prices (SQM -2006 Annual Report)
Other Lithium Prices: Lithium Hydroxide (LiOH) $ 10,500 USD / ton Lithium Chloride (LiCl) $ 8,500 USD / ton
Potassium Chloride (KCl – MOP) $175 - $ 275 USD / ton
==> picture [192 x 26] intentionally omitted <==
32
SEPTEMBER 2007
Admiralty Salar de Rincon Pilot Plant
==> picture [413 x 61] intentionally omitted <==
- All major components have been manufactured and are being assembled on site; Sep ‐ Oct 2007
==> picture [413 x 78] intentionally omitted <==
-
Pond Liners installed by end Oct 2007
-
Plant automated to largest practical degree – plus global data transfer
==> picture [413 x 78] intentionally omitted <==
==> picture [385 x 14] intentionally omitted <==
==> picture [385 x 14] intentionally omitted <==
==> picture [385 x 15] intentionally omitted <==
==> picture [385 x 14] intentionally omitted <==
==> picture [780 x 155] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
==> picture [158 x 59] intentionally omitted <==
==> picture [385 x 12] intentionally omitted <==
33
Admiralty Rincon Project Risks – RISK RATING Summary of Risks from Detailed Analysis
==> picture [780 x 405] intentionally omitted <==
----- Start of picture text -----
Consequence
Insignificant Minor Moderate Major Catastrophic
Likelihood
(1) (2) (3) (4) (5)
Almost Certain
(5)
Likely 5.3
(4)
earthquake
Possible
4.1 econ 4.4 gas
(3)
b ene fi ts
4.2, 4.3, 4.5
Unlikely
5.2, 6.2 5.1, 5.4
(2)
5.4, 6.1, 6.3
Rare
(1)
Low Medium Significant High Extreme
----- End of picture text -----
==> picture [192 x 26] intentionally omitted <==
34
Admiralty Salar de Rincon - Summary
-
A World Class Lithium Reserve plus “Free” Potassium Chloride (MOP),
-
and Sodium Sulphate sales from Rio Grande
-
Potential for production significantly greater than planned
-
Rapidly increasing world demand on many fronts not just batteries; independent of base metals, increasing price even with additional future
-
Admiralty production
-
Lowest Global Cost of Production ( estimated )
-
Relatively inexpensive to bring to Full Scale Production
-
Excellent Economics – tax free zone for sales (Zona franca, Guemes)
-
World Class Team
==> picture [192 x 26] intentionally omitted <==
35
Bulman – Northern Territory
==> picture [259 x 50] intentionally omitted <==
==> picture [259 x 78] intentionally omitted <==
==> picture [259 x 54] intentionally omitted <==
==> picture [295 x 18] intentionally omitted <==
==> picture [295 x 78] intentionally omitted <==
==> picture [295 x 78] intentionally omitted <==
-
Zinc and Lead oxide, sulphide deposit located in southern Arnhem land in Australia's Northern .
-
Territory
-
Applied for ELA23814 – 637 sq kilometres
-
In the 1950’s CRA estimated there was 375,000 tonnes @ 15% Zn and 2% Pb of mainly oxide material.
-
The Bulman Leases and five nearby Zn-Pb occurrences historically were considered having potential for at least 1 , 000 , 000 t of at- surface and near-surface exploitable oxide and sulphide ore at greater than 10% combined zinc and lead.
-
Demand for low level treated ores in Thailand , Asia
-
Further sampling work to be undertaken in order to better define the leases and determine the areas acceptable f or prospecting
==> picture [105 x 10] intentionally omitted <==
==> picture [105 x 59] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
36
Bulman Exploration Licences
==> picture [780 x 386] intentionally omitted <==
==> picture [565 x 28] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
37
Bulman – MLN 726, 727
==> picture [780 x 78] intentionally omitted <==
==> picture [482 x 78] intentionally omitted <==
Bulman Mining leases showing outcrops and banding
==> picture [780 x 232] intentionally omitted <==
==> picture [482 x 28] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
38
Bulman Resources Lead and Zinc Anomalies
==> picture [780 x 386] intentionally omitted <==
==> picture [574 x 34] intentionally omitted <==
==> picture [192 x 26] intentionally omitted <==
39
Pyke Hill – Nickel Cobalt JV – Cougar Metals NL
==> picture [278 x 56] intentionally omitted <==
==> picture [278 x 78] intentionally omitted <==
==> picture [278 x 78] intentionally omitted <==
==> picture [278 x 78] intentionally omitted <==
==> picture [278 x 78] intentionally omitted <==
==> picture [278 x 7] intentionally omitted <==
-
The Pyke Hill Project is located approximately 40km southeast of the Murrin Murrin Nickel Operation, near Leonora, Western Australia.
-
Prospective for a high-grade nickel-cobalt lateritic resource. Estimated in-ground value $3.1b.
-
Aircore drilling undertaken by Cougar in FY2004 returned intersections including 7m @ 2 . 26% Ni , 6m @ 2.03% Ni and 8m @ 1.50% Ni.
-
In FY2005 Cougar completed two additional drilling programs at the project. A total of 25 holes for 896m were drilled, The second program was completed at the end of FY2005 and consisted of 31 Aircore drill holes for 1380m.
-
Results of the better intersections encountered ranged in thicknesses from 3m to 17m and averaged 7.5m. The depth to the top of mineralisation varied from 13m to a maximum of 23m. Grades averaged 1.48% Ni overall using a 1.2% Ni cut-off.
-
Joint venture provides Admiralty with A$0.20 cents “ run of mine ” ore .
-
per tonne of
==> picture [192 x 26] intentionally omitted <==
40