AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

Admie (IPTO) Holding S.A.

Business and Financial Review May 14, 2025

2714_rns_2025-05-14_da8c0cc4-8cf3-4514-9334-5a97a22ac24c.pdf

Business and Financial Review

Open in Viewer

Opens in native device viewer

A. 89 Dyrrachiou and Kifisou str., 104 43, Athens, Greece T. (+30) 210 3636936 E. [email protected] www.admieholding.gr Registration Number: 141287501000

Announcement of the Signing of a Memorandum of Understanding between IPTO and TERNA for the Electrical Interconnection between Italy and Greece - GRITA 2

The "SOCIETE ANONYME ADMIE (IPTO) HOLDING", with the distinctive title "ADMIE (IPTO) HOLDING S.A." ( or the "Company"), informs investors that the affiliate, IPTO S.A., and Terna, the Italian national grid operator, have signed a Memorandum of Understanding (MoU) in Rome during the Italy-Greece Intergovernmental Summit. The MoU sets out the key terms and conditions for the planning and development of a new electrical interconnection between the two countries.

The new high-voltage direct current (HVDC) interconnection between Italy and Greece is a project of strategic importance that will support existing infrastructure and the future development of the networks. Additionally, it will contribute to the achievement of decarbonization targets, while strengthening both countries' roles as energy hubs in the Mediterranean region.

The new submarine power link will complement the existing 500 MW link , which has been operational since 2002.

The project will have a transmission capacity of 1,000 MW and a total length of approximately 300 km. The subsea cable will extend over approximately 240 km, with a maximum installation depth of 1,000 meters. Finally, IPTO and Terna are expected to invest approximately €1.9 billion in the project.

GRITA 2 has already been included in the European Transmission System Operators' Ten-Year Network Development Plan (TYNDP) 2024 and has been jointly proposed for inclusion in the second list of Projects of Common and Mutual Interest (PCI/PMI).

Athens, 14 May 2025

This announcement is published by ADMIE (IPTO) HOLDING S.A. in accordance with Market Abuse Regulation (EU) 596/2014 and Athens Stock Exchange Regulation. It contains information falling within the concept of inside information for the purposes of Article 7 et seq. Regulation (EU) 596/2014 and article 27 par. 8 of Law 4443/2016.