Production at Bibiani

  • New key on-site management

  • Tonnage increase at Walsh and Strauss pits from grade control drilling

  • Main Pit West Wall exploration success

  • Asempaneye prospect exploration commenced

Noble Mineral Resources (ASX: NMG) is pleased to advise that significant progress in the commissioning of the refurbished processing plant at its Bibiani gold project in Ghana has helped ensure the Company is on track to pour its first gold prior to end of month.

Noble is advancing the ramp up of production to 150,000 ounces a year through 2012.

The preparations for first production at Bibiani have been underway in parallel with a series of other significant developments at the project.

==> picture [444 x 291] intentionally omitted <==

----- Start of picture text -----

Drilling and Mining Personnel with Management
----- End of picture text -----

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

1

==> picture [566 x 98] intentionally omitted <==

Mining at the Aheman and Strauss pits is progressing well and is part of Noble’s strategy to supply the first primary ore feed for the mill from these deposits. Reclamation of the levee material is also proceeding and it is used as primary ore feed to the processing facility during commissioning.

The new grade control model for the Strauss pit has been highly successful, with the subsequent reoptimisation resulting in a 25 per cent increase in ore tonnage.

==> picture [405 x 235] intentionally omitted <==

----- Start of picture text -----

Strauss Pit with the TSF and Aheman Pit
----- End of picture text -----

==> picture [383 x 250] intentionally omitted <==

----- Start of picture text -----

Mining of Ore at Aheman Pit
----- End of picture text -----

Drilling and blasting operations have commenced during February at Aheman and Strauss pits. The public road diversion is now 85 per cent completed and equipment availability and productivity is in line with budget.

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

2

==> picture [566 x 98] intentionally omitted <==

Processing Plant

As the wet commissioning of the refurbished and upgraded 3Mtpa processing plant is now on-going for the 7[th] week, the production has been progressing well ahead of the first gold pour this month. The head grade for the commissioning feed continues to be consistently higher than 1.0 g/t at 75% recovery rate which is better than the geology forecast grade of 0.68 g/t at 70% recovery.

A new dry-screen has been installed at the Contingency Production (CP) plant to enhance mill throughput and reduce stoppages due to timber and rock material ingress in the feed. The elution circuit wet commissioning is complete. Carbon elution is planned to commence shortly and the loaded carbon transfer is in progress at this time.

==> picture [468 x 309] intentionally omitted <==

----- Start of picture text -----

New Mobile Screen Working on Levee Material
----- End of picture text -----

Several projects in the plant, such as the refurbishment of the reclaim feeder and SAG mill and the structural installation of recycle conveyors CV04 & CV05 are nearing completion in line with commissioning targets. With all crusher components now in country the completion of construction of the crusher is on-going. An update on dry and wet commissioning of the fully refurbished crushing sections will be supplied as these parameters are accomplished.

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

3

==> picture [566 x 98] intentionally omitted <==

==> picture [360 x 299] intentionally omitted <==

----- Start of picture text -----

Crusher Discharge Nearing Completion
----- End of picture text -----

Appointment of Executive Manager Operations in Ghana

Noble is pleased to announce that it has appointed Mr Roger Bannister as Executive Manager Operations in Ghana.

Mr Bannister has previously held senior positions in the resources industry. He has worked in mining for over 30 years with the last 2.5 years located in Ghana. Mr Bannister brings a wealth of knowledge and significant local expertise to Noble.

Geology Update

Walsh-Strauss Gap Grade Control Drilling

The Walsh-Strauss Gap is a 338m-long area with high grade gold shoots within a broad mineralised zone. As the grade control results below show, the Gap is now fulfilling the expectation of a significant contribution to the overall resource potential following initial setbacks prior to the new structural interpretation. Grade control drilling is now complete and indications are that the Gap will almost certainly be part of the Strauss pit but displaced laterally to the east of Walsh pit. Significant intersections from recent drilling include 1m @ 36.71 g/t, 1m @ 10.71 g/t, and 1m @ 5.98 g/t in holes GPGC_702, GPGC_707 and GPGC_713 respectively ( see table in Appendix 2a ).

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

4

==> picture [566 x 98] intentionally omitted <==

Walsh

Although two 40m sections at the south end of Walsh remain undrilled due to the proximity of the historic tails dam, which is now being cleared and supplying the levee material to the process plant, a preliminary run of the Walsh grade control model has shown an approximate 12% increase in the Walsh reserves. The remaining sections will be drilled once the final historic tailings have been removed to the plant for retreatment. Mineralisation at Walsh is typically controlled by lithology and two lateral faults through the North and South ends of Walsh lensoidal structure. A typical mineralised Walsh intersection is shown in WAGC_051 in the table in Appendix 2b where there is a wide low grade zone of 25m @ 0.57 g/t preceded by a high grade narrow shoot of 2m @ 7.48 g/t which includes 1m @ 12.68 g/t.

Main Pit West Wall

Drilling along the West wall has pierced the metavolcanic (mafic) and sedimentary domain contact with minor porphyry intrusions through the contacts. This observation is geologically significant as such structural contacts form one of the main depositional zones for gold in the Birimian system (s ee Fig 1 below). Positive indicative assays from this structure will open up a whole new drilling target which may lead to a new pit parallel to the Main Pit.

Fig 1. Metavolcanic (mafic) and sedimentary domain contact at main pit west wall

==> picture [376 x 261] intentionally omitted <==

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

5

==> picture [566 x 98] intentionally omitted <==

Elizabeth

The Elizabeth prospect is an easterly shallow dipping ore body with an approximate 300m strike length. Holes EL11_028 and EL11_025 indicate intercepts of 16m @ 2.56 g/t and 14m @ 0.53 g/t respectively ( see Appendix 2d ) as shown in the section 6400N below in figure 2. More drilling is planned to investigate the strike extensions of this find.

Fig 2. Elizabeth section 6400N showing intercepts in holes EL11_28 and EL11_25

==> picture [452 x 273] intentionally omitted <==

Asempaneye Geological Mapping

Geological mapping at the Asempaneye prospect to the south of Bibiani abutting the southern Bibiani mining lease boundary has commenced.

The objective is to delineate the metavolcanic (mafic) and granitoid contact plus the metavolcanic (mafic) Tarkwaian contact. Rock chip samples from the granitoids have returned assays of 3.45 g/t, 3.07 g/t and 0.71 g/t.

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

6

==> picture [566 x 98] intentionally omitted <==

Asempaneye Grab Sample Results

# Sample_ID **UTM_E ** **UTM_N ** LITHO **Au(ppm) ** Description
1 ASE001 573701 712907 Schist <0.01 shearedqtz veins + sericites+graphites
2 ASE002 571960 711961 Granite <0.01 smoky qtz + diss sulphides+ silicified
3 ASE003 571782 711860 Granite 0.71 smoky qtz + diss sulphides+ silicified
4 ASE004 571774 711862 Granite 3.45 qtz veinlets + diss sulphides
5 ASE005 572094 712310 Granite <0.01 smoky qtz + diss sulphides+ silicified + sericites
6 ASE006 572194 711785 Granite 3.07 smoky qtz + diss sulphides+ silicified + sericites
7 ASE007 572328 711685 Granite <0.01 k-feldspars + smoky qtz veinlets + sericites

Fig 3. Asempaneye grab samples locations

==> picture [450 x 313] intentionally omitted <==

Northern Licences Exploration

A high order soil geo-chemical anomaly exists on the ridge straddling the Bibiani North Prospecting Licence (PL) and Assuonta PL. This area has been earmarked for Auger drilling prior to RC drilling. A

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

7

==> picture [566 x 98] intentionally omitted <==

grid of 400m by 20m shall be used initially with later infill if required. Promising sections shall be drilled up to 100m x 10m grid. Auger drilling is an extremely efficient exploration tool as there is no requirement to pay any crop compensation and limited environmental issues. Depths as much as 10m can be achieved in most soil profiles.

Authorised by:

Wayne Norris Managing Director

Competent Person’s Statement

The information in this announcement that relates to Exploration Results, Mineral Resource or Ore Reserves is based on information compiled by Mr Mark Laing (BE (Hons), Mining), who is a Corporate Member of the Australasian Institute of Mining and Metallurgy. Mr Laing is a full-time employee of Noble Mineral Resources Ltd, and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Laing consents to the inclusion in this report of the matters based on his information in the form and content in which it appears.

About Noble Mineral Resources Limited

Noble Mineral Resources Limited listed on the Australian Stock Exchange on 26th June 2008 with a focus on exploring for large-scale gold deposits in the world-class Ashanti Gold Belt in Ghana, West Africa. In November 2009, the Company entered into an agreement for the acquisition of the Bibiani Gold Mine , a project located in the Sefwi-Bibiani Gold Belt in Ghana, host to over 30 Million Ounces of gold. On July 20th 2010 the final Share Transfer Form was executed to consummate the purchase.

Noble’s other primary gold concessions are Exploration Licences at Cape Three Points, Brotet and Tumentu, which cover some 141.3km² and all are located within the world-class Ashanti Gold Belt in south western Ghana. Ghana is the second largest gold producer in Africa and is the 10th largest gold producing nation in the world, with annual production of approximately 2.9 Million Ounces. Noble’s on-going focus will be to expand the drilling program at Bibiani to target new shallow resources near the Bibiani Mine and adjacent tenements while still progressing the Cape Three Points, Brotet and Tumentu Concessions within the Southern extension of the Ashanti Gold Belt. Initial exploration at Cape Three Points will be targeted towards the Satin Mine Project and the Morrison Project , both of which lie in an area of historic underground gold exploration. Noble believes that there is significant potential for the delineation of additional high-grade gold mineralisation relating to the down-plunge and strike extension to these zones. When added to the potential now available at Bibiani it will place Noble in a strong position to achieve its goal in building Australia’s next major gold mining house.

The Company recognises the Bibiani , Cape Three Points, Brotet and Tumentu concessions are relatively under explored, highly prospective projects and aims to rapidly redefine JORC-compliant resources for development.

ASX Code: NMG www.nobleminres.com.au

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

8

==> picture [566 x 98] intentionally omitted <==

Appendix 1 – Drilling Area

==> picture [452 x 538] intentionally omitted <==

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

9

==> picture [566 x 98] intentionally omitted <==

Appendix 2a - The Gap Grade Control Intercepts

Depth
From
Grade
(g/t)
Hole ID Length(m) Including Comments
GPGC_702 36 1 36.71 Walsh-Strauss GapGrade Control Drilling
GPGC_707 29 1 10.71 Walsh-Strauss GapGrade Control Drilling
GPGC_665 21 2 2.87 Walsh-Strauss GapGrade Control Drilling
GPGC_713 37 6 2.48 Walsh-Strauss GapGrade Control Drilling
38 **1m@ 5.98g/t **
GPGC_706 30 1 2.26 Walsh-Strauss GapGrade Control Drilling
GPGC_708 40 2 2.19 Walsh-Strauss GapGrade Control Drilling
GPGC_719 30 1 2.1 Walsh-Strauss GapGrade Control Drilling
GPGC_721 15 1 1.91 Walsh-Strauss GapGrade Control Drilling
GPGC_716 15 1 1.85 Walsh-Strauss GapGrade Control Drilling
GPGC_694 17 3 1.66 Walsh-Strauss GapGrade Control Drilling
17 **1m@ 4.21g/t **
GPGC_664 15 1 1.64 Walsh-Strauss GapGrade Control Drilling
GPGC_712 8 1 1.32 Walsh-Strauss GapGrade Control Drilling
GPGC_696 0 1 1.31 Walsh-Strauss GapGrade Control Drilling
GPGC_722 31 3 1.18 Walsh-Strauss GapGrade Control Drilling
GPGC_663 9 1 1.12 Walsh-Strauss GapGrade Control Drilling
GPGC_717 31 1 1.11 Walsh-Strauss GapGrade Control Drilling
GPGC_670 7 1 1.0 Walsh-Strauss GapGrade Control Drilling
GPGC_729 1 2 2.21 Walsh-Strauss GapGrade Control Drilling
GPGC_905 20 1 2.40 Walsh-Strauss GapGrade Control Drilling
GPGC_730 4 2 1.21 Walsh-Strauss GapGrade Control Drilling
GPGC_731 16 4 1.22 Walsh-Strauss GapGrade Control Drilling

Only results > 1.0 g/t have been reported or intercepts longer than 10m above 0.5 g/t.

Appendix 2b - Walsh Grade Control Intercepts

Depth
From
Grade
(g/t)
Hole ID Length(m) Including Comments
WAGC_383 4 2 1.62 Walsh Grade Control Drilling
WAGC_047 14 2 1.25 Walsh Grade Control Drilling
WAGC_051 11 25 0.57 Walsh Grade Control Drilling
5 2 7.48 Walsh Grade Control Drilling
5 **1m@ 12.68g/t **
WAGC_062 4 2 2.8 Walsh Grade Control Drilling
5 **1m@ 3.4g/t **
WAGC_063 23 3 1.06 Walsh Grade Control Drilling
WAGC_216 25 1 1.33 Walsh Grade Control Drilling
WAGC_180 29 1 1.34 Walsh Grade Control Drilling

Only results > 1.0 g/t have been reported or intercepts longer than 10m above 0.5 g/t.

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au 10

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

==> picture [566 x 98] intentionally omitted <==

Appendix 2c – Main Pit West Wall

Depth
From
Grade
(g/t)
Hole ID Length(m) Including Comments
WW11_013 8 1 1.15 Resource Definition Drilling
WW11_015 10 2 2.41 Resource Definition Drilling
MP11_007A 205 3 18.44 Resource Definition Drilling
206 [email protected]/t

Only results > 1.0 g/t have been reported or intercepts longer than 10m above 0.5 g/t.

Appendix 2d – Elizabeth

Depth
From
Grade
(g/t)
Hole ID Length(m) Including Comments
EL11_025 30 1 3.70 Infill Drilling
EL11_028 15 5 1.98 Infill Drilling
17 **1m@ 6.95g/t **
24 7 4.30
26 **1m@ 23.5g/t **
EL11_049 22 2 1.97 Re-split from Elizabeth Infill Drilling
EL11_050 27 1 1.86 Re-split from Elizabeth Infill Drilling
EL11_053 77 2 1.17 Re-split from Elizabeth Infill Drilling
EL11_058 4 2 1.33 Re-split from Elizabeth Infill Drilling

Only results > 1.0 g/t have been reported or intercepts longer than 10m above 0.5 g/t.

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

11

==> picture [566 x 98] intentionally omitted <==

Appendix 3a – March 2010 JORC Mineral Resource Estimate

TONNAGE GRADE CONT'D GOLD
0.5 g/t cut-off
Tonnes (Aug/t) Ounces
Measured 6,560,000 2.05 430,000
Indicated 13,370,000 1.77 760,000
BIBIANI MAIN PIT
Total M&I 19,920,000 1.86 1,190,000
Inferred 13,060,000 1.89 790,000
Total 32,980,000 1.87 1,980,000

Global Mineral Resource Estimate based on a cut-off grade of 0.5g/t

Appendix 3b – November 2011 JORC Resource Estimate

TONNAGE GRADE CONT'D GOLD
SATELLITE AREAS 0.4 g/t cut-off
Tonnes (Aug/t) Ounces
Measured - 0.00 -
AHEMAN Indicated 607,500 0.73 14,300
Inferred - 0.00 -
Measured 1,748,000 1.68 94,400
WALSH-STRAUSS
PRELIMINARY
Indicated 2,430,000 1.12 87,500
Inferred 6,000 1.69 300
Measured - 0.00 -
GRASSHOPPER Indicated 433,200 1.25 17,400
Inferred 4,800 1.20 200
Measured - 0.00 -
OLD TAILINGS* Indicated 2,860,200 0.70 64,000
Inferred - 0.00 -
Total 8,089,700 1.07 278,100

Global Mineral Resource Estimate based on a cut-off grade of 0.4g/t * Cut-off grade 0.0g/t

TOTAL RESOURCES = 41.1Mt @ 1.71 g/t (2.26Moz)

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

12

==> picture [566 x 98] intentionally omitted <==

Appendix 4 – Proved and Probable Ore Reserves as at June 2011

Bibiani Main Pit Proved and Probable Ore Reserves – June 2011
Oxide Fresh Fill Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs
Proved 5,020 2.17 349 5,020 2.16 349
Probable 360 1.34 16 6,280 2.02 407 340 1.73 19 6,980 1.97 441
Total 360 1.34 16 11,300 2.08 756 340 1.73 19 12,000 2.05 790
Derived from Measured and Indicated Mineral Resources using a cut‐off grade of 0.6g/t

Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves as at October 2011

Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011
Oxide Transition Sulphide Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs
Proved 181 1.30 8 132 1.70 7 753 2.22 54 1,065 2.00 69
Probable 448 1.39 20 172 1.71 9 102 2.05 7 722 1.56 36
Total 628 1.36 28 303 1.70 17 855 2.20 61 1,787 1.82 105
Derived from Measured and Indicated Resources using a cut‐off grade of 0.5g/t

Tailings Deposits Probable Ore Reserves as at November 2011

Bibiani Tailings Deposits Probable Ore Reserves Bibiani Tailings Deposits Probable Ore Reserves Bibiani Tailings Deposits Probable Ore Reserves – November 2011
Deposit Tonnes Grade Cont’dGold
Kt Au (g/t) Kozs
Dams1&2 850 0.74 20
Levees 6 &7 2,030 0.65 43
Total 2,880 0.68 63

TOTAL RESERVES = 16.7Mt @ 1.79 g/t (958,000oz)

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

13