AI assistant
ABX GROUP LIMITED — Interim / Quarterly Report 2018
Oct 30, 2018
64283_rns_2018-10-30_e3d2065b-d155-4cf4-84fc-2415ef147d94.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
==> picture [152 x 78] intentionally omitted <==
ASX code: ABX
Quarterly Activities Report – September 2018 Released 31 October 2018 Page 1
QUARTERLY REPORT AND ACTIVITY STATEMENT FOR THREE MONTHS TO 30 SEPTEMBER 2018
Corporate
- Group available cash at the end of the quarter was $1.74 million and now stands at about $2.2 million
Sales & Operations
-
Sales in the quarter totalled 978 tonnes as part of regular sales of fertiliser grade bauxite
-
A letter of intent to supply chemical-grade bauxite was signed for treatment of industrial waste water in Bangladesh
-
A tender submission for a cement-grade bauxite shipment was completed and samples of a suite of products provided for customer assessment
Bauxite Refining Technology
-
ABx incorporated ALCORE Limited as a wholly owned subsidiary to fund and manage the ALCORE Project, leading to the construction of an ALCORE Production Plant to produce Aluminium Fluoride (AlF3) & valuable co-products
-
ALCORE technology is used to beneficiate and refine raw bauxite with a market price of $50 into high-value products worth more than $US 800 per tonne, including:
-
a. Aluminium Fluoride (AlF3) used as an electrolyte for aluminium smelters & lithium ion batteries;
-
b. Silica fume for our cement industry customers and manufacturers of low-CO2 geopolymer cement;
-
c. Corethane which is an ultra-pure hydrocarbon that can substitute for natural gas for electricity and industrial heat generation and can be used for metallurgical use and brickmaking; and,
-
d. Refractory-grade bauxite & potentially high purity alumina (HPA) for making scratch-resistant sapphire glass.
-
ALCORE will be the first Australian supplier of AlF3 to the Australasian Aluminium Smelters
-
Funding is in place to complete Stage 1, scheduled to take 3 months for final design (now completed), 1 month for final permitting, followed by 3 months construction and up to 5 months of production.
-
ALCORE completed on schedule, the design of the Stage 1 plant the ALCORE Research Centre at Berkeley Vale on the NSW Central Coast and has now acquired the required equipment
-
Production of AlF3 test samples could commence before year-end, well ahead of schedule
-
Once sufficient AlF3 is produced for rigorous testing, the pilot plant will test the production of Corethane, which will provide the fuel for heat and electrical power for the ALCORE Production Plant and will also demonstrate its use as a gas-substitute in gas turbine electrical generators and its use as a diesel substitute for fuel security purposes. Corethane has significant energy and industrial potential
-
ALCORE technology is relatively low-risk because it operates at ambient temperatures and pressures
-
The ALCORE business plan targets long-established, broad industrial markets with many potential buyers
-
Subject to regulatory, statutory and shareholder approvals as required, the ALCORE project is holding discussions with governments, agencies and companies that have showed strong interest in both AIF3 and the main co-products, Corethane and silica fume.
Review of Binjour project located inland from Bundaberg Port, Queensland
-
Binjour project total bauxite resources are 40.5 million tonnes comprising 37 million tonnes of thick gibbsite trihydrate bauxite at Binjour plateau and 3.5 million tonnes in the granted mining lease at Toondoon, located 46 kms south of Binjour[ 1]
-
Binjour bauxite is 3 to 15 metres thick and comprises 10.4 million tonnes suitable for simple bulk mining and shipping as “DSO Bauxite[1] ” and 26.6 million tonnes containing silica gel veinlets which require processing by ABx’s proprietary TasTech technology to reduce silica and upgrade the Al2O3 content to the target production grade
-
Trial mining is planned to determine the optimum mining and processing needed to achieve the Binjour products, the grades of which have been established by a bulk sampling program that subsampled 2,000 tonnes of drillhole samples in December 2017. Binjour’s metallurgical bauxite grades are 44 to 45% Al2O3 & 5% SiO2
-
ABx’s marketing partner, Rawmin Industries of India has commenced shipping bauxite to the large alumina refinery of one of the prospective customers in India and has obtained pro-forma contract terms for Binjour bauxite to be sold into China and/or India.
-
See Resource Statement
Quarterly Activities Report –September 2018 Page 2
==> picture [78 x 56] intentionally omitted <==
Locations
==> picture [374 x 274] intentionally omitted <==
Figure 1 Locations of ABx bauxite mines, projects and transport infrastructure in Tasmania
==> picture [270 x 411] intentionally omitted <==
----- Start of picture text -----
ABx Project Location Yarwun RefineryQld Alumina Refinery Gladstone
Binjour Project Name Boyne Island Smelter Bundaberg
Binjour
Major Ports Binjour Ext
Toondoon
Aluminium Smelter Brovinia 2
Alumina Refinery
Brisbane
Road Infrastructure
Rail Infrastructure
Inverell
Guyra
Tomago
Smelter
Kurri Kurri Newcastle
Smelter
Taralga Sydney
Taralga Ext Port Kembla
Penrose Forest
Penrose
Canberra
Melbourne
Bell Bay
Smelter
Conara
Bald Hill ML
Hobart
----- End of picture text -----
Figure 2: ABx Project Tenements & Major Infrastructure in ABx’s major bauxite project areas nearest export ports in Eastern Australia as follows, from south to north:
-
Northern Tasmania, south of Bell Bay Port
-
Southern NSW Taralga & Penrose pine forest west of Port Kembla
-
Central Queensland based on the major Binjour Bauxite Project, southwest of Port of Bundaberg which is a port that has no impact on the Great Barrier Reef.
==> picture [210 x 140] intentionally omitted <==
----- Start of picture text -----
Figure 3. Tree windbreak at Bald Hill bauxite mine,
Tasmania planted during the quarter
----- End of picture text -----
==> picture [210 x 130] intentionally omitted <==
----- Start of picture text -----
Figure 4. Sheep grazing rehabilitated land at at Bald Hill
bauxite mine, Tasmania
----- End of picture text -----
Quarterly Activities Report –September 2018 Page 3
==> picture [78 x 56] intentionally omitted <==
Sales & Operations: Bald Hill Bauxite Project, Campbell Town, Northern Tasmania
Operating Statistics – Table 1
| Dispatch Date | Sale Tonnes | Product stockpiles(at mine site, blended to specification) Cement-grade 1,800 tonnes Fertilisergrade 250 tonnes |
|
|---|---|---|---|
| 20/01/2016 8/04/2016 7/08/2016 9/09/2016 |
446 5,557 35,913 89 |
||
| Subtotalproduct s/piles 2,050 tonnes |
|||
| Mine stockpiles(grade controlled, ready for blending) Metallurgical grade 2,500 tonnes Cement-grade 44,700 tonnes Fertilisergrade 13,558 tonnes |
|||
| 19/09/2017 28/09/2017 30/10/2017 |
30,000 5,000 669 |
||
| Cement Sub Total | 77,674 | Subtotal mine s/piles 60,758 tonnes |
|
| 24/11/2015 16/03/2016 |
195 390 |
||
| Total saleableprocessed stockpiles 62,808 tonnes |
|||
| 14/09/2016 | 1,500 | ||
| 31/01/2017 3/10/2017 |
351 468 |
Screened material available for classification 30,200 tonnes Broken Ore Stocks readyfor screening: 36,700 tonnes |
|
| 13/11/2017 | 857 | Grand total 129,708 tonnes |
|
| 6/12/2017 | 704 | ||
| 23/03/2018 | 1,412 | ||
| Fertiliser Sub Total | 5,877 | ||
| Total all sales | 83,551 |
Recent falls in the Australian dollar exchange rate are encouraging. Several sales contracts remained at the Letters of Intent stage for shipments later in the year, subject to prevailing market prices closer to the dates of shipment. Spot shipping costs for next year are currently uncertain due to fuel quality regulation changes that commence on 1 January 2019. This situation is expected to stabilise within months.
ABx’s rehabilitation program at its Bald Hill mine (see Figure 1) completed tree-planting during the quarter.
Penrose Bauxite in Strong Demand
ABx’s Penrose bauxite deposit located in a pine plantation 90km inland of Port Kembla (see Figure 2) contains a layer grading 55% Al2O3 and very low iron content which has potential to make special chemical products, as well as refractory bauxite. The strategy for Penrose is to have markets and contracted customers for each layer of Penrose bauxite.
Three significant corporations are currently engaged and the key task is to design an environmentally optimised project that will extract the maximum value from this rare quality deposit.
Letter of Intent with Aziz Group Bangladesh
Australian Bauxite Limited and Aziz Group of Bangladesh executed a Letter of Intent (LOI) over two bauxite marketing opportunities and future business development. The business relationship is designed to develop markets for a range of ABx bauxite types, focussing on utilizing ABx bauxite’s clean character, free of all deleterious elements.
Chemical Grade Bauxite
ABx has agreed to develop and supply Chemical Grade Bauxite for the manufacture of PAC (Polyaluminum Chloride) for the treatment of industrial waste water in Bangladesh. Industrial waste water is a significant issue for Bangladesh industry and communities with large volumes of waste water from industrial plants needing to be treated.
Aziz Group are a chemical manufacturing group in Bangladesh involved in a variety of chemical manufacturing industries and is also a long-established trading house.
Cement Grade Bauxite
Australian Bauxite Limited will appoint Aziz Group of Bangladesh to be the ABx agent for marketing ABx Cement Grade Bauxite to Bangladesh.
The Bangladesh Cement Industry is undergoing significant growth and an excellent opportunity exists for ABx’s ultra clean and cement specific Cement Grade Bauxite to provide a perfectly balanced blend of Aluminium, Iron and Silica to assist the Bangladesh Cement Industry produce high late-strength cement for the concrete construction industry.
Transport Logistics
ABx and Aziz Group are now jointly investigating shipping strategies between Australia and Bangladesh.
Quarterly Activities Report –September 2018 Page 4
==> picture [81 x 85] intentionally omitted <==
Bauxite Refining Technology
ALCORE’s bauxite refining technology produces Aluminium Fluoride (AIF3) and other co-products including the gas-substitute Corethane to power the plant and Silica Fume for the cement industry which ABx already services with its supplies of cement-grade bauxite. ABx has been in negotiations with potential customers about demand and technical specifications for its AIF3 product. These investigations concluded that there is sufficient demand to ultimately justify a 50,000 tonnes per year AIF3 production plant in Australia, built in 5 stages, each of 10,000 tonnes per year AlF3 production.
ABx will initially control the marketing of ALCORE products to customers in the bauxite-alumina- aluminium industry to enhance cost-efficiency. Currently all AIF3 used in Australian aluminium smelters is imported at prices higher than those paid by their overseas competitors. ALCORE may reverse this situation.
ALCORE Refining & Co-products
==> picture [267 x 177] intentionally omitted <==
----- Start of picture text -----
Bauxite + Coal + F-Acids + Water
$50/t
Process
Bauxite + Coal 1. Minerals dissolve
2. Hydrocarbon untouched = “Corethane”
3. Metal fluorides precipitated
4. Co-products are all saleable
AlF3 refinery > US$800 / tonne bauxite
Corethane for SiO2 Fe2O3 TiO2 AlF3
heat &
electricity & Silica Fume Iron Oxide Pigment TiO2 Pigment AlF3
fuel security
----- End of picture text -----
Figure 5 Summary of the ALCORE process:
-
Inputs,
-
AlF3 product &
-
Co-products
Note: Corethane is an ultra-pure hydrocarbon to power the production plant with zero particulate emissions & CO2 emissions similar to natural gas.
ALCORE can also sell electricity to the grid or sell Corethane to industrial customers, several of which have already expressed interest.
Summary
ALCORE’s bauxite refining converts bauxite valued at approximately US$50 per tonne into a suite of products worth in excess of $US800 per tonne of bauxite representing a more than 10-times increase in net value.
Competitive Advantage of ABx’s clean bauxite: zero emissions & wastes: ALCORE technology exploits the uniquely clean nature of ABx bauxite, being free of deleterious elements that would inhibit ALCORE’s bauxite refining efficiency. This allows ALCORE to operate with zero emissions and no waste products, making it easy to site amongst other industrial operations, some of which will be ALCORE’s major customers.
ALCORE can be located anywhere: An ALCORE project could operate anywhere in the world, importing bauxite from any supplier of clean bauxite for less than the $US50 per tonne which is being conservatively assumed in ALCORE’s economic studies.
Therefore, the ALCORE Technology is not affected by resource supply issues and can be located near to its major customers, near sources of low-cost reagents, in areas of skilled and semi-skilled labour and where financial incentives are most attractive for developing these mid-sized value-adding projects.
Risk management: Proven low temperature & pressure technology and achievable product grades
The ALCORE business plan is designed to minimise the financial and technical risks as follows:
-
The technology has been successfully tested twice before, at the rate of 50,000 tonne per year in Japan in 1981-86 and at 5,000 tonnes per year capacity at Cooma NSW in 2002-07;
-
ALCORE technology operates at low temperatures & low pressures with moderate temperature control;
-
ALCORE’s main products in the start-up years 1 to 5 are AlF3, silica fume and high-grade bauxite. These products have deep, well-established markets and can be sold at moderate grades and good prices. This plan for ALCORE’s initial products avoids the market risks of targeting high-purity products which can take several years of process improvements to achieve and often have very few buyers.
Quarterly Activities Report –September 2018 Page 5
==> picture [78 x 56] intentionally omitted <==
Binjour Project Commencing Financial Studies & Marketing Strategy
This project area is located inland from Bundaberg, central Queensland, comprising the main project area located at Binjour, 115kms SW of Bundaberg between Gayndah and Mundubbera with a granted Mining Lease at Toondoon 25kms south of Mundubbera and an exploration project at Brovinia further to the south.
==> picture [413 x 310] intentionally omitted <==
Figure 6: Location of Binjour, Toondoon and Brovinia Bauxite Project Areas
ABx and its Indian marketing partner, Rawmin Mining and Industries ( Rawmin ) are assessing the economic viability of the Binjour Bauxite project in the Wide Bay Burnett region, shipping from the Port of Bundaberg.
Mine studies: Mining and processing strategies are being assessed for the project resources, currently estimated as totalling 40.5 million tonnes from Binjour exploration licences[ 1] and granted mining lease at Toondoon[ 1] 46 kms south of the Binjour deposit.[ 1] - see Figure 6 above. Land status studies are well advanced.
Customers: Discussions with prospective customers have commenced and Rawmin has already commenced shipments of its bauxite, which is similar to Binjour bauxite, to one of the prospective customer’s large alumina plant in India. Terms of these sales allow ABx to evaluate the costs and yields from different mining & processing strategies compared with the additional price that can be achieved by that processing.
Rawmin has also introduced a Chinese customer and site visits with this customer occurred during August.
Port of Bundaberg: During May and June, Officers from the Port of Bundaberg investigated all options available at the Port and have located a port stockpile site that can accommodate 175,000 tonnes of bauxite and allow barge transhipment to a deepwater site within the port limits that can allow shipping via Cape-size ships carrying 150,000 tonnes of bauxite, thus achieving lowest shipping costs. ABx and Rawmin officers have inspected the site and reviewed bathymetric data – and agree that this site meets all requirements.
Road Haulage: ABx has commissioned and recently received road transport studies from expert consultants to identify opportunities for cost-efficient road transport from both Binjour deposit and Toondoon mining lease. Trucking costs can now be estimated with greater certainty.
Support: ABx acknowledges the high level of support from QLD State government departments, local councils and the Port authority. There are synergies between this bauxite project and other mining and non-mining industries in this region.
- See Resource Statement
Quarterly Activities Report –September 2018 Page 6
==> picture [78 x 56] intentionally omitted <==
Exploration: Penrose Pine Forest Quarry NSW
The Penrose project is located in a pine plantation adjacent to the major Hume Highway, some 90km from Port Kembla, south of Sydney NSW. It contains a layer of grey-white, low iron bauxite that potentially could be used to produce refractory bauxite or high value chemical-grade bauxite.
Overlying the grey-white bauxite layer is a two-metre thick layer of high grade metallurgical bauxite
Figure 7 Location of the Penrose Bauxite project area
N 10 kilometres ABx conducted significant beneficiation research and development laboratory High grade bauxite in work on the special lowPenrose Pine iron bauxite at its Plantation laboratory in Tasmania which concluded that a combination of several physical sorting methods can significantly upgrade Penrose Bauxite.
ABx is in discussions with two companies that specialise in refractory bauxite and chemical processing of bauxite. During the quarter, ABx continued discussions with a possible nearby customer for the top layer of metallurgical bauxite.
Penrose bauxite is suitable for chemical manufacturing, including polyaluminium chloride (“PAC”) for water filtration.
About Australian Bauxite Limited
ASX Code ABX Web: www.australianbauxite.com.au
Australian Bauxite Limited (ABx) has its first bauxite mine in Tasmania & holds the core of the Eastern Australian Bauxite Province. ABx’s 14 bauxite tenements in Queensland, New South Wales & Tasmania totalled 914 km[2] & were selected for (1) good quality bauxite; (2) near infrastructure connected to export ports; & (3) free of socio-environmental constraints. All tenements are 100% owned, unencumbered & free of third-party royalties. ABx’s discovery rate is increasing as knowledge, technology & expertise grows. The Company’s bauxite is high quality gibbsite trihydrate (THA) bauxite that can be processed into alumina at low temperature.
ABx has committed a large proportion of its expenditure into Research and Development to find ways to capitalise on the main strengths of its bauxite type, mainly highly clean, free of all deleterious elements and partitioned into layers, nodules, particles and grains of different qualities that can be separated into different product streams using physical, chemical and geophysical methods.
ABx has declared large Mineral Resources at Inverell & Guyra in northern NSW, Taralga in southern NSW, Binjour in central QLD & in Tasmania, confirming that ABx has discovered significant bauxite deposits.
ABx’s first mine commenced at Bald Hill near Campbell Town, Tasmania in December 2014 – the first new Australian bauxite mine for more than 35 years.
ABx aspires to identify large bauxite resources in the Eastern Australian Bauxite Province, which is a globally significant bauxite province. ABx has created significant bauxite developments in 3 states - Queensland, New South Wales and Tasmania. Its bauxite deposits are favourably located for direct shipping of bauxite to both local and export customers.
ABx endorses best practices on agricultural land, strives to leave land and environment better than we find it. We only operate where welcomed.
About ALCORE Limited:
Australian Bauxite Limited (ABx) has incorporated ALCORE Limited as a wholly-owned subsidiary to fund and manage the ALCORE Project, to lead to the construction of an ALCORE Production Plant to produce Aluminium Fluoride (AlF3) and valuable co-products, using patent (pending) new technology. The ALCORE Technology is designed to convert low grade bauxite worth $50 per tonne into a suite of valuable products worth more than $800 per tonne. Site construction works for Stage 1 of the ALCORE project commenced on 1 July as planned at ALCORE’s preapproved Research Centre in Berkeley Vale, Central Coast NSW.
Stage 1 is designed to produce AlF3 test samples for pre-qualified aluminium smelter customers & then produce Corethane, which is pure hydrocarbon powder refined from low-value coals and has been used to provide thermal and electrical power with low CO2 emissions when used as a gas-substitute to fuel large gas turbine. Corethane has also been used as a diesel substitute for fuel security purposes and is ideally suited for use as a sulphur-free bunker fuel.
Directors of ABx Officers Paul Lennon Chairman Leon Hawker Chief Operating Officer Ian Levy CEO & MD Jacob Rebek Chief Geologist Ken Boundy Director Paul Glover Marketing, Exploration & Relationships Henry Kinstlinger Company Secretary
Quarterly Activities Report –September 2018 Page 7
==> picture [78 x 56] intentionally omitted <==
Qualifying statements
General
The information in this report that relate to Exploration Information and Mineral Resources are based on information compiled by Jacob Rebek and Ian Levy who are members of The Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Rebek and Mr Levy are qualified geologists and Mr Levy is a director of Australian Bauxite Limited.
Mainland
The information relating to Mineral Resources on the Mainland was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.
Mr Rebek and Mr Levy have sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of exploration Results, Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report of the Exploration Information in the form and context in which it appears.
Tasmania
The information relating to Exploration Information and Mineral Resources in Tasmania has been prepared or updated under the JORC Code 2012.
Mr Rebek and Mr Levy have sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report of the Exploration Information in the form and context in which it appears.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All statements other than statements of historical fact are forward-looking statements. Forward-looking statements are inherently subject to uncertainties in that they may be affected by a variety of known and unknown risks, variables and factors which could cause actual values or results, performance or achievements to differ materially from the expectations described in such forwardlooking statements.
ABx does not give any assurance that the anticipated results, performance or achievements expressed or implied in those forward-looking statements will be achieved.
Table 2: Tenement information required under LR 5.3.3
| Tenement No. | Location |
|---|---|
| New South Wales | |
| EL 6997 | Inverell |
| EL 7361 | Guyra |
| EL 8370 | Penrose Forest |
| EL 7357 | Taralga |
| EL 7681 | Taralga Extension |
| EL 8600 | Penrose Quarry |
| Queensland | |
| EPM 18014 | Binjour |
| EPM 18772 | Binjour Extension |
| EPM 25146 | Toondoon EPM |
| EPM 19427 | Brovinia 2 |
| ML 80126 | Toondoon ML |
| Tasmania | |
|---|---|
| EL 7/2010 | Conara |
| EL 9/2010 | Deloraine |
| EL 16/2012 | Reedy Marsh |
| EL 18/2014 | Prosser’s Road |
| ML 1961 P/M | Bald Hill Bauxite |
Note:
During the quarter, no exploration licences were relinquished.
All tenements are in good standing, 100% owned and not subject to Farm-in or Farm-out agreements, third-party royalties nor encumbered in any way
Quarterly Activities Report –September 2018 Page 8
==> picture [78 x 56] intentionally omitted <==
Resource Statement
Tabulated below are the Mineral Resources for each ABx Project. The initial ASX disclosure for these Resources is given in the footnotes to the table. Refer to these announcements for full details of resource estimation methodology and attributions.
Table 3: ABx JORC Compliant Resource Estimates
| Region | Resource Category Thickness (m) Million Tonnes |
Al2O3 SiO2 |
A/S Fe2O3 TiO2 LOI |
Al2O3Avl @ 143°C% Rx SiO2 % Avl/Rx ratio |
% Lab Yield |
O'Burden (m) Int.Waste (m) |
|---|---|---|---|---|---|---|
| % % |
ratio % % % |
|||||
| CAMPBELL TOWN | Inferred 1.3 3.0 |
42.6 3.5 |
12 25.4 3.5 24.6 |
36.7 3.0 12 |
50 | 2.1 0.1 |
| AREA TASMANIA7 | Indicated 1.4 3.2 |
42.5 3.2 |
14 26.4 3.0 24.5 |
36.2 2.8 14 |
55 | 1.8 0.1 |
| Total 2.7 3.1 |
42.5 3.3 |
13 25.9 3.3 24.5 |
36.5 2.9 13 |
52 | 2.0 0.1 |
|
| Fingal Rail Cement- | Inferred 2.4 3.3 |
30.9 19.5 |
-- 35.4 3.9 16.7 |
-- -- -- |
-- | 1.9 0.1 |
| Grade Bauxite8 | Indicated 3.9 3.8 |
31.1 19.0 |
-- 35.2 4.0 16.9 |
-- -- -- |
-- | 1.7 0.1 |
| Total 6.3 3.6 |
31.0 19.2 |
-- 35.3 4.0 16.8 |
-- -- -- |
-- | 1.8 0.1 |
|
| DL-130 AREA TAS1 | Inferred 5.7 3.8 |
44.1 4.3 |
10 22.8 3.1 25.0 |
37.6 3.2 12 |
55 | 1.5 0.1 |
| Total Tas 14.7 3.6 |
38.2 10.5 |
n.a. 28.7 3.5 21.4 |
n.a. n.a. n.a. |
54 | 1.7 0.1 |
|
| BINJOUR QLD2 | Inferred 14.2 4.3 |
40.7 7.3 |
6 24.7 4.3 22.1 |
32.3 6.7 5 |
80 | 8.5 0.3 |
| DSO, Screen & Cement | Indicated 22.8 4.0 |
33.5 19.2 |
2 24.9 4.2 16.8 |
15.8 17.4 1 |
63 | 6.6 0.3 |
| Total 37.0 4.1 |
44.1 3.6 |
12 23.1 3.7 24.6 |
39.0 3.0 13 |
61 | 8.9 0.3 |
|
| TOONDOON QLD3 | Inferred 3.5 4.9 |
40.2 7.2 |
6 25.3 4.9 21.7 |
32.8 5.2 6 |
67 | 1.5 0.0 |
| TARALGA S. NSW4 | Inferred 9.9 3.1 |
40.4 5.7 |
7 24.6 4.1 22.2 |
35.2 1.9 18 |
54 | 0.1 0.2 |
| Indicated 10.2 3.7 |
41.3 5.3 |
8 25.9 4.0 22.9 |
36.1 1.9 19 |
55 | 0.7 0.4 |
|
| Total 20.1 5.6 |
40.8 5.5 |
7 25.3 4.0 22.6 |
35.7 1.9 19 |
55 | 0.5 0.3 |
|
| PDM-DSO* Inferred 7.6 2.5 |
37.0 6.0 |
6 38.4 3.5 13.3 |
22.1* 1.3 17 |
72 | 0.2 0.1 |
|
| Indicated 10.3 3.1 |
37.6 3.9 |
10 40.4 3.7 13.5 |
22.4* 1.1 20 |
71 | 0.7 0.4 |
|
| Total 17.8 5.8 |
37.3 4.8 |
8 39.6 3.6 13.5 |
22.3* 1.2 18 |
72 | 0.5 0.3 |
|
| Total Taralga 37.9 5.7 |
39.2 5.2 |
8 32.0 3.8 18.3 |
35.4 1.6 23 |
63 | 0.5 0.3 |
|
| INVERELL N. NSW5 | Inferred 17.5 4.7 |
39.8 4.8 |
8 27.7 4.3 22.2 |
31.0 4.2 7 |
61 | 2.3 |
| Indicated 20.5 4.8 |
40.6 4.7 |
9 26.9 4.1 22.5 |
32.0 4.0 8 |
60 | 2.4 | |
| Total 38.0 4.8 |
40.2 4.7 |
9 27.3 4.2 22.4 |
31.6 4.1 8 |
61 | 2.4 | |
| GUYRA N. NSW6 | Inferred 2.3 4.2 |
41.4 3.6 |
12 26.2 3.3 24.6 |
35.0 2.8 13 |
56 | 3.4 |
| Indicated 3.8 5.9 |
43.1 2.6 |
16 27.3 3.9 24.5 |
37.4 2.0 18 |
61 | 4.4 | |
| Total 6.0 5.3 |
42.5 3.0 |
14 26.9 3.7 24.5 |
36.5 2.3 16 |
59 | 4.0 | |
| GRAND TOTAL A | 137.1 LL AREAS |
* PDM is Al2O3spinel. Al2O3Avl at 225°C is >35% | ||||
| Explanations: All resources 100% owned & unencumbered. Res Chemical definitions: Leach conditions to measure available alu 1000°C. "Avl/Rx" ratio is (Al203 Avl)/(Rx SiO2) and "A/S" ratio is A by ALS lab at 0.26mm. Production yields are not directly related tonnages ofpotential extensions,overburden & interburden detrital b |
ource tonnage estimates are quoted as in-situ, pre mined tonnages. All assaying done at NATA-registered ALS Laboratories, Brisbane. mina "Al2O3 Avl" & reactive silica "Rx SiO2" is 1g leached in 10ml of 90gpl NaOH at 143°C for 30 minutes. LOI = loss on ignition at l203/SiO2. Values above 6 are good, above 10 are excellent. Tonnage is for bauxite in-situ. Lab Yield is for drill dust samples screened and are typically between 60% and 75%. Tonnages requiring no upgrade will have 100% yield. Resource estimates exclude large auxite and underlyingtransitional bauxite mineralisation. Production will clarifythese materials. |
The information above relates to Mineral Resources previously reported according to the JORC Code (see Competent Person Statement) as follows:
-
1 Maiden Tasmania Mineral Resource, 5.7 million tonnes announced on 08/11/2012
-
2 Binjour Mineral Resource, 37.0 million tonnes announced on 18/06/2018 (this report)
-
3 QLD Mining Lease 80126 Maiden Resource, 3.5 million tonnes announced on 03/12/2012
-
4 Goulburn Taralga Bauxite Resource Increased by 50% to 37.9 million tonnes announced on 31/05/2012
-
5 Inverell Mineral Resource update, 38.0 million tonnes announced on 08/05/2012
-
6 Guyra Maiden Mineral Resource, 6.0 million tonnes announced on 15/08/2011
-
7 Initial resources for 1st Tasmanian mine, 3.5 million tonnes announced on 24/03/2015
-
8 Resource Upgrade for Fingal Rail Project, Tasmania announced on 25/08/2016
Tabulated Resource numbers have been rounded for reporting purposes. The Company conducts regular reviews of these Resources and Reserve estimates and updates as a result of material changes to input parameters such as geology, drilling data and financial metrics.
Global Mineral Resources declared to 18/06/2018 total 137.1 million tonnes.
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Australian Bauxite Limited
| ABN 14 139 494 885 |
Quarter ended (“current quarter”) |
|---|---|
| 14 139 494 885 | 30 September 2018 |
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (9 months) $A’000 |
|---|---|---|
| 1. Cash flows from operating activities 1.1 Receipts from customers 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) staff costs (e) administration and corporate costs 1.3 Dividends received (see note 3) 1.4 Interest received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Research and development refunds 1.8 Other (research & development refund) 1.9 Net cash from / (used in) operating activities |
- (314) - (28) (37) (66) - 8 - - - - |
58 (662) - (161) (100) (185) - 22 - - - - |
| (437) | (1,028) |
2. Cash flows from investing activities
- 2.1 Payments to acquire:
| 2. Cash flows from investing activities 2.1 Payments to acquire: (a) property, plant and equipment (b) tenements (see item 10) (c) investments (d) other non-current assets |
2. Cash flows from investing activities 2.1 Payments to acquire: (a) property, plant and equipment (b) tenements (see item 10) (c) investments (d) other non-current assets |
||
|---|---|---|---|
| (a) property, plant and equipment (b) tenements (see item 10) (c) investments (d) other non-current assets |
- - - - |
- - - - |
- See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (9 months) $A’000 |
|---|---|---|
| 2.2 Proceeds from the disposal of: (a) property, plant and equipment (b) tenements (see item 10) (c) investments (d) other non-current assets 2.3 Cash flows from loans to other entities 2.4 Dividends received (see note 3) 2.5 Other (provide details if material) 2.6 Net cash from / (used in) investing activities |
- - - - (185) - - |
- - - (2) (305) - - |
| (185) | (307) | |
| 3. Cash flows from financing activities 3.1 Proceeds from issues of shares 3.2 Proceeds from issue of convertible notes 3.3 Proceeds from exercise of share options 3.4 Transaction costs related to issues of shares, convertible notes or options 3.5 Proceeds from borrowings 3.6 Repayment of borrowings 3.7 Transaction costs related to loans and borrowings 3.8 Dividends paid 3.9 Other (provide details if material) 3.10 Net cash from / (used in) financing activities |
- 472 - - - - - - - |
- 1,137 - - - - - - - |
| 472 | 1,137 | |
| 4. Net increase / (decrease) in cash and cash equivalents for the period 4.1 Cash and cash equivalents at beginning of period 4.2 Net cash from / (used in) operating activities (item 1.9 above) 4.3 Net cash from / (used in) investing activities (item 2.6 above) 4.4 Net cash from / (used in) financing activities (item 3.10 above) 4.5 Effect of movement in exchange rates on cash held 4.6 Cash and cash equivalents at end of period Does not include R&D tax rebate of $666,751 |
1,890 (437) (185) 472 - |
1,938 (1,028) (307) 1,137 - |
| 1,740 | 1,740 | |
- See chapter 19 for defined terms 1 September 2016
Page 2
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
| 5. Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts |
Current quarter $A’000 |
Previous quarter $A’000 |
|---|---|---|
| 5.1 Bank balances 5.2 Call deposits 5.3 Bank overdrafts 5.4 Other (secured bank deposits) 5.5 Cash and cash equivalents at end of quarter (should equal item 4.6 above) |
119 1,016 - 605 |
775 500 - 615 |
| 1,740 | 1,890 |
| 6. | Payments to directors of the entity and their associates | Current quarter |
|---|---|---|
| $A'000 | ||
| 6.1 | Aggregate amount of payments to these parties included in item 1.2 | Nil |
| 6.2 | Aggregate amount of cash flow from loans to these parties included | Nil |
| in item 2.3 | ||
| 6.3 | Include below any explanation necessary to understand the transactions included in | |
| items 6.1 and 6.2 |
$20,000 director fee was paid to Paul Lennon, for his services rendered.
| 7. | Payments to related entities of the entity and their | Current quarter |
|---|---|---|
| associates | $A'000 | |
| 7.1 | Aggregate amount of payments to these parties included in item 1.2 | Nil |
| 7.2 | Aggregate amount of cash flow from loans to these parties included | Nil |
| in item 2.3 | ||
| 7.3 | Include below any explanation necessary to understand the transactions included in | |
| items 7.1 and 7.2 |
N/A
- See chapter 19 for defined terms 1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
| 8. Financing facilities available Add notes as necessary for an understanding of the position Total facility amount at quarter end $A’000 Amount drawn at quarter end $A’000 8.1 Loan facilities Nil Nil 8.2 Credit standby arrangements Nil Nil 8.3 Other (please specify) N/A N/A 8.4 Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well. |
Total facility amount at quarter end $A’000 |
Amount drawn at quarter end $A’000 |
|
|---|---|---|---|
| Nil | Nil | ||
| Nil | Nil | ||
| N/A | N/A | ||
| N/A |
N/A
| 9. Estimated cash outflows for next quarter |
$A’000 |
|---|---|
| 9.1 Exploration and evaluation 9.2 Development 9.3 Production 9.4 Staff costs 9.5 Administration and corporate costs 9.6 Other (provide details if material) 9.7 Total estimated cash outflows |
50 100 - 70 20 - |
| 240 |
| 10. Changes in tenements (items 2.1(b) and 2.2(b) above) |
Tenement reference and location |
Nature of interest | Interest at beginning of quarter |
Interest at end of quarter |
|---|---|---|---|---|
| 10.1 Interests in mining tenements and petroleum tenements lapsed, relinquished or reduced |
- | - | - | - |
| 10.2 Interests in mining tenements and petroleum tenements acquired or increased |
- | - | - | - |
- See chapter 19 for defined terms 1 September 2016
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
-
1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
-
2 This statement gives a true and fair view of the matters disclosed.
Sign here: Date: 31 October 2018 (Company secretary)
Print name: Henry Kinstlinger
Notes
-
The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.
-
If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
-
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
-
See chapter 19 for defined terms 1 September 2016
Page 5