24 July 2018
AUSTRALIAN BAUXITE LIMITED ASX: ABX
==> picture [140 x 32] intentionally omitted <==
AlF3 for Aluminium smelters & Lithium ion batteries. Corethane: clean as gas, cheap as coal
ALCORE Limited Seed Capital Secured & Site Works Commenced for Stage 1 Refining Bauxite into Aluminium Fluoride
Australian Bauxite Limited (ABx) is pleased to announce that its wholly-owned subsidiary, ALCORE Limited has secured the minimum funding needed to commence Stage 1 of the ALCORE Project. Site construction works commenced on 1 July as planned at ALCORE’s pre-approved Pilot Plant site in Berkeley Vale, Central Coast NSW for the production of AlF3 test samples.
Summary:
-
The Research Site for Stage 1 was occupied 1 July 2018 on schedule – see Appendix. Factory spaces were cleared of components not needed for ALCORE’s Stage 1 Pilot Plant, walls panelled & painted. Floors are now levelled and patched for application of reagentsafe sealants to allow engineering measurements for final plant sizing so that fabricated components and modules fit safely.
-
ALCORE technology is designed to refine raw bauxite to produce Aluminium Fluoride (AlF3 and other valuable co-products from ABx bauxite – see Figure 1.
-
The Board of ALCORE Limited is shown in Figure 2. Site employees have been recruited and more will be recruited over coming weeks and months as the project develops
-
Stage 1 site operation budget is $2.5 million at the approved research site (see Appendix)
-
Stage 1 commences with the production of AlF3 test samples and then production of Corethane, which is pure hydrocarbon powder refined from low-value coals
-
Corethane has been used to provide thermal and electrical power and also been used several times as a gas-substitute in gas turbine electrical generators, and used as a diesel substitute for fuel security purposes. Corethane also has industrial applications and several potential customers have already requested test samples for their industrial plants.
-
Discussions continue with governments, agencies and major companies in the aluminium industry
ABx CEO, Ian Levy Comments:
“This is the beginning of a powerful new bauxite refining technology which will commence as an important supplier of key AlF3 products for the Australasian aluminium smelters and producing silica fume for the cement industry, then develop Corethane pure hydrocarbons for energy and fuel security.
“Upside potential includes expanding the product range to AlF3 for Lithium-ion batteries, iron and titanium-based pigments and then developing ultra-pure products such as high purity alumina (“HPA”) for the manufacture of scratch-resistant sapphire glass for phones and computer screens.”
“ABx continues the development of its three core bauxite projects, namely the Tasmanian mine and the large Binjour Project in central QLD and the Penrose refractory bauxite project 90km inland of Port Kembla NSW. Creating ALCORE Limited as a project-specific subsidiary is expected to unlock considerable value for shareholders in both the short and medium terms.”
AUSTRALIAN BAUXITE LIMITED www.australianbauxite.com.au e: [email protected]
ABN 14 139 494 885 Level 2 131 Macquarie St ASX : ABX Sydney NSW 2000 Australia P: +61 2 9251 7177 F: +61 2 9251 7500
Page 2
==> picture [63 x 62] intentionally omitted <==
==> picture [208 x 31] intentionally omitted <==
ASX: ABX
==> picture [435 x 310] intentionally omitted <==
Figure 1: Summary of the ALCORE Business Strategy
==> picture [435 x 320] intentionally omitted <==
Figure 2: ALCORE Board and Advisory Committee
Page 3
==> picture [63 x 62] intentionally omitted <==
==> picture [208 x 31] intentionally omitted <==
ASX: ABX
Listing Rules Consideration
ABx notes that in the event the Company opts at any time to spin-out ALCORE through an IPO then Listing Rule 1.19 provides that: “Admission to the official list, and the category of an entity’s admission, is in ASX’s absolute discretion. ASX may admit an entity on any conditions it thinks appropriate. ASX may grant or refuse admission without giving any reasons.”
Further, in the event that Listing Rule 11.4 applies, ABx shareholders must approve the spin-out of the securities, except those to be retained by ABx, are offered pro rata to holders of ordinary the securities in the listed entity, or in another way that, in ASX’s opinion, is fair in all the circumstances.
For further information please contact: Ian Levy, CEO and MD Australian Bauxite Limited
Telephone: +61 (0) 2 9251 7177 Mobile: +61 (0) 407 189 122
About Australian Bauxite Limited ASX Code ABX Web: www.australianbauxite.com.au
Australian Bauxite Limited (ABx) has its first bauxite mine in Tasmania & holds the core of the Eastern Australian Bauxite Province. ABx’s 22 bauxite tenements in Queensland, New South Wales & Tasmania exceed 1,975 km[2] & were selected for (1) good quality bauxite; (2) near infrastructure connected to export ports; & (3) free of socio-environmental constraints. All tenements are 100% owned, unencumbered & free of third-party royalties.
ABx’s discovery rate is increasing as knowledge, technology & expertise grows. The Company’s bauxite is high quality gibbsite trihydrate (THA) bauxite that can be processed into alumina at low temperature.
ABx has committed a large proportion of its expenditure into Research and Development to find ways to capitalise on the main strengths of its bauxite type, mainly highly clean, free of all deleterious elements and partitioned into layers, nodules, particles and grains of different qualities that can be separated into different product streams using physical, chemical and geophysical methods.
ABx has declared large Mineral Resources at Inverell & Guyra in northern NSW, Taralga in southern NSW, Binjour in central QLD & in Tasmania, confirming that ABx has discovered significant bauxite deposits including some of outstandingly high quality.
ABx’s first mine commenced at Bald Hill near Campbell Town, Tasmania in December 2014 – the first new Australian bauxite mine for more than 35 years.
ABx aspires to identify large bauxite resources in the Eastern Australian Bauxite Province, which is a globally significant bauxite province. ABx has created significant bauxite developments in 3 states - Queensland, New South Wales and Tasmania. Its bauxite deposits are favourably located for direct shipping of bauxite to both local and export customers.
ABx endorses best practices on agricultural land, strives to leave land and environment better than we find it. We only operate where welcomed.
Directors & Officers
| Paul Lennon | Chairman |
|---|---|
| Ken Boundy | Director |
| Ian Levy | CEO & MD |
| Henry Kinstlinger | Company Secretary |
| Leon Hawker | Chief Operating Officer |
| Jacob Rebek | Chief Geologist |
| Paul Glover | Marketing, Logistics & Exploration Manager |
Page 4
==> picture [63 x 62] intentionally omitted <==
==> picture [208 x 31] intentionally omitted <==
ASX: ABX
APPENDIX
Establishing the ALCORE research centre for Stage 1 pilot plant operations. Preparations as at Monday 9th July 2018
==> picture [431 x 248] intentionally omitted <==
ALCORE RESEARCH CENTRE & STAGE 1 PILOT PLANT SITE
==> picture [431 x 269] intentionally omitted <==
Factory Spaces & Floors Being Sealed for the Pilot Plant
Work completed by ALCORE : Site occupied 1 July 2018. Factory spaces cleared of components not needed for ALCORE’s Stage 1 Pilot Plant. Walls panelled & painted. Floors are now levelled and patched for application of reagent-safe sealants to allow engineering measurements for final plant sizing so that fabricated components and modules fit safely. Employees have been recruited and more will be recruited over coming weeks and months as the project develops.
Page 5
==> picture [63 x 62] intentionally omitted <==
==> picture [208 x 31] intentionally omitted <==
ASX: ABX
==> picture [431 x 280] intentionally omitted <==
Pre-existing factory machine shop
==> picture [431 x 266] intentionally omitted <==
Pre-existing factory tool store
Page
==> picture [63 x 62] intentionally omitted <==
==> picture [208 x 31] intentionally omitted <==
ASX: ABX
==> picture [228 x 276] intentionally omitted <==
Sealed clean room with some pre-existing pilot plant components.
==> picture [228 x 276] intentionally omitted <==
Pre-existing ore hopper & screw feed to granulators & sieve.
Laboratory fail-safe air-conditioning to be installed, certified by registered engineers.
==> picture [228 x 276] intentionally omitted <==
Pre-existing fluid-bed dryer, vacuum dryer & Corethane micronizer
==> picture [228 x 276] intentionally omitted <==
Pre-existing forklift mounted electric drum rotator for safe, remote discharge of bauxite into the ore hopper
Page 7
==> picture [63 x 62] intentionally omitted <==
==> picture [208 x 31] intentionally omitted <==
ASX: ABX
==> picture [285 x 348] intentionally omitted <==
Office for plant manager, operations manager and OHS&E manager
==> picture [395 x 274] intentionally omitted <==