Press Release 2025 FIRST HALF YEAR FINANCIAL RESULTS

1 2025 FIRST HALF YEAR FINANCIAL RESULTS

2025 FIRST HALF YEAR FINANCIAL RESULTS

Brussels, 17 September 2025

Cenergy Holdings S.A. (Euronext Brussels, Athens Stock Exchange: CENER), hereafter "Cenergy Holdings" or the "Group", announces today its financial results for the first half year of 2025 together with the issuance of its Interim Report for the same period.

Solid growth and margin expansion

Highlights

  • Revenue surpassed the EUR 1 billion threshold during the first half of the year with improved margins across all business units.
  • Adjusted EBITDA1 increased by 43% compared with H1 2024 and reached EUR 171 million with the corresponding margins at 16.7%. Profitability was driven by efficient execution of awarded energy infrastructure projects and an improving sales mix with the steel pipes segment maintaining its strong momentum and boosting its adjusted EBITDA margin to 18.2% (2.1pp higher than H1 2024). As for the cables segment, it also strengthened its margin to 16.3%, up from 14.2% in H1 2024 due to the favourable shift towards projects as the capacity expansion of the Corinth submarine cables plant was recently completed. The construction of the land cables manufacturing facility in Maryland, USA remains on track.
  • Consolidated profit before tax and net profit after tax stand at EUR 124 million (+70% y-o-y) and EUR 95 million (+69% y-o-y) respectively.
  • Order backlog2 on 30 June 2025 remained stable above EUR 3.3 billion.
  • We expect adjusted EBITDA in FY 2025 to reach EUR 310 – 340 million (up from EUR 300 330 million announced earlier this year).

1 Adjusted EBITDA, defined in Appendix D "Alternative Performance Measures (APMs)".

2 Order backlog includes signed contracts, as well as contracts not yet in force, for which the subsidiaries have either received a letter of award or been declared preferred bidder by the tenderers.

Alexis Alexiou, Cenergy Holdings' Chief Executive Officer, commented:

"The strong profitability and continued margin expansion in the first half of 2025 underline the effectiveness of Cenergy Holdings' value-driven strategy. Both business segments delivered robust results, elevating the Group's margins to record-high levels. The steel pipes segment maintained its solid momentum, successfully executing major projects, while the cables segment continued to capitalize on the growth of power grid infrastructure and scheduled renewable energy projects, once again delivering outstanding performance.

We remain firmly committed to creating long-term value for our shareholders and customers through disciplined strategy execution. Looking ahead, we are confident in our ability to sustain this positive trajectory. Our diversified business portfolio and targeted investments are key pillars of our growth strategy, providing resilience amid ongoing global economic and geopolitical challenges."

Overview

In the first half of 2025, Cenergy Holdings continued its positive results with adjusted EBITDA reaching EUR 171 million, a 43% increase over H1 2024. Both segments contributed strongly to this performance with cables continuing to deliver solid earnings, as it successfully kept on fulfilling its substantial order backlog, while steel pipes benefited from improved margins driven by a favourable project mix and outperformed even the exceptional first semester of 2024.

Demand for cable products remained healthy with stable prices, while both segments continued efficient execution of energy-related projects, the primary driver of profitability growth. Profit after tax for the period amounted to EUR 95 million.

Both Hellenic Cables and Corinth Pipeworks secured new projects that kept the Group's total backlog above the EUR 3 billion threshold (EUR 3.33 billion as of 30 June 2025). Notable recent awards include contracts for more than 180km for the Adriatica pipeline project in Italy, a turnkey contract from Réseau de Transport d'Électricité (RTE) in partnership with Asso.subsea, another for 225kV HVAC export cables for the Dunkerque Offshore Wind Farm in France, a 41km LSAW pipeline for the HyNet Carbon Capture and Storage (CCS) Pipeline in Liverpool Bay in the UK and the supply of 230kV submarine cables for the Silver Run Expansion Project in the USA.

In the cables segment, the newly operational expanded capacity for offshore cables led to a notable increase in both the top and the bottom line, as a higher number of projects in the segment's robust order backlog progressed smoothly. High-capacity utilization across all production lines continues to support growth and enhance overall performance. A slow ramp-up of the integration of new capacity in the Corinth plant has been resolved and the new lines are now fully operational. Revenue from projects surged by 63%, underscoring the Group's "value over volume" approach. Meanwhile, low and medium voltage power cables maintained healthy profitability margins, contributing to the segment's solid results. Altogether, these achievements drove a 52% year-on-year increase in adjusted EBITDA that reached EUR 121 million. The segment's backlog remained strong at EUR 2.8 billion with more awards expected by year end. Finally, the segment progressed its comprehensive capital expenditure programme, with key investments aimed at expanding onshore cable production in Thiva and Eleonas (Greece), as well as establishing a new manufacturing facility in Baltimore, Maryland.

The steel pipes segment demonstrated an even stronger performance in the first half of 2025, with revenue reaching EUR 280 million and a record-high EBITDA margin of 18.2%, up from 16.1% in H1 2024. Profit before tax rose to EUR 40 million, marking a 53% increase compared to the same period last year. The order backlog remained solid at EUR 560 million and the order intake of EUR 350 million exceeded half-year revenue. Key projects executed during this period included OMV Petrom's Neptune deepwater project in Romania, Woodside Energy's Trion offshore project in the Gulf of Mexico, and hydrogen-certified pipeline projects for Snam in Italy. Additionally, new projects such as BP's NEP CCS development in the North Sea were launched. Furthermore, Corinth Pipeworks completed the successful commissioning and operation of its new Concrete Weight Coating (CWC) plant at its production facility in Thisvi, Greece.

Group financial review

Profitability analysis

Amounts in EUR thousand H1 2025 H1 2024 Change (%) Q2 2025 Q2 2024 Change (%)
Revenue 1,022,220 812,157 26% 534,319 416,418 28%
Gross profit 185,099 132,644 40% 101,519 73,173 39%
Gross profit margin (%) 18.1% 16.3% 178 bps 19.0% 17.6% 143 bps
a-EBITDA 170,947 119,456 43% 95,218 65,043 46%
a-EBITDA margin (%) 16.7% 14.7% 201 bps 17.8% 15.6% 220 bps
EBITDA 171,248 121,196 41% 92,917 67,661 37%
EBITDA margin (%) 16.8% 14.9% 183 bps 17.4% 16.2% 114 bps
a-EBIT 152,549 102,890 48% 85,871 56,655 52%
a-EBIT margin (%) 14.9% 12.7% 225 bps 16.1% 13.6% 247 bps
EBIT 152,850 104,630 46% 83,569 59,273 41%
EBIT margin (%) 15.0% 12.9% 207 bps 15.6% 14.2% 141 bps
Net finance cost (29,300) (31,747) -8% (14,209) (14,770) -4%
Profit before income tax 123,550 72,883 70% 69,360 44,503 56%
Profit after tax for the year 95,256 56,463 69% 54,228 32,846 65%
Net profit margin (%) 9.3% 7.0% 237 bps 10.1% 7.9% 226 bps
Profit attributable to owners 95,255 56,459 69% 54,231 32,846 65%

Source: Consolidated Statement of Profit or Loss (Appendix A) and APMs (Appendix D)

Amounts in EUR H1 2025 H1 2024 Change (%) Q2 2025 Q2 2024 Change (%)
Earnings per share 0.44875 0.29692 51% 0.25548 0.17274 48%

During H1 2025, the Group delivered strong financial results, with consolidated revenue increasing by 26% yearon-year to EUR 1,022 million. 2025 second quarter's turnover was 28% higher than that of Q2 2024 and 10% higher than Q1 2025, reflecting sustained growth momentum across both business segments. Cables' revenue rose by 33%, driven by an improved product mix and robust performance across both subcategories: +63% in projects and +17% in power and telecom products. The steel pipes segment achieved 11% revenue growth versus H1 2024, maintaining the positive course established over the past two years.

The favourable mix of steel pipes projects and the increased contribution of cables projects to total revenue supported a notable improvement in adjusted EBITDA margins. As a result, adjusted EBITDA reached EUR 171 million, marking a 43% increase compared to H1 2024. Profitability margins in Q2 2025 exceeded 17%, contributing EUR 95 million to adjusted EBITDA, which is up 46% y-o-y and 26% q-o-q.

Net finance costs declined by 8% y-o-y, amounting to EUR 29 million in H1 2025 (vs. EUR 32 million in H1 2024), due to lower credit spreads and lower reference rates. Foreign exchange losses, linked to the Group's USD cash holdings for the Maryland investment and included in finance costs, totalled ca. EUR 7 million in H1 2025, compared to only EUR 0.2 million in H1 2024. Excluding this impact, net finance costs were 29% lower than those of H1 2024.

Strong operational performance led to a 70% increase in profit before income tax versus H1 2024, while profit after tax exceeded EUR 95 million, representing 9.3% of revenue.

Consolidated Statement of Financial Position (simplified)

Amounts in EUR thousand 30 Jun 2025 31 Dec 2024
ASSETS
Property, plant and equipment 944,971 850,478
Intangible assets 40,760 40,902
Equity - accounted investees 34,660 31,913
Other non-current assets 23,045 25,347
Non-current assets 1,043,436 948,640
Inventories 492,379 505,580
Trade and other receivables 183,898 139,588
Contract assets 391,212 242,572
Cash and cash equivalents 343,715 442,461
Other current assets 42,430 23,546
Current assets 1,453,634 1,353,747
TOTAL ASSETS 2,497,070 2,302,387
EQUITY 780,610 710,897
LIABILITIES
Loans and borrowings 184,584 243,480
Lease liabilities 5,707 6,315
Deferred tax liabilities 68,598 61,013
Other non-current liabilities 18,405 22,473
Non-current liabilities 277,295 333,281
Loans and borrowings 493,616 342,048
Lease liabilities 3,028 2,837
Trade and other payables 630,263 667,000
Contract liabilities 249,226 200,853
Other current liabilities 63,032 45,472
Current liabilities 1,439,165 1,258,209
TOTAL LIABILITIES 1,716,460 1,591,490
TOTAL EQUITY & LIABILITIES 2,497,070 2,302,387

Source: Consolidated Statement of Financial Position (Appendix C)

Total capital expenditure for the Group amounted to EUR 119 million in H1 2025, with EUR 108 million intended for the cables segment and the rest to steel pipes, as the former advances its capacity enhancement plans to serve a growing demand.

Working capital3 (WC) increased by EUR 157 million, reaching EUR 151 million as of 30 June 2025, compared to the negative levels of EUR (6) million at year-end 2024. This was anticipated and primarily driven by the timing of milestone payments related to projects under execution. To support both capital expenditure and working capital needs, the Group used available cash and unutilized credit lines. As we noted in our previous financial statements, future working capital needs remain sensitive to the timing of advance and milestone payments in energy-related projects, as well as fluctuations in raw material prices.

The combination of substantial capital expenses and higher working capital requirements, mainly for the cables segment, led to a rise in net debt, at EUR 343 million on 30 June 2025, EUR 191 million higher than the level of year end 2024. Cash proceeds from the Share Capital Increase of October 2024 continue to positively impact the Group's financial position, with the parent company's net cash reaching EUR 162 million at the end of the semester.

3 Working capital is defined as the sum of a) inventories, b) current trade and other receivables, c) contract assets, d) current contract costs and e) income tax receivables minus f) current trade and other payables, g) provisions, h) current and non-current contract liabilities and i) current tax liabilities.

EUR thousand Revenue EBITDA a-EBITDA EBIT EBT
Segment H1 2025 H1 2024 H1 2025 H1 2024 H1 2025 H1 2024 H1 2025 H1 2024 H1 2025 H1 2024
Cables 742,442 560,086 120,943 81,125 120,665 79,385 108,185 69,540 87,844 47,088
Steel Pipes 279,779 252,071 50,832 40,583 50,809 40,583 45,198 35,604 40,189 26,220
Other activities - - (526) (511) (526) (511) (533) (515) (4,483) (425)
Total 1,022,220 812,157 171,248 121,196 170,947 119,456 152,850 104,630 123,550 72,883

Financial performance by business segment

Source: Consolidated Statement of Profit or Loss (Appendix A), Segmental Information (Appendix B) and APMs (Appendix D)

Cables

The cables segment showed a healthy performance in the first half of 2025 with revenues of EUR 742 million (+33% y-o-y). As previously mentioned, growth was primarily fuelled by the projects business, which recorded a remarkable 63% surge in revenues compared to H1 2024, supported by the recent capacity expansion and the segment's continued focus on high value-added activities. Adjusted EBITDA grew to EUR 121 million (+52% y-oy), with marginsrising to 16.3%, up from 14.2% in the prior-year period. Improved profitability was due to higher revenue contribution and consistently strong margins of the projects business. On the other hand, cables products conserved solid profits, maintained by good demand and healthy margins.

Hellenic Cables continued throughout 2025 a successful tendering activity with several new awards:

  • a turnkey contract, together with Asso.subsea, from Réseau de Transport d' Électricité (RTE) for the 225kV HVAC export cables of the Dunkerque Offshore Wind Farm in France,
  • the design, manufacturing and testing of the 230kV submarine cables and the supply of related cable accessories and spare materials for the Silver Run Expansion Project in the USA.
  • frame contracts with European TSOs for low voltage and medium voltage cables.

Overall, Hellenic Cables secured over EUR 200 million of new orders, in both projects and framework contracts, despite challenges from a turbulent macroeconomic environment. Consequently, the cables order backlog amounted to ca. EUR 2.8 billion by 30 June 2025 (EUR 3 billion on 31.12.24).

At the same time, several projects were successfully fully or partially delivered throughout the first six months of the year. Among others, the installation for the turnkey project Ostwind 3 (220kV export cable system) in Germany for 50Hertz progressed significantly, while the production of both the export and inter-array cables for the Thor OWF in Denmark was completed. Furthermore, production of cables for several other projects, such as the export ones for the Baltyk II OWF in Poland, the interconnection of DolWin Kappa platform in Germany and inter-array cables for the "Eoliennes en Mer – Dieppe Le Tréport" OWF in France and the East Anglia 3 OWF in the UK progressed as planned.

Net finance costs decreased by 9% y-o-y to EUR 20 million due to lower interest rates, despite needs to finance the ongoing investment programmes, mainly in the onshore cables plants. Profit before income tax almost doubled, to EUR 88 million vs. EUR 47 million in H1 2024. Net profit after tax followed the same trend and reached EUR 67 million from EUR 35 million, a year earlier.

As of 30 June 2025, the cables segment's net debt reached EUR 491 million because of higher working capital requirements and ongoing investment programs. Capital expenditure for the first half of 2025 totalled EUR 108 million, allocated as follows:

  • EUR 49 million for the final phase of capacity expansion in the offshore cables plant in Corinth;
  • EUR 40 million for upgrades to the two onshore cables plants in Greece: new production lines and equipment at the Thiva plant which will become a best-in-class facility for MV, HV, and EHV ground and

underground cables (completion expected by year-end) and continued investments in the Eleonas plant for operational efficiency and productivity works;

  • EUR 4 million for improvements in the Bucharest plant, and
  • EUR 15 million for the launch of works in the new land cables facility in Maryland, U.S.

Steel pipes

The steel pipes segment maintained its strong momentum from 2024, delivering further revenue growth in the first half of 2025. Turnover increased to EUR 280 million, up from EUR 252 million in H1 2024, while adjusted EBITDA rose to ca. EUR 51 million, compared to EUR 41 million in the prior-year period. Hence, steel pipes achieved a record-high EBITDA margin of 18.2%, almost 2pp higher than H1 2024.

This achievement was assisted by selective capacity-enhancing investments, allowing higher production volumes, and profited from a high-margin project mix. Elevated energy prices and the ongoing need for alternative natural gas transportation routes continue to drive pipeline demand, reviving and/or bringing forward a number of projects around the world aligned with the energy transition agenda.

In the first six months of the year, Corinth Pipeworks manufactured and executed several significant projects such as:

  • OMV Petrom's Neptun deep offshore gas pipeline in Romania (162Km of 30" LSAW pipes),
  • Several pipes for Snam in Italy, including parts of the Adriatica gas infrastructure, the majority of which are certified to transport up to 100% of hydrogen, and
  • Large diameter pipeline projects for US and Israeli customers and HFW offshore pipelines for projects in the North Sea and Norwegian sea.

As of 30 June 2025, the order backlog for the steel pipes segment stood at EUR 560 million, up from EUR 430 million six months earlier. This reflects the successful award of several high-profile projects, reinforcing Corinth Pipeworks' strong market positioning. Key new awards include:

  • 41km of LSAW steel pipes for the offshore part of the HyNet CO2 Pipeline in Liverpool, UK, operated by ENI, a project of strategic importance to the country's decarbonization goals and global climate efforts.
  • New awards / lots from Snam for the Adriatica gas pipeline in Italy.

Additional awards across the U.S., the UK and Netherlands further validate the steel pipes segment's competitive edge in delivering high-performance pipeline solutions.

Net finance costs declined significantly by 47% year-over-year, amounting to only EUR 5 million in H1 2025. The reduction was due to both improved interest rate conditions and lower average debt levels compared to the same period last year. Profit before income tax rose to EUR 40 million, up from EUR 26 million in H1 2024, while net profit after tax increased by 51%, reaching approx. EUR 33 million. Operational efficiency and disciplined financial management were major factors towards achieving these results.

As of 30 June 2025, the steel pipes segment's net debt remained stable at EUR 14.5 million (EUR 15 million at year-end 2024) as strong profitability offset the moderate increase in working capital (EUR 17 million vs. EUR 6 million on 31.12.24). It also enabled the segment to self-finance selective capital expenses of EUR 10.5 million during the period, the most significant being the successful commissioning and launch of the new Concrete Weight Coating (CWC) plant at the Thisvi facility in Greece. This state-of-the-art coating line significantly enhances the company's ability to deliver fully integrated offshore pipeline solutions from a single location, reinforcing its strategic positioning in the global energy infrastructure market.

Outlook

The high order backlog of Cables remains the cornerstone of their positive financial outlook for the remainder of 2025 and into the medium term. The segment has already expanded its offshore cables capacity, is actively progressing with the expansion of its onshore cables business lines in Greece and is also advancing its strategic investment in the U.S. onshore cables market. Global trends like the growing electricity demand, the need for grid modernization in most developed economies and the rise in renewable energy generation in Europe are expected to persist well in the next decade. These "megatrends" have elevated the strategic importance of the entire cables industry, directly fueling the segment's expansion plans and strengthening its order pipeline. Demand for LV and MV power cables also remains strong, with additional volume secured through long-term framework contracts, further reinforcing the segment's growth path.

Steel pipes continue to build on their strong market position, supported by high-capacity utilization, improved profitability, and a revolving backlog of strategic projects. Recent investments in capacity enhancement, production optimization, and advanced downstream capabilities have laid the foundation for capturing new opportunities. Looking ahead, Corinth Pipeworks anticipates continued demand for natural gas infrastructure, which remains the dominant transitional fuel globally. In parallel, the energy transition is driving short-term demand for CCS projects and longer-term investment in hydrogen infrastructure — both areas where Corinth Pipeworks has established itself as a market leader.

Based on future performance estimates, corroborated by a strong order backlog, and having already achieved a strong H1 2025 profitability, Cenergy Holdings expects its adjusted EBITDA to be in the range of EUR 310 – 340 million for the FY 2025. The financial outlook is subject to several assumptions including (a) smooth execution of energy projects across both segments, (b) no further significant changes in trade policies (tariffs) and (c) limited financial impact from geopolitical uncertainties, macroeconomic volatility, supply chain disruptions, or other external shocks.

Subsequent events

There are no subsequent events affecting the Condensed Consolidated Interim Financial Statements.

Statement of the Auditor

All figures and tables contained in this press release have been extracted from Cenergy Holdings' unaudited Condensed Consolidated Interim Financial Statements for the first six months of 2025, which have been prepared in accordance with IAS 34 Interim Financial Reporting, as adopted by the European Union.

The statutory auditor, PwC Bedrijfsrevisoren BV / Reviseurs d'Entreprises SRL, represented by Alexis Van Bavel, has reviewed these Condensed Consolidated Interim Financial Statements and concluded that based on the review, nothing has come to the attention that causes them to believe that the Condensed Consolidated Interim Financial Statements are not prepared, in all material respects, in accordance with IAS 34, as adopted by the European Union.

For the Condensed Consolidated Interim Financial Statements for the first six months of 2025 and the review report of the statutory auditor, refer to Cenergy Holdings' website www.cenergyholdings.com.

Financial Calendar

Publication / Event Date
H1 2025 Financial Results Conference Call 18 September 2025
Q3 2025 trading update 19 November 2025
Q3 2025 trading update - Conference Call 20 November 2025
Financial results FY 2025 – Press release 4 March 2026
Financial results FY 2025 – Conference Call 5 March 2026
Ordinary General Meeting 2026 26 May 2026

DISCLAIMER: Any forward-looking statements that may be included in this press release are statements regarding or based on current expectations, plans or understandings of our management relating to, inter alia, Cenergy Holdings' future results of operations, financial position, liquidity, prospects, growth, strategies or developments in the markets in which its subsidiaries operate. Such forward-looking statements shall be treated as a reflection of information, data and understandings as of the date of the publication of this press release, so you are encouraged not to place undue reliance on them, given that by their nature, forward-looking statements are subject to risks, uncertainties and assumptions that could materially alter the actual results or future events from those expressed or implied thereby. The outcome and financial effects of the understandings, intentions, and events described herein could be adversely affected by these risks, uncertainties and assumptions. Forward-looking statements contained in this press release related to trends or current activities shall not to be taken as a report of the future status of such trends or activities. We undertake no obligation to update or revise any forward-looking statements, either as a result of new information or developments, future events or otherwise. The information contained in this press release is subject to change without notice. No re-report or warranty, express or implied, regarding the fairness, accuracy, reasonableness or completeness of the information contained herein and no reliance shall be placed on it. This press release has been prepared in English and translated into French and Greek. In case of discrepancies between different language versions, the English one shall prevail.

About Cenergy Holdings

Cenergy Holdings is a Belgian holding company listed on both Euronext Brussels and Athens Stock Exchange, investing in leading industrial companies, focusing on the growing global demand of energy transfer, renewables and data transmission. The Cenergy Holdings portfolio consists of Corinth Pipeworks and Hellenic Cables, companies positioned at the forefront of their respective high growth sectors. Hellenic Cables is one of the largest cable producers in Europe, manufacturing power and telecom cables as well as submarine cables. Corinth Pipeworks is a world leader in steel pipe manufacturing for the energy sector and major producer of steel hollow sections for the construction sector. For more information, please visit our website at www.cenergyholdings.com.

Contacts

For further information, please contact:

Sofia Zairi Chief Investor Relations Officer Tel: +30 210 6787111, +30 210 6787773 Email: [email protected]

Appendix A –Consolidated Statement of Profit or Loss

For the six months ended 30 June
EUR thousand 2025 2024
Revenue 1,022,220 812,157
Cost of sales (837,121) (679,513)
Gross profit 185,099 132,644
Other income 2,412 4,122
Selling and distribution expenses (8,649) (8,817)
Administrative expenses (25,845) (20,572)
Impairment loss on receivables and contract assets (65) (68)
Other expenses (1,587) (3,090)
Operating profit 151,366 104,220
Finance income 3,685 595
Finance costs (32,985) (32,341)
Net finance costs (29,300) (31,747)
Share of profit / (loss) of equity-accounted investees, net of tax 1,484 410
Profit before tax 123,550 72,883
Income tax (28,294) (16,421)
Profit for the period 95,256 56,463
Profit attributable to:
Owners of the Company 95,255 56,459
Non-controlling interests 1 4
95,256 56,463

Appendix B – Segmental Information

EUR thousand Cables Steel Pipes Other activities Total
H1 2025 H1 2024 H1 2025 H1 2024 H1 2025 H1 2024 H1 2025 H1 2024
Revenue 742,442 560,086 279,779 252,071 - - 1,022,220 812,157
Gross profit 131,214 88,255 53,884 44,389 - - 185,099 132,644
Operating profit / (loss) 108,185 69,540 44,904 35,945 (1,722) (1,266) 151,366 104,220
Finance income 573 336 302 165 2,809 93 3,685 595
Finance costs (20,914) (22,788) (5,311) (9,550) (6,760) (3) (32,985) (32,341)
Share of profit/(loss) of equity
accounted investees, net of tax
- - 295 (341) 1,190 751 1,484 410
Profit / (Loss) before tax 87,844 47,088 40,189 26,220 (4,483) (425) 123,550 72,883
Income tax (20,716) (11,755) (7,578) (4,666) - - (28,294) (16,421)
Profit/(Loss) for the period 67,128 35,333 32,611 21,554 (4,483) (425) 95,256 56,463

Appendix C –Consolidated Statement of Financial Position

EUR thousand 30 June 2025 31 December 2024
ASSETS
Non-current assets
Property, plant and equipment 944,971 850,478
Right of use assets 8,235 8,749
Intangible assets 40,760 40,902
Investment property 155 155
Equity - accounted investees 34,660 31,913
Other Investments 4,888 4,500
Derivatives 374 495
Trade and other receivables 677 534
Contract costs - 222
Deferred tax assets 8,715 10,692
1,043,436 948,640
Current Assets
Inventories 492,379 505,580
Trade and other receivables 183,898 139,588
Contract assets 391,212 242,572
Contract costs 66 288
Income tax receivables 18,207 18,329
Derivatives 24,158 4,928
Cash and cash equivalents 343,715 442,461
1,453,634 1,353,747
Total assets 2,497,070 2,302,387
EQUITY
Share capital 131,669 131,669
Share premium 232,059 232,059
Treasury shares (680) (1,127)
Reserves 43,053 36,205
Retained earnings 374,465 312,047
Equity attributable to owners of the Company 780,566 710,852
Non-Controlling Interest 45 45
Total equity 780,610 710,897
LIABILITIES
Non-current liabilities
Loans and Borrowings 184,584 243,480
Lease liabilities 5,707 6,315
Employee benefits 4,344 4,034
Grants 14,006 13,379
Trade and other payables 56 59
Deferred tax liabilities 68,598 61,013
Contract liabilities - 5,000
277,295 333,281
Current liabilities
Loans and Borrowings 493,616 342,048
Lease liabilities 3,028 2,837
Trade and other payables 630,263 667,000
Provisions 15,809 17,813
Contract liabilities 249,226 200,853
Current tax liabilities 39,330 21,946
Derivatives 7,893 5,712
1,439,165 1,258,209
Total liabilities 1,716,460 1,591,490
Total equity and liabilities 2,497,070 2,302,387

Appendix D – Alternative performance measures

In addition to the results reported in accordance with International Financial Reporting Standards ("IFRS") as adopted by the European Union, this press release includes information regarding certain alternative performance measures which are not prepared in accordance with IFRS ("Alternative Performance Measures" or "APMs"). The APMs used in this press release are Earnings Before Interest and Tax (EBIT), Adjusted EBIT, Earnings Before Interest, Tax, Depreciation and Amortisation (EBITDA), Adjusted EBITDA and Net debt. Reconciliations to the most directly comparable IFRS financial measures are presented below.

We believe these APMs are important supplemental measures of our operating and financial performance and are frequently used by financial analysts, investors and other interested parties in the evaluation of companies in the steel pipes and cables production, distribution and trade industries. By providing these measures, along with the reconciliations included in this appendix, we believe that investors will have better understanding of our business, our results of operations and our financial position. However, these APMs shall not be considered as an alternative to the IFRS measures.

These APMs are also key performance metrics on which Cenergy Holdings prepares, monitors and assesses its annual budgets and long-range (5 year) plans. However, it must be noted that adjusted items should not be considered as nonoperating or non-recurring.

EBIT, Adjusted EBIT, EBITDA and Adjusted EBITDA have limitations as analytical tools, and investors should not consider it in isolation, or as a substitute for analysis of the operating results as reported under IFRS and may not be comparable to similarly titled measures of other companies.

APM definitions remained unmodified compared to those applied as of 31 December 2024. The definitions of APMs are as follows:

EBIT is defined as result of the period (earnings after tax) before:

  • income taxes,
  • net finance costs

EBITDA is defined as result of the period (earnings after tax) before:

  • income taxes,
  • net finance costs
  • depreciation and amortisation

a-EBIT and a-EBITDA are defined as EBIT and EBITDA, respectively, adjusted to exclude:

  • metal price lag,
  • impairment / reversal of impairment of fixed, intangible assets and investment property
  • impairment / reversal of impairment of investments
  • gains/losses from sales of fixed assets, intangible assets, investment property and investments,
  • exceptional litigation fees and fines and,
  • other exceptional or unusual items

Net Debt is defined as the total of:

  • long term loans & borrowings and lease liabilities,
  • short term loans & borrowings and lease liabilities,

Less:

• cash and cash equivalents

Reconciliation tables:

EBIT and EBITDA:

Cables Steel Pipes Other activities Total
H1 H1 H1 H1 H1 H1 H1 H1
Amounts in EUR thousand 2025 2024 2025 2024 2025 2024 2025 2024
Profit/(Loss) before tax (as reported in
Consolidated Statement of Profit or Loss)
87,844 47,088 40,189 26,220 (4,483) (425) 123,550 72,883
Adjustments for:
Net finance costs 20,340 22,452 5,009 9,385 3,951 (90) 29,300 31,747
EBIT 108,185 69,540 45,198 35,604 (533) (515) 152,850 104,630
Add back:
Depreciation & Amortisation 12,758 11,585 5,634 4,978 6 4 18,398 16,567
EBITDA 120,943 81,125 50,832 40,583 (526) (511) 171,248 121,196

a-EBIT and a-EBITDA:

Cables Steel pipes Other activities Total
H1 H1 H1 H1 H1 H1 H1 H1
Amounts in EUR thousand 2025 2024 2025 2024 2025 2024 2025 2024
EBIT 108,185 69,540 45,198 35,604 (533) (515) 152,850 104,630
Adjustments for:
Metal price lag (1) (128) (1,733) - - - - (128) (1,733)
(Gains)/ Loss from sales of fixed assets (150) (7) (23) - - - (173) (7)
Adjusted EBIT 107,907 67,800 45,175 35,604 (533) (515) 152,549 102,890
Add back:
Depreciation & Amortisation 12,758 11,585 5,634 4,978 6 4 18,398 16,567
Adjusted EBITDA 120,665 79,385 50,809 40,583 (526) (511) 170,947 119,456

(1) Metal price lag is the P&L effect resulting from fluctuations in the market prices of the underlying commodity metals (ferrous and non-ferrous) which Cenergy Holdings' subsidiaries use as raw materials in their end-product production processes,

Metal price lag exists due to:

(i) the period of time between the pricing of purchases of metal, holding and processing the metal, and the pricing of the sale of finished inventory to customers,

(ii) the effect of the inventory opening balance (which in turn is affected by metal prices of previous periods) on the amount reported as Cost of Sales, due to the costing method used (e.g., weighted average),

(iii) certain customer contracts containing fixed forward price commitments which result in exposure to changes in metal prices for the period of time between when our sales price fixes and the sale actually occurs,

Subsidiaries in cables segment use back to back matching of purchases and sales, or derivative instruments in order to minimise the effect of the Metal Price Lag on their results, However, there will be always some impact (positive or negative) in the P&L, since in Cables segment part of the inventory is treated as fixed asset and not hedged and in the Steel Pipes segment no commodities hedging is possible.

Net debt:

Cables Steel pipes Other activities Total
Amounts in EUR thousand 30 Jun
2025
31 Dec
2024
30 Jun
2025
31 Dec
2024
30 Jun
2025
31 Dec
2024
30 Jun
2025
31 Dec
2024
Loans and borrowings (incl. Lease
liabilities) - Long term
175,772 229,820 14,496 19,969 24 6 190,292 249,795
Loans and borrowings (incl. Lease
liabilities) - Short term
420,038 304,255 76,596 40,623 11 7 496,644 344,885
Cash and cash equivalents (104,743) (219,963) (76,586) (45,316) (162,386) (177,182) (343,715) (442,461)
Net debt 491,067 314,112 14,505 15,275 (162,351) (177,169) 343,221 152,218