Environmental & Social Information Sep 3, 2025

4350_rns_2025-09-03_a5ec0db6-7c87-4762-877f-f19e7b3ad2df.pdf

Environmental & Social Information

Open in Viewer

Opens in native device viewer

2025 | 1

GREEN BOND ALLOCATION & IMPACT REPORT

2025

FOURTH RELEASE

TABLE OF CONTENTS

GREEN BOND REPORT 5
Bond summary and introduction 5
Corporate profile and its commitments
Green Financing Framework and its categories
Green bond allocation meant for refinancing & financing of eligible projects 7
Green financing working group & procedure 8
Data sourcing & calculation methodology 9
GREEN BOND FINANCED PROJECTS 11
1. Water losses reduction 13
2. Interventions to increase the water system resilience
and the security of water supply
14
3. Energy efficiency in the electricity distribution networks' management 19
4. Increased resilience in the electricity distribution network
thanks to development, modernisation, connectivity
and telematic control interventions 20
5. Electric mobility and related services 25
6. Environmental impact reduction
from the vehicles of the company's fleet
27
7. Substitution of 2G meters in the electricity distribution service 29
8. Efficiency and modernisation of the purification sector (sludge reduction,
centralisation and processing capacity increase, energy efficiency)
30
9. Biomethane production from purification plants 35
10. Production of renewable energy through composting plants 37
11. Increase in the waste treatment capacity 39
12. Acea Smart Comp 41
13. Production of electric energy from photovoltaic sources 43
ANNEX I – TOTAL ALLOCATED AMOUNTS PER PROJECT CARD (2022-2024) 44
ANNEX II – OUTPUT & IMPACT KPI PER PROJECT CARD (2020-2024) 45

GREEN BOND REPORT

Bond summary and introduction

In 2021 Acea issued its first Green Bond for a total nominal amount of Euro 900 million and net proceeds of roughly Euro 888.2 million1 , divided into two sub-issuances of nominal values Euro 300 million and Euro 600 million respectively, within the Euro Medium Term Notes program, both listed in the Luxembourg Stock Exchange. As described in the Second Release of Green Bond Allocation & Impact Report of January 2024, Acea has achieved the full allocation of the net proceeds raised from the first Green Bond.

In 2023 Acea issued its second Green Bond for a total amount of Euro 700 million, placed in a first issuance of Euro 500 million and a tap issuance of Euro 200 million, and net proceeds of roughly Euro 698.1 million, within the Euro Medium Term Notes program, listed in the Luxembourg Stock Exchange. The Green Bond has the following features:

ISSUANCE N.1 (ISIN XS2579284469)
Euro 700 million
Issue Date Maturity Date Net proceeds
(€ million)
Annual
Coupon
Issue Price Rating
(Fitch/Moody's)
January, 24th 2023 January, 24th 2031 698.1 3.875% 99.86%2 BBB+/Baa2

The demand for this second Acea Green Bond exceeded the supplied total amount by more than 3 times and showed remarkable interest from leading green institutional investors demonstrating the strong interest in Acea's credit profile and the effectiveness of the pre-marketing activity. The transaction followed a wellattended one-day roadshow comprising a Global Investor Call and a series of group calls.

Corporate profile and its commitments

Acea, founded in 1909, has gradually become a nationwide industrial group, working in the areas of integrated water management, electricity production, distribution and sales and value-added environmental services. The new Business Plan, called "Green Diligent Growth", reinforces the Acea Group's role as infrastructure operator – focused on regulated businesses – within a strongly evolving scenario that offers major investment opportunities:

  • ▸ in the water business, to modernise the infrastructure;
  • ▸ in the electricity sector, for grid resilience;
  • ▸ in the environmental sector, for the circular economy.

The centrality of people, a strong discipline with regard to costs and investments and optimisation of the financial structure represent the pillars of the Plan, which envisages a major increase in capex and growing value for shareholders. The investment programme will fund a number of projects and will enable an acceleration of sustainable growth to support the country. Acea confirms its role as a leading player in the energy transition, decarbonisation and enhancement of the territory, from a circular economy perspective.

1 Net Proceeds are calculated as the Issue Price net of fees.

2 Issue Price is the weighted average price of the issuances.

The Business Plan contemplates constant attention to operating efficiency, integrating new technologies and expanding the spheres of action.

The Acea Group confirms its great attention to environmental and social impacts and continues to pursue its sustainable strategy, in line with ESG criteria and the long-term objectives set forth by the UN 2030 Agenda.

Acea also pursues its commitment to sustainability through participation in important external initiatives, intended to raise awareness among decision makers and the public on particular socio-environmental issues. Specifically, through these initiatives, Acea is joined by qualified panels of companies in order to support objectives of general interest and to incorporate relevant guidelines and practices into its company culture.

Green Financing Framework and its categories

The issuance was based on the Acea Green Financing Framework presented in January 2021 to facilitate transparency and to confirm the commitments made by the Company with respect to green bonds and sustainable finance in general3 .

ISS provided a SPO attesting the alignment of the Green Financing Framework to the Green Bond Principles and Green Loan Principles. The net issuance proceeds are used to finance eligible projects according to the Green Financing Framework. All green bond's projects are clustered into four main axes, declined in the Framework itself, that follow most of the 17 United Nations' Sustainable Development Goals (SDGs):

GREEN FINANCING FRAMEWORK AXES
N. AXES RELATED SDG NUMBER* RELATED SDG
1 WATER
MANAGEMENT
Clean water and sanitation
2 ENERGY
EFFICIENCY
Affordable and clean energy
Industry, innovation and infrastructure
Sustainable cities and communities
Climate Action
Life on Land
3 CIRCULAR
ECONOMY
Clean water and sanitation
Affordable and clean energy
Industry, innovation and infrastructure
Sustainable cities and communities
Responsible production and consumption
Climate Action
4 GREEN
ENERGY
Affordable and clean energy
Industry, innovation and infrastructure
Climate Action

* The projects clustered into the abovementioned axes manifest clear references with respect to the illustrated SDGs, but can be linked also to other SDGs.

3 In February 2025, Acea published its first "Green & Blue Financing Framework", which includes a specific focus on the "Blue Economy" initiatives associated with water sector projects and therefore eligible for the issuance of "Blue Bonds". For the sake of clarity, this Green Bond Allocation & Impact Report is compliant with the 2021 Acea's Green Financing Framework principles while the green bonds outstanding have been issued under the previous framework.

The reporting plan for the Green Bond, issued in 2023, is structured as follows:

  • 1) the third release of the Green Bond Allocation & Impact Report published on September 2024 which covers:
    • ▸ the financial indicators for the period 2022-2023, and
    • ▸ non-financial indicators, if measurable or available, for years 2020-2023;
  • 2) this fourth release which covers
    • ▸ all the financial indicators for the period 2022-2024, and
    • ▸ non-financial indicators, if measurable or available, for year 2020-20244;
  • 3) the next release will represent the results obtained until complete allocation of net proceeds and will be disclosed after the presentation of Acea Group financial and non-financial results.

The projects described below follow the rationale entailed in the Green Financing Framework, thus it is possible that in some cases a few projects are merged to show the main objective described in the Framework.

Green bond allocation meant for refinancing & financing of eligible projects

This second Green Bond issuance raised a total amount of net proceeds equal to Euro 698.1 million. Within the perimeter of this report, that includes the allocation for 20225 , 2023 and 2024 in total equal to Euro 611.11 million (87.5% of the total amount of net proceeds raised), around 20% of this latter amount has been allocated to refinance eligible projects (investments made in 2022), 80% has been allocated to finance eligible projects (investments made in 2023 and 2024). A portion of investments for the residual amount of unallocated proceeds (around Euro 87 million) will be allocated in the first months of 2025.

4 With respect to non-financial indicators and KPIs, in line with the Green Bond Allocation & Impact Reports already disclosed, starting from the first Green Bond issued in 2021, 2019 represents the base year from which calculation of non-financial performance is calculated.

5 An amount of reported eligible projects in 2022 equal to Euro 147.96 million has been already allocated for the first green bond.

Green financing working group & procedure

Since the issuance of the Green Financing Framework in 2021, Acea has established within its governance system an internal procedure for the establishment of best practices for the whole Group in the sustainable finance world, including processes for designing, planning, executing and monitoring all the sustainable finance activities in the Group. Furthermore, the company formed a Green Finance Working Group (GFWG), a cross-department table led by the Chief Financial Officer (CFO). It includes representatives from Finance, Sustainability Planning & Reporting and Planning & Control holding departments, each covering responsibility according to its own expertise, and works in harmony with representatives of the Group's operating subsidiaries. The GFWG is responsible of creating and updating the abovementioned Green Financing Framework in line with the sustainability objectives of the Group, and dives deep into the eligibility criteria for potential green projects. The initial process for the first selection and evaluation of potential eligible green projects was based on the materiality assessment carried out by the Group for both the Acea's Business and Sustainability Plans, in order to isolate and define the most relevant topics and issues at stake for the whole Group in terms of sustainability objectives and related investments. Today, this process is structured as follows:

  • ▸ reviewing and validation of the Eligible Green Projects identified in accordance with the defined Eligible Green Project Categories listed in the Use of Proceeds section of the Green Financing Framework;
  • ▸ monitoring of the Eligible Green Project portfolio during the life of the transaction through a tracked and integrated internal periodical report for the whole Group, fed with Enteprise Resource Planning tools and data, regarding financial allocation;
  • ▸ if the Sustainability department deems that an eligible project becomes subject to a major ESG controversy, the GFWG will analyse it and may decide to exclude and replace such Eligible Green Project;
  • ▸ managing any future update of the Green Financing Framework.

All potential Eligible Green Projects comply with local laws and regulations, including any applicable regulatory environmental requirements, as well as Acea's internal standards for managing ethical and governance risks following the current Code of Ethics and different Management Systems, all publicly available in the Acea website.

Thirteen summary project cards have been set up with the relevant economic and KPI indicators for the following eight categories:

  • ▸ water resource protection;
  • ▸ resilience of electricity distribution Infrastructure;
  • ▸ clean transportation and infrastructure for Low Carbon Transport;
  • ▸ smart meters;
  • ▸ wastewater treatment;
  • ▸ anaerobic digestion of bio-waste and/or sewage sludge;
  • ▸ waste management;
  • ▸ renewable energy.

All the eligibility criteria are defined in the Green Financing Framework, available in the Acea Group website, so that all the projects are consistent to the Group's sustainability objectives and to the most relevant SDGs for the Group's business.

The GFWG is also responsible for managing and reporting the allocation of proceeds in the most transparent way to make up to the specific investors' and stakeholders' expectations and regulatory requirements. The GFWG monitors and tracks the net proceeds through a dedicated reporting.

Data sourcing & calculation methodology

For projects within the Water Management, quantitative environmental KPIs, showing the project progress, managed by the process owners, are based on data extracted from management systems, such as water balance systems, plant georeferencing systems, etc., or are calculated ad hoc (e.g. based on the progress schedules of works).

For Energy Efficiency, where quantitative environmental KPIs relate to tons of non-emitted CO2 , data are calculated by process owners from primary data, estimated by the energy managers, applying national reference conversion factors relating to the baseline year of investment plan. In other cases as for the KPI related to IRI (Intervention Risk Index), the indicator is consistent with the calculation methodology of ARERA (Autorità di Regolazione per Energia Reti e Ambiente), or data are extracted from software and applications and verified/integrated after the collection of actual data, or obtained from specific meters (e.g. in the case of meters for electricity delivered by installed charging stations).

For the Circular Economy, depending on the specific project and the relevant environmental KPIs, the data managed by the process owners are extracted from systems (as in the case of the waste management/"MUD"declaration - Environmental Declaration Model for sludge) or calculated on the basis of primary data (in the case of the quantification of tons of non-emitted CO2 ), or measured by specific meters (e.g. in the case of biomethane fed into the grid) or taken from technical data of plant administration (e.g. for compost produced, waste treated, etc.).

For the Green Energy area, the relevant environmental KPIs are based on extracted data (remote metering), or related to installed power generation, or are calculated on the base of data of gross energy produced from renewable source multiplied by the emission factor from fossil source, of the year of project start-up, for the calculation of avoided emissions.

GREEN BOND FINANCED PROJECTS

Acea has allocated a total of Euro 611.11 million until the end of 2024 divided as described in the following axes and project cards.

Regarding to the year 2022, an amount of Euro 147.96 million were allocated to the first Green Bond issued in 2021, as reported in the second release of Green Bond Allocation & Impact Report of January 2024, and Euro 119.25 million to the second Green Bond issued in 2023, as reported in the third release of Green Bond Allocation & Impact Report of September 2024.

Total Allocated Amount per Axis (2022-2024)

(€ MILLION) TOTAL PRO QUOTA
GREEN BOND
ISSUED
IN 2021
PRO QUOTA
GREEN BOND
ISSUED
IN 2023
TOTAL TOTAL TOTAL
GREEN FINANCING
FRAMEWORK AXES
2022 2022a 2022b 2023 2024 2022b
2024
Water Management
total categories
106.36 58.90 47.47 82.34 145.41 275.21
Energy Efficiency
total categories
76.84 42.55 34.29 53.20 16.92 104.41
Circular Economy
total categories
92.57 51.26 41.31 56.12 86.63 184.05
Green Energy
total categories
-8.56 -4.74 -3.82 35.02 16.24 47.44
Total 267.21 147.96 119.25 226.68 265.19 611.11

The following project cards include summary descriptions, results, performances of the eligible projects started in 2020 (base year 2019) and financed by the Acea's green bonds, and the EU Taxonomy alignment of the relevant activities for year 2024, on a best effort basis. For better reading, this report shows the economic allocation for the full years 2022, 2023 and 2024 and environmental KPIs for the full years 2020-2024.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Water Management Water Resource Protection The project is linked to the
taxonomic activity 2.1 (WTR),
totally aligned in 2024
Short Description
Investment aiming at reducing at least by 20% water losses and installation of gauges for pressure and
flow rate management; production and installation of water smart meters on the network

1. Water losses reduction

The sustainable management of the water resource is one of the distinctive features of the Acea Group. This implies a strong effort over the entire water service value chain and over many other themes. Within those, particular relevance is covered by the containment of water losses, faced by the Group with a shared approach. The interventions that enable the containment of physical and commercial losses are: for physical losses, the districtisation of networks, flow and pressure meters, sensors, remote control; for commercial losses, the

installation of 'smart' meters at users (for which increasingly effective remote solutions are being studied) and actions to combat abuse. In addition, the interventions lead to an optimisation in the management of infrastructures: the central system acquires quantitative and qualitative data from meters and sensors connected to the sites equipment, and remote manoeuvres can be carried out thanks to remote control.

PROJECT STATUS: ongoing LOCATION: Latium, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
194.85 83.30 65.79 45.76

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
% Reduction of water volume lost
(over 2019)*
% -5 -13.6 -17.2 -19 -18.4
Flow and pressure meters
installed during the year
n. 354 641 455 529 443
Reclaimed water network
during the year
km 136.2 203.4 204.5 68 121
Districted water network
during the year
km 7,907 3,687 1,373 109 159

* The data on the reduction of water volume lost are always calculated using the same method and for the same perimeter of municipalities managed in 2019, the base year for the start of the project, in order to preserve comparability. However, considering the entire perimeter of the municipalities managed by Acea Ato 2 in 2024, which includes the recent acquisitions of 2022, and applying the new calculation methods defined by ARERA, there was a 1.5% reduction in water loss volumes between 2024 and 2023.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Water Management Water Resource Protection The project is linked to the
taxonomic activity 2.1 (WTR),
totally aligned in 2024
Short Description
Water supply system aimed at increasing the resilience of the water supply system

2. Interventions to increase the water system resilience and the security of water supply

Acea Ato 2 began planning and realising a series of interventions for the medium-long term to increase the resiliency of the Roman and ATO2 related territory drinking water system infrastructure, thus improving the service continuity and the quantitative and qualitative supply security, also under the scope of climate change issues.

The more complex interventions, that require a longer period of time for realisation, contribute to the improvement of the whole water system's reliability and flexibility management and foresee new interventions (such as adducers, new water connections) and infrastructure and technology renewals for major aqueduct systems such as Peschiera-Le Capore, Marcio and big water connection systems. With reference to the four sub-projects concerning the modernization of Peschiera water system, the design and permitting phases were completed in 2023. As a result, starting from 2024 the progress of the works' execution and implementation phases is reported.

The medium-term interventions, focused on the realisation/renewal of water purifiers, tanks and adducers, all aim at mitigating and/or eliminating the different challenges in the water supply system for certain areas, especially in the outskirts of Rome, where water sources are the most vulnerable either in prolonged periods of drought or in cases of sustained issues in the local aqueduct systems.

PROJECT STATUS: ongoing LOCATION: Latium, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
139.26 23.07 16.55 99.64

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Advancement of the design/authorisation
phase of the longer-term interventions
"Securing and modernisation of the Peschiera
water system"
% 10 30 80 100 -

Sub-project "New Marcio water system,
lot #1"
Progress in the implementation phase of the
Sub-project "New Marcio water system, lot #1"
% - - - - 45
Advancement of the design/authorisation
phase of the longer-term interventions
"Securing and modernisation of the Peschiera
water system"
% 0 20 80 100 -

Sub-project "Doubling Siphon VIII –
segment Casa Valeria – exit Galleria Ripoli"
Progress in the implementation phase of the
Sub-project "Doubling Siphon VIII – segment
Casa Valeria – exit Galleria Ripoli"
% - - - - 30
Advancement of the design/authorisation
phase of the longer-term interventions
"Securing and modernisation of the Peschiera
water system"
% 0 10 80 100 -

Sub-project "Monte Castellone conduct -
Colle Sant'Angelo (Valmontone)"
Progress in the implementation phase of the
Sub-project "Monte Castellone conduct –
Colle Sant'Angelo (Valmontone)"
% - - - - 48
Advancement of the design/authorisation
phase of the longer-term interventions
"Securing and modernisation of the Peschiera
water system"
% 0 20 80 100 -

Sub-project "Ottavia-Trionfale adducer"
Progress in the implementation phase of the
Sub-project "Ottavia-Trionfale adducer"
% - - - - 41
Interventions* in pipeline/interventions
in the ATO2 scope
% 50 40 10 10 10
Interventions* in process/interventions
in the ATO2 scope
% 40 40 70 50 40
Interventions* completed/interventions
in the ATO2 scope
% 10 20 20 40 50

* All the "interventions" references involve a series of medium-term interventions aimed at the security of the water system supply in the ATO2 territory – central Latium/Rome – in those areas affected by vulnerable water and/or infrastructure availability. The KPIs are to be read together, taking into consideration the number of interventions in pipeline/in process/completed over the total number of the considered perimeter of interventions (10 interventions).

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Energy Efficiency Resilience of electricity
distribution Infrastructure
The project is linked to the
taxonomic activity 4.9 (CCM),
totally aligned6
in 2024
Short Description
Investments to reduce networks energy losses

3. Energy efficiency in the electricity distribution networks' management

Acea is deeply focused and committed to the improvement of Rome and Formello electricity distribution networks, both managed by Areti, which, among others, qualify the whole Group as the second ranked national operator in terms of points of delivery. The company has planned voltage

change interventions as well as interventions to substitute medium voltage/low voltage transformers with components aimed at reducing losses which will eventually contribute to the diminishing of the technical energy losses on the electric network. Energy efficiency interventions will reduce electricity consumption required to manage processes, resulting in savings which can be converted in both TOE and avoided CO2 emissions.

PROJECT STATUS: ongoing, but the proceeds from Green Bond on this project have been fully allocated. LOCATION: Latium, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
7.75 5.00 2.75 -

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Saved electricity/
Distributed electricity
MWh/
MWh
1,770/
9,070,469
1,127/
9,206,108
744/
9,408,392
514*/
9,195,590
630/
9,369,020
Avoided emissions** tCO2 637 406 268 185 227
TOE saved TOE 331 211 139 96 117.8

* The total MWh of energy savings in 2023, and the related data, have been revised to align with the scope applied in previous years. ** Avoided emissions calculation is carried out with the 2019 location-based conversion factor (base year of intervention planning). The figures are obtained by multiplying yearly saved MWh with the Terna 2019 national mix conversion factor. For the sake of transparency, the 2020, 2021, 2022 and 2023 avoided emissions datapoint, calculated based on the Terna 2020 and invariated for the years 2021-2023 location-based conversion factors, are equal to 595 tCO2 , 355 tCO2 , 234 tCO2 and 162 tCO2 ; for the year 2024, avoided emissions are calculated considering the ISPRA 2024 location-based emission factor and are equal to 35,7 tCO2 .

6 The taxonomic activity 4.9 (CCM) presents a minimum misalignment linked to the residual presence of transformers with PCBs (in 2024 only 56 transformers out of a total of 12,996 which are currently in the process of being decommissioned); the misalignment is not related to Capex and therefore, for the purposes of the Green Bond Allocation, is considered totally aligned.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Energy Efficiency Resilience of electricity
distribution Infrastructure
The project is linked to the
taxonomic activity 4.9 (CCM),
totally aligned7
in 2024
Short Description
Investments in digital technologies to improve the management and increase the efficiency of the
electric grid

4. Increased resilience in the electricity distribution network thanks to development, modernisation, connectivity and telematic control interventions

In order to increase the resilience and efficiency of the electricity distribution network, Areti, the company within the Acea Group responsible for its management, has put into place different interventions that cover maintenance, development and physical modernisation of the network as well as connectivity and telematic control of the infrastructures.

Among the main projects we find:

  • ▸ Maintenance and development interventions to increase the resilience of the electric system, which in turn imply the reduction of failures – especially the reduction of the intervention risk index – as well as the better adaptation capacity of the network to critical factors such as flooding and heat waves;
  • ▸ Planning for the realisation of plants and the decommissioning of air links and fluid oil cables in the operating high voltage network thanks to a coordinated and synergistic action between the high voltage transmission and distribution networks in the Rome area. This project contributes to the safeguard of the territory and to the environmental impact reduction in protected natural areas;
  • ▸ Digitalisation, connectivity and telematic control processes for the network and infrastructures, including broadband cabling for all Primary Substations and a segment of relevant Secondary Substations, to boost observability of both the low/medium voltage networks and infrastructures. Moreover, this project enables remote interventions, optimising the underlying service and reducing the interventions' timing when failures occur.

PROJECT STATUS: ongoing LOCATION: Latium, Italy

7 The taxonomic activity 4.9 (CCM) presents a minimum misalignment linked to the residual presence of transformers with PCBs (in 2024 only 56 transformers out of a total of 12,996 which are currently in the process of being decommissioned); the misalignment is not related to Capex and therefore, for the purposes of the Green Bond Allocation, is considered totally aligned.

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
80.74 46.98 18.61 15.15

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Annual % variation of the IRI
(intervention Risk Index)=
after intervention value/
before intervention value)
% -25 -24 -17 -4.5 -2.3
Activation/Upgrade of
Secondary Substations'
automation and telematic
control
n. 582 1,454 1,646 1,326 2,364
Broadband linked Primary
Substations /
70 Primary Substations
n./n. 14/70 10/70 6/70 37/70 1/70
cumulative n./n. 14/70 24/70 30/70 67/70 68/70
Number of pylons removed
during the year*
n. 22 48 49 39 49
cumulative n. 22 70 119 158 207
Recovered soil in highly
biodiverse areas during the
year*
m2 275 740 980 780 200
cumulative m2 275 1,015 1,995 2,775 2,975

* The high biodiversity areas impacted are: Veio Natural Park and Litorale romano Natural Reserve.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Energy Efficiency Clean Transportation and
Infrastructure for Low Carbon
Transport
The project is linked to the
taxonomic activity 6.15 (CCM),
totally aligned in 2024
Short Description
Installation of charging stations for electric vehicles and related services

5. Electric mobility and related services

Acea aims at contributing to the development of sustainable mobility, thanks to the infrastructures that enable its adoption. Acea Innovation, in particular, which was merged by incorporation into Acea Energia with effect from 1 January 2025, will be involved in the progressive installation of electric

recharge columns for electric vehicles (EV) which supply certified green energy, with a recharging power of either 22kW or 50kW. Acea Innovation also developed a multifunctional platform with the BOMTS proprietary technology (Banking Operation Maintenance Telematics Security) that allows different types of electric transportation services to be provided: from the control of the recharging infrastructure to payments, from the supply of information services to video surveillance and other applications balanced on the clients' needs, being them either retail or big corporates. This activity will contribute to the wider adoption of electric vehicles for those who value sustainable behaviours.

PROJECT STATUS: ongoing LOCATION: Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
9.29 4.74 2.78 1.77

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Installed charging columns
during the year
n. - 200 223 148 50
Supplied certified green energy
through Acea charging columns
MWh - 123 805 2,307 2,842
Avoided emissions* tCO2 - 144 942 2,698 3,322
Acea clients using the platform during
the year
n. - 978 2,813 3,865 4,972

* The emissions reduction represented here can be linked to consumers' habits, to those who picked electric vehicles rather than traditional ones and to the fact that Acea charging columns supply certified green energy.

NB: environmental performance data are available starting from 2021.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Energy Efficiency Clean Transportation and
Infrastructure for Low Carbon
Transport
The project is not linked to
taxonomic eligible activities
Short Description
Acquisition of zero emissions vehicles

6. Environmental impact reduction from the vehicles of the company's fleet

With the objective of containing the environmental impacts linked with the company's fleet used for on-site interventions Areti, the company's subsidiary that focuses on the management of the electricity distribution network in Rome and Formello, bought electric vehicles for operative employees and planning the realisation of car sharing solutions. In the same manner, Areti is engaged in the realisation of charging infrastructure within operative sites.

PROJECT STATUS: completed. The proceeds from Green Bond on this project have been fully allocated. LOCATION: Latium, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
- - - -

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Avoided emissions tCO2 5.2 26.6 24.1 19.7* 19.6
Total number of electric vehicles
from Areti
n. 125 125 125 121 121

* The 2023 avoided emissions figure has been revised following a recalculation.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Energy Efficiency Smart Meters The project is linked to the
taxonomic activity 7.5 (CCM),
totally aligned in 2024
Short Description
Production and installation of energy smart meters on the network

7. Substitution of 2G meters in the electricity distribution service

The technological innovation applied to management processes is assuming an ever-growing role for Acea as it aims the enabling of the development of the so-called 'smart-living', and clear impacts on energy savings. In particular, Areti is engaged in the massive substitution campaign with the new generation 2G meters, for a total of more than a million devices. The characteristics of those meters will provide clients with more data and more awareness, together with narrowing the expected estimates on invoices.

PROJECT STATUS: ongoing, but the proceeds from Green Bond on this project have been fully allocated LOCATION: Latium, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
49.18 20.12 29.06 -

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Number of 2G
meters installed
during the year
n. 59,275 316,176 273,294 337,546* 446,351
Installed 2G
smart meters /
total meters
% 3.5
(59,275/
1,676,378)
22.4
(375,451/
1,676,378)
38.7
(648,745/
1,676,378
58.8*
(986,291/
1,676,378)
85.5
(1,432,642/
1,676,378)

* 2023 figure has been adjusted for data consolidation.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Circular Economy Wastewater Treatment The project is linked to the
taxonomic activity 2.2 (WTR),
partially aligned in 2024
Short Description
Operation of wastewater collection and treatment aiming at reducing sewage sludge

8. Efficiency and modernisation of the purification sector (sludge reduction, centralisation and processing capacity increase, energy efficiency)

Acea, within the most important players in the integrated water system and national leader in the sector for consumers served, started different initiatives that converge to the efficiency and modernisation of the water purification sector. In particular, Acea Ato 2, the major subsidiary for the water sector within the Group, has developed a few projects with relevant impacts. Among those, the definition of a "Sludge Plan" which includes structural interventions aimed at increasing the power of medium-to-big-sized purifiers

and reducing the quantity of the overall sludge produced thanks to, by means of example, the further development of dryers, the process integration of different technologies such as ozonolysis, the renewal or the adoption of sludge drying compartments, and so on. Acea Ato 2 has also defined a plan for the rationalisation of purification plants, identified through the study of the territory on both an urbanistic and a geomorphological perspective. This activity will continue to be carried out by upgrading existing small plants or, whenever possible, through the centralisation of the purifying treatment process in bigger plants, with the related dismissal of smaller plants. Lastly, various energy efficiency activities have contributed to the modernisation of the purification sector, having been identified with a deep analysis of the plants' energy consumption and their relative sub-compartments.

PROJECT STATUS: ongoing LOCATION: Latium, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
180.53 65.23 39.81 75.49

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Sludge reduction
Total sludge (solid and liquid) t 78,934 66,605 63,229 58,384* 44,974
Reduction with respect to base year
(2019)
% 21.3 33.6 37 41.8 55.2
Rationalisation of purifying plants
Percentage increase of the purifying
capacity with respect to base year
(2019)
% 3.7 3.7 3.7 3.7 3.9
Dismissed-centralised plants
during the year
n. 7 6 4 4 4
Population equivalent interested
in the centralisation of purifiers
during the year
PE 15,730 26,540 17,100 69,630 7,200
Energy efficiency interventions
Avoided emissions thanks
to energy savings in the purifying
compartment**
tCO2 399.6 567.36 673.2 1,014.13* 1,214.72***

* 2023 figure has been adjusted for data consolidation.

** The calculation refers to the Terna conversion factor of the national mix for 2019, when the project started. Figures 2021-2024 considers the emissions avoided related to the energy efficiency measures in the purifying compartment carried out in previous years, which also determine benefits for the following year.

*** Estimated figure, pending consolidation of 557,20 MWh saved 2024.

34 | Green Bond Report

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Circular Economy Anaerobic Digestion of Bio
waste and/or Sewage Sludge
The project is linked to the
taxonomic activity 5.6 (CCM),
totally aligned in 2024
Short Description
New and revamping of the Anaerobic digestion facilities

9. Biomethane production from purification plants

Between 2020 and 2023, Acea Ato 2 developed and completed the upgrading interventions in the anaerobic digestion compartments for the two biggest purifiers in Rome (North and East), functional to the transformation of locally produced biogas into biomethane. The intervention's objective was to isolate all the methane contained into the biogas, controlling its quality and quantity, and optimising its usage. In 2024 the production of biomethane was started; it is injected into the gas network and intended for vehicles. The biomethane production supply chain management system is certified according to the UNI/TS 11567:2024 standard and enables Acea Ato 2 to issue sustainability certificates for the biomethane produced, providing environmental benefits linked to the reduction of transportation emissions.

PROJECT STATUS: ongoing LOCATION: Latium, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
9.71 0.42 7.51 1.78

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
% upgrading intervention advancement
upgrading for North and East Rome
% 35 50 70 100 -
Biomethane introduced in the network Sm3 - - - - 122,893
Avoided emissions* tCO2 - - - - 298.5

*The environmental benefits are attributed to the drivers of vehicles using biomethane instead of fossil fuels. The UNI/TS 11567:2024 standard sets the reference criteria for calculating the avoided CO2 emissions.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Circular Economy Anaerobic Digestion of Bio
waste and/or Sewage Sludge
The project is linked to the
taxonomic activity 5.7 (CCM),
totally aligned in 2024
Short Description
Facilities and services related to composting of bio-waste

10. Production of renewable energy through composting plants

Acea Ambiente and Orvieto Ambiente own an integrated system of waste management and, respectively two plants, in Lazio and in Tuscany, and one in Umbria, aimed at creating compost, where it is also possible to gather electric and thermal energy in the anaerobic digestion sections, thanks to specific realised and undergoing investments. The organic matrix coming into the anaerobic digestion section in fact gets biologically degraded and thus produces biogas, caught to produce 100% renewable energy for the market.

PROJECT STATUS: ongoing LOCATION: Latium, Umbria and Tuscany, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
12.51 5.34 3.27 3.90

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Biogas based electric energy produced
and served in the network
MWh 18,715 15,962 17,587 21,024 21,880
Installed power MW 6.96 6.96 6.96 6.96 6.96
Gross electric energy produced/
waste sent to treatment to the Aprilia,
Monterotondo Marittimo,
Orvieto plants
MWh/t 0.1216 0.1256 0.1363 0.1482 0.1425
Avoided emissions to produce
electric energy*
tCO2 6,737 5,746 6,331 7,569 7,877

* Calculations refer to the Terna 2019 national mix conversion factor, when the project started.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Circular Economy Waste Management The project is not linked to
taxonomic eligible activities
Short Description
Infrastructure to increase the total waste management capacity

11. Increase in the waste treatment capacity

Acea aims at consolidating its positioning in the circular economy sector, reinforcing core businesses such as waste to energy (WtE) and composting, developing the waste to material (WtM) value chain for plastics and paper, for example, through the acquisition of material selection and treatment plants, and with a particular focus in the special waste category sector. All this entails different synergies between the Group's activities, for example, closing the water waste circle (sludge) also through waste-to-energy and the realisation of residual ashes recovery plants coming from the same waste-to-energy process.

PROJECT STATUS: ongoing

LOCATION: Latium, Marche, Piedmont and Umbria, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
31.74* 21.07 5.22 5.45

* of which M&A activities for Euro 12.63 million in 2022.

Environmental performance indicators

KPI UoM 2020 2021 2022 2023
Overall waste treatment
capacity in the year
t 1,905,360 2,448,120 2,562,865 2,519,990 2,706,964
Treated waste for the
year
t 1,449,110 1,514,554 1,714,281 1,765,735 1,703,687
Compost produced/
waste sent to
composting plants
% 9.8 13.5 21.2 22.1 21.5
Secondary raw materials
out of treatment plants/
waste coming in plants
t/t 147,542/
184,182
182,615/
246,236
189,717/
286,772
264,121/
329,314
274,403/
330,770

CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Waste Management The project is linked to the
taxonomic activity 5.8 (CCM),
totally aligned in 2024
Short Description
Installation of Smart composting systems

12. Acea Smart Comp

Among the initiatives that promote a circular economy, Acea has developed and trademarked an intelligent system equipped with IoT technology and movement sensors for zero kilometer composting. Research and development activities led Acea Infrastructure (formerly Acea Elabori) to the creation of a Smart Comp Unit prototype, which will form the basis of the new version Acea Smart Comp 2.0. The Smart

Comp composter is a small-scale plant which, through a completely automated process, takes 90 days to transform organic waste into quality-certified compost, sanitised and without pathogenic bacteria, ready to be used as fertilizer and soil conditioner. The local treatment of organic waste is thought for those who produce huge quantities of waste: markets, malls, airports, stations, canteens, etc. Acea Smart Comp allows waste to be treated on site and thus avoids its transportation, reducing its cost and the relative emissions. The advanced integrated IoT technology automates the whole process, monitoring in real-time the state of transformation and various environmental data (temperature, humidity, interstitial gas, emissions, etc). Data gathered and analysed is given back to the client through a dedicated dashboard which shows the performance of the different indicators, such as removed CO2 emissions and the quantity of produced compost. Acea Innovation has begun the commercialisation of the Smart Comp.

PROJECT STATUS: completed. The proceeds from Green Bond on this project have been fully allocated.

LOCATION: Latium, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
0.82 0.51 0.31 -

Environmental performance indicators

KPI UoM 2020 2021 2022 2023 2024
Number of Smart Comp installed* n. - 4 4 4 4
Organic waste treated by Smart Comp** t - 200 240 240 160
Produced compost by Smart Comp** t - 40 48 48 32
Avoided emissions** tCO2 - 400 480 480 320

* Number of Smart Comp installed during 2021-2024 is unchanged. In 2024, only 2 out of the 4 installed composters were operational.

** The environmental advancement represented are linked to consumers that installed Smart Comp.

NB: environmental performance data are available starting from 2021.

AXIS CATEGORY EU TAXONOMY ALIGNMENT
FOR THE YEAR 2024
Green Energy Renewable Energy The project is linked to the
taxonomic activity 4.1 (CCM),
totally aligned in 2024
Short Description
Construction, acquisitions and development of photovoltaic plants and development of greenfield
photovoltaic plants

13. Production of electric energy from photovoltaic sources

Acea embraced the journey of production of electric energy from renewable sources, in particular from photovoltaic sources, thanks to the acquisition and realisation of new plants, with the objective of achieving an overall 747MW installed capacity (178MW through M&A activities and 569MW through the construction of greenfield photovoltaic plants in industrial and rural areas).

PROJECT STATUS: ongoing

LOCATION: Apulia, Basilicata, Latium, Marche, Piedmont, Sardinia and Sicily, Italy

Green Bond Allocation

ALLOCATION
TOTAL FINANCED AMOUNT (€ MILLION) 2022 2023 2024
42.70* -8.568 35.02 16.24

* of which M&A activities (net of divestments) for Euro -34 million in 2022 and Euro 3.24 million in 2023.

Environmental performance indicators

KPI UoM 2020 2021 2022* 2023 2024
Installed power/Expected
power
MW/MW 52/747 72.5/747 101/747 101/747 154/747
Gross production
of electric energy
GWh 74.96 78.61 111.9 134.4 172.5
Avoided emissions** tCO2 39,961 41,907 59,654 71,649 91,960

* From 2022 figures include the capacity of the plants and the gross electricity production of the investee companies, which are not fully consolidated.

** The calculation of avoided emissions refers to the emissions' intensity index provided by Acea Produzione coming from nonrenewable sources in 2019. This data is multiplied by the photovoltaic energy produced during the year.

8 On March 2022 Acea closed the agreement with the UK investment fund Equitix, managed by Equitix Investment Management Limited, for the sale of a majority interest in its photovoltaic holding company to which Acea's photovoltaic assets were transferred.

AXIS CATEGORY PROJECT CARD 2022
(M€)
2022a9
(M€)
2022b10
(M€)
2023
(M€)
2024
(M€)
TOTAL
2022b
2024(M€)
Water
Management
Water Resource
Protection
1. Water losses reduction 83.30 46.12 37.17 65.79 45.76 148.73
2. Interventions
to increment the water system
resilience and the security of
water supply
23.07 12.77 10.29 16.55 99.64 126.48
Energy Efficiency Resiliency
of electricity
distribution
infrastructure
3. Energy efficiency in the
electricity distribution
5.00 2.77 2.23 2.75 0.00 4.98
4. Increased resilience
in the electricity distribution
network thanks to development,
modernisation, connectivity and
telematic control interventions
46.98 26.01 20.97 18.61 15.15 54.72
Clean Transportation
and Infrastructure
for Low Carbon
Transport
5. Electric mobility
and related services
4.74 2.62 2.11 2.78 1.77 6.67
6. Environmental impact
reduction from the vehicles of
the company's fleet
0.00 0.00 0.00 0.00 0.00 0.00
Smart Meters 7. Substitution of 2G
meters in the electricity
distribution service
20.12 11.14 8.98 29.06 0.00 38.04
Circular Economy
Wastewater
Treatment
8. Efficiency
and modernisation of the
purification sector (sludge
reduction, centralisation
and processing capacity
increase, energy efficiency)
65.23 36.12 29.11 39.81 75.49 144.41
Anaerobic Digestion
of Bio-waste and/or
Sewage Sludge
9. Biomethane production from
purification plants
0.42 0.23 0.19 7.51 1.78 9.48
10. Production of renewable
energy through composting
plants
5.34 2.96 2.39 3.27 3.90 9.56
Waste Management 11. Increase in the waste
treatment capacity
21.07 11.67 9.40 5.22 5.45 20.07
12. Acea Smart Comp 0.51 0.28 0.23 0.31 0.00 0.54
Green Energy Renewable Energy 13. Production of electric
energy from photovoltaic
sources
-8.56 -4.74 -3.82 35.02 16.24 47.44
Total 267.21 147.96 119.25 226.68 265.19 611.11

Annex I – Total allocated amounts per Project Card (2022-2024)

9 Pro quota allocation of capex 2022 to the first Green Bond issued in 2021.

10 Pro quota allocation of capex 2022 to the second Green Bond issued in 2023.

AXIS CATEGORY PROJECT
CARD
KPI UoM 2020 2021 2022 2023 2024
1 - Water losses
reduction
% Reduction of water
volume lost (over 2019)*
% -5 -13.6 -17.2 -19 -18.4
Flow and pressure meters
installed during the year
N. 354 641 455 529 443
Water
Management
Reclaimed water network
during the year
km 136.2 203.4 204.5 68 121
Districted water network
during the year
km 7,907 3,687 1,373 109 159
Water
Resource
Protection
2 -
Interventions to
increment the
water system
resilience and
the security of
water supply
Advancement of the
design/authorisation
phase of the longer-term
interventions "Securing
and modernisation of the
Peschiera water system"
- Sub-project "New Marcio
water system, lot #1"
% 10 30 80 100 -
Progress in the
implementation phase
of the Sub-project "New
Marcio water system, lot #1"
% - - - - 45
Advancement of the design/
authorisation phase of the
longer-term interventions
"Securing and modernisation
of the Peschiera
water system"
- Sub-project "Doubling
Siphon VIII – segment Casa
Valieria – exit Galleria Ripoli"
% 0 20 80 100 -
Progress in the
implementation phase of
the Sub-project "Doubling
Siphon VIII – segment
Casa Valeria – exit Galleria
Ripoli"
% - - - - 30
Advancement of the
design/authorisation
phase of the longer-term
interventions "Securing
and modernisation of the
Peschiera water system"
- Sub-project "Monte
Castellone conduct – Colle
Sant'Angelo (Valmontone)"
% 0 10 80 100 -
Progress in the
implementation phase of
the Sub-project "Monte
Castellone conduct – Colle
Sant'Angelo (Valmontone)"
% - - - - 48
Advancement of the
design/authorisation
phase of the longer-term
interventions "Securing
and modernisation of the
Peschiera water system"
- Sub-project "Ottavia
Trionfale adducer"
% 0 20 80 100 -
Progress in the
implementation phase of
the Sub-project "Ottavia
Trionfale adducer"
% - - - - 41

Annex II – Output & Impact KPI per Project Card (2020-2024)

AXIS CATEGORY PROJECT
CARD
KPI UoM 2020 2021 2022 2023 2024
Water
Management
Water
Resource
Protection
2 -
Interventions
to increment
the water
system
resilience and
the security of
water supply
Interventions**
in pipeline/
interventions
in the ATO2
scope
% 50 40 10 10 10
Interventions**
in process/
interventions
in the ATO2
scope
% 40 40 70 50 40
Interventions**
completed/
interventions
in the ATO2
scope
% 10 20 20 40 50
Energy
Efficiency
3 - Energy
efficiency in
the electricity
distribution
networks'
management
Saved
electricity/
Distributed
electricity
MWh/
MWh
1,770/
9,070,469
1,127/
9,206,108
744/
9,408,392
514***/
9,195,590
630/
9,369,020
Avoided
emissions
tCO2 637 406 268 185** 227
Resiliency
of electricity
distribution
Infrastructure
TOE saved TOE 331 211 139 96** 117,8
4 - Increased
resilience in
the electricity
distribution
network
thanks to
development,
modernisation,
connectivity
and telematic
control
interventions.
Annual %
variation
of the IRI
(intervention
Risk
Index)=after
intervention
value/before
intervention
value)
% -25 -24 -17 -4.5 -2.3
Activation/
Upgrade of
Secondary
Cabins'
automation
and telematic
control
n. 582 1,454 1,646 1,326 2,364
Broadband
linked primary
cabins / 70
primary cabins
n./n. 14/70 10/70 6/70 37/70 1/70
cumulative n./n. 14/70 24/70 30/70 67/70 68/70
Number of
pylons removed
n. 22 48 49 39 49
cumulative n. 22 70 119 158 207
Recovered soil
in highly
biodiverse areas
m2 275 740 980 780 200
cumulative m2 275 1,015 1,995 2,775 2,975
AXIS CATEGORY PROJECT
CARD
KPI UoM 2020 2021 2022 2023 2024
5 - Electric
mobility
and related
services
Installed
charging
columns
n. not
available
in 2020
200 223 148 50
Energy
Efficiency
Clean
Transportation
and
Infrastructure
for Low
Carbon
Transport
Supplied
certified
electricity
through Acea
charging
columns
MWh not
available
in 2020
123 805 2,307 2,842
Avoided
emissions
tCO2 not
available
in 2020
144 942 2,698 3,322
Acea clients
using the
platform
during the
year
n. not
available
in 2020
978 2,813 3,865 4,972
6 -
Environmental
Avoided
emissions
tCO2 5.2 26.6 24.1 19.7**** 19.6
impact
reduction from
the vehicles of
the company's
fleet
Number
of electric
vehicles from
Areti
n. 125 125 125 121 121
Smart Meters 7 -
Substitution
of 2G
meters in the
electricity
distribution
service
Number of
2G meters
installed
during the
year
n. 59,275 316,176 273,294 337,546* 446,351
Installed 2G 3.5 22.4 38.7 58.8* 85.5
smart meters
/ total meters
% (59,275/
1,676,378)
(375,451/
1,676,378)
(648,745/
1,676,378)
(986,291/
1,676,378)
1,432,642/
1,676,378)
Wastewater
Treatment
8 - Efficiency
and
modernisation
of the
purification
sector (sludge
reduction,
centralisation
and processing
capacity
increase,
energy
efficiency)
Total sludge
(solid and
liquid)
t 78,934 66,605 63,229 58,384* 44,952
Reduction
with respect
to base year
(2019)
% 21.3 33.6 37 41.8 55.2
Circular
Economy
Percentage
increase of
the purifying
capacity with
respect to
base year
(2019)
% 3.7 3.7 3.7 3.7 3.9
Dismissed
centralised
plants
n. 7 6 4 4 4
AE interested
in the
centralisation
of purifiers
AE 15,730 26,540 17,100 69,630 7,200
Avoided
emissions
thanks
to energy
savings in
the purifying
compartment
tCO2 399.6 567.36 673.2 1,014.13* 1,214.72**
AXIS CATEGORY PROJECT
CARD
KPI UoM 2020 2021 2022 2023 2024
Circular
Economy
Anaerobic
Digestion of
Bio-waste
and/or Sewage
Sludge
9 - Biomethane
production
from
purification
plants
% upgrading
intervention
advancement
upgrading for
North and
East Rome
% 35 50 70 100 -
Biomethane
introduced in
the network
Sm3 not
applicable
before
upgrading
completion
not
applicable
before
upgrading
completion
not
applicable
before
upgrading
completion
not
applicable
before
upgrading
completion
122,893
Avoided
emissions
*
tCO2 not
applicable
before
upgrading
completion
not
applicable
before
upgrading
completion
not
applicable
before
upgrading
completion
not
applicable
before
upgrading
completion
298.5
Anaerobic
Digestion of
Bio-waste
and/or Sewage
Sludge
10 - Production
of renewable
energy through
composting
plants
Biogas based
electric energy
produced and
served in the
network
MWh 18,715 15,962 17,587 21,024 21,880
Installed power MW 6.96 6.96 6.96 6.96 6.96
Circular
Economy
Gross electric
energy
produced/
waste sent to
treatment to
the Aprilia,
Monterotondo
Marittimo,
Orvieto plants
MWh/t 0.1216 0.1256 0.1363 0.1482 0.1425
Avoided
emissions
to produce
electric energy
tCO2 6,737 5,746 6,331 7,569 7,877

* The data on the reduction of water volume lost are always calculated using the same method and for the same perimeter of municipalities managed in 2019, the base year for the start of the project, in order to preserve comparability. However, considering the entire perimeter of the municipalities managed by Acea Ato 2 in 2024, which includes the recent acquisitions of 2022, and applying the new calculation methods defined by ARERA, there was a 1.5% reduction in water loss volumes between 2024 and 2023.

** All the "interventions" references involve a series of medium-term interventions aimed at the security of the water system supply in the ATO2 territory – central Latium/Rome – in those areas affected by vulnerable water and/or infrastructure availability. The KPIs are to be read together, taking into consideration the number of interventions in pipeline/in process/completed over the total number of the considered perimeter of interventions (10 interventions).

*** The total MWh of energy savings in 2023, and the related data, have been revised to align with the scope applied in previous years.

AXIS CATEGORY PROJECT
CARD
KPI UoM 2020 2021 2022 2023 2024
Circular
Economy
Waste
Management
11 - Increase
in the waste
treatment
capacity
Overall waste
treatment
capacity in the
year
t 1,905,360 2,448,120 2,562,865 2,519,990 2,706,964
Treated waste for
the year
t 1,449,110 1,514,554 1,714,281 1,765,735 1,703,687
Compost
produced/
waste sent to
composting
plants
% 9.8 13.5 21.2 22.1 21.5
Secondary raw
materials out
of treatment
plants/Waste
coming in plants
t/t 147,542/
184,182
182,615/
246,236
189,717/
286,772
264,12/
329,314
274,403/
330,770
12 - Acea
Smart Comp
Number of
Smart Comp
installed**
n. not available
in 2020
4 4 4 4
Organic waste
treated by Smart
Comp
t not available
in 2020
200 240 240 160
Produced
compost by
Smart Comp
t not available
in 2020
40 48 48 32
Avoided
emissions
tCO2 not available
in 2020
400 480 480 320
Renewable
Energy
13 -
Production
of electric
energy from
photovoltaic
sources
***
Installed power/
Expected power
MW/
MW
52/747 72.5/747 101/747 101/747 154/747
Green
Energy
Gross production
of electric
energy
GWh 74.96 78.61 111.9 134.4 172.5
Avoided
emissions
tCO2 39,961 41,907 59,654 71,649 91,960

**** The 2023 avoided emissions figure has been revised following a recalculation.

***** 2023 figure has been adjusted for data consolidation.

****** Estimated figure, pending consolidation of 557,20 MWh saved 2024.

*******The environmental benefits are attributed to the drivers of vehicles using biomethane instead of fossil fuels. The UNI/TS 11567:2024 standard sets the reference criteria for calculating the avoided CO2 emissions.

******** Number of Smart Comp installed during 2021-2024 is unchanged. In 2024, only 2 out of the 4 installed composters were operational.

********* From 2022 figures include the capacity of the plants and the gross electricity production of the investee company, which is not fully consolidated.

52 | Green Bond Report

EXTERNAL REVIEW ON THE FOURTH RELEASE OF ACEA'S GREEN BOND REPORT

Document title: External Review on the Fourth Release of Acea's Green Bond Report Prepared by: DNV Business Assurance Italy S.r.l. Location: Milan, Italy Date: 01/08/2025

Table of Contents

DNV'S INDEPENDENT ASSESSMENT
3
Scope and
objectives3
Responsibilities
of
the
Management
of
Acea
and
DNV4
Basis of
DNV's
opinion
4
Work undertaken
5
Findings and
DNV's
opinion
6
2025 Green Bond Report
6
Schedule
1:
Description of projects that have been (re)financed through Acea's
2023 Green Bond
8
Schedule 2: Acea's 2025 Green Bond Report -
Eligibility Assessment Protocol9
1. Use of proceeds
9
2. Process for Project Selection and Evaluation
10
3. Management of proceeds
10
4. Reporting11
5. Impact Reporting
12

Disclaimer

Our assessment relies on the premise that the data and information provided by the client to us as part of our review procedures have been provided in good faith. Because of the selected nature (sampling) and other inherent limitation of both procedures and systems of internal control, there remains the unavoidable risk that errors or irregularities, possibly significant, may not have been detected. Limited depth of evidence gathering including inquiry and analytical procedures and limited sampling at lower levels in the organization were applied as per scope of work. DNV expressly disclaims any liability or co-responsibility for any decision a person or an entity may make based on this Statement.

Statement of Competence and Independence

DNV applies its own management standards and compliance policies for quality control, in accordance with ISO/IEC 17021:2011 - Conformity Assessment Requirements for bodies providing audit and certification of management systems, and accordingly maintains a comprehensive system of quality control, including documented policies and procedures regarding compliance with ethical requirements, professional standards and applicable legal and regulatory requirements. We have complied with the DNV Code of Conduct1 during the assessment and maintain independence where required by relevant ethical requirements. This engagement work was carried out by an independent team of sustainability assurance professionals. DNV was not involved in the preparation of statements or data included in the Framework except for this Statement. DNV maintains complete impartiality toward stakeholders interviewed during the assessment process.

1 DNV Code of Conduct is available from DNV website (www.dnv.com)

DNV'S INDEPENDENT ASSESSMENT

Scope and objectives

Acea S.p.A (hereinafter referred to as "Acea", or "the company"), originally established in 1909 as Azienda Elettrica Municipale (AEM) of the Municipality of Rome, is responsible for managing Rome's essential infrastructure, including electricity and water services. These services support the city's growth, social development, and environmental balance. Over the years, Acea has adapted to market opportunities, regulatory changes, and stakeholder needs, evolving its corporate and operational structures for greater efficiency. Initially focused locally, Acea has expanded into a nationwide industrial group involved in integrated water management, electricity production, distribution, sales, and environmental services, with a presence in Central and South America.

In the Rome area, Acea is a key provider of water and energy services. In the water sector, the Group partners with local management companies in parts of Central and Southern Italy, from Tuscany to Campania. Additionally, Acea is active in the circular economy along the Adriatic coast in Central and Northern Italy.

In 2021 Acea issued its first Green Bond for a total nominal amount of Euro 900 million and net proceeds of roughly Euro 888.2 million, divided into two sub-issuances of nominal values Euro 300 million and Euro 600 million respectively, within the Euro Medium Term Notes program, both listed in the Luxembourg Stock Exchange. As described in the Second Release of Green Bond Allocation & Impact Report of January 2024, Acea has achieved the full allocation of the net proceeds raised from the first Green Bond. The issuance was based on the Acea Green Financing Framework (hereinafter also referred to as the "Framework") presented in January 2021 to facilitate transparency and to confirm the commitments made by the Company with respect to green bonds and sustainable finance in general.

In 2023 Acea issued its second Green Bond for a total amount of Euro 700 million, placed in a first issuance of Euro 500 million and a tap issuance of Euro 200 million, and net proceeds of roughly Euro 698.1 million, within the Euro Medium Term Notes program, listed in the Luxembourg Stock Exchange. The demand for this second Acea Green Bond exceeded the supplied total amount by more than 3 times and showed remarkable interest from leading green institutional investors demonstrating the strong interest in Acea's credit profile and the effectiveness of the pre-marketing activity. The transaction followed a well-attended one-day roadshow comprising a Global Investor Call and a series of group calls.

The reporting plan for the Green Bond issued in 2023 is structured as follows:

  • 1) the third release of the Green Bond Allocation & Impact Report published in September 2024 which covers:
    • the financial indicators for the period 2022-2023, and
    • non-financial indicators, if measurable or available, for years 2020-2023.
  • 2) the fourth release, in 2025, which covers
    • all the financial indicators for the period 2022-2024, and
    • non-financial indicators, if measurable or available, for years 2020-2024.

3) the next release which will represent the results obtained until complete allocation of net proceeds and will be disclosed after the presentation of Acea Group financial and non-financial results.

In 2025, ACEA has updated its Green & Blue Financing Framework (hereinafter also referred to as the "Updated Framework") in alignment with its new Industrial Plan for 2024-2028 and the new sustainability targets. The Updated Framework is dedicated to various Green & Blue Financing Instruments (hereinafter referred to as the "Instruments") to be issued or contracted by the company.

DNV Business Assurance Italy S.r.l. ("DNV") had previously been commissioned by Acea to provide an eligibility assessment of the Updated Framework. Our objective has been to provide an assessment on whether the Updated Framework meets the criteria established within the International Capital Market Association (ICMA) Green Bond Principles, "GBP" (June 2021 and Appendix of June 2022) – including the Practitioner's Guide of September 2023 – and the Loan Market Association (LMA) Green Loan Principles, "GLP" (February 2023). Additionally, the assessment included the guidelines for blue finance from the International Finance Corporation (IFC, January 2022).

External Review on the 2025 Green Bond Report

DNV has now been commissioned to conduct a Green Bond Eligibility Assessment on Fourth Release of Acea's Green Bond Report, covering the financial indicators for the period 2022-2024, and the non-financial indicators, if measurable or available, for the period 2020-2024, using the Green Bond Principles (GBP) and the Harmonised Framework for Impact Reporting (HFIR).

No assurance is provided regarding the financial performance of Bond issued under the Company's Framework, the value of any investments, or the long-term social and/or societal benefits of theassociated transactions. Our objective has been to provide an assessment that the Report has met the criteria established on the basis set out below.

Responsibilities of the Management of Acea and DNV

The management of Acea has provided the information and data used by DNV during the delivery of this review. Our statement represents an independent opinion and is intended to inform Acea management and other interested stakeholders in the Framework as to whether the established criteria have been met, based on the information provided to us. In our work we have relied on the information and the facts presented to us by Acea. DNV is not responsible for any aspect of the nominated assets referred to in this opinion and cannot be held liable if estimates, findings, opinions, or conclusions are incorrect.

Thus, DNV shall not be held liable if any of the information or data provided by Acea's management and used as a basis for this assessment were not correct or complete.

Basis of DNV's opinion

We have adapted our eligibility assessment protocol, which now incorporates the requirements of the Harmonised Framework for Impact Reporting and the Green Bond Principles to create an Acea-specific 2025 Green Bond Report Protocol (henceforth referred to as "Protocol"). Our Protocol includes a set of suitable criteria that can be used to underpin DNV's opinion.

As per our Protocol, the HFIR and GBP-related criteria have been reviewed against the Fourth Release of Acea's Green Bond Report. The criteria are grouped under the five core Principles:

Principle One: Use of Proceeds

The Use of Proceeds criteria require that the issuer of a Green Bond allocate the proceeds raised exclusively to eligible projects. These projects must deliver tangible green benefits.

Principle Two: Process for Project Evaluation and Selection

The Project Evaluation and Selection criteria require that a Green Bond issuer clearly describe the process used to assess whether an investment qualifies for funding. Additionally, the issuer should specify any intended impact goals considered during this evaluation.

Principle Three: Management of Proceeds

The Management of Proceeds criteria require that Green Bond proceeds be tracked within the issuing organization. When appropriate, separate portfolios should be established, and the issuer must disclose how any unallocated proceeds will be managed.

Principle Four: Reporting

The Reporting criteria recommend that, at a minimum, issuers provide Sustainability Reporting to Bond investors regarding the use of proceeds. Where possible, this reporting should include quantitative and/or qualitative performance indicators.

Principle Five: Impact Reporting

Reporting also plays a key role in communicating the anticipated green impacts of the proceeds, and should be conducted at least annually. In addition to qualitative indicators and contextual details, the use of quantitative performance metrics is encouraged where feasible. In this context, core impact metrics—such as those outlined under the relevant project categories in the HFIR—are preferred over other types of quantitative measures, such as inputs, outputs, or outcomes.

Work undertaken

Our work constituted a high-level review of the available information, based on the understanding that this information was provided to us by Acea in good faith. We have not performed an audit or other tests to check the veracity of the information provided to us. The work undertaken to form our opinion includes:

  • Creation of an Acea-specific Protocol, adapted to the purpose of the 2025 Green Bond Report, as described above, in the next page and in Schedule 2 to this Assessment;
  • Assessment of documentary evidence provided by Acea on the specific projects that have been (re)financed and supplemented by a high-level desktop research. These checks are used to confirm whether the projects identified fit into the project categories originally included in the Framework;
  • Discussions with Acea management, as well as review of relevant documentation and evidence related to the criteria of the Protocol; and
  • Documentation of findings against the projects.

Our opinion as detailed below is a summary of these findings.

Findings and DNV's opinion

2025 Green Bond Report

As what concerns the 2025 Green Bond Report, DNV's findings are listed below, with further details in Schedule 2:

Principle One: Use of Proceeds.

Acea has used the net proceeds of the Green Bond to finance or re-finance, in whole or in part, a pool of nominated Eligible Projects/Activities qualified under the terms of the Green Bond Principles. The 2025 Green Bond Report specifies the following eligible project categories:

  • water resource protection
  • resilience of electricity distribution Infrastructure
  • clean transportation and infrastructure for Low Carbon Transport
  • smart meters
  • wastewater treatment
  • anaerobic digestion of bio-waste and/or sewage sludge
  • waste management
  • renewable energy

DNV conducted an assessment of the relevant project types to verify whether the proceeds were used to finance or refinance assets classified as 'Green' in accordance with the GBP. Acea has issued a 2025 Green Bond Report outlining the use of proceeds.

DNV assessed the criteria for the project categories mentioned above to evaluate the eligibility of the nominated projects and assets. It concluded that the financed categories align with those defined in the Framework. The proceeds have been used to finance and refinance the project categories in accordance with the GBP.

Principle Two: Process for Project Evaluation and Selection.

The proceeds from the Bond have been allocated to finance projects as specified in Schedule 1. The process for asset evaluation and selection described in the Framework has been respected. Acea reviews and validates the selection of projects in accordance with the categories listed in the Framework. Additionally, the company monitors the portfolio during the life of the transaction, including any ESG controversy.

DNV concludes that Acea has adhered to the established process for project evaluation and selection. This is in line with the GBP.

Principle Three: Management of Proceeds

From the total eligible portfolio, Acea has allocated a total of Euro 611.11 million from the date of issuance until the end of 2024, including refinancing of eligible projects made in late 2022 for 119.25mEUR before the issuance. In the original Framework, Acea stated that the net proceeds of Acea' Sustainable Debt Instruments would be tracked and managed by the Green Finance Working Group. Pending full allocation, unallocated proceeds may be temporarily invested in accordance with Acea's investment guidelines either in cash, deposits and other liquid money market instruments or in Socially Responsible Investments.

DNV has reviewed the evidence presented and can confirm that the proceeds have been appropriately managed, in line with the GBP. Unallocated proceeds will be covered in the next reporting period.

Principle Four: Reporting

Acea has reported annually, and will publish the 2025 Green Bond Report on its website with the following information:

  • ✓ the list of (re)financed projects with the net proceeds of the Bond;
  • ✓ information on key performance indicators (KPIs) related to such Eligible Projects.

DNV has reviewed the evidence presented and can confirm that the reporting has been provided annually, in line with the GBP.

Principle Five: Impact Reporting

The assessment and measurement of the impacts generated by Acea Green Bond covered all the project categories. The specific KPIs were inspired by the HFIR and overlap with the list included in the Harmonised Framework.

DNV has reviewed the evidence presented and can confirm that the KPIs selected by Acea are in line with best market practice.

DNV can confirm that Acea's 2025 Green Bond Report respects the criteria set in the original Framework, and that it appropriately describes the procedures of reporting in line with GBP and HFIR.

for DNV Business Assurance Italy S.r.l. Vimercate, August 1st , 2025

Giorgio Teresi Lead Assessor

Riccardo Arena Technical Reviewer

Schedule 1: Description of projects that have been (re)financed through Acea's 2023 Green Bond

Eligible Green
category
Project title Contribution to UN-SDGs Alignment with the project categories
included in the Framework
WATER
MANAGEMENT

Water losses reduction

Interventions to increase the water system resilience and the
security of water supply
ENERGY
EFFICIENCY

Energy efficiency in the electricity distribution networks'
management

Increased resilience in the electricity distribution network thanks to
development, modernisation, connectivity and telematic control
interventions

Electric mobility and related services

Environmental impact reduction from the vehicles of the company's
fleet

Substitution of 2G meters in the electricity distribution service
CIRCULAR
ECONOMY

Efficiency and modernisation
of the purification sector (sludge
reduction, centralisation and processing capacity increase, energy
efficiency)

Biomethane production from purification plants

Production of renewable energy through composting plants

Increase in the waste treatment capacity

Acea Smart Comp
GREEN ENERGY
Production of electric energy from photovoltaic sources

Schedule 2: Acea's 2025 Green Bond Report - Eligibility Assessment Protocol

1. Use of proceeds

Ref. Criteria Requirements Work Undertaken DNV Findings
1a Type of Bond The Bond
must fall in one of the following
categories, as defined by the Green Bond
Principles:

Green
Use of Proceeds Bond

Green
Use of Proceeds Revenue Bond

Green
Project Bond

Green
Securitized Bond
Review of:

Acea Green Financing
Framework (January 2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report
The reviewed evidence confirms that the Bond meets the
criteria for Green Use of Proceeds, demonstrating its
compliance with established standards for impactful
financing.
1b Green
Project
Categories
The cornerstone of Green Bond
is the
utilization of the proceeds of the Bond
which
should be appropriately described in the legal
documentation for the security.
Review of:

Acea Green Financing
Framework (January 2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report
As detailed in the Report, the net proceeds from the Green
Bond have been solely allocated to financing or refinancing
projects that comply with the eligibility criteria defined by the
Green Bond Principles.
1c Green
benefits
All designated Green
Project categories
should provide clear sustainable benefits,
which, where feasible, will be quantified or
assessed by the Issuer.
Review of:

Acea Green Financing
Framework (January 2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report
The environmental benefits linked to all funded projects are
well-defined, highly pertinent, and quantifiable. These
benefits are measured through specific Key Performance
Indicators (KPIs), ensuring a transparent and accountable
use of the bond proceeds.
1d Refinancing
share
In the event that a proportion of the proceeds
may be
used
for refinancing, it
is
recommended that issuers provide an
estimate of the share of financing vs. re
financing, and where appropriate, also clarify
which investments or project portfolios may
be refinanced.
Review of:

Acea Green Financing
Framework (January 2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report
The 2025 Green Bond Report clearly outlines the proportion
of net proceeds allocated to financing versus refinancing,
fully consistent with the commitments set forth in the
Framework.

2. Process for Project Selection and Evaluation

Ref. Criteria Requirements Work Undertaken DNV Findings
2a Investment
decision
process
The Issuer of a Green Bond
should outline the
decision-making process it follows to determine
the eligibility of projects using Green Bond
proceeds. This includes, without limitation:

A process to determine how the projects fit
within the eligible Green
Projects categories
identified in the GBP;

The criteria making the projects eligible for
using the Green Bond
proceeds; and

The green
sustainability objectives
Review of:

Acea Green Financing
Framework (January
2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report
The project eligibility assessment process, as defined in the
Framework, has been properly adhered to. DNV concludes
that Acea has implemented a robust and well-organized
methodology for evaluating and selecting projects, and that
this approach has been consistently executed in practice.
2b Issuer /
borrower's
Green
governance
framework
In addition to information disclosed by an issuer
on its Green Bond
process, criteria and
assurances, Green Bond
investors may also take
into consideration the quality of the issuer's
overall framework and performance regarding
sustainability.
Review of:

Acea Green Financing
Framework (January
2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report

Sustainability Report
2023

Sustainability Report
2024
,
integrated in the
Consolidated Financial
Statement
During the previous Second Party Opinion (SPO)
engagement, DNV reviewed Acea's Sustainability Strategy
and Governance framework, utilizing both publicly available
information and the Green & Blue Financing Framework.

3. Management of proceeds

Ref. Criteria Requirements Work Undertaken DNV Findings
3a Tracking
procedure
The net proceeds of Green Bond
should be
credited to a sub-account, moved to a sub
portfolio or otherwise tracked by the Issuer in an
Review of:

Acea Green Financing
Framework (January
The reviewed evidence demonstrates that Acea has
allocated the net proceeds of the Green Bond
upon
issuance. The disbursement details and the remaining
balance have been tracked through Acea's
internal financial

Ref. Criteria Requirements Work Undertaken DNV Findings
appropriate manner and attested to by a formal
internal process that will be linked to the Issuer's
operations for Green
Projects.
2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report
reporting system, ensuring transparency and accountability
throughout the process.
A portion of investments for the residual amount of
unallocated proceeds (around Euro 87 million) have been
allocated in the first months of 2025.
3b Temporary
holdings
Pending such investments or disbursements to
eligible Green
Projects, the issuer should make
known to investors the intended types of temporary
investment instruments for the balance
of
unallocated proceeds.
Review of:

Acea Green Financing
Framework (January
2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report
The remaining proceeds have been allocated in the first months
of 2025 and will be described in the following reporting
period from Acea.

4. Reporting

Ref. Criteria Requirements Work Undertaken DNV Findings
4a Periodical
reporting
Issuers
should make and keep readily available up
to date
information on the use of proceeds to be
renewed annually until fully drawn, and as
necessary thereafter in the event of material
developments. This should include a list of the
Green
projects to which the Green Bond
proceeds
have been allocated and a brief description of the
projects and the amounts allocated and their
expected impact. In addition to reporting on the use
of proceeds and the temporary investment of
unallocated proceeds, Issuers should provide at
least
annually a list of projects to which Green Bond
proceeds have been allocated including a brief
description of the projects and the amounts
disbursed, as well as the expected sustainable
impact.
Review of:

Acea Green Financing
Framework (January
2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond Report
Acea has published the 2025 Green Bond Report
on its
website, including: t:

A detailed list of Eligible Projects refinanced with
the Bond's net proceeds;

Key Performance Indicators (KPIs) linked to these
Eligible Projects.
In addition, Acea has developed a comprehensive register of
all Eligible Projects, incorporating relevant impact indicators
to track the environmental contributions of the financed
initiatives. DNV was engaged to provide an independent
assessment, confirming adherence to the established
criteria.

5. Impact Reporting

Ref. Criteria Requirements Work Undertaken DNV Findings
5a Impact
reporting
Reporting is a core component of the GBP, and
Green Bond
issuers are required to report on both the
use of Green Bond
proceeds, as well as their
expected green
impacts at least on an annual basis.
Besides qualitative performance indicators and
contextual information, the use of quantitative
performance measures is recommended, where
feasible. In this regard, core impact metrics such as
those proposed under the relevant project categories
in the
Handbook are preferred over other quantitative
metrics (e.g. inputs, outputs, outcomes).
Depending on the process put in place for the
allocation of proceeds, it is recommended that
issuers either provide a list of projects to which Green
Bond
proceeds have been allocated, or report solely
on a portfolio level.
The impact report should illustrate the expected
green
impacts or outcomes made possible as a result
of projects to which Green Bond
proceeds have been
allocated.
Review of:

Acea Green Financing
Framework (January
2021)

Acea Green & Blue
Financing Framework
(February 2025)

2025 Green Bond
Report
Acea has fully complied with the reporting requirements
outlined by both the Green Bond Principles (GBP) and the
Harmonised Framework for Impact Reporting (HFIR).
Demonstrating a strong commitment to transparency, the
company has issued annual updates detailing the allocation
of Green Bond proceeds and the resulting environmental
impacts. In line with industry's
best practices, Acea has
included quantitative performance indicators, emphasizing
core impact metrics aligned with the relevant project
categories
defined in the Harmonised Framework. The report
presents a comprehensive list of Eligible Projects along with
their corresponding KPIs. Furthermore, Acea's impact
reports clearly communicate the expected environmental
outcomes of the financed projects, reinforcing the company's
adherence to the GBP's principles of accountability and
social responsibility.

Talk to a Data Expert

Have a question? We'll get back to you promptly.