MPC Energy Solutions ("MPCES", "Company", together with its subsidiaries "Group", "we") develops, builds, owns and operates renewable energy assets, with the current focus on utility-scale solar photovoltaics (PV).
We generate and deliver clean and affordable energy to public and private off-takers in developing and emerging markets, accelerating and driving the energy transition. To sell the energy we produce in our plants, we usually sign long-term power purchase agreements (PPA) which help us secure predictable cash flows for our projects while simultaneously allowing off-takers to purchase energy at reliable prices that are usually lower than the applicable tariffs from public or private power utilities.
The Company is currently active in several countries across Latin America.
Amounts reported in thousands or millions throughout this report are computed based on the underlying numbers in US dollars (USD). As a result, the sum of the components reported in the underlying numbers in USD may not equal the total amount reported in thousands or millions due to rounding. Certain columns and rows within tables may therefore not add up due to the use of rounded numbers. Percentages presented are calculated from the underlying numbers in USD.
To supplement our consolidated financial statements presented on International Financing Reporting Standards (IFRS) basis, we disclose certain non-IFRS financial measures (Alternative Performance Measures, APM), including, without being limited to, proportionate energy output numbers, proportionate revenues, and proportionate earnings before interest, taxes, depreciation and amortization (EBITDA) and proportionate earnings before interest and taxes (EBIT), including percentages and ratios derived from those measures. EBITDA and EBIT are commonly used performance indicators in the Company's industry.
The difference between consolidated values and proportionate values is explained by the following pro-rata considerations:
| Project | Share considered to calculate consolidated values |
Share considered to calculate proportionate values |
|---|---|---|
| Los Santos I, Mexico | 100% | 100% |
| Santa Rosa & Villa Sol, El Salvador | 100% | 100% |
| San Patricio, Guatemala | 100% | 100% |
| Los Girasoles, Colombia | 100% | 100% |
| Planeta Rica, Colombia | 0% | 50% |
The APMs we use are not necessarily in accordance with generally accepted accounting principles stipulated by IFRS and should not be considered in isolation from or as a replacement for the most directly comparable IFRS financial measures. Furthermore, other companies may calculate these APMs differently than we do, which may limit the usefulness of those measures for comparative purposes.
Management uses supplemental APMs to evaluate performance period over period, to analyse the underlying trends in our business, to assess our performance relative to our competitors and to establish operational goals and forecasts that are used in allocating resources. In addition, management uses APMs to further its understanding of the performance of our operating projects and help isolate actual performance from adjustments required by accounting standards.
Certain information and statements shared in this document, including financial estimates and comments about our plans, expectations, beliefs, or business prospects, and other information and statements that are not historical in nature, may constitute forward-looking statements under the securities laws. We make these statements based on our views and assumptions regarding future events and business performance at the time we make them.
We do not undertake any obligation to update these information and statements in the future. Forward-looking statements are subject to several risks and uncertainties, and actual results may differ materially from the results expressed or implied considering a variety of factors, including factors contained in our financial statements, filings, and other releases.
MPC Energy Solutions in Brief
4 MPC Energy Solutions N.V. Financial Report H1 2025 Financial Report H1 2025 MPC Energy Solutions N.V. 5
MPCES was founded on 4 June 2020 as a Dutch public limited liability company incorporated in the Netherlands and governed by Dutch law. The Company is registered with the Dutch company register under the organization number 78205123, and its registered office is at Apollolaan 151, 1077 AR Amsterdam. MPCES has additional offices in Bogotá (Colombia) and Panama City (Panama).
The shares of the Company are listed on the Euronext Growth segment of the Oslo Stock Exchange under stock ticker MPCES (ISIN: NL0015268814).

| in million USD unless stated otherwise | H1 2025 | H1 2024 |
|---|---|---|
| Installed capacity (MW, proportionate, cumulated) | 66 | 66 |
| Energy output (GWh, proportionate, as generated) | 60.5 | 59.1 |
| Project revenue (proportionate) | 6.1 | 6.1 |
| Project EBITDA* (proportionate) | 4.4 | 3.9 |
| Project EBITDA margin (proportionate) | 73% | 64% |
| Group EBITDA* (proportionate) | 2.6 | 2.0 |
| Group EBITDA margin (proportionate) | 43% | 33% |
| Revenue (consolidated) | 5.4 | 5.5 |
| EBITDA* (consolidated) | 2.2 | 1.7 |
| Group EBITDA* margin (consolidated) | 41% | 30% |
| Total assets (consolidated, group level) | 128.4 | 131.2 |
| Equity ratio (consolidated, group level) | 37% | 50% |
| Free cash** | 2.2 | 4.2 |
| EPS (consolidated, basic and diluted, USD) | (0.06) | (0.21) |
| Cash flow from operations (consolidated) | (3.5) | (2.2) |
| Cash flow from investing activities (consolidated) | (5.9) | (3.9) |
| Cash flow from financing activities (consolidated) | 8.2 | 9.1 |
| FX translation differences (consolidated) | 0.0 | (0.1) |
| Total cash flow for the period (consolidated) | (1.1) | 2.8 |
| Free cash flow to equity (FCFE)*** | (1.1) | 3.1 |
Note: Rounding differences may occur.
* EBITDA stands for earnings before interest, taxes, depreciation and amortization.
* * We define free cash as funds available for immediate deployment for project investments, project development and group overhead.
This figure excludes cash available in our project companies as well as cash deposited as collateral to secure project-related bank
guarantees or energy trading activities.
*** Please refer to the section on free cash and free cash flow for details.
7 MPC Energy Solutions N.V. Financial Report H1 2025 Financial Report H1 2025 MPC Energy Solutions N.V. 8
As of 30 June 2025, four projects were delivering energy to power grids in Mexico, El Salvador, and Colombia. Meanwhile, our largest project to-date, the 66 MWp solar PV plant San Patricio in Guatemala, has completed construction and is – after the testing and commissioning phase - expected to connect to the power grid in the coming weeks.
| proportionate, in thousand USD | Energy output (GWh) |
Revenue (project level) |
EBITDA (project level) |
EBITDA margin (project level) |
|---|---|---|---|---|
| H1 2025 | 60.5 | 6.1 | 4.4 | 73% |
| H1 2024 | 59.1 | 6.1 | 3.9 | 64% |
| H1 2023 | 38.7 | 4.0 | 1.9 | 47% |
| Relative change 2025 vs. 2024 | +2% | -1% | +13% |
Note: Rounding differences may occur.
Overall, our projects delivered better results in the first half of the year compared to the previous year, especially on a like-for-like basis (i.e. excluding Neol CHP (Puerto Rico), which did not contribute to any results in 2025 after we divested the project at the end of 2024). We benefitted from a greater technical availability of our plants (especially in Mexico), the now fully commissioned solar trackers in Colombia, and from persistent high energy prices in El Salvador.
| H1 2025 | H1 2024 | Change |
|---|---|---|
| 21.3 | 19.0 | +12% |
| 18.3 | 18.3 | 0% |
| 10.6 | 11.0 | -3% |
| 10.3 | 9.7 | +6% |
| - | 1.1 | -100% |
| 60.5 | 59.1 | +2% |
| 2,491 | 1,957 | +27% |
| 2,100 | 2,049 | +3% |
| 835 | 718 | +16% |
| 632 | 611 | +3% |
| - | 770 | -100% |
| 6,059 | 6,104 | -1% |
| - | (770) | - |
| 6,059 | 5,334 | +14% |
| H1 2025 | H1 2024 | Change | |
|---|---|---|---|
| EBITDA (proportionate, in thousand USD) | |||
| Santa Rosa & Villa Sol | 2,185 | 1,596 | +37% |
| Los Santos I | 1,582 | 1,474 | +7% |
| Los Girasoles | 307 | 74 | +313% |
| Planeta Rica | 335 | 410 | -18% |
| Neol CHP | - | 336 | -100% |
| Total | 4,409 | 3,889 | +13% |
| Elimination of Neol CHP | - | (336) | - |
| Total EBITDA, like-for-like | 4,409 | 3,553 | +24% |
| EBITDA margin | |||
| Santa Rosa & Villa Sol | 88% | 82% | |
| Los Santos I | 75% | 72% | |
| Los Girasoles | 37% | 10% | |
| Planeta Rica | 53% | 67% | |
| Neol CHP | - | 44% | |
| Total | 73% | 64% |
Note: Rounding differences may occur.
El Salvador: Our solar PV plant Santa Rosa & Villa Sol experienced a significant increase in energy output and revenues in the first half of the year compared to the previous year, which was in part driven by higher energy prices, but mainly by an adjustment to the discount at which we sell our energy relative to a market reference tariff. The discount was 32% during the first 12 months of operations and decreased to 16% during Q1 2024, which was consequently only partially reflected in the H1 2024 figures. The project continues to deliver high operating margins in line with our expectations.
Mexico: The project is currently delivering energy and consequently operating results above our expectations. The plant has shown high technical availability during the first two quarters, irradiation levels were supportive, and we were also able to sell energy from the so called "energy bank", i.e. a reserve of produced but unsold energy from prior periods. Following cost reduction measures implemented in 2024, we are now seeing operating margins at the level we target (75% EBITDA margin in H1 2025) and are working on securing these margins for future quarters.
Colombia: While the output from our plants was similar to or improved year-over-year and the need to purchase energy in the spot market was limited compared to prior years, Colombia remains a challenging market. The security situation in certain parts of the country remains volatile, increasing related expenses to improve security and protect our staff on site. And while our plants have so far not been negatively affected, operating margins remain below normal levels for solar PV projects. During the first half of 2025, we benefitted from a stronger Colombian Pesos, positively affecting revenue generation from the plants.
Puerto Rico: We sold the CHP plant at the end of 2024. Our share in the sales price is USD 3.8 million, of which USD 2.8 million were received last year, and we expect to collect the remaining tranche latest in October 2025. Going forward, Puerto Rico will consequently no longer generate revenues and profits for the Group.
The construction of our 66 MWp solar PV plant San Patricio in Guatemala has been completed, and the project is ready to commence and complete the testing and commissioning phase in the coming weeks before officially starting operations. We are currently waiting for required permits to be issued, but have experienced delays during the process over the past weeks.
The later-than-expected connection to the grid is at the moment, however, not impacting our year-end guidance.
After significant cost reductions in 2024 (-30% compared to 2023) were already accomplished, we initiated additional cost reduction measures in H1 2025, which have not yet fully translated into our profit and loss due to higher-than-expected year-end auditing and tax advisory fees. We anticipate better reduction levels in our Q3 2025 results and beyond.
| in thousand USD | H1 2025 | H1 2024 | Change |
|---|---|---|---|
| Employee expenses | (838) | (815) | +3% |
| Other overhead | (990) | (1,043) | -5% |
| Total | (1,828) | (1,858) | -2% |
Note: Rounding differences may occur.
We define free cash as funds available for immediate deployment for project investments, project development and group overhead. This figure excludes cash available in our project companies as well as cash deposited as collateral to secure project-related bank guarantees or energy trading activities.
| in thousand USD | 30.06.2025 | 31.12.2024 |
|---|---|---|
| Consolidated group cash position | 11,337 | 12,415 |
| Restricted deposits | (181) | (635) |
| Cash held in consolidated project entities | (8,970) | (7,580) |
| Free cash position of the Group | 2,186 | 4,200 |
Note: Rounding differences may occur.
Given our activities to sell projects in the coming months, our lower overhead spending following successful cost reductions, forecasted corporate income tax refunds, and expected cash payments from project entities in Q3 2025 and Q4 2025, we currently do not foresee any liquidity concerns for 2025 and beyond. We currently project our year-end free cash position, prior to distributions to shareholders, to increase to around USD 8 million to USD 9 million. Our goal remains to start distributing cash to shareholders before year-end.
| in thousand USD | H1 2025 | H1 2024 |
|---|---|---|
| Operating cash flow | (3.5) | (2.2) |
| Capital expenditure (net of divestments) | (5.9) | (3.9) |
| Net borrowing | 8.3 | 9.2 |
| Free cash flow to equity (FCFE) of the Group |
(1.1) | 3.1 |
Note: Rounding differences may occur.
The FCFE we calculate excludes certain cash flow items, especially in investment and financing cash flows, that do not relate to capital expenditure, acquisitions, divestments or the receipt and repayment of loan amounts. Small deviations from our overall cash flow for the period therefore occur.
The operating cash flow in the first half of 2025 was negative, mainly due to (a) interest paid on non-recourse loans (USD 2.0 million) and (b) VAT payments in connection with the construction of San Patricio (Guatemala) which can only be recovered during the operational phase (USD 3.9 million). Both types of cash payouts are classified as operating cash flow under IFRS.

MPCES has initiated several key initiatives and defined milestones for the current financial year. The following are driving our Company's activities in 2025:
Provided these initiatives can be implemented as planned, MPCES will have a core operational portfolio of three projects: San Patricio (Guatemala), Santa Rosa & Villa Sol (El Salvador) and Los Santos I (Mexico), which combine for a total installed capacity of 103 MW. We remain, however, open to consider divestments from these projects at the right time and especially price to maximize shareholder value and return cash to our shareholders in the short run.
While the projects in Mexico and El Salvador will be fully operational through 2025, the project in Guatemala is only expected to contribute during the second half of the year following its successful grid connection. We project the following key metrics for 2025:
| Proportionate values, in million USD unless stated otherwise |
Projection 2025 |
Actual 2024 |
|---|---|---|
| Energy output (GWh) | 140 to 145 | 116 |
| Revenue | 12.0 to 13.0 | 12.8 |
| Project EBITDA | 9.0 to 9.5 | 7.9 |
| Group EBITDA | 6.0 to 7.0 | 4.3 |
Note: Rounding differences may occur.
Despite the delay in commencing the testing and commissioning phase of our project in Guatemala, we do not expect a negative impact on our full-year guidance, as a delay in revenue generation is currently being compensated by the contribution from our Colombian projects, which were originally not included in the 2025 outlook.
Once all three plants are fully operational for a whole year in 2026, total output and revenues are expected to increase to 220 GWh and USD 16.5 million, respectively, with proportionate EBITDA to reach between USD 12.5 million and USD 13.0 million, and Group EBITDA close to around USD 10.0 million.
The Group is exposed to a variety of risks which may or may not materialize and could potentially have an adverse effect on the Group's business and prospects. It is considered practically impossible to generate risk-free profits systematically and sustainably, as risks are part of every company's business activity. Therefore, identifying and mitigating risks is among the most important entrepreneurial duties.
For a detailed overview of the Company's risks and risk assessment, please refer to our Annual Report 2024.
The Company regularly reviews its methodology of risk management to check whether it meets the current needs and requirements of the Management Board. As part of this review, MPCES evaluates its internal controls and systems for risk management and updates them where needed and encourages employees to actively contribute to the improvement of the Company's risk management system and policies.
As of 30 June 2025, the Group's Chief Financial Officer (CFO), Stefan H.A. Meichsner, and the Group's Managing Director for Central America and the Caribbean, Fernando Zuñiga, were the only members of the Management Board.
In preparing the consolidated and company-only financial statements, the Management Board is responsible for assessing the Company's ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless it is expected to liquidate the Company or to cease its operations.
Assessing whether going concern is the correct presumption requires judgement by the Management Board on different matters concerning the Company's ability to continue its operations in the future. This judgement is based on the financial position of the Company, the Company's existing operational projects, projects under construction and the project development backlog, business opportunities and financial projections. Since the Company is not yet generating positive cash flows, the uncertainty of maintaining sufficient liquidity to support the going concern assumption has been assessed. Based on internal financial projections and preparations made to secure additional funding from external sources (asset sales, equity and debt), as well as the fact that the Company has currently no long-term debt on corporate level, the Management Board currently sees no significant risk materializing from this uncertainty.
In July 2025, MPCES signed an agreement to sell its shares and financial interests in Planeta Rica (Colombia). Closing of the transaction is expected in late Q3/early Q4 2025. MPCES will collect an upfront payment upon closing and may also benefit from earn-out payments following the year after concluding the transaction. No further details on the transaction will be disclosed.
Also in July 2025, the 66 MWp project San Patricio (Guatemala) achieved its mechanical completion milestone and is currently awaiting permits to commence the testing and commissioning phase before officially moving into commercial operation.
| Consolidated Statement of Financial Position | 15 |
|---|---|
| Consolidated Income Statement | 16 |
| Consolidated Statement of Cash Flows | 17 |
| Notes to the Consolidated Financial Statements | 18 |
for the period ended 30 June, unaudited (before appropriation of results)
| in thousands USD Notes |
30.06.2025 | 31.12.2024 |
|---|---|---|
| Intangible assets | 13,492 | 16,455 |
| Property, plant and equipment | 82,039 | 76,270 |
| Right-of-use assets | 1,391 | 1,435 |
| Investments in joint ventures | - | 6 |
| Financial assets | 4,000 | 4,000 |
| Deferred tax assets | 481 | 448 |
| Non-current assets | 101,403 | 98,614 |
| Trade and other receivables | 5,442 | 4,292 |
| Current tax receivables | 1,777 | 733 |
| Prepayments and accrued income | 359 | 122 |
| Cash and cash equivalents 1 |
11,337 | 12,415 |
| Current assets | 18,915 | 17,567 |
| Assets held for sale 2 |
8,038 | 7,410 |
| Total assets | 128,356 | 123,586 |
| Shareholders' equity | 47,992 | 50,235 |
| Total equity | 47,992 | 50,235 |
| Project finance loans 3 |
72,276 | 63,626 |
| Lease liabilities | 1,539 | 1,584 |
| Deferred tax liabilities | 1,712 | 1,169 |
| Provisions | 317 | 298 |
| Non-current liabilities | 75,844 | 66,677 |
| Trade and other payables | 2,020 | 3,522 |
| Current tax payables | - | - |
| Project finance loans 3 |
2,288 | 2,981 |
| Lease liabilities | 116 | 60 |
| Provisions | 97 | 111 |
| Accruals and deferred income | - | - |
| Current liabilities | 4,520 | 6,674 |
| Total equity and liabilities | 128,356 | 123,586 |
Note: Rounding differences may occur.
for the period ended 30 June, unaudited
| H1 2025 | FY2024 |
|---|---|
| 5,427 | 11,623 |
| (1,353) | (4,180) |
| (838) | (1,641) |
| (990) | (1,964) |
| (2,021) | (17,124) |
| 225 | (13,286) |
| (944) | (744) |
| (846) | (3,669) |
| - | (38) |
| (1,566) | (17,736) |
| 135 | 337 |
| (1,431) | (17,400) |
| (1,431) | (17,470) |
| - | 70 |
| 22,250,000 | 22,250,000 |
| (0.06) | (0.78) |
| (0.06) | (0.78) |
Note: Rounding differences may occur.
for the period ended 30 June, unaudited
| in thousand USD | Notes H1 2025 |
FY2024 |
|---|---|---|
| Cash flow from operating activities | (3,485) | (3,959) |
| Cash flow from investment activities | (5,857) | (26,140) |
| Cash flow from financing activities | 8,233 | 22,224 |
| Net change in cash and cash equivalents | (1,109) | (7,875) |
| Effects of currency translation | 31 | (193) |
| Cash and cash equivalents at the beginning of the period | 12,415 | 20,483 |
| Cash and cash equivalents at the end of the period | 11,337 | 12,415 |
Note: Rounding differences may occur.
As an integrated full-cycle independent power producer (IPP), the principal activities of the Company and its subsidiaries are to develop, build, own, and operate renewable energy projects. Such projects currently exclusively include solar photovoltaics (PV) plants.
The registered and actual address of MPC Energy Solutions N.V. is Apollolaan 151, 1077 AR Amsterdam, the Netherlands. The Company is registered at the Dutch chamber of commerce under number 78205123. The Company was incorporated on 4 June 2020. MPCES has additional offices in Bogotá (Colombia) and Panama City (Panama).
Following a private placement of shares on 22 January 2021, the shares of the Company were listed in the Euronext Growth segment of the Oslo Stock Exchange.
In preparing the consolidated and company-only financial statements, the Management Board is responsible for assessing the Company's ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless it is expected to liquidate the Company or to cease its operations.
Assessing whether going concern is the correct presumption requires judgement by the Management Board on different matters concerning the Company's ability to continue its operations in the future. This judgement is based on the financial position of the Company, the Company's existing operational projects, projects under construction and the project development backlog, business opportunities and financial projections. Since the Company is not yet generating positive cash flows, the uncertainty of maintaining sufficient liquidity to support the going concern assumption has been assessed. Based on internal financial projections and preparations made to secure additional funding from external sources (asset sales, equity and debt), as well as the fact that the Company has currently no long-term debt on corporate level, the Management Board currently sees no significant risk materializing from this uncertainty.
The Company's financial year corresponds to the calendar year.
The consolidated financial statements have been prepared in accordance with IFRS as adopted by the European Union and comply with the financial reporting requirements included in Part 9 of Book 2 of the Dutch Civil Code.
The consolidated financial statements have been prepared on a historical cost basis unless stated otherwise.
The consolidated financial statements are presented in USD. All financial information presented in USD has been rounded to the nearest thousand USD unless indicated otherwise.
The Group's intention is to adopt the relevant new and amended standards and interpretations when they become effective, subject to European Union approval before the consolidated financial statements are issued.
| in thousand USD | 30.06.2025 | 31.12.2024 |
|---|---|---|
| Bank deposits and cash in hand | 11,156 | 11,780 |
| Restricted deposits and margin accounts | 181 | 635 |
| Total cash and cash equivalents | 11,337 | 12,415 |
| Non-consolidated cash and cash equivalents, proportionate: | ||
| Proportionate cash and cash equivalents, Planeta Rica, Colombia | 636 | 379 |
The Group in some cases provides cash collateral for guarantees to secure power grid connections, tenders, and obligations under supply agreements and power purchase agreements. Such collateral is disclosed as restricted deposits. The Group also conducts energy trading activities in Colombia, which may include the use of futures contracts. A deposit of cash as a collateral is required to cover the risk of such transactions. Such collateral held in "margin accounts" is also disclosed as restricted deposits.
Given our activities to sell projects in the coming months, our lower overhead spending following successful cost reductions, forecasted corporate income tax refunds, and expected cash payments from project entities in Q3 2025 and Q4 2025, we currently do not foresee any liquidity concerns for 2025 and beyond.
| in thousand USD | 30.06.2025 | 31.12.2024 |
|---|---|---|
| Parque Solar Planeta Rica SAS, Colombia | 8,038 | 7,410 |
| Total assets held for sale | 8,038 | 7,410 |
We are in the final stages of selling our shares of Parque Solar Planeta Rica SAS (Colombia), a solar PV joint venture in which we hold a 50% stake. The increase in the book value is caused by exchange rate movements, given that the assets are denominated in Colombian Pesos (COP).
Please refer to the Group's accounting principles in the Annual Report 2024 for additional information on our accounting treatment with regards to assets held for sale.
| in thousand USD | 30.06.2025 | 31.12.2024 |
|---|---|---|
| Current portion of project finance loans | 2,288 | 2,981 |
| Non-current portion of project finance loans | 72,276 | 63,626 |
| Total project finance loans | 74,564 | 66,607 |
| Project breakdown: | ||
| Bonilla Zelaya Ingenieros Constructores SA de CV, El Salvador | 16,624 | 17,378 |
| Los Santos I SAPI de CV, Mexico | 23,744 | 24,130 |
| San Patricio Renovables SA, Guatemala | 34,196 | 25,099 |
| Total project finance loans | 74,564 | 66,607 |
| Non-consolidated project debt, proportionate: | ||
| Proportionate financial debt, Planeta Rica, Colombia | 7,407 | 6,376 |
The Group mostly includes non-recourse financing structure in its projects, with loans being provided by commercial banks or development banks with tenors usually tied to the term of the respective project's power purchase agreement(s).
For its project Santa Rosa & Villa Sol, El Salvador, a loan is being provided by Banco Agricola, a member of the Bancolombia Group. The loan is USD-denominated, has a tenor of 15 years and an interest rate of 3-month SOFR plus 4,75%.
The solar PV plant Los Santos I SAPI de CV, Mexico, has secured loans from the North American Development Bank (NADB) and the Development Finance Corporation (DFC), which each provide around 50% of the total outstanding debt. The loans originally had a tenor of 17 years and 20 years, respectively, and will mature in March 2034 and March 2037. Repayments are made semi-annually. The interest rates on both loans are fixed at 4.87% (NADB) and 4.9% (DFC) until 2025, after which the rates will increase by 25 bps for each of the two loans and remain fixed until 2030. The loans' interest rates will then increase by another 25 bps each until the end of the respective loan tenors.
We secured a project finance loan for our solar PV project in Guatemala, which began construction earlier this year. The 66 MWp plant is expected to connect to the power grid and commence operations in mid-2025. The loan of USD 34.0 million is provided by local bank Banco de América Central (BAC) and has a 16-year tenor, matching the length of the power purchase agreement (PPA) and reflecting a debt ratio for the project of around 80%. The loan carries a fixed interest rate during construction and variable rate (3-month SOFR plus 2.5%) during the operational phase.
MPCES has no short-term or long-term bank debt on corporate level.
| in thousand USD | Energy output (GWh) |
Revenue (project level) |
EBITDA (project level) |
EBITDA margin (project level) |
|---|---|---|---|---|
| Santa Rosa & Villa Sol (El Salvador) | 21.3 | 2,491 | 2,185 | 88% |
| Los Santos I (Mexico) | 18.3 | 2,100 | 1,582 | 75% |
| Los Girasoles (Colombia) | 10.6 | 835 | 307 | 37% |
| Planeta Rica (Colombia) | 10.3 | 632 | 335 | 53% |
| Total proportionate values | 60.5 | 6,059 | 4,409 | 73% |
| Consolidation adjustments | (10.3) | (632) | (335) | (53%) |
| Total consolidated values | 50.2 | 5,427 | 4,074 | 75% |
The Group has the following off-balance sheet commitments as of 30 June 2025:
The share purchase agreement with the sellers of the project Santa Rosa & Villa Sol (El Salvador) contains provisions regarding contingent purchase price payments depending on the commercial success of the project. Such contingent purchase price payments may accumulate to a maximum total amount of USD 6.9 million until 2043 (approximately USD 0.3 million per annum). The amount disclosed here refers to the part of the potential liabilities that we currently deem as improbable to be paid in the future, depending on the performance of the project.
In July 2025, MPCES signed an agreement to sell its shares and financial interests in Planeta Rica (Colombia). Closing of the transaction is expected in late Q3/early Q4 2025. MPCES will collect an upfront payment upon closing and may also benefit from earn-out payments following the year after concluding the transaction. No further details on the transaction will be disclosed.
Also in July 2025, the 66 MWp project San Patricio (Guatemala) achieved its mechanical completion milestone and is currently awaiting permits to commence the testing and commissioning phase before officially moving into commercial operation.