AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

TURCAS PETROL A.Ş.

Regulatory Filings Apr 28, 2015

8931_rns_2015-04-28_0d0bfbc9-69cc-4ba8-ae6d-88bf218d87e4.html

Regulatory Filings

Open in Viewer

Opens in native device viewer

Özel Durum Açıklaması (Genel)

1 ERKAN İLHANTEKİN FİNANS DİREKTÖRÜ TURCAS PETROL A.Ş. 28.04.2015 10:02:26
2 NURETTİN DEMİRCAN MUHASEBE MÜDÜRÜ TURCAS PETROL A.Ş. 28.04.2015 10:18:29
Ortaklığın Adresi : Ahi Evran Caddesi No:6 Aksoy Plaza Kat:7 Maslak Sarıyer 34398 İstanbul
Telefon ve Faks Numarası : 0212 259 00 00 (Tel) / 0212 259 00 19 (Faks)
E-posta adresi : [email protected]
Ortaklığın Yatırımcı/Pay Sahipleri İle İlişkiler Biriminin Telefon ve Faks Numarası : 0212 259 00 00 (Dahili: 1287) / 0 212 259 00 19 (Faks)
Yapılan Açıklama Ertelenmiş Açıklama mı? : Hayır
Özet Bilgi : Bağlı Ortaklığımız Turcas Yenilenebilir Enerji Üretim A.Ş.'nin Rüzgar Enerjisi Yatırımlarına İlişkin Ön Lisans Başvuruları Hakkında

AÇIKLAMA:

%99,99 oranında hissesine dolaylı sahip olduğumuz bağlı ortaklığımız Turcas Yenilenebilir Enerji Üretim A.Ş.'nin, 27 Nisan 2015 tarihinde 4 ayrı Rüzgar Enerjisi Yatırım projesine ilişkin Enerji Piyasası Düzenleme Kurumu'na (EPDK) ön lisans başvurularında bulunduğu bilgisi Şirketimize ulaşmıştır. Bahsi geçen 4 projenin; Balıkesir (35 MW), Çanakkale (40 MW), İzmir (21 MW) ve Tekirdağ (20 MW) illerinde gerçekleşmesi öngörülmekte olup, toplam 116 MW'lık üretim kapasitesi hedeflenmektedir.

Konu ile ilgili gelişmeler oldukça kamuyou ile paylaşılacaktır.

Kamuoyuna saygıyla duyurulur.

English version of the disclosure is stated below:

Subject: About our subsidiary Turcas Yenilenebilir Enerji Üretim A.Ş.'s Pre-License Applications Regarding Wind Power Plant Investments

Our Company has been informed that Turcas Yenilenebilir Enerji Üretim A.Ş. (99.99% indirect subsidiary of Turcas Petrol A.Ş.) has submitted pre-license applications to the Energy Market Regulation Authority ("EMRA") in 27 April 2015 regarding 4 Wind Power Plant investment projects. Mentioned 4 projects are expected to be realized in Balıkesir (35 MW), Çanakkale (40 MW), İzmir (21 MW) and Tekirdağ (20 MW) with a targeted installed capacity of 116 MW in total.

Further developments will be disclosed to the public in a timely manner.

Kind regards,

Note:  In case of a discrepancy between the Turkish and the English versions, the Turkish version shall prevail.

Yukarıdaki açıklamalarımızın, Sermaye Piyasası Kurulu'nun yürürlükteki Özel Durumlar Tebliğinde yer alan esaslara uygun olduğunu, bu konuda/konularda tarafımıza ulaşan bilgileri tam olarak yansıttığını, bilgilerin defter, kayıt ve belgelerimize uygun olduğunu, konuyla ilgili bilgileri tam ve doğru olarak elde etmek için gerekli tüm çabaları gösterdiğimizi ve yapılan bu açıklamalardan sorumlu olduğumuzu beyan ederiz.

Talk to a Data Expert

Have a question? We'll get back to you promptly.