Regulatory Filings • Nov 16, 2015
Regulatory Filings
Open in ViewerOpens in native device viewer
Özel Durum Açıklaması (Genel)
| 1 | ERKAN İLHANTEKİN | FİNANS DİREKTÖRÜ | TURCAS PETROL A.Ş. | 16.11.2015 09:23:49 |
| 2 | NURETTİN DEMİRCAN | MUHASEBE MÜDÜRÜ | TURCAS PETROL A.Ş. | 16.11.2015 09:28:09 |
| Ortaklığın Adresi | : | Ahi Evran Caddesi No:6 Aksoy Plaza Kat:7 Maslak 34398 Sarıyer İstanbul |
| Telefon ve Faks Numarası | : | 0.212.259.00.00 (Telefon) / 0.212.259.00.18 (Faks) |
| E-posta adresi | : | [email protected] |
| Ortaklığın Yatırımcı/Pay Sahipleri İle İlişkiler Biriminin Telefon ve Faks Numarası | : | 0.212.259.00.00 (Dahili: 1287) / 0.212.259.00.18 (Faks) |
| Yapılan Açıklama Ertelenmiş Açıklama mı? | : | Hayır |
| Özet Bilgi | : | Kadıncık 1 ve Kadıncık 2 Hidroelektrik Santrallerinin Özelleştirilmesi Amacıyla Düzenlenen İhaleye Katılım |
AÇIKLAMA:
Şirketimizin 10.11.2015 tarihli Özel Durum Açıklaması'nda da belirtildiği üzere; Elektrik Üretim A.Ş.ye ait hidroelektrik santrallerin özelleştirilmesi amacıyla ihale edilecek Grup 4 portföy içinde bulunan toplam 126 MW kurulu güce sahip Mersin ili Tarsus ilçesinde bulunan Kadıncık 1 ve Kadıncık 2 hidroelektrik santrallerine ilişkin ihale başvuru evrakları 10.11.2015 tarihinde Özelleştirme İdaresi Başkanlığı'na iletilmişti.
Özelleştirme İdaresi Başkanlığı tarafından yapılan davet uyarınca, Turcas Petrol A.Ş. 16.11.2015 tarihinde saat 10.15'deki 1. Tur Pazarlık ve 15.30'daki Nihai Pazarlık görüşmelerine katılacaktır.
Konu ile ilgili gelişmeler oldukça, kamuoyuna gerekli bilgilendirme yapılacaktır.
Kamuoyuna saygıyla duyurulur.
Please find the English version of the disclosure below:
Subject: About the Participation to the Tender Organised for the Privatization of Kadıncık 1 and Kadıncık 2 Hydroelectric Power Plants
As previously announced in our Company's Public Disclosure dated 10.11.2015; Turcas Petrol A.Ş. submitted tender application documents to the Privatization Administration regarding privatization of Kadıncık 1 and Kadıncık 2 Hydroelectric Power Plants in Mersin province Tarsus district with an installed capacity of 126 MW, which are included in Group 4 hydroelectric power plant portfolio of Elektrik Üretim A.Ş.
In accordance with the official invitation by Privatization Administration, Turcas Petrol A.Ş. will attend first round of talks at 10.15 and final round of talks at 15.30 local time today.
Further developments will be shared with the public on a timely basis.
Kind regards,
Note: In case of a discrepancy between the Turkish and the English versions, the Turkish version shall prevail.
Yukarıdaki açıklamalarımızın, Sermaye Piyasası Kurulu'nun yürürlükteki Özel Durumlar Tebliğinde yer alan esaslara uygun olduğunu, bu konuda/konularda tarafımıza ulaşan bilgileri tam olarak yansıttığını, bilgilerin defter, kayıt ve belgelerimize uygun olduğunu, konuyla ilgili bilgileri tam ve doğru olarak elde etmek için gerekli tüm çabaları gösterdiğimizi ve yapılan bu açıklamalardan sorumlu olduğumuzu beyan ederiz.
Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.