AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

TURCAS PETROL A.Ş.

Regulatory Filings Feb 26, 2016

8931_rns_2016-02-26_66c3ae0d-6293-405e-a7eb-f316945bbb46.html

Regulatory Filings

Open in Viewer

Opens in native device viewer

Özel Durum Açıklaması (Genel)

1 ERKAN İLHANTEKİN FİNANS DİREKTÖRÜ TURCAS PETROL A.Ş. 26.02.2016 14:30:17
2 NURETTİN DEMİRCAN MUHASEBE MÜDÜRÜ TURCAS PETROL A.Ş. 26.02.2016 14:32:57
Ortaklığın Adresi : Ahi Evran Caddesi No:6 Aksoy Plaza Kat:7 34398 Maslak İstanbul, Türkiye
Telefon ve Faks Numarası : 0212 259 00 00 (Tel) / 0212 259 00 19 (Faks)
E-posta adresi : [email protected]
Ortaklığın Yatırımcı/Pay Sahipleri İle İlişkiler Biriminin Telefon ve Faks Numarası : 0212 259 00 00 (Dahili: 1287) / 0212 259 00 19 (Faks)
Yapılan Açıklama Ertelenmiş Açıklama mı? : Hayır
Özet Bilgi : %46 Oranında Dolaylı İştirakimiz Turcas BM Kuyucak Jeotermal Elektrik Üretim A.Ş.'nin Ön Lisans Tadil Başvuru Sonucu Hakkında

AÇIKLAMA:

Şirketimiz tarafından 07.12.2015 tarihinde yapılan Özel Durum Açıklaması'nda belirtildiği üzere; %46 oranında dolaylı iştirakimiz Turcas BM Kuyucak Jeotermal Elektrik Üretim A.Ş. ("TBK")'nin Aydın ili Kuyucak ilçesinde yapılması planlanan Jeotermal Elektrik Santrali (JES) projesi kurulu gücünün 13,2 MW'dan 18 MW'a yükseltilmesi amacıyla Enerji Piyasası Düzenleme Kurumu ("EPDK")'na ön lisans tadil başvurusunda bulunulmuştu. Bahsi geçen başvurunun EPDK tarafından olumlu olarak sonuçlandığı bilgisi Şirketimize ulaşmıştır.

Kamuoyuna saygıyla duyurulur.

Please find below the English version of the disclosure:

Subject: About the Application Result of Turcas BM Kuyucak Jeotermal Elektrik Üretim A.Ş. (our 46% Indirect Subsidiary) Regarding the Revision of Pre-License

As previously announced in our Company's Public Disclosure dated 07.12.2015, Turcas BM Kuyucak Jeotermal Elektrik Üretim A.Ş. ("TBK"), our 46% indirect subsidiary, had applied to Energy Market Regulatory Authority ("EMRA") for the revision of pre-license in order to increase the installed capacity of the Geothermal Electricity Power Plant (GEPP) project located in Aydın Province, Kuyucak region from 13.2 MW to 18 MW.  Our Company has been informed that the above mentioned application was finalized by EMRA with a positive result.

Kind regards,

Yukarıdaki açıklamalarımızın, Sermaye Piyasası Kurulu'nun yürürlükteki Özel Durumlar Tebliğinde yer alan esaslara uygun olduğunu, bu konuda/konularda tarafımıza ulaşan bilgileri tam olarak yansıttığını, bilgilerin defter, kayıt ve belgelerimize uygun olduğunu, konuyla ilgili bilgileri tam ve doğru olarak elde etmek için gerekli tüm çabaları gösterdiğimizi ve yapılan bu açıklamalardan sorumlu olduğumuzu beyan ederiz.

Talk to a Data Expert

Have a question? We'll get back to you promptly.