AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

ENKA İNŞAAT VE SANAYİ A.Ş.

Regulatory Filings Dec 5, 2019

5909_rns_2019-12-05_f2360535-99dd-4817-9b8e-4490cfcaa92b.html

Regulatory Filings

Open in Viewer

Opens in native device viewer

[CONSOLIDATION_METHOD_TITLE] [CONSOLIDATION_METHOD]

İlgili Şirketler

Related Companies

[]

İlgili Fonlar

Related Funds

[]

Türkçe

Turkish

İngilizce

English

oda_MaterialEventDisclosureGeneralAbstract|

Özel Durum Açıklaması (Genel) Material Event Disclosure General

oda_UpdateAnnouncementFlag|

Yapılan Açıklama Güncelleme mi? Update Notification Flag

Hayır (No)

Hayır (No)

oda_CorrectionAnnouncementFlag|

Yapılan Açıklama Düzeltme mi? Correction Notification Flag

Hayır (No)

Hayır (No)

oda_DateOfThePreviousNotificationAboutTheSameSubject|

Konuya İlişkin Daha Önce Yapılan Açıklamanın Tarihi Date Of The Previous Notification About The Same Subject

-

-

oda_DelayedAnnouncementFlag|

Yapılan Açıklama Ertelenmiş Bir Açıklama mı? Postponed Notification Flag

Hayır (No)

Hayır (No)

oda_AnnouncementContentSection|

Bildirim İçeriği Announcement Content

oda_ExplanationSection|

Açıklamalar Explanations

oda_ExplanationTextBlock|

Overseas Bechtel, Inc . ile eşit paylara sahip olduğumuz Bechtel ENKA UK Limited 05.12.2019 tarihinde Sırbistan'da, Sırbistan Devleti adına İnşaat, Ulaşım ve Altyapı Bakanlığı ile Morava Koridor Otoyol Projesi'nin tasarım ve inşaatına ilişkin anlaşma imzalamıştır. Toplam 112 kilometre ve 745 milyon EUR tutarlı proje 2023 yılının sonunda tamamlanacaktır .

Bechtel ENKA UK Limited, which we have equal shares with Overseas Bechtel, Inc ., has signed an agreement for the design and construction of Morava Corridor Motorway with the Ministry of Construction, Transport and Infrastructure on behalf of the Government of Serbia on December 05, 2019 in Serbia. The project with total length of 112 kilometers and with a value of EUR 745 million will be completed by the end of the 2023.

(Translation into English is just for informational purposes. In case of a discrepancy between the Turkish and the English versions, the Turkish version shall prevail.)

Talk to a Data Expert

Have a question? We'll get back to you promptly.