SASA POLYESTER SANAYİ A.Ş.

Regulatory Filings Aug 5, 2022

5949_rns_2022-08-05_2ea38915-b9d6-4c34-9b98-6fb116bdbdf0.html

Regulatory Filings

Open in Viewer

Opens in native device viewer

[CONSOLIDATION_METHOD_TITLE] [CONSOLIDATION_METHOD]

İlgili Şirketler

Related Companies

[TKFEN]

İlgili Fonlar

Related Funds

[]

Türkçe

Turkish

İngilizce

English

oda_MaterialEventDisclosureGeneralAbstract|

Özel Durum Açıklaması (Genel) Material Event Disclosure General

oda_UpdateAnnouncementFlag|

Yapılan Açıklama Güncelleme mi? Update Notification Flag

Hayır (No)

Hayır (No)

oda_CorrectionAnnouncementFlag|

Yapılan Açıklama Düzeltme mi? Correction Notification Flag

Hayır (No)

Hayır (No)

oda_DateOfThePreviousNotificationAboutTheSameSubject|

Konuya İlişkin Daha Önce Yapılan Açıklamanın Tarihi Date Of The Previous Notification About The Same Subject

-

-

oda_DelayedAnnouncementFlag|

Yapılan Açıklama Ertelenmiş Bir Açıklama mı? Postponed Notification Flag

Hayır (No)

Hayır (No)

oda_AnnouncementContentSection|

Bildirim İçeriği Announcement Content

oda_ExplanationSection|

Açıklamalar Explanations

oda_ExplanationTextBlock|

Daha önce kamuoyuna duyurduğumuz Adana-Seyhan tesislerimizde gerçekleştirilecek Elyaf Üretim Tesisi ve Tekstil Cipsi, Şişe Cipsi, Pet Cipsi Üretim Tesisi (Yeni PSF ve MTR Tesisleri) yapım işleri için Tekfen Holding A.Ş.'nin bağlı ortaklıklarından Tekfen İnşaat ve Tesisat A.Ş. ile sözleşme imzalanmasına karar verilmiştir.

Projenin mobilizasyon dahil toplam süresi 25 ay olup proje bedeli vergiler hariç 61 milyon USD'dir.

It has been decided to sign a contract with Tekfen Construction and Installation Co. Inc., an affiliate of Tekfen Holding Company, for the construction works of the Fiber Production Plant and the Textile Chips, Bottle Chips, Pet Chips Production Plant (New PSF and MTR Plants) to be realized in our Adana-Seyhan facilities, which we had previously announced to the public.

The total duration of the project including mobilization period is 25 months, and the project value is USD 61 million excluding taxes.

In the event of any discrepancy between the Turkish and English versions of this disclosure statement, the original Turkish version shall prevail. SASA disclaims all warranties and makes no representations about the accuracy or completeness of the English translation and assumes no liability for any errors, omissions or inaccuracies that may arise from use of this translation.