Grenergy Renovables S.A.

Investor Presentation Sep 27, 2023

1833_rns_2023-09-27_2099686e-fd5e-4dbe-bf2f-799dc9cd3fbc.pdf

Investor Presentation

Open in Viewer

Opens in native device viewer

The sky is the limit

1H23 RESULTS RESULTS PRESENTATION

Madrid, 27th September 2023

DISCLAIMER

By attending this presentation and/or by accepting this presentation you will be taken to have represented, warranted and undertaken that you have read and agree to comply with the contents of this disclaimer.

The information contained in this presentation ("Presentation") has been prepared by Grenergy Renovables S.A. (the "Company") and has not been independently verified and will not be updated. No representation, warranty or undertaking, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained herein and nothing in this Presentation is, or shall be relied upon as, a promise or representation. Neither the the Company nor any of its employees, officers, directors, advisers, representatives, agents or affiliates shall have any liability whatsoever (in negligence or otherwise, whether direct or indirect, under contract, tort or otherwise) for any loss howsoever arising from any use of this Presentation or its contents or otherwise arising in connection with this Presentation.

This Presentation is for information purposes only and is incomplete without reference to, and should be viewed solely in conjunction with, the Company's publicly available information and, if applicable, the oral briefing provided by the Company. The information and opinions in this presentation are provided as at the date hereof and subject to change without notice. It is not the intention to provide, and you may not rely on these materials as providing, a complete or comprehensive analysis of the Company's financial or trading position or prospects.

This Presentation does not constitute investment, legal, accounting, regulatory, taxation or other advice and does not take into account your investment objectives or legal, accounting, regulatory, taxation or financial situation or particular needs. You are solely responsible for forming your own opinions and conclusions on such matters and for making your own independent assessment of the Company. You are solely responsible for seeking independent professional advice in relation to the Company. No responsibility or liability is accepted by any person for any of the information or for any action taken by you or any of your officers, employees, agents or associates on the basis of such information.

This Presentation contains financial information regarding the businesses and assets of the Company. Such financial information may not have been audited, reviewed or verified by any independent accounting firm. The inclusion of such financial information in this Presentation or any related presentation should not be regarded as a representation or warranty by the Company, its affiliates, advisors or representatives or any other person as to the accuracy or completeness of such information's portrayal of the financial condition or results of operations by the Company and should not be relied upon when making an investment decision. Certain financial and statistical information in this document has been subject to rounding off adjustments. Accordingly, the sum of certain data may not conform to the expressed total.

Certain statements in this Presentation may be forward-looking. By their nature, forward-looking statements involve a number of risks, uncertainties and assumptions which could cause actual results or events to differ materially from those expressed or implied by the forward-looking statements. These include, among other factors, changing economic, business or other market conditions, changing political conditions and the prospects for growth anticipated by the Company's management. These and other factors could adversely affect the outcome and financial effects of the plans and events described herein. Any forward-looking statements contained in this Presentation and based upon past trends or activities should not be taken as a representation that such trends or activities will continue in the future. The Company does not undertake any obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

The market and industry data and forecasts that may be included in this Presentation were obtained from internal surveys, estimates, experts and studies, where appropriate as well as external market research, publicly available information and industry publications. The Company, it affiliates, directors, officers, advisors and employees have not independently verified the accuracy of any such market and industry data and forecasts and make no representations or warranties in relation thereto. Such data and forecasts are included herein for information purposes only. Accordingly, undue reliance should not be placed on any of the industry or market data contained in this Presentation.

The distribution of this Presentation in other jurisdictions may be restricted by law and persons into whose possession this presentation comes should inform themselves about and observe any such restrictions.

NEITHER THIS PRESENTATION NOR ANY OF THE INFORMATION CONTAINED HEREIN CONSTITUTES AN OFFER OF PURCHASE, SALE OR EXCHANGE, NOR A REQUEST FOR AN OFFER OF PURCHASE, SALE OR EXCHANGE OF SECURITIES, OR ANY ADVICE OR RECOMMENDATION WITH RESPECT TO SUCH SECURITIES.

The securities of the Company may not be offered or sold in the United States of America except pursuant to an effective registration statement under the Securities Act of 1933 or pursuant to a valid exemption from registration.

HIGHLIGHTS BUSINESS REVIEW FINANCIAL REVIEW ESG

OPERATIONAL EXECUTION

15.7GW Total Platform (+1.7GW qoq) 1.9GW in Operation & U/C 10.7GWh Storage pipeline

PPA signed for Matarani (97MW) €2.0bn revenues globally contracted 1.5GW PPAs under negotiation

Sale of 100% of Belinchón (150MW) €89m net proceeds Rest of Valkyria process ongoing

FINANCIAL PERFORMANCE

Revenues €226m (+110% yoy) EBITDA €21.7m (+8% yoy) Net income €4.0m (-54% yoy)

Total capex €188m (+220% yoy) Additional decline in module costs IRRs stable at double digits

Net debt €528m (€354m proforma) Leverage 10.4x (2.9x proforma) Corp. Leverage 4.6x (0.6x proforma)

Q2 objectives of 2023 ESG Roadmap accomplished

New ESG Roadmap 2024-2026 in progress, to be approved along November

Top-ranked in ESG ratings by CDP, MSCI and Sustainalytics

BUSINESS REVIEW FINANCIAL REVIEW HIGHLIGHTS ESG

PLATFORM OVERVIEW

BUSINESS REVIEW FINANCIAL REVIEW ESG

SOLAR & WIND PIPELINE UPDATE

HIGHLIGHTS

✓ US platform added 0.6GW of solar capacity

✓ New opportunities in ERCOT (Texas) & MISO

✓ Germany added 0.4GW of solar capacity

✓ Chile is our 2nd-largest platform (3.1GW)

✓ New pipeline added in Mexico (1.1GW)

SOLAR PV
MW In Under
Const
Backlog Advanced
Dev
Early
Stage
Ident.
Opp.
Total
Pipeline
Probability
of execution
Operation 100% 90% 70% 50% 20-40%
USA 171 3,386 1,010 4,567
Total USA 171 3,386 1,010 4,567
Spain 350 472 575 750 1,797
Italy 282 225 685 1,192
UK 95 127 120 342
Poland 74 731 512 1,317
Germany 428 428
Total Europe 350 472 1,026 1,083 2,495 5,076
Chile 248 496 171 744 1,095 2,506
Colombia 72 60 48 108 216
Mexico 35 234 845 1,079
Peru 97 444 283 824
Total Latam 355 653 219 852 1,773 1,128 4,625
Total 705 1,125 219 2,049 6,242 4,633 14,268
#Projects 29 32 11 29 66 83 221
WIND
MW In Under
Const
Backlog Advanced
Dev
Early
Stage
Ident.
Opp.
Total
Pipeline
Probability
of execution
Operation 100% 90% 70% 50% 20-40%
Argentina 24
Peru 36 40 40
Chile 600 600
Total Latam 60 40 600 640
Total 60 40 600 640
#Projects 3 2 1 3

✓ Solar PV portfolio of 14.3GW (+1.7GW qoq)

705MW in operation (+3MW qoq from Chile)

1.1GW under construction (+52MW qoq from Colombia)

✓ Wind portfolio of 640MW (unchanged qoq)

60MW in operation (unchanged qoq)

HIGHLIGHTS BUSINESS REVIEW FINANCIAL REVIEW ESG

STORAGE PIPELINE UPDATE

✓ Storage pipeline of 10.7GWh (+0.9GWh qoq)

✓ Chile is the most advanced market (4.9GWh, + 0.9GWh qoq) ✓ On track to meet our 1.0GWh target in 2025

STORAGE

MW Backlog Advanced
Dev.
Early
Stage
Total Total
Probability
of execution
90% 70% 50% MWh
USA 695 695 3,033
Total USA 695 695 3,033
Spain 88 314 402 904
Italy 74 39 113 386
UK 180 180 360
Poland 345 345 1,117
Total Europe 162 878 1,040 2,767
Chile 120 551 330 1,001 4,905
Total Latam 120 551 330 1,001 4,905
Total 120 713 1,903 2,736 10,705
#Projects 2 17 45 64 64

Energy Storage Annual Capacity, GWh

Source: BNEF, Wood Mackenzie.

BUSINESS REVIEW FINANCIAL REVIEW HIGHLIGHTS ESG

PPAs - 825MW SIGNED YTD UP TO 1.5GW

1.5GW PPAs signed in Spain, Chile & Colombia ✓ 825MW YTD in Spain, Chile and Peru ✓ Another 1.5GW of PPAs under negotiation ✓ 76% of total output with PPAs from 2026 ✓ €2.0bn of revenues contracted at group level

CONTRACTED OUTPUT & REVENUES

VALKYRIA PROJECT

ESG

KEY OPERATING & FINANCIAL DATA

+28% in total output on new capacity and better load factors ✓ 63% of total output from contracted volumes (+42%) ✓ -9% in realized prices due to tough merchant comps

Key Operating Data
1H23 1H22 Var.
Avg. Forex (\$/€) 1.08 1.09 (1%)
Total Capacity (MW) 765 578 35%
Additions 53 37 -
Solar production 477,306 362,102 32%
Wind production 128,220 110,367 16%
Total production (GWh) 605,527 472,469 28%
- PPAs 384,139 269,654 42%
- Merchant 221,388 202,815 9%
Load Factor (%) 25.9% 20.2% 28%
Realized priced (€/MWh) 44.2 48.5 (9%)
- PPAs 46.2 41.2 12%
- Merchant 41.1 58.2 (29%)

✓ Results driven by Energy and asset rotation (none in Q2)

  • ✓ Capex mainly devoted to Belinchón and Gran Teno
  • ✓ Proforma net debt €354m (+13%), implying 2.9x EBITDA

Key Financial Data

(€m) 1H23 1H22 Var.
Revenues 225.8 107.4 110%
- Energy Revenues 26.9 22.9 17%
EBITDA 21.7 20.1 8%
- Energy EBITDA 20.6 18.6 11%
EBIT 13.8 13.9 (1%)
Net Income 4.0 8.8 (54%)
Capex 187.6 58.6 220%
1H23 FY22 Var.
Tangible Fixed 671.8 582.1 15%
Assets Equity 310.5 244.8 27%
Net debt ex IFRS16 527.5 313.3 68%
- Corporate net debt 142.1 72.4 96%
Net debt/EBITDA 10.4x 6.4x -
- Covenant net debt/EBITDA 4.6x 3.1x -

REVENUE & EBITDA BREAKDOWN

✓ D&C division includes €11m from the disposal of two PMGD projects (21.6MW) in 1Q23 in Chile

✓ Energy division driven by higher output (+28%) on greater installed capacity and better load factors

  • ✓ Retail supply business in Chile previously included in Energy (revenues €3.3m & EBITDA €-0.9m in 1H22)
  • ✓ Retail supply is expected to be EBITDA neutral in 2023 and EBITDA positive from 2024

CAPEX

✓ Tangible fixed assets reached €672m in 1H23

  • ✓ Total capex of €188m in 1H23 (+220% yoy)
  • ✓ Project capex concentrated in Belinchón and Gran Teno
  • ✓ Development capex expected to accelerate in 2H23

✓ Capex per MW at all-time lows

  • ✓ Deflation in modules (c€0.15m per MW) and logistic costs
  • ✓ IRRs stable at double digits

CAPEX BREAKDOWN PER MW

CASH FLOW

✓ Significant working capital recovery (€24m outflow in 1H23 vs. €51m in 1Q23) due to the unwinding of supplier debt

✓ Project Financing for the Belinchón (€90m) and Gran Teno & Tamango (\$148m) solar PV plants signed in 1H23

ESG

LEVERAGE & LIQUIDITY

Substantial reduction in pro-forma leverage post Belinchón deal ✓ Asset rotation ongoing with the second milestone of the Valkyria project ✓ Fully funded for 2023-24

1 Assuming that the Belinchón deal would have been closed in 1H23. This implies a Total net debt reduction of €173m, a Non-recourse net debt reduction of €85m and a Corporate net debt reduction of €89m. 2 Calculated as Net debt including all PF debt divided by LTM EBITDA (€52m). In the proforma figure, LTM EBITDA amounts to €120m.

3 Calculated as Net debt with recourse divided by LTM Relevant Ebitda (Dividends earned from SPVs + EBITDA from O&M and Asset Mgmt activities + EBITDA from the sale of Projects and D&C activity + EBITDA generated by the SPVs with Recourse PF Debt). In the proforma figure, LTM EBITDA amounts to €120m.

ESG ROADMAP 2021-2023

ESG Action Plan – III Phase

ACHIEVEMENT OF 100% OF THE Q2 OBJECTIVES OF THE PLAN 2023

DEFINE THE CORPORATE PURPOSE
GOVERNANCE APPROVAL OF THE INFORMATION SECURITY POLICY
PREPARATION OF THE SUSTAINABILITY REPORT 2022 WITH
EXTERNAL VERIFICATION
ESG GOALS IN
OUR STRATEGY
IT TOOL FOR MEASUREMENT AND MONITORING OF ESG
PERFORMANCE
ESG RISKS ELABORATE CLIMATE CHANGE RISKS AND OPPORTUNITIES
MAP ACCORDING TO TCFD RECOMMENDATIONS
MANAGEMENT PERFORM ESG ASSESSMENT OF A SELECTION OF SUPPLIERS
ESTABLISH A FORMAL BENEFIT PLAN
APPROVAL OF A CORPORATE PROCEDURE FOR DIALOGUE
WITH THE COMMUNITIES
ESG IMPACTS PRESENTATION OF THE EMPLOYEE PERFORMANCE
EVALUATION PROCESS
PRESENTATION OF THE RESULTS OF THE WORK ENVIRONMENT
SURVEYS
ESG IMPLEMENTATION OF A COMPLIANCE COMMUNICATION
AND TRAINING PLAN
COMMUNICATION PRESENTATION OF THE CLIMATE CHANGE STRATEGY
INTERNAL SUSTAINABILITY TRAINING

Q1 Q2 Q3 Q4

INFORMATION SECURITY

• Information security: Development and approval of the policy with the objective of establishing the basic principles and general framework for the control and management of Information Security risks.

PERFORMANCE EVALUATION FOR EMPLOYEES

• Performance evaluation for employees: Presentation of the methodology and results of the first performance evaluation to formally introduce the culture of annual employee performance feedback.

ESG TRAINING

• ESG training: Sustainability seminar for Board of Directors and Management Committee regarding ESG trends and regulations.

14

EXPANSION AND IMPROVE POSITIONING IN ESG RATINGS

Confirmation of leadership in ESG ratings

Recognition by CDP of the level of ambition of Grenergy's climate strategy, placing it in the Leadership category, with a score of A-, two notches higher than the score received in the previous year, B-.

Expansion of index coverage, in this case Refinitiv, where Grenergy has obtained a score of 81/100, ranking 2nd out of 78 companies in the renewable energy sector.

A
Grenergy Renovables
Azure Power Global Ltd. B+
EDP Renovaveis SA B+
Encavis AG B+
Greencoat Renewables plc B+

As a summary of the remaining ESG ratings obtained in 2022

1.9 GW in operation and under construction, 259 MW in final development phase

Country Project Type MW B20 Resource
(Hours)
COD Offtaker
Peru Duna Huambos Wind 36 Yes 4,900 4Q20 Merchant
Chile Quillagua Solar 103 Yes 2,950 4Q20 Basket of PPAs + Merchant
Mexico San Miguel de Allende Solar 35 Yes 2,300 1Q21 Auction 20 Yrs 100%
Argentina Kosten Wind 24 Yes 5,033 1Q21 Auction 20 Yrs 100%
Spain Los escuderos Solar 200 Yes 2,035 4Q21 PPA PV Profile 85%
Chile PMGDs (15) Solar 145 Yes 2,109 4Q21-3Q22 Stabilized Price 12 Yrs
Colombia Distribution (6 projects) Solar 72 Yes 1,990 4Q21-4Q22 PPA PaP 100% 15 Yrs
Spain Belinchón Solar 150 No 2,075 2Q23 PPA PaP 65% 12 Yrs
Total in Operation 765 (vs. 762 in previous report)
Chile PMGDs (11 projects) Solar 96 No 2,000-2,700 3Q23-1Q24 Stabilized Price 14 Yrs
Chile PMGDs (11 projects) Solar 111 Yes 2,000-2,700 3Q23-4Q23 Stabilized Price 14 Yrs
Chile Gran Teno Solar 241 Yes 2,000 4Q23 PPA PaP 60% 12 Yrs
Chile Tamango Solar 48 Yes 2,000 1Q24 PPA PaP 100% 15 Yrs
Peru Matarani Solar 97 Yes 2,750 2Q24 PPA PaP 70% 15 Yrs
Colombia Distribution (5 projects) Solar 60 Yes 1,990 2Q24-4Q24 Merchant
Spain Tabernas Solar 250 Yes 1,850 2Q24 PPA PaP 75% 15 Yrs
Spain Ayora Solar 172 Yes 2,000 2Q24 PPA PaP 75% 15 Yrs
Spain José Cabrera Solar 50 Yes 1,900 2Q24 PPA PaP 75% 15 Yrs
Total Under Construction 1,125 (vs. 1,073 in previous report)
Chile PMGDs (13 projects) Solar 60 Yes 2,300 3Q23-2Q24 Stabilized Price 14 Yrs
Peru Nairas Wind 40 No 4,150 4Q24 Est. PPA Pap 80% 15 Yrs
Chile Quillagua 2 Solar 111 Yes 2,950 4Q24 Est. PPA 70-80%
Colombia PYs Dx (4 Projects) Solar 48 Yes 1,990 4Q25 Merchant
Total Backlog 259 (vs. 235 in previous report)

>2.0 GW to feed our 2024-25 IPP targets

Country Project Type MW Resource
(Hours)
COD Offtaker Negotiation
Spain Clara Campoamor Solar 575 2,000 2Q25 PPA PaP 75% 15 Yrs (259MW) Contracted
Italy Le Isole Projects Solar 282 1,250 2Q25 PPA 60-70% In Progress
Poland Jesionowo Solar 74 1,100 4Q25 PPA 60-70% Initial
UK Solstice Projects Solar 95 1,100 1Q26 PPA 60-70% In Progress
USA Coosa Pines Solar 108 1,689 4Q25 PPA 100% Advanced
USA Creed Solar 63 1,681 4Q25 PPA 100% Advanced
Chile Gabriela Solar 264 2,900 4Q24 PPA 70-80% Advanced
Chile Victor Jara Solar 240 2,700 2Q25 PPA 70-80% Advanced
Chile Algarrobal Solar 240 2,300 3Q25 PPA 70-80% Initial
Colombia Pack 5 PYs Dx Solar 60 1,990 4Q25 PPA 60-70% Initial
Colombia Sol Santander Solar 48 1,990 4Q25 PPA 60-70% Initial
Total Advanced Development
2,049MW
(vs. 2,246MW in previous report)

SOURCE: Company ı COD: Commercial Operation Date ı In progress: searching for a proper offtaker ı Initial: conversation taking place with several offtakers ı Advanced: Negotiation moving forward to completion 18 at a good pace ı Completed: Already secured the stabilization of energy sales with offtaker or public auctions.

PLATFORM WITH RELEVANT GROWTH POTENTIAL

Project Portfolio

Total Platfom1 Includes projects in operation and total pipeline
20-40%
Success Rate
Identified Opportunity
4,633MWMW
Identified opportunities (20-40%): Project with technical and financial
feasibility, given that 1) there is the possibility of land, 2) access to the electricity
grid is operationally viable and/or 3) there is the possibility of sale to third parties.
50%
Success Rate
Early Stage
6,842MW
Early Stage (50%): Based on an identified opportunity, the project is approved
internally to enter the investment phase, with applications for grid access
being made and negotiations for land commencing.
70%
Success Rate
Advanced Development
2,049MW
Projects with an advanced technical and financial stage:
• +50% Probability to secure land; and/or
• +90% Probability to get grid access; and/or
• Environmental permits requested
90%
Success Rate
Backlog
259MW
Projects in a final phase before construction:
• Secured land and grid access; and/or
• +90% Probability to obtain environmental permits
• Off-take agreements, PPA, or bankable scheme of stabilized prices
secured / ready to be signed
Ready to Build Ready to Build: Financing close, PPA in place or negotiation of EPC
100% Under Construction
1,125MW
Under Construction: EPC provider has been mandated to start
construction works
Success Rate In operation
765MW
In Operation: Plant fully operational or at least Mechanical Completion
achieved and under commissioning

1H23 REVENUES & EBITDA

Divisional Breakdown

Revenues
(€m) 2Q23 2Q22 Var. 1H23 1H22 Var.
Development & Construction 107.3 43.6 146% 185.3 79.6 133%
Income from customer sales 4.5 13.5 (67%) 17.4 20.7 (16%)
Income from capitalize works 102.8 30.0 242% 168.0 58.9 185%
Energy 15.3 14.5 5% 26.9 22.9 17%
Retail 6.2 1.6 290% 11.7 3.3 254%
Services 1.1 0.8 33% 2.0 1.6 23%
Total 129.8 60.5 115% 225.8 107.4 110%
EBITDA
(€m) 2Q23 2Q22 Var. 1H23 1H22 Var.
Development & Construction (0.6) 2.7 n.m. 9.0 6.1 48%
Energy 12.1 11.9 2% 20.6 18.6 11%
Retail (0.8) (0.6) 50% (1.7) (0.9) 80%
Services 0.3 0.3 10% 0.5 0.4 23%
Corporate (3.6) (1.7) 118% (6.7) (4.0) 66%
Total 7.3 12.7 (42%) 21.7 20.1 8%

1H23 RESULTS Profit and Losses

2Q23 2Q22 Var. 1H23 1H22 Var.
129.8 60.5 115% 225.8 107.4 110%
27.0 30.9 11% 57.8 48.5 19%
102.8 30.0 242% 168.0 58.9 185%
(111.7) (40.7) 175% (181.8) (73.4) 148%
(12.0) (11.8) 2% (20.1) (17.2) 17%
(99.7) (28.9) 245% (161.7) (56.3) 187%
18.1 19.8 (9%) 44.0 33.9 30%
(5.6) (3.6) 55% (11.2) (6.6) 70%
0.1 0.0 n.m. 0.3 0.0 381%
(6.3) (3.6) 75% (12.4) (7.3) 69%
1.0 0.0 n.m. 1.0 0.0 n.m.
7.3 12.7 (42%) 21.7 20.1 8%
(4.1) (3.6) 13% (7.8) (6.2) 27%
3.2 9.1 (64%) 13.8 13.9 (1%)
0.2 0.3 (49%) - - -
(6.7) (4.9) 37% (11.6) (7.6) 52%
3.2 0.8 297% 2.6 3.7 (31%)
(3.3) (3.7) (11%) (8.9) (3.5) 151%
(0.0) 5.4 n.m. 5.0 10.4 (52%)
(0.8) (0.8) (2%) (0.9) (1.6) (41%)
(0.9) 4.5 n.m. 4.0 8.8 (54%)

1H23 RESULTS Balance Sheet

Balance Sheet
(€m) 1H23 FY22 Var. (€m) 1H23 FY22 Var.
Equity 310.5 244.8 65.7
Non-current assets 794.5 681.8 112.7 Non-current liabilities 491.6 420.9 70.8
Intangible assets 5.8 0.2 5.5 Deferred tax liabilities 34.1 20.4 13.7
Tangible asset 671.8 582.1 89.7 Provisions 13.9 16.4 (2.5)
Rights-of-use assets 28.5 28.2 0.3 LT Financial debt 443.7 384.1 59.6
Deferred tax assets 35.3 47.3 (12.1) Bonds & Commercial Paper 83.5 83.2 0.2
Other non-current assets 53.2 23.9 29.2 Bank debt 334.0 254.2 79.8
Derivatives - 20.6 (20.6)
Lease liabilities 26.2 26.1 0.1
Current assets 369.4 205.1 164.3 Current liabilities 361.8 221.3 140.5
Inventories 108.3 6.0 101.7 Provisions 1.3 8.2 (6.8)
Accounts receivable 110.8 80.0 30.8 Accounts payable 119.3 94.5 24.8
Current financial investments 24.2 12.0 12.2 ST Financial debt 241.2 118.6 122.6
Other current assets 2.9 0.8 2.0 Bonds & Commercial Paper 58.2 34.5 23.6
Cash & cash equivalents 123.2 105.7 17.6 Bank debt 172.8 46.3 126.5
Derivatives 7.7 36.1 (28.4)
Lease liabilities 1.4 1.5 (0.1)
Other financial liabilities 1.1 0.1 1.0
TOTAL ASSETS 1,164.0 887.0 277.0 TOTAL EQUITY AND LIABILITIES 1,164.0 887.0 277.0

1H23 RESULTS Cash Flow

Cash Flow
(€m) 2Q23 2Q22 Var. 1H23 1H22 Var.
EBITDA 7.3 12.7 (42%) 21.7 20.1 8%
+ Change in operating WK 27.2 (31.4) n.m. (23.9) (49.3) (51%)
+ Financial costs & Taxes paid (3.7) (4.6) (18%) (13.9) (8.4) 65%
Funds from operations 30.8 (23.3) n.m. (16.1) (37.7) (57%)
+ ST Investments 1.4 4.0 (65%) 1.4 2.4 (41%)
+ Capex (110.0) (31.3) 251% (187.6) (58.6) 220%
+ USA participation - - - - (4.5) -
Free cash flow (77.8) (50.6) 54% (202.3) (98.3) 106%
+ Capital Increase - 90.0 - - 90.0 -
+ Bonds & Commercial Paper 10.0 53.7 (81%) 23.9 72.3 (67%)
+ Bank debt 95.2 0.2 n.m. 206.1 31.1 562%
+ Other debts - - - - (0.0) -
+ Share Buy-back 5.0 (0.6) n.m. 0.4 (0.4) n.m.
+ FX differences (8.4) (1.2) 579% (10.6) (6.7) 58%
+ Other - - - - - -
Net cash increase 24.0 91.4 (74%) 17.6 88.0 (80%)

Total leverage1 10.4x (2.9x proforma)

Total corporate leverage2 4.6x (0.6x proforma)

Net Debt
(€m) 1H23 FY22 Var.
Long-term financial debt 90.2 92.4 (2.2)
Short-term financial debt 121.9 41.7 80.2
Long-term Lease debt (IFRS16) 25.4 25.2 0.2
Short-term Lease debt (IFRS16) 1.1 1.2 (0.1)
Other short term debt 1.1 0.1 1.0
Other current financial assets - (0.6) 0.6
Cash & cash equivalents (71.1) (61.1) (10.0)
Corporate Net Debt with recourse 168.6 98.8 69.8
Project Finance debt with recourse 16.1 16.4 (0.3)
Project Finance cash with recourse (2.4) (3.7) 1.2
Project Finance Net Debt with recourse 13.7 12.7 1.0
Project Finance debt with non-recourse 421.4 269.1 152.3
Project Finance cash with non-recourse (49.7) (40.9) (8.8)
Project Finance Net Debt with non-recourse 371.7 228.2 143.5
Total Net Debt 553.9 339.7 214.2
Total Net Debt ex IFRS16 527.5 313.3 214.2
Proforma Total Net Debt ex IFRS16 353.9 313.3 40.6

1 Calculated as Total Net Debt exIFRS16 divided by the last-12 month EBITDA exIFRS16 (€51);

2 Calculated as Net debt with recourse divided by the last-12 month EBITDA per the covenant definition (Dividends from SPVs + EBITDA from O&M and AM + EBITDA from D&C and sale of Projects + EBITDA from SPVs with Project Finance Debt with recourse until the date of the lifting of the debt service guarantees assumed by the Company as sponsor under the corresponding Projects).

1H23 RESULTS Net Debt/EBITDA Reconciliation

Net Debt/EBITDA Reconciliation
1H23 FY22
(€m) Total Corporate Non-Recourse Total Corporate Non-Recourse
Net Debt 553.9 182.2 371.7 339.7 111.5 228.2
Impact IFRS16 26.5 26.5 - 26.4 26.4 -
Net Debt ex IFRS16 527.5 155.8 371.7 313.3 85.1 228.2
Proforma Net Debt ex IFRS16 353.9 67.1 286.9 - - -
EBITDA LTM 51.7 23.5 28.3 50.2 19.9 30.3
Impact IFRS16 1.0 1.0 - 1.0 1.0 -
EBITDA LTM ex IFR16 50.7 22.5 28.3 49.2 18.9 30.3
Corporate costs (11.2) (11.2) - (8.5) (8.5) -
EBITDA LTM ex IFRS16 (covenant) 50.7 33.6 - 49.2 27.4 -
Proforma EBITDA LTM ex IFRS16 120.3 103.2 - - - -
Net debt/EBITDA 10.7x 7.8x 13.1x 6.8x 5.6x 7.5x
Net debt/EBITDA ex IFRS16 10.4x 6.9x 13.1x 6.4x 4.5x 7.5x
Net debt/EBITDA (per covenant) 10.4x 4.6x - 6.4x 3.1x -
Proforma ND/EBITDA (per covenant) 2.9x 0.6x - - - -