SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 OF THE SECURITIES EXCHANGE ACT OF 1934

March 27, 2022

Commission File Number 001-36761

Kenon Holdings Ltd.

1 Temasek Avenue #37-02B Millenia Tower Singapore 039192 (Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F ☒ Form 40-F ☐

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐

EXHIBITS 99.1 AND 99.2 TO THIS REPORT ON FORM 6-K ARE INCORPORATED BY REFERENCE IN THE REGISTRATION STATEMENT ON FORM S-8 (FILE NO. 333-201716) OF KENON HOLDINGS LTD. AND IN THE PROSPECTUSES RELATING TO SUCH REGISTRATION STATEMENT.

CONTENTS

Annual Report of OPC Energy Ltd. for the Year Ended December 31, 2021

On March 27, 2022, Kenon Holdings Ltd.'s subsidiary OPC Energy Ltd. ("OPC") reported to the Israeli Securities Authority and the Tel Aviv Stock Exchange its annual report (in Hebrew) for the year ended December 31, 2021 ("OPC's Annual Report"). English convenience translations of the (i) Report of the Board of Directors for the Year Ended December 31, 2021 and (ii) Consolidated Financial Statements as at December 31, 2021, each as published in OPC's Annual Report are furnished as Exhibits 99.1 and 99.2, respectively, to this Report on Form 6-K. In the event of a discrepancy between the Hebrew and English versions, the Hebrew version shall prevail.

Forward Looking Statements

This Report on Form 6-K, including the exhibits hereto, includes forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These statements include statements with respect to OPC's business strategy, statements relating to OPC's and CPV's development projects including expected start of construction and completion or operation dates, estimated cost and investment in projects, and characteristics (e.g., capacity and technology) and stage of development of such projects, including expected commercial operation date ("COD"), estimated construction cost and capacity, and statements with respect to CPV's development pipeline and backlog and projects including the description of projects in various stages of developments and statements relating to expectations about these projects, statements and plans with respect to the construction and operation of facilities for generation of energy on the consumers' premises and arrangements for supply and sale of energy to consumer, statements with respect to OPC Sorek 2 Ltd. project and its construction, equipment supply and long-term maintenance agreements, statements with respect to industry and potential regulatory developments in Israel and the U.S., the OPC-Hadera power plant, including the expected insurance reimbursement for COD delay and compensation for delay in delivery date, OPC's plans and expectations regarding regulatory clearances and approvals for its projects, and the technologies intended to be used thereto, statements with respect to the expected impact of COVID-19, the Electricity Authority tariffs, including announced changes effective 2022, expected timing and impact of maintenance, renovation and construction work on OPC's power plants, the expected COD of Energean's Karish reservoir and expected impact of COD delays, the expected interpretation and impact of regulations on OPC and its subsidiaries, OPC's expansion plans and goals, OPC's adoption of certain accounting standards and the expected effects of those standards on OPC's results, statements with respect to OPC's virtual supply license and virtual supply activities, statements relating to an agreement with Veridis Power Plants Ltd., the minority shareholder of OPC-Rotem, for a potential reorganization and related establishment of a subsidiary, and statements relating to potential expansion activities by OPC outside of Israel. These statements are based on OPC Energy Ltd. management's current expectations or beliefs, and are subject to uncertainty and changes in circumstances. These forward-looking statements are subject to a number of risks and uncertainties which could cause the actual results to differ materially from those indicated in such forward-looking statements. Such risks include risks relating to potential failure to obtain regulatory or other approvals for projects or to meet the required conditions and milestones for development of its projects, the risk that OPC (including CPV) may fail to develop or complete projects or any other planned transactions including dispositions or acquisitions, as planned or at all, the actual cost and characteristics of project, risks relating to potential new regulations or existing regulations having different interpretations or impacts than expected, risks relating to litigation and arbitration, the risk that the accounting standards may have a material effect on OPC's results, risks relating to changes to the Electricity Authority tariffs with and the impact on OPC's results, risks relating to electricity prices in the U.S. where CPV operates and the impact of hedging arrangements of CPV, and other risks and factors, including those risks set forth under the heading "Risk Factors" in Kenon's Annual Report on Form 20-F filed with the SEC and other filings. Except as required by law, Kenon undertakes no obligation to update these forward-looking statements, whether as a result of new information, future events, or otherwise.

Exhibits

99.1 OPC Energy Ltd. – Report of the Board of Directors for the Year Ended December 31, 2021, as published on March 27, 2022 with the Israeli Securities Authority and Tel Aviv Stock Exchange* 99.2 OPC Energy Ltd. – Consolidated Financial Statements as at December 31, 2021, as published on March 27, 2022 with the Israeli Securities Authority and Tel Aviv Stock Exchange*

*English convenience translation from Hebrew original document.

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

KENON HOLDINGS LTD.

Date: March 27, 2022 By: /s/ Robert L. Rosen

Name: Robert L. Rosen

Title: Chief Executive Officer

Exhibit 99.1

OPC ENERGY LTD.

Part B

Report of the Board of Directors regarding the Company's Matters

for the Year Ended December 31, 2021

OPC ENERGY LTD.

Report of the Board of Directors regarding the Company's Matters for the Year Ended December 31, 2021

The Board of Directors of OPC Energy Ltd. (hereinafter – "the Company") is pleased to present herein the Report of the Board of Directors regarding the activities of the Company and its investee companies, the financial statements of which are consolidated with the Company's financial statements (hereinafter – "the Group") for the year ended December 31, 2021, in accordance with the Securities Regulations (Periodic and Immediate Reports), 1970 (hereinafter – "the Reporting Regulations"). The year ended December 31, 2021 will be referred to hereinafter as – "the Period of the Report".

Presented together with this report are the consolidated financial statements of the Company and its subsidiaries for the year ended December 31, 2021 (hereinafter – "the Financial Statements"). In certain cases, details are provided regarding events that took place after the date of the Financial Statements and shortly before the submission date of the report. The materiality of the information included in this report was examined from the point of view of the group. Occasionally, an additional detailed description has been provided in order to give a comprehensive picture of the issue at hand. The Financial Statements have been prepared in accordance with International Financial Reporting Standards (IFRSs) and in accordance with Part D of the Reporting Regulations. In this report, the term "dollar" means the United States dollar. In addition, this report is submitted as part of the Company's Periodic Report for 2021 and on the assumption that the reader also has the other parts of the Periodic Report.

It is emphasized that the description in this report contains forward-looking information, as defined in the Securities Law, 1968 (hereinafter – "the Securities Law"). Forward-looking information is uncertain information relating to the future, including projections, assessments, estimates or other information relating to a future matter or event, the realization of which is uncertain and/or outside the Company's control. The forward-looking information included in this report is based on information or assessments existing in the Company as at the submission date of this report.

Except for the audited data in the financial statements that is presented in this report, the Directors' Report has not been audited or reviewed by the Company's auditing CPAs.

Explanations of the Board of Directors regarding the State of the Group's Affairs

1. General

The Company is a public company the securities of which are listed for trade on the Tel-Aviv Stock Exchange Ltd. (hereinafter – "the Stock Exchange").

The Company is engaged in two areas of activity that are reported as business segments in its financial statements: (1) generation and supply of electricity and energy in Israel – the Company manages its activities in Israel mainly through a wholly-owned subsidiary OPC Israel Energy Ltd. ("OPC Israel"); and (2) generation and supply of electricity and energy in the United States – the Company manages its activities in the U.S. through the CPV group. For details – see Sections 2.2, 7 and 8 to Part A (Description of the Company's Business).

For details regarding understandings relating to a transaction with Veridis – Power Plants Ltd. and structural change of the activities in Israel – see the Company's Immediate Report dated February 6, 2022 (Reference No.: 2022-01-013593) and Section 2.4.3 to Part A (Description of the Company's Business). As at the date of the report, the parties have not yet signed binding agreements.

As at the date of the report, the CPV Group is held indirectly by the Company (about 70% as stated in Note 25D(1) to the Financial Statements) and its acquisition was completed on January 25, 2021. The CPV Group was established in 1999 and since that date it has initiated and constructed power plants with an aggregate capacity of about 15 gigawatts, of which about 5 gigawatts using renewable energy, and an additional about 10 gigawatts is from power plants powered by natural gas. Commencing with the interim financial statements as at March 31, 2021, the Company consolidates the financial statements of the CPV Group. The CPV Group has holdings in active projects through a subsidiary and associated companies.

In addition, during 2021 the Company completed acquisition of 51% of the shares of Gnrgy Ltd. (hereinafter – "Gnrgy"), which is engaged in the area of charging services for electric vehicles. The Company includes Gnrgy as part of its activities in Israel. For details – see Section 25D(2) below.

In July 2021, the Company received a virtual supply license and in accordance therewith the said activities were started on September 1, 2021. The Company includes the virtual supply activities together with the activities in Israel. For details – see Section 3B below.

As at the publication date of the report, the Company's activities are carried on in Israel and in the United States, however it is clarified that this does not act to limit the Company's activities in the future in additional geographical areas. From time to time, the Company examines possibilities for expanding its activities in the area of generation and supply of electricity and energy, including by means of constructing and/or acquiring power plants (including using renewable energy and for storage) that are active, under construction or in the development stages, including in additional geographic regions, and advancement of projects that, as stated, are found to be suitable and that are consistent with the Company's business plans, as they will be from time to time, and expansion of the range of its services and the synergy embedded in the Group's activities.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2. Brief description of the Group's areas of activities in the Period of the Report and thereafter

The Company has two main areas of activity: (1) generation and supply of electricity and energy in Israel; and (2) generation and supply of electricity and energy in in the United States. For details regarding active projects, projects under construction and new initiations as well as projects being developed – see Section 2.2 of Part A (Description of the Company's Business).

1. Operating projects

Set forth below are main details with reference to the operating projects in Israel:

Project Capacity
(MW)1
Rate of
holdings
of
OPC
Israel
Presentation
format
in the
financial
statements
Location Type of
project/
technology
Year of
commercial
operation
OPC Rotem Ltd. ("Rotem") 466 80% Subsidiary Rotem Plain Natural gas, combined cycle 2013
OPC Hadera Ltd. ("Hadera"
2)
144 100% Subsidiary Hadera Natural gas, cogeneration 2020

1 Based on that provided in the relevant generation license.

2 In addition, Hadera holds the Energy Center (boilers and turbines located on the premises of Infinia Works Ltd. (formerly – Hadera Paper Mills Ltd.)), which serves as back-up for supply of steam from the Hadera power plant. It is noted that the turbine in the Energy Center is not operating. 4

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2. Brief description of the Group's areas of activities in the Period of the Report and thereafter (Cont.)

  1. Operating projects (Cont.)

Set forth below are main details with reference to the operating projects in the United States:

Project Capacity
(MW)
Rate of
holdings
of
CPV
Presentation
format
in the
financial
statements
Location Type of
project/
technology
Year of
commercial
operation
Restricted
market3
customer
CPV Fairview LLC
("Fairview")
1,050 25% Associated company Pennsylvania Conventional powered by
natural gas in a combined
cycle4
2019 PJM
MAAC
CPV Towantic LLC
("Towantic")
805 26% Associated company Connecticut Conventional powered by
natural gas (two fuels)
combined cycle
2018 ISO-NE
CT
CPV Maryland LLC
("Maryland")
745 25% Associated company Maryland Conventional powered by
natural gas combined cycle
2017 PJM SW
MAAC
CPV Shore Holdings LLC
("Shore")
725 37.53% Associated company New Jersey Conventional powered by
natural gas combined cycle
2016 PJM
EMAAC
CPV Valley Holdings LLC
("Valley")
720 50% Associated company New York Conventional powered by
natural gas (two fuels)
combined cycle
2018 NYISO
Zone G
CPV Keenan II Renewable
Energy Company LLC
("Keenan")
152 5100% Subsidiary Oklahoma Wind 2010 SPP (long-term PPA)

3 For additional details regarding the relevant area of activities of each project in the restricted market – see Part 6 below.

4 The possibility exists for a mix of ethane of up to 25%.

5 On April 7, 2021, the CPV Group signed and completed acquisition of 30% of the rights in Keenan from its Tax Equity partner. For additional details – see the Company's Immediate Report dated April 8, 2021 (Reference No.: 2021-01-059787) and Section 4P below.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2. Brief description of the Group's areas of activities in the Period of the Report and thereafter (Cont.)

2. Projects under initiation and construction

Main details with reference to the initiation and construction projects in Israel6 :

Power
plants/
facilities
for
generation
of energy
Status Capacity
(megawatts)
Rate of
holdings7
Location Technology Date/
expectation
of the start
of the
commercial
operation
Main
customer/
consumer
Total
expected
construction
cost
(NIS
millions)
Total cost of
the investment
as at
December 31,
2021
(NIS
millions)
Zomet Energy Ltd.
("Zomet")
Under construction ≈ 396 100% Plugot Intersection Conventional with
open cycle
First quarter of 2023 The System
Operator8
9≈ 1,500 10≈ 1,019

7 Companies consolidated in the Company's financial statements. 6 That stated in this report in connection with projects that have not yet reached operation (Zomet, Sorek, facilities for generation of energy on the consumer's premises, Rotem 2 and Hadera 2), including with reference to the expected operation date and the anticipated cost of the investment, is "forward-looking" information, as it is defined in the Securities Law, which is based on the Company's estimates and assumptions as at the publication date of the report and regarding which there is no certainty it will be realized (in whole or in part). Completion of the said projects may not occur or may occur in a manner different than that stated above due to, among other things, dependency on various factors, including those that are not under the Company's control, including assurance of connection to the network and output of electricity from the project sites and/or connection to the infrastructures (including gas infrastructures), receipt of permits, completion of planning processes and licensing, completion of construction work, final costs in respect of development, construction and land, and the terms of undertakings with main suppliers and there is no certainty they will be fulfilled or what their final terms will be. In addition, ultimately technical, operational or other delays and/or breakdowns could be caused, this being as a result of, among other things, various factors as stated above or as a result of occurrence of one or more of the risk factors the Company is exposed to, including construction risk and/or regulatory risks the Coronavirus crisis and the impacts thereof on, among other things, the supply chain and transport (deliveries). For additional information regarding risk factors involved in construction projects – see Section 19.3 of Part A (Description of the Company's Business). It is clarified that delays in completion of the projects could impact the ability of the Company and the Group companies to comply with their obligations to third parties (including, authorities, lenders, yard consumers and others) in connection with the projects.

8 Noga Management of Electricity Systems Ltd.

9 The estimate of the costs, as stated, does not take into account half of the assessment issued by Israel Lands Authority in January 2021, in the amount of about NIS 200 million (not including VAT) in respect of capitalization fees (for additional details – see Section 8.11.6 to Part A, (Description of the Company's Business)) while as at the submission date of the report the Company had filed a legal appeal of the assessment.

10 Not including amounts relating to milestones provided in the Zomet Power Plant construction agreement that were partially completed.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2. Brief description of the Group's areas of activities in the Period of the Report and thereafter (Cont.)

  1. Projects under initiation and construction (Cont.)

Main details with reference to the initiation and construction projects in Israel6 : (Cont.)

Power
plants/
facilities
for
generation
of energy
Status Capacity
(megawatts)
Rate of
holdings7
Location Technology Date/
expectation
of the start
of the
commercial
operation
Main
customer/
consumer
Total
expected
construction
cost
(NIS
millions)
Total cost of
the investment
as at
December 31,
2021
(NIS
millions)
OPC Sorek 2 Ltd.
("Sorek 2")
Under construction ≈ 87 100% On the premises of
the Sorek B seawater
desalination facility
Cogeneration Fourth quarter of
2023
Yard consumers and
the System Operator
Up to ≈ 200 ≈ 22
Facilities for
generation of energy
located on the
consumer's premises
In various stages of
initiation /
development
Projects with a
cumulative scope of
about 102 megawatts.
The Company
intends to act to
expand projects with
a scope of at least
120 megawatts11
12100% On the premises of
consumers
throughout Israel
Conventional and
renewable energy
(solar)
Gradually starting
from 2022
Yard consumers also
including Group
customers
An average of about
NIS 4 per megawatt
≈ 52

11 Every facility up to 16 megawatts. The Company's intention, as stated, reflects its intention as at the publication date of the report only, and there is no certainty that the matters will materialize based on the said expectation, and the said intention is subject to, among other things, the discretion of the Company's competent organs. As at the publication date of the report, there is no certainty regarding signing of additional binding agreements with consumers, and there is no certainty regarding the number of consumers with which the Company will sign agreements and/or regarding the scope of the megawatts the Company will contract for and/or the type of technology if agreements are signed. As stated, as at the date of the report, all of the preconditions for execution of the projects for construction of facilities for generation of electricity on the customer's premises had not yet been fulfilled, and the fulfillment thereof is subject to various factors, such as, licensing, connection and construction processes.

12 The Company operates based on an inter-company arrangement the purpose of which is to arrange the manner of the settlements deriving from construction of the generation facilities by the Company on the premises of Rotem's customers (which as at the date of the report is held by the Company at the rate of 80%).

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2. Brief description of the Group's areas of activities in the Period of the Report and thereafter (Cont.)

  1. Projects under initiation and construction (Cont.)

Main details with reference to the initiation and construction projects in Israel6 : (Cont.)

Power plants/ facilities

for
generation
of energy
Status Rate of
holdings13
Location Technology14 Additional information
OPC Hadera Expansion Ltd.
("Hadera 2")
In initiation 100% Hadera, adjacent to the Hadera
Power Plant
Conventional with storage
capability
On December 27, 2021, the plenary National Infrastructures
Committee decided to submit NIP 20B for government
approval pursuant to Section 76C(9) of the Planning and
Building Law, 1965 ("the Planning and Building Law"). For
additional details, including in connection with a petition
filed with the Supreme Court sitting as the High Court of
Justice against the decision of the National Infrastructures
Board and others (including Hadera 2) – see Section 7.3.11.1
to Part A (Description of the Company's Business).
AGS Rotem Ltd. ("Rotem 2") In initiation 80% Rotem Plain, adjacent to the
Rotem Power Plant
Being examined further to the
decision of the National
Infrastructures Committee
On December 27, 2021, the plenary National Infrastructures
Committee decided to reject NIP 94, which advanced
Rotem 2, however it requested that the developer examine
the possibility of using additional technologies on the site.
As at the date of the report, the Company is studying the
National Infrastructures Committee's decision. For
additional details – see Section 7.3.11.2 to Part A
(Description of the Company's Business).

13 Companies consolidated in the Company's financial statements.

14 It is clarified that the characteristics (including the capacity and/or the technology) of the Rotem 2 and Hadera 2 projects, which are in the initial initiation stages, and the advancement of which is subject to, among other things, planning and licensing processes and connection assurance, are subject to changes.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2. Brief description of the Group's areas of activities in the Period of the Report and thereafter (Cont.)

2. Projects under initiation and construction (Cont.)

Main details with reference to the construction projects in the United States:15

Total Amount of
estimated the investment
construction in the
Rate of Presentation cost for project at
holdings format Expected 100% of the December 31,
of the in the commercial project 2021
Capacity CPV financial operation Regulated (NIS (NIS
Project (megawatts) Group statements Location Technology date market millions)16 millions)
CPV Three Rivers 1,258 1710% Associated company Illinois Natural gas, Second quarter 2023 PJM ≈ 4,021 (≈ \$1,293 ≈ 2,261
LLC ("Three Rivers") combined cycle ComEd million) (≈ \$727 million)

15 Projects under construction in the United States are held through the CPV Group. Details with respect to the scope of the investments in the United States were translated from dollars and presented in NIS based on the currency rate of exchange on September 30, 2021 – \$1 = NIS 3.11. The information presented below regarding projects under construction and projects awaiting construction in the U.S., including regarding the commencement date of the construction, the expected commercial structure, the projected commercial operation date and the expected construction costs, including "forward-looking" information, as defined in the Securities Law, regarding which there is no certainty it will materialize (in whole or in part), including due to factors that are not under the control of the CPV Group. The information is based on, among other things, estimates of the CPV Group, and it is also based on plans the realization of which is not certain, and which might not be realized due to factors, such as: delays in receipt of permits, an increase in the construction costs, delays in the construction work and/or technical or operational malfunctions, problems or delays regarding signing an agreement for connection to the network or connection of the project to transmission or other infrastructures, an increase in costs due to the commercial conditions in the agreements with main suppliers (such as equipment suppliers and contractors), problems signing an investment agreement with a tax equity partner regarding part of the cost of the project and utilization of the tax benefits (if relevant), problems signing commercial agreements for of the potential revenues from the project, regulatory changes, an increase in the financing expenses, unforeseen expenses, weather events, the Coronavirus crisis, etc. Completion of the projects in accordance with the said estimates is subject to the fulfillment of conditions which as at the date of the report had not yet been fulfilled and, therefore, there is no certainty it will be completed in accordance with that stated. Such delays could even impact the ability of the companies to comply with liabilities to third parties in connection with the projects. For additional details regarding the risk factors involved with the activities of the CPV Group – see Section 17.14 of Part A (Description of the Company's Business).

16 Including initiation fees and reimbursement of pre-construction development expenses to the CPV Group.

17 On February 3, 2021, the transaction for sale of 7.5% of the rights in the Three Rivers project was completed, which was held up to that time by the CPV Group. For additional details – see Section 2.3.1 of Part A.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2. Brief description of the Group's areas of activities in the Period of the Report and thereafter (Cont.)

2. Projects under initiation and construction (Cont.)

Main details with reference to the construction projects in the United States:14 (Cont.)

Project Capacity
(megawatts)
Rate of
holdings
of the
CPV
Group
Presentation
format
in the
financial
statements
Location Technology Expected
commercial
operation
date
Regulated
market
Total
estimated
construction
cost for
100% of the
project
(NIS
millions)16
Amount of
the investment
in the
project at
December 31,
2021
(NIS
millions)
CPV Maple Hill Solar
LLC ("Maple Hill")
126 MWdc18 19100% Consolidated Pennsylvania Solar Second half 202220 PJM
MAAC
≈ 622 (≈ \$200 million)
21
≈ 249
(≈ \$80 million)

18 About 100 MWac.

19 As at the publication date of the report, the CPV Group had signed an agreement of principles with a "tax partner" ("Tax Equity Partner") for investment of about \$45 million in the project, where as at this date the undertaking is subject to completion of the negotiations and signing of the binding agreements. For additional details – see Section 4M in this Report of the Board of Directors below.

20 The expected operation date of Maple Hill could be delayed due to delays in completion of the connection process to the network by PJM. Delays could impact the ability of Maple Hill to comply with certain time-related commitments with third parties and could give rise to, among other things, the possibility consequences, payment of agreed compensation. For additional details – see Section 8.1.1.6 to Part A (Description of the Company's Business).

21 As at the date of this report, the expected cost of the investment in the project increased compared with the cost that was expected as at September 30, 2021 (see Report of the Company's Board of Directors as at September 30, 2021), where the said increase stems partly from a change in the structure of the expected undertaking with the Tax Equity Partner (as stated above) that is expected to permit a potential increase in development fees to the CPV Group (where the development fees are estimated as at the date of the report in the aggregate amount of about \$35 million and are included in the above amount), and partly from an increase in the equipment costs and additional expected costs. That stated in connection with the amount of the development fees to the credit of the CPV Group is "forward-looking" information that is based on the estimates of the CPV Group as at the date of the report and that is subject to the final conditions that will be determined, if any, in a binding agreement with the Tax Equity Partner, which has not yet been signed.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2. Brief description of the Group's areas of activities in the Period of the Report and thereafter (Cont.)

2. Projects under initiation and construction (Cont.)

Set forth below is a summary of the scope of the development projects (in megawatts) in the United States:22 as at the date of the report23:

Technology Advanced24 Early stage Total
Solar25 1,300 1,600 2,900
Wind 100 150 250
Total renewable energy 1,400 1,750 3,150
Natural gas 2,000 2,000 4,000
Storage 100–500 100–500

For details with respect to the Rogue's Wind project, having a scope of 114 MW and which is in the development stage – see Section 8.1.1.6(C) to Part A (Description of the Company's Business).

22 The information presented in this section with reference to development projects of the CPV Group, including regarding the number of projects, their characteristics (the capacity, technology, etc.), constitutes "forward-looking" information as it is defined in the Securities Law, regarding which there is no certainty it will be realized or the manner in which it will be realized. It is clarified that as at the date of the report there is no certainty regarding the actual execution of the development projects (in whole or in part), and their progress is subject to, among other things, completion of development and licensing processes, obtain control over the lands, signing agreements (such as equipment and development agreements), execution of construction processes and completion of the connection process, assurance of financing and receipt of various regulatory approvals and permits. In addition, advancement of the development projects is subject to the discretion of the competent authorities of the CPV Group and of the Company.

23 It is clarified that the Rogue's Wind project, which is in the advanced initiation stage in the near term, is included in the above table. It is further clarified that solar projects under development that are the subject of the Immediate Report dated October 20, 2021 (Reference No.: 2021-01-157965) are included in the above table.

24 In general, the CPV Group views projects that in its estimation are in a period of up to two years or up to three years to the start of the construction as projects in the advanced development stage (there is no certainty the development projects, including projects in the advanced stage, will be executed). It is noted that that stated depends on the scope of the project and the technology, and could change based on specific characteristics of a certain project, as well as from external circumstances that are relevant to a certain project, including, projects that are designated to operate in the PJM market could be impacted by the changes in the proposed working framework described in Section 2.2.1.1(A) of the report, and their progress could be delayed as a result of this proposal. It is clarified that in the early development stages (in particular), the scope of the projects and their characteristics are subject to changes, if and to the extent they reach advanced stages.

25 The capacities in the solar technology included in this report are denominated in MWdc. The capacities in the solar technology projects in the advanced development stages and in the early development stages are about 1,197 MWac and about 1,050 MWac, respectively.

11

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Main developments in the business environment and the Company's activities in Israel in the period of the report and thereafter:

  • A. Update of tariffs for 2022 on February 1, 2022, the annual update of the electricity tariffs of the Electricity Authority for 2022 entered into effect, according to which the generation component, increased at the rate of about 13.6%. On February 27, 2022, the Electricity Authority published an additional hearing for update of the electricity tariff for 2022, whereby it is proposed to update the generation component with the goal of reflecting the reduction in the rate of the excise tax due to the draft of the Excise Tax on Fuel Order published by the Ministry of Finance as part of the government's plan to combat the high cost of living. The application date of the new tariff, subject to a final decision in a hearing, is the beginning of the month following the entry into effect of the new Excise Tax Order (which as at the date of the report had not yet entered into effect and the proposed generation component is expected to increase in such a case by about 9.4% compared with the generation component in 2021, despite a rise of about 13.6% pursuant to the original decision as stated above. For additional details – see Section 7.2.4 of Part A (Description of the Company's Business) and Note 28B to the financial statements.
  • B. Virtual supply in June 2021, the Electricity Authority published the language of the supply license for suppliers without means of generation ("a Virtual Supply License") and update of the timetables for opening the supply area to competition, according to which commencement of the said activities took place on September 1, 2021. In July 2021, the Company received a Virtual Supply License. A license, as stated, was also granted to Gnrgy (in which, as at the submission date of the report, the Company holds an interest of 51%). Further to that stated, commencing from September 2021, the Company has customers in the scope of about 110 MW for virtual supply. For additional details – see Section 7.3.5 of Part A (Description of the Company's Business) and Note 28L to the financial statements.
  • C. Change of the structure of the activities in Israel for details regarding understands relating to a transaction and structural change of the activities in Israel see the Company's Immediate Report dated February 6, 2022 (Reference No.: 2022-01-013593) and Section 2.4.3 to Part A (Description of the Company's Business). As at the submission date of the report, binding agreements regarding that stated have not yet been signed.

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Main developments in the business environment and the Company's activities in Israel in the period of the report and thereafter: (Cont.)

  • D. Update of groups of demand hours in June 2021, the Electricity Authority published a "call" regarding update of the hourly demand categories on the basis of which the tariff is determined for customers of Israel Electric Company Ltd. (hereinafter – "the Electric Company") 26, and further thereto, in October 2021, the Electricity Authority announced, a hearing regarding the matter (after making several revisions to the said "call"). For details – see Section 7.3.15.2 to Part A (Description of the Company's Business). Pursuant to the hearing, the statistical categories of the hours created two categories in every season – low level and peak, without the intermediate category that existed up until now (Geva). Change of the categories of the hours in accordance with the hearing is expected to increase the tariffs paid by the household consumers and to decrease the tariffs paid by the TOAZ consumers. Based on the hearing, the arrangements proposed therein will enter into effect gradually starting from 2022. As at the publication date of the report, a decision had not yet been made. If the format determined in the hearing is determined as it was published, this would not be expected to have a significant impact on the Company's activities in Israel in 2022 and would be expected to have a negative impact on the Company's activities in Israel in 2023, based on the tariffs that will be provided and the composition (mix) of the Company's sales. The Company is examining its possible courses of action regarding the matter.
  • E. Excise tax on natural gas further to Government Decision No. 171 from July 202127, regarding transition to a low-carbon economy, wherein national targets were set for reduction of emissions of greenhouse gases, including a target for reduction of the annual quantity of greenhouse gas emissions in 2050 by at least 85% of the annual quantity measured in 2015, the Government decided as part of Government Decision No. 286 from August 202128, the Government decided to instruct the Minister of Finance to amend the Excise Tax on Fuel Order (Imposition of Excise Tax), 2004, and the Customs Tariffs and Exemptions Order and Purchase Tax on Goods, 2017, such that it will result in a gradual internal absorption of the external and environmental costs of carbon emissions, commencing from 2023, in the scope detailed in the Decision. As at the publication date of the report, the Company estimates that, in general the decision is expected to raise the gas acquisition costs of the Company, where this impact is expected to be partially or fully offset if the costs stemming from the decision are reflected in the generation component29. For additional details – see Section 7.2.10 to Part A (Description of the Company's Business).
  • F. The Karish gas reservoir in the estimation of Energean Israel Limited ("Energean"), based on its Immediate Reports, the "first gas" from the Karish gas reservoir is expected in the third quarter of 202230. Based on Energean's position, as conveyed to the Company, the delay in the supply of the gas from the Karish gas reservoir is due to force majeure events in accordance with the agreements. For additional details – see Section 7.14.6 to Part A (Description of the Company's Business).

26 https://www.gov.il/he/departments/publications/Call_for_bids/kol_kore_mashab

27 https://www.gov.il/he/departments/policies/dec171_2021

28 https://www.gov.il/he/departments/policies/dec286_2021

29 The Company's estimates regarding offset of the impact of the Government's decision constitutes "forward-looking" information, regarding which there is no certainty it will be realized and which is dependent on, among other things, the regulatory arrangements that will be provided and the dates of their application (entry into effect).

30 That stated above, including regarding the commercial operation of the Karish reservoir and regarding supply of the gas to the Company, includes "forward-looking" information as defined in the Securities Law, which is based on data the Company received from Energean as at the publication date of the report and additional publicly available information, regarding which there is no certainty it will be realized. Actually, the operation date of the Karish reservoir could be delayed beyond the estimate, and the consequences to the Company could be beyond that stated – this being due to factors that are not under the Company's control. In addition, there is no certainty that additional compensation will be received from Energean and there is no certainty that compensation will be paid to Rotem and Hadera that will cover all of their damages (direct and indirect).

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Main developments in the business environment and the Company's activities in Israel in the period of the report and thereafter: (Cont.)

F. The Karish gas reservoir (Cont.)

Due to the delay in supply of the gas from the Karish reservoir compared with the original projected supply date and up to the time of the actual supply, Rotem and Hadera will continue to purchase the full quantity of the natural gas required for operation of the power plants from the Tamar reservoir, at the existing gas prices of Rotem and Hadera with Tamar. Delay in supply of the gas from the Karish reservoir is expected to have a negative impact on the Company's profits (profitability) in the period of the delay. For details regarding the possibility of a reduction of quantities from the Tamar agreement – see Section 7.14 to Part A (Description of the Company's Business). It is noted that reduction of the quantities is subject to an early notification of 8–12 months (as applicable). In the period of the report, compensation was paid to Rotem and Hadera in respect of the delay in supply of the gas from the Karish reservoir in the aggregate amount of about NIS 16 million. For additional details – see Note 28G to the financial statements.

G. The Coronavirus – in March 2020, the World Health Organization declared the Coronavirus to be a worldwide pandemic. Despite taking preventative measures in order to reduce the risk of spread of the virus, the virus continued to spread in number and in different waves and variants that developed, and it has caused significant business and economic uncertainty and volatility in the global markets. As at the submission date of the report, the virus is continuing to cause business and economic uncertainty, and an additional extensive waive of the virus, against the background of the spread of the Omicron variant, has been very significant over the past several months. In the period of the report, there has been a trend in recovery in the scope of the economic activities throughout the world, including removal of some of the restrictions on movement (travel) and carrying on of business and trade, where the restrictions imposed recently are less severe than the restrictions imposed in the earlier waves of the virus.

In light of the dynamic nature of the virus and the consequences of ongoing events that are related to the virus (such as an increase in the prices of raw materials and transport costs), there remains uncertainty regarding the duration of the Coronavirus crisis, the intensity thereof and its impacts on the markets and factors relating the Company's activities (including personnel, significant customers, contractors, significant suppliers, lenders, etc.), as well as the uncertainty regarding the measures that will be taken by government entities. It is noted that during the period of the Coronavirus crisis, the activities of the Group's generation facilities in Israel and in the United States (as well as the construction activities) while making adjustments aimed at preventing the outbreak (spread) of the virus at these sites. As at the approval date of the financial statements, up to now the Coronavirus crisis has not had a significant impact on the Company's results.

In the period of the report and thereafter, due to high global demand for raw materials and transport and dispatch, on the one hand, including due to the impact of the Coronavirus crisis, limited generation capability and restrictions on transport and dispatch, on the other hand, there has been a significant increase in the costs of the raw materials, and delays in the generation and supply chain, including an increase in the costs of marine shipping. Accordingly, global delays have been caused in the equipment supply dates along with an increase in the prices of raw materials and equipment used for construction and maintenance of the Group's generation facilities and power plants. This trend impacts the construction and/or maintenance costs of the Group's projects in its activity markets and the timetables for their completion. As at the approval date of the financial statements, there is no certainty with respect to the continuation or scope of the trend and, therefore, the Group is not able to estimate with any degree of certainty the impact thereof on the Group's activities. For additional details regarding the Coronavirus crisis – see Sections 7.3.8, 7.11.1, 7.15.1 and 18.1.6 of Part A (Description of the Company's Business) and Note 28D to the financial statements.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Main developments in the business environment and the Company's activities in Israel in the period of the report and thereafter: (Cont.)

G. (Cont.)

For additional details regarding the Company's area of activities in Israel – see Section 7 to Part A (Description of the Company's Business), of this report below and the notes to the financial statements.

Rotem Power Plant

H. Repayment of project financing – during October 2021, early repayment was completed of the full amount of the outstanding credit under Rotem's project financing, in the amount of about NIS 1,292 million (an early repayment fee) and restricted cash was released, in the amount of about NIS 125 million. In the period of the report, Rotem recognized a non-recurring expense in the statement of income, in the aggregate amount of NIS 244 million, in respect of the early repayment fee (about NIS 188 million, net of tax). In addition, in light of the early repayment of the balance of Rotem's credit, in the period of the report the Company executed an early close-out of an interest SWAP contract, which yielded the amount of about NIS 13 million to the Company.

The Company and the additional shareholder in Rotem provided Rotem shareholders' loans for financing part of the amount of the early repayment, in the amount of about NIS 1,130 million, based on their proportionate holdings in Rotem's shares. For additional details regarding shareholders' loans – see Note 16D(1) to the financial statements.

I. License from supplier and decisions of the Electricity Authority regarding deviations from consumption plans and market model – in 2021, Rotem was informed that the Professional Staff of the Electricity Authority intends to recommend to grant Rotem a supply license in the same language as the existing suppliers) (the language of the license has not yet been disclosed) and at the same time to impose certain covenants on Rotem regarding the generation activities and the supply activities, including an extraordinary consumption format, as noted in Section 7.13.2 to Part A (Description of the Company's Business), including arrangement of the manner of applying the market model (described below) to Rotem and the manner of determination of the price for purchase of electricity for the consumers when generation at the plant is reduced. Based on the information provided, the team intends to act to apply the above-mentioned arrangements, subject to a hearing. Further to that stated, Rotem is taking action with the Electricity Authority in order to clarify and present its reference to the said arrangements. It is clarified that in Rotem's understanding making of a decision regarding the matter is subject to publication of a hearing, which as at the submission date of the report had not yet been published. Accordingly, as at the submission date of the report, supplementary arrangements, as stated had not yet been provided, and there is no certainty regarding their final version and the scope of their impact. A failure to receive a supply license by Rotem or a parallel arrangement under appropriate conditions and application of the decision regarding the matter of deviations from the consumption plan are expected to have negative impacts on the Company31 .

31 For details regarding contentions of the System Operator that according to his approach sale of energy to end consumers beyond the plant's generation capacity by Rotem, deviates from the provisions of the PPA agreement between it and the Electric Company and that he disputes Rotem's position regarding the application of Appendix O of the aforesaid agreement – see Section 7.15.5.1(B) of Part A (Description of the Company's Business). As stated, to the extent understandings are formulated, the System Operator could take steps with respect to Rotem. In addition, for details regarding open matters between Rotem and the Electric Company – see also the above-mentioned Section of Part A (Description of the Company's Business).

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Main developments in the business environment and the Company's activities in Israel in the period of the report and thereafter: (Cont.)

Rotem Power Plant (Cont.)

I. (Cont.)

On February 28, 2022, the decision of the Electricity Authority was received regarding "Revision of the Benchmarks for purposes of Application of the Market Model to the Existing Private Generation and Renewable Energies", which amends the existing regulations for generators in the transmission network for all types of technologies and applies to them the benchmarks that govern the manner of operation of the energy market in Israel (the commerce rules, as they are revised in the framework of the decision). The Electricity Authority notes in its decision that even though the main purpose of the decision is to create uniformity of the market rules applicable to the generation units in the market, it was decided, at this stage, to except from application of the decision the generation units of the Electric Company and Rotem, since a special regulation applies to Rotem that requires adjustments in a number of aspects. The Electricity Authority notes that at the present time it is examining all the changes that are required in the regulation that applies to Rotem in order to create uniformity between it and the other private generation units, and in this regard it will also consider application of the market rules on Rotem. For additional details – see Section 7.3.1 of Part A (Description of the Company's Business).

J. Availability (capacity) maintenance work – in 2021, planned maintenance was not performed at the Rotem Power Plant, and the rate of the plant's availability (capacity) was about 99%. As at the submission date of the report, the next maintenance is planned to be performed in April 2022, during which the plant's operation and the related energy generation activities will be shut down for a period estimated at about 20 days32. For additional details – see Section 7.11.1 of Part A (Description of the Company's Business).

32 That stated in this Section above, including regarding the performance date of the maintenance work and the additional work along with the period of the said work, includes "forward-looking" information as it is defined in the Securities Law. The information stated above may not occur, or may occur in a different manner, including as a result of reasons that do not depend on Rotem, such as coordination with the contractor or the equipment supplier, the manner of performance of the work by the contractor, technical breakdowns or other delays that could impact the performances of the power plant or the length of the shutdown (full or partial) of the power plant, including factors impacted by the Coronavirus. Delays or breakdowns, as stated, could have a negative impact on the results of the activities due to the work.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Main developments in the business environment and the Company's activities in Israel in the period of the report and thereafter: (Cont.)

Hadera Power Plant

K. Availability (capacity) maintenance work – in 2021 there were 74 maintenance days during which the Hadera Power Plant operated on a partial basis for purposes of replacement and renovation work of the gas and steam turbines. The performances of the gas turbines commencing from the end of the replacement and renovation work are in accordance with that expected from them.

In addition, in May and June 2022, additional maintenance work is expected to be performed in the steam turbine for a period of time estimated at about 50 days.

After performance of the additional maintenance activities in the steam turbine, a further improvement in the plant's performance is expected33. For additional details – see Section 7.11.1 of Part A (Description of the Company's Business).

L. Status of arbitration proceedings with the construction contractor – For details regarding starting of the arbitration proceedings by Hadera's construction contractor and the contentions of the Company and the construction contractor – see Section 7.16.4 of Part A (Description of the Company's Business) and Note 28D to the financial statements and the Company's Immediate Report dated September 23, 2021 (Reference No.: 2021-01-148533).

Power plant under construction – Zomet

M. Progress of the construction work – in 2020 the construction work on the Zomet Power Plant commenced, which continued during 2021. The uninterrupted construction could by impacted by the Coronavirus in light of the need for the arrival of equipment and foreign work teams, and from delays in the global supply chain, and the plant is expected to reach commercial operation in the first quarter of 2023. The Zomet Power Plant will sell all of its generation capacity to the System Operator as part of a fixed capacity (availability) agreement. For additional details – see Section 7.3.8 to Part A (Description of the Company's Business).

For details regarding the tariff approval for the Zomet Power Plant – see Section 7.13.8 to Part A (Description of the Company's Business).

33 The uninterrupted replacement and renovation work, as stated, could by impacted by traffic (movement) restrictions due the Coronavirus in light of the need for the arrival of equipment and foreign work teams and, accordingly, the maintenance work may be extended. That stated in this Section above, including with reference to the execution dates of the maintenance work and the Additional Work, the duration of the work of the said work periods and/or the improvement of the performance of the power plant after execution of the work, includes "forward-looking" information, as it is defined in the Securities Law. The information regarding performance of the renovation work and the impact thereof may not be realized, or may be realized in a different manner, including as a result of reasons that are not under Hadera's control, such as coordination with the contractor or equipment supplier, the manner of performance of the work by the contractor, technical breakdowns or other delays, which could impact the duration of the shutdown (full or partial of the power plant), including factors impacted by the Coronavirus crisis. Partial operation or shutdown of the Hadera Power Plant during extended periods of the maintenance, renovation and replacement work count impact Hadera's ability to comply with the power plant's availability (capacity) provisions (regarding this matter – see also Section 7.11.1 of Part A (Description of the Company's Business)) and could have a negative impact on the results of Hadera's activities.

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Main developments in the business environment and the Company's activities in Israel in the period of the report and thereafter: (Cont.)

Power plant under construction – Sorek

N. In June 2021, a number of agreements were signed in connection with construction of the Sorek project. In September 2021, a full Notice to Proceed was issued to the construction contractor. For additional details – see Section 7.15.1.2 of Part A (Description of the Company's Business). In the Company's estimate, the construction period of the Sorek B generation facility is expected to end during the fourth quarter of 202334 .

Gnrgy

O. Acquisition of Gnrgy – in April 2021, the Company signed an agreement for acquisition of shares of Gnrgy Ltd. ("Gnrgy"), which is engaged in the area of charging services for electric vehicles (e-mobility) and construction of charging stations for electric vehicles. For additional details – see Note 25D(2) to the financial statements and Sections 2.4.2 and 7.20 of Part A (Description of the Company's Business).

Company headquarters

  • P. Issuance of debentures in September 2021, the Company issued a new series of debentures, debentures (Series C) with a par value of about NIS 851 million, where the proceeds of the issuance were designated for, among other things, early repayment of Rotem financing, as stated above. For additional details – see Section 10 below and Note 17C to the financial statements.
  • Q. Issuance of shares in February 2021, the issued shares for a consideration of NIS 350 million (gross). In October 2021, the Company completed an issuance of shares by means of an offer of rights, among other things, in connection with development and expansion of the Company's activities in the United States, as stated in the shelf offer report published by the Company in September 2021. The proceeds for the rights exercised amounted to about NIS 328.5 million (gross). For additional details – see Note 20B to the financial statements.

For additional details regarding the Company's area of activities in Israel – see this report below and Section 7 to Part A (Description of the Company's Business) and the notes to the financial statements.

34 As at the submission date of the report, completion of the project is subject to, among other things, completion of planning and licensing processes, the suitability of the construction work and the equipment, and detailed technical coordination in connection with connection of the project to the electricity network. Actually, technical breakdowns and/or delays in the project's construction processes could be caused, and the Company may incur additional costs in connection with the project beyond those estimated. It is noted that a delay in the operation date could impact the ability of the project to comply with its obligations to third parties with respect to the project. For additional details regarding risk factors involved with projects under construction – see Section 18.3.12 to the report.

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

  1. Main developments in the Company's activities in the United States in the period of the report and thereafter:

  2. A. Changes in the costs in the production and supply chain of equipment for the projects in 2021, including in the period of the report and thereafter, due to high global demand for raw materials, and shipping and delivery, on the one hand, and limited production capacity and limited shipping and delivery capacity, on the other hand, there has been a significant increase in costs in the production and supply chain. In general, prices of raw materials for the generation facilities rose, as did the shipping and delivery costs. To the extent this trend continues, there could be an impact on the cost of the inputs for the CPV Group. At the present time, there is no certainty regarding the duration or the extent of the trend and, accordingly, the CPV Group is not able to predict with any degree of certainty and precision the impact thereof on the Company's activities.

  3. B. Requests for network connections the increasing demand for renewable energy in the PJM, MISO and SPP electricity markets, led to an increase in demand for connections to the grid and requests for connection surveys of solar projects to the grid. This demand creates a burden and causes a slowdown in the connection process and could impact the process and rate of the progress of the projects in the United States. For details regarding projects – see Section 8.1.1.6 to Part A (Description of the Company's Business).
  4. C. Electricity and gas prices in the activity markets of the CPV Group for details regarding trends in the various energy prices and capacity payments in the different markets in the U.S. see Section 6 below and Section 8.1.3.6 to Part A (Description of the Company's Business).
  5. D. The Infrastructures Law in November, 2021, the U.S. Congress approved the Bipartisan Infrastructure Law, which was signed by the President of the United States ("the Infrastructure Law"). The Infrastructure Law is the first part of legislation (having two main laws), which addresses numerous sectors in the U.S. economy, including, transportation, construction and energy. A significant part of the Infrastructure Law deals with expansion of transmission infrastructures, R&D regarding technologies, including carbon capture and use of hydrogen, strengthening of the network and energy efficiency. Nonetheless, there are a number of provisions in the legislation that provide financing possibilities through the Department of Energy, with the target of supporting development of energy generation projects having low or no emissions. The second part of the relevant legislation, which is known as the "Building Back Better Act", regarding energy aspects, focuses on tax incentives for support of low or no carbon generation technologies. The legislation that passed the House of Representatives in November 2021 was approved mainly through taking a unified party position in the vote (one democrat and all of the republicans voting against) and includes a general expansion of the tax benefits and refundable tax credits by generation and investment for the benefit of renewable energy projects (including wind and solar projects). Carbon capture technologies and investments in hydrogen technologies ("the BBB Law"). The BBB Law is still being negotiated in the Senate. As at the publication date of the report, there is uncertainty regarding passage of the BBB Law and its content, in light of issues that are still being discussed. The said legislation could have a material impact on the demand for electricity by means of advancement of reduced-carbon transportation and economy and concurrently raising the standards for generation of electricity using clean energy.35

35 The Company's above estimate regarding changes in the area of activities constitutes "forward-looking" information, as it is defined in the Securities Law, which is based solely on the Company's said estimates as at the publication date of the report only and on publicly-known data and which is dependent and contingent on various factors.

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

  1. Main developments in the Company's activities in the United States in the period of the report and thereafter: (Cont.)

The CPV Group

  • E. Increase of the investment commitment in CPV in September 2021, the financial investors, which hold cumulatively (indirectly) about 30% of the rights in the CPV Group, approved their participation in an additional investment commitment in the development and expansion of the CPV Group – each one based on its proportionate share (where in addition to the Company's share (70%)), the additional investment commitment is in the aggregate amount of about \$400 million, and in total commitment amounts to \$1,215 million, of which as at the date of the report about \$861 million had been invested in CPV. For additional details – see the Company's Immediate Report dated September 19, 2021 (Reference No.: 2021-01-147864) and Note 25A(4) to the financial statements.
  • F. Acquisition of solar panels in March 2022, the CPV Group signed a framework agreement for acquisition of solar panels, in the aggregate scope of about 530 megawatts. The panels will be supplied based on orders the CPV Group will submit to the supplier in 2023–2024. As at the submission date of the financial statements, the CPV Group had paid the panel supplier an advance deposit in respect of the acquisition. The CPV Group has the right to conclude the agreement early in accordance with the dates provided, while making a partial payment to the supplier, which is derived from the early conclusion date. In addition, provisions are included in the agreement with respect to, among other things, quantities, the model, manner of supply of the panels and provisions that cover conclusion of the agreement. The total consideration under the agreement could amount to about \$185 million (assuming purchase of the full quantity under the agreement). The agreement is intended to serve for solar projects of the CPV Group that are in the development stages – this being, among other things, against the background of the global trends of increasing demand for solar panels that impact the prices of the panels and timeframes for their supply.
  • G. Offshore wind as part of the strategy of expanding its activities of the CPV Group, mainly in the area of renewable energies, advancement of development projects of the CPV Group and through acquisition of projects in various stages (as stated in, among other places, Section 16.2.4 of Part A (Description of the Company's Business)), the CPV Group is considering entry into Offshore Wind projects (wind energy at sea) in the United States and, in this regard, it is examining opportunities in this area in the geographical locations of its activities. In the estimation of the CPV Group, the Offshore Wind area in the United States is expected to grow significantly in the next decade. As part of the policies to reduce emissions, the U.S. government headed by the President of the United States has set a target for installed capacity of 30 GW of Offshore Wind projects by 2030. The CPV Group's intention is to take action to initiate, finance, develop, construction and operate projects in this area, including by means of joint ventures with financial and other investors. In this connection, it is noted that the CPV Group has participated in a competitive process for acquisition of rights in an area designated for construction of a number of wind farms located along the New York coastlines, however it was not a winner in the said competitive process.
  • H. Acquisition of solar projects in October 2021, the CPV Group signed agreements for acquisition of all of the rights in two solar projects that are in various stages of development, with an aggregate capacity of about 458 MWdc in Kentucky (about 98 MWdc), Illinois (about 360 MWdc) in the United States ("the Projects") – both of which in the PJM market. Concurrent with signing of the agreements, completion of acquisition of the rights in the Projects was executed by the CPV Group. For additional details – see the Company's Immediate Report dated October 20, 2021 (Reference No.: 2021-01-157965).

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

4. Main developments in the Company's activities in the United States in the period of the report and thereafter: (Cont.)

The CPV Group (Cont.)

  • I. Repayment of Seller's loan for details regarding repayment of a seller's loan in respect of a project under construction, which was provided as part of completion of the transaction for acquisition of the CPV Group see the Company's Immediate Report dated October 31, 2021 (Reference No.: 2021-01-161151) and Note 25D(1) to the financial statements.
  • J. The Coronavirus see Section 3G above.

Maple Hill project

  • K. Construction work in May 2021, a commencement order was issued for the construction work on the Maple Hill project using solar energy, to the project's construction contractor. For additional details see Sections 8.1.1.6 and 8.13.7 to Part A (Description of the Company's Business) and Note 28D to the financial statements.
  • L. Commercial format in June 2021, the project participated for the first time in capacity tenders in the PJM market, and it will be entitled to capacity payments, as shown in the table below in Section 6. In August 2021, Maple Hill signed an agreement with a third party for sale of 48% of the amount of the electricity generated by the Maple Hill power plant for a period of 10 years from the operation date. The payment is to be made as a financial settlement between the fixed price guaranteed to the plant and the variable price in the market. The balance of the electricity generated (52%) is expected to be sold in the market or under a separate agreement for sale of electricity in the future36. In addition, Maple Hill signed an agreement for sale of 100% of the solar renewable energy certificates (SREC) of the project up to 2026. For details – see Section 8.1.1.6(B) to Part A (Description of the Company's Business).
  • M. Tax partner as at the date of this report, the CPV Group had signed a document of principles with a "tax partner" with respect to an investment in the project of about \$45 million, where as at the date of this report the undertaking is subject to completion of the negotiations and signing of binding agreements. The said tax partner is expected to enjoy most of the tax benefits relating to the project, which consist mainly of investment tax credits (ITC) and depreciation deductions for tax purposes, along with participation in a proportionate amount (to be agreed upon) of the cash flows that are free (available) for distribution. The entitlement to participate in part of the said free cash flows is effective up to reaching a certain investment period of the tax partner as will be determined in the agreement. After reaching the said period, the share of the tax partner in the income and cash flows will decline to a minimal rate. It is emphasized that the CPV Group has not yet signed a final agreement, as stated, and therefore there is no certainty that such an agreement will ultimately be signed or what its terms will be, including what will be the scope of the investment in accordance with that stated (if ultimately signed).

36 That stated constitutes "forward-looking" information, regarding which there is no certainty it will be realized or the manner of its realization. As at the date of the report, a project under construction is involved and completion of the project in accordance with that stated above is subject to conditions that have not yet been fulfilled.

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

4. Main developments in the Company's activities in the United States in the period of the report and thereafter: (Cont.)

The CPV Group (Cont.)

Maple Hill project (Cont.)

N. Cost of the project – as at the date of this report, the expected cost of the investment in the project has increased compared with the cost that was expected as at September 30, 2021, where the said increase stems partly from a change in the structure of the expected undertaking with a tax partner that is expected to permit a potential increase in development fees to the benefit of the CPV Group (as at the date of the report the development fees are estimated at about \$35 million and are included in the above amount), and partly from an increase in the equipment costs, transport and delivery costs, construction delays and additional expected costs37. For additional details relating to the project, including material agreements signed as at the publication date of the report – see Note 28 to the financial statements.

Keenan wind farm

  • O. Refinancing in August 2021, Keenan signed a financing agreement with a number of financial entities, including a term loan and accompanying credit frameworks. Concurrent with completion of the financing agreement, as stated, Keenan repaid the prior financing it took out in 2014. For additional details – see Section 8.16.4 to Part A (Description of the Company's Business) and Note 16D(5) to the financial statements.
  • P. Acquisition of rights of the tax partner in April 2021 an agreement was signed for acquisition of the balance of the rights in a project in Oklahoma by the CPV Group, which was held up to the date of the acquisition at the rate of 70%. For additional details – see Section 8.13.7 to Part A (Description of the Company's Business) and Note 28O to the financial statements.

Maryland power plant

Q. Extension of financing agreement – further to that stated in Section 17.8 to Part A (Description of the Company's Business) of the Periodic Report for 2021, in May 2021, Maryland signed a credit framework agreement of the Term Loan B type, relating to the project. As part of replacement of the credit agreement, Maryland signed a loan agreement, in the amount of about \$350 million, and accompanying frameworks, in the amount of about \$100 million. For additional details – see Section 8.16.4 to Part A (Description of the Company's Business) and Note 26C to the financial statements.

37 That stated with respect to the amount of the development fees to the benefit of the CPV Group is "forward-looking" information that is based on the estimates of the CPV Group as at the date of the report, and that are subject to the final terms that will be determined, if determined, in a binding agreement with the tax partner, which has not yet been signed.

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

4. Main developments in the Company's activities in the United States in the period of the report and thereafter: (Cont.)

The CPV Group (Cont.)

Rogue's Wind project

  • R. PPA agreement in April 2021 an agreement was signed for sale of electricity (PPA) in the wind energy project Rogue's Wind for sale of all the Project's energy, availability (capacity) and Renewable Energy Certificates (RECs) of the project. For additional details – see Section 8.13.7 to Part A (Description of the Company's Business) and Note 28A(6) to the financial statements.
  • S. Construction cost the construction cost of the project, including initiation fees to the CPV Group estimated at about \$11 million, is about \$257 million. The expected cost of the investment in the project increased in 2021, where the said increase stems mostly from an increase in the expected costs of the wind turbine for the power plant, shipping and delivery costs, an increase in the construction budget and the costs of upgrading the transmission network. It is noted that part of the increase in the costs of upgrading the transmission network could be compensated for in the framework of the price adjustments in accordance with the price formula in the project's PPA agreement. It is clarified that the construction cost is subject to additional changes, including due to a global increase in the equipment and shipping prices, as is visible in the past months, and/or other costs.

For additional details regarding the area of the Company's activities in the United States – see this report below and the notes to the financial statements.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

Category 12/31/2021 12/31/2020 Analysis
Current Assets
Cash and cash equivalents 757 200 For additional information – see the Company's consolidated statements of cash flows in the financial statements and Part 7 below.
Short-term deposits 1,607 The decrease stems from withdrawal of the deposits for purposes of acquisition of the CPV Group.
For additional details regarding the agreement covering acquisition of the CPV Group – see Note 25D to the financial statements.
Short-term deposits and restricted cash 1 207 Most of the decrease derives from release of collaterals in respect of hedging transactions, in the amount of about NIS 86 million,
and release of collaterals, which were used for provision of bank guarantees in Israel, in the amount of about NIS 67 million (for
additional details – see Note 16D(4) to the financial statements). In addition, in light of the early repayment of the full outstanding
balance of Rotem's credit in October 2021, restricted cash balances were released, in the amount of about NIS 48 million. For
additional details – see Note 16D(1) to the financial statements.
Trade receivables and accrued income 194 153 Most of the increase stems from an increase of about NIS 28 million due to the first-time consolidation of the CPV Group, an increase
of about NIS 12 million in accrued income deriving from sale of energy in the virtual supply framework (for additional details – see
Note 28B to the financial statements), and an increase in accrued income in Hadera, in the amount of about NIS 9 million. On the
other hand, there was decrease in the balance of the trade receivables in the U.S. (after the initial consolidation of the CPV Group), in
the amount of about NIS 10 million, due to collection of an annual debt.
Receivables and debit balances 118 63 Most of the increase, in the amount of about NIS 39 million, is due to the first-time consolidation of the CPV Group, and in light of
making deposits in connection with project under construction in the United States, in the amount of about NIS 15 million.
Inventory 5 As at December 31, 2021, the balance represents inventory of Gnrgy, which was consolidated for the first time in December 2021.
Short-term derivative financial instruments 2
Total current assets 1,077 2,230
24

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

Category 12/31/2021 12/31/2020 Analysis
Non-Current Assets
Long-term deposits and restricted cash 67 231 Most of the decrease stems from release of collaterals in respect of interest SWAP contracts (as described in Note 23D to the financial
statements), in the amount of about NIS 35 million, release of a collateral, in the amount of about NIS 53 million, which was designated to
secure a bank guarantee (for additional details see – Note 24D to the financial statements). In addition, there was a decrease of about
NIS 72 million stemming from release of a debt service reserve in Rotem. The release was made in light of early repayment of the full
balance of Rotem's outstanding credit in October 2021. For additional details – see Note 16D(1) to the financial statements.
Long-term prepaid expenses 178 143 Most of the increase stems from construction of infrastructures in Zomet, in the amount of about NIS 21 million, and a loan to an
associated company in the United States, in the amount of about NIS 16 million. In addition, there was an increase, in the amount of about
NIS 4 million, due to the first-time consolidation of the CPV Group.
Investments in associated companies 1,696 The increase stems from acquisition of the CPV Group. For additional details regarding investments in associated companies – see
Sections 1 and 6 of this report and Notes 25 and 26 to the financial statements.
Deferred tax assets, net 153 24 An increase of about NIS 92 million stemming from an increase in the loss for tax purposes in Israel, mainly in light of the early repayment
in Rotem (for additional details – see Note 16D(1) to the financial statements), and an increase of about NIS 37 million resulting from
acquisition of and the activities of the CPV Group.
Long-term derivative financial instruments 36 1 The balance as at December 31, 2021 includes mainly interest SWAP contracts in Israel (about NIS 28 million) and in the U.S. (about NIS 4
million), which are measured at fair value.
Property, plant and equipment 3,531 2,665 Most of the increase stems from investments in the Zomet project, in the amount of about NIS 488 million, investments in projects
involving energy generation facilities located on the consumers' premises, in the amount of about NIS 42 million, and investments in
additional projects in Israel, in the amount of about NIS 33 million. In addition, as at December 31, 2021, the balance includes the amount
of about NIS 426 million in respect of the CPV Group, where about NIS 310 million relates to construction projects in the U.S.
This increase was partly offset by depreciation expenses in respect of property, plant and equipment in Israel, in the aggregate amount of
about NIS 129 million.
25

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

2.
Financial Position as at December 31, 2021 (in millions of NIS) (Cont.)
Category 12/31/2021 12/31/2020 Analysis
Non-Current Assets (Cont.)
Right-of-use assets 302 276 Most of the increase derives from the first-time consolidation of the CPV Group.
Intangible assets 698 5 As at December 31, 2021, the balance represents mainly the amount of about NIS 311 million, in respect of an agreement for sale of
electricity in the Keenan project, and the amounts of about NIS 327 million and about NIS 42 million, respectively, relate to goodwill
created in light of acquisition of the CPV Group and Gnrgy.
Total non-current assets 6,661 3,345
Total assets 7,738 5,575
26

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

Category 12/31/2021 12/31/2020 Analysis
Current Liabilities
Current maturities of long-term loans from banks
and financial institutions
68 127 The decrease stems from repayment of the project credit in Israel based on the repayment schedule, in the amount of about NIS 128
million, and repayment of the project credit in the U.S., in the amount of about NIS 34 million.
The decrease was partly offset by an update of the current maturities of the project credit in Israel based on the repayment schedule, in
the amount of about NIS 36 million, an increase of about NIS 21 million as a result of the initial consolidation of the CPV Group, and an
increase of about NIS 45 million from update of the current maturities of the project credit in the U.S.
Current maturities of loans from holders of non
controlling interests
29 As at December 31, 2021, the balance represents current maturities of a loan provided to Rotem by the holders of non-controlling
interests in October 2021, relating to the early repayment of the full balance of Rotem's unpaid credit in October 2021 (for additional
details – see 16D(1) to the financial statements).
Current maturities of debentures 22 22
Trade payables 425 298 Most of the increase derives from an increase in the balance with the construction contractors of Zomet and Sorek, in the amounts of
about NIS 107 million, respectively, an increase of about NIS 18 million due to the first-time consolidation of the CPV Group, and an
increase, in the amount of about NIS 43 million, deriving from acquisition of energy in virtual supply framework (for additional details –
see Note 28L to the financial statements).
This increase was partly offset by a decrease stemming from a decrease in the balance of Israel Electric Company, in the amount of about
NIS 26 million, mainly due to timing differences and a decrease in the scope of electricity purchases from Israel Electric Company.
Payables and other credit balances 87 96 Most of the decrease derives from a decrease in the accrued expenses, in the amount of about NIS 41 million (mainly in light of payment
of transactions costs relating to acquisition of the CPV Group).
This decrease was partly offset by an increase, in the amount of about NIS 12 million, due to the first-time consolidation of the CPV
Group, an increase of about NIS 5 million in respect of payables relating to salary and salary-related expenses in the CPV Group, an
increase of about NIS 8 million in accrued interest expenses and an increase of about NIS 7 million due to an amount payable to the
Hadera construction contractor.
27

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

Category 12/31/2021 12/31/2020 Analysis
Current Liabilities (Cont.)
Short-term derivative financial instruments 27 126 Most of the decrease stems from repayment of hedging transactions that served to hedge the Company's investment in acquisition of
the CPV Group. For additional details – see Note 23D to the financial statements.
Current maturities of lease liabilities 59 45 Most of the increase stems from an increase in the balance of Zomet's liabilities in respect of capitalization fees for the land, in the
amount of about NIS 7 million, this being in light of a refund received from Israel Lands Authority in March 2021 (for additional details
– see Note 11A to the financial statements). In addition, there was an increase of about NIS 4 million due to the first-time consolidation
of the CPV Group.
Total current liabilities 717 714
28

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

Category 12/31/2021 12/31/2020 Analysis
Non-Current Liabilities
Long-term loans from banks and financial
institutions
1,451 1,850 The decrease, in the amount of about NIS 1,019 million, derives from repayment of the balance of Rotem's outstanding credit in light
of the early repayment in October 2021 (for additional details – see Note 16D(1)). There was an additional decrease stemming from
update of current maturities of Hadera's senior debt, in the amount of about NIS 36 million.
On the other hand, as at December 31, 2021, the balance includes a long-term loan, in the amount of about NIS 275 million, in respect
of the new financing agreement of the Keenan project (for additional details – see Note 16D(5) to the financial statements). In
addition, there was an increase stemming from a withdrawal in the framework of the Zomet Financing Agreement, in the amount of
about NIS 349 million, and an increase in the linkage differences in respect of the senior debt of Rotem and Hadera, in the amount of
about NIS 34 million.
Long-term loans from holders of
non-controlling interests
404 1 The balance as at December 31, 2021, includes mainly long-term loans, in the amount of about NIS 202 million, from the holders of
non-controlling interests in the CPV Group (for additional details – see 16D(6) to the financial statements), and the amount of about
NIS 197 million from the holders of non-controlling interests in Rotem relating to the early repayment of the full balance of Rotem's
unpaid credit in October 2021 (for additional details – see 16D(1) to the financial statements).
Debentures 1,789 952 The increase stems from issuance of debentures (Series C) of the Company, in the amount of about NIS 842 million (net of issuance
expenses). For additional details – see Note 17 to the financial statements. In addition, there was an increase in the linkage
differences in respect of the debentures (Series B), in the amount of about NIS 18 million.
This increase was partly offset by a decrease stemming from update of the current maturities of the debentures (Series B), in the
amount of about NIS 22 million.
Long-term lease liabilities 44 14 The increase stems from the first-time consolidation of the CPV Group.
Long-term derivative financial instruments 1 22 As at December 31, 2020, the balance represents mainly the fair value of interest SWAP contracts in the Company.
29

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

Category 12/31/2021 12/31/2020 Analysis
Non-Current Liabilities (Cont.)
Other long-term liabilities 90 2 As at December 31, 2021, the balance represents mainly the obligations recorded as a result of acquisition of the CPV Group, where
about NIS 47 million is in respect of an equity compensation benefit for employees of the CPV Group, which is accounted for as
share-based payment transaction settled in cash, the amount of about NIS 18 million is in respect of an obligation relating to
clearance and removal in the Keenan project and about NIS 21 million relates to liabilities of additional projects in the United States.
Deferred taxes, net 395 309 The increase, in the amount of about NIS 24 million, is due to acquisition of and the activities of the CPV Group, and an increase of
about NIS 62 million stemming from update of the deferred taxes as a result of recording of deferred taxes relating to temporary
differences in Israel.
Total non-current liabilities 4,174 3,150
Total liabilities 4,891 3,864
30

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

  • The Group's activities in Israel and the United States are subject to seasonal fluctuations. For additional details regarding seasonal impacts see Sections 7.10 and 8.7 to Part A (Description of the Company's Business). In Israel, the load and time tariffs ("TOAZ") are supervised (controlled) and published by the Electricity Authority, and are broken down into three seasons – summer (July and August), winter (January, February and December) and transition (March through June and September through November). The TOAZ tariff in the summer and the winter are higher than those in the transition seasons. In the United States, the electricity tariffs are not supervised (controlled) and are impacted by the demand for electricity, which is high in the summer and the winter compared with the average and as a function of the natural gas prices. During the fourth quarter, the natural gas prices in the U.S. rose in light of, among other things, the natural gas crisis in Europe and it impacted the electricity in the markets in which the CPV Group operates.
  • It is noted that the results of the CPV Group are consolidated in the Company financial statements commencing from the completion date of the transaction for acquisition of the CPV Group on January 25, 2021. The results of the associated companies in the U.S. (companies engaged in natural gas) are presented in the category "Company's share in losses of associated companies".

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

For the Year Ended
Category 12/31/2021 12/31/2020 Analysis
Revenues from sales in Israel 1,412 1,325 For an explanation regarding the change in the sales in Israel – see Section 5, below.
Revenues from sales and provision of services
in the U.S.
163 In 2021, the revenues from sales of electricity from the Keenan wind farm (which is consolidated in the financial statements) amounted
to about NIS 82 million and the revenues from provision of management services amounted to about NIS 81 million.
Cost of sales in Israel (less depreciation and
amortization)
1,007 968 For an explanation regarding the change in the cost of sales in Israel – see Section 5, below.
Cost of sales and provision of services in the
U.S (less depreciation and amortization)
79 In 2021, the cost of sales in the U.S. amounts to about NIS 26 million, and the cost of provision of services amounts to about NIS 53
million.
Depreciation and amortization in Israel 134 114 Most of the increase, stems from depreciation expenses of the Hadera Power Plant, in the amount of about NIS 21 million, due to the
commercial operation in July 2020.
Depreciation and amortization in the U.S. 38 In 2021, the depreciation is in respect of the Keenan wind field.
Gross profit 317 243
32

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

For the Year Ended
Category 12/31/2021 12/31/2020 Analysis
Administrative and general expenses in Israel
and headquarters expenses
75 52 Most of the increase stems from an increase in salary expenses and headquarters expenses, in the amount of about NIS 15 million
(which includes about NIS 5 million of non-cash equity remuneration), in light of, among other things, expansion of the Company's
activities, and insurance costs in Hadera, in the amount of about NIS 4 million.
Administrative and general expenses in the U.S. 124 In 2021, the administrative and general expenses in the U.S. include expenses relating to a profit participation plan, in the amount of
about NIS 50 million (non-cash), salary expenses of about NIS 39 million, office maintenance and professional services, in the amount
of about NIS 31 million, and depreciation expenses, in the amount of about NIS 4 million.
Share in losses of associated companies in
Israel
(1)
Share in losses of associated companies in the
U.S.
(34) In 2021, the expense includes a loss of about NIS 145 million (before taxes) in respect of changes in the fair value of derivative financial
instruments in hedge plans in the CPV Group. Eliminating the impact of changes in the fair value of derivative financial instruments, the
income in respect of associated companies in the United States is about NIS 111 million (for additional details regarding the results of
associated companies – see Section 6 below and Note 26 to the financial statements).
Transaction expenses in respect of acquisition
of the CPV Group
2 42 For additional details – see Note 25D to the financial statements.
Business development expenses in Israel 1 7 Most of the decrease stems from commencement of capitalization of expenses to projects under construction.
Business development expenses in the U.S. 4
Other income, net, in Israel 1
Operating income 76 143
33

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

For the Year Ended
Category 12/31/2021 12/31/2020 Analysis
Financing expenses, net, in Israel (377) (172) Most of the increase stems from a non-recurring early repayment loss, in the amount of about NIS 244 million, in light of execution of
early repayment of the full balance of Rotem's outstanding credit in October 2021 (for additional details – see Note 16D(1) to the
financial statements). In addition, there was an increase in interest expenses and linkage differences on Hadera's senior debt, in the
amount of about NIS 20 million (including the results of the hedge of linkage to the CPI), as a result of the commercial operation of the
Hadera Power Plant and discontinuance of capitalization of the financing expense to the cost of the asset under construction and an
increase stemming from interest and linkage differences in respect of debentures, in the amount of about NIS 21 million.
This increase was partly offset by a decrease in the financing expenses stemming from the impact of the changes in the shekel/dollar
exchange rate, in the amount of about NIS 26 million, and a decrease in interest expenses and linkage differences on Rotem's senior
debt, in the amount of about NIS 14 million (including the results of the hedge of linkage to the CPI), in light of early repayment of the
full balance of Rotem's outstanding credit in October 2021. Furthermore, in 2020 the Company recognized a non-recurring expense, in
the amount of about NIS 41 million, due to a commission relating to early repayment of the debentures (Series A).
Financing expenses, net, in the U.S. (80) The result stems from acquisition of the CPV Group. The financing expenses, net, in the U.S. include financing expenses in respect of
acquisition of the balance of the rights of the tax partner in Keenan, in the amount of about NIS 39 million (for additional details – see
Note 28O to the financial statements), interest expenses of about NIS 26 million (including the results of the hedge in respect of an
interest SWAP contract), and expenses stemming from the impacts of the changes in the dollar/shekel exchange rate, in the amount of
about NIS 26 million. On the other hand, there was financing income stemming from amortization of excess cost, in the amount of about
NIS 11 million, as a result of early repayment of the balance of the credit in Keenan.
Loss before taxes on income (381) (29)
Taxes on income (tax benefit) in Israel (33) 13 The decrease derives from the lower income in 2021 compared with 2020.
Tax benefit in the U.S. (44) The result stems from the activities of the CPV Group .
Loss for the year (304) (42)
34

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Results of operations for the year and three months ended December 31, 2021 (in millions of NIS) (Cont.)

For the Year Ended
Category 12/31/2021 12/31/2020 Analysis
Elimination of the fair value of derivative
financial instruments
145 Derivative financial instruments that are used for hedging plans of the CPV Group as described in Section 4A of this Report.
Loss from settlement of financial liabilities, 272 41 For additional details – see Notes 16D(1), 16D(4) and 28O to the financial statements.
net
Elimination of transaction expenses in
respect of acquisition of the CPV Group
2 42 For additional details – see Note 25D to the financial statements.
Elimination of tax impact in respect of the
adjustments
(89) (11)
Adjusted net income38 26 30
Income (loss) attributable to:
The owners of the Company (220) (57)
Non-controlling interests (84) 15
Adjusted net income (loss) attributable to:
The owners of the Company 20 6
Non-controlling interests 6 24

38 It is emphasized that "adjusted income or loss" as stated in this report is not a recognized data item that is recognized under IFRS or under any other set of generally accepted accounting principles as an index for measuring financial performance and should not be considered as a substitute for income or loss or other terms provided in accordance with IFRS. "Adjusted income or loss" should not be viewed as a substitute for net income or loss attributable to the Company's shareholders prepared (calculated) pursuant to IFRS. It is possible that the Company's definitions of "adjusted income or loss" are different than those used by other companies. Nonetheless, the Company believes that the "adjusted income or loss" provides information that is useful to management and investors by means of eliminating certain line items (categories) that do not constitute an indication of the Company's ongoing activities.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

For the
Three Months Ended
Category 12/31/2021 12/31/2020 Analysis
Revenues from sales in Israel 387 347 For an explanation regarding the change in the sales in Israel – see Section 5, below.
Revenues from sales and provision of
services in the U.S.
40 In the fourth quarter of 2021, the revenues from sale of electricity from the Keenan wind farm amount to about NIS 23 million, and the
revenues from provision of management services amount to about NIS 17 million.
Cost of sales (less depreciation and
amortization) in Israel
285 266 For an explanation regarding the change in the cost of sales – see Section 5, below.
Cost of sales and provision of services
(less depreciation and amortization) in the
U.S.
24 In the fourth quarter of 2021, the total cost of the sales and provision of services in the U.S. includes expenses in respect of a profit
participation plan, in the amount of about NIS 16 million (non-cash) and the cost of sales in the U.S. amounts to about NIS 10 million
and the cost of provision of services in the U.S. amounts to about NIS 15 million.
Depreciation and amortization in Israel 31 34
Depreciation and amortization in the U.S. 10 In the fourth quarter of 2021, the depreciation is in respect of the Keenan wind farm.
Gross profit 77 47
36

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

For the
Three Months Ended
Category 12/31/2021 12/31/2020 Analysis
Administrative and general expenses in
Israel and headquarters expenses
19 14 Most of the increase stems from an increase in salary expenses and headquarters expenses, in the amount of about NIS 3 million (which
includes about NIS 2 million of non-cash equity remuneration), in light of, among other things, expansion of the Company's activities.
Administrative and general expenses in the
U.S.
38 In the fourth quarter of 2021, administrative and general expenses in the U.S. include expenses in respect of a profit participation plan,
in the amount of about NIS 16 million (non-cash) and salary expenses, in the amount of about NIS 14 million, and expenses for
professional services and office maintenance, in the amount of about NIS 6 million.
Share in losses of associated companies in
Israel
(1)
Share in income of associated companies in
the United States
(57) In the fourth quarter of 2021, the expense includes a loss of about NIS 97 million (before taxes) in respect of changes in the fair value of
derivative financial instruments in hedge plans of the CPV Group. Eliminating the impact of changes in the fair value of derivative
financial instruments, the income in respect of associated companies in the United States is about NIS 40 million (for additional details
regarding the results of associated companies – see Section 6 below and Note 26 to the financial statements).
Transaction expenses relating to
acquisition of the CPV Group
38 In the fourth quarter of 2020, expenses in connection with acquisition of the CPV Group were included (as described in Note 25D to the
financial statements).
Business development expenses in Israel 1
Business development expenses in the U.S. 1
Other income, net, in Israel 1
Operating loss (38) (6)
37

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

For the
Three Months Ended
Category 12/31/2021 12/31/2020 Analysis
Financing expenses, net, in Israel (29) (89) Most of the decrease in the financing expenses stems from changes in the dollar/shekel exchange rate, in the amount of about NIS 9
million, and a decrease in interest expenses and linkage differences on Rotem's senior debt, in the amount of about NIS 17 million
(including the results of the hedge in respect of linkage to the CPI), in light of early repayment of the full balance of Rotem's outstanding
credit in October 2021. In addition, in the fourth quarter of 2020, the Company recognized a non-recurring expense, in the amount of about
NIS 41 million, due to a commission relating to early repayment of the debentures (Series A).
This decrease was partly offset by an increase in the interest expenses and linkage differences relating to debentures, in the amount of
about NIS 7 million.
Financing expenses, net, in U.S. (26) The financing expenses, net, in the U.S. include interest expenses, in the amount of about NIS 5 million (including the results of the hedge
in respect of an interest SWAP transaction), and expenses deriving from the impact of the changes in the dollar/shekel exchange rate, in
the amount of about NIS 19 million.
Loss before taxes on income (93) (95)
Taxes on income (tax benefit) in Israel 8 (13) The increase in taxes on income stems from better results in Israel in the fourth quarter of 2021 compared with the corresponding quarter
last year.
Tax benefit in the U.S. (13) The result stems from activities of the CPV Group.
Net loss for the period (88) (82)
38

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

3. Results of operations for the year and three months ended December 31, 2021 (in millions of NIS) (Cont.)

For the
Three Months Ended
Category 12/31/2021 12/31/2020 Analysis
Elimination of the fair value of derivative
financial instruments
97 Derivative financial instruments that are used for hedging plans of the CPV Group as described in Section 4A of this Report.
Loss (income) from settlement of financial
liabilities, net
(1) 41
Elimination of transaction expenses in
respect of acquisition of the CPV Group
38 For additional details – see Note 25D to the financial statements.
Elimination of tax impact in respect of the
adjustments
(18) (10)
Adjusted net loss for the period39 (10) (13)
Loss for the period attributable to:
The owners of the Company (51) (77)
Non-controlling interests (37) (5)
Adjusted net income (loss) for the period
attributable to:
The owners of the Company (2) (16)
Non-controlling interests (8) 3

39 It is emphasized that "adjusted income or loss" as stated in this report is not a recognized data item that is recognized under IFRS or under any other set of generally accepted accounting principles as an index for measuring financial performance and should not be considered as a substitute for income or loss or other terms provided in accordance with IFRS. "Adjusted income or loss" should not be viewed as a substitute for net income or loss attributable to the Company's shareholders prepared (calculated) pursuant to IFRS. It is possible that the Company's definitions of "adjusted income or loss" are different than those used by other companies. Nonetheless, the Company believes that the "adjusted income or loss" provides information that is useful to management and investors by means of eliminating certain line items (categories) that do not constitute an indication of the Company's ongoing activities.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

4. EBITDA

The Company defines "EBITDA" as earnings (losses) before depreciation and amortization, changes in the fair value of derivative financial instruments, net financing expenses or income and taxes on income. EBITDA is not recognized under IFRS or under any other generally accepted accounting standards as an indicator for the measurement of financial performance and should not be considered a substitute for profit or loss, cash flows from operating activities or other terms of operational performance or liquidity prescribed under IFRS.

EBITDA is not intended to represent monies that are available for distribution of dividends or other uses, since such monies may be used for servicing debt, capital expenditures, working capital and other liabilities. EBITDA is characterized by limitations that impair its use as an indicator of the Company's profitability, since it does not take into account certain costs and expenses deriving from the Company's business, which could materially affect its net income, such as financing expenses, taxes on income and depreciation.

The Company believes that the EBITDA (including EBITDA after making adjustments as detailed below) data provides transparent information that is useful to investors in examining the Company's operating performances and in comparing them against the operating performance of other companies in the same sector or in other sectors with different capital structures, debt levels and/or income tax rates. This data item is also used by Company management when examining the Company's performance. The Company believes that these indices, which are not in accordance with IFRS, provide useful information to investors since they improve the comparability of the financial results between periods and provide greater transparency of the main indices used for evaluating the Company's performance.

Set forth below is a calculation of the EBITDA data item for the periods presented. Other companies may calculate the EBITDA differently. Therefore, the EBITDA presentation herein may differ from those of other companies. In addition, other companies might use other indices for purposes of evaluation their performance, and thereby reducing the comparability of the Company's indices that are not in accordance with IFRS.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

4. EBITDA (Cont.)

Calculation of the EBITDA (in millions of NIS):

For the
Year Ended
December 31
For the
Three Months Ended
December 31
2021 2020 2021 2020
Revenues from sales and provision of services 1,575 1,325 427 347
Cost of sales and provision of services (less
depreciation and amortization) (1,086) (968) (309) (266)
Administrative and general expenses (less depreciation
and amortization) (191) (49) (54) (13)
Transaction expenses relating to acquisition of the
CPV Group (2) (42) (38)
Business development expenses (5) (7) (1) (1)
Other income 1 1
Consolidated EBITDA* 291 260 64 29
Group's share in the proportionate EBITDA of
associated companies** 340 103
EBITDA (total consolidated and the
proportionate amount of associated companies) 631 260 167 29
Elimination of non-recurring expenses, net 3 42 38
EBITDA (total consolidated and the
proportionate amount of associated companies)
after elimination of non-recurring expenses 634 302 167 67

* Presented on the basis of 100% of the companies the financial results of which are consolidated in the Company's financial statements and commencing from the completion date of the acquisition of the CPV Group on January 25, 2021 (as stated in Section 1 above the Company does not hold full ownership of Rotem and the CPV Group).

** Represents mainly the EBITDA of the associated companies in the CPV Group, which are presented based on the rate of the holdings of the CPV Group commencing from the completion date of the acquisition on January 25, 2021. For detail of the results of the associated companies in the CPV Group – see Section 6 below.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

4. EBITDA (Cont.)

Set forth below is the EBITDA data after elimination of non-recurring expenses broken down by the subsidiaries (on a consolidated basis) and the associated companies (on a proportionate basis) (in NIS millions):

Basis of
presentation
in the For the
Company's Year Ended Three Months Ended
December 31
financial December 31
statements 2021 2020 2021 2020
Rotem40 Consolidated 310 308 78 69
Hadera Consolidated 55 15 15 3
Headquarter and others in Israel Consolidated and associate (34) (21) (10) (5)
Total in Israel including
headquarters 331 302 83 67
Keenan Consolidated 53 15
Fairview Associate 73 28
Towantic Associate 92 22
Maryland Associate 41 16
Shore Associate 69 18
Valley Associate 70 21
Headquarter and others in the
United States41 Consolidated and associates (95) (36)
Total in the United States 303 84
Total EBITDA (consolidated
and proportionate amount of
the associated companies 634 302 167 67

40 The EBITDA of Rotem includes the amount of about NIS 2 million in respect of the virtual supply activities that are attributable to Rotem. 41 After elimination of management fees between the CPV Group and the Company, in the amounts of about NIS 16 million and about NIS 5 million, respectively, in the year and three-month period ended December 31, 2021.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

5. Additional data regarding activities in Israel

Energy balance sheet

Set forth below is detail of sales, generation of purchases of energy in (in millions of KW/hours):

For the Year Ended
December 31
Section 2021 2020
Sales to private customers 4,445 4,033
Sales to the System Operator and suppliers 535 311
Total sales 4,980 4,344
For the Year Ended
December 31
Section 2021 2020
Generation of electricity 4,492 3,925
Purchases of electricity from the System Operator and others 488 419
Total sales 4,980 4,344
43

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

5. Additional data regarding activities in Israel (Cont.)

Set forth below is detail of the Company's revenues from sales in Israel (in NIS millions):

For the
Year Ended
December 31
Three Months Ended
December 31
2021 2020 2021 2020
Revenues from sale of energy to private customers 42 (1) 966 943 261 244
Revenues from private customers in respect of
infrastructure services (2) 298 274 80 70
Revenues from sale of energy to the System Operator
and to other suppliers (3) 91 52 31 20
Revenues from sale of steam 57 56 15 13
Total revenues 1,412 1,325 387 347

In Israel, the Company's net revenues from the sale of electricity to its private customers stem mainly from electricity sold at the generation component tariffs, as published by the Electricity Authority, with a certain discount from the tariff. The weighted-average generation component tariff for 2021, as published by the Electricity Authority, is NIS 0.2526 per KW hour. This weighted-average is attributed to the mix of consumption in the market, which differs from that of the customers of Rotem and Hadera. In 2020, the weighted-average of the generation component tariff was NIS 0.2678 per KW hour. In addition, the Company's revenues from sale of steam are linked partly to the price of gas and partly to the Consumer Price Index. The reduction in the generation component has had a negative impact on the Company's income in 2021 compared with 2020.

In addition, in September 2021 the Company commenced supplying electricity to customers through purchase of energy from the System Operator that was purchased at a tariff that includes a component of the supplier's tariff and SMP (marginal half-hour price) in the framework of the virtual supply.

For the years ended December 31, 2021 and 2020:

  • (1) An increase of about NIS 47 million stemming from commencement of the virtual supply activities and an increase in the Company's revenues from customers of the Hadera Power Plant, in the amount of about NIS 60 million, mainly due to the commercial operation that started in in July 2020. On the other hand, there was a decrease of about NIS 61 million stemming from a decline in the weighted-average generation component tariff, and a decrease, in the amount of about NIS 22 million, due to conformance of the customer profile of the Rotem Power Plant.
  • (2) An increase in infrastructure revenues, in the amount of about NIS 22 million, stemming from an increase in consumption by customers of Hadera Power Plant in light of the commercial operation that took place in July 2020, an increase of about NIS 14 million due to commencement of the virtual supply activities and an increase of about NIS 2 million due to a tariff update for customers of Rotem Power Plant. On the other hand, there was a decrease, in the amount of about NIS 7 million, stemming from adjustment of the consumption profile of customers of the Rotem Power Plant, and a decrease in infrastructure revenues of about NIS 7 million due to a decline in the infrastructure tariffs in 2021.

42 Including during load reductions.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

5. Additional data regarding activities in Israel (Cont.)

Set forth below is detail of the Company's revenues from sales in Israel (in NIS millions): (Cont.)

For the years ended December 31, 2021 and 2020: (Cont.)

(3) An increase in sale of surplus energy, in the amount of about NIS 34 million, stemming mainly from an increase in sales energy at a cogeneration tariff, this being in light of the commercial operation of the Hadera Power Plant in July 2020, and an increase of about NIS 5 million, due to adjustment of the profile of the customers of the Rotem Power Plant.

For the three-month periods ended December 31, 2021 and 2020:

  • (1) An increase of about NIS 34 million stemming from commencement of the virtual supply activities while, on the other hand, there was a decrease stemming mainly from a decrease in the generation component tariff, in the amount of about NIS 16 million.
  • (2) An increase in infrastructure revenues, in the amount of about NIS 10 million, deriving from commencement of the virtual supply activities, along with an increase of about NIS 2 million due to a tariff update for customers of Rotem Power Plant. On the other hand, there was a decrease, in the amount of about NIS 2 million, due to adjustment of the consumption profile of the customers of the Rotem Power Plant.
  • (3) An increase in sale of surplus energy, in the amount of about NIS 8 million, at the Hadera Power Plant, and an increase of about NIS 3 million due to adjustment of the consumption profile of the customers of Rotem Power Plant.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

5. Additional data regarding activities in Israel (Cont.)

Set forth below is detail of the Company's cost of sales in Israel (less depreciation and amortization) broken down into the following components (in NIS millions):

For the
Year Ended
December 31
Three Months Ended
December 31
2021 2020 2021 2020
Gas and diesel oil (1) 495 465 127 114
Expenses for acquisition of energy (2) 102 125 51 51
Expenses for infrastructure services (3) 298 274 80 70
Gas transmission costs 32 33 8 8
Operating expenses (4) 80 71 19 23
Total cost of sales (less depreciation and
amortization) 1,007 968 285 266

For the years ended December 31, 2021 and 2020:

  • (1) The increase in the gas consumption expenses stems from an increase in the gas consumption, in the amount of about NIS 40 million, mainly due to the commercial operation of the Hadera Power Plant in July 2020, and an increase in the availability (capacity) of the Hadera Power Plant in the second half of 2021, compared with the second half of 2020. In addition, there was an increase in the gas consumption expenses by the Rotem Power Plant, in the amount of about NIS 36 million, deriving from an increase in the plant's availability (capacity), and a decrease in the plant's load reductions. On the other hand, there was a decrease, in the amount of about NIS 30 million, in the gas price as a result a decline in the dollar/shekel exchange rate. In addition, in 2021 the amount of about NIS 16 million was received due to compensation in respect of delay of the commercial operation of the Karish reservoir, which was presented as a decrease of the cost of sales expenses (for additional details – see Note 28G to the financial statements).
  • (2) The decrease in expenses in respect of acquisition of energy, in the amount of about NIS 57 million, stemming from a decline in the load reductions and an increase in Rotem Power Plant's availability (capacity), along with a decline in expenses in respect of acquisition of energy, in the amount of about NIS 22 million, stemming from adjustment of the consumption profile of customers of Rotem Power Plant, and decline of about NIS 3 million due to a decrease of the price of the energy purchased in light of a drop in the generation component tariff. On the other hand, there was an increase in purchases of energy, in the amount of about NIS 12 million, for Hadera customers mainly due to the commercial operation of the Hadera Power Plant in July 2020, and an increase in acquisitions for virtual supply activities, in the amount of about NIS 45 million.
  • (3) An increase in expenses in respect of purchases for private customers, in the amount of about NIS 22 million, as a result of the commercial operation of the Hadera Power Plant in July 2020, an increase, in the amount of about NIS 2 million, due to a tariff update for customers of Rotem Power Plant, and an increase of about NIS 14 million stemming from commencement of the virtual supply activities. On the other hand, there was a decrease, in the amount of about NIS 7 million, due to an adjustment of the customer consumption profile of customers of the Rotem Power Plant, and a decrease in the infrastructure expenses, in the amount of about NIS 7 million, due to a decrease in the infrastructure tariffs.

(4) Most of the increase stems from current operating costs due to the commercial operation of the Hadera Power Plant in July 2020.

Report of the Board of Directors

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

5. Additional data regarding activities in Israel (Cont.)

Set forth below is detail of the Company's cost of sales in Israel (less depreciation and amortization) broken down into the following components (in NIS millions): (Cont.)

For the three-month periods ended December 31, 2021 and 2020:

  • (1) The increase gas consumption expenses at the Rotem Power Plant, in the amount of about NIS 16 million, derives from an increase in the plant's availability (capacity), and an increase, in the amount of about NIS 6 million, resulting from an increase in the availability (capacity) of the Hadera Power Plant. On the other hand, there was a decrease in the gas consumption expenses due to a fall in the dollar/shekel exchange rate, in the amount of about NIS 9 million.
  • (2) The decrease in the expenses in respect of purchase of energy, in the amount of about NIS 30 million and about NIS 2 million, for customers of Rotem and Hadera power plants, respectively, due to an increase in the availability (capacity) of the plants compared with the corresponding period last year. On the other hand, there was an increase of about NIS 32 million due to commencement of the virtual supply activities.
  • (3) There was an increase, in the amount of about NIS 10 million, stemming from commencement of the virtual supply activities, and an increase in the amount of about NIS 2 million, due to a tariff update for customers of Rotem Power Plant. On the other hand, there was a decrease of about NIS 2 million relating infrastructure expenses of Rotem Power Plant due to a decline in the infrastructure tariffs for 2021.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

6. Additional data regarding activities in the United States

Energy prices

In the fourth quarter of 2021 and the entire 2021 year, the electricity prices increased in the markets in which the CPV Group, compared with the corresponding periods last year. Most of the increase stems from an increase in the prices of natural gas along with an increase in the demand for electricity.

The following table summarizes the average electricity prices in each of the main markets in which projects of the CPV Group are active, for the periods of the year and the three months ended December 31, 2021 and 2020 (the prices are denominated in dollars per megawatt hour):

For the year ended
December 31
(MW/h)
For the three months ended
December 31
(MW/h)
2021 2020 2021 2020
\$ 38.92 \$ 23.05
\$ 38.35 \$ 22.52
\$ 40.74 \$ 24.29
\$ 45.92 \$ 30.06
20.95 \$
20.95 \$
20.32 \$
23.31 \$
54.39 \$
51.88 \$
51.33 \$
59.88 \$

Note: The average electricity prices are based on Day-Ahead prices as published by the relevant ISO.

Gas prices

The following table summarizes the average gas prices in each of the main markets in which the projects of the CPV Group are active in the year and three-month period ended December 31, 2021 and 2020. As stated, the gas prices rose in the year ended December 31, 2021 compared with the year ended December 31, 2020 due to, among other things, increased demand for electricity in the United States, an increase in the global demand for natural gas, an increase in demand for liquid natural gas from the United States, stagnation in production of natural gas and low inventory levels of natural gas compared with prior years (the prices are denominated in dollars per MMBtu)*:

For the year ended
December 31
For the three months ended
December 31
Region 2021 2020 2021 2020
TETCO M3 (Shore, Valley) 3.40 1.59 4.23 1.72
Transco Zone 5 North (Maryland) 3.91 2.04 4.95 2.55
TETCO M2 (Fairview) 3.08 1.34 3.96 1.36
Dominion South (Valley) 3.06 1.38 3.98 1.40
Algonquin (Towantic) 4.51 2.00 6.23 2.74

Source: The average gas prices are based on Day-Ahead prices at gas Midpoints as reported in Platt's Gas Daily.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

6. Additional data regarding activities in the United States (Cont.)

PJM market

In the PJM market, the capacity payments vary between the market's sub-regions, as a function of local supply and demand and transmission capabilities. The next tender relating to the June 2023 through May 2024 generation year is expected to take place in the second quarter of 2022.

Set forth below are the capacity tariffs in the sub-regions that are relevant to CPV's projects and in the general market (the prices are denominated in dollars per megawatt per day):

Sub-Region CPV Plants43 442022/2023 2021/2022 2020/2021
PJM – RTO
("General Market")
50 140 76.53
PJM MAAC Fairview, Maryland, Maple Hill 95.79 140 86.04
PJM EMAAC Shore 97.86 165.73 187.77

Source: PJM

43 The Three Rivers project, which is presently under construction, did not participate in the capacity tender, and is expected to participate in the capacity tender starting from the 2023–2024 capacity year. 44 As determined in capacity tenders in June 2021, as stated in the Report of the Company's Board of Directors dated June 30, 2021 (Reference No.: 2021-01-070297).

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

6. Additional data regarding activities in the United States (Cont.)

NYISO market

Similar to the PJM market, in the NYISO market availability (capacity) payments are made in the framework of a central mechanism for acquisition of capacity. In the NYISO market, there are a number of submarkets, wherein there could be various capacity demands as a function of local supply and demand and transmission capability. NYISO makes seasonal tenders in every spring for the upcoming summer (May through October) and in the fall for the upcoming winter (November through April). In addition, there are supplemental monthly tenders for the balance of the capacity not sold in the seasonal tenders. Power plants are permitted to assure the capacity payments in the seasonal tender, the monthly tender or through bilateral sales. The Valley power plant is in Area G (Lower Hudson Valley).

Set forth below are the capacity prices determined in the seasonal tenders in NYISO market. It is noted that the actual capacity prices for Valley are impacted by the seasonal tenders, the monthly tenders and the SPOT prices, with variable capacity prices every month, as well as bilateral agreements with energy suppliers in the market (the prices are denominated in dollars per kilowatt per month):

Sub-Area CPV
Plants
Winter
2021/2022
Summer
2021
Winter
2020/2021
Summer Winter 2020
NYISO
Rest of the Market
- 1.00 4.09 0.10 2.71
Lower Hudson Valley Valley 1.01 4.56 0.23 3.07

Source: NYISO

ISO-NE market

The ISO-NE permits availability (capacity) payments as part of a central mechanism for acquisition of capacity. In the ISO-NE market, there are a number of submarkets, wherein there could be various capacity demands as a function of local supply and demand and transmission capability. Forward capacity tenders are made three years in advance for the capacity year. In addition, there are supplemental monthly tenders for the balance of the capacity not sold in the Forward tenders.

Towantic participated for the first time in an availability (capacity) tender for 2018–2019 at a price of \$9.55 KW/month and determination of the tariff for seven years in respect of 725 megawatts linked to the Utilities Inputs Index, which will apply up to May 2025. In March 2022, Towantic participated in the annual availability (capacity) tender for 2025–2026 and won a guaranteed availability (capacity) price of \$2.59 KW/month and for 745 megawatts.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

6. Additional data regarding activities in the United States (Cont.)

EBITDA results

Set forth below is EBITDA data of the active power plants. For explanations of the results – see Section 3 above.

The following EBITDA data is based on the results in accordance with IFRS and is presented in millions NIS:

EBITDA
for the
year ended
December 31,
2021
Rate of
holdings
of the
CPV Group
Proportionate
EBITDA for
year ended
December 31,
2021
Proportionate
EBITDA for
the period from
January 25, 2021
and up to
December 31, 2021
Fairview 316 25% 79 73
Towantic 385 26% 100 92
Maryland 174 25% 43 41
Shore 199 37.53% 74 69
Valley 149 50% 74 70
Keenan 57 100% 57 53
Total active plants
in the U.S.
1,280 427 398
EBITDA
for the
three-month
period ended
December 31,
2021
Rate of
holdings
of the
CPV Group
Proportionate
EBITDA for
the three-month
period ended
December 31, 2021
Fairview 112 25% 28
Towantic 86 26% 22
Maryland 64 25% 16
Shore 48 37.53% 18
Valley 45 50% 21
Keenan 15 100% 15
Total active plants
in the U.S. 370 120

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

6. Additional data regarding activities in the United States (Cont.)

Comments regarding the results in the United States

For the years ended December 31, 2021 and 2020:

    1. In 2021, there was an increase in the demand for electricity in the markets in which the CPV Group is active in the northeast area of the U.S. compared with 2020. The gas prices and the electricity prices rose significantly in 2021 compared with 2020. In the estimation of the CPV Group, these changes were caused, among other things, as a result of a return to "business as usual" compared with 2020, the year of the outbreak of the Coronavirus.
    1. The Maryland, Fairview and Valley power plants enjoyed an increase in the electricity and gas prices and showed an improvement in the results of the power plants and the energy margins.
    1. The Maryland and Fairview power plants enjoyed high availability (capacity) prices in 2021 compared with 2020, mainly due to the increase in the period June December 2021, compared with the availability (capacity) prices in the corresponding period last year.
    1. The results of the Shore power plant were less favorable than the results in 2020 due to expiration of the agreement of the Heat Rate Call Option type in April 2021. This agreement was signed as part of the project's financial closing and included payment of a fixed premium. As at the publication date of the report, a similar agreement is not expected to be signed.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

6. Additional data regarding activities in the United States (Cont.)

Comments regarding the results in the United States (Cont.)

For the three-month periods ended December 31, 2021 and 2020:

    1. The fourth quarter of the year, which is mainly a transition season, in October and November, is generally characterized by average demand and prices. December is characterized as a winter month with an increase in demand for natural gas and an increase in the natural gas prices in the northeast area of the U.S.
    1. In the fourth quarter of 2021, the natural gas prices in the and globally increased due to the energy crisis in Europe. The natural gas prices in in the markets in which the CPV Group is active, which is the northeast area of the U.S., increased even more compared with the general market in the U.S., mainly in New York and in the New England region.
    1. The impact of the increase in the energy prices in the period of the report, as noted in Section 6 above (Main Developments in the Business Environment and in the Company's Activities in the United States), was offset cumulatively by CPV's hedge plans. These hedging agreements, the purpose of which was to fix the electricity margin (in certain scopes that were determined at every date / for every project), are generally for short time periods – this being as part of implementation of the specific risk management policies for each of the projects, based on the specific characteristics of each project.
    1. An increase in the natural gas and electricity prices led to an improvement in the results of the Fairview, Maryland and Valley power plants.
    1. The results of the Shore power plant weakened compared with the fourth quarter of 2020 due to expiration of the Heat Rate Call Option hedge agreement in April 2021. This agreement was signed as part of the project's financial closing and included payment of a fixed premium. As at the publication date of this report, a similar agreement is not expected to be signed.
    1. As stated in Section 6, above (Main Developments in the Business Environment and in the Company's Activities in the United States), on June 1, 2021 the capacity tariffs for the 2021–2022 capacity year in the PJM market, which had a favorable impact on the results of the Fairview and Maryland power plants, and the ISO-NE market, with no impact on the Towantic power plant.
    1. The functional currency of the CPV group is the dollar and, therefore, its results are impacted by changes in the dollar/shekel exchange rate. The change in the exchange rate of the shekel against the dollar in the year and the three months ended December 31, 2021 compared with the corresponding periods last year was 3.3% and 3.7%, respectively.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

6. Additional data regarding activities in the United States (Cont.)

Comments regarding the results in the United States (Cont.)

Set forth below is a comparison of the EBITDA45 data, in U.S. GAAP terms, for the year and three-month periods ended December 31, 2021 and 2020, of the active power plants of the CPV Group, in accordance with the rates of holdings of the CPV Group. In 2020, the CPV Group prepared its financial statements in accordance with U.S. GAAP. The data is presented in millions of NIS.

For the
Year Ended
December 31
Three Months Ended
December 31
2021 2020 2021 2020
Fairview 72 61 26 17
Towantic 93 94 20 23
Maryland 38 29 15 8
Shore 57 75 11 19
Valley 67 64 20 5
Keenan* 52 7 15 2
Total active plants in the U.S. 379 330 107 74

* The CPV Group consolidates Keenan commencing from the fourth quarter of 2020 wherein the reversal date with the tax partner took place. Prior to the said reversal date, the rate of holdings in Keenan was 10%, whereas starting from the reversal date the rate of holdings in Keenan was 70%. Starting from the second quarter of 2021 the rate of holdings rose to 100% – this being in light of acquisition of 30% of the rights in Keenan from the tax partner (for additional details – see Note 28O to the financial statements).

45 It is emphasized that this data item is not recognized in accordance with IFRS and should not be considered as a substitute for income or loss of other terms provided in accordance with IFRS. This data item is provided for purposes of comparability with the period prior to acquisition of the CPV Group by the Company.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

7. Liquidity and sources of financing (in NIS millions)

For the Year Ended
December 31
Category 2021 2020 Analysis
Cash flows provided by operating activities 385 362 The increase stems from an increase in the current ongoing activities, in the amount of about NIS 24 million and income from dividends
from associated companies, in the amount of about NIS 32 million, due to the activities of the CPV Group. On the other hand, there was
a decrease in the working capital, in the amount of about NIS 33 million.
Cash flows used in investing activities (872) (2,183) Most of the decrease in the cash flows used in investing activities stems from release of short-term deposits, net, in the amount of
about NIS 1,607 million, while on the other hand in 2020 short-term term deposits were made in the amount of about NIS 1,607 million. In
addition, the increase derives from release of restricted cash, net, in the amount of about NIS 403 million, a decrease in investments
projects in Israel, in the amount of about NIS 39 million, a receipt, in the amount of about NIS 154 million, in respect of repayment of
partnership capital mainly due to sale of part of the holdings of the CPV Group in the Three Rivers project (for details – see Note 26A
to the financial statements).
This decrease was partly offset by the increase deriving from acquisition of the CPV Group and Gnrgy, in the amounts of about
NIS 2,140 million and about NIS 38 million, respectively, from investments in projects under construction in the CPV Group, in the
amount of about NIS 291 million, and an increase, in the amount of about NIS 20 million, relating to investments in associated
companies.
55

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

7. Liquidity and sources of financing (in NIS millions) (Cont.)

For the Year Ended
December 31
Category 2021 2020 Analysis
Cash flows provided by financing activities 997 1,638 Most of the decrease in cash flows provided by financing activities, in the amount of about NIS 1,292 million, stems from the early
repayment of the full outstanding balance of Rotem's credit in October 2021 (for additional details – see Note 16D(1) to the financial
statements), payment of loans in the CPV Group, in the amount of about NIS 594 million, where out of this amount, the amount of about
NIS 244 million is in respect of repayment of a loan under the prior financing agreement in the Keenan project (for additional details –
see Note 16D(5) to the financial statements), in respect of an early close-out of an interest hedge transaction relating to this financing
agreement, and the amount of about NIS 175 million relating to repayment of the seller's loan (for additional details – see Note 25D to
the financial statements). In addition, in 2021 the Company acquired the rights of the tax partner in the Keenan project for a
consideration of about NIS 82 million (for additional details – see Note 28O to the financial statements), and there was a decline in
issuance of debentures, net, in the amount of about NIS 132 million and issuance of shares, net, in the amount of about NIS 403 million.
This decrease was partly offset by an increase of investments of holders of non-controlling interests in the CPV Group, in the amount
of about NIS 824 million, loans from holders of non-controlling interests in Rotem, in the amount of about NIS 226 million, an increase
in withdrawals from frameworks under financing agreements in Israel, in the amount of about NIS 98 million, and receipt of a long-term
loan under the new financing agreement in the Keenan project, in the amount of about NIS 333 million, in 2021. In addition, in 2020 full
early repayment was made of the debentures (Series A), in the net amount of about NIS 324 million (including an early repayment fee),
and execution of a payment in respect of acquisition of non-controlling interests in Zomet, in the net amount of about NIS 26 million.
56

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

7. Liquidity and sources of financing (in NIS millions) (Cont.)

For the Three Months Ended
December 31
Category 2021 2020 Analysis
Cash flows provided by operating
activities
122 56 Most of the increase stems from an increase in the working capital, in the amount of about NIS 35 million, an increase in current
activities, in the amount of about NIS 29 million, and in dividends from associated companies, in the amount of about NIS 2 million, as a
result of the activities of the CPV Group.
Cash flows used in investing activities (148) (1,750) Most of the decrease in the cash flows used in investing activities derives from the fact that in the fourth quarter of 2020 short-term
deposits were made, in the amount of about NIS 1,607 million. In addition, the decrease stems from an increase deriving from a release
of restricted cash, net, in the amount of about NIS 174 million.
This decrease was partly offset by an increase in investments in projects under construction in the CPV Group, in the amount of about
NIS 77 million, and an increase in investments in the Zomet project, in the amount of about NIS 75 million.
Cash flows provided by (used in) financing
activities
(770) 1,309 Most of the increase in the cash used in financing activities, stems from the early repayment of the full amount of Rotem's outstanding
credit, in the amount of about NIS 1,292 million, in October 2021 (for additional details – see Note 16D(1) to the financial statements),
and repayment of loans in the CPV Group, in the amount of about NIS 175 million, in respect of repayment of the seller's loan (for
additional details – see Note 25D to the financial statements). In addition, there was a decrease in issuance of debentures, net, in the
amount of about NIS 578 million, and the issuance of shares, net, in the amount of about NIS 768 million.
This decrease was partly offset by an increase of investments of holders of non-controlling interests in the CPV Group, in the amount
of about NIS 97 million, loans from holders of non-controlling interests in Rotem, in the amount of about NIS 226 million, a decrease in
current repayments of loans, in the amount of about NIS 38 million, and an increase in withdrawals from frameworks under financing
agreements in Israel, in the amount of about NIS 37 million. In addition, in the fourth quarter of 2020 full early repayment was made of
the debentures (Series A), in the net amount of about NIS 324 million (including an early repayment fee).

For additional details – see the Company's consolidated statements of cash flows in the financial statements.

As at December 31, 2021, there are no warning signs in accordance with Regulation 10(B)(14) of the Reporting Regulations that require publication of a "forecasted cash flow" statement by the Company.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

7. Liquidity and sources of financing (in NIS millions) (Cont.)

The following table details the debt, cash and cash equivalents, deposits, debt service reserves and restricted cash, as at December 31, 2021 (in millions of NIS) of the Company and its subsidiaries:

Debt (including
interest payable)
Cash and cash
equivalents
Restricted cash –
debt service
reserves
Other
restricted
cash
1,828 268 15
227 53
681 24 45 5
528 74
5 26 3
1 106
305 3
45
203 158
3,778 757 45 23

Main changes in the year of the report:

(1) The Company:

  • A. Investments in subsidiaries and associated companies the Company invested about NIS 1,922 million in acquisition of the CPV Group and in its projects (of which about NIS 225 in the fourth quarter), about NIS 64 million in acquisition of Gnrgy, about NIS 8 million Hadera, about NIS 41 million in Sorek, and about NIS 39 million in various other generation facilities.
  • B. The Company issued shares for an aggregate net consideration of about NIS 674 million.
  • C. The Company repaid the amount of about NIS 19 million of the principal of the debentures (Series B).
  • D. The Company issued debentures (Series C) with a par value of about NIS 851 million, where the issuance expenses amounted to about NIS 9 million. For additional details regarding the early repayment see Note 17 to the financial statements.

(2) Rotem:

  • A. During 2021, Rotem repaid the entire outstanding balance of the project financing it was provided, by means of both current repayments and an early repayment (including an early repayment fee). In addition, balances of restricted cash were released in Rotem, which as at the date of the report amounted to about NIS 125 million. For additional details regarding the early repayment – see Note 16D(1) to the financial statements.
  • B. The balance of the debt represents a loan granted to Rotem from non-controlling interests. For additional details see Note 16D(1) to the financial statements.

(3) Hadera repaid the amount of about NIS 30 million of the principal of its loans.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

7. Liquidity and sources of financing (in NIS millions) (Cont.)

Main changes in the year of the report: (Cont.)

  • (4) Zomet withdrew about NIS 349 million from the long-term loans framework in accordance with its financing agreement.
  • (5) The balance of the cash in the "Others in Israel" category includes the balance of the cash in OPC Israel, in the amount of about NIS 82 million. In the period of the report, OPC Israel invested the amount of about NIS 85 million in the Zomet project.
  • (6) The amount represents the balance of the debt of Keenan in accordance with the financing agreement it signed in the period of the report, where in December 2021 Keenan repaid the repaid the amount of about NIS 14 million (about \$4 million) out of the loan principal under the said financing agreement. It is noted that during 2021, Keenan repaid, including by means of early repayment, the full amount of the outstanding debt under its prior financing agreement, in the amount of about NIS 223 million (about \$69 million). For additional details regarding Keenan's financing agreement and the prior financing agreement – see Note 16D(5) to the financial statements.
  • (7) Others in the United States:
    • A. The amount of about NIS 202 million in respect of a shareholders' loan from financial investors (non-controlling interests) to the CPV Group, which was provided by means of a loan that is not repaid on a current basis. For details regarding loans from the non-controlling interests in the CPV Group – see Note 16D(6) to the financial statements.
    • B. In October 2021, the seller's loan was repaid, in the amount of about NIS 175 million, which was received in January 2021, as part of acquisition of the CPV Group. For additional details see Note 25D to the financial statements.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

7. Liquidity and sources of financing (in NIS millions) (Cont.)

The following data presents the share of the CPV Group in the debt, cash and cash equivalents, deposits and debt-service reserves and other restricted cash of the associated companies as at December 31, 2021 (presented in millions of New Israeli Shekels):

Project Rate of holdings
of the
CPV Group
Debt (including
interest payable)
Cash and
cash equivalents
and deposits*
Other
restricted
cash
Fairview 25% 515 3 53
Towantic 26% 483 1 62
Maryland 25% 288 34
Shore 37.53% 588 3 127
Valley 50% 898 119
Three Rivers 10% 220 70
Total 2,992 7 465

(*) Including balances of restricted cash that serve for financing the current ongoing activities of the associated companies.

The following table details the debt, cash and cash equivalents, deposits and debt service reserves, as at December 31, 2020 of the Company and its subsidiaries (in millions of NIS):

Debt (including
interest payable)
Cash and cash
equivalents and
short-term
deposits
Restricted cash –
debt service
reserves*
Other
restricted
cash
The Company 980 1,644 25 232
Rotem 1,097 122 78 48
Hadera 698 2 44 11
Zomet 184 35
Others 1 4
Total 2,960 1,807 147 291

* Including funds serving for guarantee of the debt.

As at the date of the report, the Company and its investee companies were in compliance with all the financial covenants provided in their financing agreements and trust certificates. For details regarding the financial covenants relating to the significant loans of the Company and its investee companies – see Sections 7.18.2 and 10.4 to Part A (Description of the Company's Business) and Note 16 to the financial statements.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

8. Significant Events in the Year of the Report and Thereafter

For details – see Part A (Description of the Company's Business) and Notes 1, 9, 11, 16, 17, 18, 20, 25, 26 and 28 to the financial statements.

9. Outstanding Liabilities by Maturity Dates

For details regarding the Company's outstanding liabilities – see the Immediate Report regarding outstanding liabilities by maturity dates that is published by the Company concurrent with publication of this report.

10. Debentures (Series B) and Debentures (Series C)

10.1 Set forth below are details regarding the Company's debentures (Series B):

Name of the series Series B
Issuance date April 26, 2020
Total nominal value on the date of issuance (including expansion of the series made in
October 2020)
About NIS 956 million par value
Nominal value on the date of the report About NIS 936 million par value
Nominal value after revaluation based on the linkage terms About NIS 954 million par value
Amount of the interest accrued as included in the financial statements as at December 31,
2021
About NIS 6 million
The fair value as included in the financial statements as at December 31, 2021 About NIS 1,128 million.
Stock market value on December 31, 2021 About NIS 1,128 million.
Type of interest and interest rate Fixed annual interest at the rate of 2.75%.
Principal payment dates 16 unequal semi-annual payments, to be paid on March 31 and September 30 of each of the years from 2021 to 2028
(inclusive).
Interest payment dates The interest on the outstanding balance as it will be from time to time on the principal of the debentures (Series B) is
payable commencing from September 2020 twice a year (except for 2020) on September 30, 2020, and on March 31 and
September 30 of each of the years from 2021 to 2028 (inclusive).
The interest payments are to be made in respect of the period of six months that ended on the last day prior to the
relevant interest payment date, except for the first interest payment that is to be made on September 30, 2020, and is to be
paid for the period that commenced on the first trading day after the tender date of the debentures (Series B) and that
ends on the last day prior to the said payment date, and is to be calculated based on the number of days in the said
period and on the basis of 365 days per year.

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

10. Debentures (Series B) and Debentures (Series C) (Cont.)

10.1 Set forth below are details regarding the Company's debentures (Series B): (Cont.)

Linkage basis and terms The principal of the debentures (Series B) and the interest thereon are linked to the increase in the Consumer Price Index
(CPI) against the CPI for March 2020 that was published on April 15, 2020. The linkage terms will not be changed during
the period of the debentures.
Are they convertible into another security No.
Right of the Company to make early repayment The Company has the right to make early repayment pursuant to the conditions in the trust certificate.
Was a guarantee provided for payment of the Company's liabilities based on the
debentures
No.
Name of trustee Reznik Paz Nevo Trustees Ltd.
Name of the party responsible for the series of liability certificates with the trustee Michal Avatlon and/or Hagar Shaul
Contact information Address: 14 Yad Harutzim St., Tel-Aviv
Telephone: 03–6389200
Fax: 03–6389222
E–mail: [email protected]
Rating of the debentures since the issuance date Rating of ilA– by "Maalot" from February 2020 which was reconfirmed in October 2020 in connection with expansion of
the series. In July and September 2021, the rating was reconfirmed.
See the Company's Immediate Reports dated February 28, 2020 (Reference No.: 2020-01-017383), April 20, 2020 (Reference
No.: 2020-01-035221), October 3, 2020 (Reference No.: 2020-01-107493), October 4, 2020 (Reference No.: 2020-01-107604)
and September 2, 2021 (Reference No.: 2021-01-075907).
Pledged assets None.
There is a future commitment that the Company will not create a general floating lien on its assets and rights, existing and
future, in favor of any third party without the conditions stipulated in the trust certificate being fulfilled.
Is the series material Yes.
62

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

10. Debentures (Series B) and Debentures (Series C) (Cont.)

10.2 Set forth below are details regarding the Company's debentures (Series C):

Name of the series Series C
Issuance date September 9, 2021
Total nominal value on the date of issuance About NIS 851 million par value
Nominal value on the date of the report About NIS 851 million par value
Nominal value after revaluation based on the linkage terms The debentures are not linked.
Amount of the interest accrued as included in the financial statements as at December 31,
2021
About NIS 7 million.
The fair value as included in the financial statements as at December 31, 2021 About NIS 869 million.
Stock market value on December 31, 2021 About NIS 869 million.
Type of interest and interest rate Fixed annual interest at the rate of 2.5%.
Principal payment dates 12 unequal semi-annual payments, to be paid on February 28 and August 31 of each of the years from 2024 to 2030
(inclusive), except for 2028.
Interest payment dates The interest on the outstanding balance as it will be from time to time on the principal of the debentures (Series C) is
payable commencing from February 2022 twice a year on February 28 and on August 31 of each of the years from 2022 to
2030 (inclusive).
The interest payments are to be made in respect of the period of six months that ended on the last day prior to the
relevant interest payment date, and is to be in the amount of the annual interest divided by 2, except for the first interest
payment that is to be made on February 28, 2022 and will be paid for the period that commenced on the first trading day
after the tender date of the debentures (Series C) and that ends on the last day prior to the said payment date, and is to
be calculated based on the number of days in the said period and on the basis of 365 days per year.
63

Explanations of the Board of Directors regarding the State of the Group's Affairs (Cont.)

10. Debentures (Series B) and Debentures (Series C) (Cont.)

10.2 Set forth below are details regarding the Company's debentures (Series C): (Cont.)

Linkage basis and terms The principal of the debentures (Series C) and the interest thereon are not linked to the Consumer Price Index (CPI) or any
currency whatsoever.
Are they convertible into another security No.
Right of the Company to make early repayment The Company has the right to make early repayment pursuant to the conditions in the trust certificate.
Was a guarantee provided for payment of the Company's liabilities based on the
debentures
No.
Name of trustee Reznik Paz Nevo Trustees Ltd.
Name of the party responsible for the series of liability certificates with the trustee Michal Avatlon and/or Hagar Shaul
Contact information Address: 14 Yad Harutzim St., Tel-Aviv
Telephone: 03–6389200
Fax: 03–6389222
E–mail: [email protected]
Rating of the debentures since the issuance date Rating of ilA– by S&P Global Ratings Maalot Ltd. ("Maalot") from August 2021 which was reconfirmed in September
2021.
See the Company's Immediate Reports dated July 19, 2021 (Reference No.: 2021-01-119229) and September 2, 2021
(Reference No.: 2021-01-075907).
Pledged assets None.
There is a future commitment that the Company will not create a general floating lien on its assets and rights, existing and
future, in favor of any third party without the conditions stipulated in the trust certificate being fulfilled.
Is the series material Yes.

The Company is in compliance with all the conditions of the Company's debentures (Series B and Series C) and the trust certificates. The Company was not required to take any action in accordance with the request of the trustees for the said debentures.

Corporate Governance

11. Directors having Accounting and Financial Expertise

As at the date of this report, seven of the members of the Company's Board of Directors have accounting and financial expertise. For details regarding the directors Aviad Kaufman, Antoin Bonaire, Robert Rosen, Jacob Worenklein, Yosef Tene, Michal Marom Brickman and Sarit Sagiv, who were classified as directors with accounting and financial expertise – see Regulation 26 of Chapter D (Additional Details regarding the Company).

The Board of Directors determined that the minimum number of directors having accounting and financial expertise in accordance with Section 92(A)(12) of the Companies Law, 1999, is two – this being taking into account the type of the Company, its size, the scope of its activities and the complexity of its activities.

12. Independent Directors

Except for the external directors Yosef Tena and Michal Merom Brickman, Ms. Sarit Sagiv serves as an independent director of the Company commencing from January 12, 2022. For details regarding the director Ms. Sarit Sagiv – see Regulation 26 of Chapter D (Additional Details regarding the Company).

On February 7, 2022, Mr. Moshe Lahmani concluded his service as an independent director of the Company.

As at the date of the report, the Company's Articles of Association do not include a provision regarding the rate of independent directors.

13. The Internal Auditor

Summary of Details The Company
Name of the Internal Auditor Ms. Shoshana Shidlo ("the Internal Auditor").
Education and professional experience Certified Public Accountant and Certified Internal Auditor (U.S. C.I.A.)
Holder of a degree in accounting and economics from Tel-Aviv University.
Has more than 20 years' experience in the area of internal auditing.
Commencement date of service January 17, 2019.
Compliance with legal requirements To the best of the Company's knowledge, based on the Internal Auditor's declaration, the Internal Auditor meets the requirements of Section 146(b) of
the Companies Law and the provisions of Section 8 of the Internal Audit Law, 1992 ("the Internal Audit Law").
Employment status The Internal Auditor provides the Company internal audit services and is not employed by the Company in a full-time time position and, in addition,
she does not hold an additional position in the Company other than her position as Internal Auditor.
65

Corporate Governance (Cont.)

13. The Internal Auditor (Cont.)

Manner of appointment The appointment of the Internal Auditor was approved by the Board of Directors on January 17, 2019, following the recommendation of the Audit
Committee on December 27, 2018. The Audit Committee and the Company's Board of Directors examined Internal Auditor's qualifications, education
and experience in internal auditing.
The part to whom the Internal Auditor reports The Chairman of the Board of Directors.
Other relationships the Internal Auditor has with the Company To the best of the Company's knowledge, the Internal Auditor does not hold securities of the Company.
The Internal Auditor is not an interested party in the Company or a relative of an interested party in the Company, nor is he a relative of the external
auditor or a party acting on its behalf.
The work plan The audit work plan for 2021 prepared by the Internal Auditor is for one year and is based on a multi-year work plan. The work plan of the Company and
its subsidiaries was determined based on, among others, the following considerations: coverage of the Company's main areas of activity, risk centers
and exposures known to the Internal Auditor and to management; potential for savings and efficiency; recurring items and monitoring correction of
deficiencies; and implementation of recommendations. The audit work plan also includes the companies in which the Company has significant
holdings.
The work plan for 2021 did not relate to the activities of the CPV Group, the acquisition of which was completed in 2021.
The audit work plan is submitted for analysis and approval by the Company's Audit Committee and Board of Directors. The Internal Auditor has
discretion to recommend a variance from the work plan to management and the Audit Committee, where necessary.
Audit reports were submitted to the Audit Committee and management. The Company's Board of Directors received an update regarding the audit
reports.
Meeting of the Audit Committee were held to discuss the audit reports on the following dates: May 26, 2021; August 22, 2021; November 25, 2021; and
December 27, 2021.
In the estimation of the Board of Directors, the scope, nature and continuity of the activities of the Internal Auditor and her work plan are reasonable
under the circumstances of the manner, and they are sufficient to achieve the Company's internal audit goals.

Corporate Governance (Cont.)

13. The Internal Auditor (Cont.)

Performance of the audit and the professional standards Based on information provided to the Company, performance of the internal audit is made in accordance with the generally accepted professional
standards in and outside of Israel and in accordance with Section 4(B) of the Internal Audit Law.
The Board of Directors relied on the confirmations of the Internal Auditor regarding her compliance with the requirements of the said generally
accepted professional standards. In addition, the audit reports are submitted in writing and are discussed at the meetings of the Audit Committee,
where as part of the discussion the Internal Auditor reports with respect to the manner of her performance, the policies and procedures applied and
the findings. The Board of Directors is satisfied that the Internal Auditor is in compliance with all the requirements provided in the said standards.
Access to information The Internal Auditor has free access to information, as stated in Section 9 of the Internal Audit Law, including constant and direct access to the
Company's information systems, including financial data.
Remuneration The remuneration of the Internal Auditor in respect of services she provided in 2021 amounted to NIS 230 thousand (not including VAT), this being
based on a work scope of 840 audit hours. In addition, the cost of outsourced audit services in 2021 amounted to NIS 48 thousand, this being based
on a work scope of 130 audit hours.
In the opinion of the Board of Directors, the remuneration of the Internal Auditor is reasonable and does not impact or adversely affect use of her
professional judgment in performance of the audit.
The remuneration of the Internal Auditor is a function of the total number of work hours as provided in the annual work plan that is approved by the
Company's Audit Committee and Board of Directors.

14. Contributions Policy

14.1 The Company has a policy for making contributions that places emphasis on activities in the periphery and non-profit organizations that operate in the field of education.

Corporate Governance (Cont.)

14. Contributions Policy (Cont.)

14.2 As part of the Company's policy for charitable contributions, in the period of the report the following contributions were paid:

Recipient of the
Contribution
Amount of the
Contribution in 2021
(NIS thousands)
Relationship to the
Recipient of the
Contribution
"Password for Every Student" Society 1,000 "Password for Every Student" receives contributions from parties related indirectly to the Company's
controlling shareholder. The Company's CEO is a representative of the project's Steering Committee
without compensation.
"Nirim" Society 150
"Technoda Hadera Givat Olga" Society 152
"Rakhashei Lev" Society 145 For the sake of good order, it is noted that Ms. Michal Marom Brickman, an external director of the
Company, serves as a director and member of the Investments Committee of the Management Committee of
the Soraski Medical Center (without compensation).
"Ramot Yehuda" Society 72
"Yedud Kaplan" Society 50
"Running to Give" Society 50 For the sake of good order, it is noted that a relative of the Company's CEO serves as CEO of the Society
without compensation.
Total 1,619
68

Corporate Governance (Cont.)

15. Details regarding the Auditing CPAs

15.1 The Company's auditing CPAs is the Office of KPMG (the "Auditor").

15.2 The fee is determined in negotiations between the Company's management and the Auditor, according to the scope of the work, the nature of the work, past experience and market conditions. The fee is in respect of provision of auditing and review services for three quarterly reviewed reports and one audited annual report. Also included in the fee are tax services in connection with preparation of the annual tax reports of the Company.

15.3 Set forth below is detail of the audit fee of the Auditor (in millions of NIS):

For the Year Ended December 31
2021 2020
Audit Services* Other Services*** Audit Services* Other Services***
**7.5 1 2.2 1.2
* Audit services, including audit-related work and tax services relating to the audit.
In 2021, the fees include amounts paid to the auditing CPA of the CPV Group commencing from the acquisition date, January 25, 2021.
* Other services include mainly tax consulting services.
Yair Caspi
Chairman of the Board of Directors
Giora Almogy
CEO
Date: March 24, 2022
69

Consolidated Financial Statements

As at December 31, 2021

Consolidated Financial Statements as at December 31, 2021

Table of Contents
Page
Independent Auditors' Report F-3
Consolidated Statements of Financial Position F-4 - F-5
Consolidated Income Statements F-6
Consolidated Statements of Comprehensive Income or Loss F-7
Consolidated Statements of Changes in Equity F-8 - F-9
Consolidated Statements of Cash Flow F-10 - F-11
Notes to the Consolidated Financial Statements F-12

Somekh Chaikin Millennium Tower KPMG 17 Ha'arba'a St., P.O.B. 609 Tel Aviv 6100601 03 684 8000

Independent Auditors' Report to the Shareholders of OPC Energy Ltd.

We audited the attached consolidated statements of financial position of OPC Energy Ltd. (hereinafter - the "Company") as at December 31, 2021 and 2020 and the consolidated statements of income, of comprehensive income or loss, of changes in equity and of cash flows for each of the three years in the period ended December 31, 2021. These financial statements are the responsibility of the Company's Board of Directors and management. Our responsibility is to express an opinion on these financial statements based on our audit.

We conducted our audit according to generally accepted accounting principles in Israel, including standards set out in the Independent Auditors' Regulations (Modus Operandi of Certified Public Accountant), 1973. Such standards require us to plan and conduct the audit in order to obtain reasonable assurance that the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and information in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by the board of directors and management of the Company, as well as evaluating the accuracy of the overall financial statements presented. We believe that our audit provides a reasonable basis for our opinion.

In our opinion, the above financial statements reflect fairly, in all material aspects, the financial position of the Company as of December 31, 2021 and 2020 and the results of its operations, changes in equity and cash flows for each of the three years ended on December 31, 2021, in accordance with International Financial Reporting Standards (IFRS) and with the provisions of the Israeli Securities Regulations (Annual Financial Statements), 2010.

Somekh Chaikin Certified Public Accountants

March 24, 2022

KPMG Somekh Chaikin, a partnership registered in Israel and member of the KPMG network of independent firms affiliated with KPMG International Limited, a limited liability private English firm.

Consolidated Statements of Financial Position as of December 31

Note 2021
NIS million
2020
NIS million
Current assets
Cash and cash equivalents
Short term deposits
5
6
757
-
200
1,607
Short-term restricted deposits and cash 6 1 207
Trade receivables and accrued income 7 194 153
Other receivables and debit balances 8 118 63
Inventories 5 -
Short-term derivative financial instruments 2 *-
Total current assets 1,077 2,230
Non-current assets
Long-term restricted deposits and cash 6 67 231
Prepaid expenses and other long-term receivables 9 178 143
Investments in associates 26 1,696 -
Deferred tax assets 19 153 24
Long-term derivative financial instruments 23 36 1
Property, plant & equipment 10 3,531 2,665
Right-of-use assets 11 302 276
Intangible assets 12 698 5
Total non-current assets 6,661 3,345
Total assets 7,738 5,575

* Amount is less than NIS 1 million.

Consolidated Statements of Financial Position as of December 31

Note 2021
NIS million
2020
NIS million
Current liabilities
Current maturities of long-term loans from banks and financial institutions 16 68 127
Current maturities of loans from non-controlling interests 16 29 -
Current maturities of debentures 17 22 22
Trade payables 13 425 298
Payables and credit balances 14 87 96
Short-term derivative financial instruments 23 27 126
Current maturities of lease liabilities 11 59 45
Total current liabilities 717 714
Non-current liabilities
Long-term loans from banks and financial institutions 16 1,451 1,850
Long-term loans from non-controlling interests 16 404 1
Debentures 17 1,789 952
Long-term lease liabilities 11 44 14
Long-term derivative financial instruments 1 22
Other long-term liabilities 15 90 2
Deferred tax liabilities 19 395 309
Total non-current liabilities 4,174 3,150
Total liabilities 4,891 3,864
Equity 20
Share capital 2 2
Share premium 2,392 1,714
Capital reserves 68 (74)
Retained earnings (loss) (192) 28
Total equity attributable to the Company's shareholders 2,270 1,670
Non-controlling interests 577 41
Total equity 2,847 1,711
Total liabilities and equity 7,738 5,575
Yair Caspi Giora Almogy Tzahi Goshen
Chairman of the Board of Directors Chief Executive Officer Chief Financial Officer
Date of approval of the financial statements: March 24, 2022
The accompanying notes are an integral part of the financial statements.

Consolidated statement of income for the year ended December 31

Note 2021
NIS million
2020
NIS million
2019
NIS million
Revenues from sales and provision of services 21 1,575 1,325 1,330
Cost of sales and provision of and services (net of depreciation and amortization) 21 1,086 968 910
Depreciation and amortization 172 114 111
Gross profit 317 243 309
General and administrative expenses 21 199 52 55
Share in losses of associates 26 (35) - -
Transaction expenses in respect of acquisition of the CPV Group 25D 2 42 -
Business development expenses 5 7 7
Other income (expenses), net 21 - 1 21
Operating profit 76 143 268
Finance expenses 21 194 **132 100
Finance income 21 9 1 7
Loss from disposal of financial liabilities, net 16D, 17C and 28O 272 **41 -
Finance expenses, net 457 172 93
Profit (loss) before income taxes (381) (29) 175
Taxes on income (tax benefit) 19 (77) 13 50
Profit (loss) for the year (304) (42) 125
Attributable to:
The Company's shareholders (220) (57) 90
Non-controlling interests (84 ) 15 35
Profit (loss) for the year (304) (42) 125
Earnings (loss) per share attributed to the Company's owners 22
Basic earnings (loss) per share (in NIS) (1.15) (0.37) 0.66
Diluted earnings (loss) per share (in NIS) (1.15) (0.37) 0.65
* Amount is less than NIS 1 million

The accompanying notes are an integral part of the financial statements.

Consolidated statement of comprehensive income or loss for the year ended December 31

2021
NIS million
2020
NIS million
2019
NIS million
Profit (loss) for the year (304) (42) 125
Components of other comprehensive income (loss) that, subsequent to initial recognition in comprehensive income, were or will be transferred to profit
and loss
Effective portion of the change in the fair value of cash flow hedges 28 (156) (29)
Net change in fair value of derivative financial instruments used for hedging cash flows stated to the cost of the hedged item 120 10 4
Net change in fair value of derivative financial instruments used to hedge cash flows transferred to profit and loss (7) 22 10
Group's share in other comprehensive income of associates, net of tax 40 - -
Foreign currency translation differences in respect of foreign operations (40) - -
Tax on other comprehensive income (loss) items (1) 5 1
Other comprehensive income (loss) for the year, net of tax 140 (119) (14)
Total comprehensive income (loss) for the year (164) (161) 111
Attributable to:
The Company's shareholders (83) (176) 76
Non-controlling interests (81) 15 35
Total comprehensive income (loss) for the year (164) (161) 111

The accompanying notes are an integral part of the financial statements.

Attributable to the Company's shareholders
Share capital
NIS million
Share
premium
NIS million
Capital
reserve from
transactions
with non
controlling
interests and merger
NIS million
Hedge fund
NIS million
Foreign
operations
translation
reserve
NIS million
Capital
reserve from
transactions
with
shareholders
NIS million
Capital
reserve for
share-based
payment
NIS million
Retained
earnings
(loss)
NIS million
Total
NIS million
Non-controlling
interests
NIS million
Total equity
NIS million
For the year ended December 31,
2021
Balance as at January 1, 2021 2 1,714 (25) (132) - 78 5 28 1,670 41 1,711
Issuance of shares (less issuance
expenses)
*- 674 - - - - - - 674 - 674
Investments by holders of non
controlling interests in equity of
subsidiary
Non-controlling interests in
- - - - - - - - - 629 629
respect of business combinations
Share-based payment
-
-
-
-
-
-
-
-
-
-
-
-
-
9
-
-
-
9
21
-
21
9
Exercised options and RSUs
Dividend to non-controlling
*- 4 - - - - (4) - - - -
interests - - - - - - - - - (33) (33)
Other comprehensive income
(loss), net of tax
- - - 164 (27) - - - 137 3 140
Loss for the year - - - - - - - (220) (220) (84) (304)
Balance as at December 31, 2021 2 2,392 (25) 32 (27) 78 10 (192) 2,270 577 2,847

* Amount is less than NIS 1 million.

The accompanying notes are an integral part of the financial statements.

Attributable to the Company's shareholders
Share capital
NIS million
Share
premium
NIS million
Capital
reserve from
transactions
with non
controlling
interests and merger
NIS million
Hedge fund
NIS million
Capital
reserve from
transactions
with
shareholders
NIS million
Capital
reserve for
share-based
payment
NIS million
Retained
earnings
NIS million
Total
NIS million
Non-controlling
interests
NIS million
Total equity
NIS million
For the year ended December 31, 2020
Balance as at January 1, 2020 1 635 (4) (13) 78 4 85 786 69 855
Issuance of shares (less issuance expenses) 1 1,077 - - - - - 1,078 - 1,078
Acquisition of non-controlling interests - - (21) - - - - (21) *- (21)
Share-based payment - - - - - 3 - 3 - 3
Exercised options and RSUs *- 2 - - - (2) - - - -
Issuance of capital notes to non-controlling
interests
- - - - - - - - *- *-
Dividend to non-controlling interests - - - - - - - - (43) (43)
Other comprehensive loss, net of tax - - - (119) - - - (119) - (119)
Profit (loss) for the year - - - - - - (57) (57) 15 (42)
Balance as at December 31, 2020 2 1,714 (25) (132) 78 5 28 1,670 41 1,711
For the year ended December 31, 2019
Balance as at January 1, 2019 1 361 2 1 78 4 231 678 80 758
Issuance of shares (less issuance expenses) *- 271 - - - - - 271 - 271
Acquisition of non-controlling interests - - (6) - - - - (6) *- (6)
Share-based payment - - - - - 3 - 3 - 3
Exercised options and RSUs *- 3 - - - (3) - - - -
Issuance of capital notes to non-controlling
interests - - - - - - - - *- *-
Dividends to Company shareholders - - - - - - (236) (236) - (236)
Dividend to non-controlling interests - - - - - - - - (47) (47)
Sale of a subsidiary - - - - - - - - 1 1
Other comprehensive loss, net of tax - - - (14) - - - (14) - (14)
Profit for the year - - - - - - 90 90 35 125
Balance as at December 31, 2019 1 635 (4) (13) 78 4 85 786 69 855

* Amount is less than NIS 1 million.

The accompanying notes are an integral part of the financial statements.

Consolidated Statement of Cash Flows for the year ended December 31

2021 2020 2019
NIS million NIS million NIS million
Cash flows from operating activities
Profit (loss) for the year (304) (42) 125
Adjustments:
Depreciation, amortization and diesel fuel consumption 186 133 147
Finance expenses, net 457 172 93
Taxes on income (tax benefit) (77) 13 50
Share in losses of associates 35 - -
Gain on sale of a subsidiary - (1) (2)
Share-based compensation transactions 58 3 3
355 278 416
Changes in trade and other receivables (2) (47) (2)
Changes in trade payables, other payables and long-term liabilities 1 131 (19)
(1) 84 (21)
Dividends received from associates 32 - -
Income tax paid (1) *- (4)
31 - (4)
Net cash from operating activities 385 362 391
Cash flows from investing activities
Interest received - 1 7
Short-term restricted deposits and cash, net 1,780 (1,696) 70
Withdrawals from long-term restricted cash 172 134 2
Deposits to long-term restricted cash (5) (107) (91)
Acquisition of subsidiaries, net of cash acquired (2,152) (47) -
Acquisition of an associate and investment in associates (28) - -
Long-term loans to an associate (17) - -
Proceeds for repayment of partnership capital from associates 154 - -
Proceeds of sale of a subsidiary net of cash sold - 1 3
Long-term advance payments prepaid expenses (23) (199) (11)
Purchase of property, plant and equipment (746) (255) (122)
Refunds for right-of-use assets and property, plant, and equipment 16 - -
Purchase of intangible assets (5) (1) (1)
Payment for derivative financial instruments (21) (19) (3)
Proceeds for derivative financial instruments 3 5 -
Net cash used in investing activities (872) (2,183) (146)

The accompanying notes are an integral part of the financial statements.

Consolidated Statement of Cash Flows for the year ended December 31

2021
NIS million
2020
NIS million
2019
NIS million
Cash flows for financing activities
Proceeds of share issuance, less issuance expenses 674 1,078 271
Proceeds of debenture issuance, less issuance expenses 842 974 -
Receipt of long-term loans from banks and financial institutions 682 251 -
Receipt of long-term loans from non-controlling interests 421 - -
Investments by holders of non-controlling interests in equity of subsidiary 629 *- *-
Interest paid (102) (86) (76)
Prepaid costs for loans taken (16) (30) (6)
Dividend paid to the Company's shareholders - - (236)
Dividend paid to non-controlling interests (33) (43) (47)
Repayment of long-term loans from banks and others (1,936) (134) (68)
Repayment of debentures (19) (324) (11)
Repayment of other long-term liabilities (94) - -
Acquisition of non-controlling interests - (26) (2)
Payment for derivative financial instruments (58) (21) (11)
Proceeds for derivative financial instruments 13 - -
Repayment of principal in respect of lease liabilities (6) (1) (2)
Net cash provided by (used for) financing activities 997 1,638 (188)
Net increase (decrease) in cash and cash equivalents 510 (183) 57
Cash and cash equivalents balance at the beginning of the year 200 385 330
Effect of exchange rate fluctuations on cash and cash equivalent balances 47 (2) (2)
Cash and cash equivalents balance at the end of the year 757 200 385

The accompanying notes are an integral part of the financial statements.

NOTE 1 - GENERAL

A. The reporting entity

OPC Energy Ltd. (hereinafter – the "Company") was incorporated in Israel on February 2, 2010. The Company's registered address is 121 Menachem Begin Blvd., Tel Aviv, Israel. The controlling shareholder in the Company is Kenon Holdings Ltd. (hereinafter - the "Parent Company"), a company incorporated in Singapore, the shares of which are dual-listed on the New York Stock Exchange (NYSE) and the Tel Aviv Stock Exchange (hereinafter - the "TASE").

The Company is a publicly-traded company whose securities are traded on the TASE. As at the date of the report (commencing from January 2021), the Group is engaged in two reportable segments: (1) generation and supply of electricity and energy in Israel; and (2) in the United States. In these segments, the Group is engaged in generation and supply of energy (electricity, steam and EV car charging services) to private customers, Israel Electric Corporation Ltd. (hereinafter – the "IEC") and Noga - The Israel Independent System Operator Ltd. (hereinafter - the "System Operator", the "System Operator Company" or "Noga"), in initiation, development, construction and operation of power plants and facilities for the generation of energy and provision of management services for power plants in the United States that are owned by third parties. The Group's activities in Israel are managed mainly through a wholly-owned subsidiary, OPC Israel Energy Ltd. (hereinafter - "OPC Israel"). Its activities in the United States are managed under CPV Group LP and its investees (hereinafter - "CPV Group"), held by the Company at a rate of 70%, indirectly (for further information see Note 25D1).

In Israel, the Group operates the Rotem Power Plant through OPC. Rotem Ltd. (hereinafter – "Rotem") (which is held by the OPC Israel (80%) and by another shareholder (20%)) uses conventional technology, and has an installed capacity of approximately 466 megawatts (MW); the Hadera Power Plant, which is through OPC Hadera Ltd. (hereinafter – "Hadera"), which is wholly owned by OPC Israel, uses cogeneration technology and has an installed capacity of 144 MW. Furthermore, Hadera holds the Energy Center (boilers and turbines on the site of Infinya Ltd. plants (formerly Hadera Paper) (hereinafter - "Infinya"), which serves as backup for the supply of steam. In addition, OPC Israel wholly owns Zomet Energy Ltd. (hereinafter – "Zomet"), which is working to construct a power plant powered by natural gas, using conventional open-cycle technology (a peaker plant) having an installed capacity of approximately 396 MW, located in the vicinity of the Plugot Intersection, near Kiryat Gat. In addition, as from September 2021 the Company supplies 110 MW (as defined in Note 28L) in electricity under the virtual supply license. Furthermore, the Company is working to construct and operate energy generation facilities on the consumers' premises, which generate electricity using natural gas and renewable energy and enters into arrangements for supply and sale of energy to consumers; in addition, the Company entered into an agreement to supply the equipment to, construct, operate and maintain the Sorek B energy facility and to supply the energy required by the Sorek B Desalination Facility, with a capacity of approximately 87 MW, as stated in Note 25A1(D).

The Group's activities in Israel are subject to regulation, including, among other things, the provisions of the Electricity Sector Law, 1996, and the regulations promulgated thereunder, resolutions of the Israeli Electricity Authority, the provisions of the Law for Minimizing Market Centralization and Promoting Economic Competition, 2013, the provisions of the Economic Competition Law, 1988 and the regulations promulgated thereunder, as well as regulation in connection with licensing of businesses, planning and construction, and environmental protection. The Israeli Electricity Authority is authorized to issue licenses under the Electricity Sector Law (licenses for facilities having a generation capacity in excess of 100 MW also require approval by the Minister of Energy), supervise the license holders (including supply licenses and private generation licenses), determine tariffs and set benchmarks for the level, nature and quality of the services that are required from a holder of a "Essential Service Provider" license. Accordingly, the Israeli Electricity Authority supervises both the IEC and independent power producers.

NOTE 1 - GENERAL (cont.)

A. The reporting entity (cont.)

The Group's activity in Israel is subject to seasonal effects resulting from changes in the time of use tariff (hereinafter – the "TAOZ"), which is regulated and published by the Israeli Electricity Authority. The year is broken down into three seasons, as follows: summer (July and August), winter (December, January and February) and "transitional" (March through June and September through November), with a different tariff set for each season. The Company's results are based on the generation component, which is part of the TAOZ, resulting in a seasonal effect.

In the United States, through CPV Group, the Group operates power plants using conventional energy, powered by natural gas, and also operates in the renewable energy sector. As at the approval date of the financial statements, CPV's share of the natural gas-fired power plants is approximately 1,290 MW out of 4,045 MW (5 power plants), and in wind energy - CPV's share is approximately 152 MW (one power plant, wholly-owned).

In addition, the CPV Group holds rights to gas-fired power plants using conventional energy with a capacity of 1,258 MW which are under construction (CPV's share as at the approval date of the financial statements is 126 MW) and 126 MW in a solar project under construction. The project backlog of CPV Group as at the reporting date includes a backlog of renewable energy projects and conventional natural gas-fired power plants in the advanced development stages and other projects using various technologies. CPV Group's activities also include: providing asset management services and energy management services to US-based power plants owned by the Group and by third parties. As of the approval date of the Financial Statements, the CPV Group provides asset management services to power plants at a total capacity of 7,366 MW and energy management services to power plants at a total capacity of 4,235.

The power market in the United States is regulated both on the federal level (wholesale sale of electricity and inter-state transmission) and state level (retail sale of electricity and distribution services to end consumers). The primary federal regulator is the Federal Energy Regulatory Commission (FERC), alongside state-level public service commissions exercising additional regulatory oversight. The electricity market in the United States operates under several regional or state market operators, known as Regional Transmission Organizations (RTO) or Independent System Operators (ISOs). The ISOs and RTOs are responsible for the day-to-day operation of the transmission system, the administration of the wholesale markets in their respective regions, and for the long-term transmission planning and resource adequacy functions.

The activity of the CPV Group is subject to, among other things, changes in federal and state legislation, federal and state energy regulations and federal and state environmental protection laws and regulations. These laws impact the ability of the facilities of the CPV Group to operate, the prices of the products they produce and the costs and charges involved in their production. Therefore, regulations, laws and decisions by the federal and state authorities, particularly public service committees, a federal energy regulatory committee and environmental protection authorities, have a direct and indirect impact on the CPV Group's activity.

The revenues of the CPV Group from electricity generation are seasonal and impacted by variable demand, gas prices and electricity prices, as well as the weather. In general, with respect to power plants powered by natural gas, there is higher profitability in seasons where temperatures are at their highest or lowest - usually during summer and winter. Similarly, the profitability of renewable energy production is subject to production volume, which varies based on wind and solar constructions, as well as its electricity price, which tends to be higher in winter, unless there is a fixed contractual price for the project.

NOTE 1 - GENERAL (cont.)

B. Global trends and effects of the spread of Covid-19

In March 2020, the World Health Organization announced that Covid-19 was a global pandemic. Despite the preventative measures implemented in order to reduce the spread of the pandemic, it continued to spread, in various variants, and caused considerable business and economic uncertainty and volatility in global markets. As at the approval date of the financial statements, Covid-19 continues to cause business and economic uncertainty and another widespread Covid-19 wave, against the background of the outbreak of the Omicron variant, has been in progress in recent months. In the reporting period, global economic activity started to rebound, including the removal of some of the restrictions on movement, business, and commerce, and the recent restrictions that were imposed are more lenient that those in earlier Covid-19 waves. Due to the dynamic nature of the pandemic and the consequences of Corona related events (such as an increase in the prices of raw materials and shipping costs), there is still uncertainty about the continuation of the Corona, its intensity, and its effect on the markets and on factors related to the Company's activity (including manpower, major customers and suppliers, contractors, and financiers); there is also uncertainty regarding the measures that will be taken by government entities. It should be noted that during the entire period of the Corona crisis, the Group's production facilities in Israel and the United States continued to operate (as did the construction activities) while making adjustments in order to prevent outbreaks of the pandemic at these sites. As at the financial statements approval date, the Covid-19 Crisis has not had a material impact on the Company's results.

During the reporting period and thereafter, due to high global demand for raw materials and for transportation and shipping on the one hand, including due to the effects of the coronavirus crisis, limited production capabilities and transportation and shipping restrictions on the other hand, there was a significant increase in the costs of raw materials, delays in production and the supply chain, including an increase in the cost of maritime transport. This resulted in global delays in delivery dates for equipment alongside increased prices of raw materials and equipment used for the construction and maintenance of the Group's facilities and power plants. This trend affects the construction and maintenance costs of the Group's projects in the markets of activity and the schedules for their completion. As of the report approval date, there is no certainty as to the duration or scope of the trend, therefore the Group is unable to assess with full certainty its effect on the Group's activity.

It should also be noted that in recent weeks, the global geopolitical environment, against the backdrop of the fighting between Russia and Ukraine, is characterized by instability, which greatly affects the macroeconomic environment, causes changes in energy prices, economic uncertainty, as well as supply chain, commodity prices and availability issues, etc. As of the initial phase of the event, the Company is unable to assess the extent of its impact on the Company's operations as of the approval date of the financial statements, but there are already indications of an increase in commodity, transportation and energy prices, and a challenge in terms of availability of various raw materials.

Definitions

    1. The Company OPC Energy Ltd.
    1. The Group OPC Energy Ltd. and its consolidated companies.
    1. Consolidated companies/subsidiaries companies, including partnerships, whose financial statements are fully consolidated, directly or indirectly, with the financial statements of the Company.
    1. Investee companies consolidated companies and companies, including a partnership or joint venture, the Company's investment in which is included, directly or indirectly, in the financial statements based on the equity method.
    1. Related parties as defined in IAS 24 (2009), Related Party Disclosures.
    1. Interested parties as defined in Paragraph (1) of the definition of an "interested party" in a company in Section 1 of the Israel Securities Law, 1968.

NOTE 2 – BASIS OF PREPARATION OF THE FINANCIAL STATEMENTS

A. Statement of compliance with International Financial Reporting Standards (IFRS)

The consolidated financial statements were prepared by the Group in accordance with Financial Reporting Standards (IFRS). Such financial statements were also prepared in accordance with the Israeli Securities Regulations (Annual Financial Statements), 2010.

The Company's financial statements were approved for publication by its Board of Directors on March 24, 2022.

B. Functional and presentation currency

The New Israeli Shekel is the currency that represents the primary economic environment in which the Company operates (hereinafter - "NIS"). Accordingly, the NIS is the Company's functional currency. The NIS also serves as the presentation currency in these financial statements. Currencies other than the NIS constitute foreign currency.

C. Basis of measurement

The financial statements were prepared based on the historical cost, other than derivative financial instruments at fair value through profit and loss, financial instruments measured at fair value through other comprehensive income, liability in respect of profit-sharing to CPV Group employees, treated as a cash-settled share-based payment transaction, deferred taxes and provisions. For further details, see Note 3.

D. The operating cycle period

The Group's normal operating cycle is one year. Therefore, current assets and current liabilities include items whose disposal is planned and expected during the Group's normal operating cycle.

E. Use of estimates and judgment

In preparation of the condensed consolidated interim financial statements in accordance with the IFRS, the Company's management is required to use judgment when making estimates, assessments and assumptions that affect implementation of the policies and the amounts of assets, liabilities, income and expenses. It is clarified that the actual results may differ from these estimates.

When formulating accounting estimates used in preparing the Group's financial statements, the management was required to use assumptions concerning circumstances and events that involve significant uncertainty. In determining the estimates, the Group management's discretion is based on past experience, various facts, external factors and reasonable assumption under the appropriate circumstances for each estimate.

These estimates and underlying assumptions are reviewed regularly. Changes in accounting estimates are recognized in the period in which the estimates were revised and in any future affected period.

Information regarding the assumptions made by the Group in respect of the future and other major factors for uncertainty regarding the estimates that have a significant risk of resulting in a material adjustment in the carrying amount of assets and liabilities in the next financial year, is included in the following items:

1. Expected useful life of property, plant and equipment

Property, plant and equipment is depreciated using the straight-line method over the expected useful life, considering the residual value of the assets. The Group routinely re-examines the expected useful life of assets in order to determine the depreciation expenses to be recognized for the period. The useful life is based on the Group's past experience in respect of similar assets and takes into account expected technological changes. Depreciation expenses in respect of future periods are adjusted to reflect significant changes compared to previous estimates. For further information, see Note 3E.

2. Deferred tax asset in respect of tax losses

The main assumption in determining a deferred tax asset in respect of tax losses is the expectation that there will be taxable income in future against which it may be utilized. Deferred taxes are recognized or reversed in the statement of income in respect of tax losses. For information about losses in respect of which a deferred tax asset was recognized, see Note 19.

3. Assessment of the likelihood of contingent liabilities

The Group has contingent liabilities whose outcome may have a material impact on the Group's results. Cancellation or creation of a provision in respect of such contingent liabilities is based on the assumption of whether the outflow of economic resources will more likely than not be required in respect of such contingent liabilities. For more information regarding contingent liabilities, see Note 28.

4. Allocation of acquisition costs

The Group makes estimates with respect to allocation of excess cost to tangible and intangible assets and to liabilities. In addition, when determining the depreciation rates of the tangible and intangible assets and liabilities, the Group estimates the expected life of the asset or liability. These estimates are based, among other things, on the Company's use of an independent appraiser. For further information, see Note 25D.

5. Recoverable amount of cash-generating units that include goodwill and testing for indications of impairment of investments in equity-accounted companies

The calculation of the recoverable amount of cash-generating units to which goodwill balances are allocated is based, among other things, on the projected expected cash flows and discount rate. For further information, see Note 12B.

The carrying amounts of investments in equity-accounted companies are reviewed at each reporting date to determine whether there is any indication of impairment. If any such indication exists, the recoverable amount of the investments is estimated.

6. Ability to recover development costs

For the purpose of discounting construction costs, the Company relies on an estimate regarding obtaining regulatory approvals, affinity to land, ability to connect to electricity, etc., and the expectation that the project will generate economic benefits for the Company. If such approvals are not obtained, the Company will reduce the construction costs recognized in profit and loss.

7. Measurement of fair value for profit participation plan for CPV Group employees

The fair value of the profit participation plan for CPV Group employees was assessed using the option pricing model (OPM) and according to the model's assumptions. For additional details, see Note 18C.

NOTE 2 – BASIS OF PREPARATION OF THE FINANCIAL STATEMENTS (cont.)

F. Reclassification

In the reporting year, the Company classified a loss from prepayment of loans and debentures that were previously presented in the finance expenses item, to a separate item in the statement of income, under finance expenses, net. Accordingly, the Company reclassified, from the finance expenses item to the loss from prepayment of loans and debentures item, an amount of NIS 41 million for the year ended December 31, 2020.

G. Changes in accounting policies

First-time application of new standards, amendments to standards and interpretations

1. Amendments to IFRS 9, Financial Instruments; IAS 39 Financial Instruments: Recognition and Measurement; and IFRS 7 Financial Instruments: Disclosures: Reform of Benchmark Interest Rates Phase 1 (hereinafter in this section - the "Amendments")

The Amendments include several relevant mandatory expedients to assess hedge accounting affected by uncertainly arising from the IBOR interest rate reform (a reform that will lead to the replacement of interest rates such as LIBOR and EURIBOR).

  • When determining the probability of the materialization of hedged cash flows, the existing contractual cash flows should be used as a basis and future changes resulting from the interest rate reform (hereinafter "IBOR") should be disregarded.
  • In prospective assessment, the contractual terms of the hedged item and the hedged instrument should be taken into consideration, and the uncertainty arising from the reform should be disregarded.

The Company assessed the effect of the interest rate reform ("IBOR") on its hedge accounting and decided on retrospective adoption of Phase 1 Amendments. Adoption of the Amendments provides temporary exemption from application of hedge accounting requirements for hedges directly affected by the IBOR reform. As a result of the exemptions, application of the IBOR reform will not result in termination of the hedging ratios. However, if the hedge is ineffective, it is recognized in profit or loss. The Amendments also establish triggers for the end of the expedients, including the date when there is longer be uncertainty resulting from the reform.

The Company is also exposed to changes in the LIBOR interest rate. As at December 31, 2021, the balance of loans in Keenan's financial statements (as defined in Note 25A3) amounts to USD 98 million and interest rate swap contracts linked to the LIBOR interest rate amounts to USD 69 million. Interest rate swaps are used for hedging cash flows against the LIBOR interest rate (for further information, see Note 23). When assessing whether the hedge is expected to be effective based on forward-looking information, the Company assumed that the LIBOR interest rate underlying the cash flows of the interest swap contracts and the loans hedged with variable interest rates remain unchanged when applying the LIBOR reform. Accordingly, application of Phase 1 Amendments did not have a significant effect on the consolidated financial statements.

NOTE 2 – BASIS OF PREPARATION OF THE FINANCIAL STATEMENTS (cont.)

2. Amendments to IFRS 9, Financial Instruments; IAS 39 Financial Instruments: Recognition and Measurement; and IFRS 7 Financial Instruments: Disclosures: Reform of Benchmark Interest Rates Phase 2 (hereinafter in this section - the "Amendments")

The Amendments include practical expedients in respect of accounting treatment of changes in contractual terms due to the Interest Rate Benchmark Reform (a reform intended to lead to cancellation of interest rates such as LIBOR and EURIBOR). Including:

  • When changing certain terms of financial assets or liabilities due to the reform, an entity will amend the effective interest rate of the financial instrument in lieu of recognition in profit or loss.
  • Changes in certain lease terms due to the reform will be accounted for as an amendment of lease payments linked to the CPI or exchange rate.
  • Changes in certain terms of a hedging instrument or hedged item due to the reform will not lead to discontinuing the application of hedge accounting.

The Amendments are applied retrospectively. All Amendments are applied retrospectively by amending the opening balance of the equity of the annual reporting period in which the amendment was adopted, without restatement of comparative data. Restatement of comparative data is permitted if possible without the use of "retrospective wisdom".

Phase 2 Amendments came into effect on January 1 2021. However, the Amendment is applied when modifications are made as a direct result of the IBOR reform, when changing the basis for determining the cash flows of the revised interest rate is economically equivalent to the previous basis prior to the Amendments. The Company expects that use of LIBOR interest will be replaced by SOFR interest and it is also preparing a plan for transition to IBOR interest. The Company intends to use practical expedients in future periods. As a result, application of this standard is not expected to have a material effect on the financial statements.

NOTE 3 - SIGNIFICANT ACCOUNTING POLICIES

The accounting policy principles below will be applied consistently to all periods presented in these consolidated financial statements by entities of the Group, except as described in Note 2G - First-time application of new standards, amendments to standards and interpretations.

A. Basis of consolidation

1. Business combinations

The Group applies the acquisition method to all business combinations. The acquisition date is the date on which the acquirer obtains control over the acquiree. Control exists when the Group is exposed, or has rights to variable returns from its involvement with the acquiree and has the ability to affect those returns through its power over the acquiree. When testing for control, substantive rights held by the Group and others are taken into account. On acquisition date, the acquirer recognizes a contingent liability assumed in a business combination if there is a present obligation resulting from past events and its fair value can be reliably measured. The consideration transferred includes the fair value of the assets transferred to the previous owners of the acquiree, the liabilities incurred by the acquirer to the previous owners of the acquiree as well as equity interests issued by the Group. In addition, goodwill is not updated in respect of utilization of tax loss carryforwards that existed on the business combination date.

Costs associated with the acquisition incurred by the acquirer in respect of a business combination, such as: brokers' commissions, consultants' fees, legal fees, valuations and other fees and commissions relating to professional services or consulting services, except for those relating to issuance of debt or equity instruments in connection with the business combination, are recognized as expenses in the period in which the services were received.

2. Goodwill

The Group recognizes goodwill on acquisition date according to the fair value of the consideration transferred less the net amount of the identifiable assets acquired and the liabilities assumed. Goodwill is initially recognized as an asset based on its cost, and in subsequent periods, is measured at cost less accumulated impairment losses.

Cash-generating units to which goodwill has been allocated are aggregated such that the level at which impairment is tested reflects the lowest level at which goodwill is subject to monitoring for internal reporting purposes, but in no case is it higher than an operating segment (prior to grouping similar segments). In cases where goodwill is not monitored for internal management purposes, goodwill is allocated to operating segments (before grouping similar segments) rather than to a cash-generating unit or a group of cash-generating units that is smaller than an operating segment.

Goodwill is allocated to each of the Group's cash-generating units that is expected to benefit from the synergy of the business combination. Cash-generating units to which goodwill was allocated are tested for impairment each year, or more frequently if there are indications of a possible impairment of the unit, as stated. For further details, see Section H2 below.

3. Subsidiaries

Subsidiaries are entities controlled by the Company. The financial statements of subsidiaries are included in the consolidated financial statements from the date that control commences until the date of loss of control.

The accounting policies of subsidiaries have been changed when necessary to align them with the policies adopted by the Group.

4. Non-controlling interests

Non-controlling interests are the equity of a subsidiary that cannot be attributed, directly or indirectly, to the parent company, and they include additional components.

Measurement of non-controlling interests on the date of the business combination

Non-controlling interests, which are instruments that grant present ownership rights and grant the holder a share of the net assets in the event of liquidation, are measured on the date of the business combination at fair value or based on their proportionate share of the identified assets and liabilities of the acquiree, based on each transaction separately.

Allocation of profit or loss and other comprehensive income among shareholders

Profit or loss and any component of other comprehensive income are attributed to the owners of the Company and the non-controlling interests. The total profit or loss and other comprehensive income are attributed to the owners of the Company and the non-controlling interests even if the resulting balance of non-controlling interests is negative.

4. Non-controlling interests (cont.)

Transactions with non-controlling interests, while maintaining control

Transactions with non-controlling interests while maintaining control are treated as equity transactions. Any difference between the consideration paid or received and the change in non-controlling interests is attributed to the share of the owners of the Company in a capital reserve from transactions with non-controlling interests and mergers.

The amount at which non-controlling interests are adjusted at an increase in the holding rate, according to the proportionate share acquired of the balance of the non-controlling interests in the consolidated financial statements prior to the transaction.

Issuance of a put option to non-controlling interests

A put option which was issued by the Group to non-controlling interests is settled, at the Group's discretion, in cash or a variable number of Group companies shares; the option is accounted for separately from the shares held by the non-controlling interests.

In such a case, the Group recognizes non-controlling interests within equity, and the put option is accounted for as a financial derivative under financial liabilities, measured at fair value through profit and loss. Changes in fair value of the derivative are recognized in profit and loss as finance income (expenses).

5. Loss of control

Upon loss of control, the Group derecognizes the assets and liabilities of the subsidiary, any non-controlling interests and other equity components attributable to the subsidiary. The difference between the consideration and the derecognized balances is recognized in profit and loss in the other income line item.

6. Investment in associates and joint ventures

Associates are entities in which the Group has significant influence, but not control or joint control, over the financial and operating policies. Significant influence is the power to participate in making decisions relating to the financial and operational policies of the investee company. In testing for significant influence, potential voting rights that are currently exercisable or convertible into shares of the investee are taken into account.

Investments in associates and joint ventures are accounted for using the equity method and are initially recognized at cost. The investment cost includes transaction costs. Transaction costs that are directly attributable to an expected acquisition of an associate are recognized as an asset under the deferred expenses line item in the statement of financial position. These costs are added to the investment cost on the acquisition date. The consolidated financial statements include the Group's share of the income and expenses in profit or loss and of other comprehensive income of associates, after adjustments to align the accounting policies with those of the Group, from the date that significant influence commences until the date that significant influence ceases. Where the Group disposes of part of an investment that is an associate that includes foreign operations while maintaining significant influence, the proportionate part of the cumulative amount of the exchange rate differences is reclassified to the statement of income. The Company's share in profit or loss from associates will be recorded under operating profit or loss.

7. Loss of significant influence

The Group ceases to apply the equity method from the date on which it lost significant influence over the associate and treats the remaining investment as a financial asset or subsidiary, as applicable.

On the date of loss of significant influence or joint control, the Group measures at fair value, any remaining investment in the associate.

The Group recognizes in profit and loss under the other income or expenses item, any difference between the fair value of any investment remaining plus any consideration from disposal of part of the investment in the associate and the carrying amount of the investment on that date.

The amounts recognized in equity through other comprehensive income in respect of that associate are reclassified to profit, loss or retained earnings, in the same way as would have been required had the associate independently disposed of the assets or liabilities.

8. Transactions eliminated on consolidation

Intra-group balances, any unrealized income and expenses, and profits arising from intra-group transactions, were eliminated in the preparation of the consolidated financial statements. Unrealized losses were eliminated in the same way as unrealized gains, but only to the extent that there is no evidence of impairment.

B. Business combinations under common control

Acquisition of interests in businesses controlled by the controlling shareholder of the Group were accounted for using the book value approach, as if the acquisition were made on the day control was first gained by the controlling shareholder of the Group. For this purpose, the comparative data were restated. The acquired assets and liabilities are presented at the values previously presented in the consolidated financial statements of the controlling shareholder of the Group. The Group's equity components were restated from the date control was first gained by the controlling shareholder of the Group, so that the equity components of the acquired entity were added to the Group's existing equity components.

Any difference between the issuance proceeds for the acquisition and the values of the acquired assets and liabilities on the date control was achieved, and the investment of the controlling shareholder of the acquired company in the period subsequent to achievement of control is recognized directly in equity as a capital reserve from transactions with non-controlling interests and mergers. For details, see Note 25D.

1. Foreign currency transactions

Foreign currency transactions are translated into the functional currency of the Group companies at the exchange rate effective on the transaction dates. Monetary assets and liabilities denominated in Foreign Currencies on the reporting date are translated to the functional currency at the exchange rate at that date. Non-monetary assets and liabilities denominated in foreign currencies that are measured at fair value are translated to the functional currency at the exchange rate as at the date on which the fair value was determined. The exchange rate differences due to translation of the functional currency are usually recognized in profit and loss (except for differences from cash flow hedges, which are recognized in other comprehensive income, in respect of the effective part of the hedge). Non-monetary items denominated in Foreign Currencies that are measured at historical cost are translated using the exchange rate at the transaction date.

  • C. Foreign currency
    1. Foreign operations

The assets and liabilities of foreign operations, including goodwill and fair value adjustments arising on acquisition, are translated to NIS at exchange rates in effect at the reporting date. The income and expenses of foreign operations are translated to NIS at exchange rates in effect at the transaction dates. Foreign exchange differences are recognized in other comprehensive income and are presented in equity in the foreign operations translation reserve (hereinafter – "translation reserve"). When the foreign operation is not a wholly-owned subsidiary of the Company, the pro rata share of the foreign operation translation difference is allocated to the non-controlling interests.

Generally, foreign exchange rate differentials from loans received from or provided to a foreign operation, including foreign operations that are subsidiaries, are recognized in profit or loss in the consolidated financial statements.

D. Financial instruments

1. Non-derivative financial assets

Initial recognition and measurement of financial assets

The Group initially recognizes trade receivables and issued debt instruments as they are incurred. All other financial assets are initially recognized on the date when the Group becomes party to the contractual terms of the instrument.

A financial asset is initially measured at fair value plus the transaction costs attributable directly to the acquisition or issuance of the financial asset. A trade receivable without a significant financing component is initially measured at the transaction price. Receivables from contractual assets are initially measured at the carrying amount of the contractual assets on the date of reclassification from a contractual asset to receivables.

Derecognition of financial assets

Financial assets are derecognized when the contractual rights of the Group to the cash flows from the asset expire, or the Group transfers the rights to receive the contractual cash flows arising from the financial asset in a transaction in which substantially all the risks and rewards of ownership of the financial asset are substantively transferred.

If the Group is essentially left with the risks and rewards of ownership of the financial asset, the Group continues to recognize the financial asset.

Classification of financial assets into groups and the accounting treatment of each group

On the date of initial recognition, financial assets are classified to one of the following measurement categories: amortized cost; or fair value through profit and loss.

Financial assets are not reclassified in subsequent periods unless, and only if, the Group changes its business model for management of financial debt assets, in which case the affected financial debt assets are reclassified at the beginning of the reporting period subsequent to the business model change.

A financial asset is measured at amortized cost if it meets both of the following two conditions cumulatively and is not designated for measurement at fair value through profit and loss:

  • It is held within a business model whose objective is to hold assets in order to collect the contractual cash flows; and

  • The contractual terms and conditions of the financial asset provide entitlement, at specified dates, to cash flows that are only principal and interest payments in respect of the outstanding principal amount.

D. Financial instruments (cont.)

1. Non-derivative financial assets (cont.)

Classification of financial assets into groups and the accounting treatment of each group (cont.)

All financial assets not classified as measured at amortized cost are measured at fair value through profit and loss.

The Group has balances of trade and other receivables and deposits held under a business model whose objective is collection of contractual cash flows. The contractual cash flows in respect of such financial assets include only principal and interest payments that reflect consideration for the time value of the money and the credit risk. Accordingly, such financial assets are measured at amortized cost.

Assessment of whether cash flows include principal and interest only

For the purpose of assessing whether the cash flows include principal and interest only, 'principal' is the fair value of the financial asset on the date of initial recognition. 'Interest' consists of consideration for the time value of the money, for the credit risk attributed to the outstanding principal during a certain time period and for other basic risks and costs of the loan, as well as a profit margin.

When assessing whether contractual cash flows are payments of principal and interest only, the Group examines the contractual terms of the instrument, and in this context, it estimates whether the financial asset includes a contractual condition that may change the timing or amount of the contractual cash flows so that it fails to meet the said condition. In making this assessment, the Group takes into account the following considerations:

  • Any contingent events that will change the timing or amount of the cash flows;
  • Terms that may change the nominal interest rate, including variable interest;
  • Extension or prepayment characteristics; and - Terms that limit the Group's right to cash flows from defined assets (for example, a non-recourse financial asset).

An early repayment characteristic is consistent with the principal and interest only criterion if the early repayment amount essentially represents the unpaid principal and interest amounts in respect of the outstanding principal amount, which may include reasonable compensation, received or paid, in respect of early termination of the contract.

Subsequent measurement and profits and losses

Financial assets at fair value through profit and loss

In subsequent periods, such assets are measured at fair value. Net profits and losses, including interest income or dividends, are recognized in profit and loss (except certain derivative instruments designated as hedging instruments).

Financial assets at amortized cost

These assets are measured in subsequent periods at amortized cost using the effective interest method net of impairment losses. Interest income, exchange rate profits or losses and impairment are recognized in profit and loss. Any profit or loss from derecognition is also recognized in profit and loss.

2. Non-derivative financial liabilities

Non-derivative financial liabilities include: loans and credit from banks and other lenders, marketable debt instruments, capital notes from shareholders, lease liabilities, and trade and other payables.

D. Financial instruments (cont.)

Initial recognition of financial liabilities

The Group initially recognizes debt instruments as they are incurred. Other financial liabilities are initially recognized at the trade date when the Group becomes party to the contractual provisions of the instrument.

Financial liabilities are initially recognized at fair value net of any attributable transaction costs. Transaction costs attributable directly to the issuance of an instrument that will be classified as a financial liability are deducted from the financial liability upon initial recognition.

Subsequent measurement of financial liabilities

Subsequent to initial recognition, these financial liabilities are measured at amortized cost using the effective interest method.

Derecognition of financial liabilities

Financial liabilities are derecognized when the obligation of the Group, as specified in the agreement, expires or when it is discharged or canceled.

Changes in material terms of a debt instrument

Replacement of debt instruments with materially different terms is treated as elimination of the original financial liability and recognition of a new financial liability. In such case, the entire difference between the amortized cost of the original financial liability and the fair value of the new financial liability is recognized in profit and loss in the loss from prepayment of loans and debentures item.

The terms and conditions are substantively different if the discounted present value of the cash flows according to the new terms and conditions, including any fees and commissions paid, less any fees and commissions received and discounted using the original effective interest rate, is different by at least ten percent from the discounted present value of the remaining cash flows of the original financial liability.

Netting of financial instruments

Financial assets and liabilities are netted and the net amount is presented in the statement of financial position when the Group currently has a legal right to offset the amounts and intends either to settle the asset and liability on a net basis or to dispose of the asset and settle the liability simultaneously.

3. Derivative financial instruments, including hedge accounting

Hedge accounting

On initial designation of the accounting hedge, the Group formally documents the relationship between the hedging instrument and hedged item, including the risk management objectives and strategy in undertaking the hedge transaction, together with the methods that will be used to assess the effectiveness of the hedging relationship.

The Group estimates, upon creation of the hedge and in the subsequent periods, whether the hedge is expected to be highly effective in offsetting changes in fair value or in the cash flows attributable to the hedged risk during the period for which the hedge is designated, and whether the actual results of the hedge are within a range of 80% to 125%.

In respect of cash flow hedging, a forecast transaction that is a hedged item must be at a highly probable level and cause exposure to cash flow changes that may ultimately affect profit and loss.

Changes in fair value of derivatives used to hedge cash flows in respect of the effective part of the hedge are recognized through other comprehensive income directly in a capital reserve for hedges.

D. Financial instruments (cont.)

2. Non-derivative financial liabilities (cont.)

For the non-effective part, the changes in fair value are recognized in profit and loss. The amount accumulated in a capital reserve for hedges is reclassified to the hedged assets in the statement of financial position or statement of income in the period in which the cash flows affect such assets or the statement of income, respectively, and is presented in the same category in the financial statements as the hedged item.

If the hedging instrument no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, then hedge accounting is discontinued. The cumulative profit and loss previously recognized through other comprehensive income and presented in the hedging capital reserve remains in equity until the projected transaction occurs or is no longer expected to occur. If the forecast transaction is no longer expected to occur, then the cumulative profit and loss previously recognized in the hedging capital reserve is recognized immediately in profit and loss.

When the hedged item is a non-financial asset, the amount recognized in the capital reserve for hedges is added to the carrying amount of the asset when it is recognized.

Non-hedge derivatives

Derivatives are initially recognized at fair value. Subsequent to initial recognition, changes in fair value of non-hedge derivatives are recognized in profit and loss as finance income (expenses).

4. Liabilities linked to the Consumer Price Index (hereinafter - "CPI") not measured at fair value

The value of CPI-linked financial liabilities that are not measured at fair value, is revalued every period according to the actual increase/decrease in the CPI.

E. Property, plant and equipment

1. Recognition and measurement

Property, plant and equipment items are measured at cost less accumulated depreciation.

The cost of property, plant and equipment includes expenditure that is directly attributable to the purchase of the asset. The cost of self-constructed assets includes the cost of materials, direct labor costs, any additional costs directly attributable to bringing the asset to the location and the condition necessary for it to be capable of operating in the manner intended by management, the estimated cost for decommissioning and removing the items and restoring the site on which they are located, as well as capitalized borrowing costs. Advance payments made in respect of self-constructed assets are recognized as part of the cost of the said equipment.

Purchased software that is integral to the functionality of the related equipment is recognized under the cost of that equipment.

When the Company enters into a transaction to acquire an asset (a transaction that does not constitute a business combination) and the acquisition consideration includes a contingent consideration that depends on the occurrence of future events that are beyond the Company's control, the liability in respect of the contingent consideration is recognized only upon occurrence of the future event (date of realization of the contingent consideration) and recorded against the cost of the acquired asset.

Spare parts, auxiliary equipment and backup equipment are classified as property, plant and equipment when they meet the definition of property, plant and equipment under IAS 16, Property, Plant and Equipment.

E. Property, plant & equipment (cont.)

When major parts of a property, plant and equipment item (including costs of periodic tests) have different useful lives, they are accounted for as separate items (major components) of property, plant and equipment.

2. Subsequent costs

The cost of replacement of part of a property, plant and equipment item and other subsequent costs are recognized as part of the carrying amount of property, plant and equipment if their future economic benefit is expected to be received by the Group and if their cost can be measured reliably. The carrying amount of the replaced part of a property, plant and equipment item is derecognized. Ongoing maintenance costs of property, plant and equipment items are recognized in profit and loss as incurred.

3. Depreciation

Depreciation is a systematic allocation of the depreciable amount of an asset over its useful life. The amortizable amount is the cost of the asset, or another amount that replaces the cost, less its residual value.

An asset is depreciated from the date it is ready for use, meaning the date it reaches the location and condition required for it to operate in the manner intended by management.

Amortization is recognized in the income statement (unless included in the carrying amount of another asset) on a straight-line basis over the estimated useful life of each part of the property, plant and equipment items, since this method reflects the expected consumption pattern of the future economic benefits inherent in the asset in the best way possible.

Estimates regarding depreciation methods, useful life and residual value are reviewed at the end of each reporting year and adjusted as needed.

The estimated useful life for the current period and comparative periods is as follows:

Facilities, machinery and equipment 5-30 years (mainly 30 years) Roads and buildings 23-30 years Wind power plant 35 years Leasehold and other improvements (*) 3-30 years

(*) The shorter of the lease term and the useful life.

F. Intangible assets

1. Goodwill

Goodwill resulting from the acquisition of subsidiaries is presented under intangible assets. For information regarding measurement of goodwill upon initial recognition, see Section A2 above. In subsequent periods, goodwill is measured at cost less accumulated impairment losses. For further information see Note 12B.

2. Other intangible assets

Other intangible assets acquired by the Group that have a defined useful life are measured at cost less amortization.

F. Intangible assets (cont.)

3. Amortization

Amortization is the systematic allocation of the amortizable amount of an intangible asset over its useful life. The amortizable amount is the cost of the asset, less its residual value.

Amortization is recognized in the income statement on a straight-line basis, over the estimated useful lives of the intangible assets from the date they are available for use, since these methods most closely reflect the expected pattern of consumption of the future economic benefits best embodied in each asset. Goodwill is not amortized systematically unless tested for impairment at least once a year.

The estimated useful life for the current period and comparative periods is as follows:

Power purchase agreement* 10 years

* The useful life of the PPA reflects the balance of the agreement period from the acquisition date.

Estimates regarding amortization methods, useful life and residual value are reviewed at the end of each reporting year and adjusted as needed.

G. Inventories

Inventories are measured at the lower of cost or net realizable value. The cost of raw material inventories is determined using the first in, first out (FIFO) method. The cost of inventories of finished goods is determined on the basis of average cost, including materials, labor and the attributable share of production overheads, based on normal capacity.

Net realizable value is the estimated selling price in the ordinary course of business, less the estimated costs of completion and the estimated costs required for the sale.

G. Impairment

1. Non-derivative financial assets

The Group recognized a provision for expected credit losses for financial assets measured at amortized cost.

The Group elected to measure the provision for expected credit losses in respect of trade receivables and contract assets at an amount equal to the contractual credit losses over the useful life of the instrument.

A financial assets not presented at fair value through profit and loss is tested for impairment when objective evidence indicates that a loss event has occurred subsequent to initial recognition of the asset, and that the loss event had a negative impact on the estimated future cash flows of such asset that can be measured reliably.

Objective evidence that financial assets are impaired may include contractual breach by a debtor, restructuring of the amount due to the Group under terms which the Group would not consider otherwise, indications that the debtor or issuer will become bankrupt or the disappearance of an active market for a security.

The Group reviews evidence of impairment in respect of receivables and loans on a specific basis.

G. Impairment (cont.)

2. Non-financial assets

Timing of impairment testing

The carrying amounts of the Group's non-financial assets, other than deferred tax assets, are reviewed at each reporting date to determine whether there is any indication of impairment. If any such indication exists, the recoverable amount of the asset is estimated.

Measurement of recoverable amount

The recoverable amount of an asset or cash-generating unit is the higher of its value in use and its fair value less disposal costs. When determining the value in use, the Group discounts the projected future cash flows at the pre-tax discount rate that reflects the estimates of the market participants regarding the time value of the money and the specific risks attributed to the asset. For the purpose of impairment testing, assets are grouped together into the smallest asset class that generates cash inflows from continuing use that are largely independent of the cash inflows of other assets or other groups of assets (hereinafter - a "cash-generating unit").

Recognition of impairment loss

An impairment loss is recognized if the carrying amount of an asset or cash-generating unit exceeds its recoverable amount, and are recognized in profit and loss. With regard to cash-generating units that include goodwill, an impairment loss is recognized when the carrying amount of the cash-generating unit, after grossing up the goodwill balance, exceeds its recoverable amount. Impairment losses recognized in respect of cash-generating units are first allocated to impairment of the carrying value of goodwill attributed to those units and then to impairment of the carrying value of the other assets in the cash-generating units, proportionally.

Reversal of impairment loss

On each reporting date, a review is conducted of whether there are indications that such losses have decreased or no longer exist. An impairment loss is canceled in the event of a change in the estimates used to determine the recoverable amount, only if the carrying amount of the asset, after cancellation of the impairment loss, does not exceed the carrying amount after deduction of depreciation or amortization, that would have been determined had the impairment loss not been recognized. An goodwill impairment loss is not reversed in subsequent periods.

I. Employee benefits

Defined contribution plans

The Group has a defined contribution plan. A defined contribution plan is a post-employment benefit plan under which the Group pays fixed contributions into a separate entity and has no legal or constructive obligation to pay further amounts. The Group's obligations for contributions to defined contribution pension plans are recognized as an expense in profit and loss in the periods during which related services are rendered by the employees. Liabilities for contributions into a defined contribution plan that are due for payment within more than 12 months from the end of the period in which the employees rendered the service are recognized at their present value.

Short-term employee benefits

Obligations in respect of short-term employee benefits are measured on a non-discounted basis, and the expense is recognized when the related service is rendered or in the event of non-accrued absences, at the time of the actual absence.

I. Employee benefits (cont.)

A provision in respect of short-term employee benefits for a cash bonus or a profit-sharing plan is recognized at the amount expected to be paid, when the Group has a present legal or constructive obligation to make such payment as a result of past service rendered by an employee and a reliable estimate of the amount can be made.

J. Share-based compensation transactions

The fair value at the grant date of share-based compensation bonuses to the Company's employees is recognized as a salary expense in parallel to an increase in equity over the period in which a non-contingent entitlement to the bonuses is achieved. The amount recognized as an expense in respect of share-based compensation bonuses that is subject to vesting conditions that are service terms is adjusted to reflect the number of bonuses that are expected to vest.

The fair value of the liability for employees for cash-settled rights to participate in the earnings of CPV Group was treated as a share-based payment and is recognized as an expense against a corresponding increase in liability, over the period in which the unconditional right to payment is achieved. The liability is remeasured at each reporting date until the settlement date. The changes in the fair value of the liability were included in administrative and general expenses in the income statement.

K. Provisions and indemnity assets

The Group recognizes a indemnification asset if, and only if, it is virtually certain that the indemnification will be received if the Group settles the obligation. The amount recognized in respect of indemnification does not exceed the amount of the provision.

A provision is recognized if, as a result of a past event, the Group has a present legal or constructive obligation and it is more likely than not that an outflow of economic benefits will be required to settle the obligation and the amount of obligation can be reliably estimated. When the effect of the time value is material, the provision is measured at its present value.

L. Liability in respect of decommissioning and removal costs of an item and recovery of the site where the item is located

The cost of property, plant and equipment includes the cost of decommissioning and removing the item and restoring the site on which it is located, for which the entity was obligated when the item was acquired or as a result of the use of the item during a particular period, not for inventory production purposes in such period.

Subsequent to initial recognition, a change in the estimate of such liability up to the end of the item depreciation period will be added or deducted from the asset in the current period. Changes in such liability due to the passage of time are recognized in profit or loss as finance expenses.

M. Revenues

The Group recognizes revenue when the customer gains control over the promised goods or services. The revenue is measured at fair value of the consideration to which the Group expects to be entitled in exchange for the goods or services promised to the customer, other than amounts collected for third parties.

M. Revenues (cont.)

Revenues from the sale of electricity and steam are recognized in the period in which the sale takes place in accordance with the price set in the electricity sale agreements and the quantities of electricity supplied. Furthermore, Company's revenues include revenues from provision of asset management services to power plants; those revenues are recognized in accordance to the service provision rate.

When setting the transaction price, the Groups takes into consideration fixed amounts and amounts that may vary as a result of discounts, credits, price concessions, penalties, claims and disputes and contract modifications that the consideration in their respect has not yet been agreed by the parties.

The Group includes variable consideration, or part of it, in the transaction price only when it is highly probable that its inclusion will not result in a significant revenue reversal in the future when the uncertainty has been subsequently resolved. At the end of each reporting period and if necessary, the Group revises the amount of the variable consideration included in the transaction price.

When another party is involved in providing goods or services to a customer, the Group shall determine whether the nature of its promise is a performance obligation to provide the specified or services itself (i.e., the Group is a principal) or to arrange for those services to be provided by the other party (i.e., the Group is an agent), and therefore recognizes the revenue as the net fee amount.

The Group is a principal if it controls the specified service before that service is transferred to a customer. Indicators that the Group controls the specified service before it is transferred to the customer include the following: The Group is primarily responsible for fulfilling the promise to provide the specified service; the entity bears a risk before the specified service has been transferred to a customer; and the Group has discretion in establishing the price for the specified service.

N. Share capital

Ordinary shares are classified as equity. Incremental costs attributed directly to the issuance of shares less the tax effect are presented as a deduction from equity. Incremental costs attributed directly to the expected issuance of an instrument that will be classified as an equity instrument are recognized as an asset under the deferred expenses category in the statement of financial position. The costs are deducted from the equity upon initial recognition of the equity instruments, or amortized as finance expenses in the statement of income when the issuance is no longer expected to take place.

O. Business development expenses

The Company recognized in the statement of income, all development costs in respect of projects that it develops until a stage at which, in the management's opinion, the feasibility of construction of the project has been proven. From the stage at which the project is feasible, the development and construction costs are discounted to the project costs. A project is considered feasible when the Company's management believes that the likelihood of the project materializing and generating future economic benefits is greater than the likelihood that it will not materialize.

P. Finance income and expenses

Finance expenses include interest expenses in respect of loans and debentures received, losses from derivative financial instruments recognized in profit and loss, losses from hedging instruments recognized in profit and loss and prepayment fees of loans and debentures. Borrowing costs are recognized in the income statement using the effective interest method.

P. Finance income and expenses (cont.)

Finance income includes interest income in respect of loans granted and amounts invested, and gains from derivative financial instruments recognized in profit and loss.

Profits and losses from exchange rate differences in respect of financial assets and liabilities are reported on a net basis as finance income or finance expenses, depending on exchange rate fluctuations, and depending on their position (net profit and loss).

Interest income and expenses are recognized using the effective interest method. As a rule, interest income and expenses are calculated by applying the effective interest rate to the gross carrying amount of the financial asset or the amortized cost of the financial liability, as applicable.

In statements of cash flows, interest received is presented under cash flows from investing activities. Interest paid is presented under cash flows from financing activities. Borrowing costs capitalized to qualifying assets are presented together with the interest paid under cash flows from investing activities. Cash flows paid (or received) in respect of derivative financial instruments not designated for hedging are presented under cash flows from investing activities.

Q. Income tax expenses

Income taxes include current and deferred taxes. Income taxes are recognized in the statement of income unless the tax derives from a business combination, or are recognized directly to equity or other comprehensive income if derived from items recognized directly in equity or other comprehensive income.

Current assets

Current tax is the tax amount expected to be paid (or received) on taxable income in the tax year, when it is calculated at the tax rates under the applicable laws that have been enacted or substantively enacted as at the reporting date. Current taxes include taxes in respect of previous years.

Deferred taxes

Deferred taxes are recognized in respect of temporary differences between the carrying amount of assets and liabilities for financial reporting purposes and their value for tax purposes. The Group does not recognize deferred taxes in respect of the following temporary differences: (1) initial recognition of goodwill; (2) initial recognition of assets and liabilities in a transaction that does not constitute a business combination and does not affect the accounting profit and the profit for tax purposes; (3) the differences are due to an investment in subsidiaries, if the Group controls the reversal date of the difference and, they are not expected to reverse in the foreseeable future, whether by way of disposal of an investment or by way of distribution of dividends in respect of an investment.

Deferred taxes are measured at the tax rates that are expected to be applied to temporary differences when they reverse, based on the laws that have been enacted or substantively enacted by the reporting date.

A deferred tax asset is recognized for carryforward losses, tax benefits and deductible temporary differences, to the extent that it is probable that future taxable income can be utilized. Deferred tax assets are examined on every reporting date, and if the attributed tax benefits are not expected to materialize, they are amortized.

Q. Income tax expenses (cont.)

Deferred tax assets which were not recognized are reassessed on every reporting date and recognized if the expectation changes so that future taxable income will be available against which they can be utilized.

Offsetting current and deferred tax assets and liabilities

The Group offsets deferred tax assets and liabilities if there is a legally enforceable right to offset current tax liabilities and assets, and they are attributed to the same taxable income levied by the same tax authority on the same taxable entity, or on different tax entities, but they intend to settle deferred tax liabilities and assets on a net basis or their tax assets and liabilities will be realized simultaneously.

Additional tax on dividend distribution

The Group may undertake additional tax in the event of distribution of dividends by the Group companies. Such additional tax is not included in the financial statements, while the policy of the Group companies is not to cause distribution of a dividend that entails additional tax for the receiving company in the foreseeable future. In cases in which an investee company is expected to distribute a dividend from profits involving additional tax for the Company, the Company creates a tax reserve for the additional tax that the Company may incur in respect of distribution of the dividend.

Income taxes from the distribution of dividends by the Company are recognized in profit and loss on the date of recognition of the obligation to pay the dividend.

R. Earnings (loss) per share

The Group presents basic and diluted earnings (loss) per share (EPS) data for its ordinary shares. Basic earnings (loss) per share is calculated by dividing the profit and loss attributable to ordinary shareholders of the Company by the weighted average number of ordinary shares outstanding during the year.

Diluted earnings (loss) is calculated by adjusting the profit or loss attributed to the ordinary shareholders of the Company and adjusting the weighted average number of the ordinary shares in circulation, after adjustment of diluted securities, if any.

S. Capitalization of borrowing costs

A qualifying asset is an asset that requires a substantial period to prepare it for its intended use or sale. Specific borrowing costs are capitalized to a qualifying asset during the period required for construction and completion until it is ready for its intended use. Foreign currency differences from credit in foreign currency are capitalized if they are considered an adjustment of interest costs. Other borrowing costs are expensed in profit and loss as incurred.

T. Leases

1. Determination of whether an arrangement includes a lease

At the lease inception date, the Group determines whether the arrangement constitutes or contains a lease, while examining whether the arrangement transfers a right to control the use of an identifiable asset for a period in return for payment. When assessing whether an arrangement transfers the right to control the use of an identifiable asset, the Group examines whether throughout the lease period it has the following two rights:

(a) The right to essentially obtain all the economic benefits associated with the use of the identifiable asset; and (b) The right to direct the use of the identifiable asset.

For lease contracts that include non-lease components, such as services or maintenance, which are connected to a lease component, the Group elected to account for the lease component separately.

2. Leased assets and lease liabilities

Contracts that grant the Group control over the use of an asset in respect of a lease during a period in return for a consideration are treated as leases. Upon initial recognition, the Group recognizes a liability in the amount of the present value of the future lease payments (such payments do not include certain variable lease payments), and in parallel, the Group recognizes a right-of-use asset in the amount of the liability in respect of the lease, adjusted for the lease payments - prepaid or accrued - plus direct costs incurred in the lease.

Since the interest rate inherent in the Group's leases cannot be determined, the Group uses the incremental interest rate of the lessee.

Subsequent to initial recognition, the right-of-use asset is accounted for using the cost model, and amortized throughout the lease period or throughout the useful life of the asset, whichever is earlier.

The Group examined application of the practical expedient under which short-term leases of up to one year or leases in which the underlying asset has a low value are treated in a way that the lease fees are recognized in profit and loss using the straight line method, throughout the lease period, without recognizing an asset and/or liability in the statement of financial position.

2. Lease term

The lease term is determined as the period in which it is not possible to terminate the lease, together with the periods covered by an option to extend or terminate the lease if it is reasonably certain that the lessee will choose to exercise or not to exercise the option, respectively.

3. Variable lease payments

Variable CPI-linked lease payments are initially measured using the existing CPI on the lease commencement date and are included in the measurement of the lease liability. When there is a change in the cash flows of the future lease payments due to CPI or exchange rate changes, the balance of the liability is updated against the right-of-use asset.

Other variable lease payments that are not included in measurement of the liability are recognized in profit and loss at the date the payment terms are fulfilled.

T. Leases (cont.)

4. Amortization of right-of-use asset

Subsequent to the lease commencement date, the right-of-use asset is measured using the cost method, less accumulated depreciation and accrued impairment losses adjusted for re-measurement of the lease liability. The amortization is calculated on the straight-line basis over the useful life or the contractual lease period, whichever is earlier, as follows:

  • Land 19-49 years
  • Offices 3-9 years • PRMS facility 24 years
  • Others 3-5 years

2. Subleases

In leases in which the Group sublets the underlying asset, the Group assesses the classification of the sublease as a finance or operating lease, for the right-of-use received from the head lease.

Operating leases

Leases that do not actually transfer any risks and rewards of ownership of the underlying asset are classified as operating leases. The Group recognizes lease payments from operating leases as income on a straight-line basis throughout the lease period.

U. New standards and interpretations not yet adopted

1. Amendment to IAS 1 - "Presentation of Financial Statements: Classification of Liabilities as Current or Non-Current"

The Amendment replaces certain classification requirements of current or non-current liabilities. For example, pursuant to the amendment, a liability will be classified as non-current if an entity has the right to defer the payment for a period of at least 12 months after the reporting period, which is "substantive" and exists at the end of the reporting period. A right exists as at the reporting date only if an entity is in compliance with the conditions for deferment of the payment as at that date. In addition, the amendment clarifies that a conversion right of a liability will affect its classification as current or non-current, unless the conversion component is capital-based.

The Amendment will become effective for reporting periods commencing on January 1, 2023. Early application is permissible. The Amendment is to be applied retrospectively, including adjustment of the comparative data.

The Group has yet to begin examining the ramifications of the amendment's application for the financial statements.

2. Amendment to IAS 16, Property, Plant and Equipment: Proceeds before Intended Use (hereinafter in this section - the "Amendment")

The Amendment annuls the requirement by which in the calculation of costs directly attributable to property, plant and equipment, the net proceeds from selling certain items that were produced while the Company tested the functioning of the asset should be deducted (such as samples that were produced when testing the equipment). Instead, such proceeds will be recognized in profit or loss according to the relevant standards.

The Amendment is effective for reporting periods beginning on or after January 1, 2022 Early application is permissible. The Amendment will be applied on a retrospective basis, including an amendment of comparative figures, only for items of property, plant and equipment that have been brought to the location and condition required for them to operate in the manner intended by management subsequent to the earliest reporting period presented at the date of initial application of the Amendment. The cumulative effect of the Amendment will adjust the opening balance of retained earnings for the earliest reporting period presented.

The Group will apply the Amendment starting from January 1, 2022. Application of the Amendment for the year ended December 31, 2020 in respect of the commencement of operations of the Company's Hadera facility during this year, is expected to result in an increase in loss in the amount of NIS 4 million and as at December 31, 2020, a decrease in property, plant and equipment in the amount of NIS 9 million, an increase in equity in the amount of NIS 7 million, and an increase in deferred tax assets in the amount of NIS 2 million. Application of the Amendment to 2021 and 2022 is not expected to be material.

NOTE 4 - DETERMINATION OF FAIR VALUE

As part of the accounting policy principles and disclosure requirements, the Group is required to determine the fair value of financial and non-financial assets and liabilities. The fair value is determined for measurement and/or disclosure purposes using the methods described below. Further information regarding the assumptions used in determining the fair value is provided in notes that relate to that asset or liability.

Non-derivative financial liabilities

Fair value, which is calculated for reporting purposes, is estimated at the present value of future cash flows (in respect of principal and interest), which are discounted at the market interest rate as at the reporting date.

Share-based compensation transactions in the CPV Group

For information regarding the assumptions used in determining the fair value of share-based compensation transactions in the CPV Group, see Note 18C.

Fair value of assets and liabilities acquired in a business combination

For information regarding the assumptions used in determining the fair value of assets and liabilities acquired in a business combination, see Note 25D

Fair value of derivatives

For information about the calculation method used in determining the fair value of derivatives, see Note 23D.

NOTE 5 - CASH AND CASH EQUIVALENTS

As at December 31
2021 2020
NIS million NIS million
Current account balances in banks 603 102
Bank deposits 154 98
757 200

The Group's exposure to credit, interest and exchange rate risks and sensitivity analysis of financial assets are presented in Note 23.

NOTE 6 - RESTRICTED DEPOSITS AND CASH

As at December 31
2021 2020
NIS million NIS million
Stated in current assets
Short-term bank deposits - 1,607
Short-term restricted deposits and cash in banks (*) 1 207
Stated in non-current assets
Long-term restricted cash in banks (*) 67 231

(*) For further information about restricted cash, see Notes 16D, 23D and 24D.

NOTE 7 - TRADE RECEIVABLES

As at December 31
2021 2020
NIS million NIS million
Open accounts 27 9
Income receivable 167 144
194 153

NOTE 8 - RECEIVABLES AND DEBIT BALANCES

As at December 31
2021 2020
NIS million NIS million
Advances to suppliers 1 3
Deposits to a third party for collateral 51 -
Prepaid expenses 18 11
Refunds receivable 1 6
Government institutions 15 11
Compensation from construction contractor (see Note 28D) 28 29
Other 4 3
118 63

A. Composition

As at December 31
2021 2020
NIS million NIS million
Long-term deferred expenses (B.1) 104 86
Payments to customers (see Note 28A2 and 28A3) 27 26
Deferred finance expenses (B.2) 29 31
Loan to an associate 16 -
Other 2
178 143

B. Additional details

Long-term deferred expenses

As at December 31
2021 2020
NIS million NIS million
Deferred expenses 135 113
Accumulated amortization (31) (27)
104 86
  1. Long-term deferred expenses represent mainly connection costs to the gas transmission system and the electricity transmission grid, as follows:

A. Costs paid by Rotem and Zomet to Israel National Gas Lines Ltd. (hereinafter - "INGL") for their share in the connection to the national gas transmission network through a pressure reduction and metering system (hereinafter - the PRMS") and for the gas transmission pipe from the PRMS facilities to the premises of the Rotem and Zomet power plants (see also Note 28F).

B. Costs paid by the Group companies to IEC for the infrastructure of electricity transmission lines used to connect the Group's power plants to IEC's transmission grid.

It should be noted that the said connection infrastructure is designed and part is even actually used to connect additional consumers to the same infrastructure. Therefore, these costs are treated as long-term deferred expenses. Long-term deferred expenses are amortized in a straight line over a period of use of between 21 and 30 years. At Zomet, the period of use had not yet commenced. Such amortization is recognized under the depreciation and amortization section in the statement of income.

  1. The Group has financing agreements and credit facilities in financing agreements as described in Note 16D (hereinafter - the "Financing Agreements"). Under the Financing Agreements, various commissions were paid such as financial closing commission and periodic commission in respect of an unutilized credit facility (hereinafter - the "Commissions"). The Commissions are amortized according to the percentage of withdrawals from the financing agreements under the Financing Agreements and are treated, using the effective interest method, as part of the balance of loans from banks and others.

NOTE 10 - PROPERTY, PLANT & EQUIPMENT

A. Composition Roads and
buildings
NIS million
Facilities,
machinery and
equipment
NIS million
Diesel and spare
parts
NIS million
Wind turbine
NIS million
Leasehold and
other
improvements
NIS million
Assets under
construction and
development
NIS million
Advances on
account of
property, plant and
equipment
NIS million
Total
NIS million
Cost
Balance as at January 1, 2020 132 1,765 104 - 16 833 11 2,861
Additions, net * - 15 46 - 2 390 9 462
Derecognitions - (14) (32) - - - - (46)
Classification of assets under construction 90 722 - - - (812) - -
Balance as at December 31, 2020 222 2,488 118 - 18 411 20 3,277
Acquisitions as part of a business combination - - - 98 5 62 - 165
Additions 12 6 2 3 7 813 17 860
Derecognitions - - (6) (3) (1) - - (10)
Effect of changes in exchange rates - - - (5) - (13) - (18)
Balance as at December 31, 2021 234 2,494 114 93 29 1,273 37 4,274
Accumulated depreciation
Balance as at January 1, 2020 29 483 - - 5 - - 517
Depreciation per year 6 101 - - 2 - - 109
Derecognitions - (14) - - - - - (14)
Balance as at December 31, 2020 35 570 - - 7 - - 612
Depreciation per year 8 118 - 2 3 - - 131
Balance as at December 31, 2021 43 688 - 2 10 - - 743
Amortized balance as at December 31, 2021 191 1,806 114 91 19 1,273 37 3,531
Amortized balance as at December 31, 2020 187 1,918 118 - 11 411 20 2,665
Amortized balance as at January 1, 2020 103 1,282 104 - 11 833 11 2,344

* Additions for assets under construction are presented net of agreed compensation from the construction contractor (for further information, see Note 28D).

NOTE 10 - PROPERTY, PLANT & EQUIPMENT (cont.)

B. Discounted credit costs

Borrowing costs capitalized to assets under construction in the years ended 2021 and 2020 amounted to NIS 22 million and NIS 28 million, respectively.

C. Non-cash purchase of property, plant and equipment

In the years ended December 31 2021 and 2020, non-cash property, plant and equipment was purchased in the amount of NIS 121 million and NIS 113 million, respectively.

NOTE 11 - LEASES

A. Information about material leases

Land on which the Rotem Power Plant was constructed

Rotem has a lease agreement for a 5.5-hectare plot of land in Mishor Rotem, on which the Rotem Power Plant was constructed. Under the conditions set out in the agreement, the lease is for a term of 49 years as from November 4, 2010, with an option to extend the lease for one additional term of 49 years, subject to advance notice. In the event of rezoning of the plot during the Lease Term, the Lessor will not be required to extend the Lease Term. The lessor may cancel the lease agreement in events defined as a fundamental breach.

The balance of the right of use asset for lease of land on which the Rotem Power Plant is being constructed in the statement of financial position as at December 31, 2021 amounts to NIS 7 million.

Rotem 2 land

In 2014, AGS Rotem Ltd. (hereinafter - "Rotem 2") won a tender for lease of lots on an area covering 5.5 hectares. Land adjacent to the Rotem Power Plant. Under the agreement, the lease is for a term of 49 years as from March 9, 2014, with an option to extend the lease for an additional 49 years, subject to the terms of the agreement. The lessor may cancel the lease agreement in events defined as a fundamental breach. During the reporting period, the Company applied to the ILA to extend the period for completion of construction in the land in accordance with the lease agreement, at no cost. As of the filing date of the Report, a response has yet to be received.

The balance of the right of use asset for the lease of land on which the Rotem 2 Power Plant is scheduled to be built in the statement of financial position as at December 31, 2021 amounts to NIS 8 million.

Land on which Hadera Power Plant was built

Hadera leases land covering 2.8 hectares (including an emergency road), on which the Hadera Power Plant was built, from Infinya (hereinafter in this section - the "Agreement"). Under the Agreement, the monthly rent amounts to NIS 117 thousand (linked to the CPI), subject to adjustments in certain cases, and the lease term is 24 years and 11 months starting from December 2018. The agreement sets a yearly liability limit for Hadera at the rent amount paid in 2019. The agreement grants the parties a termination right in various default events, and grants Infinya a termination right in the event of a material breach by Hadera, including breach of the commitment to pay rent, unless remedied within 45 days.

The balance of the lease liability and the right of use asset for the lease of land on which the Hadera Power Plant is built in the statement of financial position as at December 31, 2021 amounts to NIS 7 million each.

NOTE 11 - LEASES (cont.)

A. Information about material leases (cont.)

Land on which the Zomet Power Plant was constructed

In January 2020, the Israel Land Authority (hereinafter - the "ILA") approved the allotment of an area of 8.5 hectares for construction of a power plant for electricity generation, which is under construction by Zomet (hereinafter in this Section - the "Land"). Similarly, in January 2020, the ILA and Kibbutz Netiv HH (hereinafter - the "Kibbutz") signed a development agreement for the Land, effective until November 5, 2024, and after fulfillment of its terms, a lease agreement will be signed for a term of 24 years and 11 months from approval of the transaction, namely until November 4, 2044 (hereinafter - the "Development Agreement"). In addition, in January 2020, the option agreement between Zomet and the Kibbutz expired and, following its cancellation, Zomet and the Kibbutz signed an agreement of principles for establishment of a joint company to which the Land rights were transferred after receiving approval from the ILA in May 2020 (hereinafter – the "Joint Company"). The consideration for the rights of the Kibbutz to the land under which a development agreement with the ILA can be signed amounted to NIS 30 million. The Joint Company Agreement in Principle clarified that the Kibbutz acted as a trustee of the Joint Company when it signed the Development Agreement with the ILA, and acted as an agent of the Joint Company when it signed the financial specification under which the capitalization fees for the Land were paid, in the amount of NIS 207 million (as detailed below). In February 2020, an updated lease agreement was also signed according to which the Joint Company, as the owner of the Land, will lease the Land to Zomet in favor of the project.

The Joint Company was established by Zomet and the Kibbutz as a limited partnership under the name Zomet Netiv Limited Partnership" and the composition of the partners therein is: (1) the general partner, Zomet HLH General Partner Ltd. (1%) held by Zomet (74%) and the Kibbutz (26%); (2) the limited partners are Zomet (73%) and the Kibbutz (26%).

Following approval by the ILA to allocate the Land for the construction of the Zomet Power Plant, in January 2020, the ILA issued a financial specification of the capitalization fees, according to which the value of the Land (excluding development expenses) was estimated at NIS 207 million (excluding VAT) (hereinafter - the "Initial Assessment"). The Initial Assessment was subject to audit procedures.Under the Initial Assessment and to complete the Land transaction, Zomet, on behalf of the Joint Company and through the Kibbutz, paid 75% of the Initial Assessment in January 2020, and provided, through the Company, the remaining 25% as a bank guarantee in favor of the ILA. For information about the short-term loan taken by the Company to pay the Initial Assessment, see Note 16D4.In January 2021, a final assessment was issued by the Israel Lands Authority in respect of the land, whereby the value of the usage fees for the land, for a period of 25 years, in respect of the construction of a power plant with a capacity of 396 MW, amounts to NIS 200 million (hereinafter – the "Final Assessment"). In March 2021, a refund in the amount of NIS 7 million was received, including linkage differences and interest, for the difference between the capitalization fees effectively paid and the amount of the Final Assessment and the bank guarantee was also reduced by 25% of the difference (see also Note 16D(4)).

In February 2021 the Joint Company submitted a legal appeal of the amount of the Final Assessment. In August 2021, the Joint Company was notified that the ILA had dismissed the objection and as at the publication date of the report, the Joint Company intends to continue to appeal the assessment and in this context, in November 2021 an assessor objection was filed, which has not yet been discussed as at the approval date of the report.

All the amounts attributable to acquisition of the Land, in the amount of NIS 231 million, were classified in the Company's statement of financial position as at December 31, 2021, under right-of-use assets. The unpaid balance of the Initial Assessment, in the amount of NIS 52 million, was classified in the statement of financial position as at December 31, 2021, under current maturities of lease liabilities.

NOTE 11 - LEASES (cont.)

A. Information about material leases (cont.)

PRMS facility in Hadera

The balance of the right of use asset for the PRMS facility in Hadera in the statement of financial position as at December 31, 2021 amounts to NIS 19 million. For further information, see Note 28F.

Lease of offices

In 2017, Rotem signed an agreement with the Azrieli Group Ltd. to rent offices and parking spaces in the Azrieli Sarona Center, for a term of 10 years, ending in December 2027. In May 2021, an addendum to the agreement was signed for the rental of additional office space in the Azrieli Sarona Center, which was accounted for as an additional lease agreement. The Company has an option to extend the agreements by an additional 5 years. As at the reporting date, there is no reasonable certainty that the option to extend will be exercised. Thus, it was not taken into account in calculating the lease liability and right of use asset.

The balance of the lease liability and the right of use asset in the statement of financial position as at December 31, 2021 for rental of the Company's offices amounts to NIS 14 million.

CPV Group leases two offices, in Maryland and in Massachusetts, USA, under leases that terminate in June 2024 and in October 2028, respectively. The balance of the lease liability and the right of use asset with respect to the offices, in the statement of financial position as at December 31, 2021, amounts to USD 16 million (USD 5 million) and NIS 15 million (USD 5 million), accordingly.

Land on which the Keenan wind farm is constructed

Keenan has an agreement for the lease of land on which a wind power plant has been constructed. The term of the lease is until December 31, 2040. The balance of the lease liability and the right of use asset with respect to the land in the statement of financial position as at December 31, 2021, amounts to NIS 12 million (USD 4 million) each.

B. Right-of-use assets

Composition

Land PRMS facility Offices Vehicles Total
NIS million NIS million NIS million NIS million NIS million
Balance as at January 1, 2020 24 22 9 2 57
Depreciation for right-of-use assets (7) (2) (1) - (10)
Other 231 - - (2) 229
Balance as at December 31, 2020 248 20 8 - 276
Depreciation for right-of-use assets (11) (2) (5) - (18)
Acquisitions as part of a business combination 14 - 20 - 34
Effect of changes in exchange rates - - (1) - (1)
Additions 4 - 7 - 11
Balance as at December 31, 2021 255 18 29 - 302
F - 41

NOTE 11 - LEASES (cont.)

C. Lease liability

Analysis of repayment dates of liabilities for the Group's lease

As at December 31
2021 2020
NIS million NIS million
Up to one year 59 45
Between one and five years 23 5
More than five years 21 9
Total 103 59
Current maturities of lease liability 59 45
Long-term lease liabilities 44 14

D. Amounts recognized in the statement of income

For the year ended December 31
2021 2020
NIS million NIS million
Interest expenses for lease liability 2 1
E. Amounts recognized in the statement of cash flows
For the year ended December 31
2021 2020
NIS million NIS million
Total cash flow paid for leases, net - 189
F - 42
Goodwill PPA * Other Total
NIS million NIS million NIS million NIS million
Cost
Balance as at January 1, 2020 1 - 6 7
Additions - - 1 1
Balance as at December 31, 2020 1 - 7 8
Additions - - 4 4
Acquisitions as part of a business combination 385 361 11 757
Effect of changes in exchange rates (16) (17) - (33)
Balance as at December 31, 2021 370 344 22 736
Amortization
Balance as at January 1, 2020 - - 2 2
Depreciation per year - - 1 1
Balance as at December 31, 2020 - - 3 3
Depreciation per year - 35 1 36
Effect of changes in exchange rates - (1) - (1)
Balance as at December 31, 2021 - 34 4 38
Amortized balance as at December 31, 2021 370 310 18 698
Amortized balance as at December 31, 2020 1 - 4 5
Amortized balance as at January 1, 2020 1 - 4 5

* The power purchase agreement in Keenan was acquired in a business combination - the acquisition of the CPV Group. For further information, see Note 28A4.

NOTE 12 - INTANGIBLE ASSETS (cont.)

B. Impairment testing of a cash-generating unit

As part of the acquisition of the CPV Group as set out in Note 25D, at the acquisition date, the Company recognized goodwill of NIS 343 million (USD 105 million), which reflects the potential of future activities of CPV Group in the market in which it operates. Goodwill was attributed in full to CPV Group, which is a cash-generating unit and a separate operating segment of the Group, for the production and supply of electricity and energy in the United States.

The Company conducted annual impairment testing as of December 31 2021. The recoverable amount of the cash-generating unit was estimated by an independent external appraiser and was based on discounting expected future cash flows approved by the Company's management. Projects under commercial operation and projects under construction were estimated by discounting expected future cash flows before tax and the weighted average cost of capital (WACC) after tax. Projects under development were estimated at cost.

Below are the main assumptions used in the valuation:

    1. Forecast years represents the period spanning from January 1 2022 to December 31 2054, based on the estimate of the economic life of the power plants and their value as at the end of the forecast period.
    1. Market prices and capacity market prices (electricity, gas, capacity, etc.) were provided by an external independent appraiser, the cash flow forecasts were made for each power plant separately, taking into account the relevant electricity market (NYISO, ISO-NE, PJM and SPP) and the relevant regulation.
    1. The annual inflation rate of 2.6% equals the derived 10-year inflation rate as of the estimate date.
    1. The WACC calculated for each material project separately, and ranges between 4.75 % (project with agreements for sale of the entire capacity) and 8.5%.

The Company used a relevant discount rate reflecting the specific risks associated with the future cash flow of a cash-generating unit.

As of December 31, 2021, the recoverable amount of the cash-generating unit of the CPV Group exceeds its book value and therefore, no impairment has been recognized for them. The fair value measurement was classified at Level 3 due to the use of input that is not based on observable market inputs in the assessment model.

As of the report date, in accordance with management's assessments regarding future industry trends, which are based on external and internal sources, management has not identified any key assumptions in which a possible likely changes may occur, which would cause the CPV Group's recoverable amount to decrease below its carrying amount.

NOTE 13 – TRADE PAYABLES

As at December 31
2021 2020
NIS million NIS million
Accrued expenses 330 232
Open accounts 95 66
425 298

NOTE 14 - PAYABLES AND CREDIT BALANCES

As at December 31
2021 2020
NIS million NIS million
Employees and institutions for salaries 36 19
Related parties and interested parties 1 1
Accrued expenses 14 54
Interest payable 15 7
Government institutions 8 11
The balance payable to the construction contractor in Hadera (see Note 28D) 7 -
Other 6 4
87 96

NOTE 15 - OTHER LONG-TERM LIABILITIES

Composition

As at December 31
2021 2020
NIS million NIS million
Profit-sharing plan for CPV Group employees (1) 47 -
Liabilities for evacuation, decommissioning, and removal 21 -
Liability for the projects under construction and development 21 -
Other liabilities 1 2
90 2

(1) For details about profit-sharing plan for CPV Group employee see Note 18C.

NOTE 16 - LOANS AND GUARANTEES

A. Composition

As at December 31
2021 2020
NIS million
NIS million
Loans from non-controlling interests (1) 433 1
Long-term loans from banks and financial institutions (2) 1,519 1,977
Current maturities (97) (127)
1,855 1,851

(1) Loans from non-controlling interests:

As at December 31
2021 2020
NIS million NIS million
Loan to Rotem (see Section D1 below) 226 -
Loan to OPC Power (see Section D6 below) 202 -
Other loans 5 -
433 -

(2) Long-term loans from banks and financial institutions:

As at December 31
2021 2020
NIS million NIS million
Loans in Rotem (see Section D1 below) - 1,096
Loans in Hadera (see Section D2 below) 681 698
Loans in Zomet (see Section D3 below) 528 183
Loans in Keenan (see Section D5 below) 305 -
Loans in Gnrgy 5 -
1,519 1,977

B. Repayment period

The loans are repayable in the years subsequent to the reporting date, as follows:

As at December 31
2021 2020
NIS million
NIS million
First year 97 127
Second year 173 126
Third year 171 153
Fourth year 616 164
Fifth year 82 302
Sixth year and onwards 813 1,106
1,952 1,978

C. Movement in liabilities arising from financing activity

Loans from
non-controlling
interests
1
-
-
-
-
-
-
-
-
-
-
-
Debentures
283
-
974
-
(286)
(13)
-
-
675
-
19
3
Lease liability
NIS million
19
-
-
-
-
(1)
(1)
-
(2)
-
1
42
Financial
instruments
designated for
hedging
14
(21)
-
-
-
-
-
-
(21)
42
-
-
Other liabilities
-
-
-
-
-
-
-
-
-
-
-
-
Total
2,185
(21)
974
251
(420)
(86)
(1)
(30)
667
42
93
68
1 980 60 35 - 3,055
- - - (45) - (45)
- 842 - - - 842
421 - - - - 1,103
- (19) - - - (1,955)
(102)
(6)
(16)
(94)
421 803 (7) (45) (94) (273)
722
(28)
5
183
3 - 16 (11) 43 281
3,945
-
-
-
-
(5)
-
14
(20)
-
-
-
-
-
41
434
1,824
(1)
(6)
-
34
(2)
-
2
103
-
-
-
39
-
(44)
-
(26)
-
-
-
(94)
93
(2)
49
1
90

NOTE 16 - LOANS AND GUARANTEES (cont.)

D. Additional details and guarantees

  1. Rotem

Rotem financing agreement:

The Rotem Power Plant project was financed using the project financing method (hereinafter - the "Rotem Financing Agreement") with a consortium of lenders.

The loans (which were linked to the CPI) bore fixed annual interest at rates between 4.9% and 5.4% and were repaid quarterly basis, starting in the fourth quarter of 2013. In addition, under the Rotem Financing Agreement, Rotem undertook to hold certain funds that were classified under restricted cash in the statement of financial position, and the Company and holders of non-controlling interests in Rotem (hereinafter - "Veridis") also provided bank and corporate guarantees in favor of lenders in the consortium.

In October 2021, early repayment of the full outstanding balance of Rotem's project financing in the amount of NIS 1,292 million (including an early repayment fee) was completed, a debt service reserve and additional restricted cash in Rotem in the amount of NIS 125 million were released, and guarantees related to the Rotem Financing Agreement were canceled. During the reporting period, Rotem recognized a one-off expense in the income statement, totaling NIS 244 million in respect of an early repayment fee (approximately NIS 188 million, net of tax). In addition, during the reporting period, in view of the early repayment of the balance of Rotem's credit, the Company executed an early close-out of a CPI swap contract. (For further information, see Note 23D). It should be noted that upon the execution of early repayment in full of the outstanding balance of Rotem's project financing, the rating of Rotem's senior debt was discontinued.

Shareholder loan to Rotem

The Company and Veridis extended to Rotem shareholder loans for the financing of a portion of the early repayment amount, totaling NIS 1,130 million according to their share in Rotem's shares (hereinafter - the "Shareholder Loans"), such that the Company provided an amount of NIS 904 million, which is eliminated in the financial statements and Veridis provided an amount of NIS 226 million. The shareholder loans are not linked and bear annual interest (representing market conditions) at a rate of 2.65% or interest in accordance with Section 3(J) of the Income Tax Ordinance, whichever is higher. The loans shall be repaid in quarterly unequal installments in accordance with the borrower's free cash flow balance as determined in the Shareholder Loans agreement, and in any case no later than October 2031.

Below is a list of Rotem's material bank guarantees as at December 31, 2021:

  • In February 2017, Rotem provided a bank guarantee in the amount of NIS 2 million (linked to the CPI) in favor of the National Petroleum Commissioner, in accordance with the Excise Tax Law that requires the deposit of a three-year guarantee as a condition for exemption from excise tax on the purchase of the diesel oil serving as backup inventory.
  • In addition, Rotem provided a bank guarantee in favor of the Ministry of Energy in the amount of USD 1 million, in accordance with Rotem's electricity generation license.

D. Additional details and guarantees (cont.)

2. Hadera

Hadera financing agreement:

In July 2016, Hadera entered into a financing agreement for the senior debt (hereinafter – the "Hadera Financing Agreement") with a consortium of lenders (hereinafter – the "Hadera Lenders"), headed by Israel Discount Bank Ltd. (hereinafter – "Bank Discount") and Harel Insurance Company Ltd. (hereinafter – "Harel") to finance the construction of the Hadera Power Plant, according to which the lenders undertook to provide credit frameworks to Hadera, mostly linked to the CPI, up to an amount of NIS 1,006 million in several facilities (some of which are alternates): (1) a long-term credit facility (including a facility for changes in construction and related costs); (2) a working capital facility; (3) a debt service reserves account and a VAT facility; (4) a guarantees facility; and (5) a hedge facility.

Some of the loans under the Hadera Financing Agreement are linked to the CPI and some are unlinked. The loans bear interest at rates between 2.4% and 3.9% (for the linked loans) and between 3.6% and 5.4% (for the unlinked loans) and are repaid in quarterly installments up to 2037, starting from the first quarter of 2020.

In addition, under the Hadera Financing Agreement, commencing from commercial operation, Hadera provided a debt service reserve in an amount equal to the amounts of two consecutive quarterly debt payments (as at December 31, 2021, NIS 30 million) and an owners' guarantee reserve in the amount of NIS 15 million.

In respect of the Hadera Financing Agreement, liens were placed in favor of Discount Bank, as a trustee for the collateral on behalf of the Hadera Lenders, on some of Hadera's existing and future assets, on its rights, and on the Company's holdings in Hadera.

The Hadera distribution operations defined in the Hadera Financing Agreement, subject to a series of conditions described in that agreement, including: repayment of the principal in three installments according to the repayment schedule, after a minimum of 12 months after the date of commercial operation, the absence of a default or potential default event, compliance with the following financial criteria: Historic DSCR, Projected DSCR and LLCR at a minimum rate of 1.25:1, and subject to the conditions set out in the agreement, the debt service account and reserve accounts complying with the level required under the agreement, maintaining a minimum cash amount as required under the amendment to the Subscription Agreement described below, proof of ability to comply with the take or pay undertakings as per the natural gas supply agreement by the next planned calculation date (as defined in the agreement), no more than two distributions were carried out in a 12-month period, if the Hadera power plant fails to comply with the requirements of a cogeneration production unit, as set out in the Cogeneration Regulations, proof will be required of the ability to comply with the payments to IEC and the Electricity Authority due to failure to comply with the foregoing conditions.

In light of the delay in the commercial operation date of the Hadera Power Plant, in January 2020, the Company's Board of Directors approved, to the extent it will be necessary, provision of shareholder loans to Hadera in the amount necessary in order to make the payments to the lenders in accordance with the Hadera Loan – this being up to the end of 2020. In addition, in February 2021, the Company's Board of Directors approved the grant to Hadera of additional shareholder loans, in the amount of up to NIS 30 million, as needed, for purposes of repaying the lenders under the Hadera Loan, until the end of June 2021. In 2020 and 2021, the Company provided Hadera with loans in the amount of NIS 92 million, as per these decisions.

D. Additional details and guarantees (cont.)

2. Hadera (cont.)

The Hadera Equity Subscription Agreement (as amended in May 2017) includes the Company's commitments to pay fees, hedging agreements, and commitments to provide a number of guarantees, including guarantees for insolvency scenarios in the event of failure to collect up to NIS 8 million from customers, and additional bank guarantees in certain cases. Furthermore, the Company is required to comply with certain covenants, which include a (separate) equity to asset ratio of at least 20%, minimum equity of NIS 250 million (until end of the construction contractor liability period and NIS 200 million thereafter), and minimum balance of cash and cash equivalents or a bank guarantee of the Company in the amount of NIS 50 million, which will be reduced under certain conditions. Under certain conditions, a lien will be placed on the cash amount in favor of the lenders.

As at the reporting date, Hadera and the Company were in compliance with all of the covenants in the Hadera Financing Agreement and the Hadera Equity Subscription Agreement.

Hadera has a guarantee facility in the amount of NIS 60 million (of which NIS 26 million has been used as at the date of the financial statements), a hedge facility in the amount of NIS 68 million (of which an insignificant amount has been used) and a working capital facility in the amount of NIS 30 million, which has not been used.

Below is a list of Hadera's material bank guarantees as at December 31, 2021:

  • A. Bank guarantees in favor of the Israeli Electricity Authority in the amount of NIS 7 million (some of which are linked to the USD) as required under the licenses.
  • B. A bank guarantee in favor of the Israel Electric Company in the amount of NIS 18 million (linked to the CPI), as required in accordance with the financial covenants of the Israeli Electricity Authority. It should be noted that subsequent to the reporting date, in February 2022, the Company provided a bank guarantee for the benefit of IEC in an amount that was amended to NIS 17 million, and the bank guarantee to Hadera was canceled.

Hadera rating:

In December 2021, Hadera's senior debt was rated A+ with negative outlook by Maalot.

3. Zomet:

Zomet financing agreement:

In December 2019, a financing agreement for a senior debt (project financing) to finance the construction of the Zomet Power Plant (hereinafter – the "Zomet Financing Agreement") was signed between Zomet and a syndicate of lenders led by Bank Hapoalim Ltd. (hereinafter – "Bank Hapoalim", and jointly with the lenders – the "Zomet Lenders") signed, the main points of which are as follows:

Under the Zomet Financing Agreement, the Zomet Lenders undertook to provide Zomet a long-term loan facility, a standby facility, a working capital facility, a debt service reserve, a VAT facility, third-party guarantees, and a hedge facility in the total amount of NIS 1,372 million. Some of the facility amounts will be CPI-linked, while another portion will be USD-linked. The loans will accrue interest at the rates set out in the Zomet Financing Agreement.

D. Additional details and guarantees (cont.)

3. Zomet: (cont.)

The Zomet Financing Agreement set out provisions for conversion of interest on the long-term loans from variable interest to CPI-linked interest. The conversion will take place in three cases: (A) automatically, 6 years after signing the Zomet Financing Agreement; (B) at the request of Zomet, in the first 6 years after signing the Zomet Financing Agreement; (C) at the request of Bank Hapoalim, in certain cases, in the first 6 years after signing the Zomet Financing Agreement. In addition, Zomet has the right to repay the loans prematurely within 6 years after signing the Zomet Financing Agreement, subject to a reduced one-time (without an early repayment penalty), provided that up to the early repayment date, the loans were not converted into loans bearing fixed CPI-linked interest, as set out above.

The withdrawals from the various facilities are subject to the absence of default events and to compliance with various conditions as is standard in agreements of this type, including, in certain circumstances, receipt of approval from the technical advisor of the Zomet Lenders and compliance with financial covenants.

Under the Zomet Financing Agreement, liens were provided in favor of Poalim Trust Services Ltd., as a trustee for the collateral on behalf of the Lenders, on part of Zomet's existing and future assets, on Zomet's rights, and on the Company's holdings in Zomet.

Distributions by Zomet (including repayment of shareholders' loans) as defined in the Zomet loan agreement are subject to various conditions that are described in the foregoing agreement, and among others: Subsequent to the approved construction completion date (as defined in the agreement) one quarterly principal and interest payment was made in respect of the loans under the long-term credit facility and the standby credit facility; at least 12 months have elapsed since the date of commercial operation (as defined in the agreement); the absence of a breach or potential default event; compliance with the following financial criteria: historic ADSCR, predicted ADSCR and LLCR will not fall below 1:1.2; the reserve accounts and the third-party guarantees facility comply with the levels set in the agreement; under certain circumstances, maintaining minimum cash amounts required; no more than four distributions will be executed per year (and if the emissions permit applicable to the project includes restrictions that the bank believes are reasonably likely to restrict the availability payments payable to the project at the approval tariff - no more than one distribution per year); all the loans provided from the credit facility for filling the debt service reserve, from the third party guarantee facility and the hedging facility, are paid up in full.

As at the reporting date, Zomet and the Company were in compliance with all of the covenants in the Zomet Financing Agreement.

In and subsequent to the reporting period, Zomet withdrew a total amount of NIS 349 million and NIS 156 million, respectively, from the long-term loan facility. The loans bear annual interest of prime + 0.95%. The loans will be repaid in quarterly payments, starting shortly after the end of the first or second quarter following the start of the commercial operation of the Zomet Power Plant (up to the date of the first interest payment, the interest amounts will be accrued to the loan principal on a quarterly basis) and up to the date of the final repayment, which will fall on the earlier of the end of 19 years from the start of the commercial operation or 23 years after signing the Zomet Financing Agreement (but no later than December 31, 2042).

D. Additional details and guarantees (cont.)

3. Zomet: (cont.)

The Zomet Equity Subscription Agreement:

In December 2019, Zomet and the Zomet Lenders signed an equity subscription agreement (hereinafter – the "Zomet Equity Subscription Agreement"). As part of the agreement, the Company undertook certain commitments to the Lenders in connection with Zomet and its activity, including an undertaking to provide Zomet with equity, as defined in the Zomet Financing Agreement, in the amount of NIS 293 million. As at December 31, 2021, the Company provided Zomet with the amount of equity that it had undertaken.

The Zomet Equity Subscription Agreement includes other undertakings of the Company in connection with the provision of further equity under certain circumstances, including where the capital requirements stipulated by law are revised and up to NIS 50 million, and in certain scenarios that have an adverse effect on the project (such as failure to obtain certain permits or the placement of certain restrictions on the power plant's activity), resulting in the Company's being required to provide further equity that may also include the entire amounts required to service the debt and fund the remaining project construction and operation expenses, as the case may be. In addition, the Company undertook that shortly before the start of commercial operation, it will provide a bank guarantee (hereinafter – the "Operation and Maintenance Guarantee"), which will serve as collateral for Zomet's debt under the financing agreement, in the amount of NIS 15 million (which, in certain circumstances, could increase to NIS 22.5 million), and the Company undertook to provide, in certain cases, certain additional bank guarantees required for the project, to the extent they are not issued out of the guarantee facility provided under the Zomet Financing Agreement.

Zomet rating:

In September 2021, Maalot affirmed the senior debt rating of Zomet as AA- with stable outlook.

4. Company:

2020.

Short term loans:

In January 2020, the Company took out a bank loan in the amount of NIS 169 million from its short-term credit facility, which was used to pay the Initial Assessment of Zomet, as described in Note 11A. The loan bore annual interest at the rate of prime + 0.6% and at the rate of prime + 1.7% in part of the period, and was repaid in April 2020.

In March 2020, the Company took out a loan from Bank Mizrahi Tefahot Ltd., a related party of the Company, in the amount of NIS 50 million. The loan bore annual interest at the rate of prime + 1.25% and was repaid in April

Credit facility agreement with Harel:

In October 2020, the Company signed an agreement with entities from the Harel Group (hereinafter – "Harel"), according to which Harel undertook to provide the Company an NIS loan facility in the total amount of NIS 400 million, which may be withdrawn over 24 months after signing the agreement (hereinafter – the "Facility Term"), subject to completion of the transaction in accordance with the acquisition agreement of the CPV Group described in Note 25D. During the facility term, the Company will be entitled to withdraw: (a) short-term loans, which will be repaid at the end of the facility period or converted into long-term loans (end of the facility period), and (b) long-term loans.

D. Additional details and guarantees (cont.)

4. Company: (cont.)

The loans withdrawn from the credit facility will be used for one or more of the following purposes: (A) as payment for part of the consideration under the acquisition agreement of CPV Group, or to provide the amounts required by the CPV Group for development of its business; or (B) for the Company's operating activities in the ordinary course of business, subject to completion of the transaction for acquisition of the CPV Group.

The principal of the long-term loans to be provided to the Company will be repaid after 36 months from the first long-term withdrawal or from the end of the Facility Term, whichever is earlier (hereinafter – the "Final Repayment Date"). The loans will bear annual interest at a rate equal to the Bank of Israel interest rate plus a margin of between 2.55% – 2.75%, which will be paid in quarterly payments.

Under the agreement, the Company undertook, as from the first withdrawal, to comply with certain financial covenants, which, if they are breached, Harel may, among other things, call for immediate repayment of the full balance of the loans. The financial covenants will be assessed shortly after the publication date of the Company's quarterly financial statements, as from the date of the first withdrawal: (A) the Company's equity will not fall below NIS 550 million (and as a condition for distributing a dividend – it will not fall below NIS 850 million); (B) the ratio of the Company's equity to asset ratio based on its separate financial statements will not fall below 20% (and as a condition for distributing a dividend – it will not fall below 30%); (C) the ratio of the Company's net debt to its adjusted EBITDA will not be higher than 12 (and as a condition for distributing a dividend – it will be less than 11); (D) the loan to value ratio of the Company's holdings (as a limited partner) in OPC Power (as defined in Note 25A4) (hereinafter - the "LTV of the pledged rights") will not be less than 50% (and as a condition for distributing a dividend – not less than 35%). In addition, up to the Final Repayment Date, the Company is required to maintain a cash balance or certain amounts of deposits (hereinafter – the "Minimum Liquidity Requirement").

Under to the agreement, if any of the following events occur, the interest rate on the loans will increase by 2%: (A) non-compliance with the Minimum Liquidity Requirement; (B) the Company's equity to asset ratio, as set out above, is less than 25%; (C) the LTV of the pledged rights is higher than 40%.

Distributions of a dividends by the Company are subject to certain conditions, including compliance with the financial covenants, as set out above, compliance with the Minimum Liquidity Requirement, and the absence of a default event. As collateral for the Company's liabilities to Harel under the agreement, a lien will be place in favor of Harel on the Company's direct and indirect rights (as a limited partner) in OPC Power, and on certain bank accounts of the Company and of the General Partner in OPC Power(as defined in Note 25A4).

As at December 31, 2021, the facility has not been utilized.

Other credit facility agreements of the Company

As at the financial statements approval date, in addition to the foregoing, the Company has short-term credit facilities, and other credit facilities for periods of up to three years from banks and institutional entities, in a total amount of NIS 200 million, that has not been utilized as at Reporting Date. It is noted that an amount of NIS 100 million is from Mizrahi Tefahot Bank Ltd., which is a related party to the company. Subsequent to the reporting date, an additional credit facility agreement was signed with another banking corporation for an addition NIS 100 million, which as of the date of approval of the financial statements has not yet been utilized.

Covenants:

As at the reporting date, the Company is in compliance with all of the financial covenants.

D. Additional details and guarantees (cont.)

4. The Company (cont.):

Guarantees:

Below is a list of the Company's material bank guarantees as at December 31, 2021:

  • A. A bank guarantee in the name of Zomet in favor of the ILA in the amount of NIS 58 million (which, as at the reporting date, was guaranteed by a deposit in the amount of NIS 15 million), which was released subsequent to the reporting date. For further information about the land on which the Zomet Power Plant is located, see Note 11A.
  • B. Bank guarantees in the total amount of NIS 9 million for construction of facilities for generation of energy on the consumers' premises, which generate electricity using natural gas and are connected to the distribution grid (for further information, see Note 28K). Subsequent to the reporting date, in February 2022, the amount of the guarantees increased to NIS 19 million.
  • C. A bank guarantee in the name of Zomet in favor of the Israeli Electricity Authority in the amount of NIS 15 million (linked to the USD), under the provision in Zomet's conditional license.
  • D. For information about a bank guarantee provided by the Company in the name of Rotem in favor of Israel Electric Corporation, see Note 24D.
  • E. In June 2021, the Company provided a NIS 2 million bank guarantee in favor of the Israeli Electricity Authority as required in order to obtain a virtual supply license, and in December 2021 the Company provided a NIS 33 million bank guarantee in favor of the System Operator for the purpose of an application to allocate certain customers to the virtual supply activity. For further details regarding the virtual supply activity and the virtual supply license, see Note 28L.
  • F. In 2021, after the Company provided the balance of the equity to Zomet, a bank guarantee in the amount of NIS 85 million was canceled and the deposit of NIS 43 million, which served as collateral for the Company's said undertaking.
  • G. In March 2021, a bank guarantee in the amount of NIS 50 million provided by the Company according to the Hadera Equity Subscription Agreement was canceled, and the collateral in the amount of NIS 25 million that was provided for this guarantee was released. For further information about the Hadera Equity Subscription Agreement see Note 16D2.
  • H. During the reporting period, as part of a settlement, Zomet completed payment to the Shafir Regional Council (hereinafter the "Council") for the development levies, such that the total amount of levies paid to the Council is NIS 20 million. Following the settlement of payment of the development levies, the bank guarantee in the amount of NIS 21 million, which the Company gave to the Council for securing Zomet's liabilities for paying the Council development levies, expired. It should be noted that the amount of the development levies includes levies for a built-up area of 11,600 square meters that has not yet been built and that Zomet has the right to build it without paying additional levies.

5. Keenan:

Keenan Financing Agreement:

In August 2021, Keenan and a number of financial entities entered into a NIS 387 million (approx. USD 120 million) financing agreement (hereinafter - the "Keenan Financing Agreement"). Concurrently with the closing of the Keenan Financing Agreement, Keenan repaid its former financing agreement entered into in 2014 (as of the repayment date, the outstanding principal was approximately NIS 207 million). The previous annual interest rate was LIBOR plus a 2.25%-2.75% spread on the Term Loan, and a 1% spread on the ancillary credit facilities. It is noted that due to the early repayment of the previous financing agreement, no fines or fees were imposed on Keenan by the lender.

D. Additional details and guarantees (cont.)

5. Keenan: (cont.)

The loan and the ancillary credit facilities in the Keenan Financing Agreement shall be repaid in installments over the term of the agreement; the final repayment date is December 31, 2030. The loan and the ancillary credit facilities in the Keenan Financing Agreement shall carry an annual interest of LIBOR + 1% to 1.375%.

It should be noted that the Keenan Financing Agreement includes, among other things, and as customary in agreements of this type, provisions regarding mandatory prepayments, fees in respect of credit facilities, annual fees relating to the issuance of LC and additional customary terms and conditions, including hedging of the base interest rate in respect of 70% of the loan.

As part of the Keenan Financing Agreement, collateral and pledges on the project's assets held by Keenan were provided in favor of the lenders. The Keenan Financing Agreement includes a number of restrictions, such as compliance with a minimum debt service coverage ratio of 1.15 during the 4 quarters that preceded the distribution, and a condition whereby no grounds for repayment or default event exists (as defined in the financing agreement).

The Keenan Financing Agreement includes grounds for calling for immediate repayment as customary in agreements of this type, including, among others – breach of representations and covenants that have a material adverse effect, default events, non-compliance with certain obligations, various insolvency events, termination of the activities of the project or termination of significant parties in the project (as defined in the agreement), occurrence of certain events relating to the regulatory status of the project and maintaining of government approvals, certain changes in the project's ownership, certain events in connection with the project, existence of legal proceedings relating to the project, and a situation wherein the project is not entitled to receive payments for electricity – all in accordance with and subject to the terms and conditions, definitions and cure periods detailed in the financing agreement.

Completion of the Keenan Financing Agreement generated the CPV Group approximately NIS 85 million (approximately USD 26 million) in cash (after making payments in respect of: repayment of Keenan's previous outstanding loan balance, consultants' costs, early closing of an interest rate hedging transaction totaling NIS 34 million (approx. USD 10.5 million) and additional costs. Similarly, in view the repayment of Keenan's previous financing, in the reporting period, the Group recognized a NIS 11 million (USD 3 million) profit under loss from repayment of financial liabilities, net, in the income statement.

6. OPC Power

Shareholder loans to OPC Power

In the reporting period, the Company (through a wholly-owned subsidiary) and non-controlling interests provided loans to PC Power Ventures LP (hereinafter – "OPC Power") in the amount of NIS 455 million (USD 143 million), and NIS 195 million (USD 61 million), respectively. Subsequent to the reporting date, the Company (through a wholly-owned subsidiary) and non-controlling interests provided additional loans to OPC Power in the amount of NIS 27 million (USD 8 million), and NIS 12 million (USD 4 million), respectively. The loans bear annual interest at a rate of 7%. The loan principal will be repayable at any time as will be agreed on between the parties, but no later than January 2028. Accrued interest is payable on a quarterly basis. To the extent the payment made by OPC Power is lower than the amount of the accrued interest, payment in respect of the balance will be postponed to the following quarter – but not later than January 2028. For further information about OPC Power, see Note 25A4(b).

NOTE 17 - DEBENTURES

A. Composition

As at December 31
2021 2020
NIS million NIS million
Marketable debentures 1,811 974
(22) (22)
1,789 952

B. Repayment period

Debentures repayable in the years subsequent to the reporting date:

As at December 31
2021 2020
NIS million NIS million
First year 22 22
Second year 32 22
Third year 184 31
Fourth year 201 98
Fifth year 234 98
Sixth year and onwards 1,138 703
1,811 974

NOTE 17 - DEBENTURES (cont.)

Debentures (Series A):

In May 2017, the Company issued Debentures (Series A) (hereinafter – "Debentures (Series A)"). The par value of Debentures (Series A) was NIS 320 million. The deed of trust stipulates that the debentures will bear annual interest at the rate of 4.95%, and the principal and interest for the debentures will be repaid on a semi-annual basis (on June 30 and December 30 of every calendar year) – starting from June 30, 2018 and up to December 30, 2030. In addition, the deed of trust stipulates that the interest on Debentures (Series A) will be reduced by 0.5% if they are listed on the Main Board of the TASE. In August 2017, the Company listed Debentures (Series A) on the TASE, as part of an issuance and listing of its shares, and accordingly, as from that date, the interest on Debentures (Series A) was reduced by 0.5% to 4.45% annually.

In October 2020, after expansion of Debentures (Series B), as described below and after the approval of the board of directors, the Company initiated early and full redemption of the balance of Debentures (Series A). As part of the early redemption, the debt service reserve was released in the amount of NIS 67 million and a total of NIS 313 million was paid to the holders of Debentures (Series A). In view of the aforesaid, the Company recognized a loss of NIS 41 million in the fourth quarter of 2020.

Debentures (Series B):

In April 2020, the Company issued Debentures (Series B) with a par value of NIS 400 million (hereinafter – "Debentures (Series B)"). The issuance costs amounted to NIS 4 million. The Debenture B are listed on the TASE, are CPI-linked and bear annual interest of 2.75%. The principal and interest for Debentures (Series B) will be repaid in unequal semi-annual payments (on March 31, and September 30 of every calendar year), starting from March 31, 2021 and up to September 30, 2028 (the first interest payment falls on September 30, 2020).

In October 2020, the Company issued additional Debentures (Series B) of the Company (hereinafter – the "Additional Debentures (Series B)") by way of expanding the series, in the amount of NIS 556 million par value. The proceeds of the issuance of the Additional Debentures (Series B) amounted to NIS 584 million. Issuance costs amounted to NIS 7 million.

The Debentures (Series B) were rated A3 by Midroog with stable outlook (it should be noted that in the reporting period, the rating of Midroog was discontinued) and A– by Maalot. The Maalot rating was ratified in July 2021.

The Debenture B deed of trust (hereinafter in this section - the "Deed of Trust") includes generally acceptable causes to call for immediate repayment (subject to stipulated remediation periods), including default events, liquidation proceedings, receivership, suspension of proceedings and debt arrangements, certain restructurings, material deterioration in the condition of the Company, failure to publish financial statements in a timely manner, etc. Furthermore, a right to call for immediate repayment was established: (1) In case of a call for immediate repayment of another series of debentures (marketable on the TASE or on the TACT Institutional system) that the Company has issued; or of another financial debt (or a number of cumulative debts) of the Company and of consolidated companies (except for the case of having to make immediate repayment of a non-recourse debt), including forfeiture of a guarantee (that secure payment of a debt to financial creditor) that the Company or investee companies made available to a creditor, in an amount not less than USD 40 million; (2) Upon breach of financial covenants on two consecutive review periods; (3) In the case described in Subsection 2 (and even without waiting for the second review date) if the Company has carried out an extraordinary transaction with a controlling shareholder, excluding transactions to which the Companies Regulations (Expedients in Transactions with an Interested Party), 2000 apply, without obtaining prior approval of the Debenture B holders by way of a special resolution);

NOTE 17 - DEBENTURES (cont.)

C. Additional details (cont.)

(4) If an asset or a number of assets of the Company are sold in an amount representing over 50% of the value of the Company's assets according to the Company's consolidated financial statements during a period of 12 consecutive months, or if a change is made to the main operations of the Company, (the "main operations of the Company" - the field of energy, including electricity generation in power plants and from renewable energies); (5) Upon the concurrence of certain events leading to loss of control; (6) If rating is discontinued over a certain period of time; (7) If trading in the debentures is suspended for a certain period of time or if the Debentures B are delisted; (8) If the Company ceases being a reporting corporation; (9) In the event that a "going concern" emphasis-of-matter paragraph is included in the Company's financial statements solely in respect of the Company, for a period of two consecutive quarters; and (10) If the Company breaches its undertaking not to place a general floating charge on its current and future assets and rights, in favor of any third party, without the criteria set in the Deed of Trust being met. In addition, the Deed of Trust includes an undertaking not to create a floating charge on the Company's assets and rights, both current and future, in favor of any third party without fulfillment of one of the terms and conditions stipulated in the Deed of Trust between the Company and Resnick Paz Nevo Trustee Company Ltd. in April 2020.

Furthermore, the Deed of Trust includes an undertaking on behalf of the Company to comply with financial covenants and restrictions (including restrictions as to distribution, expansion of series, provisions as to interest adjustment in the event of change in rating or non-compliance with financial covenants). The financial covenants include compliance with a ratio of the consolidated net financial debt less the financial debt designated for construction of projects that have not yet started generating EBITDA, to the adjusted EBITDA that is no more than 13 (and for a distribution, does not exceed 11); minimum equity of NIS 250 million (and for a distribution, NIS 350 million); and the equity to asset ratio that is no less than 17% (and for a distribution, no less than 27%).

As of December 31 2021, the Company meets the said financial covenants, as follows: (1) The Company's equity is NIS 2,270 million; (2) the Company's equity to asset ratio is 55%;; (3) the ratio between net consolidated financial debt less the financial debt designated for the construction of projects that have not yet started generating EBITDA and adjusted EBITDA is 7.3..

Debentures (Series C)

In September 2021, the Company issued Series C debentures at a par value of NIS 851 million, with the proceeds of the issuance designated, among other things, for early repayment of Rotem's financing, as outlined in Note 16D1. The debentures are listed on the TASE, are not CPI-linked and bear annual interest of 2.5%. The debentures shall be repaid in twelve semi-annual and unequal installments (on February 28 and August 31) as set out in the amortization schedule, starting on February 28 2024 through August 31, 2030 (the first interest payment is due on February 28, 2022). The debentures were rated A- by Maalot. The issuance expenses amounted to about NIS 9 million.

The deed of trust of Debentures C (hereinafter in this section - the "Deed of Trust") includes generally acceptable causes to call for immediate repayment (subject to stipulated remediation periods), including default events, liquidation proceedings, receivership, suspension of proceedings and debt arrangements, merger under certain conditions without obtaining debenture holders' approval, material deterioration in the condition of the Company, failure to publish financial statements in a timely manner, etc. Furthermore, a right to call for immediate repayment was established under the following circumstances: (1) In case of a call for immediate repayment of another series of debentures (marketable on the TASE or on the TACT Institutional system) that the Company has issued; or of another financial debt (or a number of cumulative debts) of the Company and of consolidated companies (except for the case of having to make immediate repayment of a non-recourse debt), including forfeiture of a guarantee (that secure payment of a debt to financial creditor) that the Company or investee companies made available to a creditor, in an amount not less than USD 75 million;

NOTE 17 - DEBENTURES (cont.)

C. Additional details (cont.)

(2) Upon breach of financial covenants on two consecutive review dates; (3) In the case described in Subsection 2 (and even without waiting for the second review date) if the Company has carried out an extraordinary transaction with a controlling shareholder, excluding transactions to which the Companies Regulations (Expedients in Transactions with an Interested Party), 2000 apply, without obtaining prior approval of the debenture holders by special resolution; (4) If an asset or a number of assets of the Company are sold in an amount representing over 50% of the value of the Company's assets according to the Company's consolidated financial statements during a period of 12 consecutive months, or if a change is made to the main operations of the Company, except where the consideration of the sale is intended for the purchase of an asset or assets within the Company's main area of operations (the "main operations of the Company" - the field of energy, including electricity generation in power plants and from renewable energies); (5) Upon the concurrence of certain events leading to loss of control; (6) If rating is discontinued over a certain period of time; (7) If trading in the debentures is suspended for a certain period of time or if the debentures are delisted; (8) If the Company ceases being a reporting corporation; (9) In the event that a "going concern" emphasis-of-matter paragraph is included in the Company's financial statements solely in respect of the Company, for a period of two consecutive quarters; (10) If the Company breaches its undertaking not to place a general floating charge on its current and future assets and rights, in favor of any third party, without the criteria set in the Deed of Trust being met; (11) Distribution in breach of the provisions of the Deed of Trust. All in accordance with the terms set out in the Deed of Trust signed between the Company and Reznick Paz Nevo Trust Company Ltd. in September 2021.

Furthermore, the Deed of Trust includes an undertaking on behalf of the Company to comply with financial covenants and restrictions (including restrictions as to distribution, expansion of series, provisions as to interest adjustment in the event of change in rating or non-compliance with financial covenants). The financial covenants include maintaining the ratio between net consolidated financial debt (less the financial debt designated for the construction of projects that have not yet started generating EBITDA) and adjusted EBITDA at no more than 13 (and for the purpose of distribution as defined in the Deed of Trust - not more than 11), minimum equity (standalone) of NIS 1 billion (and for the purpose of distribution - NIS 1.4 billion), equity to asset ratio of the Company (separate) of no less than 20% (and for the purpose of distribution - no less than 30%), and equity to (consolidated) balance sheet ratio of no less than 17%.

As at December 31, 2021, the Company meets the following financial covenants: (1) the ratio between the net consolidated financial debt, less the financial debt earmarked for the construction of projects that have not yet started generating EBITDA, and the adjusted EBITDA is 7.3; (2) the Company's equity amounts to NIS 2,270 million; (3) the Company's equity to total assets ratio is 55%; (4) the equity to balance sheet (consolidated) ratio is 37%.

In addition, the Deed of Trust includes an undertaking not to create a floating charge on the Company's assets and rights, both current and future, in favor of any third party without fulfillment of one of the terms and conditions stipulated in the Deed of Trust; everything shall be according to the terms stipulated in the Deed of Trust (it is clarified that the Company and/or its investees will be entitled to create a fixed and/or floating lien on any of their assets, without fulfillment of any of the said terms and conditions).

The terms of the debentures also include an option to increase the interest rate under certain instances of changes in rating and in certain cases of failure to comply with financial covenants (in accordance with thresholds set in the Deed of Trust). The Company's ability to expand the series of debentures is subject to certain restrictions, including maintaining the rating of the debentures as it stood prior to such expansion and non-breach of financial covenants.

NOTE 18 - EMPLOYEE BENEFITS

A. Post-employment benefit plans – defined contribution plan

The Group has a defined contribution plan for the Group's liability to pay the savings component of provident funds and for all its employees who are subject to Section 14 of the Severance Pay Law, 1963.

For the year ended December 31
2021 2020 2019
NIS million NIS million NIS million
Amount recognized as an expense for a defined contribution plan 8 4 4

It should be noted that the Group has defined benefit plans in non-material amounts.

B. Equity-based compensation plan in Israel

In July 2017, the Company's board of directors (after the approval of the Company's compensation committee) approved an options plan (hereinafter – the "Options Plan") for offerees. Under the plan, the Company will allot the offerees, whose identity will be determined by the board of directors (and the general meeting, as the case may be) at its sole discretion, non-marketable and non-transferable options (other than transfer to successors in the event of death, as set out in the Options Plan) that are exercisable for the Company's shares, in an amount to be instructed by the board of directors, as the case may be. The options are non-marketable and non-transferable. Each option will confer on the offeree the right to receive from the Company, by way of an allotment, one ordinary share of NIS 0.01 par value, at the exercise price to be determined for each offeree, and which will be at least the average share price in the 30 trading days prior to the board decision on the allotment and subject to certain adjustments set out in the Options Plan. The ordinary shares to be allotted following exercise of the options will have the same rights as the Company's ordinary shares, immediately upon their allotment. The exercise price is subject to certain adjustments (including in respect of distribution of dividends, issuance of rights, etc.).

In May 2018, the employee Options Plan was revised to an alternative for allotting restricted stock units (hereinafter – the "RSUs") and an amendment to the adjustment mechanism in the event of change of control. Each RSU will confer the right to receive from the Company, by way of an allotment and for no consideration, one ordinary share of NIS 0.01 par value of the Company. The RSUs will not confer on the holder any right conferred on a shareholder, prior to their exercise for shares of the Company, including a voting right, with the exception of the right to receive an amount equivalent to a dividend, should the Company decide to distribute a dividend.

The provisions of Section 102 to the Income Tax Ordinance apply to the allotted options. The allotment was made through a trustee in the capital gains track. In accordance with this track, the Company is not entitled to claim a tax deduction for amounts credited to an employee as a benefit, including amounts recorded as a salary benefit in the Company's financial statements, for the options received by the offeree under the plan, other than a yield benefit component, if any, determined on the allotment/grant date.

Between 2017 and 2021, the Company allotted options and RSUs to offerees in several allotments in a capital gains track (with a trustee) in accordance with Section 102 of the Income Tax Ordinance, in four equal tranches, which are exercisable net (hereinafter – the "Offered Securities"). In accordance with this track, the Company is not entitled to claim a tax deduction for amounts credited to an offeree as a benefit, including amounts recorded as a salary benefit in the Company's financial statements, for the options received by the offeree under the plan, other than a yield benefit component, if any, determined on the allotment/grant date. The vesting terms and expiration dates of the offered securities are as follows:

Tranche No. Vesting terms and conditions Expiration date
Tranche One At the end of 12 months from the grant date At the end of 36 months from the vesting date
Tranche Two At the end of 24 months from the grant date At the end of 24 months from the vesting date
Tranche Three At the end of 36 months from the grant date At the end of 24 months from the vesting date
Tranche Four At the end of 48 months from the grant date At the end of 24 months from the vesting date

NOTE 18 - EMPLOYEE BENEFITS (cont.)

B. Equity-based compensation plan in Israel (cont.)

Below is information about allotments of offered securities in and subsequent to the reporting period:

Offerees and allotment dates No. of RSUs at
the grant date
(in thousands)
No. of unvested
RSUs as at
December 31,
2021 (in
thousands)
Fair value of
each RSUs
(in NIS)*
No. of options
at the grant
date (in
thousands)
No. of unvested
options as at
December 31,
2021 (in
thousands)
Average fair
value of each
option at the
grant date (in
NIS)**
Exercise price
for each option
(in NIS,
unlinked)
Standard deviation Risk-free interest
rate
Expected life of
each option
CEO, July 2017 (1) - N/A N/A 1,000 - 2.50 12.50 20.7% - 21.5% 0.7% - 1.4% 4 to 6 years
Officers, June 2018 (2) 242 45 18.52 1,166 318 3.80 18.41 21.41% - 20.93% 0.88% - 1.43% 4 to 6 years
Former chairperson of the
board, July 2019 (3)
- N/A N/A 352 - 5.67 22.80 21.0% - 21.6% 1.04% - 1.44% 4 to 6 years
Officer, May 2020 (2) 29 22 26.8 99 99 7.76 25.81 31.48% 0.36% - 0.58% 4 to 6 years
Officer, October 2020 (2) 11 8 35.24 29 29 12.98 30.28 36.65% 0.25% - 0.43% 4 to 6 years
Chairperson of the board,
January 2021 (4)
- N/A N/A 367 367 13.07 32.78 38.80% 0.20% - 0.40% 4 to 6 years
CEO, April 2021 (4) - N/A N/A 1,253 1,253 9.54 34.46 34.97% 0.35% - 0.59% 4 to 6 years
Officers, August 2021 (4) - N/A N/A 663 663 8.23 30.24 34.59% 0.24% - 0.55% 4 to 6 years
Officers, January 2022 (4) 27 N/A 33.4 272 N/A 9.91 33.21 33.55% - 33.67% 0.47% - 0.75% 4 to 6 years

(*) The fair value of the RSU was estimated on the basis of the price of the Company's shares as at the allotment date.

(**) The average fair value of each allotted option is estimated at the grant date using the Black & Scholes model. Calculation of the standard deviation is based on historical fluctuations of the shares of the Company or of benchmark companies for corresponding periods over the expected life of the option until exercise. A risk-free interest rate is based on the "fair margin" database and an expected life of 4 to 6 years.

NOTE 18 - EMPLOYEE BENEFITS (cont.)

B. Equity-based compensation plan in Israel (cont.)

  • (1) In the years ended on December 31 2019, 2020, and 2021, 500 thousand, 250 thousand, and 250 thousand options were exercised, respectively; share price on the TASE at the exercise date of the options was NIS 29.87, NIS 32.90, and NIS 30.07 per share, respectively.
  • (2) In the year ended on December 31 2019, 150 thousand options and 31 thousand RSUs expired following the termination of an officer's position in the Company before the end of the vesting period.

In the years ended on December 31 2019, 2020, and 2021, following the vesting of the RSUs, the Company issued 55 thousand, 45 thousand, and 55 thousand ordinary shares. In addition, in the years ended on December 31 2019, 2020, and 2021, 180 thousand, 115 thousand, and 303 thousand options were exercised. The weighted average price per share on the exercise dates of the options was NIS 27.31, NIS 32.90, and NIS 35.26, respectively.

  • (3) In January 2021, Avisar Paz ended his service as chairperson of the Company's board of directors, before the end of the vesting period of 176 thousand options that were allotted to him and accordingly, all his rights for these options expired. In addition, in 2021, 176 thousand options were exercised. The weighted average price per share on the exercise date of the options was NIS 32.81.
  • (4) The cost of the benefit for the allotment of securities in the year ended on December 31 2021 and subsequent to the reporting date is NIS 22 million and NIS 4 million, respectively. This amount will be recorded in profit and loss over the vesting period of each tranche.

In the years ended on December 31, 2019, 2020, and 2021, the Company recognized an expense in the amount of approx. NIS 3 million, NIS 3 million, and NIS 9 million, respectively, for the offered options and securities.

C. Profit-sharing plan for CPV Group employees

In April 2021, the CPV Group LP (hereinafter in this note - the "Partnership") approved an allocation of 6.5% of the profit participation rights in the Partnership for allocations to certain CPV Group employees and managers (hereinafter in this note - the "Offerees") as part of long-term compensation (hereinafter - the "CPV Group's Profit-Sharing Plan"). The Offerees' participation rights relate to earnings and appreciation net of repayment of investment amounts to investors and subject to vesting periods that may be accelerated in certain cases, such as merger, sale of activities, and termination of employment under certain circumstances, etc. The deeds of allotment granted to the Offerees stipulate, among other things, events upon the occurrence of which the Partnership will buy the Offerees' rights. Included in that stated above, subject to the vesting as, as stated, the Offerees are entitled to require the Partnership to acquire their rights on exercise dates that fall after three and five years from the grant date at the rates and under the conditions defined, and in certain cases of sale of rights in the Partnership by the Company (including a change in control). In addition, the Partnership is entitled to acquire rights of the Offerees under certain circumstances, such as conclusion of the transaction and passage of five years.

The plan was accounted for as a cash-settled share-based payment transaction and accordingly, the fair value of the CPV Group's Profit-Sharing Plan is recognized as an expense, against a corresponding increase in liability, over the period in which the unconditional right to payment is achieved. The liability is remeasured at each reporting date until the settlement date. Any change in the fair value of the liability is recognized as a general and administrative expense in profit and loss. The fair value as at the reporting date is estimated using an options pricing model (OPM) and is based on a standard deviation of 33%, a risk-free interest rate of 1.15% and an expected life of 4.25 years. During the reporting period, an expense was recorded in respect of a profit-sharing program for employees of the CPV Group, for a total of NIS 50 million. As of the Report date, the fair value of the participating rights awarded totals NIS 117 million (approx. USD 36 million).

NOTE 19 - TAXES ON INCOME

A. Information about the tax environment in which the Group operates

1. Corporate tax rate

The rate of corporate tax in Israel between 2019 and 2021 is 23%.

The tax rates applicable to the US companies are: (1) Federal corporate tax of 21% and (2) state tax of 6% to 11.5%.

The profits (losses) of associates and joint ventures which are transparent for tax purposes are indirectly attributed to the partnership OPC Power (indirectly held by the ICG Energy) based on their share in equity (as defined in Note 25A). Profits (losses) of the OPC Power are attributed directly to the partners in accordance with their share in the equity, since according to US tax laws, a partnership that was incorporated in the USA is deemed transparent for tax purposes. Therefore, ICG Energy will be attributed the profits (losses) of OPC Power, in which it serves as a limited partner. ICG Energy will be liable to tax in the USA in respect of such profits attributed to it; the tax will be determined in accordance with the federal corporate tax rate and the state tax rate, that constitutes an expense for the purpose of calculating the federal tax.

2. Benefits under the Law for Encouragement of Industry (Taxes), 1969 (hereinafter – the "Encouragement of Industry Law")

The industrial plants owned by some of the Company's consolidated companies in Israel have a single production line, and as such, these companies, together with the consolidated subsidiary that holds these companies (parent company), are entitled to file a consolidated tax report under Section 23 of the Encouragement of Industry Law. Pursuant to Section 24 of said Law, the taxable income or loss of each of the said companies which own the industrial plants shall be regarded as taxable income or as a loss of the parent company holding these companies.

"Industrial Companies" as defined in the Encouragement of Industry Law are entitled to tax benefits, mainly:

(a) Depreciation for tax purposes at increased rates.

(b) Deduction of tax-deductible expenses for the issue of shares listed on the stock exchange at three equal annual rates as from the year the shares were listed. (c) Amortization over 8 years, for tax purposes, of patents and know-how used in the development of the plant. (D) The option of submitted consolidated tax statements of companies with a single production line.

B. Tax assessments

The Company has tax assessments that are considered final up to and including the 2018 tax year (subject to reservations stipulated in the law). Rotem has tax assessments that are considered final up to and including the 2017 tax year (subject to reservations stipulated in the law). The other Israeli Group companies have tax assessments that are considered final up to and including the 2016 tax year (subject to reservations stipulated in the law).

ICG Energy is subject to taxation is several US jurisdictions. Tax year 2017 and all periods thereafter are open for assessment by US federal and state tax authorities due to the carryforward tax losses.

NOTE 19 - TAXES ON INCOME

C. Components of income (expenses) for income tax

For the year ended December 31
2021 2020 2019
NIS million NIS million NIS million
Current tax expenses: (1) - -
Deferred taxes expenses (income):
Deferred taxes (75) 14 50
Deferred taxes for previous years (1) (1) -
(76) 13 50
Taxes on income (tax benefit): (77) 13 50

D. Adjustments between theoretical tax on income before taxes and tax expenses:

For the year ended December 31
2021 2020 2019
NIS million NIS million NIS million
Income (loss) before taxes on income (381) (29) 175
Statutory tax rate of the Company 23% 23% 23%
Tax (tax saving) calculated at the statutory tax rate of the Company (88) (7) 40
Share of non-controlling interests in entities transparent for tax purposes
Additional tax (savings) for:
18 - -
Losses for tax purposes and other tax benefits for which deferred taxes were not recorded 1 21 10
Effect of the creation of deferred taxes at a tax rate that is different from the main tax rate (7) - -
Taxes for previous years (1) (1) -
Expenses for taxes on income (tax benefit) (77) 13 50

E. Taxes on income for other comprehensive income and equity items

In the years ended on December 31 2021 and 2020, the Company recorded tax expenses in the statement of comprehensive income in the amount of NIS 14 million and tax income in the amount of NIS 5 million, respectively, for items of other comprehensive income.

NOTE 19 - TAXES ON INCOME (cont.)

F. Deferred tax assets and liabilities

(1) Deferred tax assets and liabilities recognized in the financial statements

Movement in deferred tax assets and liabilities attributable to the following items:

As at December 31,
Carried to income comprehensive Business Effect of changes in As at December 31,
2020 and loss income combinations exchange rates 2021
(307) (76) - (13) 1 (395)
5 344 - 9 (9) 349
- (35) - 10 1 (24)
- (169) (9) (37) 8 (207)
- - - 7 - 7
6 - (1) (1) - 4
11 12 - 2 (1) 24
(242)
As at December 31,
2019
Carried to income
and loss
Carried to other
comprehensive
income
As at December 31,
2020
(286) (21) - (307)
8 (3) - 5
- 1 5 6
1 10 - 11
(277) (13) 5 (285)
(285) 76
Deferred taxes are recognized in the statement of financial position as follows:
(10) NIS million
(23)
-
NIS million
As at December 31
2021 2020
NIS million NIS million
Under non-current assets 153 24
Under non-current liabilities (395) (309)
Deferred tax assets, net (242) (285)

NOTE 19 - TAXES ON INCOME (cont.)

  • F. Deferred tax assets and liabilities (cont.)
  • (3) Carryforward losses for which deferred tax assets were not recognized:
As at December 31
2021 2020
NIS million NIS million
Losses for tax purposes 522 177
Deductible temporary differences - 6
522 183

According to Israeli tax laws, there is no time limitation on the utilization of losses for tax purposes and on the utilization of deductible temporary differences. Deferred tax assets have not been recognized for these items, since it is not probable that there will be future taxable income against which the tax benefits can be utilized.

In the US, as of December 31, 2021, the Group has loss carryforwards for which no deferred taxes have been created, as detailed below:

  • Net operating losses (NOL) for tax purposes of NIS 336 million (USD 108 million), which may be offset for tax purposes in the United States against future income, subject to complying with the conditions of the law, some of which are not under the Company's control and, therefore, the Company did not recognize deferred tax assets in respect thereof. These losses will expire in 2027-2037.
  • NIS 5 million (USD 2 million) in tax credits, offsettable for tax purposes in the US against future profits in the US, are subject to complying with the conditions of the law, some of which are not under the Company's control and, therefore, the Company did not recognize deferred tax assets. These losses will expire in 2027-2037.

NOTE 20 - EQUITY

A. Composition

As at December 31, 2021 As at December 31, 2020
No. of shares Authorized Issued and paid up Authorized Issued and paid up
Ordinary shares of NIS 0.01 par value 500,000,000 202,255,647 500,000,000 178,370,397

B. Additional details

In October 2020, the Company issued to the public 23,022,100 ordinary shares of NIS 0.01 par value each. The issuance was by way of a uniform offering with a range of quantities, in a tender on the price per unit and the quantity. It is noted that the parent company submitted bids for participation, and as part of the issuance, it was issued 10,700,200 ordinary shares. Issuance proceeds, gross, amounted to NIS 737 million. The issuance expenses amounted to NIS 5 million.

In addition, in October 2020, the Company issued to Clal Insurance Company Ltd. (hereinafter – "Clal Insurance Group") and The Phoenix Insurance Ltd. and to entities it owns 11,713,521 ordinary shares of NIS 0.01 par value each. The gross proceeds of the issuance amounted to about NIS 350 million. The issuance expenses amounted to NIS 5 million.

The proceeds for the issuance in the year ended on December 31 2020, less issuance expenses, amounted to NIS 1,078 million, and were recognized in equity.

In February 2021, the Company issued Altshuler Shaham Ltd. (hereinafter – "Altshuler") and entities managed by Altshuler, 10,300,000 ordinary shares of NIS 0.01 par value each. The gross proceeds of the issuance amounted to about NIS 350 million. The issuance expenses amounted to NIS 4 million.

In September 2021, the Company issued rights to purchase 13,174,419 ordinary shares of the Company (hereinafter - the "Rights"), for development and expansion of the Company's activity in the United States. The Rights were offered such that each holder of ordinary shares of the Company holding, as at the effective date, 43 ordinary shares, was entitled to purchase one right unit composed of three shares at a price of NIS 75 (NIS 25 per share). Through the deadline for exercising the rights in October 2021, notices of exercise were received for the purchase of 13,141,040 ordinary shares of the Company. It should be noted that the Parent Company exercised the rights it was entitled to purchase as part of the issuance of rights. The proceeds from the exercised rights amounted to NIS 328.5 million (gross). The issuance expenses amounted to about NIS 0.5 million.

The proceeds for the issuance in the reporting period, less issuance expenses, amounted to NIS 674 million, and were recognized in equity.

For information about the changes in the Company's capital arising from an equity-based compensation plan in Israel, see Note 18B.

C. Dividend

In the years ended December 31, 2020 and 2021, the Company did not distribute dividends. As of December 31 2021, the Company has no balance of distributable earnings.

In July 2017, the Company's Board of Directors decided to adopt a dividend distribution policy, whereby in every calendar year, a dividend will be distributed to the shareholders; the dividend will be equal to at least 50% of the Company's after-tax net income in the calendar year preceding the dividend distribution date. Implementation of the dividend distribution policy and approval of the distribution from time to time by the Company's board of directors is subject to the provisions of any law, including the distribution tests set out in Section 302 of the Companies Law, 1999 (the profit test and the solvency test), restrictions imposed by agreements to which the Company is a party, present or future covenants or financial covenants undertaken by the Company, tax considerations, investments required in the Company's projects (present or future), and additional restrictions that may apply to the Company, if any, and decisions that the Company is permitted to make, including a different designation of its profits and an amendment to this policy.

For the avoidance of doubt, the Company's Board of Directors will be permitted at any time, taking into account business considerations and in accordance with the law, to change the abovementioned dividend rate or to decide to refrain from any distribution, for example, as was the case in the past two years, taking into account the Company's business needs and strategic plans to expand its activity. It should also be clarified that the timing of the distribution, every year, to the extent that it is made, will not necessarily be after the publication of the Company's annual financial statements.

NOTE 21 - DATA ON INCOME STATEMENT ITEMS

A. Revenues

For the year ended December 31
2021 2020
NIS million
2019
NIS million
NIS million
Revenues from sale of electricity 1,437 1,269 1,271
Revenues from sale of steam 57 56 59
Revenues from provision of services 81 - -
1,575 1,325 1,330

Below is information about the total sales of the Group to material customers and the rate out of the total revenue of the Company (in NIS million):

For the year ended December 31
Customer 2021 2020 2019
% of the Company's % of the Company's % of the Company's
Total income revenue Total income revenue Total income revenue
Customer 1 303 19.2% 299 22.5% 288 21.7%
Customer 2 229 14.5% 257 19.4% 273 20.5%
Customer 3 *- *- *- *- 201 15.1%
Customer 4 *- *- *- *- 142 10.7%
Customer 5 *- *- *- *- 174 13.1%

(*) Represents an amount lower than the 10% revenue threshold.

B. Cost of sales (less depreciation and amortization)

For the year ended December 31
2021 2020
NIS million
2019
NIS million
NIS million
Fuels (*) 495 465 491
Electricity and infrastructure services 431 432 360
Salaries and related expenses 68 25 24
Manufacturing and operating expenses and outside contractors 54 30 23
Insurance 16 12 8
Other expenses 22 4 4
1,086 968 910

(*) After deducting third-party participation costs.

NOTE 21 - DATA ON INCOME STATEMENT ITEMS (cont.)

C. General and administrative expenses

For the year ended December 31
2021
NIS million
2020
NIS million
2019
NIS million
Salaries and related expenses 129 27 25
Directors' pay 6 2 2
Professional services 32 10 16
Depreciation 8 3 3
Travel and hosting 1 1 1
Office maintenance 10 3 4
Donations 2 2 1
Insurance 4 1 1
Other 7 3 2
199 52 55

D. Other income (expenses), net

For the year ended December 31
2021 2020 2019
NIS million NIS million NIS million
Revenues from sale of gas, net - - 5
Reimbursement of expenses in arbitration - - 14
Other income 2 1 2
Other expenses (2) - -
- 1 21

NOTE 21 - DATA ON INCOME STATEMENT ITEMS (cont.)

E. Finance income and expenses

For the year ended December 31
2021 2020
NIS million
2019
NIS million
NIS million
Finance income
Net change in fair value of derivative financial instruments 1 - -
Amounts reclassified to profit and loss from a hedge reserve and hedging cost reserve in respect of the cash flow hedge 7 - -
Interest income from bank and other deposits 1 1 7
9 1 7
Finance expenses
Exchange rate differences 19 17 7
Interest expenses for debentures 38 17 14
Interest expenses for loans from banks and financial institutions 117 67 66
Interest expense for loans from non-controlling interests 13 - -
Amounts reclassified to profit and loss from a hedge reserve and hedging cost reserve in respect of the cash flow hedge - 22 10
Interest expenses for lease liabilities 2 1 -
Net change in fair value of derivative financial instruments - 4 -
Fees and others 5 4 3
194 132 100
Loss from disposal of financial liabilities, net 272 41 -
Finance expenses, net, recognized in the statement of income 457 172 93

NOTE 22 - EARNINGS (LOSS) PER SHARE

Information used in the calculation of the basic and diluted earnings (loss) per share:

A. Earnings (loss) attributable to holders of ordinary shares

For the year ended December 31
2021
NIS million
2020
NIS million
2019
NIS million
Profit (loss) for the year attributable to shareholders of the Company (220) (57) 90

B. Weighted average number of ordinary shares

Weighted average number of shares used for the basic calculation For the year ended December 31
In thousands of shares of NIS 0.01 par value 2021 2020 2019
Balance as at January 1 178,370 143,360 131,887
Effect of shares issued in the year 12,548 7,359 4,845
Effect of options exercised for shares 150 26 77
Effect of RSUs 102 133 185
Weighted average number of shares used for the basic calculation 191,170 150,878 136,994
Effect of future exercise of options *- *- 2,049
Weighted average number of shares used for the diluted calculation 191,170 150,878 139,043

(*) In the years ended December 31 2021 and 2020, the number of shares arising from the future exercise of options amounted to 2,427 thousand and 1,615 thousand shares with a par value of NIS 0.01, respectively.

Since during those years the Company has had a loss, the effect of the future exercise of the options is anti-dilutive.

A. General

The Group is exposed to the following risks arising from use of financial instruments:

  • µ Credit risk µ Liquidity risk
  • µ Market risk

B. Credit risk

This risk includes any cash amounts due to the Group from counterparties, less any amounts due to the counterparties by the Group, where a there is a legal right of offset. This also includes the fair value amounts of contracts with individual counterparties which are presented in the financial statements.

Maximum exposure to credit risk

The carrying amount of financial assets represents the maximum credit exposure. The maximum exposure to credit risk as at the reporting date was as follows:

As at December 31
2021 2020
NIS million NIS million
Cash and cash equivalents 757 200
Short term deposits - 1,607
Restricted deposits and cash 68 438
Trade and other receivables (*) 294 194
Derivative financial instruments 28 1
1,147 2,440

(*) As at December 31, 2021 and 2020, trade receivables arise from current debts of customer credit and there are no trade receivables in arrears.

C. Liquidity risk

The Group's approach to managing liquidity risk is to ensure, to the extent possible, sufficient liquidity to meet its liabilities when due, under both normal and stress conditions, without incurring unacceptable losses or impairing goodwill.

Below are the contractual maturity dates of the financial liabilities, including expected interest payments:

As at December 31, 2021
Carrying amount Contractual amount 12 months or less One to two years 2-5 years More than 5 years
NIS million
Non-derivative financial liabilities
Trade payables 425 425 425 - - -
Payables and credit balances 28 28 28 - - -
Loans from holders of non-controlling interests (including interest
payable) 434 554 35 81 129 309
Debentures (including interest payable) 1,824 2,083 66 76 735 1,206
Lease liability (including interest payable) 103 120 61 8 19 32
Loans from banks and financial institutions (including interest
payable) 1,520 1,849 103 139 882 725
Financial liabilities - derivative instruments
Forwards on exchange rates used for hedging 16 19 19 - - -
Other forwards on exchange rates 4 6 6 - - -
Total financial liabilities 4,354 5,084 743 304 1,765 2,272
As at December 31, 2020
Carrying amount Contractual amount 12 months or less One to two years 2-5 years More than 5 years
NIS million
Non-derivative financial liabilities
Trade payables 298 298 298 - - -
Payables and credit balances 59 59 59 - - -
Loans from holders of non-controlling interests (including interest payable) 1 2 - - - 2
Debentures (including interest payable) 980 1,125 45 45 290 745
Lease liability (including interest payable) 60 71 46 2 6 17
Loans from banks and financial institutions (including interest payable) 1,979 2,568 210 203 836 1,319
Financial liabilities - derivative instruments
Interest swap contracts used for hedging 35 133 20 18 45 50
Forwards on exchange rates used for hedging 110 108 102 6 - -
Other forwards on exchange rates 3 3 3 - - -
Total financial liabilities 3,525 4,367 783 274 1,177 2,133

D. Market risk

In the ordinary course of business, the Group buys and sells derivatives and assumes financial liabilities, in order to manage market risks.

CPI and currency risks

The Group is exposed to currency risk for trade payables that are denominated in a currency other than the functional currency of the Group. The currencies in which most of these transactions are denominated are EUR and USD.

Balances denominated in or linked to foreign currency are presented in the financial statements according to the representative exchange rate at the reporting date. Balances linked to the CPI are presented on the basis of the CPI attributable to each linked asset or liability.

Below is information about the CPI and exchange rates:

CPI (points) Exchange rate of
USD against NIS
Exchange rate of
EUR against NIS
December 31, 2021 102.6 3.110 3.520
December 31, 2020 100.2 3.215 3.944
December 31, 2019 100.8 3.456 3.878
Changes during the year ended on:
December 31, 2021 2.4% (3.3)% (10.8)%
December 31, 2020 (0.6)% (7.0)% 1.7%
December 31, 2019 0.3)% (7.8)% (9.6)%

* According to the 2018 base CPI

The Group's exposure to CPI and foreign exchange risks, excluding derivative financial instruments (see below), is as follows:

NIS Foreign currency
CPI-linked Non-linked USD EUR Other Total
NIS million
December 31, 2021
Assets
Cash and cash equivalents - 496 261 - - 757
Short-term restricted deposits and cash - 68 - - - 68
Trade and other receivables - 181 113 - - 294
Total financial assets - 745 374 - - 1,119
Liabilities
Trade payables - (186) (203) (29) (7) (425)
Payables and credit balances - (20) (8) - - (28)
Debentures (976) (848) - - - (1,824)
Lease liabilities (22) (52) (29) - - (103)
Loans from non-controlling interests - (233) (201) - - (434)
Loans from banks and financial institutions (454) (761) (305) - - (1,520)
Total current liabilities (1,452) (2,100) (746) (29) (7) (4,334)
Total financial instruments (1,452) (1,355) (372) (29) (7) (3,215)

D. Market risk (cont.)

CPI and currency risks (cont.)

The Group's exposure to CPI and foreign exchange risks, excluding derivative financial instruments (see below), is as follows:

NIS Foreign currency
CPI-linked Non-linked USD EUR Other Total
December 31, 2020
Assets
Cash and cash equivalents - 177 23 - - 200
Restricted deposits and cash - 1,924 121 - - 2,045
Trade and other receivables - 163 31 - - 194
Total financial assets - 2,264 175 - - 2,439
Liabilities
Trade payables - (132) (122) (34) (10) (298)
Payables and credit balances - (24) (35) - - (59)
Debentures (980) - - - - (980)
Capital notes issued to a related party - (1) - - - (1)
Lease liabilities (16) (44) - - - (60)
Loans from banks and financial institutions (1,559) (420) - - - (1,979)
Total current liabilities (2,555) (621) (157) (34) (10) (3,377)
Total financial instruments (2,555) 1,643 18 (34) (10) (938)
F - 75

D. Market risk (cont.)

CPI and currency risks (cont.)

The Group's exposure to risk for foreign currency derivative financial instruments not used for hedging is as follows:

As at December 31, 2021
In NIS million Currency / linkage receivable Currency / linkage payable Amount receivable Amount payable Expiration date Fair value
Forwards on exchange rates USD NIS 10 30 2022 *-
Forwards on exchange rates EUR NIS 15 58 2022 (4)
Foreign currency call options USD NIS 55 209 2022 *-
In NIS million Currency / linkage receivable Currency / linkage payable As at December 31, 2020
Amount receivable
Amount payable Expiration date Fair value
Forwards on exchange rates USD NIS 39 127 2021 (3)
Foreign currency call options USD NIS 162 610 2021-2022 1
As at December 31, 2020
In NIS million Currency / linkage payable Currency / linkage receivable Amount payable Amount receivable Expiration date Fair value
Foreign currency put options USD NIS 30 114 2021 *-
* Amount is less than NIS 1 million.

The Group hedges its exposure to changes in the cash flows from payments in foreign currency. Below is a summary of the Group's main hedges:

• Zomet is hedging its exposure to changes in the cash flows from payments in USD for the Zomet Power Plant construction agreement (described in Note 28D). Zomet uses forward transactions to hedge its currency risk. These forward transactions have maturity dates that fall within the period between February 2021 and up to January 2023. If necessary, the transactions are renewed for an additional period on their repayment dates. These transactions are designated as a cash-flow hedge.

• In October 2020, the Company partly hedged its exposure to changes in the cash flows from payments in USD for acquisition of the CPV Group (as described in Note 25D) mainly by means of forward transactions. In January 2021, following the completion of the acquisition of the CPV Group, these forward transactions were repaid.

D. Market risk (cont.)

CPI and currency risks (cont.)

The Group's exposure to risk for foreign currency derivative financial instruments used for hedging is as follows:

As at December 31, 2021
In NIS million Currency / linkage receivable Currency / linkage payable Amount receivable Amount payable Expiration date Fair value
Forwards on exchange rates USD NIS 104 340 2022-2023 (16)
As at December 31, 2020
In NIS million Currency / linkage receivable Currency / linkage payable Amount receivable Amount payable Expiration date Fair value
Forwards on exchange rates USD NIS 565 1,924 2021-2022 (110)

D. Market risk (cont.)

CPI and currency risks (cont.)

In June 2019, the Group entered into an agreement with Bank Hapoalim Ltd. to hedge up to 80% of the exposure to the CPI in respect of the principal of the loans of Rotem and Hadera from financial institutions, in exchange for payment of additional interest at an annual rate of between 1.70% and 1.76%. The Group chose to designate the CPI transactions as an accounting hedge. In the years ended on December 31 2020 and 2021, due to changes in inflationary expectations and in view of the changes in the projected interest rates, the Company recorded an increase in assets and liabilities, respectively, following revaluation of the financial derivatives for the CPI swap transactions (hereinafter in this section – the "Derivative"), in the amount of NIS 43 million and NIS 42 million, respectively, which was mostly classified under other comprehensive income. The valuation of the Derivative was made by an independent outside appraiser. The value of the Derivative was based on the discounted linked NIS cash flow expected to be received less the discounted fixed NIS cash flow expected to be paid. This value was adjusted for the credit risks of the parties. It should be noted that, in view of the early repayment of the balance of Rotem's credit, the Company executed an early close-out of Rotem's CPI swap contract, which yielded proceeds of NIS 13 million for the Company.

The Group's exposure to CPI risk for derivative financial instruments used for hedging is as follows:

As at December 31, 2021
Linkage receivable Interest payable Expiration date Amount of the linked
reserve
Fair value
NIS million
CPI swap contracts CPI 1.76% 2036 335 23
As at December 31, 2020
Amount of the linked
Linkage receivable Interest payable Expiration date reserve Fair value
NIS million
CPI swap contracts CPI 1.70% 2031 773 (23)
CPI swap contracts CPI 1.76% 2036 351 (12)

Index and currency sensitivity analyses:

Appreciation (depreciation) of the NIS by a rate of 5% or 10% against the following currencies would have increased (decreased) the comprehensive income or loss by the amounts shown below. This analysis assumes that all other variables, in particular interest rates, remain fixed. The analysis for 2020 is performed on the same basis.

D. Market risk (cont.)

CPI and currency risks (cont.)

As at December 31, 2021
Effect on total comprehensive income (loss) and capital
10% decrease 5% decrease 5% increase 10% increase
NIS million NIS million NIS million NIS million
Non-derivative instruments
USD/NIS 29 14 (14) (29)
Non-derivative instruments
EUR/NIS 2 1 (1) (2)
Derivative instruments
USD/NIS (24) (12) 12 24
F - 79

D. Market risk (cont.)

CPI and currency risks (cont.)

Index and currency sensitivity analyses (cont.):

As at December 31, 2020
Effect on total comprehensive income (loss) and capital
10% decrease
NIS million
5% decrease
NIS million
5% increase
NIS million
10% increase
NIS million
Non-derivative instruments
USD/NIS (2) (1) 1 2
Non-derivative instruments
EUR/NIS 3 1 (1) (3)
Derivative instruments
USD/NIS (150) (75) 76 153

A change of 1% or 2% in the CPI would have increased (decreased) the comprehensive profit or loss in the amounts presented below. The analysis below is based on index changes that the Group believes are reasonably feasible as at the end of the Reporting Period. The analysis is based on the assumption that all the other variables, particularly interest rates, remain fixed and do not take into account any expected sales and purchases. The analysis for 2020 was performed according to the same basis.

As at December 31, 2021
Effect on total comprehensive income (loss) and capital
2% decrease 1% decrease 1% increase 2% increase
NIS million
Long-term loans (CPI) 7 4 (4) (7)
Debentures (CPI) 18 10 (10) (19)
CPI swap contracts (6) (3) 3 6
As at December 31, 2020
Effect on total comprehensive income (loss) and capital
2% decrease 1% decrease 1% increase 2% increase
NIS million
Long-term loans (CPI) 20 11 (12) (24)
Debentures (CPI) - - (10) (19)
CPI swap contracts (17) (9) 9 17
F - 80

D. Market risk (cont.)

Interest rate risk

Below is a breakdown of the types of interest of the Group's interest-bearing financial instruments as at the end of the Reporting Period, based on the Group management reports:

Fixed interest instruments linked to the CPI:

As at December 31
2021 2020
NIS million NIS million
Financial assets - -
Financial liabilities 1,424 2,531
(1,424) (2,531)

Fixed interest instruments not linked to the CPI:

As at December 31
2021 2020
NIS million NIS million
Financial assets 50 1,867
Financial liabilities 1,504 236
(1,454) 1,631

Fair value sensitivity analysis for fixed interest instruments:

The Group's fixed interest financial instruments are not measured at fair value through profit and loss, therefore changes in interest rates as at Reporting Date are not expected to have any effect on profit and loss.

Variable interest instruments:

As at December 31
2021 2020
NIS million NIS million
Financial assets 172 276
Financial liabilities 833 184
(661) 92

A change of 0.5%-1.5% in the LIBOR interest rate would have increased (decreased) the comprehensive profit or loss in the amounts presented below. The analysis below is based on LIBOR rate changes that the Group believes are reasonably feasible as at the end of the Reporting Period. The analysis is based on the assumption that all other variables, in particular foreign exchange rates, remained constant.

  • D. Market risk (cont.)
  • Interest rate risk (cont.)
As at December 31, 2021
Effect on total comprehensive income (loss) and capital
0.5% decrease 0.5% increase 1% increase 1.5% increase
NIS million
Long-term loans (US LIBOR) 2 (2) (4) (5)
Interest rate swaps (US LIBOR) (1) 1 2 4

The Group's exposure to LIBOR risk for derivative financial instruments used for hedging is as follows:

As at December 31, 2021
Amount of the linked
Linkage receivable Interest payable Expiration date reserve Fair value
NIS million
USD LIBOR
Interest rate swaps interest 0.93% 2030 216 3
F - 82

E. Fair value of financial instruments

The Group's financial instruments include non-derivative assets, such as: cash and cash equivalents, deposits and restricted cash, other receivables and debit balances and capital notes. Financial instruments also include short-term credit, payables and credit balances, long-term loans and other liabilities.

Due to their nature, the fair value of the financial instruments included in the Group's working capital is generally the same as or approximate to their carrying amount. The fair value of long-term deposits and debit balances and long-term liabilities is also close to their carrying amount, as these are financial instruments that bear interest at a rate similar to the regular market interest rate.

In determining the fair value of an asset or liability, the Group uses as much observable market inputs as possible. Fair value measurements are divided into three levels in the fair value hierarchy, based on the inputs used in the valuation, as follows:

  • Level 1 Quoted (unadjusted) prices in an active market for identical assets or liabilities.
  • Level 2 Observable market inputs, directly or indirectly, that are not included in Level 1 above.
  • Level 3 Data that are not based on observable market inputs.

The table below gives a breakdown of the carrying amount and fair value of groups of financial instruments, as presented in the financial statements, not on the basis of fair value:

As at December 31, 2021
Carrying amount (*) Fair value
NIS million NIS million
Loans from banks and financial institutions (Level 2) 1,520 1,697
Loans from non-controlling interests (Level 2) 429 440
Debentures (Level 1) 1,824 1,997
3,773 4,134
As at December 31, 2020
Carrying amount (*) Fair value
NIS million NIS million
Loans from banks and financial institutions (Level 2) 1,979 2,360
Debentures (Level 1) 980 1,056
2,959 3,416

(*) Includes current maturities and interest payable.

NOTE 24 – RELATED AND INTERESTED PARTIES

A. Compensation and benefits for key management personnel (including directors)

Key management executives of the Group (hereinafter - the "Chairperson of the Boards of Directors and CEO") are eligible, in addition to their salaries, to non-cash benefits (such as a company car, medical insurance, etc.). In addition, the Group contributes funds to a defined post-employment benefit plan. The Chairperson of the Boards of Directors and the CEO also take part in the Company's options plan. For further information, see Note 18B.

Compensation and benefits for the Chairperson of the Boards of Directors and the CEO employed in the Group:

For the year ended December 31
2021 2020
2019
No. of people NIS million No. of people NIS million No. of people NIS million
Employee benefits 3 7 2 4 2 4
Post-employment benefits 3 1 2 *- 2 *-
Share-based payment 3 6 2 1 2 1
3 14 2 5 2 5

* Amount is less than NIS 1 million.

Compensation and benefits for directors who are not employed in the Group:

For the year ended December 31
2021 2020 2019
No. of people NIS million No. of people NIS million No. of people NIS million
Total benefits for directors who are not employed in the
Group 8 1 9 1 8 1

B. Balances with related and interested parties

As at December 31
2021 2020
NIS million NIS million
Cash and cash equivalents (2) 279 2
Short term deposits - 1,107
Short-term restricted deposits and cash - 25
Trade receivables (1) 30 29
Other long-term receivables 16
Other accounts payables (1) (1)
Long-term loans from banks and financial institutions (3) - (504)
Loans from non-controlling interests (See Note 16A) (86) (1)
F - 84

NOTE 24 – RELATED AND INTERESTED PARTIES (cont.)

C. Transactions with related parties and interested parties

For the year ended December 31
2021 2020
NIS million NIS million 2019
NIS million
276
-
-
-
-
-
-
(7)
-
-
-
-
(1)
Sales (1) 240 279
Revenues from provision of services (4) 44
Cost of sales (25)
General and administrative expenses (1)
Interest expenses for loans from banks and financial institutions (3) (25) (4)
Interest expense for loans from non-controlling interests (9)
Loss from disposal of financial liabilities, net (95)
Discounted interest expenses for property, plant and equipment - (1)
  1. The Group sells electricity to, among others, related parties in Israel. See Note 28A for information concerning electricity sales contracts with private customers.

    1. Part of the Group's cash balance is from Mizrahi Bank, which is a related party to the Company.
    1. Part of the Group's outstanding loans are from interested parties that are financial institutions. See Note 16D for information concerning the Group's financing agreements.
    1. The Group provides management, entrepreneurship and maintenance services to associates; for further details, See Note 26.
    1. The Group has engaged in a Partnership agreement (as defined in Note 25D1) for the acquisition of CPV Group, with institutional investors from the Migdal Insurance Group, an interested party in the Company, which, as of the acquisition date, was an interested party in the Company. For further information, see Note 25A4B.

D. Guarantees by related parties

The Company and Veridis each provided, pro rata to their holdings in Rotem (including indirect), bank guarantees in favor of the System Operator (hereinafter – the "System Operator Guarantees"), as required under the power purchase agreement described in Note 28C. As at December 31, 2021, the System Operator Guarantees amounted to NIS 87 million (linked to the CPI). Subsequent to the reporting date, in February 2022, the amounts of the IEC Guarantees were updated to an amount of NIS 75 million (linked to the CPI). In the year ended December 31 2021, pledged deposits in the amount of NIS 38 million, which served as collateral against this guarantee, were released.

NOTE 25 – SUBSIDIARIES

A. Subsidiaries

Below is a breakdown of the Group's material subsidiaries (directly and indirectly held):

subsidiary
As at December 31
Main location of the
Company's
operations
2021 2020
Company
OPC Israel Energy Ltd. (hereinafter - "OPC Israel") (1)
CPV Group PL (hereinafter - "CPV Group") (3)
Israel
USA
100%
70%
100%
-

The Group's ownership rights in the

A. Subsidiaries (cont.)

  1. OPC Israel

In December 2020, the Company carried out an internal reorganization in accordance with Section 104A of the Income Tax Ordinance, in which it transferred to OPC Israel its entire holdings in some of the subsidiaries it owned. As of the report date, OPC Israel holds subsidiaries Rotem, Hadera, Zomet, Hadera Operations Company and Sorek, as detailed below.

In connection with the transfer of Hadera and Zomet shares to OPC Israel, it should be noted that the financing entities' consent was obtained and that amendments to the relevant financing agreements have been signed, including, among other things, adjustments to the financing agreements such that they reflect the restructuring. Furthermore, OPC Israel joined, jointly and severally (but without double payment), to the Company's undertakings by virtue of the Equity Subscription Agreements in each of the said subsidiaries. The Company has undertaken not to sell or transfer its stake in OPC Israel without first obtaining the lenders' consent.

Set forth below are details regarding the main projects indirectly held through the subsidiaries of OPC Israel:

Entity Year of commercial operation Technology Capacity (MW) Holding rate as at
December 31, 2021
Power plant location
OPC Rotem Ltd. (hereinafter - "Rotem") (a) July 2013 Natural gas, combined cycle 466 80% Mishor Rotem
OPC Hadera Ltd. (hereinafter - "Hadera") (b) July 2020 Natural gas - cogeneration 144 100% Hadera
Zomet Energy Ltd. (hereinafter - "Zomet") (c) Under construction. Commercial
operation is expected to commence
in the first quarter of 2023.
Conventional open-cycle (a peaker
plant)
396 100% Plugot Intersection
OPC Sorek 2 Ltd. (hereinafter - "Sorek") (d) Under construction. Commercial
operation is expected to commence
in the fourth quarter of 2023.
Cogeneration 87 100% On the premises of the Sorek B
seawater desalination facility

A. Subsidiaries (cont.)

(A) Rotem

Rotem operates in accordance with a tender conducted in 2001. Furthermore, as a result of winning the foregoing tender, Rotem was issued a license to generate and sell electricity for a period of 30 years from the date of commencement of commercial operation.

(B) Hadera

Hadera holds a permanent power generation license using cogeneration technology for the Hadera Power Plant (i.e., a power plant that generates both electricity and steam that are sold to consumers), with 144MW installed capacity, as well as a supply license. The generation license is for a period of 20 years, and may be extended for an additional period of 10 years by the Israeli Electricity Authority with the approval of the Minister of Energy. In addition, Hadera holds the Energy Center (boilers and turbines on the premises of Infinya), which is located on the premises of Infinya Mills (hereinafter – the "Energy Center"). As at the approval date of the financial statements, the Energy Center serves as backup for supply of steam from the Hadera Power Plant. It should be noted that the turbine in the Energy Center is not being operated.

Hadera supplies all of the electricity and steam needs of Infinya Mills, which is located adjacent to the Hadera Power Plant. In addition, the Hadera Power Plant supplies electricity to additional private customers and sells electricity to the System Operator. In December 2020 and between January and May 2021, some components of the Hadera Power Plant gas turbines were replaced and refurbished, as part of scheduled work, and over November and December, 2021, maintenance works were done on the steam turbine. Accordingly, in 2021, there were 74 days of maintenance work during which the Hadera Power Plant did not work in full capacity. Following the replacement and renovation work, the gas turbines function as expected from such turbines. In addition, during May and June 2022, additional maintenance work is scheduled to be performed on the steam turbine, for a period estimated at 50 days during which the power plant is expected to operate on a partial basis. After performance of the additional maintenance activities in the steam turbine, a further improvement in the turbine's performance is expected. It is noted that the continuity of the said retrofitting and renovation activities could be impacted by movement restrictions due to the Covid-19 crisis in light of the need for arrival of equipment and foreign work teams. In October 2021 the Hadera Power Plant was connected to Infinya by way of a direct electricity line.

A. Subsidiaries (cont.)

1. OPC Israel (cont.)

(C) Zomet

Conventional open-cycle power plant (peaker plant) under construction, with a capacity of 396 MW in proximity to the Plugot Intersection near Kiryat Gat. Peaker power plants receive capacity payments and reimbursement of expenses in respect of electricity generated based on Regulation 914.

Subject to completion of construction of the Zomet Power Plant, and subject to receipt of a permanent generation license, the power plant's entire capacity will be allocated to Noga. Zomet will not be permitted to enter into power purchase agreements with private customers.

In April 2019, Zomet received a conditional license to construct an open-cycle conventional technology power plant. In December 2019, Zomet received tariff approval, under which Zomet is entitled to tariffs for selling capacity and energy to the System Operator for a period of twenty years commencing from the date on which it received the permanent generation license (hereinafter - the "Tariff Approval"). Considering the restrictions included in the connection survey that Zomet received, the Tariff Approval includes a reduced capacity tariff for 2023. It is noted that the tariff approval noted that the expected commercial operation date is up to 36 months from the date of the notice of the Israeli Electricity Authority to Zomet regarding completion of a financial closing (February 10, 2020).

(D) Sorek

In May 2020, Sorek (a special-purpose company wholly-owned by the Company) signed an agreement with SMS IDE Ltd. (hereinafter - "IDE"), that won a tender of the State of Israel for the construction, operation, maintenance and transfer of a seawater desalination facility on the Sorek B site (hereinafter – the "Desalination Facility"), whereby Sorek is to supply equipment, construct, operate, and maintain a (natural gas-powered) energy generation facility on the site of the Desalination Facility, with a production capacity of 87 MW (hereinafter – the "Generation Facility"), and supply the energy required for the Desalination Facility for a period to end after 25 years of the Desalination Facility's commercial operation date (hereinafter in this section - the "Agreement"). At the end of the aforesaid period, ownership of the Generation Facility will be transferred to the State. Following on the above, a BOT (build, operate, transfer) agreement was signed between IDE and the State of Israel (hereinafter - the "BOT Agreement"). The Company's engagement with IDE includes, among other things, the Company's undertakings to construct the generation Facility within 24 months of the date of approval of National Infrastructure Plan (approved in November 2021) and an undertaking to supply energy at a specific scope of capacity to the desalination facility. Furthermore, to secure Sorek's commitments under the construction agreement of the generation facility, the Company provided IDE guarantees that will remain valid throughout the term of the construction agreement. In 2021, the Company engaged in agreements for supplying equipment, a construction agreement and a maintenance agreement, for further information see Note 28.

The Generation Facility is expected to be established, under the framework of the Arrangement for High-Voltage Producers that are Established without a Tender, which was published by the Israeli Electricity Authority in March 2019 and the capacity remaining beyond the consumption of the Desalination Facility is designated to be sold to the onsite consumer and System Operator. Application of the said arrangement is to projects that will reach a financial closing up to the end of 2023. The building of the Generation Facility will be executed by the Company as an IPP contractor (subcontractor of the concessionaire) under the BOT Agreement of the Sorek B Desalination Facility, including commitments and provision of guarantees applicable to the IPP contractor under the Desalination Authority.

A. Subsidiaries (cont.)

1. OPC Israel (cont.)

Construction of the Generation Facility depends, among other things, on proper functioning of construction work and equipment, as well as completion of detailed technical coordination with respect to connecting the project to the electricity grid.

2. Additional subsidiaries in Israel

(A) Hadera Operations Company

In July 2016, Hadera engaged in an agreement for the ongoing operation and maintenance of the Hadera Power Plant (hereinafter - the "Hadera Operating Agreement") with OPC Operations Ltd. (hereinafter - "Hadera Operations Company"), for a period of 20 years from the date of commencement of commercial operation. Under the engagement, Hadera Operations Company undertook to provide services to the Hadera Power Plant in the construction stage as detailed in the agreement and to be responsible for the regular maintenance and operation of Hadera Power Plant after its commercial operation, excluding services included in the Hadera maintenance agreement (see Note 28E), all in accordance with the approved annual budget. Hadera Operations Company undertook to carry out the services in accordance with the standards set forth and committed to minimum suspension time of the Hadera Power Plant. As part of the Hadera Operating Agreement, in October 2019, the Company provided a corporate execution guarantee in the amount of NIS 21 million to secure the commitments of Hadera Operations Company towards Hadera.

(B) Rotem 2

Rotem 2 is a privately-held company that is advancing the construction of a power plant on land adjacent to the Rotem Power Plant. The Company holds 80% of the issued and paid-up share capital of Rotem 2 and the remaining shares of Rotem 2 are held by Veridis.

In July 2020, the National Infrastructure Committee (hereinafter - "NIC") discussed the plan and approved posting the plan for comment by the District Committees and for public objection. In January 2021, the Subcommittee for Comments and Objections of the National Planning and Building Committee of National Infrastructures held a hearing for comments and objections with respect to NIP 94; the objections to the plan were rejected and Rotem 2 was requested to make technical revisions to the provisions of the plan, which were made in early March 2021. In April 2021, the National Infrastructures Committee decided to reject the plan due to the plan's non-compliance with the principles set forth in the above National Council decision (distance from the consumption areas). In the decision, it was noted that the National Infrastructures Committee asked the developer of the Plan to check whether it would be possible to use the area for another technology if the review leads to positive conclusions, including in connection with the transmission of electricity from the power plant; the developer was advised to ask the government to amend the authorization. As of the Financial Statements approval date, the Company is studying the resolution and reviewing the options, including promoting a net-zero "green technology" power plant and/or an electricity storage facility.

(C) OPC Gas Limited Partnership

OPC Natural Gas Limited Partnership is a limited partnership that, as part of the Group's energy production and supply activity, supplies natural gas for the Group's needs, including for Company projects to establish energy generation facilities at the consumer's premises, as well as selling natural gas to third parties.

A. Subsidiaries (cont.)

2. Additional subsidiaries in Israel (cont.)

(D) Hadera 2

OPC Hadera Expansion Ltd. (hereinafter - "Hadera 2") is a privately-held company that is promoting the construction of a power plant for the generation of electricity using natural gas on land owned by Infinya Mills located adjacent to the Hadera Power Plant (the plan also allows storage of energy in batteries). Hadera 2 has an option agreement with Infinya to lease of a plot of 6.8 hectares near the Hadera Power Plant. The option period ends on December 31, 2022. The annual option fees in respect of each of the years 2019 through 2022 (inclusive) amount to NIS 3 million, where according to the agreement, for 2019 Hadera 2 paid Infinya Mills an amount of NIS 2.2 million and if Hadera 2 exercises the option and signs a lease agreement, Hadera 2 will pay Infinya Mills, on the date of the financial closing with a financing entity with respect to the construction of the Hadera Power Plant, an additional amount of NIS 0.8 million. If Hadera exercises the option in 2020-2022, an amount relative to the rental fees in respect of the years determined will be offset, and to the extent that the option will not be exercised, a settlement was determined between the parties in connection with the rent and the unexercised option.

As part of the agreement, Hadera 2 undertook to act to obtain legal authorization for moving forward with the National Infrastructures Plan for the construction of a power plant on the leased land, and will also act to for the advancement and approval of the statutory plan within the option period. Hadera 2 will be required to give notice at least 90 days prior to the end of each option year that it seeks to extend the option by an additional year, and if it fails to do so, the option will expire at the end of that year. The agreement provides that the option will expire if the Planning Administration NIC refuses to approve the statutory plan and if Hadera 2 will not conduct legal proceedings with regard to such refusal. If the option is exercised, the lease agreement to be signed will be for a period of 25 years less one month, commencing from the date on which possession of the leased property is handed over (that is, the date of the option) or the date of commencement of commercial operation, as set out in the agreement, with an option to extend the engagement. Furthermore, it provided that the lease agreement will not include liability limitation, and that the Company will bear all the fees, taxes and payments that will be imposed with regard to the construction of a power plant on the leased property.

In October 2021, Hadera 2 notified Infinya Mills of the extension of the option period until 2022 and, accordingly, in December 2021, Hadera 2 paid Infinya Mills option fees in the amount of NIS 3 million for 2022.

In September 2020, an environmental impact survey was submitted to the National Infrastructures Committee. In November 2020, the government revised the authority granted for expansion of the Hadera Power Plant so that an authorized maximum capacity will not be fixed, in order to allow the use of turbines using cutting-edge technologies when constructing them, which increase energy efficiency and reduce pollutant emissions. In January 2021, the National Infrastructures Committee discussed the plan and approved transfer of the plan for review of the District Committee and objections of the public. In February 2021, National Infrastructure Plan 20B was submitted for the comments of the regional committees and for public objections and in May and June 2021, there were two hearings before an investigator appointed by the National Infrastructure Committee. In November 2021, the NIP Subcommittee posted objections to the decision according to which if the Committee decides that the Plan meets the criteria that were set by the National Committee and that based on all the considerations it should be submitted for government approval, the Committee will decide to recommend adopting the recommendations of the surveyor and to submit the plan for government approval, subject to completion of and technical amendments to the plan documents.

A. Subsidiaries (cont.)

2. Additional subsidiaries in Israel (cont.)

In December 2021, the National Infrastructure Committee plenum resolved to submit the plan to the Government for approval. Subsequent to the reporting date, in February 2022, a petition was submitted to the High Court by the Hadera Municipality against the National Infrastructure Committee, the Ministry of the Interior, the Ministry of Health and Hadera 2 regarding the Committee's resolution on Hadera 2. In the petition, it was alleged, among other things, that there were significant defects in the planning process in violation of the obligation under the rules of administrative law. Hadera 2 is working to submit its position as part of its response to the petition.

(E) Gnrgy

Gnrgy is a private company offering EV charging services. For further information concerning the operations of Gnrgy, see Note 25D2.

3. The CPV Group

CPV Group is an American limited partnership established under Delaware law in the United States; it is owned by the Company through OPC Power. The CPV Group holds rights in active power plants and in power plants under construction and under development – both in the conventional and renewable energy areas, through subsidiaries and associates. Set forth below are details regarding the main projects held through the subsidiaries of the CPV Group. For details relating to major projects held by associates of the CPV Group – see Note 26. For information about the main agreements of the subsidiaries of the CPV Group – see Note 28.

Holding rate as at
Entity Year of commercial operation Technology Capacity (MW) December 31, 2021* Power plant location
CPV Keenan II Renewable Energy Company, LLC 2010 Wind 152 100% Oklahoma
(Hereinafter - "Keenan")
CPV Maple Hill, LLC Under construction. Commercial
operation is expected begin in the
second half of 2022.
Solar 126 100% Pennsylvania
(Hereinafter - "Maple Hill")
CPV Rogue's Wind, LLC Towards construction. Commercial
operation is expected to begin in the
second half of 2023.
Wind 114 100% Pennsylvania
(Hereinafter - ("Rogue's Wind")

(*) The holding rate is the holding rate of the CPV Group, which is a subsidiary of the Company and 70% of which is indirectly held by the Company (excluding CPV employees' rights of profit participation allocated to managers in the CPV Group as outlined in Note 18C).

  • A. Subsidiaries (cont.)
    1. Additional US subsidiaries

(A) ICG Energy

In January 2021, the parent company transferred (through a wholly-owned subsidiary) to the Company, at no consideration, all its shares and rights (100%) in IC Green Energy Inc. (previously Primus Green Energy Inc.), a company incorporated in New Jersey, USA (hereinafter - "ICG Energy"), which had owned a renewable energy operation. The parent company held the shares of ICG Energy through a wholly-owned subsidiary, IC Green Energy Ltd. (hereinafter – "IC Green"). The transfer of the company has had no material effect on the Company's equity. Furthermore, the parent company undertook to indemnify the Company for any loss (as defined in the agreement), unlimited as to amount, that may be caused to it directly or indirectly as a result of: (a) the transfer of the shares or any misrepresentation or a breach of a representation by the parent company or IC Green in the agreement; (b) one of the following: (1) a claim or demand by a third party with regard to any act or omission by IC Green or ICG Energy prior to completion of the transfer; (2) an act or omission by ICG Energy that occurred prior to completion of the transfer. It was further provided that in the case of a claim, the parent company may take responsibility for handling of the claim in accordance with the mechanism provided and may compromise without the need for the Company's approval, other than in certain cases.

During 2005-2020, ICG Energy recorded net operating losses for tax purposes, which as at December 31, 2020 amounted to approximately USD 108 million, and utilizable tax credits in the amount of approximately USD 2 million, which may be offset for tax purposes in the United States against future income in the United States, subject to complying with the conditions of the law, some of which are not under the Company's control and, therefore, the Company did not recognize deferred tax assets in respect thereof. According to information the Company received from the parent company, prior to the transfer of ICG Energy to the Company, ICG Energy sold its entire operations to a third party. The Company coordinates its operations in the US (including following the acquisition of CPV Group, as set out in Note 25D) under ICG Energy. Among other things, the said transfer will allow tax savings with respect to profits, if any, from the business activities in the United States.

Transfer of ICG Energy to the Company was approved by the Company's Board of Directors as a transaction that is only for the Company's benefit, pursuant to Section 1(2) of the Companies Regulations (Expedients in Transactions with an Interested Party), 2000.

In addition, in January 2021, after the transfer of ICG Energy to the Company, the Company transferred its rights and loans in the limited partnership, OPC Power to ICG Energy in respect of a loan in the amount of NIS 472 million, and capital notes issued by ICG Energy to the Company, in the amount of NIS 1,188 million. The loan is denominated in NIS, is not linked to the CPI, and bears annual interest at a rate of 7%. The loan principal will be repayable at any time that will be agreed on between the parties, but no later than January 2028. Accrued interest is payable on a quarterly basis. To the extent the payment made by ICG Energy is lower than the amount of the accrued interest, the payment in respect of the balance will be postponed to the next quarter, but not later than January 2028. The capital notes are repayable only after five years will have elapsed from their issuance date; they are denominated in shekels, are not linked to the CPI, and are to be repaid based on the decision of ICG Energy. For further information concerning OPC Power and the Company's interests therein, see Section B below.

A. Subsidiaries (cont.)

  1. Additional US subsidiaries (cont.)

(B) OPC Power Ventures LP

In October 2020, the Company engaged in a partnership agreement with three financial entities (hereinafter - the "Partnership Agreement"), under which the parties will invest in OPC Power. OPC Power is a special purpose partnership for the purpose of acquiring and holding CPV Group and for making additional investments in CPV Group, in the Power and Electricity sector in the United States. The Limited Partners in the Partnership are as follows: The Company (through a subsidiary) that holds 70%; three financial investors that are: Clal Insurance Group institutional investors that hold 12.75%; Migdal Insurance Group institutional investors that hold 12.75%; a Poalim Capital Markets Group company that holds 4.5% (these three investors will be referred to hereinafter - the "Financial Investors") (the rates do not include profit-sharing rights allocated to CPV Group managers as set out in Note 18C). A wholly owned company of the Company is the General Partner of the Partnership, and as such will manage the Partnership's business. So long as the Company is the controlling shareholder of the Partnership's General Partner, a separate operation of the Company in the area of operation of the Partnership in the US will require approval by a special majority of the other partners.

The total investment undertakings and provision of the shareholder loans by all partners (after approval of participation in further investment undertakings by all the investors totaling USD 400 million), according to the foregoing holding rates, amounts to USD 1,215 million. The said amount is designated for acquisition of all the rights in the CPV Group and for financing additional investments. During the reported period, the Limited Partners in the Partnership provided OPC Power with equity investments totaling USD 657 million (NIS 2,096 million) and provided it with loans at the total amount of USD 204 million (NIS 650 million), in accordance with their proportionate share in the partnership. The loans are denominated in USD and bear an annual interest rate of 7%. The loan principal will be repayable at any time as will be agreed on between the parties, but no later than January 2028. Accrued interest is payable on a quarterly basis. To the extent the payment made by OPC Power is lower than the amount of the accrued interest, payment in respect of the balance will be postponed to the following quarter – but not later than January 2028.

The Partnership Agreement provides, among other things, the rights of the General Partner to management fees at a rate deriving from the scope of investments of the Partnership, and a carried interest that is dependent on the rate of return earned by the Partnership. Furthermore, the Partnership Agreement contains, among other things, arrangements for the relationships between the Limited Partners and the relationships between them and the General Partner of the Partnership, provisions relating to the management of the Partnership, restrictions on the transfer partners' rights, tag along rights of the financial investors in certain cases, right of first offer (ROFO) in certain cases and drag along rights.

The Company and the financial investors also signed agreements during the Reporting Year and subsequent thereto, whereby the Company granted the financial investors a put option, and they granted the Company a call option (in the event that the put option is not exercised), with respect to the holdings of the financial investors in the Partnership. The exercise price of the put option will be based on the fair value of the Partnership less a certain discount, and exercise price of the call option will be based on the fair value of the Partnership plus a certain premium. The Partnership Agreement defines the exercise period and expiry dates of the options. The Company may pay the exercise price through its shares based on their average price on the stock exchange shortly before the exercise.

It is noted that upon transfer of ICG Energy to the Company (as described in Note 25A4), the Company transferred all the loans and rights of OPC Power to ICG Energy.

B. Significant restrictions on the transfer of resources between entities within the Group

With regard to restrictions on the distribution of dividends and liens on the assets of Rotem, Hadera and Zomet, see Note 16D.

C. Non-controlling interests in consolidated companies

Rotem

The tables below present a breakdown of information regarding Rotem, in which there were non-controlling interests of 20% as of December 31, 2021, 2020 and for the years ended on December 31, 2021, 2020 and 2019 that are material to the Group (before the revocation of intercompany transactions).

As at December 31
2021 2020
NIS million NIS million
Current assets 195 300
Non-current assets 1,412 1,565
Current liabilities 337 338
Non-current liabilities 1,265 1,284
Non-controlling interests 1 49
Total assets, net 4 194

Information on results:

For the year ended December 31
2021 2020
NIS million
2019
NIS million
NIS million
Sales 1,034 1,119 1,247
Profit (loss) for the year (73) 121 174
Total comprehensive income (loss) (73) 121 174
Profit (loss) attributable to the non-controlling interests (15) 24 35

Cash flow data:

For the year ended December 31
2021 2020 2019
NIS million NIS million NIS million
Cash flows from operating activities 261 399 387
Cash flows from investing activities 112 (23) (1)
Cash flows for financing activities (442) (365) (370)
Effect of exchange rate fluctuations on cash and cash equivalent balances - (2) (1)
Total increase (decrease) in cash and cash equivalents (69) 9 15

Dividend distribution in Rotem

In 31, Rotem distributed dividends to OPC Israel in a total amount of NIS 132 million and to Veridis in a total amount of NIS 33 million.

In the years ended on December 31 2020 and 2019, Rotem distributed dividends to the Company in a total amount of NIS 170 million and NIS 190.4 million, respectively, and to Veridis in a total amount of NIS 42.5 million and NIS 47.6 million, respectively.

C. Non-controlling interests in consolidated companies (cont.)

OPC Power

The tables below present a breakdown of information concerning OPC Power in which there were non-controlling interests of 30% as at December 31, 2021 and the year ended on that date, that are material for the Group (prior to the revocation of intercompany transactions).

As at December 31,
2021
NIS million
Current assets 278
Non-current assets 2,715
Current liabilities 67
Non-current liabilities 1,082
Non-controlling interests * 553
Total assets, net 1,291

Information on results:

Cash flow data:

For the year ended
December 31, 2021
NIS million
Sales 164
Loss for the year * (218)
Total comprehensive loss * (164)
Loss attributable to the non-controlling interests * (65)

(*) The OPC Power partnership is transparent for tax purposes; therefore - its results are presented before the effect of taxes on income.

For the year ended
December 31, 2021
NIS million
Cash flows from operating activities 6
Cash flows from investing activities (2,229)
Cash flows for financing activities 2,381
Effect of exchange rate fluctuations on cash and cash equivalent balances 48
Total increase in cash and cash equivalents 206

During the year ended December 31, 2021, no dividend distributions were made by OPC Power.

D. Business combinations that occurred during the reporting period

1.The CPV Group

On January 25 2021, the transaction for the acquisition of 70% of the rights and holdings in CPV Group was completed (hereinafter – the "Transaction Completion Date"). The acquisition was executed through a limited partnership, CPV Group LP (hereinafter – the "Acquirer"), which is held, indirectly, by the Company (approximately 70% by the limited partner). The entities acquired under CPV Group are: CPV Power Holdings LP (hereinafter – "CPVPH"); Competitive Power Ventures Inc. (hereinafter – "CPVI"); and CPV Renewable Energy Company Inc. hereinafter - "CPVREC").

The CPV Group is engaged in the development, construction and management of power plants using renewable energy and conventional energy (power plants powered by natural gas of the advanced-generation combined-cycle type) in the United States through subsidiaries and associates. The CPV Group holds rights in active power plants that it developed and constructed – both in the area of conventional energy and in the area of renewable energy. In addition, through an asset management group, the CPV Group is engaged in provision of management services to US-based power plants using a range of technologies and fuel types, by means of signing asset-management agreements, usually for short to medium terms.

On the Transaction Completion Date, in accordance with the mechanism for determination of the consideration as defined in the acquisition agreement, the Acquirer paid the Sellers a consideration that was set at the total amount of about USD 648 million, and approximately USD 5 million for a deposit in the same amount, which remains in the CPV Group. In May 2021, the consideration for the CPV Group acquisition transaction was adjusted, as a result of which the Sellers paid CPV Group an immaterial amount. It is noted that, in respect of 17.5% of the rights to the Three Rivers project under construction (hereinafter – the "Project under Construction"), a sellers' loan, in the amount of USD 95 million (hereinafter – the "Seller's Loan") was granted to CPVH. The Seller's Loan was granted for a period of up to two years from the Transaction Completion Date, bore an annual interest of 4.5%, which was paid quarterly and secured by a lien on shares of the holding company that owns the rights to the Project under Construction and rights pursuant to the management agreement of the Project under Construction. In February a total amount of USD 41 million of the balance of the Seller's Loan was repaid by the sale of rights in the Three Rivers Project (for further information see Note 26A) and in October 2021, the balance of the Seller's Loan, in a total amount of USD 54.5, was repaid in full.

The Company partially hedged its exposure to changes in the cash flows from payments in US dollars in connection with the agreement for acquisition of the CPV Group by means of forward transactions and dollar deposits. The Company chose to designate the forward transactions as an accounting hedge. On the Transaction Completion Date, the Company recorded an amount of approximately NIS 103 million that was accrued in a hedge capital reserve to the investment cost in the CPV Group. This cost was recorded under the goodwill line item and increased the acquisition cost by approximately USD 32 million.

The contribution of the CPV Group to the Group's revenues and loss from the acquisition date until December 31, 2021 amounted to NIS 164 million and NIS 181 million, respectively. Management estimates that had the acquisition taken place as early as January 1, 2021, the revenue amount in the consolidated statement of income for the year ended December 31, 2021 would have been NIS 1,590 million and the consolidated loss for the year ended on that date would have been NIS 278 million.

D. Business combinations that occurred during the reporting period (cont.)

1.The CPV Group (cont.)

Determination of fair value of assets and liabilities identifiable as of the acquisition date:

The acquisition of the CPV Group was accounted for according to the provisions of IFRS 3 - "Business Combinations". Thus, on the Transaction Completion Date, the Company included the net assets of the CPV Group in accordance with their fair value. The Company's management, based on an independent external appraiser, evaluated the fair value of investments in associates, property, plan and equipment and intangible assets using the cash flow discount method (DCF) and based on the following estimates: forecast years, market prices and capacity, annual inflation rate and weighted capital price.

Set forth below is the fair value of the identifiable assets and liabilities acquired:

In NIS million
(based on the
exchange rate at the
In USD millions
acquisition date)
Cash and cash equivalents 94 29
Trade and other receivables 50 15
Long-term restricted deposits and cash 2 1
Investments in associates 1,944 595
Property, plant & equipment 162 50
Right-of-use assets 34 10
Intangible assets 361 111
Trade and other payables (19) (6)
Derivative financial instruments (39) (12)
Loans and credit (550) (169)
Lease liabilities (34) (10)
Other long-term liabilities (92) (28)
Deferred tax liabilities* (22) (6)
Net identifiable assets* 1,891 580

D. Business combinations that occurred during the reporting period (cont.)

1.The CPV Group (cont.)

The aggregate cash flows accrued to the Group as a result of the acquisition transaction:

In NIS million
(Translated) In USD millions
Cash and other cash equivalents paid 2,131 653
Hedging costs 103 32
Cash and other cash equivalents acquired (94) (29)
2,140 656

Goodwill:

Goodwill created as part of the business combination reflects the potential of future activities of the CPV Group in the market in which it operates. The Group expects that part of the goodwill will be tax deductible. Due to the acquisition, goodwill was recognized as follows:

In NIS million
(Translated) In USD millions
Consideration transferred in cash and cash equivalents 2,131 653
Plus hedging costs 103 32
Less fair value of the identifiable assets, net (1,891) (580)
Total goodwill generated* 343 105

(*) In these financial statements, the Company amended, by way of increasing the balance of goodwill and the balance of deferred tax liabilities, an immaterial amount of approximately NIS 4 million (approximately USD 1 million) compared to the amount presented in the unaudited condensed interim financial statements as at September 30, 2021.

Costs relating to the business combination

In the years ended on December 31 2020 and 2021, the Group incurred legal expenses and due diligence costs attributable to the acquisition totaling approximately NIS 2 million and NIS 42 million, respectively. These costs were recorded in the statement of income in the said years under the "Transaction expenses in respect of acquisition of the CPV Group" line item.

D. Business combinations that occurred during the reporting period (cont.)

2.Gnrgy

In April 2021, the Company signed an agreement for acquisition of shares in Gnrgy Ltd. (hereinafter - "Gnrgy"), that operates in the area of charging services for electric vehicles (e-mobility) and construction of charging posts for electric vehicles; and a shareholder's agreement with Gnrgy's founder, Mr. Ran Eloya (hereinafter - the "Developer"), Gnrgy's other shareholder.

Pursuant to the terms and conditions of the agreement, in May 2021 (the First Closing Date), the Company acquired approx. 27% of Gnrgy's share capital for a total of NIS 25 million (NIS 19.8 million against the allocation of new Gnrgy shares and the balance against the acquisition of the Developer's shares).

Furthermore, in December 2021 (the other closing date), the Company invested NIS 29 million more in Gnrgy to further develop and promote its business plans, against a further allocation of Gnrgy shares; at the same time, the Company purchased further shares from the Developer in consideration for additional NIS 13 million (that are partially expected to be paid in installments bearing a 5% additional annual interest), such that as at the reporting date, the Company holds 51% of Gnrgy's share capital. As a result of assuming control, the Company recognized an immaterial profit. The Company consolidates Gnrgy in its financial statements as from the other closing date, and includes it under its activity in Israel.

Gnrgy was established in Israel in 2008 and is engaged in charging of electric vehicles (e-mobility). Gnrgy offers and develops a number of solutions, along with charging and energy management services. As at the approval date of the financial statements, Gnrgy's activities are concentrated in Israel. The solutions that Gnrgy is developing include: (1) the sale and installation of charging stations, including through framework agreements with the leading car importers; and (2) a public charging station network - Gnrgy owns a nationwide network of public charging stations. Gnrgy intends to continue expanding the said public charging network with emphasis on quick charging posts in strategic locations; (3) charging and energy management services for condominiums and holistic charging services for the business sector and vehicle fleets based on Gnrgy's technological developments.

Concurrent with the share purchase agreement, a shareholders' agreement was signed that governs the relationship between the Company and the Developer following the completion of the transaction (hereinafter – the "Shareholders' Agreement"). As part of the Shareholders' Agreement, the Company is granted an option to acquire the balance of the Developer's shares and to wholly own (100%) Gnrgy's share capital (hereinafter – the "Purchase Option"). The exercise price of the Purchase Option will be derived from the fair value of Gnrgy on the exercise date, assuming an agreed-to rate, but no less than a price based on the value of the original transaction. The exercise period of the Purchase Option will be the period of time determined after approval of the financial statements for each of the years 2024 through 2026. To the extent the entire exercise period of the Purchase Option passes without the Company exercising the Purchase Option, and on the assumption that no capital investments have been made in Gnrgy so as to dilute the Developer's share and subject to additional conditions stipulated in the Shareholders' Agreement, the Developer has an option to acquire shares of Gnrgy from the Company such that after the acquisition, he will hold 2% more than the Company in Gnrgy's share capital, and will once again become the controlling shareholder of Gnrgy. In addition, to the extent the Company did not exercise the Purchase Option within the first period for exercise of the Purchase Option, and the Developer will hold less than 15% of Gnrgy's share capital, the Developer will have an option to require the Company purchase his shares based on the fair value that will be determined in accordance with that stated in the Shareholders' Agreement at a discount rate as provided in the agreement. The Company will be permitted to pay the consideration for the said put option of the Developer and, under certain circumstances, part of the consideration for exercise of the Purchase Option of the Company, by means of issuance of shares of the Company to the Developer. In addition, the Shareholders' Agreement determines, among other things, the rights of the shareholders in connection with appointment of directors to Gnrgy's Board of Directors, the voting power (rights) of each of them will reflect the rates of ownership of the parties in Gnrgy's share capital.

In July 2021, Gnrgy received a Virtual Supply License. For more information about the regulation, see Note 28L.

D. Business combinations that occurred during the reporting period (cont.)

2.Gnrgy (cont.)

Determination of temporary fair value of assets and liabilities identifiable as of the acquisition date:

The acquisition of Gnrgy was accounted for according to the provisions of IFRS 3 - "Business Combinations". Thus, on the Transaction Completion Date, the Company included the net assets of Gnrgy in accordance with their fair value.

Set forth below is the fair value of the identifiable assets and liabilities acquired (according to temporary amounts):

In NIS million
Cash and cash equivalents 26
Trade and other receivables 7
Restricted deposits and cash 2
Inventories 5
Property, Plant, and Equipment and right-of-use assets 4
Intangible assets 10
Trade and other payables (5)
Loans and credit and lease liabilities (6)
Identifiable assets, net 43

D. Business combinations that occurred during the reporting period (cont.)

2.Gnrgy (cont.)

The aggregate cash flows accrued to the Group as a result of the acquisition transaction:

In NIS million
Cash and other cash equivalents paid 38
Cash and other cash equivalents acquired (26)
12

Goodwill:

Goodwill created as part of the business combination reflects the potential of future activities of the Gnrgy in the market in which it operates. Due to the acquisition, goodwill was recognized as follows:

In NIS million
Consideration transferred in cash and cash equivalents 38
Non-controlling interests 21
Fair value of prior equity rights in the acquiree 26
Less fair value of the identifiable assets, net (43)
Total goodwill generated 42

The Group has elected to measure the non-controlling interests arising from the acquisition of Gnrgy according to their pro rata share in the identifiable net assets of the acquiree that confer upon it a present ownership right (ordinary shares).

NOTE 26 – ASSOCIATES

A. Condensed information regarding associates and joint ventures

General information

The Company, through CPV Group, holds interests in active power plants and power plants under construction, both in the conventional and renewable energy areas. Below are the main details in respect of the active projects and project under construction of the CPV Group's associates:

Year of
commercial
Capacity Holding rate
As of
Entity operation (MW) Dec. 31 2021* Power plant location
CPV Fairview, LLC (hereinafter - "Fairview") 2019 1,050 25.0% Pennsylvania
CPV Maryland, LLC (hereinafter - "Maryland") 2017 745 25.0% Maryland
CPV Shore Holdings, LLC (hereinafter - "Shore") 2016 725 37.5% New Jersey
CPV Towantic, LLC (hereinafter - "Towantic") 2018 805 26.0% Connecticut
CPV Valley Holdings, LLC (hereinafter - "Valley") 2018 720 50.0% New York
CPV Three Rivers, LLC (hereinafter - "Three Rivers") (1) Project under construction 1,258 10.0% Illinois

(*) The holding rate is that of the CPV Group, which is a indirectly held by the Company (70%).

(1) Three Rivers is a project under construction, and its commercial operation is expected to begin in the second quarter of 2023.

Further to what is stated regarding the purchase of CPV Group in Note 25D, in February 2021, 7.5% of the Three Rivers project was sold in consideration for USD 41 million (which were used to partly repay the seller's loans). As a result of the sale, the CPV Group did not record any gain or loss.

The Company accounts for its holdings in Three Rivers using the equity method, since the Company has significant influence due to its representation on Three Rivers' Board of Directors.

The CPV Group owns additional associates that hold rights to projects under development and in which the investment amounts to non-material amounts.

In the reporting period, the Group received dividends from associates amounting to NIS 32 million.

Accounting treatment applied to derivatives in associates and joint ventures

Some of the CPV Group's associates use derivative financial instruments, such as interest rate swaps, forwards and commodities contracts in order to hedge the interest risk, the energy prices risk and the commodities risks, respectively. Such derivative financial instruments are initially recognized as fair value and subsequently remeasured at fair value. Derivatives are recognized as financial assets when their fair value is positive and as financial liabilities when their fair value is negative. Commodities contracts for the purpose of the receipt or delivery of a non-financial item in accordance with the Company's expected purchase, sale or usage requirements are held at cost. Furthermore, some of the associates conduct transactions involving energy derivatives (put option on revenues) in order to reduce their exposure to fluctuations in energy and natural gas prices. Any gain or loss from changes in the fair value of the derivatives is recognized in the income statement, except for the effective portion of the cash flow hedge, which is recognized in other comprehensive income, and subsequently reclassified to the income statement in the period in which the hedge item's cash flow affect the income statement.

B. Condensed financial information on the financial position as at December 31, 2021 and results of operations for the periods commencing on the completion date of the acquisition of the CPV Group - from January 25, 2021 to December 31, 2021:

Fairview
NIS million
Maryland
NIS million
Shore
NIS million
Towantic
NIS million
Valley
NIS million
Three Rivers
NIS million
As at December 31, 2021
Current assets 334 83 142 120 111 9
Non-current assets 3,067 2,083 3,232 2,964 2,194 2,953
Total assets 3,401 2,166 3,374 3,084 2,305 2,962
Current liabilities 423 115 25 386 265 65
Non-current liabilities 1,839 1,110 2,261 1,676 1,671 2,203
Total liabilities 2,262 1,225 2,286 2,062 1,936 2,268
Net assets 1,139 941 1,088 1,022 369 694
Holding rate 25.0% 25.0% 37.5% 26.0% 50.0% 10.0%
Company's share 285 235 408 266 185 174
Fair value adjustments made on acquisition date 254 (46) (175) 83 (4) 26
Carrying amount of investment 539 189 233 349 181 200
Fairview
NIS million
Maryland
NIS million
Shore
NIS million
Towantic
NIS million
Valley
NIS million
Three Rivers
NIS million
Operating income 746 568 569 969 645 -
Net change in fair value of derivative financial instruments (102) (18) 45 (135) (194) 1
Total income 644 550 614 834 451 1
Operating expenses (535) (459) (488) (705) (561) (31)
Operating profit (loss) 109 91 126 129 (110) (30)
Finance expenses, net (77) (73) (73) (70) (80) -
Net profit (loss) * 32 18 53 59 (190) (30)
Other comprehensive income * 36 35 25 36 12 63
Comprehensive income (loss) 68 53 78 95 (178) 33
Holding rate 25.0% 25.0% 37.5% 26.0% 50.0% 10.0%
Company's share in profit (loss) 8 4 20 15 (95) (3)
Company's share in other comprehensive income 9 9 10 9 6 6
Reductions of profit and loss in respect of adjustments to
fair value made on the acquisition date (4) 8 12 *- 2 -
Share in the profits (losses) of consolidated companies 4 12 32 15 (93) (3)
Group's share in other comprehensive income of associates 9 9 10 9 6 6
Depreciation and amortization 82 55 103 89 57 -

(*) It should be noted that the associates are entities which are transparent for tax purpose and therefore their results do not reflect the tax effect.

C. Loans of the Project Companies in the CPV Group:

Each CPV associate (hereinafter - the "Project Companies") has taken out senior debt under similar outlines - per-project, per-asset financing, at non-recourse terms. On financial closing of each loan, debt and equity capital is committed in an amount sufficient to cover the project's projected capital costs during construction, along with ancillary credit facilities. The ancillary credit facilities are provided by a subset of the project's lenders and are comprised of letters of credit (LC), which support collateral obligations under the financing arrangements and commercial arrangements, and a working capital revolver facility, which supports the project's ancillary credit needs. The senior debt facilities are generally structured such that, subject to certain conditions precedent, they are converted from facilities to finance the construction phase to long-term facilities (term loans) with maturity dates generally tied to the term of the commercial agreements anchoring projected operating cash flows of each project. For the gas-fired projects, the term loans generally span the construction period plus 5-7 years after launch of commercial operation (hereinafter – "mini-perm financing"). The mini-perm financing is repaid based on a combination of (1) predetermined amounts per project in accordance with set end-of-quarter repayment dates, and (2) result-based metrics, which result in partial or full of the loan on end-of quarter repayment dates (cash sweep), which result, in the aggregate, in partial repayment over the loan term and a balance payable or refinanced upon final repayment date.

The CPV Group seeks to take advantage of opportunities to recycle its credit according to market conditions and, in any case, prior to the scheduled final repayment date. As a rule, the credit facilities in place during construction are sourced from a consortium of international lenders (10 to 20 for each gas-fired project, fewer for renewable energy projects with lower capital needs) on the "Term Loan A" market, which is substantially comprised of commercial banks, investment banks, institutional lenders, insurance companies, international funds, and equipment suppliers' credit affiliates. The Project Companies refinanced loans for certain gas-fired projects in both the Term Loan A market and the Term Loan B market, which includes mainly institutional lenders, international funds, and a number of commercial banks.

While the credit facility terms and conditions have certain provisions specific to the project being financed, an overwhelming majority of the standard key terms and conditions (first lien security, covenants, events of default, equity cure rights, distribution restrictions, reserve requirements, etc.) are similar across the CPV project companies' Term Loan A refinancing, while the Term Loan B market refinancing terms are slightly less restrictive, as customary in this market. In each market and often within each project loan, lenders extended loans to CPV's projects either according to a credit margin based on the LIBOR, variable base interest rate or fixed interest. To minimize exposure to potential interest rate risk, the project companies execute interest rate hedges for the main exposure at each project level, whereby the Project Companies pay the major financial institutions fixed rate interest and receive variable interest payments for certain terms, according to the terms and conditions of the project and loan. For most existing LIBOR-based credit facilities, the credit agreements and interest rate hedging arrangements include market-standard provisions to accommodate the potential replacement of LIBOR by SOFR as a benchmark interest rate. New variable credit facilities and refinancing of future debt bearing variable interest of CPV Group project companies are expected to have the SOFR as their benchmark interest rate (with US Prime interest as an alternative, in a manner that corresponds to the existing credit facilities of CPV Group project companies).

Set forth below is a summary the main commercial terms and conditions of the key senior debt facilities of the CPV Group's Project Companies. The balances are presented in millions of US dollars, represent 100% of the outstanding debt of each Project Company, including payable interest, and include fair value adjustments that were made on the acquisition date of the CPV Group. The loan amounts under the term loans are presented as at the date noted, and to the extent they are withdrawn and repaid, they may not be withdrawn again.

It is noted that the main financing agreements include, among other things, non-standard terms and conditions that are customary in agreements for projects of this type, provisions regarding mandatory prepayments, various grounds for repayment, fees and commissions in respect of credit facilities, annual fees and commissions relating to the issuance of LC and additional customary terms and conditions. In addition, as part of the financing agreements, collateral and pledges were placed on all of the project's assets. As of the financial statements approval date, there are no grounds for calling any of the financing agreements in the project companies for immediate repayment.

C. Loans of the Project Companies in the CPV Group: (cont.):

Borrower Date of
completion /
restructuring of
financing
agreement
Linkage
basis
Mechanisms and interest
rates for term loan / related
facilities
Repayment dates and final repayment Covenants and distribution
restrictions
Grounds for calling for immediate repayment Outstanding debt
As at December
31, 2021
Fairview From March 2017
(as amended in
February 2020).
USD Variable interest - LIBOR plus
a spread ranging from 2.50%
to 2.75% per year.
• Fixed interest - at a rate of
5.78% per year. (it is noted
that the agreement includes
the higher alternative interest
benchmark rate of (i) US
Federal, (ii) US Prime Rate
and Funds Effective Rate +
0.50% and 1M LIBOR +
1.00% and (iii) plus a 1.50%-
1.75% margin)
The final repayment date is June 30
2025. The rate and scope of the
repayment of the loan principal varies
until the final repayment, in accordance
with a combination of amortization and
cash sweep repayment mechanisms
("mini-perm" financing).
Execution of a distribution is
subject to the Project
Company's compliance with
several terms and conditions,
including compliance with a
minimum debt service coverage
ratio of 1.2 during the 4 quarters
that preceded the distribution,
compliance with reserve
requirements (pursuant to the
terms of the financing
agreement), compliance with the
debt balances target defined in
the agreement, and that no
The main grounds for calling for immediate repayment or
default events are as follows: the financing agreement includes
grounds for repayment that are standard in agreements of this
type, including, inter alia – breach of representations and
commitments that have a material adverse effect, non-payment
events, non-compliance with certain obligations, various
insolvency events, winding down of the project or termination
of significant parties in the project (as defined in the
agreement), occurrence of certain events relating to the
regulatory status of the project and holding government
approvals, certain changes in ownership of the project, certain
events in connection with the project, existence of legal
proceedings relating to the project, and a situation wherein the
project is not entitled to receive payments for capacity and
electricity – all in accordance with and subject to the terms and
conditions, definitions and periods detailed in the financing
agreement.
NIS 2,058 million
(approximately
USD 662 million).
Towantic From March 2016
(as amended in
July 2019).
USD LIBOR interest plus a spread
ranging from 2.75% to 3.25%.
(It should be noted that the
agreement includes an
alternate base rate at the
higher of: (i) US Prime Rate,
(ii) US Federal Funds
Effective Rate + 0.50% and
(iii) 1M LIBOR + 1.00%, plus
a spread of 1.75% - 2.25%).
The final repayment date is June 30
2025. The rate and scope of the
repayment of the loan principal varies
until the final repayment, in accordance
with a combination of amortization and
cash sweep repayment mechanisms
("mini-perm" financing).
ground for repayment or default
event exists (as defined in the
financing agreement).
NIS 1,859 million
(USD 598
million).
Shore Term Loan B
credit from
December 2018.
USD LIBOR rate plus a 3.75%
spread per term loan and a
spread of 3% for ancillary
credit facilities. (It should be
noted that the agreement
includes an alternate base
rate at the higher of: (i) US
Prime Rate, (ii) US Federal
Funds Effective Rate + 0.50%
and (iii) 1M LIBOR + 1.00%,
plus a spread of 2.75%, and
for ancillary credit facilities - a
2% spread).
Final repayment date of loans and
ancillary credit facilities: Term loan -
December 27 2025; ancillary credit
facilities - December 27 2023. The rate
and scope of the repayment of the loan
principal varies until the final
repayment, in accordance with a
combination of amortization and cash
sweep repayment mechanisms
("mini-perm" financing).
Historical debt service coverage
ratio of 1:1 during 4 quarters.
Execution of a distribution is
conditional on the Project
Company's compliance with a
number of conditions, including
compliance with reserve
requirements (as provided in the
agreement), and that no
grounds for repayment or
default event exists in
accordance with the financing
agreement.
NIS 1,566 million
(USD 504
million).

C. Loans of the Project Companies in the CPV Group: (cont.):

Borrower Date of
completion /
restructuring of
financing
agreement
Linkage
basis
Mechanism and interest
rate for term loan /
ancillary facilities
Date of principal repayment Financial covenants and distribution
restrictions
Grounds for calling for immediate repayment Outstanding
debt
As at December
31, 2021
Maryland Term Loan B
credit from May
2021
USD Interest on loan: LIBOR
plus spread of 4%.
Interest on ancillary
facilities: LIBOR plus
spread of 2.75%.
(It should be noted that
the agreement includes
an alternate base rate at
the higher of: (i) US
Prime Rate, (ii) US
Federal Funds Effective
Rate + 0.50% and (iii) 1M
LIBOR + 1.00%, plus a
spread of 3.00%)
The final repayment date of the term loan will be May
2028 and the ancillary facilities - in November 2027.
The rate and scope of the repayment of the loan
principal varies until the final repayment, in
accordance with a combination of amortization and
cash sweep repayment mechanisms ("mini-perm"
financing).
Historical debt service coverage ratio of
1:1 during the last 4 quarters. As of the
report date, Maryland meets the
covenant. A distribution is conditional
on the project company meeting a
number of terms and conditions,
including compliance with the
requirements for reserves (as stated in
the agreement), and that there was no
grounds for repayment or breach in
accordance with the financing agreement.
The main grounds for calling for immediate
repayment or default events are as follows: the
financing agreement includes grounds for
repayment that are standard in agreements of
this type, including, inter alia – breach of
representations and commitments that have a
material adverse effect, non-payment events,
non-compliance with certain obligations,
various insolvency events, winding down of
the project or termination of significant parties
in the project (as defined in the agreement),
occurrence of certain events relating to the
regulatory status of the project and holding
government approvals, certain changes in
ownership of the project, certain events in
connection with the project, existence of legal
proceedings relating to the project, and a
situation wherein the project is not entitled to
receive payments for capacity and electricity
(as the case may be) – all in accordance with
and subject to the terms and conditions,
definitions and periods detailed in the
financing agreement. Furthermore, for projects
under construction, the grounds for calling for
immediate repayment is failure on behalf of the
equity investors to inject funds during the
course of construction.
NIS 1,153 million
(USD 371 million)
Valley From June 2015
(as amended in
April 2021)
USD LIBOR interest plus a
spread ranging from
3.50% to 3.75%.
(It should be noted that
the agreement includes
an alternate base rate at
the higher of: (i) US
Prime Rate, (ii) US
Federal Funds Effective
Rate + 0.50% and (iii) 1M
LIBOR + 1.00%, plus a
spread of 2.50% -
2.75%).
The final repayment date is June 30 2023. The rate
and scope of the repayment of the loan principal
varies until the final repayment, in accordance with a
combination of amortization and cash sweep
repayment mechanisms ("mini-perm" financing).
In April 2021 some expedients were received for the
ancillary credit facilities in exchange for a commitment
to provide equity in the cumulative amount of USD 10
million from the investors in the project. The own
capital provided in April 2021 as shareholder loans
carry an annual interest of 5%. As of the report date,
the outstanding amount of the shareholder loans was
approximately USD 6 million.
Execution of a distribution is subject to
the Project Company's compliance with
several terms and conditions, including
compliance with a minimum debt service
coverage ratio of 1.2 during the 4 quarters
that preceded the distribution,
compliance with reserve requirements
(pursuant to the terms of the financing
agreement), compliance with the
requirements of obtaining a certain permit
as stated in Section 17.8 to the 2020
Periodic Report, compliance with the debt
balances target defined in the agreement,
and that no ground for repayment or
default event exists (as defined in the
financing agreement).
NIS 1,779 million
(USD 572
million).
(excluding the
foregoing
shareholder
loan)

C. Loans of the Project Companies in the CPV Group: (cont.):

Borrower Date of completion /
restructuring of
financing
agreement
Linkage
basis
Mechanism and
interest rate for term
loan / related
facilities
Date of principal repayment Financial covenants and distribution restrictions Grounds for calling for immediate repayment Outstanding debt
As at December 31,
2021
Three Rivers From August 2020 USD • Variable interest is
annual LIBOR plus a
3.5% - 4% spread (It
should be noted that
the agreement
includes an alternate
base rate at the higher
of: (i) US Prime Rate,
(ii) US Federal Funds
Effective Rate + 0.50%
and (iii) 1M LIBOR +
1.00%, plus a spread
of 2.50% - 3.00%).
• Fixed interest - at a
rate of 4.75% per year.
The final repayment date is
June 30 2028. The rate and
scope of the repayment of the
loan principal varies until the
final repayment, in accordance
with a combination of
amortization and cash sweep
repayment mechanisms ("mini
perm" financing").
Execution of a distribution is subject to the Project
Company complying with a number of conditions,
including compliance with terms and conditions for
conversion of the loan from a construction loan to an
operating loan, and after the conversion - compliance with
a minimum debt service coverage ratio of 1.2 during the
4 quarters that preceded the distribution, compliance with
reserve requirements (pursuant to the terms of the
financing agreement), compliance with the debt balances
target defined in the agreement, and that no grounds for
repayment or default event exist (as defined in the
financing agreement).
The main grounds for calling for immediate
repayment or default events are as follows: the
financing agreement includes grounds for
repayment that are standard in agreements of
this type, including, inter alia – breach of
representations and commitments that have a
material adverse effect, failure of the equity
investors to inject funds during the
construction phase, non-payment events,
non-compliance with certain obligations,
various default events, winding down of the
project or termination of significant parties in
the project (as defined in the agreement),
occurrence of certain events relating to the
regulatory status of the project and holding
government approvals, certain changes in
ownership of the project, certain events in
connection with the project, existence of legal
proceedings relating to the project, and a
situation wherein the project is not entitled to
receive payments for capacity and electricity –
all in accordance with and subject to the terms
and conditions, definitions and amendment
periods of the financing agreement.
NIS 2,200
million
(USD 707 million).

D. Main agreements of the Project Companies in the CPV Group:

  1. Partnership agreements in the Project Companies of conventional projects powered by natural gas:

As a rule, each of the Project Companies in the CPV Group entered into an agreement with all other owners of rights to the project (if any), for the establishment of a limited liability company; the agreement sets forth each partner's rights and obligations with respect to the applicable project (each, hereinafter - an "LLC Agreement"). Most LLC Agreements contain customary provisions for agreements of this type restricting the transfer of rights, including terms and conditions for permissible transfers, minimum equity percentage transfer requirements and rights of first offer. CPV is usually obliged, under the agreements, to maintain at least a minimum ten percent equity ownership in a Project Company for up to five years after closing of construction financing. Each Project Company is governed by a board of directors selected by the Partners. Certain material decisions typically require unanimous approval by all partners, including, inter alia, declaring insolvency, liquidation, sale of assets or merger, entering into or amending material agreements, taking on debt, initiating or settling litigation, engaging critical service providers, approving the annual budget or making expenditures exceeding the budget, and adopting hedging strategies and risk management policies.

  1. Natural gas projects activity:

All active conventional projects trade and participate in the sale of capacity, electricity and ancillary services in their respective ISO or RTO. Typically, CPV's project companies conduct daily projections and planning for the next operating day. After making preparations in terms of purchasing adequate natural gas to support the expected electricity generation activity, as needed, bids are submitted to the Day-Ahead market. In addition, revisions are made throughout the day for actual operations occurring that day (the real-time market), which include purchases and sales of natural gas and optimizing generation output based on the real-time market price. Natural gas projects have hedging plans that are designed to set a fixed margin for electricity and reduce the impact of fluctuations in gas and electricity prices.

  1. Hedging plans and RPO agreements:

Fairview, Maryland and Valley entered into economic hedging agreements on the electricity margins of the revenue put option (hereinafter - "RPO") type. The RPO is intended to provide the companies a minimum margin from the sale of electricity on the market for the duration of the agreement. Calculation of the amount of the minimum margin is determined on the basis of a contractual year where the actual settlement dates take place every three months in respect of a partial amount and an annual adjustment is made to the calculation of the total annual margin each year. For purposes of calculating the minimum margin, the agreement makes use of specific parameters, such as utilization, expected generation levels, electricity and gas prices and other specific operating costs for the project. The RPO periods are until May 31, 2025 for Fairview, until February 28 2022 for Maryland and until May 31, 2023 for Valley.

Furthermore, from time to time the CPV Group uses various hedges to hedge some of the power plants' capacity; the portion of capacity being hedged changes from one project to another; these hedges are used in order to hedge against volatility in electricity and gas prices through a range of tools and other products. The aim of using the hedges is to lower the level of uncertainty of the margin between the price of electricity received and the price of gas paid. And to determine the energy margin by entering into hedging agreements on gas and electricity prices. Those hedges are normally entered into for short periods, normally up to one year. The hedging plans are intended to ensure a minimum cash flow for the debt service. The price increase during the reporting period was partially offset by the hedging agreements of the corresponding power plants.

4. Asset and energy management agreements:

The CPV Group is engaged in provision of management services to power plants in the United States with respect to a variety of technologies and fuel types both for projects in which it holds equity rights, and for third parties. For more information about CPV Group's management agreements, see Note 28M.

Each of CPV Group's project companies entered into an asset management agreement with an entity in the CPV Group (hereinafter - the "Management Company"), whereby the Management company provides asset construction and management services. The consideration includes a fixed annual payment, a performance-based payment and reimbursement of certain expenses, including expenses relating to construction management services (work hours of the construction workers, expenses and expenses incurred by third parties).

Although a CPV Group entity currently serves as the asset manager for Fairview in accordance with an inter-company management agreement, one of the other investors in the project is expected to replace the said entity on behalf of CPV Group, in accordance with the terms of the agreement, whereby the asset manager will be replaced at the end of one year from the project's commercial operation date.

D. Main agreements of the Project Companies in the CPV Group (cont.):

  1. Other main agreements of the Project Companies in the CPV Group:

Fairview

Fairview entered into an agreement for the purchase and transmission of natural gas of up to 180,000 MMBtu per day at a price linked to market prices as set in the agreement. Pursuant to the agreement, the gas supplier is responsible for transporting natural gas to the designated supply point and is permitted to supply ethane in place of natural gas up to a rate of 25% of the agreed supply quantity. The agreement commenced upon the commercial operation of the power plant and ends on May 31 2025.

Fairview entered into a service agreement with its original equipment manufacturer, for the supply of spare parts and maintenance services for the combustion turbines. The agreement went into effect on December 27, 2016 (hereinafter - the "Effective Date") and ends on the earlier of: (a) 25 years from the Effective Date; or (b) when specific milestones are reached on the basis of use and wear and tear. Fairview pays a fixed and a variable amount as of the date of the commercial operation.

Fairview entered into an agreement for operation and maintenance of the power plant. The agreement period is three years from the construction completion date of the power plant; the agreement includes an extension/renewal clause for a period of one year, unless one of the parties gives notice of termination of the agreement based on its terms.

Towantic

Towantic entered into a service agreement according to which Towantic is guaranteed gas transmission of 2,500 MMBtu per day, at the AFT 1 tariff. The First Agreement Period ends on March 31, 2022 and has been extended until March 31, 2023. The agreement is automatically renewed for periods of one year, unless one of the parties terminates the agreement.

Towantic signed an agreement for the supply of natural gas. Pursuant to the agreement, up to 115,000 MMBtu per day will be supplied at a price linked to market prices. The supply period is until March 31, 2023.

Towantic entered into a maintenance agreement with its original equipment manufacturer, for the provision of maintenance services for the combustion turbines. In consideration for the maintenance services, Towantic pays a fixed and a variable amount as of the date stipulated in the agreement. The agreement period is 20 years.

Towantic entered into an operating and maintenance agreement (O&M) of the power plant. The consideration includes a fixed and variable amount, a performance-based bonus, and reimburses for employment expenses, including payroll costs and taxes, subcontractor costs and other costs. In July 2021, the agreement was extended and the agreement term spans from 2022 to 2024. The agreement includes an extension/renewal clause for a period of one year, unless one of the parties gives a termination notice in accordance with that provided in the agreement.

D. Main agreements of the Project Companies in the CPV Group (cont.):

  1. Other main agreements of the Project Companies in the CPV Group (cont.):

Maryland

Maryland signed an agreement to purchase natural gas. According to the agreement, the gas supplier Maryland is to supply up to 132,000 MMBtu of gas per day at a price linked to the market prices. The agreement expires on October 31, 2022.

Maryland entered into a natural gas transmission agreement for guaranteed daily capacity of up to 132,000 MMBtu. The agreement period is 20 years, which commenced on May 31, 2016, with an option for Maryland to extend it by an additional 5 years.

Maryland entered into a maintenance agreement with its original equipment manufacturer. Maryland may acquire additional services under the agreement, as needed. The payments under the agreement consist of minimum annual fixed payments, variable quarterly payments based on operating parameters of the defined equipment, and fixed quarterly management fees. In addition to the minimum annual payment, the remaining payments increase by 2.5% every year. The agreement ends on the earlier of: (a) the date on which the equipment reaches a defined milestone; or (b) 25 years from the signing date on – August 8 2014.

Maryland entered into an agreement for the operation and maintenance of the power plant. The consideration includes fixed annual management fees, a performance-based bonus, and reimburses for employment expenses, payroll costs and taxes, subcontractor costs and other costs. In March 2021, the agreement was extended through July 23 2028, and may be renewed by one-year periods, unless one of the parties issues a termination notice in accordance with the terms set in the agreement.

Shore

Shore signed an agreement to purchase natural gas. According to the agreement, the gas supplier is to supply 120,000 MMBtu of gas per day at a price linked to the market price. The agreement period is until October 31 2022, and is renewable by one-year periods subsequent to that date.

Shore entered into two agreements with inter-state pipeline companies for the use of two pipelines, one of which was already active and the other became active in late 2021. Pursuant to the agreements, natural gas connection and transmission services are provided to Shore by means of a pipeline that starts in an existing inter-state pipe that allows gas to reach the facility's connection point. Shore paid an advance to one of the gas companies in respect of the said services. The term of the gas transmission agreements is 15 years (until April 2030) for a single connection, with an option to extend the agreement twice by ten years and twenty years (until September 2041) for the other connection, with an option to extend annually.

In December 2017, Shore entered into an amended maintenance agreement with its original equipment manufacturer. Shore may acquire additional services under the agreement, as needed. The consideration consists of a fixed minimum annual payment, variable quarterly payments based on operating parameters of the defined equipment, and quarterly management fees. In addition to the minimum annual payment, the remaining payments increase by 2.5% every year. The agreement ends on the earlier of: (a) the date on which the equipment reaches a defined milestone; or (b) 20 years from the signing date.

Shore entered into an operating and maintenance agreement of the power plant. The consideration includes fixed annual management fees, a performance-based bonus and reimbursement of employment expenses, including payroll and taxes, subcontractor costs and other costs as provided in the agreement. The agreement is valid until July 2023 and includes an extension/renewal clause for a period of one year, unless one of the parties gives a termination notice in accordance with that provided in the agreement.

Shore entered into a Heat Rate Call Option (HRCO) agreement, covering 100% of the facility's expected production output at terms normally accepted in agreements of this type. The agreement expired on April 30, 2021.

D. Main agreements of the Project Companies in the CPV Group (cont.):

  1. Other main agreements of the Project Companies in the CPV Group (cont.):

Valley

Valley entered into an agreement to purchase natural gas of up to 127,200 MMBtu per day at a price linked to the market price. Pursuant to the agreement, the supplier is responsible for transmission of natural gas to the designated supply point. During the reporting period, the agreement was extended until October 31, 2025.

Valley signed an agreement with an inter-state pipeline company for the licensing, construction, operation and maintenance of a pipe and measurement and regulating facilities, from the inter-state pipeline system for transmission of natural gas up to the power plant. The supplier provides 127,200 MMBtu per day of natural gas delivery at an agreed price during a period ending March 31, 2033, with an option to extend by up to three periods of 5 additional years. In addition, Valley signed a further agreement for provision of transmission services of 35,000 MMBtu per day, for a period of 15 years ending on March 31 2033, which can supply gas from another location to the abovementioned binding transmission agreement.

Valley entered into a maintenance agreement with its original equipment manufacturer, for the provision of maintenance services for the combustion turbines. The consideration includes fixed and variable amounts from the initial activation date of the turbines. The agreement period is the earlier of (a) 132,800 equivalent base load hours; or (b) 29 years from June 9 2015.

Valley entered into an operation and maintenance agreement (O&M) of the power plant with a partner in the project. The consideration includes fixed annual management fees, an operation bonus, and reimbursement of certain costs set out in the agreement. The agreement period is five years from the construction completion date of the power plant, and the agreement may be renewed for an additional three years.

Three Rivers

Three Rivers entered into two agreements for the supply of natural gas. The agreements supply 139,500 MMBtu per day to the power plant from the power plant's activation date for a period of five years, and a reduced quantity of 25,000 MMBtu per day from the fifth year of operation of the power plant and up to the tenth year. The price of natural gas delivered under these agreements is linked to the day-ahead electricity price within PJM. The agreements include, as aforesaid, an obligation to purchase a fixed quantity of natural gas, with a right to resell surplus gas.

Three Rivers entered into two connection agreements (for the transmission of gas), each sufficient to fulfill the entire demand of the power plant. One agreement is an interconnect agreement with an inter-state pipeline company for transmission of natural gas. The agreement sets forth the responsibility of the parties in connection with the design, construction, ownership, operation and management of a pipeline as well as the connection and pressure equipment. Based on the agreement, Three Rivers will bear the costs of all the said facilities, which are included in the expected construction cost. The second agreement is an additional interconnect agreement with an inter-state pipeline company for transmission of natural gas. Under the agreement, the counterparty is responsible for the design and construction to the existing pipeline. The counterparty to the agreement will remain the owner of these facilities and will operate them, and Three Rivers will bear the development and construction costs, which are included in the construction cost.

Three Rivers entered into an agreement for the transmission of gas with an inter-state pipeline company and its Canadian affiliate, for transmission of natural gas from Alberta, Canada to the power plant. The agreements include capacity of 36.2 MMcf per day, at agreed prices. The agreement period is 11 years from the signing date of the agreement on November 1, 2020; the counterparty may extend the agreement by an additional year with a advance notice of 12 months.

D. Main agreements of the Project Companies in the CPV Group (cont.):

  1. Other main agreements of the Project Companies in the CPV Group (cont.):

Three Rivers (cont.)

Three Rivers entered into an agreement for the acquisition of electricity generation equipment and ancillary services, with an international company specializing in design and manufacture of equipment, including that required for an electricity generation facility. The said equipment includes two units, with each consisting of the following main components: a gas or combustion turbine; a heat recovery steam generator; a steam turbine; a generator; a continuous control system for emissions and additional related equipment. The equipment supplier is responsible for supply and installation in accordance with that stipulated in the agreement. In addition, the supplier is to provide technical consulting services to Three Rivers in order to support the installation process, commissioning, inspections and operation of all the equipment. Pursuant to the terms and conditions of the agreement, Three Rivers will pay the third party in installments based on reaching milestones.

Three Rivers entered into a construction, engineering, acquisition and building agreement with an international engineering, acquisition and construction contractor. Pursuant to the agreement, the Contractor will design and construct the required components of the power plant, to integrate all the equipment required for the power plant.

Three Rivers entered into a maintenance agreement with its original equipment manufacturer, for maintenance services for the combustion turbines. The consideration includes a fixed and a variable amount as of the commercial operation date. The agreement went into effect on August 21, 2020 (hereinafter - the "Effective Date") and ends on the earlier of: (a) 25 years from the Effective Date; or (b) when specific milestones are reached based on use and wear and tear.

Three Rivers entered into an operating and maintenance agreement (O&M) of the power plant. The consideration includes fixed annual management fees, a performance-based bonus, and reimburses for employment expenses, payroll costs and taxes, subcontractor costs and other costs. The period of the agreement will commence during the construction period, and will run up to about 3 years from the date of completion of construction of the power plant.

E. Attachment of financial statements of a material associate

The Group attaches to these consolidated financial statements the consolidated financial statements of Valley (hereinafter - the "material associate") as of December 31 2021.

The functional currency and the presentation currency of the material associate is the US dollar. For details regarding the changes in the currency exchange rate of the US dollar in the reporting period – see Note 23D.

The financial statements of the material associate are drawn up in accordance with US GAAP, which vary, in some respects, from IFRS. Set forth below are the adjustments to comprehensive income, total assets, total liabilities and Partnership's equity to reflect those differences.

  • E. Attachment of financial statements of a material associate (cont.)
  • 1) Statement of Financial Position
As at December 31, 2021
US GAAP Adjustments IFRS
In USD thousand In USD thousand In USD thousand
Property, plant & equipment A, C, D 811,284 (188,193) 623,091
Intangible assets D 10,332 (10,332) -
Other assets 118,188 - 118,188
Total assets 939,804 (198,525) 741,279
Accounts payable and deferred expenses A 40,493 (1,421) 39,072
Other liabilities 583,413 - 583,413
Total liabilities 623,906 (1,421) 622,485
Partners' equity A, C 315,898 (197,104) 118,794
Total liabilities and equity 939,804 (198,525) 741,279
As at December 31, 2020
US GAAP
In USD thousand
Adjustments
In USD thousand
IFRS
In USD thousand
Property, plant & equipment A,D 836,428 20,479 856,907
Intangible assets A 10,657 (10,657) -
Other assets 175,692 - 175,692
Total assets 1,022,777 9,822 1,032,599
Accounts payable and deferred expenses 19,140 (1,228) 17,912
Other liabilities A 618,057 - 618,057
Total liabilities 637,197 (1,228) 635,969
Partners' equity A 385,580 11,050 396,630
  • E. Attachment of financial statements (cont.)
  • 2) Statements of income and other comprehensive income:
For the year ended December 31, 2021
US GAAP
In USD thousand
Adjustments
In USD thousand
IFRS
In USD thousand
Revenues 150,647 - 150,647
Operating expenses A 171,571 (4,872) 166,699
Depreciation and amortization C 25,714 (6,277) 19,437
Impairment of property, plant & equipment C - 219,302 219,302
Operating loss (46,638) (208,153) (254,791)
Finance expenses B 31,806 (5,052) 26,754
Loss for the year (78,444) (203,101) (281,545)
Other comprehensive income - interest rate swaps B 8,762 (5,052) 3,710
Comprehensive loss for the year (69,682) (208,153) (277,835)
For the year ended December 31, 2020
US GAAP
Adjustments
IFRS
In USD thousand In USD thousand In USD thousand
Revenues 129,667 - 129,667
Operating expenses A 135,419 (5,237) 130,182
Operating loss (5,752) 5,237 (515)
Loss on sale of assets 12 - 12
Finance expenses B 36,666 20 36,686
Loss for the year (42,430) 5,217 (37,213)
Other comprehensive loss - interest rate swaps B (5,252) 2 (5,250)
Comprehensive loss for the year (47,682) 5,219 (42,463)
F - 115
  • E. Attachment of financial statements (cont.)
  • 3) Adjustment to equity and comprehensive income:
As at December 31
2021 2020
In USD thousand In USD thousand
Partners' equity from the Partnership balance sheet according to US GAAP 315,898 385,580
IFRS adjustments:
Costs of periodic maintenance at the power plant A 15,921 11,050
Impairment of property, plant & equipment (after periodic depreciation) C (213,025) -
Partners' equity after adjustments to IFRS 118,794 396,630

E. Attachment of financial statements of a material associate (cont.)

4) Material adjustments to the statement of cash flows

For the year ended December 31, 2021
Adjustments
US GAAP
IFRS
In USD thousand In USD thousand In USD thousand
Loss for the year A, B, C (78,444) (203,101) (281,545)
Net cash from operating activities 16,448 - 16,448
Net cash from investing activities E (342) 11,156 10,814
Net cash used in financing activities (27,407) - (27,407)
Net increase (decrease) in cash and cash equivalents (11,301) 11,156 (145)
Cash and cash equivalents balance at the beginning of the year E 89 335 424
Restricted cash balance at beginning of the year E 87,700 (87,700) -
Cash and cash equivalents balance at the end of the year E 98 181 279
Restricted cash balance at end of the year E 76,390 (76,390) -
For the year ended December 31, 2020
US GAAP Adjustments
In USD thousand
IFRS
In USD thousand In USD thousand
Loss for the year A, B, C (42,430) 5,217 (37,213)
Net cash from operating activities 5,364 - 5,364
Net cash from investing activities E (5,734) 25,902 20,168
Net cash used in financing activities (26,425) - (26,425)
Net increase (decrease) in cash and cash equivalents (26,795) 25,902 (893)
Cash and cash equivalents balance at the beginning of the year E 22 1,295 1,317
Restricted cash balance at beginning of the year E 114,562 (114,562) -
Cash and cash equivalents balance at the end of the year E 89 335 424
Restricted cash balance at end of the year E 87,700 (87,700) -

E. Attachment of financial statements of a material associate (cont.)

  • 5) Explanations for the main differences between US GAAP and IFRS:
    • A. Maintenance costs under the Long-Term Control Plan (LTCP) agreement: under IFRS, variable payments which were paid in accordance with the milestones as set in the LTCP agreement are capitalized to the cost of property, plant and equipment and depreciated over the period from the date on which maintenance work was carried out until the date on which maintenance work is due to take place again. Under US GAAP, the said payments are recognized on payment date within current expenses in the statement of income.
    • B. Hedge effectiveness of interest rate swaps: in accordance with IFRS 9 Financial Instruments Valley recognizes adjustments relating to the ineffective portion of its cash flow hedge. Under US GAAP, in accordance with ASU 2017-12 there is no ineffective portion.
    • C. Property, plant and equipment: during the course of the first quarter of 2021, there were indications for impairment that require impairment testing in accordance with both sets of standards: IFRS and US GAAP. Pursuant to IAS 36 the carrying amount exceeded the recoverable amount (the discounted cash flows that Valley expects to generate from the asset), and consequently an impairment loss was recognized during the first quarter of 2021. In accordance with ASC 360, the non-discounted cash flows that Valley expects to generate from the asset exceed the carrying amount, and therefore no impairment loss was recognized in accordance with US GAAP.
    • D. Intangible assets: intangible assets that fall within the scope of ASC 350: Intangibles Goodwill and Others are defined as property, plant and equipment in accordance with IAS 16.
    • E. Restricted Cash: The difference is due to a difference in the presentation of restricted cash in the cash flow statements between IFRS and US GAAP.

NOTE 27 – SEGMENT REPORTING

As a result of acquisition of the CPV Group in January 2021 (as stated in Note 25D), which is engaged in development, construction and management of renewable energy and conventional (advanced-generation, gas-fired combined-cycle power plants) in the United States, as of the first quarter of 2021 the Group presents two geographic activity segments that constitute strategic business units of the Group. These strategic business units include products and services and are managed separately for resource allocation and evaluation of performance purposes due to the fact that they are located in different geographic regions. For each strategic business unit, the chief operating decision maker regularly reviews the internal managerial reports. In addition, the segment's results are based on the Company's profit (loss) before depreciation and amortization, changes of the fair value of derivative financial instruments, net finance expenses or income, and income taxes attributed to the Group's reportable segments, as well as net of non-recurring income (expenses) (hereinafter - "Adjusted EBITDA"). The data of associates and joint ventures in this note are included by way of proportionate consolidation according to the CPV Group's holding rate. The information on subsidiaries in this note is presented in full without adjustment to the holding rate. The adjustment column adjusts the results to the income statement mainly as a result of presenting the data of associates. Set forth below is a brief description of the business activities of each of the Group's operating segments:

  • Electricity and energy generation and supply in Israel Under this segment, the Group is engaged in the generation and supply of energy (as at the reporting date, electricity, steam and charging services for electric vehicles), mainly to private customers and to the System Operator, and in the development, construction and operation in Israel of power plants and energy generation facilities powered using natural gas and renewable energy.
  • Generation and supply of electricity and energy in the United States development, holding, and management of power plants using renewable energy and conventional energy (natural gas-fired) in the United States. In this operating segment, the Group develops, constructs, and manages renewable energy and conventional power plants in the United States and holds rights in renewable energy and conventional power plants that are operational and under construction. Furthermore, the Company engages in providing asset and energy management services for power plants in the US that are owned by the Group and by third parties.

The Company manages its operations in Israel under a single operational roof, mainly through OPC Israel, and its operations in the United States under another operational roof through the CPV Group.

For the year ended December 31, 2021
Generation and
supply of electricity
and energy in Israel
NIS million
Generation and
supply of electricity
and energy in the
United States
NIS million
Adjustments
NIS million
Consolidated - total
NIS million
Revenues from sales and provision of and services 1,412 1,135 (972) 1,575
Adjusted EBITDA for the period 360 303 (29) 634
Depreciation and amortization
Finance expenses, net
Share in losses of associates
Non-recurring expenses
(180)
(457)
(375)
(3)
(1,015)
Loss before taxes on income (381)
Tax benefit (77)
Loss (304)
F - 119

A. Contracts for the sale of electricity to private customers

Agreements for the sale of electricity and steam to private customers in Israel

  1. Rotem has signed power purchase agreements with its customers (hereinafter - the "PPAs") with regard to which, as at the reporting date, their average remaining term is 6.2 years, subject to the option for early termination, as set out in the agreements with each customer (not including agreements with customers for short periods, from time to time, of up to 3 months). In addition, some of Rotem's customers signed agreements for the construction and operation of energy generation facilities in the consumers' premises with the Company (as described in Note 28K), under which the electricity will be supplied jointly by the production plant and Rotem. As part of the engagements with the Company for construction of the generation facilities, Rotem also signed PPAs with existing and new customers, with which the engagement period was set at 15 to 20 years from the commercial operation date of the generation facility. The price fixed in the PPA agreements is based on the time of use (TAOZ) tariff with a certain discount given for the Generation Component (hereinafter - the "Discount"). The TAOZ tariff, including the tariff for the Generation Component, is fixed by the Israeli Electricity Authority and are updated from time to time. Under the terms of these agreements, Rotem is committed to a minimum capacity of the plant for supplying electricity (with financial sanctions in the event of failure to comply with such minimum capacity).

It should be noted that Rotem has no obligation to give the Discount in certain cases, such as failure to supply natural gas and in some agreements, in the event of a reduction in the tariff for the Generation Component Rotem has the right to reduce the rate of the Discount in accordance with a mechanism set in the agreement. Furthermore according to the terms of some of the agreements, Rotem has the right to cancel the agreement if the Generation Component falls below the minimum rate as set in the power purchase agreement with the IEC. Rotem has the option to sell the capacity allocated to private customers back to the IEC, with 12 months' prior notice, and to be entitled to fixed capacity fees. As a rule, the PPAs are not backed by collateral.

  1. Hadera has signed PPAs with its customers with regard to which, as at Reporting Date, their average remaining term is 9.9 years, subject to an early termination option. In addition, some of Hadera's customers have signed agreements for construction of the generation facilities in the consumers' premises with the Company (as stated in Note 28K), under which their agreements with Hadera were extended to 15 years from the commercial operation date of the generation facility. The consideration is set based on the TAOZ tariff, less the production component discount. If the price falls below the minimum tariff set for the Generation Component, Hadera will be entitled to terminate the agreements. It should be noted that Hadera has no obligation to give a discount in certain cases. For example, if the tariff for the Generation Component drops, Hadera has the right to reduce the rate of the Discount in accordance with the mechanism set in the agreement for some cases and for another case it entitled not to give a discount at all. According to Hadera's Financing Agreement, under certain conditions, some of their PPAs, including amendments thereto, must be submitted for approval by the financing entities.

Hadera's agreements with its customers include a compensation mechanism in a case of a delay in the power plant's commercial operation date and compensation for lower-than-agreed capacity of the power plant. As a result, due to the delay in the commercial operation date of the Hadera Power Plant, Hadera paid compensation to its customers. Total compensation to customers (including compensation for Infinya Mills, as specified in Section 3 below) amounted to NIS 13 million, which was paid in 2019-2021 (excluding negligible amounts). Pursuant to the provisions of IFRS 15 regarding variable consideration, on the date of payment of compensation to customers the Company recognized long-term prepaid expenses, which are amortized throughout the term of the agreement, from the date of commercial operation of the Hadera Power Plant, against a decrease in revenue from customer agreements.

  1. Hadera entered into a long-term supply agreement with Infinya (as amended in 2019) (hereinafter - the "Electricity and Steam Agreement"), under which Hadera will exclusively supply electricity and steam to the Infinya plants for 25 years from commercial operation of the Hadera Power Plant, which began on July 1, 2020.

The tariff paid by Infinya for the electricity purchased by it for the period is based on the time of use tariff, with a discount for generation, with the addition of a fixed payment for the connection size, similar the Company's standard PPAs as described above. As at the date of approval of the financial statements, Infinya is not charged transmission payments and the capacity coefficient, as it was connected directly to an electrical substation of the Hadera Power Plant (in October 2021). In addition, the electricity and steam agreement sets the price of steam, which is primarily linked to Hadera's gas price, as stipulated in the gas supply agreements signed by Hadera and in accordance with Infinya's annual steam consumption.

In addition, the electricity and steam agreement includes a take-or-pay undertaking of Infinya for a certain annual volume of steam, based on a mechanism that was set out. In the reporting period, the average hourly steam consumption of Infinya Mills was higher than its TOP undertaking. On the other hand, the agreement includes Hadera's undertaking, among other things, for certain capacity for supplying electricity and steam and Hadera is exposed to compensation payments if it fails to meet the rate of capacity for electricity and steam as set out in the agreement. The Electricity and Steam Agreement sets an annual limit of liability of USD 2 million under the terms set, and a compensation mechanism that Infinya Mills is entitled to due to the delay in the commercial operation of the Hadera Power Plant. For further information concerning the amounts of compensation that Hadera paid for the delay in commercial operation of the Hadera Power Plant, see Note 28A2.

Under the agreement with Infinya, in the event of a shortage of gas and if Infinya instructs the Energy Center to continue operating, Hadera will operate the Energy Center for the production of steam using alternative fuel to be supplied by Infinya. In addition, under the agreement with Infinya, Hadera will receive full payment for the steam, and on the other hand, will indemnify Infinya for each ton of steam produced in the amount of the cost of its production using natural gas.

  1. In addition, under the agreement, Hadera undertook, among other things, to indemnify Infinya Ltd. in respect of 50% of the actual cost paid for construction of the infrastructure under the responsibility of Infinya (hereinafter the "Infrastructures Bridge"). In 2019, the construction of the Infrastructures Bridge was completed and in 2021, final netting with Infinya was carried out whereby Hadera's share of the construction costs of the Infrastructure Bridge amounted to NIS 17 million.

A. Contracts for the sale of electricity to private customers (cont.)

Contracts for the sale of electricity to private customers in the US

    1. Keenan entered into a wind power energy agreement for the sale of renewable energy. Under the terms and conditions of the agreement, the acquirer is entitled to receive all of the electricity generated by the wind plant, credits, certificates, similar rights, or other environmental allotments. The consideration includes a fixed payment. The agreement term is 20 years, ending in 2030. The acquirer is permitted, under certain circumstances, to extend the agreement for another five-year period, and to acquire an option to purchase the project at the end of the agreement period at its market value, as defined in the agreement and pursuant to the terms and conditions stipulated therein. As of the acquisition completion date of the CPV Group, the fair value of the PPA using the income approach, in which the present value of the cash flows – based on potential sale according to the PPA's current prices - were discounted, net of the present value of the potential sales without the PPA. The said PPA was stated under the intangible assets line item in the statement of financial position.
    1. Maple Hill Solar entered into an agreement with a third party for the sale of 48% of the electricity generated; the electricity price is carried out based on financial netting between the parties for 10 years from the commercial operation date. In accordance with the agreement, a net calculation will be made of the difference between the variable price that Maple Hill receives from the System Operator and which is published and the fixed price set with a third party. As security for the payment and for the fulfillment of its obligations under the agreement (which include achievement of certain project milestones, including operation by a specific date), Maple Hill gave a third party a security interest in a certain deposit with a bank. The CPV Group provided a total of approximately NIS 6 million (approximately USD 2 million) as collateral to secure its obligations in the agreement, which include making certain payments to the other party if certain milestones (including commencement of activities) in the project are not completed according to a specific schedule. This agreement includes an option to transition to a physical PPA with a fixed price on fulfillment of certain terms and conditions, which have yet to be met as at the reporting date. The PPA meets the definition of a derivative under IFRS 9, but is subject to conditions precedent that have yet to be met as of the report date.

Maple Hill has entered into an agreement to sell 100% of the Solar Renewable Certificates (SRECs) for the project until 2026 with a global energy company. The CPV Group provided a total of approximately NIS 16 million (approximately USD 5 million) as collateral to secure its obligations in the agreement, which include making certain payments to the other party if certain milestones (including commencement of activities) in the project are not completed according to a specific schedule.

  1. In April 2021, CPV Group signed an agreement for the sale of all the electricity and the environmental consideration of the Rogue's Wind wind energy project (including Renewable Energy Certificates (RECs), benefits related to availability, and related expenses). The agreement was signed for a period of 10 years commencing on the commercial operation date. The CPV Group provided NIS 28 million (approximately USD 9 million) as collateral for its obligations under the agreement, including in relation to the operation date.

B. Tariffs set by the Israeli Electricity Authority

In December 2018, the Israeli Electricity Authority published a decision that entered into effect on January 1, 2019, regarding the update of the 2019 tariffs, whereby the rate of the generation component was raised by approximately 3.3% - from NIS 281.6 per MWh to NIS 290.9 per MWh.

In December 2019, the Israeli Electricity Authority published a decision that entered into effect on January 1, 2020, regarding the update of the 2020 tariffs, whereby the rate of the generation component was reduced by approximately 8% - from NIS 290.9 per MWh to NIS 267.8 per MWh.

In December 2020, the Israeli Electricity Authority published a decision that entered into effect on January 1, 2021, regarding the update of the 2021 tariffs, whereby the rate of the generation component was reduced by approximately 5.7% - from NIS 267.8 per MWh to NIS 252.6 per MWh.

Subsequent to the reporting date, in January 2022, the Israeli Electricity Authority published a decision that entered into effect on February 1, 2022, regarding the update of the 2022 tariffs, whereby the rate of the generation component was increased by approximately 13.6% - from NIS 252.6 per MWh to NIS 286.9 per MWh. On February 27 2022, the Israeli Electricity Authority published a hearing for updating the electricity tariff in 2022; in the hearing it is proposed to update the production component in order to reflect the reduction in the excise duty rate following the draft excise tax on fuel order issued by the Ministry of Finance as part of the government's plan to tackle the increase in cost of living. The effective date of the new tariff, subject to a final decision at the hearing, is at the beginning of the month following the entry into effect of the new excise order (which has not yet came into force as of the approval date of the financial statements). The proposed production component (subject to a final decision) is expected to amount to NIS 276.4 per MW, which is an increase of approx. 9.4% in relation to the production component in 2021, instead of an increase of approx. 13.6% according to the original decision, as stated above.

C. Power purchase agreements

Rotem's power purchase agreement

Following its win in the tender for the construction of a power plant on November 2, 2009, Rotem signed a PPA with the IEC, in which Rotem undertook to construct the power plant in accordance with the terms of the PPA, and the IEC undertook to purchase capacity from Rotem in accordance with the terms of the PPA, over a period of twenty years from the date of commercial operation of the power plant.

The PPA includes sections governing the obligations of each of the parties during the construction and operation period, as well as a compensation mechanism in case of non-compliance by one of the parties with its obligations under the PPA.

As part of the establishment of a System Operator under the IEC reform, part of the agreement was reassigned to Noga, subject to its obligation to provide adequate rating by March 31 2022, and part of the power purchase agreement will continue to apply to IEC, within the powers remaining under IEC in accordance with the IEC reform.

In 2014 (commencing in August), letters were exchanged between Rotem and IEC regarding the tariff to be paid by Rotem to IEC for electricity that it had purchased from the electric grid, concerning the sale of electricity to private customers in cases where the electricity generation at the power plant is insufficient to meet the electricity needs of such customers. According to Rotem, the applicable tariff is the "ex-post" tariff, whereas according to IEC in the foregoing exchange of letters, the applicable tariff is the TAOZ tariff, and based on part of the correspondences a tariff that is 25% higher than the TAOZ tariff (and part of the correspondence also raise allegations of breach of the PPA with IEC). In order not to avoid a specific dispute, Rotem paid the IEC the TAOZ tariff for the foregoing purchase of electricity, and as of that date also pays the IEC the TAOZ tariff for purchasing electricity from the IEC to be sold to private customers. Rotem estimates that, based on the opinions of its legal counsel, it is more likely than not that Rotem will not pay any additional amounts in respect of the period ended December 31, 2021, and therefore no provision for the additional amounts was included in the financial statements.

As at the approval date of the financial statements, IEC had contacted Rotem for purposes of arrangement of open matters between the parties. In this regard, the IEC raises contentions regarding past accounting in respect of the energy purchase cost for Rotem customers in a case of a load reduction of the power plant by the System Operator, and collection differences due to non-transfer of meter data in 2013 through 2015, in amounts that are immaterial to the Company. In addition, the IEC stated its position with respect to additional matters in the arrangement between the parties relating to the acquisition price of surplus energy and the acquisition cost of energy by Rotem during performance of tests. Rotem's position regarding the matters referred to by IEC, based on its legal advisors, is – as of the report date, different and talks are being held between the parties in order to reach an understanding. However, the open matters, as stated, had not yet been resolved and therefore, there is no certainty that the parties will reach an agreement. To the extent the open matters are not resolved, there will be no choice other than to turn to the courts. It should be noted that what is stated above does not exhaust all open issues between the System Operator, IEC and Rotem.

As stated above, part of the establishment of a System Operator Company under the IEC reform, a part of the agreement has been reassigned to Noga (the System Operator Company) and part of the power purchase agreement will continue to apply to IEC, within the powers remaining under IEC in accordance with the IEC reform. Noga notified Rotem that its position is that the sale of energy by Rotem to end consumers beyond the generation capacity of the power plant does not comply with the provisions in the power purchase agreement between it and IEC. According to Rotem's understanding, the matter is expected to be impacted by complementary arrangements that are to be determined by the Israeli Electricity Authority.

C. Power purchase agreements

Hadera power purchase agreement

In September 2016, Hadera signed an agreement with the IEC to purchase energy and provide utility services. Under the establishment of the System Operator Company as part of the IEC Reform, in September 2020, Hadera received notice that its agreement with the IEC has been reassigned to the System Operator Company, as of the transition date of the System Management Unit from the IEC to the System Operator Company in November 2021. Under the agreement, Hadera undertook to sell energy and related services to the IEC, and the IEC undertook to sell infrastructure and electricity management services to Hadera, including backup services. The agreement will remain in effect until the end of the period in which Hadera is permitted to sell electricity to private consumers as set forth in the supply license, regarding the infrastructure and system management services, and up to the end of the period in which Hadera may sell energy to the System Operator, as set forth in the generation license (i.e., up to 20 years from the commercial operation date), regarding the purchase of energy and ancillary services. The agreement also includes provisions governing the connection of the Hadera Power Plant to the electrical grid, as well as provisions covering the design, construction, operation and maintenance of the Hadera Power Plant. Among other things, it was decided that the System Operator will be entitled to disconnect the Hadera Power Plant from the electrical grid if it fails to follow the safety guidelines provided by law or a safety guideline of the System Operator delivered to Hadera in advance and in writing. In addition, Hadera undertook to meet the capacity and reliability requirements provided in its license and in the Covenants, and to pay for failure to comply with them, as stipulated in the Covenants.

Zomet capacity and power purchase agreement

In January 2020, Zomet signed an agreement with the IEC for the purchase of capacity and energy and the prevision of infrastructure services. Under the establishment of the System Operator Company as part of the IEC Reform, in October 2020, Zomet received notice that its agreement with the IEC has been reassigned to the System Operator Company, as of the transition date of the System Management Unit from the IEC to the System Operator Company in November 2021. Under the agreement, Zomet undertook to sell energy and available capacity from its facility to the IEC, and IEC undertook to provide Zomet with infrastructure services and management services for the electricity system, including backup services, in accordance with the provisions of the agreement, the law, and the covenants. The obligations of IEC were endorsed to Noga as part of the endorsement of the agreement as set out above.

The agreement will remain in effect up to the end of the period in which Zomet is permitted to sell available capacity and energy in accordance with the provisions of its generation license (i.e., 20 years from Zomet's commercial operation date). Nonetheless, if Noga is unable to purchase available capacity and energy due non-extension of its license or receipt of an alternative license, the agreement will be terminated on the date in which the said impediment occurs. Under the agreement, Zomet will allocate all of the power plant's capacity to the fixed capacity arrangement; the purchase of fixed capacity will be subject to compliance with binding criteria, as stipulated in Regulation 914. Furthermore, the agreement includes provisions that cover connection of the power plant to the electrical grid, provisions relating to the planning, construction and maintenance of the power plant, and provisions addressing the purchase of the power plant's available capacity. The agreement provides, among other things, that the System Operator be permitted to disconnect the supply of electricity to the electrical grid if Zomet fails to comply with the safety provisions under law or a safety provision of the System Operator delivered to it in advance and in writing. In addition, Zomet undertook to comply with the capacity and reliability requirements stipulated in its license and in Regulation 914, and to pay for non-compliance therewith, in accordance with that provided in Regulation 914.

D. Construction agreements

Hadera Construction Agreement

In January 2016, an agreement was signed between Hadera and SerIDOM Servicios Integrados IDOM, SAU (hereinafter in this Section - the "Construction Contractor") for the design, engineering, purchase and construction of a cogeneration power plant for consideration in an amount equivalent to NIS 639 million (as amended several times as part of additions and modification orders), which is payable on the basis of the progress of construction and compliance with milestones (hereinafter in this section - the "Construction Agreement"). The Construction Contractor provided Hadera with bank guarantees and a corporate guarantee of its parent company to secure these obligations and the Company provided the Construction Contractor with a corporate guarantee in the amount of USD 10.5 million to secure the full obligations of Hadera under the Construction Agreement. Furthermore, in an addendum to the Construction Agreement signed in October 2018 (hereinafter - the "Addendum"), the parties agreed, among other things, to waive past claims until the date of signing of the Addendum.

On July 1, 2020, the commercial operation date of the Hadera Power Plant commenced, after a delay in power plant's completion of construction as a result of, among other things, components replaced or repaired.

Pursuant to the Construction Agreement, Hadera is entitled to receive agreed compensation from the Construction Contractor for the delay in completion of the construction of the Hadera Power Plant (hereinafter the "Compensation for Delay in Delivery of the Power Plant" or "LDS") or compensation (limited to the amount of the limit set in the Agreement) in the event of failure to comply with the terms set out in the Agreement with regard to the Power Plant performance (hereinafter - "Compensation for Power Plant Performance"). The compensation is limited to the amount set out in the Construction Agreement.

Hadera estimates that the amount of compensation for LDs to which it is entitled amounts to USD 23 million. Furthermore, according to the Construction Agreement, Hadera has a contractual right to deduct any amount due to it under the Construction Agreement, including the foregoing agreed compensation, from any amounts that it owes to the construction contractor. In July 2020, upon completion of construction of the Hadera Power Plant, the Construction Contractor requested that the Company make the final two milestone payments in accordance with the Construction Agreement, in the amount of NIS 48 million. Hadera believes that it has an unconditional right to the compensation and that it is more likely than not that its position will be accepted. Therefore, and in accordance with the right of set-off, Hadera offset the payment for the two final milestones against the compensation it contends it is entitled to, such that as at December 31, 2021, the balance of the compensation due to Hadera for the delay in handing over the power plant amounted to NIS 28 million (USD 9 million).

In May 2021 Hadera received from the construction contractor notice of dispute before instigation of proceedings; in his notice, the construction contractor claims, inter alia, that Hadera does not have any grounds for charging the amounts specified in the agreement in respect of LDs and due to non-compliance with conditions set out in the agreement in connection with the performance of the power plant (including by way of offsetting). In addition, the construction contractor claims he is entitled to consideration of EUR 7 million and that he may renew the guarantee provided in a reduced amount. It should be noted that in June 2021, the bank guarantee provided by the construction contractor (in the original amount, without reduction), was extended through May 31, 2022, without derogating from the Contractor's claims as per his claims.

In September 2021, the construction contractor started an arbitration procedure against Hadera in the International Court of Arbitration (ICC), after the period of negotiations prior to instigating arbitration procedures, as set out in the construction agreement, has elapsed. The contractor's claims are similar in nature to the claims described above, including a claim for payments totaling USD 14 million for meeting milestones (that Hadera has unilaterally offset against LDs), net of any compensation in respect of LDS which the construction contractor may be required to pay as a result of the arbitration process; additional consideration totaling EUR 7 million in respect of work; a claim by the construction contractor to the effect that it may reduce the amount of guarantees it provided in favor of Hadera, as well as certain declarative remedies.

Hadera disputes the claims of the construction contractor (except in respect of an insignificant amount out of said claim, relative to EUR 7 million), and his claims were rejected by it even prior to receiving the Contractor's said notice. It is Hadera's position, according to the construction agreement and based on the position of its legal counsel, that it is entitled to LDs and damages for non-compliance with conditions set out in the agreement in connection with the performance of the power plant. The total amount in respect of all of the above grounds for compensation is capped at USD 36 million. As of the report date, the Company filed a response to the construction contractor's application and a counter-application to the Arbitration Institution. It should be noted that, at the same time, the parties are holding negotiations in an attempt to formulate a compromise, although at this point, the formulation of a compromise remains uncertain.

It should be noted that in November 2021, Hadera received a refund from the insurance company for the Construction Contractor in the amount of NIS 7 million for a claim filed by the Construction Contractor. As of the report date, the refund is recorded in the payables and credit balances line item, and subsequent to the report date, in January 2022, the refund was remitted to the Construction Contractor.

D. Construction agreements (cont.)

Zomet Construction Agreement

In September 2018, Zomet engaged in an engineering, procurement and construction (EPC) agreement (hereinafter in this section - the "Construction Agreement") with PW Power Systems LLC (hereinafter in this section - the "Construction Contractor"), for the construction of the Zomet Power Plant. The Construction Agreement is a "Lump Sum Turn-key" agreement, under which the Construction Contractor undertook to construct the Zomet Power Plant in accordance with the technical and engineering specifications fixed and including the Construction Contractor's obligations. In addition, the Construction Contractor undertook to provide certain maintenance services in connection with the Zomet Power Plant, for a period of 20 years commencing on its commercial operation date.

Under the Construction Agreement, the Construction Contractor undertook to complete the construction work on the Zomet Power Plant, including acceptance tests until late January 2023.

The estimated total consideration, based on the anticipated work regime to be paid under the Construction Agreement in Zomet's estimation, is about USD 300 million (hereinafter – the "Total Consideration"), and is payable in accordance with the dates and milestones set forth in the Construction Agreement. The Total Consideration includes the consideration for the Maintenance Agreement as set out below in Note 28E. In 2020, Zomet partially hedged its exposure to changes in the cash flows from payments in US dollars in connection with the agreement by means of currency forwards. Zomet chose to designate the said forward contracts as accounting hedges (for details – see Note 23D).

Furthermore, the Construction Agreement includes customary provisions for agreements of this type, such as obligations for agreed compensation that are limited in amount, in case of non-compliance with the terms and conditions set forth in the Construction Agreement, including in connection with certain guaranteed results and for non-compliance with the schedule under the terms and conditions. Under the Construction Agreement, the Construction Contractor is to provide guarantees, including by the parent company, as is customary in agreements of this type.

Continuity of construction work may to be affected by the Covid-19 Crisis, in light of the need for equipment and foreign work teams to arrive, and by delays in the global supply chains. As such, the Company believes that the construction period of the Zomet Power Plant is expected to end in the first quarter of 2023. It should be noted that delays in the completion of the construction work beyond the date scheduled in Zomet's conditional license might affect Zomet's ability to meet its undertakings in connection with the construction of the project.

Sorek construction and equipment supply agreement

In June 2021, Sorek contracted with BHI CO. Ltd. a South Korean-owned corporation that will serve as the project's construction contractor (hereinafter in this section - the "Construction Contractor") entered into a "lump sum turn-key" EPC agreement, where under the Construction Contractor will build a gas-fired energy generation facility with an installed capacity of up to 87 MW, all in accordance with the milestones, terms and dates set in relation to each of the agreement's components (hereinafter in this section - the "Construction Agreement"). A IDE group corporation is also a party to the Construction Agreement (in its capacity as the commissioning party), under which systems are supplied to the desalination facility, for which the said corporation is required to pay. Sorek's share in the amount payable to the Construction Contractor is estimated at USD 42 million; this amount also includes the amount payable for the purchase of the gas turbines. The amount payable under the agreement shall be paid in US dollars, euros and shekels. It should be noted that the agreement sets, inter alia, mechanisms for agreed and capped compensation in respect of delays, non-compliance with execution and availability requirements; the agreement also sets the scope of liability and requirements for provision of guarantees in the different stages of the project.

Sorek also entered into an agreement for the supply of a gas turbine to the energy generation facility with companies of the General Electric group (hereinafter - "GE"). As part of the agreement, GE has undertaken, inter alia, to supply the turbine and related equipment, to provide support to the Construction Contractor, as well as commissioning and testing the equipment, all in accordance to the terms, milestones and dates agreed between the parties (hereinafter in this section - the "Equipment Supply Agreement"). Pursuant to the agreement between the parties, once the limited notice to proceed (LNTP) was issued and the first payment to GE was made the Equipment Supply Agreement was assigned - under the same terms - to the Construction Contractor in the aforesaid Construction Agreement.

Subsequently, in July 2021, an agreement was signed that regulates the decision-making process and the assignment of responsibility between Sorek 2 and the said corporation of the IDE Group in connection with the Construction Agreement; except for cases provided for in the Agreement, the arrangements are mainly derived from each party's part in the Construction Agreement and the joint decision mechanism. To secure Sorek 2's undertakings under this agreement, the Company provided a capped corporate guarantee. In September 2021, the construction contractor was handed a notice to proceed.

D. Construction agreements (cont.)

Maple Hill Construction and Equipment Purchase Agreements

In May 2021, Maple Hill signed a construction, procurement and engineering agreement with an international contractor. Pursuant to the agreement, the Construction Contractor is to plan and construct the required components for the power plant in order to integrate all the required equipment into the power plant. The total consideration to be paid to the contractor is a fixed amount payable under a milestone schedule. In May 2021, a notice to proceed was issued to the Construction Contractor.

In addition, Maple Hill entered into agreements with international suppliers for the purchase of solar panels and transformers. The considerations in respect of the agreements include the payment of a fixed price (as amended) for the purchase, supply and installation of the solar panels and transformers.

E. Maintenance and service agreements

Rotem Maintenance Agreement

On June 27, 2010, Rotem engaged in an agreement with Mitsubishi Heavy Industries Ltd. (which on June 24, 2014 was assigned to Mitsubishi Hitachi Power Systems Ltd. and on March 31, 2016 to Mitsubishi Hitachi Power Systems Europe Ltd.) (hereinafter - "Mitsubishi") for the long-term maintenance of Rotem Power Plant, from the date on which commercial operation commenced, for an operating period of 100 thousand work hours or up to the date on which 8 scheduled maintenance services are completed on the gas turbine (which the Company estimates to be 12 years), at a cost of about EUR 55 million, payable over the period based on the formula provided in the agreement (hereinafter in this section – the "Maintenance Agreement"). Under the Maintenance Agreement, Mitsubishi will perform maintenance work on the main components of Rotem Power Plant, comprising the gas turbine, the steam turbine and the generator (hereinafter – the "Main Components"). In addition, Mitsubishi will supply new or refurbished spare parts, as necessary. It is noted that the Agreement covers scheduled maintenance work and that, as a rule, Rotem will be charged separate additional amounts for any unscheduled or additional work, if required. Nonetheless, the Agreement provides for unscheduled maintenance work, subject to various restrictions and the terms of the Agreement.

The Maintenance Agreement includes Mitsubishi's guarantees with regard to the performance of the Rotem Power Plant. Mitsubishi undertook to compensate Rotem in the event of failure to comply with the foregoing guarantees and Rotem undertook to pay Mitsubishi to for improvement in the performance of Rotem Power Plant resulting from the maintenance work; all this – up to an annual maximum limit, as set out in the Maintenance Agreement.

In October 2020, planned maintenance work continued for 13 days, during which the Rotem Power Plant was shut down.

As at the date of approval of the financial statements, the next maintenance work is scheduled for April 2022, during which the Rotem Power Plant operations and the related energy generation will be shut down for a period of 20 days.

Hadera service agreement

In June 2016, Hadera engaged in a long-term service agreement (hereinafter in this section – the "Service Agreement") with General Electric International Inc. (hereinafter – "GEII") and GE Global Parts & Products GmbH (hereinafter – "GEGPP"), under which these two companies will carry out maintenance work for the two gas turbines, generators and auxiliary facilities of the Hadera Power Plant, for a period commencing on the date of commercial operation, until the earlier of: (a) the date on which all of the covered units (as defined in the Service Agreement) will have reached the end-date of their performance and (b) 25 years from the date of signing of the Service Agreement. The cost of the Service Agreement amounts to USD 42 million, payable over the term of the Agreement, based on the formula prescribed therein.

The Service Agreement includes a warranty for reliability and other obligations concerning the performance of the power plant and indemnification to Hadera in the event of failure to meet the performance obligations, on the other hand, Hadera undertook to pay bonuses in the event of improvement in the performance of the power plant as a result of the maintenance work, up to a cumulative maximum limit for each inspection period.

GEII and GEGPP provided Hadera a corporate guarantee from their parent company to secure these liabilities, and the Company provided GEII and GEGPP a corporate guarantee, in the amount of USD 21 million, to secure part of Hadera's liabilities.

E. Maintenance and service agreements (cont.)

Zomet service agreement

In December 2019, Zomet signed a long-term service agreement (hereinafter – the "Zomet Maintenance Agreement") with PW Power Systems LLC (hereinafter – "PWPS"), for providing maintenance servicing for the Zomet Power Plant, for a period of 20 years commencing from the date of delivery of the plant. Zomet may terminate the Zomet Maintenance Agreement after a period of 5 years from the power plant's delivery date. The Zomet Maintenance Agreement provides a general framework for provision of maintenance services by PWPS for the generation units and additional equipment on the site during the Agreement term (hereinafter, in this Section – the "Equipment"). Zomet is responsible for the current operation and maintenance of the Equipment. Pursuant to the terms and conditions of the agreement, PWPS will provide Zomet with ongoing services, including, among others, an annual inspection of the Equipment and engineering support, with a representative of PWPS being present onsite during the first 18 months of the operation. In addition, the agreement includes providing the Company with access to PWPS leasable equipment, and in case of interrupted production, PWPS will provide the Company with a replacement engine, pursuant to the terms and conditions and for the amounts set forth in the agreement. The agreement includes a mechanism for the performance of the replacement generator. Pursuant to the terms and conditions of the agreement and with the Zomet Power Plant being a peaker plant, other maintenance services, in addition to those set forth in the agreement, will be purchased based on work orders, i.e., the services will be provided by PWPS in accordance with the prices that will be agreed upon, or with respect to certain services - based on the prices stipulated in the agreement.

Sorek Maintenance Agreement

In June 2021, Sorek and GE (as defined in Note 28D) entered into a long-term agreement for the maintenance of the turbine and its related equipment; the term of the agreement is 16 years with an option to renew by 25 years, in return for up to approximately USD 29 million (which will vary in accordance with the term of the agreement), subject to the milestones set in the agreement (hereinafter in this section - the "Maintenance Agreement").

The Maintenance Agreement includes provisions regarding agreed and capped compensation in respect of execution and meeting time tables for servicing, and regarding GE's responsibility for its equipment and services. The Maintenance Agreement includes guarantees provided by the Parent Company to secure each of the parties' undertakings. It should be noted that the above agreements will require, among other things, the approval of the Water Desalination Administration, in accordance with and as required pursuant to the concession agreement signed between IDE and the State of Israel in connection with the desalination facility and the project.

Keenan service agreement -

Keenan entered into a master service agreement and an operation agreement with its original equipment manufacturer for the operation, maintenance and repair of the wind farm. The consideration includes fixed annual fees, a performance-based bonus and reimbursement of expenses. The agreements expire in February 2031.

F. Gas transmission agreements

Agreement for transmission of gas to Rotem

In July 2010, Rotem signed a gas transmission agreement with INGL. The agreement remains in force until 2029, with an option to renew for an additional five years. The agreement includes a payment for a gas pressure regulation and measurement station, PRMS, which was set up for Rotem, at a cost of NIS 47 million and a monthly payment for use of the gas transmission infrastructure.

Agreement for transmission of gas to Hadera

In July 2007, Infinya Mills signed a gas transmission agreement with INGL, which was assigned to Hadera on July 30, 2015. Under the agreement, INGL is to construct a PRMS facility for Hadera Power Plant (hereinafter – the "PRMS Facility") at a cost of NIS 27 million. The agreement includes a monthly payment for the use of infrastructure and gas transmission to the Hadera Power Plant. The agreement term will continue until the earlier of: (1) 16 years from the commercial operation date of the PRMS- May 2018; (2) Expiry of the INGL license (as at the Report date – August 1, 2034); or (3) Termination of the agreement in accordance with its terms and conditions. In addition, Hadera has the option to extend the agreement period by another five years.

F. Gas transmission agreements (cont.)

Agreement for transmission of gas to Zomet

In December 2019, an agreement was signed between Zomet and INGL for transmission of natural gas to the power plant being constructed by Zomet. The agreement includes provisions that are customary in agreements with INGL and is essentially similar to the agreements of Rotem and Hadera with INGL, as stated above.

Under the agreement, partial connection fees were defined for the connection planning and procurement for a total budget of NIS 13 million. On the signing date of the agreement, the Company provided a corporate guarantee in the amount of NIS 11 million, in connection with Zomet's obligations under the agreement. In February 2020, Zomet notified INGL that construction work has commenced. Pursuant to the agreement, the expected commencement date of the transmission is 25-29 months from the signing date. During January 2021, INGL updated the total connection fees to NIS 32 million.

Gas transmission agreement with OPC Natural Gas

In October 2020, an agreement was signed between OPC Natural Gas Ltd. (hereinafter - "OPC Natural Gas") and INGL for the transmission of natural gas for OPC Natural Gas operations as a marketer, and which was endorsed to OPC Gas Limited Partnership in January 2021. The agreement includes the customary provisions in agreements with INGL.

G. Agreements for supply of natural gas

Agreement between Tamar Group and Rotem

On November 25, 2012, Rotem signed an agreement with Tamar Group, which to the best of the Company's knowledge, as at Reporting Date, includes Isramco Negev 2 Limited Partnership, Chevron Mediterranean Ltd., Tamar Investment 1 RSC Limited, Tamar Investment 2 RSC Limited, Dor Gas Exploration Limited Partnership, Everest Infrastructures Limited Partnership and Tamar Petroleum Ltd. (hereinafter – "Tamar Group"), with regard to the supply of natural gas to the power plant (hereinafter – the "Agreement between Tamar Group and Rotem"). The Agreement between Tamar Group and Rotem will remain in effect until September 2029. Furthermore, if 93% of the Total Contractual Quantity is not consumed, both parties have the right to extend the agreement by the earlier between consumption of the full contractual quantity or two additional years. The Total Contractual Quantity under the Agreement amounts to 10.6 BCM.

Certain annual quantities in the Agreement between Tamar Group and Rotem are subject to a TOP obligation, based on a mechanism set out in the Agreement. Under the Agreement between Tamar Group and Rotem, under certain circumstances if payment is made for a quantity of natural gas that is not actually consumed or a quantity of gas over and above the TOP amount is purchased, Rotem may, subject to the restrictions and conditions set out in the Agreement, accumulate this quantity, for a limited time, and use it within the framework of the Agreement. The Agreement includes a mechanism that allows, under certain conditions, these rights to be assigned to related parties for quantities that were not consumed, up to close to their expiration date. In addition, Rotem may sell surplus gas under a secondary sale. Moreover, Rotem was granted an option to reduce the daily contractual quantity to a quantity equivalent to 83% of the average gas consumption in the three years preceding the notice of exercise of this option. The annual contractual quantity will be reduced starting 12 months after the date of such notice, subject to the adjustments set out in the Agreement between Tamar Group and Rotem (including the TOP). If the annual contractual quantity is decreased, all other contractual quantities set in the agreement are to be decreased accordingly. Nonetheless, the TOP is expected to decrease such that the minimum consumption quantity from Tamar will constitute 50% of the average gas consumption in the three years prior to the notice of exercise of the option. The option is exercisable as of January 1, 2020, but not later than December 31, 2022.

In April 2017, the Natural Gas Sector Regulations (Management of the Natural Gas Sector in an Emergency Situation), 2017, were published, which provide for handling of the gas supply in the event of failure by a gas supplier to supply all of the natural gas out of the relevant field. As a rule, pursuant to the Regulations, in the event of shortage of natural gas, the available gas will be allocated proportionately among consumers that generate electricity and consumers that do not generate electricity, based on their average consumption, and after deducting gas quantities that are earmarked for distribution consumers. It is noted that in extraordinary circumstances of shortage that has an extensive adverse effect on the regular operation of the electricity sector, the Regulations authorize the Minister of Energy to make an exception to the allocation provided in the Regulations, after consulting with the Director of the Natural Gas Authority and the Director of the Israeli Electricity Authority.

G. Agreements for supply of natural gas (cont.)

Agreement between Tamar Group and Rotem (cont.)

Pursuant to the Agreement, the price of gas is based on a base NIS price that was fixed on the date of signing the Agreement, linked to changes in the generation component tariff, which is part of the TAOZ, and in part (30%) to the representative USD rate of exchange. As a result, increases and decreases in the generation component, as fixed by the Israeli Electricity Authority, affect Rotem's cost of sales and its profit margins. In addition, the natural gas price formula set in the Agreement between Tamar Group and Rotem is subject to a minimum price in USD. In the reporting period, Rotem paid the minimum price for gas. As of the approval date of the financial statements, Rotem pays a price that is higher than the minimum price.

In November 2019, an amendment to the agreement between Tamar and Rotem was signed. The material points of which being as follows: (a) The option granted to Rotem to reduce the minimum annual contractual quantity to a quantity equal to 50% of the average annual own consumption of gas from Tamar in the three years that preceded the option exercise notice was changed, such that after exercise of the option and subsequent to the notice period, it is expected that the minimum annual contractual quantity in Rotem will be reduced to 40% of the average annual own consumption of gas from Tamar in the three years that preceded the option exercise notice; the quantity will be delivered 12 months prior to the effective date of the reduction, subject to adjustments provided for in the agreement and assuming the expected gas consumption amount; (b) Rotem undertook to continue to consume all the gas required for its power plant from Tamar (including quantities exceeding the minimum quantities) up to the completion date of the test-run of the Karish and Tanin Reservoirs (hereinafter - the "Karish Reservoir"), except for a limited consumption of gas during the test-run period of the Karish Reservoir.

Agreement between the Tamar Group and Hadera

On June 30, 2015, the gas sale and purchase agreement with Tamar Group that was signed on January 25, 2012 with Infinya Mills (hereinafter – the "Agreement between Tamar and Hadera") was assigned to Hadera. The price of gas is denominated in USD, is linked to the weighted average of the generation component published by the Israeli Electricity Authority. Moreover, the natural gas price formula set in the Agreement between Tamar and Hadera is subject to a minimum price.

Hadera was granted an option to reduce the daily contractual quantity to a certain rate, such that the minimum consumption from Tamar will constitute 50% of the average own consumption of gas from Tamar in the three years that preceded the option exercise notice, subject to adjustments stipulated in the agreement. If the daily contractual quantity is decreased, the annual quantity and total quantity will be decreased accordingly. The option may be exercised in the period commencing on the fifth year after the supply commencement date from the Tamar Reservoir or in January 2018 (whichever is later) and up to the end of the seventh year after the supply commencement date or until the end of 2020 (whichever is later). The terms and conditions of the agreement set forth that the quantity of gas purchased will increase upon construction of the Hadera Power Plant.

In November 2019, an amendment to the agreement between Tamar and Hadera was signed. The material points of the agreement are as follows: (a) The option granted to Hadera to reduce the minimum annual contractual quantity to a quantity equal to 50% of the average annual own consumption of gas from Tamar in the three years that preceded the option exercise notice was changed, such that after exercise of the option it is expected that the minimum annual contractual quantity in Hadera will be reduced to 30% of the average annual own consumption of gas from Tamar in the three years that preceded the option exercise notice, subject to adjustments provided for in the agreement and assuming the expected gas consumption amount; (b) Hadera undertook to continue to consume all the gas required for its power plant from Tamar (including quantities exceeding the minimum quantities) up to the completion date of the test-run of the Karish Reservoir, except for a limited consumption of gas during the test-run period of the Karish Reservoir; (c) Extension of the time frame for provision of the exercise notice regarding the reduction option by Hadera from the end of 2020 to the end of 2022 and shortening the notice period for reduction of the quantities in the Hadera agreement from 12 months to 8 months. In January 2020, Hadera was informed of the resolution of the Competition Commissioner, whereby Hadera is exempt from seeking cartel clearance from the Competition Court for the amendment of the agreement; the exemption was granted subject to the same terms and conditions for exemption which applied to the original agreement. In March 2020, all the conditions precedent provided in the amendment to the agreement between Tamar and Hadera were fulfilled. In February 2020, and in accordance with the amendment signed between the parties, as stated in this section, the Company gave notice of the date from which the average quantity will be calculated for purposes of calculating the reduced quantities.

In addition, in September 2016, Hadera and Tamar Group engaged in an additional agreement for the sale and purchase of gas (hereinafter - the "Additional Gas Agreement") for the supply of additional volumes of natural gas (in addition to the original Gas Agreement), from commencement of operation of the power plant. The agreement shall be in effect for up to 15 years from January 2019 or until the Total Contractual Quantity has been consumed – whichever is first. The price of gas is denominated in USD, is linked to the weighted average of the generation component published by the Israeli Electricity Authority and includes a minimum price. The supply of the gas under the Agreement, will be on an interruptible basis; meaning Tamar Group will not be responsible for failure in supplying the demand for gas. At the same time, Tamar Group may decide over the course of the engagement, at its discretion, that the supply will be on a non-interruptible basis, which will require it to supply the amounts requested by Hadera (provided the change occurs after January 1, 2019). In the event of such a resolution and as of the date of the Change in Supply Mechanism, Hadera will be subject to a take or pay liability regarding a certain annual quantity of natural gas, in accordance with the mechanism set in the agreement. It is noted that the contractual amount will be reduced at the end of the reduction notice period.

As a result of the tariff update as described in Note 28B, as from March 2022, Hadera pays above the minimum gas price. If a further tariff update will come into force, as described in Note 28B, Hadera will pay a price lower than the minimum gas price.

G. Agreements for supply of natural gas (cont.)

The Energean Agreements

In December 2017, Rotem, Hadera, Israel Chemicals Ltd. and Bazan Ltd. (hereinafter – the "Group Companies") engaged in agreements with Energean Israel Ltd. (hereinafter – "Energean"), which has holdings in the Karish Reservoir, for the purchase natural gas (subject to the fulfillment of preconditions). The agreements with respect to each of the Group Companies are separate and independent. According to the terms of the agreements, the total quantities of natural gas that Rotem and Hadera are expected to purchase are 5.3 BCM and 3.7 BCM, respectively, for the entire supply period (hereinafter – the "Total Contractual Quantity"). The agreement includes, among other things, a take or pay mechanism, whereby Rotem and Hadera will undertake to pay for a minimum quantity of natural gas even if they have not used it.

Furthermore, the agreements include additional provisions and arrangements customary in agreements for the purchase of natural gas, including with regard to maintenance, gas quality, limitation of liability, buyer and seller collateral, assignments and liens, dispute resolution and operating mechanisms.

The agreements will remain in effect until the earlier of - 15 years or until the Total Contractual Quantity will have been supplied by Energean to each of the subsidiaries (Rotem and Hadera) (hereinafter – the "First Agreement Period"), where the commencement date of the agreement will be on the commercial operation date of Energean, and the contractual obligations will enter into effect no later than 12 months from the date Energean pumps its first gas. Under each of the Agreements, if, after 14 years from the date the agreement took effect the contracting company has not taken a volume equivalent to 90% of the Total Contractual Quantity, subject to prior notice, each party may extend the agreement for an additional period which will begin at the end of 15 years from the date the agreement took effect, until the earlier of: (1) full consumption of the Total Contractual Quantity; or (2) for an additional 3 years from the end of the first agreement period.

Regarding the consideration, the price of the natural gas is denominated in USD and is based on an agreed formula, which is linked to the Electricity Generation Component and includes a minimum price. The financial amount of the agreements may reach USD 0.7 billion for Rotem and USD 0.5 billion for Hadera (assuming they consume the maximum quantity under the agreements, and in accordance with the gas price formula as at the date of this report), and depends mainly on the Electricity Generation Component and the gas consumption quantity.

In November 2019, an amendment was signed to the Rotem's natural gas supply agreement with Energean, whereby the rate of gas consumption was accelerated, such that Rotem's daily and annual contractual gas consumption from Energean was increased by 50%, with no change in the Total Contractual Quantity being purchased from Energean. Accordingly, the agreement period was updated to the earlier of 10 years or until the Total Contractual Quantity will have been consumed (in lieu of the earlier of 15 years or until the Total Contractual Quantity will have been consumed).

It should be noted that the agreements include circumstances under which each party to the agreements will be entitled to terminate the relevant agreement before the end of the First Agreement Period (or the additional agreement period), including cases of prolonged suspension of supply, compromised collateral, and more.

The arrangements under the amendment to the Rotem agreement with Energean and the amendment to the agreements of Rotem and Hadera with the Tamar Group from November 2019, as outlined in this note, are intended to allow them to reduce of the gas quantities being purchased under the agreements with the Tamar Group and to increase the quantities being purchased under the terms and conditions of the agreements with Energean, with the goal of reducing the Company's weighted gas price. The scope of the aggregate annual take or pay (TOP) obligation of Rotem and Hadera (based on all of their gas contracts) is not expected to increase. Nonetheless, as a practical outcome of the growing consumption under the Energean agreement, with respect to Rotem the aggregate annual TOP liability amount will increase under all of its gas contracts. It is noted that the said TOP liability is lower than Rotem's expected consumption.

It is noted that Hadera entered into an agreement with an unrelated third party (subject to conditions precedent) for the sale of surplus quantities of gas to be supplied to it under the agreement between Energean and Hadera; as from January 2022, the said agreement was revoked.

As reported in its immediate reports, Energean believes that "first gas" from the Karish reservoir is expected in the third quarter of 2022. Energean's position, as delivered to the Company, is that the delay in the supply of gas from the Karish reservoir is caused by force majeure events in accordance with the agreements. The Company rejected the contentions that a force majeure event is involved pursuant to the agreements.

In this context, it should be noted that the agreements with Energean provide limited compensation for such delays; the amount of compensation as per the said agreements depends on the reason for the delay, and the compensation cap is lower if the delay is caused by a force majeure event (in accordance with the terms and conditions stipulated in the Agreement). Nonetheless, the damages that will be caused to the Company due to a delay could well exceed the amount of the said compensation.

G. Agreements for supply of natural gas (cont.)

The Energean Agreements (cont.)

In the reporting period, Rotem and to Hadera were paid the reduced compensation amount in respect of the delay in the supply of gas from the Karish reservoir - NIS 9 million (approximately USD 3 million) and NIS 7 million (approximately USD 2 million), respectively. The said amount was offset from the cost of goods sold. During the reporting period, Rotem and Hadera informed Energean that they reject its claims of a force majeure and that they were retaining their rights in accordance with their agreements with Energean.

H. In November 2017, a petition was filed with the Tel Aviv-Jaffa District Court for certification of a derivative claim on behalf of Oil Refineries Ltd. (hereinafter – "Bazan" and the "Petition", respectively). The Petition is based on the petitioner's claim that the engagement in the electricity purchase transaction between Bazan and Rotem is an extraordinary interested party transaction that did not receive the approval of the general meeting of Bazan shareholders on the relevant dates. The respondents to the Petition include Bazan, Rotem, Israel Corporation Ltd. and members of Bazan's board of directors at the time of the engagement in the electricity purchase transaction. The remedies sought include a mandatory injunction and financial remedies.

In July 2018, the Company submitted its response to the motion. The Company rejected the contentions of the motion and requested in limine dismissal of the motion. Bazan's motion for in limine dismissal was denied. It should be noted that negotiations are being held for entering into a compromise agreement that will settle a lawsuit which - as of the financial statements approval date - is subject to signing the agreement and obtaining approvals.

I. In January 2018, a petition was filed with the District Court in Tel Aviv-Jaffa for certification of a derivative claim (hereinafter in this Section – the "Petition") by a shareholder in Bazan against former and current directors of Bazan, Israel Chemicals Ltd., the Company, Rotem and Hadera, and against Israel Corporation Ltd and its controlling shareholders, regarding gas purchase transactions of the forgoing Group Companies, including the intercompany aspects, in a transaction of the Companies for the purchase of natural gas from Tamar Group (for further information see Note 28G), in a transaction of the Companies for the purchase of natural gas from Energean (for further information see Note 28G), and a transaction for sale of surplus gas of Bazan.

In August 2018, the Company submitted its response to the motion. The Company rejected the allegations in the motion and requested in limine dismissal of the motion. Evidentiary hearings were held in the second half of 2021, after which an order was issued for summations and dates were set for submitting them in the second and third quarters of 2022.

The Company believes that, based on the opinion of its legal counsel, it is more likely than not that the request will not be accepted by the court and, accordingly, no provision was recorded in the financial statements in respect of the motion.

J. In February 2020, the Electricity Authority published the resolution adopted at Meeting 573 held on January 27, 2020, with regard to the amendment of criteria relating to deviations from the consumption plans (hereinafter – the "Resolution"). Pursuant to the resolution, a supplier may not sell more to its consumers than the total capacity that is the object of all the engagements it has entered into with independent generation license holders. Actual energy consumption at a rate higher than 3% of the installed capacity allocated to the supplier will trigger payment of an annual tariff reflecting the annual cost of the capacity the supplier used as a result of the deviation, as detailed in the resolution (hereinafter - "Annual Payment Due to Deviation from the Capacity"). In addition, the resolution provides a netting mechanism due to a deviation from the daily consumption plan (surpluses and deficiencies), that will apply beside the Annual Payment Due to a Deviation from the Capacity. The decision applies to Hadera and is expected to apply to Rotem after the complementary arrangements are set. Note that the resolution might affect the Company unfavorably. As at the date of approval of the financial statements, the extent of the resolution's effect on Rotem is uncertain, and it depends, among other things, on the final supplementary arrangements to be determined.

During the reporting period, Noga notified Rotem that, according to its approach, Rotem's sale of energy to end-consumers in excess of the power plant's generation capacity deviates from the provisions of the power purchase agreement between it and the IEC (as stated in Note 28C. Rotem's position regarding the power purchase agreement is different, and in any event, according to Rotem's position, the matter is expected to be impacted by complementary arrangements that are to be determined further to the resolution of the Israeli Electricity Authority.

In May 2021, the Israeli Electricity Authority published a hearing on the amendment of the criteria for applying the market model to existing independent producers (including Rotem, subject to complementary arrangements and Hadera) and to renewable energies, according to which the applicability of market rules on different types of manufacturers is regulated and lateral amendments to market rules are proposed. The purpose of the hearing is to integrate existing manufacturers. The Israel Electricity Authority states in the hearing that at this stage, it is proposed to exclude the Rotem generation unit, which is subject to special regulation requiring adjustments in several aspects, from the scope of the decision, and that the Israeli Electricity Authority is currently assessing all the required amendments to the regulation applicable to this unit for the sake of regulatory uniformity between the unit and the other independent generation units, and it will also consider applying the market rules to it. The effect of the hearing on Rotem in respect of the market model is subject to the final arrangements to be determined for Rotem (to the extent that they are determined).

K. As at the date of approval of the financial statements, the Company engaged in several agreements under which it sets up and operates energy generation and storage facilities on the consumers' premises using gas-powered electricity generation installations, photovoltaic (solar) installations, and setting up electricity storage installations (hereinafter - the "Generation Facilities"), totaling approximately 102 MW as of the financial statements approval date, and signed PPAs for the supply and sale of energy to such consumers (including customers of the Group) from other resources of the Group. The Company will sell the consumers electricity produced by the generation facilities for a period of 15 to 20 years from the commercial operation date of the generation facilities. Subject to an early termination option, as set forth in the agreements with each consumer. It is noted that construction of the generation facilities in the vicinity of the consumer permits supply of energy while saving on grid resources and contributing to the energy security of the consumers. In general, most of the agreements with consumers are based on a discount on the generation component and a savings on the grid tariff. The planned commercial operation dates vary between agreements, and in some agreements, they depend on or are conditioned on fulfillment of various conditions in the project's life (such as permits, connection to the natural gas distribution network or to the electrical grid). It is clarified that separate, independent agreements are involved, having different scopes and different terms and conditions that are agreed to with each consumer, which may enter into effect at different rates and times.

The undertakings with each of the said consumers includes commitments of the Company in connection with construction and operation of the generation facilities, including timetables for execution, connection of the facilities to the regional natural gas distribution network and responsibility for certain results. As of the approval date of the financial statements, the Company signed construction agreements and agreements covering supply and maintenance of motors for the generation facilities, with a total capacity of 58 MW. As part of implementation of the abovementioned projects, the Company signed a master agreement that allows it to purchase motors for the generation facilities. It is noted that, as part of the undertakings with the consumers, as stated above, most of the consumers are concurrently bound by power purchase agreements with Rotem or Hadera.

It is noted that the binding agreements and the execution thereof are subject to receipt of approvals and/or consents of third parties, to the extent required, including, connection of the consumer to the natural gas distribution infrastructure (in a case where the consumer is not connected), receipt of approval of IEC for connection of the facility to the electrical grid, issuance of a building permit for the facility, and where necessary even preparation of a detailed statutory plan (Urban Building Plan) for this purpose.

As of the approval date of the financial statements, most of these projects are in different licensing stages (planning and permits or construction), and as for the projects for which permits were not obtained at all yet, their completion, construction, and operation are subject to receipt of permits.

Further to the above, the Company is seeking to sign further agreements with potential consumers (including the Group's customers), including for construction and operation of an energy generation facility on the consumer's premises, along with arrangements for supply and sale of energy to the consumers.

L. In February 2021 the Israeli Electricity Authority reached a resolution on regulation for suppliers that do not have means of production (hereinafter - "Virtual Supply"), and amended the criteria applicable to existing suppliers, so as to open to new suppliers the supply segment in the electricity sector, and to gradually supply to household consumers. As part of the resolution, the Israeli Electricity Authority sets criteria and tariffs that will apply to suppliers who do not have means of production, and which allow them to purchase energy for their customers from the System Operator, subject to receipt of supply license and the provision of a collateral. Pricing will be based on the SMP (half-hour system marginal price) mechanism and components which are affected, among other things, by peak-time consumption. Later on, in July 2021, the Company received a Virtual Supply License. Further to the above, as from September 2021, the Company attributed 110 MW in receivables to virtual supply.

M. Management agreements

The CPV Group provides asset management services to power plants in the United States using renewable energy and conventional energy (gas powered) – this being in an overall scope, as at the Report date, of 7,366 MW (approximately 5,455 MW for projects in which it holds equity rights, as stated in Note 7 above, and approximately 1,811 MW for projects for third parties) by means of signing asset management agreements. In addition to providing general asset management services, CPV Group is also engaged in provision of certain energy management services totaling, as at the Report date, 4,235 MW (3,325 MW for projects in which it holds equity rights, and 810 MW for projects for third parties) by means of signing energy management agreements. The two categories of management agreements are usually for short/medium periods. As at the approval date of the financial statements, the average period of all management agreements is. As at the approval date of the financial statements, the average period of all management agreements is between 3.5 and 6.8 years.

The asset management services and energy management services are provided in exchange for a fixed annual fee, an incentive-based payment, and reimbursement of certain expenses, including expenses related to construction management services (work hours of the construction workers, expenses incurred by third parties). Asset management services include: project management and compliance with regulations; supervision over project operation; project debt and credit management; management of agreements, licenses and contractual obligations; management of budgets and financial matters; and project insurance. Energy management services include more specific functions to address ISO/RTO, including: assessment and consultation for RTO/ISO standards, agreements with RTOs/ISOs, RTO/ISO project coordination, and preparation of periodic regulatory reports.

  • N. In May 2021, Maple Hill entered into operating and maintenance agreement with a third party service provider in connection with services relating to the operation and maintenance of the Maple Hill solar facility. The agreement is for an initial 3-year term starting on May 11 2021 and ending on December 31 of the third year from the date on which the service provider actually started rendering the services. The term of the agreement may be renewed for periods of two years each, unless one of the parties delivers a notice of non-renewal in accordance with the terms of the agreement. Maple Hill will pay a fixed consideration paid on a monthly basis over the term of the agreement.
  • O. In April 2021, the CPV Group signed an agreement for the purchase of A rights in Keenan from the tax equity partner in consideration for NIS 82 million (app. USD 25 million); the rights were classified into other long-term liabilities until the purchase date. As part of the purchase of the said rights, the outstanding financial liability to the tax equity partner was repurchased at the total amount of NIS 44 million (USD 13 million), and the subsidiary's tax status was changed. As a result, a NIS 39 million (USD 12 million) loss was recognized in the line item "loss on settlement of financial liabilities, net". As from the date of the purchase described above, and as of the financial statements date, CPV Group holds all rights in Keenan, and is its only controlling shareholder.
  • P. In October 2021, the CPV Group entered into agreements to acquire the full rights in two solar projects under development, with a total capacity of approximately 458 MWdc in Kentucky (approximately 98 MWdc) and Illinois (approximately 360 MWdc) in the United States (hereinafter - the "Acquisition" and the "Projects", respectively). While signing of the agreements, the Acquisition of the rights in the Projects was completed by the CPV Group.

In exchange for the Acquisition of the rights in the projects, on the Acquisition completion date, the seller was paid a total of approximately USD 9 million; the transaction includes a contingent consideration, which - together with the amount paid on completion date - may reach approximately USD 46 million. The contingent consideration will be paid in installments, subject to meeting the Projects' development milestones. Upon the Projects' acquisition, the Projects were added to the CPV Group's solar-powered projects under development.

As of report date, the projects carry land rights and have submitted grid connection requests; the CPV Group estimates that, subject to the completion of the various development phases - including securing the funds needed for construction, the Projects are expected to reach the construction phase in the second half of 2023. The projects are in the PJM market.

Q. In March 2022, CPV Group entered into a master agreement for the purchase of solar panels with a total capacity of 530 MW (hereinafter - the "Agreement"). Pursuant to the agreement, the solar panels will be supplied in accordance with orders to be placed with the supplier by the CPV Group in 2023-2024. The CPV Group has an early termination right in accordance with the dates set, by paying a proportionate share of the consideration payable to the supplier, as derived from the early repayment date. Furthermore, the agreement sets, among other things, provisions regarding the panels' quantities and model and the manner of their supply, as well as provisions regarding the termination of the agreement.

The overall consideration in respect of the agreement may amount to USD 185 million (assuming that the maximum quantity specified in the agreement will be purchased). The agreement is intended to serve CPV Group solar projects under development, in view of, among other things, increased demand for solar panels, which impact panel prices and the time tables for their supply.

R. As at the date of approval of the financial statements, the Company and Veridis are conducting negotiations, during the course of which the parties reached understandings regarding the engagement in a transaction based on the following principles:

As at the approval date of the financial statements, Veridis holds 20% of the issued and paid up share capital of Rotem and Rotem 2 (hereinafter - the "Rotem Companies"). The Company holds (directly or indirectly) the remaining issued and paid up share capital (80%) of the Rotem Companies.

Under the outline discussed between the parties and for the purpose of its implementation, the Company will establish a new subsidiary (hereinafter - the "New Company"), which will coordinate all the Company's activities relating to the production and supply of electricity and energy in Israel. For this purpose, the Company will transfer to the New Company, among other things, the shares of OPC. Israel, the holdings in Rotem 2, in Gnrgy, and also other activities in the area of activity in Israel, such as energy generation facilities on consumer's premises, virtual electricity supply activity, and more (hereinafter - the "Transferred Activities").

The New Company will allot 20% of the issued and paid up share capital of the New Company to Veridis, and in return Veridis will transfer to the New Company its shares in the Rotem Companies and an amount of NIS 425 million, so that at the date of closing of the transaction, the Company will hold 80% of the issued and paid up share capital of the New Company and Veridis will hold the remaining 20% of the issued and paid up share capital of the New Company. The New Company will hold 100% of the shares of Rotem Companies and the other operations that will be transferred as described above.

It should be emphasized, that as of the report's date, the engagement in a binding agreement between the parties is subject to investigations, formulation of detailed agreements and arrangements and approval by the parties' organs; furthermore, the completion of the said transaction (if it is, indeed, signed) is expected to be subject to the fulfillment of conditions precedent, and to the obtaining of approvals as agreed between the parties in relation to the transaction, including with respect of the aforesaid restructuring, and in accordance with the law and the circumstances of the matter.