Annual Report • Nov 17, 2023
Annual Report
Open in ViewerOpens in native device viewer
Washington, D.C. 20549
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 OF THE SECURITIES EXCHANGE ACT OF 1934
November 16, 2023
Commission File Number 001-36761
1 Temasek Avenue #37-02B Millenia Tower Singapore 039192 (Address of principal executive offices)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F ☒ Form 40-F ☐
EXHIBITS 99.1 AND 99.2 TO THIS REPORT ON FORM 6-K ARE INCORPORATED BY REFERENCE IN THE REGISTRATION STATEMENT ON FORM S-8 (FILE NO. 333-201716) OF KENON HOLDINGS LTD. AND IN THE PROSPECTUSES RELATING TO SUCH REGISTRATION STATEMENT.
On November 16, 2023, Kenon Holdings Ltd.'s subsidiary OPC Energy Ltd. ("OPC") reported to the Israeli Securities Authority and the Tel Aviv Stock Exchange its periodic report (in Hebrew) for the nine-month and three-month periods ended September 30, 2023 ("OPC's Periodic Report"). English convenience translations of the (i) Report of the Board of Directors for the Nine-Month and Three-Month Periods ended September 30, 2023 and (ii) Unaudited Condensed Consolidated Interim Financial Statements as at September 30, 2023, each as published in OPC's Periodic Report are furnished as Exhibits 99.1 and 99.2, respectively, to this Report on Form 6-K. In the event of a discrepancy between the Hebrew and English versions, the Hebrew version shall prevail.
This Report on Form 6-K, including the exhibits hereto, includes forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These statements include statements with respect to OPC's business strategy, statements relating to the impact of the ongoing war between Israel and Hamas and the ongoing hostilities between Israel and Hezbollah, including the impact on OPC's business, including electricity demand, prices of energy, electricity, natural gas, electricity tariffs, the impact of the war on the electricity sector in Israel, the impact on exchange rates, statements relating to compensation for producers for the use of diesel fuel, statements relating to OPC's and CPV's construction and development projects including expected start of construction and completion or operation dates, expected increase in revenue, estimated investment in projects, and characteristics (e.g., capacity and technology) and stage of development of such projects, including expected commercial operation date ("COD"), estimated construction cost, financing of projects and statements with respect to CPV's development pipeline and backlog and projects including the description of projects in various stages of developments and statements relating to expectations about these projects, statements and plans with respect to the construction and financing of projects and operation of facilities for the generation of energy on the consumers' premises and arrangements for supply and sale of energy to consumers, the OPC-Hadera power plant, OPC's plans and expectations regarding regulatory clearances and approvals for its projects, and the technologies intended to be used therein, the Electricity Authority tariffs, expected timing and impact of maintenance, renovation and construction work on OPC's power plants, including statements relating to the impact and duration of OPC-Hadera's steam turbine shutdown and the related maintenance plans, the expected interpretation and impact of regulations on OPC and its subsidiaries, OPC's expansion plans and goals, OPC's adoption of certain accounting standards and the expected effects of those standards on OPC's results, statements relating to the Rogue's Wind project, and statements relating to potential expansion activities by OPC outside of Israel and other non-historical statements. These statements are based on OPC Energy Ltd. management's current expectations or beliefs, and are subject to uncertainty and changes in circumstances. These forward-looking statements are subject to a number of risks and uncertainties which could cause the actual results to differ materially from those indicated in such forward-looking statements. Such risks include risks relating to potential failure to obtain regulatory or other approvals for projects or to meet the required conditions and milestones for development of its projects, the risk that OPC (including CPV) may fail to develop or complete projects or any other planned transactions including dispositions or acquisitions, as planned (including as to the actual cost and characteristics of projects) or at all, risks relating to potential new regulations or existing regulations having different interpretations or impacts than expected, the risk that changes to the accounting standards may have an impact on OPC's results, risks relating to changes to the updated Electricity Authority tariffs and the potential impact on OPC's results, risks relating to changes in customs duty on imported solar panels and its impact on CPV's results, risks relating to electricity prices in the U.S. where CPV operates and the impact of hedging arrangements of CPV, risks relating to the impact of the war including potential physical impact on OPC's facilities, the impact of the military-reserve call up on OPC's personnel, the impact of gas prices and exchange rates and tariffs and the impact of the war on the economy and electricity sector in Israel, risks relating to cybersecurity attacks, the impact on borrowing costs and availability of financing, risks relating to liquidity and ability to comply with covenants in debt instruments and potential impact of the war on the foregoing, and other risks and factors, including those risks set forth under the heading "Risk Factors" in Kenon's most recent Annual Report on Form 20-F filed with the SEC and other filings. Except as required by law, Kenon undertakes no obligation to update these forward-looking statements, whether as a result of new information, future events, or otherwise.
*English convenience translation from Hebrew original document.
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Name: Robert L. Rosen
Title: Chief Executive Officer
Date: November 16, 2023 By: /s/ Robert L. Rosen
The Board of Directors of OPC Energy Ltd. (hereinafter – "the Company") is pleased to present herein the Report of the Board of Directors regarding the activities of the Company and its investee companies (hereinafter together – "the Group"), as at September 30, 2023 and for the nine-month and three-month periods then ended. The nine-month period ended on September 30, 2023 will be referred to as – "the Period of the Report".
Except for the data reviewed in the Company's consolidated financial statements as at September 30, 2023 (hereinafter – "the Interim Statements") that is included in this report below, the data appearing in the Report of the Board of Directors has not been audited or reviewed by the Company's auditing CPAs.
This Report of the Board of Directors is submitted on the assumption that the Interim Statements and all the sections of the Company's Periodic Report for 2022, which was published on March 19, 2023 (Reference No.: 2023-01-028212) ("the Periodic Report for 2022") are known to the reader and references to the Company's reports include the information stated therein by means of reference.
Highlights of the results (in millions of shekels)
| For the Nine Months Ended September 30 |
For the | ||||||
|---|---|---|---|---|---|---|---|
| Three Months Ended September 30 |
|||||||
| 2023 | 2022 | % | 2023 | 2022 | % | ||
| Adjusted EBITDA* after proportionate | |||||||
| consolidation – consolidated | 813 | 599 | 36% | 379 | 274 | 38% | |
| Adjusted EBITDA* – Israel | 445 | 265 | 68% | 235 | 119 | 97% | |
| Adjusted EBITDA* after proportionate | |||||||
| consolidation – U.S. | 388 | 351 | 11% | 151 | 161 | (6)% | |
| Adjusted EBITDA* renewable energies – U.S. | 17 | 22 | (23)% | (2) | 2 | -4M | |
| Adjusted EBITDA* after proportionate | |||||||
| consolidation energy transition – U.S. | 437 | 389 | 12% | 169 | 181 | (7)% | |
| Net income | 140 | 180 | (22)% | 101 | 108 | (6)% | |
| Adjusted income* | 166 | 120 | 38% | 100 | 90 | 11% |
* Adjusted EBITDA, EBITDA after adjusted proportionate consolidation and adjusted net income – for definitions and the manner of the calculation – see Section 4B below.
Main developments in the third quarter and thereafter
Continuity of activities of the power plants – from the beginning of the War and up to the approval date of the report the power plants are continuing to operate and there has been no significant change in the scope of generation of the electricity compared with the situation existing prior to the outbreak of the War.
Continuity of supply of natural gas to the power plants – from the beginning of the War and up to the approval date of the report the power plants are acquiring natural gas in a scope that is sufficient for full generation activities and at a price that is not significantly different than the price in the ordinary course of business.
Sales of electricity to the Company's customers – from the beginning of the War and up to the approval date of the report no significant impact is discernable on the level of demand on the part of the Company's customers.
War costs of Israel Electric Company – based on a hearing published by the Electricity Authority, the Authority designated surplus revenues from sale of the Eshkol power plant for coverage of costs of the war.
Liquidity – proximate to the approval date of the report, the Group has cash balances in the Group's headquarters and in Israel in the amount of about NIS 694 million, and unutilized secured credit frameworks in the amount of about NIS 540 million.
The Swords of Iron War2
1 The Executive Summary below is presented solely for convenience and it is not a substitute for reading the full detail (including with reference to the matters referred to in the Summary) as stated in this report with all its parts (including warnings relating to "forward-looking" information as it is defined in the Securities Law, definitions or explanations with respect to the indices for measurement of the results and including the information included by means of reference, as applicable). This Summary includes estimates, plans and assessment of the Company, which constitute "forward-looking" information regarding which there is no certainty it will materialize and the readers are directed to the detail presented in this report below. 2 For details and more information – see Section 3.1C below. That stated is based solely on the Company's estimates as at the approval date of the report. Continuation of the War or escalation of the security situation in Israel could have an impact on the Group, as noted in this report below and, accordingly there is no certainty regarding the impacts of the War.
| Main developments in the third quarter (Cont.) | |||||||
|---|---|---|---|---|---|---|---|
| Israel | Doubling of the EBITDA in Israel in the third quarter compared with last year | ||||||
| Operating power plants (Rotem and Hadera) – additional EBITDA of about NIS 82 million, which constitutes an increase of about 66% compared (1) with the corresponding quarter last year, of which about NIS 63 million due to a change in the hourly demand brackets. |
|||||||
| Power plants that started commercial operation (Zomet and Gat) – additional EBITDA of about NIS 37 million. (2) |
|||||||
| Israel Land Authority tenders – win in a land tender of Israel Lands Authority for a consideration of about NIS 484 million, for rights in land involving construction of facilities for solar generation of electricity, with a capacity of about 245 megawatts, together with storage, with a capacity of about 1,375 megawatts/hour. In the period of the report, 20% of the consideration was paid and an authorization agreement was signed with Israel Lands Authority. The project is expected to continue development on the National Infrastructures Committee. |
|||||||
| U.S. | EBITDA in the U.S. of NIS 151 million in the quarter – despite the sharp drop in in the natural gas prices, the electricity margins declined at a more moderate rate. |
||||||
| Commercial operation of the Three Rivers project with a scope of 1,258 megawatts – the power plant commenced its operations in July 2023 and joined the fleet of CPV's modern power plants (CPV holds a 10% interest in the power plant). |
|||||||
| A financing agreement was signed for construction of projects in the renewable energy area – in the aggregate scope of about \$370 million. | |||||||
| The commitment framework for investment of the partners in the CPV Group was increased – by the amount of \$100 million. | |||||||
| Completion of construction of the Maple Hill solar project in the scope of 126 megawatts – construction of the project was completed proximate to the approval date of the report. The full amount of the consideration for the investment of the tax partner has not yet been received. |
|||||||
| Group headquarters | Reconfirmation of a credit rating for the Company and its debentures of 'ilA–' and an update of the rating outlook to negative by S&P Maalot. | ||||||
| Renewal of binding credit frameworks – in the amount of NIS 550 million and LC frameworks for the CPV Group in the amount of NIS 365 million, which are valid up to the second half of 2024. |
United States

Israel
(*) For additional information – see Section 6 below.
The Company is a public company the securities of which are listed for trade on the Tel Aviv Stock Exchange Ltd. (hereinafter – "the Stock Exchange").
For details regarding the Group's activity segments in the period of the report and the update thereto commencing from the end of 2022 – see Section 2 of the Report of the Board of Directors for 2022 ("the Report of the Board of Directors for 2022").
A. Macro-economic environment (particularly changes in inflation and interest) – for details regarding significant changes in the macro-economic environment in Israel and in the U.S., mainly during 2023 and subsequent to the period of the report due to the outbreak of the Swords of Iron War in Israel, as well as due to the impact of the business environment on the activities of the Group companies, among other things, the prices of energy, electricity and natural gas, tariffs in the Israeli electricity sector, the costs of executing construction projects, financing expenses, currency exchange rates and the like – see Sections 3.1C and 12 below.
Set forth below is data with reference to the Consumer Price Index (CPI) in Israel and in the U.S. and the interest rates of Bank of Israel and the Fed and the currency exchange rate:
| Bank of Israel |
Federal | NIS/\$ | |||
|---|---|---|---|---|---|
| Israeli | U.S. | interest | interest | exchange | |
| CPI | CPI | rate | rate | rate | |
| Proximate to the approval | |||||
| date of the report* | 111.1 | 307.8 | 4.75% | 5.25%–5.50% | 3.833 |
| At September 30, 2023 | 111.2 | 307.0 | 4.75% | 5.25%–5.50% | 3.824 |
| At December 31, 2022 | 107.7 | 297.7 | 3.25% | 4.25%–4.50% | 3.519 |
| At September 30, 2022 | 106.8 | 296.2 | 2.0% | 3.00%–3.25% | 3.543 |
| Change: | |||||
| January–September 2023 | 3.3% | 3.1% | 1.5% | 1.00% | 8.7% |
| January–September 2022 | 4.4% | 6.6% | 1.9% | 3.00% | 13.9% |
| June–September 2023 | 0.8% | 1.0% | - | 0.25% | 3.4% |
| June–September 2022 | 1.2% | 1.3% | 1.25% | 1.50% | 1.2% |
| 2022 | 5.3% | 7.1% | 3.15% | 4.25% | 13.2% |
* November 14, 2023.
In January 2023, the Government began advancement of a plan for making changes in Israel's judicial system. Pursuant to the publications in the media, the changes could impact the strength of the Israeli economy, adversely impact investments in the Israeli economy and trigger a removal of money and investments from Israel, increase the costs of the financing sources in Israel, cause of weakening of the exchange rate of the shekel against other currencies (including the dollar) and harm the activities of the business sector. To the extent the above estimates materialize, wholly or partly, this could negatively impact the financial position and activities of the Company customers and suppliers and could also impact the availability and cost of the capital and financing sources that are required by the Company, mainly for purposes of supporting its continued business growth.
B. The Coronavirus and broad global impacts on raw-material prices and the supply chain – for details regarding the impacts of the global trends that started against the background of the Coronavirus crisis and the Company's estimate regarding the continuation and scope thereof on the Group's activities, if any – see Section 3.1B to the Report of the Board of Directors for 2022.
C. The Iron Swords War in Israel – subsequent to the period of the report, on October 7, 2023, the Iron Swords War (hereinafter – "the War") broke out in Israel – this coming as a result of a deadly attack by the Hamas terrorist organization on communities skirting in the Gaza Strip in the southern part of Israel. Ultimately, the War led to consequences and restrictions with respect to the Israeli economy, including, among others, a curtailment of business activities, a significant call-up of military reserves, limitations on gatherings in work places and public areas, restrictions on carrying on the operation of schools in the educational system, and others. In addition, the impacts of the War include considerable uncertainty regarding its ramifications with respect to macro-economic factors in Israel as well as on the State of Israel's financial position, including possible unfavorable changes of the credit rating of Israel and Israeli financial institutions (particularly the Israeli banking system), sharp fluctuations in the currency exchange rates, particularly a strengthening of the dollar exchange rate, and instability in the Israeli capital market (including wider trading fluctuations, falling security prices, liquidity issues and limited accessibility).
Set forth below is an overview of the main impacts of the War on the Group's business activities in Israel since the onset thereof and based on the facts and circumstances existing as at the approval of the report:
3 As is usual in policies of this type in Israel, the insurance coverage is subject to exceptions, self-participation (deductible) and conditions. Accordingly, there is no certainty that the insurance coverage will compensate the Company for the harm it suffers (in whole or in part) in a case of an attack on its facilities (if any). Furthermore, there is no certainty regarding the renewal terms of the policies upon their expiration. For details regarding risk factors relating to insurance – see Section 19.2.10 of Part A of the Periodic Report for 2022.

It is further noted that the activities of the Group's power plants in Israel are subject to the directives of the Defense and Cyber Unit in the Ministry of Energy regarding cyber defense matters in power plants (for additional information – see Section 16 of Part A of the Periodic Report for 2022). Moreover, the Group employs a multi-faceted approach with respect to protection of its generation facilities against cyber-attacks, particularly protections against outside intrusions (in general, an outside connection to the power plants in not permitted), protections against internal attackers that have access to the control networks of the power plants (suppliers, technicians, etc.) and creation of real-time capabilities for monitoring and identifying cyber events. Since the beginning of the War, the Group is making the required adjustments on an ongoing basis in order to minimize the exposure to cyber risks.
4 A shortage or interruption of the supply of natural gas could have an adverse impact, even a significant one, on the Group's activities and its results. Regarding the risk factor involving interruptions of the supply of natural gas – see Section 19.2.2 of Part A of the Periodic Report for 2022.
It is noted that Rotem, Hadera and Zomet power plants are "two-fuels" generators of electricity (that is, they have the capability of operating using both natural gas and diesel oil, subject to the required adjustments5). As at the approval date of the report, the plants have seen to an inventory of diesel oil that is at least in conformance with the terms of the license of each plant. It is further noted that the Hadera and Zomet power plants are subject to Standard 1256 , which covers a case of shortage of natural gas in the economy and provides, among other things, the authority of the System Operator to provide directives for use of diesel oil in the electricity sector in hours where there is a shortage of gas and a generator that operates using diesel oil based on the instructions of the System Operator, as stated, will be compensation for the difference between the generation cost using diesel oil and the generation cost using gas recognized by the generator (for additional details – see Section 7.3.17.7 of the Periodic Report for 2022). As stated in Section 19.2.2 of the Periodic Report for 2022, pursuant to the Group's position and based on past experience, Standard 125 also applies to the Rotem power plant, and the Company has expressed its position to the Electricity Authority regarding this matter.7 8
5 The Gat power plant is a "single-fuel" generator powered by natural gas, which is entitled to an availability tariff, as stated in Section 7.3.14 of Part A of the Periodic Report for 2022. Pursuant to Standard 125 referred to below, a generator will be considered available even in certain circumstances of a shortage of natural gas as provided in the Standard, However, there is no certainty that the mentioned arrangements will apply to the circumstances as they will be (as many as they may be).
6 Published in the Record of Regulations in the Internet site of the Electricity Authority.
7 As stated in Section 7.3.14.3 of Part A of the Periodic Report for 2021. The Professional Staff of the Electricity Authority has notified Rotem that its position regarding application of the Standard to Rotem is different. As stated above, the Company has presented its position regarding this matter to the Electricity Authority. That stated regarding the Company's estimate constitutes "forward-looking" information as defined in the Securities Law, regarding which there is no certainty it will materialize, and where ultimately Rotem's entitlement to compensatory arrangements in a case of a shortage of natural gas, including compensation for the difference between the operating cost using natural gas and the operating cost using diesel oil, could be limited as a result of that stated. As stated in Section 7.15.5.1B of Part A the Periodic Report for 2022, pursuant to the provisions of Rotem's PPA with Israel Electric Authority, in a case of a continuing shortage in the supply of natural gas, subject to the provisions of the PPA, Rotem is entitled to provide the plant's availability to the System Operator against receipt of a reimbursement in respect of the cost of using diesel oil (in respect of which Rotem pays an annual premium) and receipt of a payment for providing the availability. As stated in the Periodic Report, provision of availability to the System Operator is much less economically worthwhile than selling to customers.
8 That stated above with reference to the arrangements applying in a case of a shortage of natural gas is based on the Company's estimates as at the date of the report. Nonetheless, there is no certainty that these arrangements will fully or partly compensate the Group for the gas shortage or the interruption in supply of the natural gas, and there is no certainty regarding the actual manner of their implementation by the System Operator and the authorities, particularly in light of the emergency situation. In addition, these arrangements might change and/or be cancelled as a result of a worsening of the emergency situation, length of the War, circumstances relating to the shortage of natural gas and pressures in the economy and the combat requirements.
With reference to the Company's investment in the CPV Group, which operates in the United States and its functional currency is the dollar, a strengthening of the dollar has a positive impact on the dollar value of the Company's investments and on the Company's net income and shareholders' equity. It is noted that in the short run, financing of the expected investments in the projects of the CPV Group that are under construction is made mostly from sources in the U.S. (for details regarding a financing agreement for construction of projects in the renewable energy segment in the U.S. – see 7A(4)) and, therefore, a strengthening of the dollar exchange rate in the near term is not expected to lead to a significant increase in the financing requirements in order to continue execution of these investments.
9 It is noted that that stated above with reference to determination of the generation component, its composition and the manner of its impact on the Group constitutes "forward-looking" information, regarding which there is no certainty of its realization and that is impacted by factors not under the Company's control.
A significant adverse impact on the ability to generate cash from the Company's current operating activities in Israel due to, among other things, occurrence of one of the risks enumerated above, could have a deleterious effect on the Company's financial strength and on its ability to comply with the provisions of the financing agreements of the Group companies, including the debentures, as well as on the ability to utilize credit frameworks. It is further noted that a negative impact on the credit rating in Israel and, accordingly, a possible negative impact on the credit rating of the banks in Israel, could impact compliance with the minimum rating commitments, as stated. In this regard, assuming certain conditions, the Company might need to consider raising debt and/or equity in order to reduce the possible impact.
For additional details regarding the status of projects under construction as at the approval date of the report – see Section 6 of the Report of the Board of Directors. In addition, for details with respect to contributions and the Group's actions aimed at assisting the War effort and those harmed by the War – see Section 13 of the Report of the Board of Directors.
As at the approval date of the report, there is significant uncertainty regarding the development of the War, its scope and duration. Furthermore, there is significant uncertainty with respect to the impacts of the War on macro-economic and financial factors in Israel, including the situation in the Israeli capital market. Accordingly, at this stage it is not possible to estimate the extent of the impact of the War on the Group and on its results.
As a group operating in Israel, continuation of the War, expansion of the scope thereof and/or a worsening of the defense (security) situation in Israel could well have an unfavorable impact on the Group's activities, results and liquidity, including due to impacts, as stated, on significant suppliers and customers of the Group and/or on macro-economic factors and the capital market. For additional details regarding the risk factors to which the Company is exposed, including as a result of risks relating the defense (security) situation in Israel, changes in the currency exchange rates, instability and/or access to the capital market and macro-economic changes – see Section 19 of Part A of the Periodic Report for 2022.
D. Update of the electricity tariffs in the period of the report, including the brackets of the demand hours –
Commencing from January 2023, as well as during 2022, a number of updates of the Electricity Authority of the electricity tariff and the generation component entered into effect. For additional details – see Sections 7.2.3 and 7.10 of Part A of the Periodic Report for 2022.
Set forth below is data regarding the weighted-average annual generation component (the prices are denominated in kilowatt hours):
| Period | 2023 | 2022 | Change | |
|---|---|---|---|---|
| January–September average | 30.57 | 28.56 | +7% | |
| July–September average | 30.39 | 30.15 | +1% |
For additional details regarding the updates made and the circumstances thereof – see Section 3.2C to the Report of the Board of Directors for 2022. For details regarding a hearing published by the Electricity Authority with respect to designation of the surplus revenues from sale of the Eshkol power plant for coverage of expenses of the war of Israel Electric Company – see Section 3.1(C) above. As at the date of the report, a final decision had not yet been issued.
It is noted that the results of the Group's activities in Israel are materially impacted by changes in the electricity generation component tariff, in such a manner that an increase in the electricity generation component has a positive impact on the Group's result, and vice-versa.
In August 2022, the Electricity Authority published a decision to revise, the time of use (TOU) demand categories (brackets) for purposes of adjusting the structure of the load and time tariffs (TOAZ) for a significant integration of solar energy and storage. For additional details – see Section 3.2C of the Report of the Board of Directors for 2022. The updated tariff structure entered into effect at the beginning of 2023.
As stated in the Periodic Report for 2022, update of the demand-hours categories has a negative impact on the Group's results, as detailed in Sections 4 and 5 below, this mainly in light of the consumption profile of the Group's customers (which are mostly industrial and commercial customers), which is usually low consumption volatility in the daytime hours, compared with the consumption profile of households that is reflected in the tariffs and arrangements determined in the update with reference to the low-level and peak hours. In the Company's estimation, the annual scope of the negative impact on its activities in Israel is estimated at about NIS 35 million10. In addition, a change in the demand brackets changes the seasonal breakdown of the Company's revenues and income in Israel over the year in such a manner that it significantly increases the summer months (June– September), mainly the third quarter at the expense of the other quarters – particularly the first quarter. Accordingly, the results of the Group's activities in Israel in the third quarter enjoyed a significant positive impact compared with the corresponding quarter last year against the background of the seasonal difference, as stated (for additional details – see Sections 4 and 5 below).
10 For additional details – see Sections 7.2.4 and 7.10.2 of Part A of the Periodic Report for 2022. That stated in this Section with reference to the impacts of the update to the hourly demand brackets constitutes "forward-looking" information as it is defined in the Securities Law which is based on the Company's estimates and assumptions as at the date of the report and regarding which there is no certainty it will materialize. Ultimately, the impact could be different than that stated, this being due to, among other things, the Company's estimates with respect to the consumption profile not materializing, the manner of its distribution and/or the actual mix of the customers and/or occurrence of one or more of the risk factors the Company is subject to.

E. Supplementary arrangements and granting of a supply license to Rotem – in February 2023, the Electricity Authority published a proposed decision that includes application of benchmarks and granting of a supplier license to Rotem – for additional details – see Section 3.2E of the Report of the Board of Directors for 2022 ("the Proposed Decision"). As at the approval date of the report, a final decision had not yet been published and the arrangements included as part of the Proposed Decision had not yet entered into effect, where to the best of the Company's knowledge, the Electricity Authority is expected to publish a decision regarding the matter. As at the approval date of the report, there is no certainty regarding the final language of the arrangements that will be determined (if ultimately determined) and the scope of their impact. Based on the publication, the Proposed Decision creates uniformity regarding many aspects of the regulation applicable to Rotem with that of the generation facilities that are authorized to execute bilateral transactions, and thus the arrangements should permit Rotem to operate in the energy market in a manner similar to that of the other generation facilities that are authorized to execute bilateral transactions. In addition, in the Company's estimation arrangements as stated in the proposed decision are expected to settle certain disputes between Rotem and the System Operator (as stated in Section 7.15.5.1 of Part A of the Periodic Report for 2022), and in this regard it is noted that subsequent to the date of the report the System Operator repeated its position with respect to exceptional consumption beyond the plant's generation capability, where without detracting from its basic position it contended, among other things, that according to its position the exceptional consumption will be charged at a tariff that is based on the high-voltage TOAZ rate plus 25%11. Rotem disagrees with the System Operator's position and is holding talks with it and, as noted, to the best of Rotem's understanding the matters are expected to be resolved as part of the overall arrangement proposed in the proposed decision.
As stated in Section 7.3.18.5 of Part A of the Periodic Report for 2022, in the Company's estimation, the proposed decision, to the extent it is determined and as a derivative of the final arrangements, should reduce the uncertainty regarding the arrangements applicable to Rotem and allow Rotem to operate through a supply license, similar to other relevant private generators. Nonetheless, as at the approval date of the report, a final decision on the proposed decision had not yet been made and, accordingly, the Company is not able to estimate the impact of the said disputes on Rotem's activities12 .
For additional details regarding developments of the Group's activities in Israel – see Sections 6 and 10 below.
11 A tariff the impact of which, in the Company's estimation, on the Group's results compared to the period prior as at the date of the report is not material. 12 For additional details – see Section 7.3.18.5 of Part A of the Periodic Report for 2022.
12
For additional details regarding the electricity and natural gas prices in the United States – see Section 3.3F of the Report of the Board of Directors for 2022.
Set forth below are the average natural gas in each of the main markets in which the power plants of the CPV Group operate (the prices are denominated in dollars per MMBtu)*:
| For the Nine Months Ended September 30 |
For the Three Months Ended September 30 |
|||||
|---|---|---|---|---|---|---|
| Region | ||||||
| (Power Plant) | 2023 | 2022 | Change | 2023 | 2022 | Change |
| TETCO M3 (Shore, Valley) | 1.94 | 6.87 | (72)% | 1.39 | 7.10 | (80)% |
| Transco Zone 5 North (Maryland) | 2.73 | 8.41 | (68)% | 2.83 | 9.69 | (71)% |
| TETCO M2 (Fairview) | 1.63 | 5.86 | (72)% | 1.25 | 6.84 | (82)% |
| Dominion South (Valley) | 1.63 | 5.87 | (72)% | 1.27 | 6.87 | (82)% |
| Algonquin (Towantic) | 3.02 | 9.46 | (68)% | 1.93 | 7.57 | (74)% |
| Chicago Citygate (Three Rivers) | N/A | N/A | N/A | 2.31 | N/A | N/A |
*Source: The Day-Ahead prices at gas Midpoints as reported in Platt's Gas Daily. It is clarified that the actual gas prices of the power plants of the CPV Group could be significantly different.
The natural gas prices in the U.S. started to rise in the second half of 2021 due to recovery from the economic crisis as a result of the corona virus and even more so as a result of the outbreak of the war between Russia and the Ukraine in the beginning of 2022, and remained high in 2022, while the generation levels of the natural gas were low. The prices of the natural gas began to fall sharply at the end of December 2022 when the generation of natural gas recovered and the demand slowed owing to the warm winter, and against the background of the high inventory levels they remained at a significantly lower level in the period of the report than in the corresponding period last year.
The following table summarizes the average electricity prices in each of the main markets in which power plants of the CPV Group are active (the prices are denominated in dollars per megawatt hour)*:
| For the | For the | ||||||
|---|---|---|---|---|---|---|---|
| Region | Nine Months Ended September 30 |
Three Months Ended September 30 |
|||||
| (Power Plant) | 2023 | 2022 | Change | 2023 | 2022 | Change | |
| PJM West (Shore and Maryland) | 31.97 | 74.56 | (57)% | 33.32 | 90.44 | (63)% | |
| PJM AD Hub (Fairview) | 30.64 | 71.01 | (57)% | 31.83 | 87.06 | (63)% | |
| NY-ISO Zone G (Valley) | 33.86 | 85.30 | (60)% | 32.46 | 89.48 | (64)% | |
| ISO-NE Mass Hub (Towantic) | 37.55 | 88.48 | (58)% | 33.22 | 85.74 | (61)% | |
| PJM ComEd (Three Rivers) | – | – | – | 30.86 | – | – |
Based on Day-Ahead prices as published by the relevant ISO. It is clarified that the actual electricity prices of the power plants of the CPV Group could be significantly different.
The decrease in the electricity prices in the period of the report and in the third quarter of 2023 compared with the corresponding periods last year, as shown by the above table, corresponds to the trend of decreasing natural gas prices.

The electricity margin (Spark Spread) is the difference between the price of the electricity in the relevant market and the price of the natural gas used for its generation. The electricity margin is calculated based on the following formula:
Electricity margin (\$/MWh) = price of the electricity (\$/MWh) – [the gas price (\$/MMBtu) x thermal conversion ratio (MMBtu/MWh)]
Set forth below are the average electricity margins (Spark Spread) for each of the main markets in the power plants of the CPV Group are operating (the prices are denominated in dollars per megawatt/hour)*:
| For the Nine Months Ended September 30 |
For the Three Months Ended September 30 |
|||||
|---|---|---|---|---|---|---|
| Power Plant | ||||||
| (Region) | 2023 | 2022 | Change | 2023 | 2022 | Change |
| Shore | ||||||
| (PJM West/TETCO M3) | 18.61 | 27.16 | (31)% | 23.70 | 41.46 | (43)% |
| Maryland | ||||||
| (PJM West/Transco Zn 5N) | 13.15 | 16.55 | (21)% | 13.77 | 23.6 | (42)% |
| Valley | ||||||
| (NY-ISO Zone G/30% Dominion South, 70% | ||||||
| TETCO M3) | 21.13 | 39.97 | (47)% | 23.11 | 40.97 | (44)% |
| Towantic | ||||||
| (ISO-NE Mass Hub/Algonquin) | 17.94 | 27.01 | (34)% | 20.67 | 36.52 | (43)% |
| Fairview | ||||||
| (PJM AD Hub/TETCO M2) | 20.04 | 32.94 | (39)% | 23.67 | 42.62 | (44)% |
| Three Rivers | ||||||
| (PJM ComEd / Chicago City Gate) | – | – | – | 15.86 | – | – |
* Based on Day-Ahead prices as shown in the above tables, with a discount for the thermal conversion ratio (heat rate) of 6.9 MMBtu/MWh for Maryland, Shore and Valley, and a thermal conversion ratio of 6.5 MMBtu/MWh for Three Rivers, Towantic and Fairview. It is clarified that the actual energy margins of the power plants of the CPV Group could be significantly different.
The decrease in the electricity margins (Spark Spread) in the period of the report and in the third quarter of 2023 compared with the corresponding periods last year, as shown by the above table, corresponds to the trend of decreasing natural gas prices. Nonetheless, the decline in the electricity margins in the regions wherein the power plants of the CPV Group are operating was more moderate in light of the decrease in the supply for generation of electricity against the background of closing of power plants (mainly power plants powered by coal) and limited new supply of power plants (including those using renewable energy).
Capacity is a payment component that is paid by regulatory bodies that manage demand and loads (system operators) for electricity generators, with respect to their ability to generate energy at the required times for purposes of reliability of the system. This payment component is an additional component, separate and apart from the component based on the energy prices (which is paid in respect of sale of the electricity). Definition of the payment component, as stated, including entitlement to a payment for seeing to availability of the electricity, including provisions regarding bonus or penalty payments, are governed by the tariffs determined by the FERC of every market. Accordingly, NY-ISO, PJM and ISO-NE publish mandatory public tenders for determination of the capacity tariffs. It is noted that, in the nature of things, an increase in the capacity prices favorably impacts CPV's results, and vice-versa. The impact on the overall results changes as a function of the energy margins, which impacts the essential payment component for generation of the electricity and the sale thereof – this being taking into account that the weight of the capacity payments is usually lower than the sale of the electricity component.
In the PJM market, the capacity payments vary between the market's sub-regions, as a function of local supply and demand and transmission capabilities.
Set forth below are the capacity tariffs in the sub-regions that are relevant to the CPV Group's power plants and in the general market (the prices are denominated in dollars per megawatt per day). It can be seen in the following table that generally the capacity prices have declined from period to period – this being mainly as a result of a decline in the expected demand, increase in the projects based on gas and renewable energy projects – and respectively, offering of lower prices by the players as part of the capacity tenders.
| Sub-Region | CPV Plants13 | 2024/2025 | 2023/2024 | 2022/2023 | 2021/2022 |
|---|---|---|---|---|---|
| PJM RTO | 28.92 | 34.13 | 50 | 140 | |
| PJM COMED | Three Rivers | 28.92 | 34.13 | - | - |
| PJM MAAC | Fairview, Maryland, Maple Hill | 49.49 | 49.49 | 95.79 | 140 |
| PJM EMAAC | Shore | 54.95 | 49.49 | 97.86 | 165.73 |
Source: PJM
13 The Three Rivers power plant, which commenced commercial operation in July 2023, is entitled to capacity payments, from this date.
I. Capacity payments (Cont.)
In August 2023, the Appellate Court in Washington approved the FERC's decision to reduce the flexibility of suppliers to fix the prices of their bids in the capacity tenders. The Court ruled that FERC acted within the scope of its rights in determination of the rule that requires PJM to examine and approve most of the bids in the capacity tenders.
In October 2023, PJM submitted to FERC changes in the format for the capacity market for the purpose of applying the changes to the tenders planned for June 2024. The proposed changes include changes in the modeling of risks, a recognition process for June the source of the capacity, requirements for examination of generators, a ceiling for an annual penalty on the performance levels and a ceiling for recognized bids. In the estimation of the CPV Group, the proposed changes, if approved, are expected to have a positive impact on the capacity prices14 .
Similar to the PJM market, the NYISO market capacity payments are made as part of a mechanism for centralized purchase of capacity. For additional details, particularly regarding seasonal and monthly tenders – see Section 3.3G of the Report of the Board of Directors for 2022.
Set forth below are the capacity prices determined in the seasonal tenders in NYISO market, the capacity prices rose compared with prior periods – and this being mainly due to exit from the system of power plants and an anticipated increase in demand (the prices are denominated in dollars per megawatt per day):
| Sub-Area | CPV Plants |
Winter 2023/2024 | Summer 2023 | Winter 2022/2023 | Summer 2022 |
|---|---|---|---|---|---|
| NYISO Rest of the Market |
– | 127.25 | 153.26 | 39.12 | 110.87 |
| Lower Hudson Valley | Valley | 128.9 | 164.35 | 43.43 | 151.63 |
Source: NYISO – the Company's processing in order to convert from dollars for kilowatt per month to dollars for megawatt per day.
It is noted that the Valley power plant is located in Area G (Lower Hudson Valley) and the actual capacity prices for the Valley power plants are impacted by the seasonal tenders, the monthly tenders and the SPOT prices, with variable capacity prices every month, as well as bilateral agreements with energy suppliers in the market.
14 That stated in this Section regarding the estimate of the CPV Group constitutes "forward-looking" information as it is defined in the Securities Law, regarding which there is no certainty it will be realized and that depends on the content of the arrangements that will be provided (if any) and the manner of their application.
I. Capacity payments (Cont.)
The Towantic power plant, which operates in this market, participated for the first time in a capacity tender for 2018–2019 at a price of \$313.97 MW/day and determination of the tariff for seven years in respect of 725 megawatts linked to the Utilities Inputs Index, which will apply up to May 2025.
Set forth below are the capacity payments determined in the sub-regions that are relevant to the Towantic power plant (the prices are denominated in dollars per megawatt per day):
| Sub-Region | CPV Power Plants | 2026/2027 | 2025/2026 |
|---|---|---|---|
| ISO-NE Rest of the Market |
Towantic | 85.15 | 85.15 |
Source: NE-ISO – the Company's processing in order to convert from dollars for kilowatt per month to dollars for megawatt per day.
It is noted that the actual capacity prices for the Towantic power plant are impacted by forward tenders, supplemental annual tenders, monthly tenders with variable capacity prices in every month and bilateral agreements with the energy suppliers in the market.
J. The Inflation Reduction Act ("the IRA Law") – for additional details regarding the IRA Law, which grants significant tax benefits to projects involving renewable energies and carbon capture technologies, and the impact thereof on the construction and development projects of the CPV Group – see Section 3.3H of the Report of the Board of Directors for 2022.
The Group's activities in Israel and the United States are subject to seasonal fluctuations (for additional details regarding seasonal impacts – see Sections 7.10 and 8.7 to Part A of the Periodic Report for 2022 and Section 3.2D above).
In Israel, the TOAZ tariffs are supervised (controlled) and published by the Electricity Authority. For details regarding a decision to update the hourly demand categories of the TOAZ commencing from January 1, 2023 – see Section 3.2D above and Section 7.2.4 of Part A of the Periodic Report for 2022. Update of the hourly demand brackets changes the breakdown of the Company's revenues over the quarters in such a manner that it increases the summer months (and mainly the third quarter) at the expense of the other quarters, and particularly the first quarter.
In the United States, the electricity tariffs are not supervised (controlled) and are impacted by the demand for electricity, which is generally high in the summer and the winter periods compared with the average and they are materially impacted by the natural gas prices, which are usually higher in the winter compared with the annual average. In addition, in connection with renewable energy wind projects, the wind speeds tend to be higher in the winter and lower in the summer.

A. Statement of income15
| Section | For the nine months ended September 30 |
||
|---|---|---|---|
| 2023 | 2022 | ||
| Revenues from sales and provision of services (1) | 1,971 | 1,423 | |
| Cost of sales and provision of services (without depreciation and amortization) (2) | (1,395) | (1,036) | |
| Depreciation and amortization | (205) | (132) | |
| Gross profit | 371 | 255 | |
| Administrative and general expenses | (182) | (155) | |
| Share in earnings of associated companies16 | 179 | 190 | |
| Business development expenses | (47) | (35) | |
| Other income, net | 6 | – | |
| Operating income | 327 | 255 | |
| Financing income (expenses), net | (143) | (18) | |
| Income before taxes on income | 184 | 237 | |
| Taxes on income expenses | (44) | (57) | |
| Net income for the period | 140 | 180 | |
| Adjustments | 26 | (60) | |
| Adjusted net income for the period17 | 166 | 120 | |
| Attributable to: | |||
| The Company's shareholders | 140 | 84 | |
| Holders of non-controlling interests | 26 | 36 |
15 The results of the associated companies in the U.S. (mainly in the Energy Transition segment) are presented in the category "Company's share in earnings of associated companies".
16 The earnings of associated companies in the U.S. include income or loss in respect of changes in the fair value of derivative financial instruments from plans of the CPV Group that hedge electricity margins, which are not designated for application of hedge accounting and that were not yet realized as at the date of the financial statements.
17 Adjusted net income or loss – net income or loss in accordance with IFRS plus or minus the adjustments detailed in Section G below. It is emphasized that "adjusted income or loss" as stated in this report is not a recognized data item that is recognized under IFRS or under any other set of generally accepted accounting principles as an index for measuring financial performance and should not be considered as a substitute for income or loss or other terms provided in accordance with IFRS. It is possible that the Company's definitions of "adjusted income or loss" are different than those used by other companies. Nonetheless, the Company believes that the "adjusted income or loss" provides information that is useful to management and investors by means of eliminating certain line items (categories) that do not constitute an indication of the Company's ongoing business activities.
(1) Changes in revenues:
| Revenues | For the | Board's Explanations | |
|---|---|---|---|
| Nine Months Ended September 30 |
|||
| 2023 | 2022 | ||
| Revenues in Israel | |||
| Revenues from sale of energy to private customers | 1,154 | 891 The increase stems mainly from an increase in the generation component and an increase in customer consumption, in the aggregate amount of about NIS 198 million, and an increase, in the amount of about NIS 66 million, due to consolidation of Gat for the first time starting from the second quarter of 2023. |
|
| Revenues from private customers in respect of infrastructure services | 373 | 237 The increase, stems mainly from an increase in the infrastructure tariff and an increase in customer consumption, in the amounts of about NIS 76 million and about NIS 40 million, respectively, and an increase of about NIS 20 million due to consolidation of Gat for the first time starting from the second quarter of 2023. |
|
| Revenues from sale of energy to the System Operator and to other suppliers |
127 | 79 Most of the increase, in the amount of about NIS 49 million, stems from the commercial operation of Zomet at the end of the second quarter of 2023. |
|
| Revenues in respect of capacity payments | 30 | – The increase stems from the commercial operation of Zomet at the end of the second quarter of 2023. |
|
| Revenues from sale of steam | 45 | 44 | |
| Other revenues | 50 | 28 Most of the increase stems from sale of electricity from the Zomet power plant prior to the commercial operation at the end of June 2023. |
|
| Total revenues in Israel | 1,779 | 1,279 | |
| Revenues in the U.S. Revenues from sale of electricity from renewable energy |
89 | 65 The increase derives mainly from the first-time consolidation of the results of Mountain Wind project in the second quarter of 2023. |
|
| Revenues from provision of services (under others) | 103 | 79 The increase stems mainly from an increase in the scope of the services provided to projects. |
|
| Total revenues in the U.S. | 192 | 144 | |
| Total revenues | 1,971 | 1,423 | |
| 21 |
(2) Changes in the cost of sales and provision of services (not including depreciation and amortization):
| Cost of Sales and Provision of Services |
For the | Board's Explanations | |
|---|---|---|---|
| Nine Months Ended September 30 |
|||
| 2023 | 2022 | ||
| Cost of sales in Israel | |||
| Natural gas and diesel oil | 489 | 372 The increase stems mainly from an increase in the natural gas tariff as a result of an increase in the generation component and the shekel/dollar exchange rate, in the amount of about NIS 41 million, from an increase in the quantity of the gas consumed against the background of maintenance work at the Rotem and Hadera power plants in the corresponding period last year, in the amount of about NIS 45 million, and an increase due to consolidation of the results of Gat for the first time and the commercial operation of Zomet starting from the second quarter of 2023, in the amount of about NIS 85 million. On the other hand, there was a decrease of about NIS 52 million, deriving from entry of the Energean agreement into effect commencing from the second quarter of 2023 (of which about NIS 18 million stemming from a contractual monetary amount that Rotem and Hadera are entitled to from Energean that was recognized in the first quarter, as described in Note 8A(3) to the Interim Statements). |
|
| Expenses in respect of acquisition of energy | 249 | 240 The increase stems mainly from an increase of about NIS 89 million in customer consumption in the period of the report. On the other hand, there was a decrease, in the amount of about NIS 81 million, against the background of maintenance work at the Rotem and Hadera power plants in the corresponding period last year. |
|
| Expenses in respect of infrastructure services | 373 | 237 The increase stems mainly from an increase in the infrastructure tariff and an increase in customer consumption, in the amounts of about NIS 76 million and about NIS 40 million, respectively, and an increase of about NIS 20 million due to consolidation of Gat for the first time in the second quarter of 2023. |
|
| Cost of transmission of gas | 29 | 24 | |
| Operating expenses | 83 | 61 The increase stems mainly from the first-time consolidation of Gat and the commercial operation of Zomet starting from the second quarter of 2023. |
|
| Other expenses | 60 | 25 Most of the increase stems from natural gas and other expenses at the Zomet power plant prior to the commercial operation at the end of June 2023. |
|
| Total cost of sales in Israel | 1,283 | 959 |
| Cost of sales and services in the U.S. | |||
|---|---|---|---|
| Cost of sales in respect of sale of electricity from renewable energy | 35 | 22 The increase stems mainly from the first-time consolidation of the | |
| Mountain Wind project starting from the second quarter of 2023. | |||
| Cost in respect provision of services (under others) | 77 | 55 Most of the increase is parallel to the increase in the scope of the | |
| services provided to projects. | |||
| Total cost of sales and provision of services in the U.S. | 112 | 77 | |
| Total cost of sales and provision of services | 1,395 | 1,036 | |
| 23 |
It is noted that EBITDA indices are not intended to represent an approximate of the free cash flows from the Group's operating activities, or to represent cash available for distribution as dividend or for other uses (particularly in light of the provisions of the project financing agreements for some of the Group's power plants), since these amounts will most likely be used for debt service, capital investments, working capital and other liabilities. Moreover, the EBITDA indices are characterized by limitations that negatively impact the use thereof as indices for analysis of the Company's profitability, since they do not take into account certain revenues and expenses deriving from the Company's business, which could have a significant impact on its net profit or loss, such as, depreciation expenses, financing expenses or income and taxes on income.
The Company believes that the data relating to adjusted EBITDA after proportionate consolidation and FFO18 provide useful and transparent information to investors when reviewing the Company's operating performances and its current operating cash flows and when comparing these performances to performances of other companies in the same sector or in other industries (having different capital structures, different levels of debt and/or different income tax rates) and when comparing performances between periods. It is noted that the adjusted EBITDA after proportionate consolidation also serves the Company's management when reviewing the Company's performances.
18 It is noted that other companies might define the EBITDA and FFO indices differently.

The net cash flows after service of the project debt provides additional information regarding the net cash flows of the projects that are available to the Group (subject to compliance with the provisions of law and the project financing agreements regard distribution of dividends) for purposes of service of non-project debt, growth and making new investments, as well as distribution of dividends to its owners (subject to the provisions of law, the trust indentures and non-project financing agreements and pursuant to the Group's policies).
| For the Nine Months Ended September 30 |
|||
|---|---|---|---|
| 2023 | 2022 | ||
| Revenues from sales and provision of services | 1,971 | 1,423 | |
| Cost of sales (without depreciation and amortization) | (1,395) | (1,036) | |
| Administrative and general expenses (without depreciation and | |||
| amortization) | (172) | (147) | |
| Business development expenses | (47) | (35) | |
| Share in income of associated companies | 179 | 190 | |
| Consolidated EBITDA | 536 | 395 | |
| Elimination of the share in income of associated companies | (179) | (190) | |
| Addition of the share of Group in proportionate EBITDA of | |||
| associated companies (1) | 423 | 393 | |
| EBITDA after proportionate consolidation | 780 | 598 | |
| Adjustments – see detail in Section G below | 33 | 1 | |
| Adjusted EBITDA after proportionate consolidation | 813 | 599 |
(1) Calculation of the Group's share in the proportionate EBITDA of associated companies (in millions of NIS):
| For the Nine Months Ended September 30 |
||
|---|---|---|
| 2023 | 2022 | |
| Revenues from capacity payments | 177 | 177 |
| Revenues from sales of energy and other | 741 | 1,600 |
| Cost of sales – natural gas (without depreciation and amortization) | (339) | (978) |
| Cost of sales – other expenses (without depreciation and | ||
| amortization) | (209) | (210) |
| Gain (loss) from realization of transactions hedging the electricity margins | 85 | (184) |
| Changes in fair value of forward transactions in hedging plans | ||
| of the electricity margins | (15) | 1 |
| Administrative and general expenses (without depreciation and | ||
| amortization) | (17) | (13) |
| Group's share in proportionate EBITDA of associated companies | 423 | 393 |
| Adjustments in respect of associated companies (see detail in | ||
| Section G below) | 15 | (1) |
| Group's share in proportionate adjusted EBITDA of associated | ||
| Companies | 438 | 392 |

(2) Set forth below is a breakdown of the adjusted EBITDA after proportionate consolidation data broken down by the subsidiaries (on a consolidated basis) and the associated companies (on a proportionate basis, based on the rate of the holdings of the CPV Group therein) (in NIS millions):
| Basis of presentation |
|||
|---|---|---|---|
| in the Company's |
For the Nine Months Ended |
||
| statements | 2023 | 2022 | |
| 471 | 282 | ||
| Consolidated | (26) | (17) | |
| 445 | 265 | ||
| Associate | 440 | 393 | |
| Consolidated | (3) | (4) | |
| 437 | 389 | ||
| Consolidated | 46 | 41 | |
| Consolidated | (29) | (19) | |
| 17 | 22 | ||
| Consolidated | 6 | 4 | |
| Consolidated | (72) | (64) | |
| 388 | 351 | ||
| Consolidated | (20) | (17) | |
| 813 | 599 | ||
| financial Consolidated |
September 30 |
19 After elimination of management fees between the CPV Group and the Company, in the amounts of about NIS 21 million and about NIS 10 million for the six-month periods ended September 30, 2023 and 2022, respectively.
(3) Set forth below is additional information regarding the revenues, adjusted EBITDA after proportionate consolidation, FFO and net cash flows after service of the project debt of the Group's active power plants broken down by activity segments and subsidiaries (on a consolidated basis) and the associated companies (on a proportionate basis, based on the rate of the holdings of the CPV Group therein) (in NIS millions):
| For the nine months ended September 30, 2023 |
For the nine months ended September 30, 2022 |
||||||||
|---|---|---|---|---|---|---|---|---|---|
| Main projects in operation |
Basis of presentation in the Company's financial statements |
Revenues | Adjusted EBITDA after proportionate consol- idation |
FFO | Net cash flows after service of project debt |
Revenues | Adjusted EBITDA after proportionate consol- idation |
FFO | Net cash flows after service of project debt |
| Rotem20 | Consolidated | 993 | 344 | 334 | 334 | 844 | 244 | 203 | 203 |
| Hadera | Consolidated | 298 | 78 | 65 | 32 | 243 | 38 | 35 | 8 |
| Zomet21 | Consolidated | 79 | 14 | 19 | 19 | – | – | – | – |
| Gat22 23 | Consolidated | 108 | 35 | 12 | 6 | – | – | – | – |
| Total operating projects in Israel |
1,478 | 471 | 430 | 391 | 1,087 | 282 | 238 | 211 | |
| Fairview | Associated | ||||||||
| (25%) | 223 | 130 | 125 | 29 | 214 | 73 | 47 | 7 | |
| Towantic | Associated | ||||||||
| (26%) | 235 | 107 | 80 | (32) | 349 | 71 | 61 | 19 | |
| Maryland24 | Associated (25%) |
162 | 44 | 16 | 8 | 153 | 45 | 22 | 6 |
| Shore25 | Associated | ||||||||
| (37.53%) | 163 | 26 | 3 | (6) | 222 | 42 | 2 | 10 | |
| Valley | Associated (50%) |
332 | 130 | 83 | 25 | 530 | 162 | 60 | 10 |
| Three Rivers18 | Associated (10%) |
22 | 3 | – | – | – | – | – | – |
| Total energy transition in the |
|||||||||
| U.S.26 | 1,137 | 440 | 307 | 24 | 1,468 | 393 | 192 | 52 | |
| Keenan | Consolidated | 62 | 34 | 30 | 12 | 65 | 41 | 38 | 10 |
| Mountain Wind19 | Consolidated | 27 | 12 | 15 | – | – | – | – | – |
| Total renewable energy in the U.S. |
89 | 46 | 45 | 12 | 65 | 41 | 38 | 10 |
20 Not including a deduction of repayment of loans to shareholders of Rotem before the Veridis transaction (see Note 6A(2) of the interim statements) and intercompany taxes paid in the consolidated tax reconciliation statement.
21 The financial results of the Zomet and Three Rivers power plants were included starting from the commercial operation date at the end of June 2023 and during July 2023, respectively. For details regarding the capacity tariffs in the Zomet power plant, particularly in 2023, see Section 10B.
23 The FFO in the period of the report includes a payment of about NIS 8 million for significant planned maintenance work that was performed at Gat in the first quarter of 2023.
24 The FFO in the period of the report includes a payment in respect of the project for upgrade of facilities of the Maryland power plant, in the amount of about NIS 8 million.
25 The FFO in the period of the report includes a payment, in the amount of about NIS 17 million, in respect of significant planned maintenance work performed at Shore, in the first half of 2023.
26 It is noted that the financing agreements of the CPV Group including mechanisms of the "cash sweep" type in the framework of which all or part of the free cash flows from the project is designated for repayment of the loan principal on a current basis in addition to the predetermined minimum repayment schedule with respect to every long-term loan. Accordingly, there could be an acceleration of execution of repayments upon occurrence of certain events and there are limitations on distributions to the owners. For additional details – see Section 9 below.

22 The financial results of the projects were included starting from the initial consolidation date in the second quarter of 2023. The estimated EBITDA for a full calendar year of the Mountain Wind project in the period of the PPA agreements is about NIS 45 million (about \$13 million). That stated above with reference to the estimated EBITDA for a full calendar year constitutes "forward-looking" information as it is defined in the Securities Law, which is based on estimates of the CPV Group as at the date of the report and regarding which there is no certainty it will materialize. That stated might be impacted by, among other things, changes in the PPA agreements, operating factors (including breakdowns or wind conditions), changes in financing or in the energy market or regulatory factors or as a result of occurrence of one or more of the risk factors to which the CPV Group is exposed.
Set forth below is an analysis of the change in adjusted EBITDA in Israel in the period of the report compared with the corresponding period last year (in NIS millions):

28 In the Company's estimation, the expected impact for 2023 is a decrease in revenues of about NIS 35 million (of which about NIS 30 million is expected in the fourth quarter of 2023). The Company's estimate constitutes "forward-looking" information, as it is defined in the Securities Law, which is based on the Company's estimates and assessments that might not materialize or could change during the relevant period due to various factors, including those not under the Company's control and/or consumption of the electricity and/or occurrence of one or more of the risk factors to which the Company is exposed.

27 In the Company's estimation, upon the commercial operation of the Karish reservoir, an annual monetary savings is expected estimated at about NIS 60 million, based on the average projected gas consumption of Rotem and Hadera. The Company's estimate of the expected monetary savings upon the commercial operation of the Karish reserve constitutes "forward-looking" information, as it is defined in the Securities Law, which is based on the Company's estimates, assessments and plans proximate to the publication date of the report. The said data, estimates and assessments might not materialize or could change during the relevant period due to a range of circumstances that are not under the Company's control, including operating factors, changes in the actual consumption of electricity and gas, changes in foreign currency, and/or occurrence of one or more of the risk factors to which the Company is exposed.
Set forth below is an analysis of the change in adjusted EBITDA in Israel in the period of the report compared with the corresponding period last year (in NIS millions): (Cont.)
In addition, the operating results of the Hadera power plant were negatively impacted in the third quarter of 2023 due to advancement of planned maintenance work in one of the gas turbines.
Set forth below is an analysis of the change in the adjusted EBITDA after proportionate consolidation in the energy transition segment in the U.S. in the period of the report compared with the corresponding period last year (in millions of NIS):

29 For details relating to the risk management policies in the CPV Group, and particularly with reference to hedging of part of the electricity margins – see Note 23 to the consolidated financial statements for 2022.

Set forth below is an analysis of the change in the adjusted EBITDA from activities in the renewable energy segment in the period of the report compared with the corresponding period last year (in millions of NIS):

Energy margin – most of the decrease derives from the impact of a decline in the wind speed on the results of Keenan.
As part of its risk management policy, the CPV Group is in the practice, from time to time, of entering into hedging agreements, which reduce the commodity price risks in the electricity margins. In addition, the capacity payments for the nominal capacity of the power plants running on natural gas (that are held through associated companies) are determined for certain future periods, as detailed in Section 3.3H above.
Set forth below is the scope of the hedging for the rest of 2023 and for 2024 as at the date of the report (the data presented in the tables below is on the basis of the rate of holdings of the CPV Group in the associated companies):
| October–December 2023 | 2024 | |
|---|---|---|
| Net scope of the hedged energy margin (% of the power plant's capacity based on the expected generation) (*) |
48% | 35% |
| Net hedged energy margin (millions of \$) | ≈ 15 (≈ NIS 55 million) | ≈ 52.4 (≈ NIS 191 million) |
| Net hedged energy margin (MWH/\$) | 15.58 | 16.04 |
| Net market prices of energy margin (\$/MWH) (**) | 19.07 | 16.62 |
(*) Pursuant to the policy for hedging electricity margins, the CPV Group seeks to hedge up to 50% of the scope of the expected generation. The actual hedge rate could ultimately be different.
(**) The net energy margin is the energy margin less other variable costs, such as, variable emissions, operation and maintenance, consumable materials, etc. For details regarding the manner of calculation of the electricity margin (Spark Spread) – see Section 3.3H above. The market prices of the net hedged energy are based on the market prices of electricity and natural gas in the future contracts.
Set forth below is the scope of the secured capacity payments for the rest of 2023 and 2024:
| October–December 2023 | 2024 | |
|---|---|---|
| Scope of the secured capacity payments (% of the power plant's capacity) | 92% | 87% |
| Capacity payments (millions of \$) | ≈ 15 (≈ NIS 55 million) | ≈ 54 (≈ NIS 197 million) |
30 The estimated percentages and the actual hedged energy margins could change due to new hedges and/or sales of capacity made or as a result of market conditions.
F. Analysis of the change in net income


| For the nine months ended Section September 30 |
Board's explanations | ||||
|---|---|---|---|---|---|
| 2023 | 2022 | ||||
| Change in the fair value of derivative financial instruments in the U.S. (presented as part of the Company's share of income of associated companies in the U.S.) |
15 | (2) Represents the change in the fair value of derivative financial instruments that are used in programs for hedging electricity margins of the transition generation energies segment in the U.S. and that were not designated for hedge accounting – for details see Section E above. |
|||
| Change in net expenses, not in the ordinary course of business and/or of a non-recurring nature |
18 | 3 In the period of the report and in the corresponding period last year, represents test runs and other activities relating to the Company's preparations for the commercial operation of the Zomet power plant, which took place at the end of June 2023. |
|||
| Total adjustments to EBITDA after proportionate consolidation | 33 | 1 | |||
| Income from exchange rate differences in respect of intercompany loans (*) |
– | (82) | |||
| Tax impact in respect of the adjustments | (7) | 21 | |||
| Total adjustments to net income for the period | 26 | (60) |
(*) For purposes of improving the comparability between the periods with respect to the adjusted net income data, the Company made a reconciliation to the net income in the nine months and three months ended on September 30, 2022 in respect of income that is not cash (cash flow) income from exchange rate differences from revaluation of intercompany loans that occurred from October 1, 2022 that were classified as part of the Group's net investment in the U.S. and exchange rate differences in respect thereof are recorded, commencing from that date, to other comprehensive income as part of the translation reserve.
Israel
Set forth below is detail of the generation of the power plants and wind plants in Israel and the U.S.:
| For the nine months ended September 30, 2023 | For the nine months ended September 30, 2022 | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Capacity (MW) |
Potential electricity generation (GWh)(1) |
Net electricity generation (GWh)(2) |
Actual generation percentage (%)(3) |
Actual availability percentage (%) |
Potential electricity generation (GWh) |
Net electricity generation (GWh) |
Actual generation percentage (%) |
Actual availability percentage (%) |
|
| Rotem | 466 | 2,811 | 2,656 | 94.5% | 98.7% | 2,808 | 2,406 | 85.7% | 85.9% |
| Hadera | 144 | 747 | 677 | 91.0% | 91.0% | 751 | 584 | 77.7% | 77.7% |
| Gat | 75 | 309 | 307 | 99.3% | 100.0% | – | – | – | – |
| Zomet | 396 | 907 | 256 | 28.2% | 89.8% | – | – | – | – |
(1) The generation potential is the net generation capability adjusted for temperature and humidity.
(2) The actual net generation in the period.
(3) The actual generation percentage is the net electricity divided by the generation potential.
U.S.
Set forth below is detail of the generation of the power plants and wind plants in Israel and the U.S.: (Cont.)
| For the nine months ended September 30, 2023 | For the nine months ended September 30, 2022 | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Capacity (MW) |
Potential electricity generation (GWh)(1) |
Net electricity generation (GWh)(2) |
Actual generation percentage (%)(3) |
Actual availability percentage (%) |
Potential electricity generation (GWh) |
Net electricity generation (GWh) |
Actual generation percentage (%) |
Actual availability percentage (%) |
|
| Energy transition projects (natural gas) | |||||||||
| Fairview | 1,050 | 6,848 | 6,205 | 93.5% | 96.9% | 6,692 | 5,768 | 86.9% | 88.8% |
| Towantic | 805 | 5,107 | 4,310 | 81.0% | 94.7% | 4,454 | 3,737 | 70.2% | 83.8% |
| Maryland | 745 | 4,648 | 3,051 | 63.4% | 90.8% | 4,648 | 2,858 | 68.9% | 92.7% |
| Shore | 725 | 3,728 | 2,689 | 57.1% | 77.8% | 4,522 | 3,251 | 68.9% | 95.1% |
| Valley | 720 | 4,707 | 3,422 | 75.9% | 81.5% | 4,516 | 3,638 | 80.9% | 88.0% |
| Three | |||||||||
| Rivers | 1,258 | 1,524 | 1,055 | 61.3% | 68.7% | – | – | – | – |
| Renewable energy projects | |||||||||
| Keenan II | 152 | 987 | 194 | 19.5% | 93.2% | 994 | 229 | 23.0% | 92.9% |
| Mountain | |||||||||
| Wind | 82 | 301 | 79 | 22.9% | 89.5% | – | – | – | – |
(*) Regarding the planned maintenance – see Sections 5C(2) and 5D(3) below and Section 8.8 of Part A of the Company's Periodic Report for 2022.
(1) The potential generation is the gross generation capability during the period after planned maintenance and less the electricity used for the power plant's internal purposes.
(2) The net generation of electricity is the gross generation during the period less the electricity used for the power plant's internal purposes.
(3) The actual generation percentage is the quantity of the net electricity generated in the facilities compared with the maximum quantity that can be generated in the period.
A. Statement of income
| Section | For the three months ended September 30 |
|||
|---|---|---|---|---|
| 2023 | 2022 | |||
| Revenues from sales and provision of services (1) | 851 | 550 | ||
| Cost of sales and provision of services (without depreciation and amortization) (2) | (561) | (393) | ||
| Depreciation and amortization | (95) | (46) | ||
| Gross profit | 195 | 111 | ||
| Administrative and general expenses | (65) | (59) | ||
| Share in earnings of associated companies | 79 | 124 | ||
| Business development expenses | (17) | (12) | ||
| Other income, net | 11 | – | ||
| Operating income | 203 | 164 | ||
| Financing expenses, net | (70) | (26) | ||
| Income before tax benefit | 133 | 138 | ||
| Taxes on income | (32) | (30) | ||
| Net income for the period | 101 | 108 | ||
| Adjustments | (1) | (18) | ||
| Adjusted net income for the period | 100 | 90 | ||
| Attributable to: | ||||
| The Company's shareholders | 82 | 62 | ||
| Holders of non-controlling interests | 18 | 28 | ||
(1) Changes in revenues:
| Revenues | For the Three Months Ended September 30 |
Board's Explanations | ||
|---|---|---|---|---|
| 2023 | 2022 | |||
| Revenues in Israel | ||||
| Revenues from sale of energy to private customers | 530 | 355 The increase stems mainly from an increase in the generation component and an increase in customer consumption, in the amount of about NIS 63 million, an increase of about NIS 63 million deriving from the change in the brackets for the demand hours (as detailed in in Section 3.2D above and in Section C below), and an increase of about NIS 43 million deriving from consolidation of the results of Gat for the first time starting from the second quarter of 2023. |
||
| Revenues from private customers in respect of infrastructure services | 138 | 93 The increase stems mainly from an increase in the infrastructure tariffs and an increase in customer consumption, in the amounts of about NIS 22 million and about NIS 11 million, respectively, and an increase of about NIS 12 million due to consolidation of Gat for the first time starting from the second quarter of 2023. |
||
| Revenues from sale of energy to the System Operator and to other suppliers |
64 | 22 Most of the increase, in the amount of about NIS 45 million, stems mainly from the commercial operation of Zomet at the end of the second quarter of 2023. |
||
| Revenues in respect of capacity payments | 28 | – The increase derives from the commercial operation of Zomet at the end of the second quarter of 2023. |
||
| Revenues from sale of steam | 14 | 14 | ||
| Other revenues | 7 | 14 | ||
| Total revenues in Israel | 781 | 498 | ||
| Revenues in the U.S. | ||||
| Revenues from sale of electricity from renewable energy | 29 | 18 The increase stems mainly from the first-time consolidation of the Mountain Wind project in the second quarter of 2023. |
||
| Revenues from provision of services (under others) | 41 | 34 | ||
| Total revenues in the U.S. | 70 | 52 | ||
| Total revenues | 851 | 550 | ||
| 38 |
| Cost of Sales and | ||
|---|---|---|
| Provision of Services | For the Three Months Ended September 30 |
Board's Explanations | ||
|---|---|---|---|---|
| 2023 | 2022 | |||
| Cost of sales in Israel | ||||
| Natural gas and diesel oil | 203 | 149 The increase stems from an increase in the gas tariff as a result of an increase in the shekel/dollar exchange rate, in the amount of about NIS 9 million, and an increase due to the initial consolidation of Gat and the commercial operation of Zomet starting from the second quarter of 2023, in the aggregate amount of about NIS 66 million. On the other hand, there was a decrease in the gas expenses of about NIS 20 million, deriving from entry of the Energean agreement into effect commencing from the end of the first quarter of 2023. |
||
| Expenses in respect of acquisition of energy | 123 | 78 An increase of about NIS 52 million stemming from an increase in customer consumption. |
||
| Expenses in respect of infrastructure services | 138 | 93 The increase stems mainly from an increase in the infrastructure tariff and an increase in customer consumption, in the amounts of about NIS 22 million and about NIS 11 million, respectively, and an increase of about NIS 12 million due to consolidation of Gat for the first time starting from the second quarter of 2023. |
||
| Cost of transmission of gas | 13 | 8 | ||
| Operating expenses | 39 | 19 The increase in the operating expenses stems mainly from the initial consolidation of Gat and the commercial operation of Zomet in the second quarter of 2023. |
||
| Other expenses | 4 | 14 | ||
| Total cost of sales in Israel | 520 | 361 | ||
| Cost of sales and services in the U.S. | ||||
| Cost of sales in respect of sale of electricity from renewable energy | 15 | 9 The increase stems mainly from the first-time consolidation of the Mountain Wind project. |
||
| Cost in respect provision of services (under others) | 26 | 23 | ||
| Total cost of sales and provision of services in the U.S. | 41 | 32 | ||
| Total cost of sales and provision of services | 561 | 393 | ||
| 39 |
| For the Three Months Ended September 30 |
|||
|---|---|---|---|
| 2023 | 2022 | ||
| Revenues from sales and provision of services | 851 | 550 | |
| Cost of sales and services (without depreciation and amortization) | (561) | (393) | |
| Administrative and general expenses (without depreciation and | |||
| amortization) | (62) | (56) | |
| Business development expenses | (17) | (12) | |
| Share in income of associated companies | 79 | 124 | |
| Consolidated EBITDA | 290 | 213 | |
| Elimination of the share of income of associated companies | (79) | (124) | |
| Addition of the Group's share in proportionate EBITDA of associated | |||
| companies (1) | 169 | 195 | |
| EBITDA after proportionate consolidation | 380 | 284 | |
| Adjustments – see detail in Section F below | (1) | (10) | |
| Adjusted EBITDA after proportionate consolidation | 379 | 274 |
(1) Calculation of the Group's share in proportionate EBITDA of associated companies (in millions of NIS):
| For the Three Months Ended September 30 |
|||
|---|---|---|---|
| 2023 | 2022 | ||
| Revenues from capacity payments | 62 | 57 | |
| Revenues from sales of energy and other | 279 | 688 | |
| Cost of sales – natural gas (without depreciation and amortization) | (103) | (399) | |
| Cost of sales – other expenses (without depreciation and | |||
| amortization) | (71) | (74) | |
| Profit (loss) from realization of transactions hedging the electricity | |||
| margins | 6 | (85) | |
| Changes in fair value of forward transactions in hedging plans | |||
| of the electricity margins | 1 | 11 | |
| Administrative and general expenses (without depreciation and | |||
| amortization) | (5) | (3) | |
| Group's share of proportionate EBITDA of associated companies | 169 | 195 | |
| Adjustments in respect of associated companies (see detail in | |||
| Section F below) | (1) | (12) | |
| Group's share of proportionate adjusted EBITDA of associated | |||
| companies | 168 | 183 | |
31 For details regarding the definitions of the "EBITDA" indices, "FFO" and "cash flow after service of project debt" – see Section 4B above.
(2) Set forth below is a breakdown of the adjusted EBITDA after proportionate consolidation data broken down by the subsidiaries (on a consolidated basis) and the associated companies (on a proportionate basis, based on the rate of the holdings of the CPV Group therein):
| Basis of presentation in the Company's financial |
For the Three Months Ended September 30 |
||
|---|---|---|---|
| statements | 2023 | 2022 | |
| Total operating projects (see Section 5B(3) below) | Consolidated | 243 | 124 |
| Business development costs, headquarters in Israel and others | Consolidated | (8) | (5) |
| Total Israel | 235 | 119 | |
| Total operating projects (see Section 5B(3) below) | Associate | 170 | 183 |
| Other | Consolidated | (1) | (2) |
| Total energy transition in the U.S. | 169 | 181 | |
| Total operating projects (see Section 5B(3) below) | Consolidated | 10 | 9 |
| Development costs of renewable energy and others | Consolidated | (12) | (7) |
| Total renewable energy in the U.S. | (2) | 2 | |
| Total activities under other segments | Consolidated | 9 | 3 |
| Headquarters in the United States32 | Consolidated | (25) | (25) |
| Total United States | 151 | 161 | |
| Company headquarters (not allocated to the segments) | Consolidated | (7) | (6) |
| Adjusted EBITDA after proportionate consolidation | 379 | 274 |
32 After eliminating management fees between the CPV Group and the Company, in the amounts of about NIS 8 million and about NIS 5 million for the three-month periods ended September 30, 2023 and 2022, respectively.
(3) Set forth below is information regarding the revenues, EBITDA after adjusted proportionate consolidation, FFO and net cash flows after project debt service of the Group's active power plants broken down by the subsidiaries (on a consolidated basis) and the associated companies (on a proportionate basis, based on the rate of the holdings of the CPV Group therein) (in NIS millions):
| Basis of presentation in the Company's financial statements |
For the three months ended September 30, 2023 |
For the three months ended September 30, 2022 |
||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Main projects in operation |
Revenues | Adjusted EBITDA after proportionate consol- idation |
FFO | Net cash flows after service of project debt |
Revenues | Adjusted EBITDA after proportionate consol- idation |
FFO | Net cash flows after service of project debt |
||
| Rotem33 | Consolidated | 414 | 170 | 185 | 185 | 322 | 112 | 131 | 131 | |
| Hadera | Consolidated | 118 | 36 | 41 | 29 | 87 | 12 | 24 | 13 | |
| Zomet34 | Consolidated | 75 | 12 | 19 | 19 | – | – | – | – | |
| Gat35 | Consolidated | 62 | 25 | 13 | 7 | – | – | – | – | |
| Total operating projects in Israel |
669 | 243 | 258 | 240 | 409 | 124 | 155 | 144 | ||
| Fairview | Associated (25%) |
67 | 40 | 37 | 21 | 98 | 42 | 28 | (1) | |
| Towantic | Associated (26%) |
86 | 44 | 42 | (2) | 140 | 34 | 32 | 12 | |
| Maryland | Associated (25%) |
55 | 22 | 8 | 3 | 74 | 26 | 19 | 5 | |
| Shore | Associated (37.53%) |
58 | 16 | 12 | 3 | 100 | 19 | 12 | 11 | |
| Valley | Associated (50%) |
102 | 45 | 18 | 14 | 200 | 62 | 23 | 7 | |
| Three Rivers31 | Associated (10%) |
22 | 3 | – | – | – | – | – | – | |
| Total energy transition in the |
||||||||||
| U.S.36 | 390 | 170 | 117 | 39 | 612 | 183 | 114 | 34 | ||
| Keenan | Consolidated | 19 | 7 | 3 | 9 | 18 | 9 | 6 | 5 | |
| Mountain Wind32 | Consolidated | 10 | 3 | 1 | (11) | – | – | – | – | |
| Total renewable energy in the U.S. |
29 | 10 | 4 | (2) | 18 | 9 | 6 | 5 |
33 Not including a deduction of repayment of loans to the shareholders in Rotem before the Veridis transaction (see Note 6A(2) of the interim statements) and intercompany tax payments as part of the consolidated tax reconciliation statement.
34 The financial results of the Zomet and Three Rivers power plants were included starting from the commercial operation date, from the end of June 2023 and during July 2023, respectively. For details regarding the capacity payments in the Zomet power plant, particularly in 2023 – see Section 10B.
35 The financial results of the projects were included starting from the initial consolidation date, in the second quarter of 2023.
36 It is noted that the financing agreements of the CPV Group including mechanisms of the "cash sweep" type in the framework of which all or part of the free cash flows from the project is designated for repayment of the loan principal on a current basis plus the predetermined minimum repayment schedule with respect to every long-term loan. Accordingly, there could be an acceleration of execution of repayments upon occurrence of certain events and there are limitations on distributions to the owners. For additional details – see Section 9 below.

Set forth below is an analysis of the change in adjusted EBITDA in Israel in the third quarter of 2023 compared with the corresponding quarter last year (in NIS millions):


Set forth below is an analysis of the change in the EBITDA after adjusted proportionate consolidation in the energy transition segment in the U.S. in the third quarter of 2023 compared with the corresponding quarter last year (in millions of NIS):

E. Analysis of the change in net income

(1) Most of the increase stems from depreciation expenses of the Gat (about NIS 13 million) and Mountain Wind (about NIS 5 million) power plants which were consolidated for the first time in the second quarter of 2023, and the commercial operation of the Zomet power plant (about NIS 15 million) that took place in the second quarter of 2023.


| Section | For the three months ended September 30 |
Board's explanations | |||
|---|---|---|---|---|---|
| 2023 | 2022 | ||||
| Change in the fair value of derivative financial instruments (which are presented as part of the Company's share of income of associated companies in the U.S.) |
(1) | (12) Represents the change in the fair value of derivative financial instruments that are used in programs for hedging electricity margins of the natural gas segment in the U.S. that were not designated for hedging, as described in Section D above. |
|||
| Net expenses, not in the ordinary course of business and/or of a non-recurring natures |
– | 2 In the period of the report and in the corresponding quarter last year, represents activities in respect of a test run and the Company's preparations for the commercial operation of the Zomet Power Plant at the end of June 2023. |
|||
| Total adjustments to EBITDA after proportionate consolidation | (1) | (10) | |||
| Income from exchange rate differences in respect of intercompany loans (*) |
– | (12) | |||
| Tax impact in respect of the adjustments Total adjustments to the income for the period |
– (1) |
4 (18) |
(*) For purposes of improving the comparability between the periods with respect to the adjusted net income data, the Company made a reconciliation to the net income in the nine months and three months ended on September 30, 2022 in respect of income that is not cash flow income from exchange rate differences from revaluation of intercompany loans that occurred from October 1, 2022 that were classified as part of the Group's net investment in the U.S. and exchange rate differences in respect thereof are recorded, commencing from that date, to other comprehensive income as part of the translation reserve.
Set forth below is detail of actual generation of the power plants in Israel and the U.S.:
| For the three months ended September 30, 2023 | For the three months ended September 30, 2022 | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Capacity (MW) |
Potential electricity generation (GWh)(1) |
Net electricity generation (GWh)(2) |
Actual generation percentage (%)(3) |
Actual availability percentage (%) |
Potential electricity generation (GWh) |
Net electricity generation (GWh) |
Actual generation percentage (%) |
Actual availability percentage (%) |
|||
| Rotem | 466 | 917 | 907 | 98.9% | 100% | 925 | 924 | 99.9% | 100% | ||
| Hadera | 144 | 249 | 193 | 77.8% | 77.8% | 250 | 184 | 73.6% | 73.6% | ||
| Gat | 75 | 155 | 152 | 98.0% | 100% | ||||||
| Zomet | 396 | 835 | 247 | 29.6% | 89.4% |
For definitions – see Section 4H above.
Israel
U.S.
| Capacity (MW) |
Potential electricity generation (GWh)(1) |
Net electricity generation (GWh)(2) |
Actual generation percentage (%)(3) |
Actual availability percentage (%) |
Potential electricity generation (GWh) |
Net electricity generation (GWh) |
Actual generation percentage (%) |
Actual availability percentage (%) |
||
|---|---|---|---|---|---|---|---|---|---|---|
| 88.0% | ||||||||||
| 99.9% | ||||||||||
| 745 | 1,656 | 885 | 55.6% | 1,656 | 1,067 | 99.4% | ||||
| 725 | 1,571 | 1,218 | 77.5% | 1,576 | 1,365 | 100.0% | ||||
| 91.3% | ||||||||||
| 1,258 | 1,524 | 1,055 | 61.3% | – | – | – | – | |||
| Renewable energy projects | ||||||||||
| 92.7% | ||||||||||
| 82 | 180 | 31 | 17.2% | – | – | – | – | |||
| 1,050 805 720 152 |
2,368 1,775 1,657 328 |
2,060 1,539 1,394 72 |
93.5% 88.2% 94.3% 21.4% |
For the three months ended September 30, 2023 | 99.3% 2,376 98.6% 1,780 89.4% 97.9% 97.9% 1,549 68.7% 88.1% 335 90.0% |
Energy transition projects (natural gas) 1,931 1,611 1,241 82 |
For the three months ended September 30, 2022 87.6% 91.8% 66.5% 86.6% 83.6% 24.5% |
For definitions – see Section 4H above.
(*) Regarding the planned maintenance – see Sections 5C(2) and 5D(3) above and Section 8.8 of the Company's Periodic Report for 2022.
| Power plants/ facilities for generation of energy |
Status | Capacity (megawatts) |
Location | Technology | Date/ expectation of the start of the commercial operation |
Main customer/ consumer |
Total expected construction cost (NIS millions) |
Total construction cost as at September 30, 2023 (NIS millions) |
|---|---|---|---|---|---|---|---|---|
| OPC Sorek 2 Ltd. ("Sorek 2") |
Under construction |
≈ 87 | On the premises of the Sorek B seawater desalination facility |
Powered by natural gas, cogeneration |
The first half of 202438 | Yard consumers and the System Operator |
≈ 200 | ≈ 123 |
For additional details regarding projects in the development stages in Israel (Hadera 2 and Rotem 2) – see Section 6A to the Report of the Board of Directors for 2022 and Section 10E below. In addition, for details regarding a win in a tender of Israel Land Authority for rights in land designated for construction of solar facilities with integration of storage capabilities – see Section 10A below.
38 It is noted that a delay in the commercial operation beyond the projected contractual date, as detailed in Section 7.15.1.2 of Part A of the Periodic Report for 2022, which is not considered a justified delay as defined in the project agreements, could trigger payment of monthly compensation at a limited graduated rate (taking into account the length of the delay, where a delay after full utilization of the compensation ceiling could give rise to a cancellation right). It is clarified that in the initial delay period, the amount of the compensation for an unjustified delay is not material. It is noted that the construction contractor of the Sorek 2 project delivered a force majeure notification due to the outbreak of the War, and Sorek 2 project delivered on its behalf a force majeure notification to the initiator of the desalination facility. The construction work, its completion the commercial operation date and the costs involved with the construction could be adversely impacted by the War and/or its impacts. It is further noted that on November 5, 2023, a hearing of the Electricity Authority was published in connection with extension of the dates, among other things, as part of the arrangement that applies to the project due to the defense (security) by two months. If passed and subject to the final language, this should permit a postponement of the financial closing date of Sorek 2. As at the approval date of the report, a final decision has not yet been determined.
37 That stated in connection with projects that have not yet reached operation (including generation facilities on the premises of the consumers) including with reference to the expected operation date, the technologies and/or the anticipated cost of the investment, is "forward-looking" information, as it is defined in the Securities Law, which is based on, among other things, the Company's estimates and assumptions as at the approval date of the report and regarding which there is no certainty it will be realized (in whole or in part). Completion of the said projects (or any one of them) may not occur or may occur in a manner different than that stated above, among other things due to dependency on various factors, including those that are not under the Company's control, including assurance of connection to the network and output of electricity from the project sites and/or connection to the infrastructures (including gas infrastructures), receipt of permits, completion of planning processes and licensing, completion of construction work, final costs in respect of development, construction, equipment and land, the proper functioning of the equipment and/or the terms of undertakings with main suppliers (including lenders), and there is no certainty they will be fulfilled, the manner of their fulfillment, the extent of their impact or what their final terms will be. Ultimately technical, operational or other delays and/or breakdowns and/or an increase in expenses could be caused, this being as a result of, among other things, factors as stated above or as a result of occurrence of one or more of the risk factors the Company is exposed to, including construction risks (including force majeure events and the War and its impacts), regulatory, licensing or planning risks, macro-economic changes, delays and increased costs due relating to the supply chain, transport and changes in raw-material prices and etc. For additional details regarding risk factors – see Section 19 of Part A of the Periodic Report for 2022. It is further clarified that delays in completion of the above-mentioned projects beyond the date originally planned for this could impact the ability of the Company and the Group companies to comply with their obligations to third parties (including by force of guarantees provided), including authorities, conditions of permits, lenders, yard consumers, customers and others, in connection with the projects.
| Power plants/ facilities for generation of energy |
Status | Capacity (megawatts) |
Location | Technology | Date/ expectation of the start of the commercial operation |
Main customer/ consumer |
Total expected construction cost (NIS millions) |
Total construction cost as at September 30, 2023 (NIS millions) |
|---|---|---|---|---|---|---|---|---|
| Facilities for generation of energy located on the consumer's premises |
In various stages of development / construction |
Projects in operation: about 11, projects under construction: about about 33, projects in advanced development: about 65. The Company intends to act to expand projects with a cumulative scope of at least 12039 |
On the premises of consumers throughout Israel |
Natural gas and renewable energy (solar, storage) |
Regarding projects under construction, gradually starting from the second half of 2023 and up to the end of 2025 |
Yard consumers and the System Operator. |
An average of about NIS 4 per megawatt |
≈ 150 |
39 Every facility with a capacity of up to 16 megawatts. The Company's intention, as stated, reflects its intention as at the approval date of the report only, and there is no certainty that the matters will materialize based on that stated, and the said intention is subject to, among other things, the discretion of the Company's competent organs. As at the approval date of the report, there is no certainty regarding signing of additional binding agreements with consumers, and there is no certainty regarding the number of consumers with which the Company will sign agreements and/or regarding the scope of the megawatts the Company will contract for and/or the type of technology if agreements are signed. As stated, as at the approval date of the report, all of the preconditions for execution of all the projects for construction of facilities for generation of electricity on the customer's premises had not yet been fulfilled, and the fulfillment thereof is subject to various factors, such as, licensing, permits, connection and construction processes, including connection to the gas and other infrastructures. It is noted that due to the War, the Company delivered a force majeure notification to the customers. The war and its impacts could have an adverse impact on the compliance with the expected dates for the commercial operation and the expected costs of the project.
40 Details with respect to the scope of the investments in the United States were translated from dollars and presented in NIS based on the currency rate of exchange on September 30, 2023 – \$1 = NIS 3.824. The information presented below regarding projects under construction, including regarding the expected commercial structure, the projected commercial operation date and the expected construction cost and expected results of activities for a full calendar year (revenues, EBITDA and cash flows after the tax partner) includes "forward-looking" information, as it is defined in the Securities Law, regarding which there is no certainty it will materialize (in whole or in part), including due to factors that are not under the control of the CPV Group. The information is based on, among other things, estimates, assessments and plans of the CPV Group, the realization of which is not certain, and which might not be realized due to factors, such as: delays in receipt of permits, an increase in the construction costs, delays in the construction work and/or technical or operational malfunctions, problems or delays regarding signing an agreement for connection to the network or connection of the project to transmission or other infrastructures, an increase in costs due to the commercial conditions in the agreements with main suppliers (such as equipment suppliers and contractors), problems signing an investment agreement with a Tax Equity Partner regarding part of the cost of the project and utilization of the tax benefits (if relevant), problems signing commercial agreements for of the potential revenues from the project, terms of the commercial agreements, conditions of the energy market, regulatory changes (including changes impacting main suppliers of the projects), an increase in the financing expenses, unforeseen expenses, macro-economic changes, weather events, including delays and an increase in costs of undertakings in the supply chain, transport and an increase in raw-material prices, etc. Completion of the projects in accordance with the said estimates is subject to the fulfillment of conditions which as at the approval date of the report had not yet been fulfilled (fully or partly) and, therefore, there is no certainty they will be completed in accordance with that stated. Construction delays could even impact the ability of the companies to comply with liabilities to third parties in connection with the projects (including based on guarantees provided in favor of those third parties). For additional details regarding the risk factors involved with the activities of the CPV Group – see Section 8.21 of Part A of the Periodic Report for 2022.
| Project | Capacity (megawatts) |
Location | Expected commercial operation date |
Commercial structure |
Regulated market after the PPA period |
Total expected construction cost net41 for 100% of the project (NIS billions) |
Tax equity (NIS millions) |
Total construction cost as at September 30, 2023 (NIS billions) |
Expectation for a full calendar year in the period of the PPA agreements |
||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenues (NIS millions) |
EBITDA (NIS millions) |
Cash flows after tax partner (NIS millions) |
|||||||||
| CPV Maple Hill Solar LLC ("Maple Hill"). |
126 MWdc | Pennsyl vania |
As at the approval date of the report, construction of the project had been completed42 |
Long-term PPA. green certificates43 |
PJM market PA + MAAC SRECs |
≈ 0.69 (≈ \$0.18 billion) |
≈ 298 (≈ \$78 million)44 |
≈ 0.65 (≈ \$0.17 billion) |
≈ 48 (≈ \$13 million) |
≈ 37 (≈ \$10 million) |
≈ 30 (≈ \$8 million) |
41 Not including initiation fees and reimbursement of pre-construction development expenses to the CPV Group. In projects that are entitled to tax benefits of the ITC type, the Company's estimate regarding the scope of the investment of the tax partner also includes the initiation fees and reimbursement of the development expenses on the basis of calculations that are customary in agreements with tax partners. The expected cost of the investment in the project is subject to changes as a result of, among other things, the final costs involved with supply of the solar panels, the construction work and/or the connection.
42 As at the approval date of the report, the project had been substantially completed, although the investment of the project's tax partner had not yet been received in full.
43 About half of the electricity is under a long-term PPA agreement, including hedging of the electricity price with a fixed price, in effect up to 2033, and an undertaking with an international energy company for sale of 100% of the project's green certificates, in effect up to 2027.
44 For additional details – see Note 7A(3) to the Interim Statements.
| Project | Capacity (megawatts) |
Location | Expected commercial operation date |
Commercial structure |
Regulated market after the PPA period |
Total expected construction cost net38 for 100% of the project (NIS billions) |
Tax equity (NIS millions) |
Total construction cost as at September 30, 2023 (NIS billions) |
Expectation for a full calendar year in the period of the PPA agreements |
||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenues (NIS millions) |
EBITDA (NIS millions) |
Cash flows after tax partner (NIS millions) |
|||||||||
| CPV Stagecoach Solar, LLC ("Stagecoach"). |
100 MWdc | Georgia | First half of 2024 |
Long-term PPA (including green certificates)45 |
SERC | ≈ 0.42 (≈ \$0.11 billion) |
≈ 203 (≈ \$53 million)46 |
≈ 0.24 (≈ \$0.06 billion) |
≈ 24 (≈ \$7 million) |
≈ 17 (≈ \$5 million) |
≈ 17 (≈ \$5 million |
45 The project signed an electricity supply agreement with a local utility company for a period of 30 years from the start of the commercial operation for supply of all the electricity expected to be generated by the project in the said period. In addition, the project contracted with a global company for sale of 100% of the solar renewable energy certificates and hedge of the electricity price with a fixed price for a period of 20 years from the start of the commercial operation.
46 In the estimation of the CPV Group, the project is expected to sign an agreement with a tax partner in a PTC format, where the amount of about \$43 million out of the amount stated is expected to be received on the commercial operation date of the project and the balance over a period of 10 years. In projects that are entitled to tax benefits of the PTC type, the Company's estimate regarding the scope of the investment of the tax partner is based on the provisions of the IRA law and customary calculations in the agreements with the tax partner, a tax benefit for every KW/hr. of generation, and does not depend on the expected cost of the investment (and does not depend on the initiation fees and reimbursement of pre-construction development expenses). The estimate of the CPV Group regarding the expectation of contracting with a tax partner, including the PTC format for the undertaking, is "forward-looking" information as it is defined in the Securities Law, which is based on data, estimates, assessments and plans of the Company proximate to the publication date of the report. The estimates might not materialize or might change due to a range of circumstances, including changes in the provisions of the law or regulations and locating a tax partner that will wish to contract with the project, which are not dependent on the Company and there is no certainty regarding their realization.

| Project | Capacity (megawatts) |
Location | Expected commercial operation date |
Commercial structure |
Regulated market after the PPA period |
Total expected construction cost net37 for 100% of the project (NIS billions) |
Tax equity (NIS millions) |
Amount of the cost of the investment September 30, 2023 (NIS billions) |
Expectation for a full calendar year in the period of the PPA agreements |
||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenues (NIS millions) |
EBITDA (NIS millions) |
Cash flows after tax partner (NIS millions) |
|||||||||
| CPV Backbone Solar, LLC ("Backbone"). |
170 MWdc | Maryland | Second half of 2025 |
Long-term PPA47 (including green certificates) |
PJM + MD SRECs |
≈ 1.07 (≈ \$0.28 billion) |
≈ 478 (≈ 125 million)48 |
≈ 0.24 (≈ \$0.06 billion) |
≈ 66 (≈ \$18 million) |
≈ 45 (≈ \$13 million) |
≈ 35 (≈ \$10 million) |
47 The project has signed a connection agreement and electricity supply agreement with the global e-commerce company for a period of 10 years from the start of the commercial operation, for supply of 90% of the electricity expected to be generated by the project in the said period, and sale of solar renewable energy certificates, which is valid up to 2035. The balance of the project's capacity (10%) will be used for supply to active customers, retail supply of electricity of the CPV Group or for sale in the market.
48 The project is located on a former coal mine and, therefore, it is expected to be entitled to enlarged tax benefits of 40% in accordance with the IRA Law. The CPV Group intends to act to sign an agreement with a tax partner (Equity Tax) in respect of about 40% of the cost of the project and use of the tax credits that are available to the project (subject to appropriate regulatory arrangements), such that the net cost of the investment is estimated as about NIS 0.5 billion. The intention of the CPV Group to sign an agreement with a tax partner (equity tax), including the scope thereof and/or the scope of the tax benefits, includes "forward-looking" information as it is defined in the Securities Law, which based on estimates, assessments and plans of the CPV Group proximate to the date of the report and regarding which there is no certainty they will materialize (in whole or in part). The said estimates and assessment might not materialize or might change due to a range of circumstances, including changes in the provisions of the law or regulations and locating a tax partner that will wish to contract with the project, which are not dependent on the Company and there is no certainty regarding their realization.
For additional details – see Section 6 of the Report of the Board of Directors for 2022.
Set forth below is a summary of the scope of the development projects (in megawatts) in the United States as at the approval date of the report49:
| Technology | Advanced50 | Early stage | Total* |
|---|---|---|---|
| Solar51 | 1,600 | 1,050 | 2,650 |
| Wind (1) | 100 | 1,150 | 1,250 |
| Total renewable energy | 1,700 | 2,200 | 3,900 |
| Carbon capture projects (natural gas | |||
| with reduced emissions) (2) | 1,300 | 2,600 | 3,900 |
* It is noted that out of the total of the development projects, as stated above, a scope of about 950 megawatts (of renewable energy) and about 3,400 megawatts (of which about 1,400 megawatts are renewable energy) are in the PJM market in an advanced stage and in an initial stage, respectively.
51 The capacities in the solar technology included in this report are denominated in MWdc. The capacities in the solar technology projects in the advanced development stages and in the early development stages are about 1,200 MWac and about 850 MWac.
49 The information presented in this section with reference to development projects of the CPV Group, including regarding the status of the projects and/or their characteristics (the capacity, technology, the possibility for integrated carbon capture, expected construction date etc.), constitutes "forward-looking" information as it is defined in the Securities Law, regarding which there is no certainty it will be realized or the manner in which it will be realized. It is clarified that as at the approval date of the report there is no certainty regarding the actual execution of the development projects (in whole or in part), and their progress and the rate of their progress is subject to, among other things, completion of development and licensing processes, obtain control over the lands, signing agreements (such as equipment and construction agreements), execution of construction processes and completion of the connection process, assurance of financing and/or receipt of various regulatory approvals and permits. In addition, advancement of the development projects is subject to the discretion of the competent authorities of the CPV Group and of the Company.
50 In general, the CPV Group views projects that in its estimation are in a period of up to two years or up to three years to the start of the construction as projects in the advanced development stage (there is no certainty the development projects, including projects in the advanced stage, will be executed). That stated is impacted by, among other things, the scope of the project and the technology, and could change based on specific characteristics of a certain project, as well as from external circumstances that are relevant to a certain project, such as the anticipated activities' market or regulatory circumstances, including, projects that are designated to operate in the PJM market could be impacted by the changes in the connection processes as part of the proposed change described in Section 8.1.2.2(A) of Part A to the Periodic Report for 2022, and their progress could be delayed as a result of this proposal. It is clarified that in the early development stages (in particular), the scope of the projects and their characteristics are subject to changes, if and to the extent they reach advanced stages.
B. Additional details regarding development projects in the U.S. (Cont.)
List of development projects (Cont.)
52 The information stated with reference to the projected time of commencement of the construction and the scope of the estimated EBITDA of the Rogues Wind project constitutes "forward-looking" information as it is defined in the Securities Law, which is based on the estimates and assessments of the CPV Group as at the date of the report, and regarding which there is no certainty it will materialize. The time of commencement of the construction actual scope of the EBITDA (assuming the project is ultimately constructed) might be different due to, among other things, changes in the project's commercial structure, changes in the terms of the PPA, changes in the energy market or regulatory changes, or as a result of occurrence of one or more of the risk factors the CPV Group is exposed to. Completion of the project is subject to various factors, including, development and licensing processes, signing of agreements (such as equipment and construction agreements), execution of construction processes, assurance of a connection process, assurance of financing and/or receipt of various regulatory approvals and permits. It is noted that non-compliance with dates or non-advancement of the project could impact, among other things, compliance with the commitments under the PPA agreement (which are secured by a guarantee). In addition, advancement of development of the project is subject to the discretion of the competent authorities of the CPV Group and the Company.

7. Financial Position as at September 30, 2023 (in millions of NIS)
| Category | 9/30/2023 | 12/31/2022 | Board's Explanations |
|---|---|---|---|
| Current Assets | |||
| Cash and cash equivalents | 915 | 849 For additional information – see the Company's condensed consolidated statements of cash flows in the interim financial statements and Part 8 below. |
|
| Short-term restricted cash and deposits | – | 125 The decrease stems from release of short-term deposits. | |
| Short-term deposits and restricted cash | 62 | 36 The increase derives mainly from provision of collaterals in favor of projects under construction in the U.S. |
|
| Trade receivables and accrued income | 304 | 260 Most of the increase stems from an increase in accrued income in Israel, in the amount of about NIS 16 million, as a result of the consolidation of Gat power plant commencing from the second quarter of 2023 (for additional details – see Note 6A(1) to the Interim Statements) and an increase of about NIS 19 million due to the commercial operation of Zomet starting from the end of the second quarter of 2023. |
|
| Receivables and debit balances | 146 | 190 Most of the decrease stems from a decrease, in the amount of about NIS 90 million, in the balance of other receivables and debit balances in the U.S., mainly as a result of release of collaterals in connection with transactions hedging electricity margins in Valley. On the other hand, there was an increase, in the amount of about NIS 18 million, in respect of the balance of the debt of Energean (for additional details – see Note 8A (3) to the Interim Statements), and an increase of about NIS 37 million, relating to a receivable balance for a refund of excise tax on diesel oil in Zomet. |
|
| Inventory | 8 | 7 | |
| Short-term derivative financial instruments | 16 | 10 | |
| Total current assets | 1,451 | 1,477 | |
| 56 |
| Category | 9/30/2023 | 12/31/2022 | Board's Explanations |
|---|---|---|---|
| Non-Current Assets | |||
| Long-term deposits and restricted cash | 59 | 53 | |
| Long-term prepaid expenses and other receivable | 424 | 179 Most of the increase stems from a loan granted to an associated company in the U.S., in the amount of about NIS 87 million, as detailed in Note 11 to the Interim Statements, an increase of about NIS 28 million in deferred financing expenses in respect of loans in the U.S., an increase of about NIS 97 million relating to consideration paid for a tender of Israel Lands Authority for construction of facilities for generation of electricity using renewable energy in Israel, and an increase in the investment in infrastructures of Zomet, in the amount of about NIS 19 million. |
|
| Investments in associated companies | 2,661 | 2,296 The increase stems mainly from equity earnings of the CPV Group, in the amount of about NIS 179 million and from an increase in the shekel/dollar exchange rate, in the amount of about NIS 207 million, offset by other comprehensive loss, in the amount of about NIS 27 million. For additional details regarding investments in associated companies – see Sections 4D and 5D above. |
|
| Deferred tax assets | 34 | 22 | |
| Long-term derivative financial instruments | 73 | 57 | |
| Property, plant and equipment | 6,306 | 4,324 Most of the increase, in the amounts of about NIS 870 million and about NIS 451 million, stems from the initial consolidation of the Gat power plant (for additional details – see Note 6A(1) to the Interim Statements) and the Mountain Wind project (see Note 6B to the Interim Statements), respectively, an increase deriving from investments in Israel and the U.S. (mainly in construction and development projects), in the amount of about NIS 208 million and about NIS 462 million, respectively, and an increase of about NIS 124 million, in property, plant and equipment in the U.S. due to an increase in the shekel/dollar exchange rate. This increase was partly offset by depreciation expenses on property, plant and equipment. |
|
| Right-of use assets | 487 | 347 The increase derives mainly from lease of land in the U.S. (the Backbone project). |
|
| Intangible assets | 1,092 | 777 Most of the increase derives from recognition of goodwill, in the amounts of about NIS 85 million and about NIS 75 million, in respect of acquisition of the Gat power plant and the Mountain Wind project, respectively, recognition of intangible assets in respect of agreements for sale of electricity in the Mountain Wind project, in the amount of about NIS 93 million, and an increase of about NIS 75 million due to the increase in the shekel/dollar exchange rate. |
|
| Total non-current assets | 11,136 | 8,055 | |
| Total assets | 12,587 | 9,532 | |
| 57 |
7. Financial Position as at September 30, 2023 (in millions of NIS) (Cont.)
| Category | 9/30/2023 | 12/31/2022 | Board's Explanations |
|---|---|---|---|
| Current Liabilities | |||
| Current maturities of loans from banks and financial institutions | 216 | 92 Most of the increase stems from update of the current maturities of the Zomet, Gat and Mountain Wind projects, in the amounts of about NIS 46 million, about NIS 22 million and about NIS 20 million respectively, and an increase of about NIS 24 million relating to receipt of short-term credit in Zomet. |
|
| Current maturities of loans from holders of non-controlling interests | 30 | 13 Most of the increase stems from update of the current maturities of the loans based on the Company's expectation regarding the repayment schedule of the debt from holders of non-controlling interests in Rotem. |
|
| Current maturities of debentures | 192 | 33 The increase stems from update of the current maturities of the debentures based on the repayment schedules. |
|
| Trade payables | 436 | 335 Most of the increase stems from an increase, in the amount of about NIS 50 million, relating to the gas suppliers in Israel, mainly as a result of timing differences, and an increase of about NIS 42 million deriving from investments in projects under construction in the U.S. |
|
| Payables and other credit balances | 432 | 110 Most of the increase derives from deferred consideration in respect of acquisition of the Gat power plant, as detailed in Note 6A(1) to the Interim Statements, in the amount of about NIS 296 million, and reclassification of current maturities, in the amount of about NIS 30 million, in respect of a liability relating to a profit-sharing plan for employees of the CPV Group. |
|
| Short-term derivative financial instruments | 2 | 3 | |
| Current maturities of lease liabilities | 62 | 61 | |
| Current tax liabilities | 1 | 2 | |
| Total current liabilities | 1,371 | 649 | |
| 58 |
| Category | 9/30/2023 | 12/31/2022 | Board's Explanations |
|---|---|---|---|
| Non-Current Liabilities | |||
| Long-term loans from banks and financial institutions | 2,744 | 1,724 Most of the increase stems from receipt of long-term loans, in the amounts of about NIS 450 million, for financing acquisition of the Gat power plant (for additional details – see Notes 6A(1) and 7A(1) to the Interim Statements), about NIS 270 million for financing acquisition of the Mountain Wind project (for additional details – see Notes 6B and 7A(2) to the Interim Statements), and about NIS 223 million for financing projects under construction in the renewable energy segment in the U.S. (for additional details – see Note 7A(4) to the Interim Statements), the amounts of about NIS 173 million and about NIS 51 million relating to receipt of financing and accrual of interest on the principal in Zomet and an increase of about NIS 44 million relates to an increase in the shekel/dollar exchange rate. This increase was partly offset by repayment of loans, in the amount of about NIS 76 million, and an increase in current maturities, in the amount of about NIS 100 million. |
|
| Long-term loans from holders of non-controlling interests | 396 | 424 Most of the decrease stems from a decrease, in the amount of about NIS 122 million, in loans from the holders of non-controlling interests in Rotem, this being as a result of repayment and update of the current maturities of the loans. This decrease was partly offset by an increase deriving from an increase in the balance of the long-term loans from the holders of non-controlling interests in the CPV Group, where an increase of about NIS 68 million is in respect of additional loans provided to the Group and accrual of interest to the principal in the period of the report, and an increase of about NIS 28 million due to an increase of the shekel/dollar exchange rate. |
|
| Debentures | 1,647 | 1,807 The decrease stems from repayment of debentures, in the amount of about NIS 31 million, and update of current maturities, in the amount of about NIS 159 million. On the other hand, there was an increase deriving from linkage differences in respect of the debentures (Series B), in the amount of about NIS 32 million. |
|
| Long-term lease liabilities | 217 | 69 Most of the increase stems from lease of land in the Backbone project, in the amount of about NIS 122 million (against a right-of-use asset), and a lease agreement for offices in the U.S., in the amount of about NIS 15 million, recognized against a right-of-use asset. |
|
| Other long-term liabilities | 157 | 146 | |
| Liabilities for deferred taxes | 525 | 347 Most of the increase, in the amount of about NIS 110 million, stems from the initial consolidation of the Gat power plant (for additional details – see Note 6A(1) to the Interim Statements) and an increase of about NIS 59 million stemming from update of the deferred taxes as a result of timing differences in Israel. |
|
| Total non-current liabilities | 5,686 | 4,517 | |
| Total liabilities | 7,057 | 5,166 | |
| For the Nine Months Ended |
|||||
|---|---|---|---|---|---|
| Category | 9/30/2023 | 9/30/2022 | Board's Explanations | ||
| Cash flows provided by operating activities | 443 | 271 Most of the increase in the cash flows provided by operating activities stems from an increase in cash-basis income, in the amount of about NIS 152 million, and an increase in the Group's working capital, in the amount of about NIS 18 million. |
|||
| Cash flows used in investing activities | (1,607) | (790) Most of the increase in the cash used in investing activities in the period of the report stems from acquisition of the Gat power plant, for a consideration of about NIS 268 million (for additional details – see Note 6A(1) of the Interim Statements), and the Mountain Wind project, for a consideration of about NIS 625 million (for additional details – see Note 6B of the Interim Statements). In addition, the investments in property, plant and equipment in the U.S. increased by about NIS 228 million and the Company provided a loan to an associated company in the U.S., in the amount of about NIS 87 million. On the other hand, cash was provided to the Group, in the amount of about NIS 125 million, relating to the release of short-term deposits, and there was an increase of about NIS 158 million, in respect of release of collaterals, net, relating to hedging electricity margins in the CPV Group. In addition, there was a decrease, in the amount of about NIS 106 million, in investments in property, plant and equipment in Israel, main in connection with commercial operation of Zomet at the end of the second quarter of 2023. |
|||
| Cash flows provided by financing activities | 1,187 | 972 Most of the increase in the cash flows provided by financing activities stems from a receipt in the period of the report, in the amount of about NIS 452 million, in respect of a swap of shares of transaction and investment with Veridis (for additional details – see Note 6A(2) of the Interim Statements), long-term loans, in the amounts of about NIS 450 million and about NIS 270 million, for purposes of financing a transaction for acquisition of the Gat power plant and a transaction for acquisition of the Mountain Wind project, respectively, taking out of a long-term loan, in the amount of about NIS 223 million, for financing construction of projects in the renewable energy segment in the U.S. (for additional details – see Note 7A(4) to the Interim Statements), and from an increase of about NIS 184 million, in investments and loans from holders of non-controlling interests (in the CPV Group and Veridis). On the other hand, in the period of the report the Group repaid a loan to the prior holders of the rights in the Gat power plant, in the amount of about NIS 303 million (for additional details – see Note 6A(1) of the Interim Statements), there was an increase, in the amount of about NIS 74 million, in repayments of Rotem to the holders of non-controlling interests, an increase of about NIS 61 million in costs paid in advance in respect of loans (mainly relating to loans in the U.S.) and, in addition, there was a decrease, in the amount of about NIS 56 million, in respect of withdrawals from Zomet's financing agreement framework. Furthermore, in 2022 the Group raised about NIS 815 million, resulting from an issuance of shares. |
| For the Three Months Ended |
|||
|---|---|---|---|
| Category | 9/30/2023 | 9/30/2022 | Board's Explanations |
| Cash flows provided by operating activities | 283 | 175 Most of the increase in the cash flows provided by operating activities stems from an increase in income on a cash basis, in the amount of about NIS 113 million, offset by a decrease in the Group's working capital, in the amount of about NIS 8 million. |
|
| Cash flows used in investing activities | (291) | (253) Most of the increase in the cash flows used in investing activities stems from the fact that during the third quarter there was an increase in the investments in property, plant and equipment in the U.S. increased by about NIS 123 million. On the other hand, collaterals were released, in the amount of about NIS 85 million, net, in connection with hedging of electricity margins in the CPV Group. |
|
| Cash flows provided by financing activities | 98 | 778 Most of the decrease in the cash flows provided by financing activities stems from raising of capital, in the amount of about NIS 815 million, in the corresponding quarter last year, and an increase of about NIS 48 million in costs paid in advance in respect of loans (mainly in respect of loans in the U.S.). On the other hand, in the third quarter of 2023 the Group took out a long-term loan, in the amount of about NIS 223 million, for financing projects under construction in the renewable energy segment in the U.S. (for additional details – see Note 7A(4) to the Interim Statements). |
For additional details – see the Company's condensed consolidated interim statements of cash flows in the Interim Statements.
As at September 30, 2023 and 2022 and as at December 31, 2022, the Group's working capital (current assets less current liabilities) amounted to about NIS 80 million, about NIS 895 million and about NIS 828 million, respectively.
For details regarding definition of the net financial debt and the adjusted net financial debt – see Section 9 of the Report of the Board of Directors for 2022. The following table details the adjusted financial debt, net, as at September 30, 2023 (in millions of NIS)53:
| Method of presentation |
Gross debt | Cash and cash equivalents and deposits |
||||
|---|---|---|---|---|---|---|
| Name of project | in the Company's financial statements |
Debt (including interest payable) |
Weighted- average interest rate |
Final repayment date of the loan |
(including restricted cash used for debt service) (1) |
Net debt |
| Rotem | Consolidated | – | – | – | 32 | (32) |
| Hadera | Consolidated | 652 | 4.9% | 2037 | 89 | 563 |
| Zomet | Consolidated | 1,075 | 7.2% | 2042 | 55 | 1,020 |
| Gat | Consolidated | 438 | 6.9% | 2039 | 17 | 421 |
| Headquarters and others – Israel (2) | Consolidated | – | 47 | (47) | ||
| Total Israel | 2,165 | 6.4% | 240 | 1,925 | ||
| Keenan | Consolidated | 317 | 3.5% | 2030 | 13 | 304 |
| Mountain Wind | Consolidated | 268 | 5.4% | 2028 | 4 | 264 |
| Financing construction projects (5) | Consolidated | 210 | 7.9% | 2026 | – | 210 |
| Total renewable energy | 795 | 5.3% | 17 | 778 | ||
| Fairview (Cash Sweep 100%) | Associate 25% | 368 | 5.6% | 2025 | 24 | 344 |
| Towantic (Cash Sweep 100%) | Associate 26% | 389 | 5.7% | 2025 | 7 | 382 |
| Maryland (3) (Cash Sweep 100%) | Associate 25% | 316 | 6.9% | 2028 | 3 | 313 |
| Shore (3) (Cash Sweep 75%) | Associate 37.5% | 644 | 6.9% | 2025 | 7 | 637 |
| Valley (4) (Cash Sweep 100%) | Associate 50% | 748 | 10.8% | 2026 | 17 | 731 |
| Three Rivers | Associate 10% | 296 | 5.3% | 2028 | 2 | 294 |
| Total energy transition54 | 2,761 | 7.4% | 60 | 2,701 | ||
| Headquarters and others – U.S. | Consolidated | – | – | – | 171 | (171) |
| Total U.S. | 3,556 | 248 | 3,308 | |||
| Total Energy headquarters (6) | 2.5%–2.75% (weighted-average |
|||||
| 1,841 | 2.6%)55 | 538 | 1,303 | |||
| Total | 7,562 | 1,026 | 6,536 |
(1) Includes restricted cash (a debt service reserve in Hadera), in the amount of about NIS 51 million.
(2) Includes mainly balances of cash and cash equivalents in OPC Israel Holdings and OPC Power Plants.
(3) As part of the financial agreements, an historical debt-service coverage ratio financial covenant of 1:1 during the last four quarters was determined for Shore and Maryland. As at the date of the financial statements, Maryland and Shore are in compliance with the covenant (2.84 and 1.11, respectively). Subsequent to the date of the report, the credit frameworks accompanying the Shore project were extended up to March 31, 2025.
(4) For details regarding signing of an amendment and extension agreement with respect to the financing agreement of Valley on June 28, 2023 – see Note 11 to the Interim Statements. The balance in the above table does not include subordinated shareholders' loans.
(5) For details regarding signing in the third quarter of 2023 of an agreement for financing projects under construction in the renewable energy segment in the U.S. – see Note 7A(4 ) to the Interim Statements.
(6) Includes balances of debt and cash in the Company and cash in ICG Energy Inc. (available for use for all the Group's needs).
62
53 In addition, the Group has liabilities to the holders of non-controlling interests, the balance of which as at September 30, 2023 is about NIS 426 million.
54 The rate regarding the Cash Sweep mechanism is in accordance with the estimate of the CPV Group for 2023 and could change based on the provisions of the financing agreements of the projects.
55 For details regarding the interest rate and linkage on the debentures – see Section 11 to the Report of the Board of Directors for 2022.
The following table details the financial debt, net, as at December 31, 2022 (in millions of NIS):
| Method of presentation in the Company's financial statements |
Debt (including interest payable) |
Cash and cash equivalents and deposits (including restricted cash used for debt service) |
Net debt |
|
|---|---|---|---|---|
| Rotem | Consolidated | – | 25 | (25) |
| Hadera | Consolidated | 670 | 58 | 612 |
| Zomet | Consolidated | 833 | 9 | 824 |
| Headquarters and others in Israel | Consolidated | 4 | 107 | (103) |
| Total Israel | 1,507 | 199 | 1,308 | |
| Keenan | Consolidated | 310 | 3 | 307 |
| Maple Hill | Consolidated | – | 11 | (11) |
| Total renewable energy | 310 | 14 | 296 | |
| Fairview | Associate | 442 | 1 | 441 |
| Towantic | Associate | 509 | 39 | 470 |
| Maryland | Associate | 300 | 6 | 294 |
| Shore | Associate | 607 | 16 | 591 |
| Valley | Associate | 895 | 2 | 893 |
| Three Rivers | Associate | 290 | – | 290 |
| Total energy transition | 3,043 | 64 | 2,979 | |
| Headquarters and others in the U.S. | Consolidated | – | 226 | (226) |
| Total U.S. | 3,353 | 304 | 3,049 | |
| Total Energy headquarters | 1,854 | 586 | 1,268 | |
| Total Company | 6,714 | 1,089 | 5,625 |
The following table details the financial debt, net, as at September 30, 2022 (in millions of NIS):
| Method of presentation in the Company's financial statements |
Debt (including interest payable) |
Cash and cash equivalents and deposits (including restricted cash used for debt service) |
Net debt |
|
|---|---|---|---|---|
| Rotem | Consolidated | – | 38 | (38) |
| Hadera | Consolidated | 675 | 81 | 594 |
| Zomet | Consolidated | 789 | 26 | 763 |
| Headquarters and others in Israel | Consolidated | 4 | 103 | (99) |
| Total Israel | 1,468 | 248 | 1,220 | |
| Keenan | Consolidated | 318 | 3 | 315 |
| Maple Hill | Consolidated | – | 8 | (8) |
| Total renewable energy | 318 | 11 | 307 | |
| Fairview | Associate | 472 | 2 | 470 |
| Towantic | Associate | 523 | 27 | 496 |
| Maryland | Associate | 311 | 1 | 310 |
| Shore | Associate | 611 | 14 | 597 |
| Valley | Associate | 917 | 11 | 906 |
| Three Rivers | Associate | 278 | – | 278 |
| Total energy transition | 3,112 | 55 | 3,057 | |
| Headquarters and others in the U.S. | Consolidated | – | 167 | (167) |
| Total U.S. | 3,430 | 233 | 3,197 | |
| Total Energy headquarters | Consolidated | 1,834 | 837 | 997 |
| Total | 6,732 | 1,318 | 5,414 |
For additional information regarding interest and linkage bases – see Section 9 of the Report of the Board of Directors for 2022.
The Company and its investee companies are subject to financial covenants provided in their financing agreements and trust certificates. As at the date of the financial statements, the Company and its investee companies were in compliance with all the financial covenants provided. For detail regarding the covenants for violation, relating to significant loans and debentures – see Note 7C to the Interim Statements56:
On August 1, 2023, S&P Global Ratings Maalot Ltd. reconfirmed a rating of 'ilA–' for the Company and for the debentures and the rating outlook was updated to negative (Reference No.: 2023-01-079929).
56 For a description of the financial covenants of the material loans of the Company and the investee companies – see Sections 7.18.3 and 10.5 to Part A to the Periodic Report for 2022.
Movement in the adjusted financial debt, net, for the nine-month period ended September 30, 2023:

(*) Includes the amount of about NIS 91 million in respect of current payments and the amount of about NIS 874 million in respect of payments relating to construction projects.
(**) In respect of translation of the net financial debt of the U.S. which is denominated in dollars into the Company's functional currency.

Activities in Israel
On May 10, 2023, the Group was announced as a winner in a tender of Israel Lands Authority for planning and an option to acquire lease rights in land for construction of facilities for generation of electricity using renewable energy using photovoltaic technology together with storage with respect to three sites in the area of the Local Industrial Council of Naot Hovav, with a cumulative area of about 2,270 dunams. The Group's bids in the tender amount, in the aggregate, to about NIS 484 million for the three sites. In light of proximity of the sites to each other, the Group intends to advance construction of a project for generation of electricity using photovoltaic technology on the sites that are the subject of the tender with a cumulative capacity of about 245 megawatts plus storage capacity estimated at a capacity of about 1,375 megawatts per hour (hereinafter in this Section – "the Project").
Pursuant to the Company's initial estimate, the proximity of the sites that are the subject of the win to each other should allow a continuous project in such a manner that will lead to savings on costs and streamlining the development processes. In the Group's estimation, the total cost of the three projects (including the land) is estimated at about NIS 2.2 billion to about NIS 2.4 billion, and in this preliminary stage, subject to completion of all the development processes and receipt of the required approvals, the project will reach the construction stage in the first half of 202657 .
According to the terms of the tender, in the third quarter of 2023 an amount equal to 20% of the aggregate amount of the consideration for the three above-mentioned sites was paid in respect of the authorization and planning agreement58. It is noted that the amount paid, as stated, will not be returned to the winner even if the development and planning processes of the project do not ripen into an approved plan and signing of a long-term lease agreement.
57 That stated above regarding the characteristics and the capacity of the solar facilities and the storage capacity, the estimated cost of the projects, the feasibility for advancement of the project as a single (combined) project and the resulting cost savings, the commencement date of the construction of the project/s, the regulation that will apply to the facilities, the Company's activities in the renewable area, and obtaining of the government's consent include "forward-looking" information, as it is defined in the Securities Law, which is based on the Company's estimates and assumptions as at the date of the report, regarding which there is no certainty it will be realized or the manner of its realization. As at the submission date of the report, construction of the facilities and advancement of the project/s depends on completion of the planning processes, construction, connection to the network (grid), licensing, and regulatory conditions, approval of the plan (which is expected to include, among other things, examination of planning, environmental, security, planning of connection to the grid and transmission capability, including examination of objections of various parties), contracting with relevant suppliers and assurance of financing for the construction, which as at the date of the report has not yet been completed and there is no certainty regarding the completion thereof or the manner of the said completion (if completed). Ultimately, there could be administrative, planning, environmental, regulatory, infrastructure, operating delays / problems and/or cost increases – this being, among other things, due to factors not under the Company's control, or as a result of the occurrence of one or more of the risk factors to which the Company is exposed.
58 It is noted that if a new plan is not approved in accordance with law within 3 years, Israel Lands Authority will be permitted to extend the development authorization for an additional year. An extension as stated involves additional consideration at the rate of 2.5% of the amount of the winning bid, plus VAT, linked to the CPI.
Activities in Israel (Cont.)
It is noted that further to the winner's contact to the Planning Administration for receipt of a plan recommendation for purposes of its consent to submit a National Infrastructure Plan for a photovoltaic facility for the sites, as stated, a notification of the Planning Administration was sent to the Ministry of Energy whereby an initial plan examination indicates that the sites requested for construction of the project meet the conditions for location of a photovoltaic power plant59. Accordingly, it was recommended to the Ministry to continue to examine the requested sites as part of advancement of the National Infrastructure Plan by the National Infrastructure Board.
For additional details regarding the tender and the payment terms included therein – see Note 10G to the Interim Statements.
The win in the tender is part of realization of the Group's strategy and targets for expansion of its activities in the area of generation and supply of electricity in Israel, in general, and in the area of renewable energy, in particular (as stated in Section 17.2 Part A of the Periodic Report for 2022) and constitutes a significant foothold in the area of generation of solar energy and storage in Israel. At the same time, the Group is advancing undertakings with consumers in Israel in agreements for supply of electricity and energy from renewable sources (including storage).
As at the approval date of the report, there is no certainty that the approvals and the required consents for development of the project will be completed with respect to any of the sites.
B. Receipt of approval for commercial operation for the Zomet power plant – further to that stated in Section 7.1.2 of Part A of the Periodic Report for 2022, on June 22, 2023, the commercial operation of the Zomet power plant commenced. Pursuant to the decision of the Electricity Authority published on June 21, 2023, the Electricity Authority decided to grant a permanent electricity generation license ("the License") to the Zomet power plant using conventional technology in an open cycle, with a capacity of about 396 megawatts. The License is for a period of 20 years (with a possibility for extension subject to the decision of the Electricity Authority). The total construction cost of Zomet amounted about NIS 1.4 billion (without the amount of the assessment issued by Israel Lands Authority, in the amount of about NIS 200 million, as detailed in Note 11B to the financial statements for 2022). Pursuant to the generation license, Zomet is entitled to receive an availability tariff from the System Operator, as at the date of the report of between 5.7 and 6.5 agurot per kilowatt hour60, subject to the number of ignitions. In addition, Zomet is entitled to an electricity and gas tariff based on the generation and purchase cost and pursuant to the terms of the generation license and Regulation 914 of the Electricity Authority61 .
59 Based on the relevant government decision and upon making certain adjustments to the area of the sites.
60 The tariff is linked to various indices: the CPI (primarily), the exchange rate of the dollar and a tariff of fixed costs of INGL. It is noted that in 2023 only the availability tariff will be reduced by about 36%.
61 For additional details regarding Regulation 914 of the Electricity Authority – see Section 7.3.1 of the Periodic Report for 2022.
Activities in Israel (Cont.)
B. (Cont.)
In the Company's estimation, the additional annual EBITDA resulting from operation of the Zomet power plant in 2024, will be about NIS 145 million62 .
C. Agreement for sale of electricity (PPA) with Bazan – further to that stated in Section 7.6.2 of Part A of the Periodic Report for 2022 regarding an agreement of Rotem for sale of electricity (PPA) to Bazan, in May 2023, new PPA agreements were signed between Rotem and Bazan for supply of electricity to the consumption facilities of the Bazan Group ("the PPA Agreements" or "the Undertaking") for a maximum scope of 125 megawatt/hour. Supply of the electricity is in exchange for a payment equal to the TAOZ (load time) high-voltage tariff determined from time to time by the Electricity Authority and less a discount on the generation component in accordance with the rates and arrangements detailed in the agreement. The period of the agreement is ten years, commencing from July 2023 (upon conclusion of the present agreement as stated in above-mentioned Periodic Report), subject to grounds for early termination63, along with graduated exit points commencing after the passage of 5 years from the commencement date of the supply and pursuant to the provisions agreed to. As part of the Undertaking, additional provisions were included that are customary in PPA agreements of this type, among other things, regarding consumption in excess of the maximum quantity, a commitment for availability of the power plant and supply of the electricity from different sources.
In addition, as part of the Undertaking provisions were included regarding supply of electricity in the scope of about 50 megawatts from renewable energy generation facilities in a graduated manner, starting from January 2025 and in accordance with the dates stipulated64, and "green certificates" 65 subject to ceilings and the conditions agreed to. The arrangements in respect of supply of the electricity based on generation from renewable energy constitute part of the Company's strategy to expand its activities in the area of renewable energy and supply of electricity from renewable energy sources in Israel.
62 The Company's estimate regarding the additional EBITDA of the Zomet power plant constitutes "forward-looking" information within the meaning thereof in the Securities Law, which is based on data, estimates, assessments and plans of the Company regarding the characteristics of the power plant that are in the Company's possession proximate to the publication date of the report. These data items, estimates and assessments may not materialize or could change during the relevant period due to a range of circumstances that are not under the Company's control, including changes in the provisions of law or regulations, unforeseen expenses, technical, operational or other malfunctions, defects in the system, changes in the system cost and changes in the scope of the consumption or operation, which do not depend on the Company and regarding which there is no certainty they will occur.
63 Including, non-compliance with the commitments (including, as stated, with reference to supply of renewable energy sources), license cancellation, construction of a generation facility using natural gas by Bazan above a certain capacity, and etc. – all of this subject to the provisions determined.
64 Subject to entry into effect of the decision of the Electricity Authority regarding regulation of the activities of generation and storage facilities that are connected to or integrated in the distribution network (grid).
65 The certificates constitute exclusive approval for the quantity of energy that will be generated in Israel from a renewable energy source. At the present time, there are green certificates in Israel of the IREC (International Renewable Energy Certificate) type that are issued by the international I-REC organization and that meet the international standard regarding green certificates and the use thereof.
68
Activities in Israel (Cont.)
D. Tender for sale of Eshkol as part of the reform of Israel Electric Company (IEC)66 – on May 22, 2023, the Group submitted, through a joint designated company held in equal shares by OPC Power Plants Ltd. (a subsidiary that is held at the rate of 80% (indirectly) by the Company) and a company held by the Noy Fund ("OPC Eshkol") a bid for acquisition of the Eshkol power plant, in the framework of a tender of Israel Electric Company. The tender includes acquisition of a number of generation units that operate using conventional technology (natural gas) with a cumulative capacity of about 1,680 megawatts67, and the possibility to construct additional capacity of 600 megawatts to 850 megawatts68 based on regulations of the Electricity Authority, for the Eshkol site that is located in the Ashdod area.
On June 15, 2023, a notification was delivered to the Company whereby the Tenders Board announced that the bid of Eshkol Power Energies Ltd. is the winning bid in the tender and OPC Eshkol was declared as the "second qualifier" pursuant to the tender documents.
After the winner did not complete signing of the purchaser agreement for the consideration it offered in the tender, on July 19, 2023, IEC gave notice of cancellation of the tender and of its decision to hold a new competitive process between the bidders that submitted bids in the tender (and that includes a minimum price of NIS 9 billion) ("the Competitive Process").
Further to that stated, on August 9, 2023, OPC Eshkol submitted an administrative petition to the Court for Administrative Matters in Tel-Aviv. On September 14, 2023, the decision of the Court for Administrative Matters was received which rejected the petition.
It is noted that OPC Eshkol did not submit a bid in the Competitive Process that was held on October 30, 2023.
For additional details – see the Company's Immediate Reports dated June 18, 2023, July 19, 2023, August 10, 2023 and September 14, 2023 (Reference Nos.: 2023-01-066522, 2023-01-068125, 2023-01-092253 and 2023-01-087175 respectively), which are presented herein by means of reference.
E. Hadera 2 – on May 28, 2023, a government decision was made not to approve National Infrastructure Plan 20B, relating to the Hadera 2 power plant, and to return it to the National Infrastructure Board for further deliberations. Further to this, the Company submitted a petition for issuance to the Government of a conditional order to provide reasons for non-approval of NIP 20B, which was summarily dismissed on July 19, 2023.
68 The possibility of constructing the additional capacity is subject to the existence of additional conditions, among others, approval of the site plan for construction of the additional capacity (which as at the approval date of the report there is no certainty regarding their ultimate existence of the timing of their occurrence).

66 For additional details – see Section 7.2.11.2 of Part A of the Periodic Report for 2022.
67 Out of this capacity, steam units on the site with a cumulative capacity of about 912 megawatts, are expected to discontinue their activities within 3 – 6 years, while the other units are expected to operate based on a license for a period of 20 years.
Activities in Israel (Cont.)
69 It is noted that on May 14, 2023, all of the directors presently serving with the Company were classified as "expert directors" for purposes of the Remuneration Regulations. For details regarding the directors presently serving with the Company – see Regulation 26 in Part D of the Periodic Report for 2022.
J. Proposed Clean Power Plan – in May 2023, the U.S. Environmental Protection Agency announced a proposal Clean Power Plan 2.0, the goal of which is to significantly limit emission of greenhouse gases from generation of energy through fossils. Pursuant to the proposal, the regulation will require large electricity generation facilities operating using natural gas with an output coefficient of more than 50% to integrate burning of hydrogen with natural gas or, alternatively, carbon capture technology – this being commencing from 2032 or 2035, respectively. As at the approval date of the report, the said proposal, is not final and will be subject to comments of the public and a thorough examination process. In CPV's estimation, the proposed plan could undergo significant changes before its potential application in 2024.
The development portfolio of the CPV Group, which includes wind energy and solar projects, in a scope of more than 3 GW and two natural gas power plants with carbon capture in a scope of about 9 GW, will enjoy significant tailwinds from the regulation. In addition, in the estimation of the CPV Group, its natural gas power plants have a significant competitive advantage, in light of their high efficiency and their ability to integrate carbon capture and to integrate hydrogen.
In July 2023, the commercial operation period of the Three Rivers power plant. The power plant has a capacity of about 1,258 megawatts, utilizing conventional technology in an integrated cycle, which is located in the State of Illinois, U.S., and operates in the PJM market. The total construction cost of the project amounted to about NIS 4.8 billion (about \$1.3 billion). The CPV Group holds the project at the rate of 10%.
Further to that stated in Section 8.1.4 of Part A of the Periodic Report for 2022 regarding a legal proceeding in the State of Pennsylvania regarding the question whether sale of quotas of carbon dioxide in accordance with the carbon quota plan and the trade budget of Pennsylvania is a permissible "commission" or a "tax" that may be imposed only by the State legislator. Subsequent to the date of the report, the Pennsylvania court ruled that the RGGI constitutes a tax that requires legislative processes in order to enter into effect. This decision cancels the Governor's plan to impose RGGI by means of an administrative decision. The Court's decision creates a delay in its application however the matter is not expected to come to an end and an appeal of the Court's decision is possible or advancement of legislative processes later on.

In the period of the report, there were no significant changes in the details of the outstanding debentures issued by the Company and that were offered to the public pursuant to a prospectus, the details of the trustees for the debentures, the conditions for call the debentures for immediate repayment, compliance on the part of the Company with these conditions and the collaterals for the debentures, as detailed in Section 11 to the Report of the Board of Directors for 2022 and in Note 17 to the consolidated financial statements for 2022.
As at the date of the report, the Company is in compliance with all the conditions of the Company's debentures (Series B and Series C) and the trust certificates. The Company was not required to take any action in accordance with the request of the trustees for the said debentures.
For additional details – regarding the rating of the Company published subsequent to the date of the report – see Section 9C above.
Changes in the macro-economic environment, which are characterized by high rates of inflation, strengthening of the dollar against the shekel and rising interest rates, could impact the Group's activities in different ways, including, an impact on the electricity generation component (and as a result an impact on the Company's natural gas revenues and costs) and other index-linked revenues, an increase in fixed expenses (including wages), maintenance costs, project construction costs – both in Israel and in the U.S., equipment acquisition costs and financing expenses in respect of loans and debentures the Group companies are liable for that bear variable interest and/or are linked to the CPI. In addition, an increase in the interest rate could impact the economic feasibility of projects under construction, the discount rates used for examining impairment of the value of active projects, projects under construction or in the development stage and cash-generating units to which goodwill was allocated, and the fair value of a liability in respect of a profit-sharing plan in the CPV Group. It is noted that changes in the currency exchange rate, particularly the exchange rate of the dollar, also impact the Company.
Set forth below is disclosure regarding impacts of changes in the currency exchange rates, CPI and interest rates on the Group's activities. Taking into account the complexity of an analysis of the impacts of the said factors, particularly since some of them are indirect (and not direct) impacts and the existence of reciprocal relationships between the various macro-economic parameters, the Company is not able to estimate the impacts of the changes in the said macro-economic parameters on the Company's overall results.
The Group is exposed to changes in the currency exchange rates, particularly the exchange rate of the dollar.
Regarding its activities in Israel, the Company is exposed to a change in the exchange rate of the dollar, directly and indirectly, due to the linkage of a significant part of its revenues to the generation tariff (which is impacted, in part, by changes in the exchange rate of the dollar), while on the other hand acquisitions of the natural gas, some of which are linked to the dollar exchange rate and/or are denominated based on the dollar exchange rate, are also linked to the generation tariff and include dollar floor prices.
Therefore, even though an increase in the rate of the dollar increases the cost of the natural gas purchased by the Company, the structure of the revenues includes a partial natural hedge that reduces the said exposure. Nonetheless, it is pointed out that generally the generation component is updated once a year, and accordingly timing differences are possible between the impact of a rise in the rate of the dollar on the current gas cost and its impact on the Company's gross margin. The said timing differences could have a negative effect on the Company's current profit and cash flows in the short run. In the long run, a rise in the rate of the dollar will lead to an increase in the generation tariff and, in turn, to an increase in the Company's revenues corresponding to the increase in the gas costs, such that a strengthening of the dollar could adversely impact the Company's profits.
In addition, from time to time the Company enters into hedges of the currency exposure in significant construction and maintenance contracts that are denominated in different currencies, particularly the dollar and the euro.
It is noted that from time to time, and based on business considerations and risk-management policies, the Company makes use of forward contracts on the exchange rates.
With reference to the Company's investment in the CPV Group, which operates in the U.S. with a dollar functional currency, in general a fall in the dollar rate has a negative impact on the dollar value of the Company's investment and on the Company's net income and shareholders' equity. On the other hand, due to the need to raise financing in Israel in shekels in order to finance the expected investments in the construction and development projects of the CPV Group, an increase in the dollar could lead to an increase in the financing requirements in order to realize these investments.
The Group is exposed to changes in the CPI. Regarding its activities in Israel, the Company is exposed to changes in the CPI, directly and indirectly, mainly due to linkage of a significant part of its revenues to the generation component (which is impacted partly by a change in the CPI). On the other hand, purchases of the natural gas are partly linked to the generation tariff and include, as stated, a dollar floor price. Also, part of the Company's capital costs and investments are linked to the CPI, directly or indirectly. Therefore, despite the fact that an increase in the CPI increases the Company's costs and investments, the structure of the revenues includes a natural hedge that reduces the said exposure, such that the Company's profits could be positively affected by an increase in the CPI.
Furthermore, the Company is exposed to changes in the CPI with respect to the terms of the Company's debentures (Series B) and part of Hadera's loans (regarding which hedging transactions were not executed as detailed in Note 23 to the financial statements for 2022). An increase in the CPI increases the Company's liabilities and financing costs. In order to reduce part of the exposure to changes in the CPI with respect to Hadera's loans, in June 2019 the Group entered into transactions with a bank for purposes of hedging part of the exposure to the CPI.
The Group has loans and liabilities bearing variable interest that are based on prime or Libor plus a margin. An increase in the variable interest rates could cause an increase in the Group's financing costs. In addition, an increase in the interest rates could impact the discount rates for projects (active, under construction and in development) and could also lead to a lack of economic feasibility of continued development and/or acquisition of projects and a slowdown in the Company's growth processes, along with an existence of signs of impairment of value of assets and/or recording of impairment losses in the financial statements.

In order to reduce the exposure to changes in the interest rate in Israel (mainly prime), the Group makes use of mix of loans (including credit frameworks) and debentures in such a manner that part of the loans and the debentures bear fixed interest and part of them bear variable interest.
Most of the long-term loans and credit frameworks of the CPV Group (including through associated companies) bear variable interest (mainly Libor) and have cash flow exposure to changes in the interest rates. In order to reduce part of the exposure to interest risk, the CPV Group enters into transactions for swap of variable dollar interest for fixed dollar interest with respect to part of its long-term loans.
For additional details regarding the Group's policies for management of the financial risks and sensitivity analyses – see Note 23 to the financial statements for 2022.
The Company has a policy for making contributions that places emphasis on activities in the periphery and non-profit organizations that operate in the field of education.
As part of the Company's policy for charitable contributions, in the period of the report, the following contributions were paid:
| Recipient of the Contribution |
Amount of the Contribution (NIS thousands) |
Relationship to the Recipient of the Contribution |
|---|---|---|
| "Password for Every Student" Society | 1,000 | "Password for Every Student" also receives contributions from parties related indirectly to the Company's controlling shareholder (including from the Israel Corporation Group). The Company's CEO is a representative of the project's Steering Committee without compensation. |
| "Rahashei Lev" Society | 145 | For the sake of good order, it is noted that Ms. Michal Marom Brickman, who served as an external director of the Company, serves as a director and a member of the Investments Committee of the Management Committee of the Tel-Aviv Medical Center in the name of Sorosky (without pay). It is further noted that, as the Company was informed, commencing from November 2022, the daughter of Mr. Yosef Tena, an external director of the Company, is employed by the Tel-Aviv Medical Center in the name of Sorosky. |
| "Nirim" Society | 150 | – |
| "Technoda Hadera Givat Olga" Society | 300 | – |
| "Running to Give" Society | 50 | For the sake of good order, it is noted that a relative of the Company's CEO serves as Chairman of the Society without compensation. |
| Total | 1,645 |
In addition to the contributions as part of the Company's annual contributions' policy, as a result of the outbreak of the War, the Company's Contributions Committee approved an additional framework budget for contributions, in the amount of NIS 2 million, in favor of targets relating to assistance in war effort of the State of Israel and those harmed by the war (families that are victims of the war and that have been removed from the combat zones). As part of the said framework, as at the date of the report contributions were made (by OPC Holdings Israel) as follows:

Further to that stated in Note 6A1 to the Interim Statements regarding completion of a transaction for acquisition of all the rights in the Gat Power Plant on March 30, 2023, on the completion date of the transaction the Company performed a valuation for determination of the fair value of the identified assets and liabilities of the Gat Power Plant and determination of the amount of the goodwill and the manner of allocation thereof to the cash-generating units, by means of an external independent appraiser (BDO Ziv Haft). For additional details regarding the valuation – see Note 6A(1) to the Interim Statements. Up to the approval date of the report, the Company had not yet completed allocation of the acquisition cost and as a result part of the fair value data is still not final and there could be changes to them.
Details of the valuation:
| Subject matter of the valuation | Determination of the fair value of the identified assets and liabilities of the Gat power plant and determination of the amount of the goodwill and the method for allocation thereof to the cash-generating units pursuant to the provisions of IFRS 3. |
|---|---|
| Date of the valuation | March 30, 2023. |
| Value of the identified assets and liabilities and the amount of the goodwill as at the valuation date |
About NIS 555 million. |
| Identity of the appraiser and his characteristics | The valuation was performed by a team headed by Mr. Sagiv Mizrahi, CPA, a partner and team manager in the Corporate Finance Department of the Office of BDO (Ziv Haft). Sagiv has a Bachelor's degree in applied mathematics from Bar Ilan University and a Master's degree in business administration (MBA), with honors, and a specialization in financial management from Tel-Aviv University. Sagiv has more than 10 years of experience in the areas of business and economic consulting, valuations of companies and financial instruments and economic–accounting work of various types in accordance with International Financial Reporting Standards (IFRS) and generally accepted accounting principles in the U.S. (U.S GAAP). In the past, Sagiv was a lecturer at Bar Ilan University regarding accounting and valuation matters. |
| 76 |
| Transaction for acquisition of the Gat power plant (Cont.) | |
|---|---|
| Details of the valuation: (Cont.) | |
| Valuation model | The fair value of the power plant was estimated using the revenues' method, the multi-period excess earnings method (MPEEM). The fundamental assumption of this method is that the value of the asset being estimated equals the present value of the free cash flows allocable to the asset less the fair rate of return of the required assets (the contributing assets) for purposes of realization of these cash flows. |
| The assumptions based on which the appraiser performed the valuation |
– The nominal shekel weighted-average cost of capital (WACC) rates ranges between 8% and 8.75%. |
| – Forecast years – represents the period between March 31, 2023 and up to December 31, 2059, and is based on an estimate of the economic useful life of the power plant. |
|
| Transaction for acquisition of the Mountain Wind wind plants | |
| Further to that stated in Note 6B to the Interim Statements with respect to completion of the transaction for acquisition of all of the rights in the Mountain Wind project on April 5, 2023, as at the completion date of the transaction a valuation was performed in order to determine the fair value of the identified assets and liabilities of the Mountain Wind project as well as to determine the amount and manner of allocation of the goodwill to the cash-generating units, by an external and independent appraiser (PwC Israel). |
|
| Details of the valuation: | |
| Subject matter of the valuation | Estimation of the fair value of certain assets and liabilities of a renewable energy project pursuant to the provisions of IFRS 3. |
| Date of the valuation | April 5, 2023. |
| Value of the identified assets and liabilities and the amount of the goodwill as at the valuation date |
About NIS 625 million. |
| Identity of the appraiser and his characteristics | The valuation was performed by a team headed by Mr. Gil Mor, CPA, Partner, and Manager of the Economics Department in the |
77 degree in business administration (with honors) from Tel-Aviv University.
Office of Price Waterhouse Coopers Advisory Ltd. Mr. Mor holds a bachelor's degree in accounting and economics and a master's
| Transaction for acquisition of the Mountain Wind wind plants (Cont.) | |||
|---|---|---|---|
| Details of the valuation: (Cont.) | |||
| Valuation model | weighted-average cost of capital (WACC). | The fair value was estimated using the DCF method by means of discounting the project's future pre-tax cash flows, at an after-tax | |
| The assumptions based on which the appraiser performed the valuation |
– – – |
The nominal dollar weighted-average cost of capital (WACC) rates range between 5.75% and 6.25%. Prices – the prices in the forecast (electricity, availability of RECs, etc.) are based PPA agreements and market forecasts received from external, independent information sources, taking into account the region and the relevant market for each project and the relevant regulation. Forecast years – between 20 and 29 years, and is based on an estimate of the economic useful life of the project's power plant. |
|
| Yair Caspi | Giora Almogy | ||
| Chairman of the Board of Directors | CEO | ||
| Date: November 16, 2023 |
Exhibit 99.2
OPC Energy Ltd. Condensed Consolidated Interim Financial Statements As at September 30, 2023 (Unaudited)
| Page | |
|---|---|
| Independent Auditors' Review Report | F-3 |
| Letter of consent in connection with the Company's shelf prospectus | F-4 |
| Condensed Consolidated Interim Statements of Financial Position | F-5 |
| Condensed Consolidated Interim Statements of Income | F-7 |
| Condensed Consolidated Interim Statements of Comprehensive Income | F-8 |
| Condensed Consolidated Interim Statements of Changes in Equity | F-9 |
| Condensed Consolidated Interim Statements of Cash Flow | F-12 |
| Notes to the Condensed Consolidated Interim Financial Statements | F-14 |

Somekh Chaikin Millennium Tower KPMG 17 Ha'arba'a St., P.O.B. 609 Tel Aviv 6100601 +972-3-684-8000
We have reviewed the accompanying financial information of OPC Energy Ltd. (hereinafter – the "Company") and its subsidiaries, including the condensed consolidated interim statement of financial position as at September 30, 2023 and the condensed consolidated interim statements of income, comprehensive income, changes in equity and cash flows for the nine-month and threemonth period then ended.The Board of Directors and management are responsible for preparing and presenting financial information for these interim periods in accordance with IAS 34, Interim Financial Reporting, and are also responsible for preparing financial information for these interim periods under Chapter D of the Securities Regulations (Periodic and Immediate Reports), 1970. Our responsibility is to express a conclusion regarding the financial information for these interim periods based on our review.
We conducted our review in accordance with Review Standard (Israel) 2410 - "Review of Interim Financial Information Performed by the Independent Auditor of the Entity" of the Institute of Certified Public Accountants in Israel. A review of financial information for interim periods consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures.A review is substantially smaller in scope than an audit conducted in accordance with generally accepted auditing standards in Israel and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might have been identifiable in an audit.Accordingly, we do not express an audit opinion.
Based on our review, nothing has come to our attention that causes us to believe that the aforementioned financial information was not prepared, in all material respects, in accordance with International Accounting Standard (IAS 34).
In addition to that mentioned in the previous paragraph, based on our review, nothing has come to our attention that causes us to believe that the aforementioned financial information does not comply, in all material respects, with the disclosure requirements of Section D of the Securities Regulations (Periodic and Immediate Reports), 1970.
Somekh Chaikin Certified Public Accountants
November 16, 2023
KPMG Somekh Chaikin, an Israeli registered partnership and a member firm of the KPMG global organization of independent member firms affiliated with KPMG International Limited, a private English company limited by guarantee.


Somekh Chaikin Millennium Tower KPMG 17 Ha'arba'a St., P.O.B. 609 Tel Aviv 6100601 +972-3-684-8000
November 16, 2023
To
The Board of Directors of
OPC Energy Ltd. (hereinafter - the "Company")
Dear Sirs/Madams,
This is to inform you that we agree to the inclusion in the shelf prospectus (including by way of reference) of our reports listed below in connection with the shelf prospectus of May 2023:
Somekh Chaikin
KPMG Somekh Chaikin, an Israeli registered partnership and a member firm of the KPMG global organization of independent member firms affiliated with KPMG International Limited, a private English company limited by guarantee.
| September 30 2023 (Unaudited) NIS million |
September 30 2022 (Unaudited) NIS million |
December 31 2022 (Audited) NIS million |
||
|---|---|---|---|---|
| Current assets | ||||
| Cash and cash equivalents | 915 | 1,213 | 849 | |
| Short term deposits | - | - | 125 | |
| Short-term restricted deposits and cash | 62 | 36 | 36 | |
| Trade receivables and accrued income | 304 | 185 | 260 | |
| Other receivables and debit balances | 146 | 157 | 190 | |
| Inventories Short-term derivative financial instruments |
8 16 |
7 | 7 | |
| 14 | 10 | |||
| Total current assets | 1,451 | 1,612 | 1,477 | |
| Non-current assets | ||||
| Long-term restricted deposits and cash | 59 | 53 | 53 | |
| Prepaid expenses and other long-term receivables | 424 | 206 | 179 | |
| Investments in associates | 2,661 | 2,216 | 2,296 | |
| Deferred tax assets | 34 | 21 | 22 | |
| Long-term derivative financial instruments | 73 | 60 | 57 | |
| Property, plant & equipment | 6,306 | 4,184 | 4,324 | |
| Right-of-use assets | 487 | 322 | 347 | |
| Intangible assets | 1,092 | 786 | 777 | |
| Total non-current assets | 11,136 | 7,848 | 8,055 | |
| Total assets | 12,587 | 9,460 | 9,532 |
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
| September 30 2023 (Unaudited) NIS million |
September 30 2022 (Unaudited) NIS million |
December 31 2022 (Audited) NIS million |
||
|---|---|---|---|---|
| Current liabilities | ||||
| Current maturities of long-term loans from banks and financial institutions | 216 | 101 | 92 | |
| Current maturities of loans from non-controlling interests | 30 | 58 | 13 | |
| Current maturities of debentures | 192 | 33 | 33 | |
| Trade payables | 436 | 357 | 335 | |
| Payables and credit balances | 432 | 98 | 110 | |
| Short-term derivative financial instruments | 2 | 4 | 3 | |
| Current maturities of lease liabilities | 62 | 61 | 61 | |
| Current tax liabilities | 1 | 5 | 2 | |
| Total current liabilities | 1,371 | 717 | 649 | |
| Non-current liabilities | ||||
| Long-term loans from banking corporations and financial institutions | 2,744 | 1,685 | 1,724 | |
| Long-term loans from non-controlling interests | 396 | 415 | 424 | |
| Debentures | 1,647 | 1,799 | 1,807 | |
| Long-term lease liabilities | 217 | 72 | 69 | |
| Other long-term liabilities | 157 | 126 | 146 | |
| Deferred tax liabilities | 525 | 339 | 347 | |
| Total non-current liabilities | 5,686 | 4,436 | 4,517 | |
| Total liabilities | 7,057 | 5,153 | 5,166 | |
| Equity | ||||
| Share capital | 2 | 2 | 2 | |
| Share premium | 3,210 | 3,209 | 3,209 | |
| Capital reserves | 755 | 346 | 327 | |
| Retained earnings (retained loss) | 90 | (55) | (31) | |
| Total equity attributable to the Company's shareholders | 4,057 | 3,502 | 3,507 | |
| Non-controlling interests | 1,473 | 805 | 859 | |
| Total equity | 5,530 | 4,307 | 4,366 | |
| Total liabilities and equity | 12,587 | 9,460 | 9,532 | |
Chairman of the Board of Directors Chief Executive Officer Chief Financial Officer
Yair Caspi Giora Almogy Ana Berenshtein Shvartsman
Date the financial statements were approved: November 16, 2023
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
| For the nine-month period ended September 30 |
For the three-month period ended September 30 |
For the year ended December 31 |
||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | 2023 | 2022 | 2022 | ||
| (Unaudited) | (Unaudited) | (Unaudited) | (Unaudited) | (Audited) | ||
| NIS million | NIS million | NIS million | NIS million | NIS million | ||
| Revenues from sales and provision of services | 1,971 | 1,423 | 851 | 550 | 1,927 | |
| Cost of sales and services (excluding depreciation and amortization) | (1,395) | (1,036) | (561) | (393) | (1,404) | |
| Depreciation and amortization | (205) | (132) | (95) | (46) | (191) | |
| Gross profit | 371 | 255 | 195 | 111 | 332 | |
| General and administrative expenses | (182) | (155) | (65) | (59) | (239) | |
| Share in the profits of associates | 179 | 190 | 79 | 124 | 286 | |
| Business development expenses | (47) | (35) | (17) | (12) | (50) | |
| Other income, net | 6 | - | 11 | - | - | |
| Operating profit | 327 | 255 | 203 | 164 | 329 | |
| Finance expenses | (196) | (128) | (85) | (43) | (167) | |
| Finance income | 53 | 110 | 15 | 17 | 120 | |
| Finance expenses, net | (143) | (18) | (70) | (26) | (47) | |
| Profit before taxes on income | 184 | 237 | 133 | 138 | 282 | |
| Expenses for income tax | (44) | (57) | (32) | (30) | (65) | |
| Profit for the period | 140 | 180 | 101 | 108 | 217 | |
| Attributable to: | ||||||
| The Company's shareholders | 121 | 143 | 82 | 76 | 167 | |
| Non-controlling interests | 19 | 37 | 19 | 32 | 50 | |
| Profit for the period | 140 | 180 | 101 | 108 | 217 | |
| Profit per share attributed to the Company's owners | ||||||
| Basic and diluted earnings per share (in NIS) | 0.54 | 0.70 | 0.36 | 0.36 | 0.79 |
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
| For the nine-month period ended September 30 |
For the three-month period ended September 30 |
For the year ended December 31 |
||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | 2023 | 2022 | 2022 | ||
| (Unaudited) | (Unaudited) | (Unaudited) | (Unaudited) | (Audited) | ||
| NIS million | NIS million | NIS million | NIS million | NIS million | ||
| Profit for the period | 140 | 180 | 101 | 108 | 217 | |
| Other comprehensive income items that, subsequent to initial recognition in comprehensive income, were or will be transferred to profit and loss |
||||||
| Effective portion of the change in the fair value of cash flow hedges | 33 | 51 | 16 | 12 | 50 | |
| Net change in fair value of derivative financial instruments used to hedge cash flows recognized in the cost of the hedged item |
(7) | - | (3) | (2) | (4) | |
| Net change in fair value of derivative financial instruments used to hedge | ||||||
| cash flows transferred to profit and loss | (15) | (11) | (4) | (4) | (14) | |
| Share in other comprehensive income (loss) of associates, net of tax | (24) | 68 | (10) | 14 | 64 | |
| Foreign currency translation differences in respect of foreign operations | 368 | 287 | 153 | 44 | 267 | |
| Tax on other comprehensive income (loss) items | (22) | (10) | (10) | (1) | (9) | |
| Other comprehensive income for the period, net of tax | 333 | 385 | 142 | 63 | 354 | |
| Total comprehensive income for the period | 473 | 565 | 243 | 171 | 571 | |
| Attributable to: | ||||||
| The Company's shareholders | 380 | 411 | 190 | 119 | 412 | |
| Non-controlling interests | 93 | 154 | 53 | 52 | 159 | |
| Comprehensive income for the period | 473 | 565 | 243 | 171 | 571 |
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
F - 8
| Attributable to the Company's shareholders | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Share capital NIS million |
Share premium NIS million |
Capital reserve from transactions with non controlling interests and merger NIS million |
Hedge fund NIS million |
Foreign operations translation reserve NIS million |
Capital reserve from transactions with shareholders NIS million (Unaudited) |
Capital reserve for share based payment NIS million |
Retained earnings (retained loss) NIS million |
Total NIS million |
Non-controlling interests NIS million |
Total equity NIS million |
|
| For the nine-month period ended September 30, 2023 |
|||||||||||
| Balance as at January 1, 2023 | 2 | 3,209 | (25) | 91 | 159 | 78 | 24 | (31) | 3,507 | 859 | 4,366 |
| Investments by holders of non controlling interests in equity of subsidiary |
- | - | - | - | - | - | - | - | - | 231 | 231 |
| Share-based payment | - | - | (1) | - | - | - | 8 | - | 7 | 1 | 8 |
| Exercised options and RSUs Restructuring - share exchange and investment transaction with |
*- | 1 | - | - | - | - | (1) | - | - | - | - |
| Veridis | - | - | 163 | - | - | - | - | - | 163 | 289 | 452 |
| Other comprehensive income | |||||||||||
| (loss) for the period, net of tax Profit for the period |
- - |
- - |
- - |
(10) - |
269 - |
- - |
- - |
- 121 |
259 121 |
74 19 |
333 140 |
| Balance as at September 30, 2023 | 2 | 3,210 | 137 | 81 | 428 | 78 | 31 | 90 | 4,057 | 1,473 | 5,530 |
| For the nine-month period ended September 30, 2022 |
|||||||||||
| Balance as at January 1 2022 | 2 | 2,392 | (25) | 32 | (27) | 78 | 10 | (198) | 2,264 | 577 | 2,841 |
| Issuance of shares (less issuance expenses) |
*- | 815 | - | - | - | - | - | - | 815 | - | 815 |
| Investments by holders of non controlling interests in equity of subsidiary |
- | - | - | - | - | - | - | - | - | 74 | 74 |
| Share-based payment | - | - | - | - | - | - | 12 | - | 12 | - | 12 |
| Exercised options and RSUs | *- | 2 | - | - | - | - | (2) | - | - | - | - |
| Other comprehensive income for | |||||||||||
| the period, net of tax | - | - | - | 68 | 200 | - | - | - | 268 | 117 | 385 |
| Profit for the period | - | - | - | - | - | - | - | 143 | 143 | 37 | 180 |
| Balance as at September 30, 2022 | 2 | 3,209 | (25) | 100 | 173 | 78 | 20 | (55) | 3,502 | 805 | 4,307 |
* Amount is less than NIS 1 million.
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
| Attributable to the Company's shareholders | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Share capital NIS million |
Share premium NIS million |
Capital reserve from transactions with non controlling interests and merger NIS million |
Hedge fund NIS million |
Foreign operations translation reserve NIS million |
Capital reserve from transactions with shareholders NIS million (Unaudited) |
Capital reserve for share based payment NIS million |
Retained earnings (retained loss) NIS million |
Total NIS million |
Non-controlling interests NIS million |
Total equity NIS million |
|
| For the three-month period ended September 30, 2023 |
|||||||||||
| Balance on July 1, 2023 | 2 | 3,210 | 137 | 83 | 318 | 78 | 29 | 8 | 3,865 | 1,385 | 5,250 |
| Investments by holders of non controlling interests in equity of subsidiary Share-based payment |
- - |
- - |
- - |
- - |
- - |
- - |
- 2 |
- - |
- 2 |
35 - |
35 2 |
| Other comprehensive income for the period, net of tax Profit for the period |
- - |
- - |
- - |
(2) - |
110 - |
- - |
- - |
- 82 |
108 82 |
34 19 |
142 101 |
| Balance as at September 30, 2023 | 2 | 3,210 | 137 | 81 | 428 | 78 | 31 | 90 | 4,057 | 1,473 | 5,530 |
| For the three-month period ended September 30, 2022 |
|||||||||||
| Balance on July 1, 2022 | 2 | 2,392 | (25) | 87 | 143 | 78 | 17 | (131) | 2,563 | 716 | 3,279 |
| Issuance of shares (less issuance expenses) Investments by holders of non |
*- | 815 | - | - | - | - | - | - | 815 | - | 815 |
| controlling interests in equity of subsidiary Share-based payment |
- - |
- - |
- - |
- - |
- - |
- - |
- 5 |
- - |
- 5 |
37 - |
37 5 |
| Exercised options and RSUs Other comprehensive income for the period, net of tax |
*- - |
2 - |
- - |
- 13 |
- 30 |
- - |
(2) - |
- - |
- 43 |
- 20 |
- 63 |
| Profit for the period | - | - | - | - | - | - | - | 76 | 76 | 32 | 108 |
| Balance as at September 30, 2022 | 2 | 3,209 | (25) | 100 | 173 | 78 | 20 | (55) | 3,502 | 805 | 4,307 |
* Amount is less than NIS 1 million.
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
| Attributable to the Company's shareholders | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Share capital NIS million |
Share premium NIS million |
Capital reserve from transactions with non controlling interests and merger NIS million |
Hedge fund NIS million |
Foreign operations translation reserve NIS million |
Capital reserve from transactions with shareholders NIS million (Audited) |
Capital reserve for share based payment NIS million |
Retained loss NIS million |
Total NIS million |
Non-controlling interests NIS million |
Total equity NIS million |
|
| For the year ended December 31, 2022 |
|||||||||||
| Balance as at January 1 2022 | 2 | 2,392 | (25) | 32 | (27) | 78 | 10 | (198) | 2,264 | 577 | 2,841 |
| Issuance of shares (less issuance expenses) |
*- | 815 | - | - | - | - | - | - | 815 | - | 815 |
| Investments by holders of non controlling interests in equity of |
|||||||||||
| subsidiary | - | - | - | - | - | - | - | - | - | 123 | 123 |
| Share-based payment | - | - | - | - | - | - | 16 | - | 16 | - | 16 |
| Exercised options and RSUs | *- | 2 | - | - | - | - | (2) | - | - | - | - |
| Other comprehensive income for | |||||||||||
| the year, net of tax | - | - | - | 59 | 186 | - | - | - | 245 | 109 | 354 |
| Profit for the year | - | - | - | - | - | - | - | 167 | 167 | 50 | 217 |
| Balance as at December 31, 2022 | 2 | 3,209 | (25) | 91 | 159 | 78 | 24 | (31) | 3,507 | 859 | 4,366 |
* Amount is less than NIS 1 million.
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
| For the nine-month period ended September 30 |
For the three-month period ended September 30 |
For the year ended December 31 |
||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | 2023 | 2022 | 2022 | ||
| (Unaudited) | (Unaudited) | (Unaudited) | (Unaudited) | (Audited) | ||
| NIS million | NIS million | NIS million | NIS million | NIS million | ||
| Cash flows from operating activities | ||||||
| Profit for the period | 140 | 180 | 101 | 108 | 217 | |
| Adjustments: | ||||||
| Depreciation, amortization and diesel fuel consumption | 239 | 147 | 103 | 51 | 210 | |
| Finance expenses, net | 143 | 18 | 70 | 26 | 47 | |
| Expenses for income tax | 44 | 57 | 32 | 30 | 65 | |
| Share in profits of associates | (179) | (190) | (79) | (124) | (286) | |
| Other income | (18) | - | (18) | - | - | |
| Share-based payment transactions (including cash-settled transactions in | ||||||
| subsequent periods) | 26 | 31 | 9 | 14 | 62 | |
| 395 | 243 | 218 | 105 | 315 | ||
| Changes in inventory, trade and other receivables | 99 | (17) | 82 | 2 | (84) | |
| Changes in trade payables, service providers, other payables and long-term | ||||||
| liabilities | (52) | 46 | (19) | 69 | (19) | |
| 47 | 29 | 63 | 71 | (103) | ||
| Dividends received from associates | 7 | - | 3 | - | - | |
| Income tax paid | (6) | (1) | (1) | (1) | (5) | |
| Net cash from operating activities | 443 | 271 | 283 | 175 | 207 | |
| Cash flows from investing activities | ||||||
| Interest received | 23 | 3 | 8 | 3 | 8 | |
| Short-term restricted deposits and cash, net | (17) | (33) | - | 1 | (33) | |
| Short term deposits, net | 125 | - | - | - | (125) | |
| Provision of short-term collateral(1) | - | (66) | - | (66) | (79) | |
| Release of short-term collateral(1) | 110 | 17 | 37 | 17 | 17 | |
| Withdrawals from long-term restricted cash | - | 44 | - | - | 44 | |
| Deposits to long-term restricted cash | (1) | (1) | - | 1 | (2) | |
| Acquisition of Gat and Mountain Wind, net of cash acquired(2) | (893) | - | - | - | - | |
| Investment in associates | (25) | (6) | (17) | (3) | (10) | |
| Subordinated long-term loans to Valley(3) | (87) | - | - | - | - | |
| Purchase of property, plant, and equipment, intangible assets and long-term | ||||||
| deferred expenses | (872) | (763) | (332) | (211) | (942) | |
| Proceeds for derivative financial instruments, net | 11 | 2 | 2 | 1 | 5 | |
| Other | 19 | 13 | 11 | 4 | 15 | |
| Net cash used in investing activities | (1,607) | (790) | (291) | (253) | (1,102) |
Including mainly a collateral provided to secure transactions to hedge energy margins in Valley in 2022, and which was released in the reporting period.
For further details, see Notes 6A1, 6B, 7A1 and 7A2.
For further details, see Note 11.
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
| For the nine-month period ended September 30 |
For the three-month period ended September 30 |
For the year ended December 31 |
||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | 2023 | 2022 | 2022 (Audited) NIS million |
||
| (Unaudited) | (Unaudited) | (Unaudited) | (Unaudited) | |||
| NIS million | NIS million | NIS million | NIS million | |||
| Cash flows from financing activities | ||||||
| Proceeds of share issuance, net of issuance costs | - | 815 | - | 815 | 815 | |
| Receipt of long-term loans from banking corporations and financial | ||||||
| institutions, net(1) | 1,045 | 246 | 174 | - | 282 | |
| Receipt of long-term loans from non-controlling interests | 50 | 31 | 5 | 11 | 46 | |
| Investments by holders of non-controlling interests in equity of subsidiary | 231 | 74 | 35 | 37 | 123 | |
| Proceed in respect of restructuring - share exchange and investment | ||||||
| transaction with Veridis(2) | 452 | - | - | - | - | |
| Short term loans from banking corporations, net | 29 | - | 5 | - | - | |
| Interest paid | (105) | (72) | (46) | (33) | (86) | |
| Repayment of long-term loans from banking corporations and others | (76) | (57) | (30) | (17) | (74) | |
| Repayment of long-term loans as part of the acquisition of Gat(3) | (303) | - | - | - | - | |
| Repayment of long-term loans from non-controlling interests | (105) | (35) | (31) | (21) | (89) | |
| Repayment of debentures | (31) | (20) | (15) | (10) | (20) | |
| Proceeds (payment) for derivative financial instruments, net | 6 | (5) | 3 | (2) | (3) | |
| Repayment of principal in respect of lease liabilities | (6) | (5) | (2) | (2) | (8) | |
| Net cash provided by financing activities | 1,187 | 972 | 98 | 778 | 986 | |
| Net increase in cash and cash equivalents | 23 | 453 | 90 | 700 | 91 | |
| Balance of cash and cash equivalents at beginning of period | 849 | 731 | 818 | 506 | 731 | |
| Effect of exchange rate fluctuations on cash and cash equivalent balances | 43 | 29 | 7 | 7 | 27 | |
| Balance of cash and cash equivalents at end of period | 915 | 1,213 | 915 | 1,213 | 849 |
For further details, see Notes 7A1, 7A2 and 7A4.
For further details, see Note 6A2.
For further details, see Note 6A1.
The accompanying notes to the Condensed Consolidated Interim Financial Statements are an integral part thereof.
OPC Energy Ltd. (hereinafter – "the Company") was incorporated in Israel on February 2, 2010. The Company's registered address is 121 Menachem Begin Road, Tel Aviv, Israel. The Company's controlling shareholder is Kenon Holdings Ltd. (hereinafter - the "Parent Company"), a company incorporated in Singapore, the shares of which are dual-listed on the New York Stock Exchange (NYSE) and the Tel Aviv Stock Exchange Ltd. (hereinafter - the "TASE").
The Company is a publicly-traded company whose securities are traded on the TASE.
As of the approval date of the report, the Company and its investees (hereinafter - the "Group") are engaged in the generation and supply of electricity and energy through three reportable segments. For further details regarding the Group's operating segments during the reporting period, see Note 27 to the Financial Statements as at December 31, 2022 (hereinafter – the "Annual Financial Statements").
The Condensed Consolidated Interim Financial Statements were prepared in accordance with International Accounting Standard 34 (hereinafter – "IAS 34") - "Interim Financial Reporting" and do not include all of the information required in complete Annual Financial Statements. These statements should be read in conjunction with the Annual Financial Statements. In addition, these financial statements were prepared in accordance with the provisions of Section D of the Securities Regulations (Periodic and Immediate Reports) 1970.
The condensed consolidated interim financial statements were approved for publication by the Company's Board of Directors on November 16, 2023.
The New Israeli Shekel (NIS) is the currency that represents the primary economic environment in which the Company operates. Accordingly, the NIS is the Company's functional currency. The NIS also serves as the presentation currency in these financial statements. Currencies other than the NIS constitute foreign currency.
In preparation of the condensed consolidated interim financial statements in accordance with the IFRS, the Company's management is required to use judgment when making estimates, assessments and assumptions that affect implementation of the policies and the amounts of assets, liabilities, income and expenses. It is clarified that the actual results may differ from these estimates.
Management's judgment, at the time of implementing the Group's accounting policies and the main assumptions used in the estimates involving uncertainty, are consistent with those used in the Annual Financial Statements.

The Group carried out immaterial classifications in its comparative figures so that their classification will match their classification in the current financial statements.
The results of group companies in Israel are based on the generation component, which constitutes part of the energy demand management tariff (hereinafter – the "TAOZ"), which is supervised and published by the Israeli Electricity Authority. Through January 2023, the year was broken down into three seasons: summer (July and August), winter (December, January and February) and "transitional" (March through June and September through November), and for each season a different tariff was set for each demand hour cluster (hereinafter - "DHC"). Two key changes occurred as from January 2023: (1) The cancellation of the mid-peak DHC tariff, on account of the expansion of the number of months of the peak and off-peak DHCs; (2) the summer season was extended to 4 months instead of two months, such that June to September are considered as summer, March to May and October to November are considered as the transitional season, and the winter season did not change. The changes made to the DHCs alters the seasonality aspect of the breakdown of the Company's revenues and profitability in Israel throughout the year, such that it significantly raises them during the summer months, specifically during the third quarter compared with the other quarters - especially the first quarter.
In the USA, the activity of CPV Group is affected by seasonality as a result of variable demand due to, among other things, weather changes in different seasons, gas and electricity prices. In general, with respect to gas-fired power plants, there is higher profitability in seasons where temperatures are at their highest or lowest - usually during summer and winter. Similarly, the profitability of renewable energy production is subject to production volume, which varies based on wind and solar constructions, as well as its electricity price, which tends to be higher in winter, unless there is a fixed contractual price for the project.
The Group's accounting policies in these condensed consolidated interim financial statements are the same as the policies applied to the Annual Financial Statements.
| For the nine-month period ended September 30, 2023 | |||||||
|---|---|---|---|---|---|---|---|
| Israel | Energy transition in the USA |
Renewable energies in the USA |
Other activities in the USA |
Adjustments to consolidated |
Consolidated - total |
||
| In NIS million | (Unaudited) | ||||||
| Revenues from sales and provision of services | 1,779 | 1,137 | 98 | 94 | (1,137) | 1,971 | |
| EBITDA after proportionate consolidation adjusted1 for the period |
445 | 437 | 17 | 6 | (438) | 467 | |
| Adjustments: | |||||||
| Share in profits of associates | 179 | ||||||
| Net pre-commissioning expenses of Zomet | (18) | ||||||
| General and administrative expenses at the US | |||||||
| headquarters (not allocated to segments) | (72) | ||||||
| General and administrative expenses at the | |||||||
| Company's headquarters (not allocated to segments) | (20) | ||||||
| Total EBITDA for the period | 536 | ||||||
| Depreciation and amortization | (215) | ||||||
| Finance expenses, net | (143) | ||||||
| Other income, net | 6 | ||||||
| (352) | |||||||
| Profit before taxes on income | 184 | ||||||
| Expenses for income tax | (44) | ||||||
| Profit for the period | 140 |
| For the nine-month period ended September 30, 2022 (*) | |||||||
|---|---|---|---|---|---|---|---|
| Israel | Energy transition in the USA |
Renewable energies in the USA |
Other activities in the USA |
Adjustments to consolidated |
Consolidated - total |
||
| In NIS million | |||||||
| Revenues from sales and provision of services | 1,279 | 1,470 | 71 | (Unaudited) 73 |
(1,470) | 1,423 | |
| EBITDA after proportionate consolidation adjusted for the period |
265 | 389 | 22 | 4 | (391) | 289 | |
| Adjustments: | |||||||
| Share in profits of associates | 190 | ||||||
| Net pre-commissioning expenses of Zomet | (3) | ||||||
| General and administrative expenses at the US | |||||||
| headquarters (not allocated to segments) | (64) | ||||||
| General and administrative expenses at the | |||||||
| Company's headquarters (not allocated to segments) | (17) | ||||||
| Total EBITDA for the period | 395 | ||||||
| Depreciation and amortization | (140) | ||||||
| Finance expenses, net | (18) | ||||||
| (158) | |||||||
| Profit before taxes on income | 237 | ||||||
| Expenses for income tax | (57) | ||||||
| Profit for the period | 180 |
(*) Restated due to changes in composition of segments. For further details, see Section B above.1
1 For a definition of EBITDA following adjusted proportionate consolidation, please see Note 27 to the annual financial statements.
| For the three-month period ended September 30, 2023 | ||||||
|---|---|---|---|---|---|---|
| Renewable | ||||||
| Israel | Energy transition in the USA |
energies in the USA |
Other activities in the USA |
Adjustments to consolidated |
Consolidated - total |
|
| In NIS million | ||||||
| Revenues from sales and provision of services | 781 | 389 | 31 | 39 | (389) | 851 |
| EBITDA after proportionate consolidation adjusted | ||||||
| for the period | 235 | 169 | (2) | 9 | (168) | 243 |
| Adjustments: | ||||||
| Share in profits of associates | 79 | |||||
| General and administrative expenses at the US | ||||||
| headquarters (not allocated to segments) | (25) | |||||
| General and administrative expenses at the | ||||||
| Company's headquarters (not allocated to segments) | (7) | |||||
| Total EBITDA for the period | 290 | |||||
| Depreciation and amortization | (98) | |||||
| Finance expenses, net | (70) | |||||
| Other income, net | 11 | |||||
| (157) | ||||||
| Profit before taxes on income | 133 | |||||
| Expenses for income tax | (32) | |||||
| Profit for the period | 101 |
| For the three-month period ended September 30, 2022 (*) | ||||||
|---|---|---|---|---|---|---|
| Renewable | ||||||
| Israel | Energy transition in the USA |
energies in the USA |
Other activities in the USA |
Adjustments to consolidated |
Consolidated - total |
|
| In NIS million | (Unaudited) | |||||
| Revenues from sales and provision of services | 498 | 613 | 19 | 33 | (613) | 550 |
| EBITDA after proportionate consolidation adjusted | ||||||
| for the period | 119 | 181 | 2 | 3 | (183) | 122 |
| Adjustments: | ||||||
| Share in profits of associates | 124 | |||||
| Net pre-commissioning expenses of Zomet | (2) | |||||
| General and administrative expenses at the US | ||||||
| headquarters (not allocated to segments) | (25) | |||||
| General and administrative expenses at the | ||||||
| Company's headquarters (not allocated to segments) | (6) | |||||
| Total EBITDA for the period | 213 | |||||
| Depreciation and amortization | (49) | |||||
| Finance expenses, net | (26) | |||||
| (75) | ||||||
| Profit before taxes on income | 138 | |||||
| Expenses for income tax | (30) | |||||
| Profit for the period | 108 |
(*) Restated due to changes in composition of segments. For further details, see Section B above.
| For the year ended December 31, 2022 | ||||||
|---|---|---|---|---|---|---|
| Israel | Energy transition in the USA |
Renewable energies in the USA |
Other activities in the USA |
Adjustments to consolidated |
Consolidated - total |
|
| In NIS million | (Audited) | |||||
| Revenues from sales and provision of services | 1,735 | 1,967 | 95 | 97 | (1,967) | 1,927 |
| EBITDA adjusted after proportionate consolidation | ||||||
| for the year | 367 | 562 | 26 | - | (564) | 391 |
| Adjustments: | ||||||
| Share in profits of associates | 286 | |||||
| Net pre-commissioning expenses of Zomet | (10) | |||||
| General and administrative expenses at the US | ||||||
| headquarters (not allocated to segments) | (111) | |||||
| General and administrative expenses at the | ||||||
| Company's headquarters (not allocated to segments) | (26) | |||||
| Total EBITDA for the year | 530 | |||||
| Depreciation and amortization | (201) | |||||
| Finance expenses, net | (47) | |||||
| (248) | ||||||
| Profit before taxes on income | 282 | |||||
| Expenses for income tax | 65 | |||||
| Profit for the year | 217 |
| For the nine-month period ended September 30 |
For the three-month period ended September 30 |
For the year ended December 31 |
|||
|---|---|---|---|---|---|
| 2023 | 2022 | 2023 | 2022 | 2022 | |
| In NIS million | (Unaudited) | (Unaudited) | (Audited) | ||
| Revenues from sale of electricity in Israel: | |||||
| Revenues from the sale of energy to private customers | 1,154 | 891 | 530 | 355 | 1,212 |
| Revenues from energy sales to the System Operator and other suppliers | 127 | 79 | 64 | 22 | 107 |
| Revenues for capacity services | 30 | - | 28 | ||
| Revenues from sale of steam in Israel | 45 | 44 | 14 | 14 | 62 |
| Other income in Israel | 50 | 28 | 7 | 14 | 39 |
| Total revenues from sale of energy and others in Israel (excluding | |||||
| infrastructure services) | 1,406 | 1,042 | 643 | 405 | 1,420 |
| Revenues from private customers for infrastructure services | 373 | 237 | 138 | 93 | 315 |
| Total income in Israel | 1,779 | 1,279 | 781 | 498 | 1,735 |
| Revenues from the sale of electricity from renewable energy in the USA | 89 | 65 | 29 | 18 | 87 |
| Revenues from provision of services in the US | 103 | 79 | 41 | 34 | 105 |
| Total income in the USA | 192 | 144 | 70 | 52 | 192 |
| Total income | 1,971 | 1,423 | 851 | 550 | 1,927 |
| F - 18 |
A. Israel
Further to what is stated in Note 28D to the annual financial statements regarding the Group's engagement in a transaction for the acquisition of the Gat Power Plant, on March 30, 2023, the transaction was completed, and all rights in the Gat Partnership were transferred to the Group in consideration for approx. NIS 873 million (which is subject to working capital adjustments as is generally accepted in agreements of this type), of which approx. NIS 303 million were used to repay the shareholder loan, and the remaining balance of approx. NIS 570 million was used to acquire all the rights in the Gat Partnership (of which a total of approx. NIS 300 million constitutes a deferred consideration that will be paid through December 31, 2023). For more information regarding the project financing agreement that was signed on March 30, 2023, and which was used to finance part of the consideration as stated above, see Note 7A1.
The acquisition of the Gat Power Plant was accounted for according to the provisions of IFRS 3 - "Business Combinations". Therefore, on the Transaction Completion Date, the Company included in its financial statements the net identifiable assets of the Gat Power Plant in accordance with their fair value, that was estimated by an external independent appraiser (BDO Ziv Haft). As of the approval date of the report, the Company had not yet completed the attribution of the acquisition cost to the identifiable assets and liabilities, in light of the short time that had elapsed from the business combination date to the report's approval date. As a result, some of the fair value data are temporary and there may be changes that will affect the data included in these financial statements.
Set forth below is the fair value of the identifiable assets and liabilities acquired (according to temporary amounts):
| In NIS million | |
|---|---|
| Cash and cash equivalents | 2 |
| Trade and other receivables | 24 |
| Property, plant, and equipment and right-of-use assets - facilities and electricity generation and supply license (1) | 795 |
| Property, plant, and equipment - land owned by the Gat Partnership (2) | 84 |
| Trade and other payables | (23) |
| Loans from former right holders (3) | (303) |
| Deferred tax liability | (109) |
| Identifiable assets, net | 470 |
| Goodwill (4) | 85 |
| Total consideration (5) | 555 |
| In NIS million | |
|---|---|
| The aggregate cash flows that were used by the Group for the acquisition transaction: | |
| Cash and cash equivalents paid | 270 |
| Cash and cash equivalents acquired | (2) |
| 268 |
Furthermore, a total of approx. NIS 303 million was used to repay the shareholder loan as described above.

The restructuring (transfer of assets and share exchange) and investment transaction entered into between Veridis, the Company and OPC Israel (a wholly-owned subsidiary of the Company) was completed in January 2023; as part of the transaction, assets were transferred from the Company and Veridis to OPC Israel and a whollyowned company thereof; the transfer was tax-exempt in accordance with the provisions of the Income Tax Ordinance and was made in consideration for the allocation of shares in OPC Israel and a wholly-owned company thereof.
In addition, a shareholders agreement between the Company and Veridis was signed and came into force, which regulates their relationship in OPC Israel, such that as from the transaction completion date, all of the Company's electricity and energy generation and supply in Israel are wholly-owned by OPC Israel.2 Furthermore, on the transaction completion date, Veridis transferred to OPC Israel a total of approx. NIS 452 million (after adjustments to working capital as is generally accepted in agreements of this type); against the transfer of the said investment amount and Veridis' rights in the Rotem Companies, Veridis was allocated 20% of OPC Israel's issued capital. It should be noted that a total of NIS 400 million out of the said investment amount was used by Rotem to repay (pro rata) part of shareholder loans extended by the Company and Veridis to Rotem in 2021 (for more information, see Note 25D2 to the Annual Financial Statements). In addition, as part of the Transaction, arrangements were put in place regarding guarantees that the Company provided and/or will provide in favor of the assets transferred to OPC Israel, as well as indemnity arrangements in respect of such guarantees that will be retained by the Company. As of the approval date of the report, the parties take steps to complete actions in connection with the financing agreements of the Zomet and Hadera power plants, and in connection with adapting the said agreements to the holdings structure after the completion of the transaction.
The accounting treatment applied to the Veridis transaction in accordance with the provisions of IFRS 10 is a transaction with non-controlling interests while retaining control; accordingly, all differences between the cash received from Veridis as stated above and the increase in the non-controlling interests line item was recognized in capital reserve from transactions with non-controlling interests.
2 In January 2023, on the eve of the transaction's completion, the Company transferred to OPC Israel, among other things, the shares of OPC Power Plants, the holdings in Rotem 2, the holdings in Gnrgy, as well as other companies and operations in the area of activity in Israel, such as energy generation facilities on consumers' premises, virtual electricity supply activity, and more.
Further to what is stated in Note 29B to the annual financial statements regarding CPV Group's engagement in an agreement for the acquisition of all rights in four active wind energy power plants (hereinafter - the "Mountain Wind Project"), on April 5, 2023, the transaction was completed and CPV Group received all rights in the Mountain Wind Project against payment of approx. a NIS 625 million consideration (approx. USD 175 million) (after adjustments as is generally accepted in agreements of this type). For more information regarding the project financing agreement that was signed on April 6, 2023, and which was used to finance part of the consideration as stated above, see Note 7A2.
The acquisition of the Mountain Wind project was accounted for according to the provisions of IFRS 3 - "Business Combinations". Therefore, on the Transaction Completion Date, the Company included in its financial statements the fair value of the net identifiable assets and goodwill of the Mountain Wind project, that was estimated by an external independent appraiser (PwC Israel).
In the reporting period, the allocation of the acquisition cost to identifiable assets and liabilities has been completed, with no changes compared with the financial data reported in the financial statements for the first quarter of 2023.
| In NIS million | ||
|---|---|---|
| (based on the | ||
| USD exchange | ||
| rate at | ||
| acquisition | ||
| date) | In USD millions | |
| Trade and other receivables | 14 | 4 |
| Property, plant & equipment (1) | 451 | 127 |
| Intangible assets (1) | 93 | 26 |
| Trade and other payables | (3) | (1) |
| Liabilities in respect of evacuation and removal | (5) | (2) |
| Identifiable assets, net | 550 | 154 |
| Goodwill (2) | 75 | 21 |
| Total consideration | 625 | 175 |
In March 2023, the Gat Partnership and Bank Leumi le-Israel B.M. (hereinafter - "Bank Leumi") signed a financing agreement for a senior debt (project financing) to finance the construction of the Gat Power Plant, as described in Note 6A1; set forth below are the key points of the agreement:
| Loan principal | NIS 450 million, repayable in quarterly installments, starting from September 25, 2023, with the final repayment date being May 10, 2039 (subject to the stipulated early repayment provisions in the agreement). |
||
|---|---|---|---|
| Interest on the loan | Prime interest + a spread ranging from 0.4% to 0.9% per annum. • Conversion from a variable interest to fixed unlinked interest, in accordance with the conversion mechanism (unlinked interest payable on government • bonds as defined in the agreement + a spread ranging from 2.05% to 2.55%), according to the earliest of: four years from the date of the first withdrawal or at the Gat Partnership's discretion, or at the Bank's discretion, in accordance with the forced conversion mechanism, as stipulated in the agreement. Repayment in quarterly installments, starting on June 25, 2023. • |
||
| Collateral and pledges | Collateral were provided on all of the Gat Partnership's assets and rights in it, including the real estate, bank accounts, insurances, the Gat • Partnership's assets and rights in connection with the Project Agreements (as defined in the agreement). A lien was placed on the rights of the entities holding the Gat Partnership. • Guarantees were provided by the Company and Veridis Power Plants, each in accordance with its proportionate share in the Gat Partnership, as well as • OPC Power Plants, to pay all principal and accrued interest payments, in connection with the completion of the registration of the collateral and the payment of the Deferred Consideration balance in the transaction for the purchase of the Gat Power Plant under the circumstances and subject to the terms set in the letter of guarantee. |
||
| Liabilities | The agreement prescribes certain restrictions and liabilities as is generally accepted in agreements of this type, including: • Prohibition on pledging assets, and restrictions on the sale and transfer of assets; Restrictions on assuming financial debts and providing guarantees; • requirement to obtain Bank Leumi's approval for engagement in material agreements and other material actions; • Undertaking in connection with holding certain reserve deposits for maintenance and debt service; • • Bank Leumi was granted veto rights and other rights in connection with certain decisions as is generally accepted in agreements of this type; Undertaking to obtain rating for the project under certain circumstances. • |
||
| Financial covenants and default events |
The agreement prescribes standard default events as is generally accepted in agreements of this type, including: Various default events; • Shutdown of the Gat Power Plant; • Payment default; • Events that have a material adverse effect; • Cross-default events by parties to certain project agreements; • certain events relating to the project (as defined in the agreement); • Certain changes in ownership/control; • Certain force majeure events; • Events associated with insurance coverage of activity of the Gat Power Plant; • • Non-compliance with the financial ratios as set out in Note 7C and OPC Power Plants and certain other Group entities' non-compliance with certain financial covenants; Certain legal proceedings in connection with the Gat Partnership. • |
||
| Conditions for distribution | Distributions by the Gat Partnership (as defined in the Gat Financing Agreement, including a repayment of shareholder loans) is subject to a number of terms and conditions outlined in the agreement, including, among other things: • Compliance with the following financial covenants: Historic DSCR, Average Projected DSCR and LLCR at a minimal rate of 1.15; A first quarterly principal and interest payment was made; • The provisions of the agreement were complied with; • no more than four distributions will be carried out in a 12-month period. • |
In March 2023, the Gat Partnership, the Entities Holding the Gat Partnership, including OPC Power Plants and Bank Leumi signed an equity subscription agreement, under which the said entities made certain undertakings toward Bank Leumi in connection with the Gat Partnership's activity, including undertakings to bear 6 months of debt service at the terms set forth in the said agreement; to provide equity capital; an undertaking to make certain guarantees in favor of third parties in connection with the Gat Power Plant's activity, to the extent required; certain financial covenants of OPC Power Plants and the Group companies; payment of certain amounts in connection with the arbitration proceeding between the Gat Partnership and the Operator (as defined in the agreement); bearing capacity payments under some circumstances prescribed in the said equity subscription agreement; and paying any amount to Bank Leumi beyond the principal and the accrued interest under the abovementioned Letter of Guarantee, to the extent it is realized.
On April 6, 2023, a CPV Group and a banking corporation entered into a financing agreement that includes: (1) a term loan of approx. NIS 270 million (approx. USD 75 million) that was used to fund part of the purchase consideration of the Mountain Wind Project (as described in Note 6B above) (hereinafter - the "Loan"); and (2) ancillary credit facilities for working capital and LC at a total amount of approx. NIS 60 million (approx. USD 17 million) for the current credit needs of the Mountain Wind Project.
The term of the Loan and Credit Facilities is for a period of 5 years. The Loan bears annual interest of SOFR plus a fixed margin and a variable margin of between 1.625% and 1.75% over the term of the loan; the interest will be paid at least every quarter. It should be noted that the CPV Group hedged the exposure to changes in variable SOFR interest by entering into an interest rate swap in respect of 75% of the balance of the Loan and opted to apply cash flow hedge accounting. The weighted interest as of the transaction date is approx. 5.3%.
The agreement and credit facilities include generally accepted grounds for immediate repayment of the outstanding debt balance, and generally accepted financial covenants in connection with distributions. Furthermore, in order to secure the credit facilities, the banking corporation was provided with pledges on the assets of the Mountain Wind Project and the rights therein.
On May 12, 2023, CPV Group entered into an investment agreement with a tax equity partner totaling approx. NIS 280 million (approx. USD 78 million) in the Maple Hill project (hereinafter - the "Project"). Pursuant to the Agreement, the tax equity partner's investment in the Project shall be provided in part (20%) on the date of completion of the construction works (Mechanical Completion) and the remainder (80%) on the Commercial Operation Date, as these terms are defined in the Agreement, subject to the fulfillment of the terms and conditions prescribed for that in the Agreement on each said date, as is the accepted norm in agreements of this type. It should be noted that if commercial operation of the Project will not be completed by December 31, 2023, the tax equity partner will be entitled to approx. a NIS 13 million (approx. USD 4 million) compensation and for a certain period that was set, also to an option to sell to CPV Group his share in accordance with a mechanism set in the agreement, which is mainly derived on injection of the tax equity partner's investments through that date.
In consideration for its investment in the project corporation, the tax equity partner is expected to receive most of the project's tax benefits, including Investment Tax Credit (ITC) at a higher rate of 40% (in accordance with the IRA), and participation in the distributable free cash flow from the project (at single digit rates and on a gradual basis as set out in the investment agreement). In addition, the tax equity partner is entitled to participate in the project's loss for tax purposes; in the first few years, the tax equity partner's share in such taxable income or loss for tax purposes is high. At the end of 6 years from the commercial operation date, the tax equity partner's share in such taxable income decreases significantly, and CPV Group has the option to acquire the tax equity partner's share in the project corporation within a certain period and in accordance with a mechanism and conditions set out in the agreement in connection therewith.
As is generally accepted in engagements of this type, the agreement includes a guarantee provided by CPV Group, and an undertaking to indemnify the tax equity partner in connection with certain matters. Furthermore, the tax equity partner has certain veto rights, among other things, in respect of the creation of liens on the Project Partnership's assets or the entry of the Project Corporation into additional material Project agreements.
The completion of the agreement and the injection of the tax equity partner's investments on the dates set for that purpose as stated above is subject to conditions precedent, which have not yet been fully fulfilled as of the approval date of the report; accordingly, the entire investment consideration of the tax equity partner has yet to be received.
On August 24, 2023, the CPV Group - through wholly owned subsidiaries holding advanced-stage projects - entered into a financing agreement with several international financing corporations for a total amount of approx. NIS 1.4 billion (approx. USD 370 million; hereinafter - the "Total Financing Commitment") for the purpose of financing and providing collaterals required for the construction and initial operating period of qualifying3 projects in the field of renewable energy in the United States (hereinafter the "Financing Agreement"). As of the report date, the Maple Hill and Stagecoach projects are qualifying projects (hereinafter, jointly - the "Qualifying Projects").
Out of the Total Financing Commitment, a total of approx. NIS 690 million (approx. USD 181 million) will be earmarked for the financing of the projects' construction and initial commercial operating period subject to the terms and conditions detailed below (hereinafter - "Financing of Construction"); a total of approx. NIS 150 million (approx. USD 39 million) will be earmarked for the provision of letters of credit (LCs) for the projects (hereinafter - "Letters of Credit") and a total of approx. NIS 570 million (approx. USD 150 million) will be advanced as a bridge loan for the project following its engagement with a "tax equity partner" (hereinafter - the "Bridge Loan").
As of the report date, a total of approx. NIS 223 million (approx. USD 59 million) were withdrawn by CPV Group from the Financing Commitment as part of Financing of Construction. It should be noted that the CPV Group hedged the exposure to changes in variable SOFR interest by entering into an interest rate swap in respect of 75% of the balance of the Loan and opted to apply cash flow hedge accounting.
Subsequent to the report date, a total of approx. NIS 285 million (approx. USD 75 million) was withdrawn by CPV Group as part of the Bridge Loan.
| Lenders | International and Israeli banking corporations (with an option to expand the group of lenders by way of syndication) (hereinafter in this section - the "Financing Entities"). |
|---|---|
| Financing of Construction |
On the Financial Closing Date of the financing agreement (hereinafter - the "Financial Closing Date), the above maximum Financing of Construction amount will be set in accordance with the projects' compliance with the scope of leveraging principles, such that each project is required to meet a projected minimum DSCR ratio of 1.3,4 based on the stream of revenues from PPAs and green certificates, and 1.8 based on the stream of revenues from market sales (hereinafter - the "Leveraging Ratios").5 It should be noted that for each project, the compliance with the Leveraging Ratios will be assessed on the date of the first withdrawal (and as a condition thereof), and at the end of the completion of construction work (hereinafter - the "Conversion Date"). The Financing of Construction amount that may be converted on the Conversion Date (if any) into financing for the initial commercial operation period shall be determined in accordance with the assessment of the compliance with the Leveraging Ratios as of that date. |
3 The classification as a "qualifying project" is conditional upon the project's meeting generally accepted conditions for senior debt financing as part of a non-recourse project financing.
5 The Financing of Construction amount, as of the financial closing date, will meet the leverage ratios as of that date. If a project shall not comply with the leverage ratios at the first withdrawal date of the Financing of Construction or at the abovementioned Conversion Date, as the case may be, the total Financing Commitment allocated thereto will be reduced to the level at which it will comply with the Leveraging Ratios described above.

4 The ratio between the free cash flow for debt service and the principal and interest payments for the relevant period.
Conditions for first withdrawal or conversion The conditions for first withdrawal for each qualifying project include, among other things, compliance of the Financing of Construction amount with the Leveraging Ratios, and the provision of a minimum equity amount (under certain conditions, surplus amounts may be diverted from a qualifying project in favor of another qualifying project, as described below). Furthermore, the withdrawal of financing by each project is subject to the relevant project's compliance with financial covenants that are generally accepted in project financing, to the submission of withdrawal requests, and to the following: Financing of Construction: As of the Financial Closing Date, the Maple Hill and Stagecoach projects meet the said conditions (including the above Leveraging Ratios). As stated above, on each project's Conversion Date, the project's compliance with the Leveraging Ratios will be assessed as a condition for the conversion of the Financing of Construction amount into a loan for the initial commercial operation period instead of full repayment of the Financing of Construction amount on that date if it has not been converted. Letters of credit: - The total amount of letters of credit is based on the project's needs in accordance with the commercial arrangement, and on the conversion date subject to an undertaking to provide a collateral at the amount of the projected debt service in a 6-month period, for each project and in accordance with the provisions of the Financing Agreement. Bridge Loan is subject to the provision of the tax equity partner's undertaking as defined in the Financing Agreement. The amount of the Bridge Loan that may be withdrawn for a qualifying project is limited to up to 98% of the liabilities of the project's tax equity partner. Final repayment date The earlier of 4 years after the Financial Closing Date or a year after the Conversion Date of the third qualifying project. Interest and linkage, other costs The loans for each project bear annual interest based on SOFR plus a margin as follows: Financing of Construction6 : approx. 2%. Bridge Loan: approx. 1.25%. Letters of credit: Issued for an annual issuance fee as is generally accepted in facilities of this type. In addition, a facility fee will apply to unutilized amounts as is generally accepted in financing arrangements of this type, and the projects will bear transaction costs and other fees and commissions, including in connection with the organization of the financing and the syndication. Early repayment dates of Financing of Construction (principal and interest) Repayment of principal: • For each project, starting on the conversion date of each project (if it is converted), in quarterly installments in accordance with the amortization schedule set in the Financing Agreement, and on the loan repayment date - a single installment of the outstanding principal balance. If no conversion will be carried out, the repayment date will take place at the end of the construction period. • For each project, a cash-sweep mechanism will apply to 50% of the quarterly free cash flow after debt service (the remaining 50% shall be retained as a reserve and may be utilized for another qualifying project subject to compliance with certain conditions). The interest will be repaid in monthly or quarterly installments, subject to the Borrower's discretion.
6 It should be noted that if CPV Group will convert the Financing of Construction amount to finance the initial commercial operation period, approx. a 2.75% margin will apply.
| Additional material terms and conditions |
• The financing agreement includes grounds for immediate repayment that are standard in project financing agreements of this type, including, inter alia – breach of representations and commitments that have a material adverse effect, default events, non-compliance with certain obligations, various insolvency events, winding down of the project or termination of significant parties in the project (as defined in the agreement), occurrence of certain events relating to the regulatory status of the project and holding regulatory approvals, certain changes in ownership of the project, certain events in connection with the project, existence of legal proceedings relating to the project, and a situation wherein the project is not entitled to receive payments for capacity and electricity – all in accordance with and subject to the terms and conditions, definitions and periods detailed in the financing agreement. • The three projects are pledged in favor of the lenders in order to secure the undertakings under the Financing Agreement, and a cross default provision is in place between the projects. • The Borrower may use the surplus equity and/or surplus cash flows of a qualifying project in order to support another qualifying project's needs and requirements, subject to the conditions that were set. |
|---|---|
| Collateral, pledges, guarantees |
Collaterals and liens are provided in favor of the Financing Entities on all of the projects' assets and the rights arising therefrom, and in respect of which a withdrawal was made or credit letters were provided (and in respect of each qualifying asset that will be added). CPV Group provided a guarantee to secure certain undertakings in connection with the Financing Agreement, including an undertaking to bear the expenses that will apply to the project as a result of changes to the law in connection with the tax benefits that will arise from the projects, in respect of costs pertaining to breach of a warranty claim by the solar panels supplier, in respect of costs incurred by the projects (if any) in connection with customs payable with respect to the solar panels, and the Maple Hill project's failure to meet the dates-related undertakings to the tax equity partner, all in accordance with and subject to the conditions set in the Financing Agreement. |
During the reporting period, the Company published a shelf prospectus that will be in effect through May 31, 2026.
A. Significant events during and subsequent to the reporting period (cont.)
As of the report's approval date, the Company has binding short-term credit facilities from Israeli banks in effect through the second half of 2024. Set forth below is information regarding short-term credit facilities of the Group companies from Israeli banks immediately prior to the report's approval date (in NIS million):
| Actual amount | ||
|---|---|---|
| Facility amount | utilized (1), (2) | |
| The Company | 300 | 10 |
| OPC Israel | 250 | - |
| 365 (approx. USD | 155 (approx. USD | |
| The Company for CPV Group (1) | 95 million) | 40 million) |
| Total | 915 | 165 |
(2) Furthermore, as at the report date, the Company utilized unsecured credit facilities for the purpose of letters of credit and bank guarantees at the total amount of approx. NIS 405 million. The utilization of unsecured facilities is subject to the discretion of any financing entity on a case-by-case basis on every utilization request date, and therefore there is no certainty as to the ability to utilize them.
Further to Note 16C to the Annual Financial Statements, following are details on the main changes which took place during the reporting period in the bank guarantee amounts given by Group companies to third parties:
| As at September 30, 2023 |
As at December 31, 2022 |
|
|---|---|---|
| For operating projects in Israel (Rotem, Hadera and the Gat Power Plant) (1) | 145 | 111 |
| For Zomet (2) | 90 | 74 |
| For projects under construction and development in Israel (Sorek and consumers' premises) | 47 | 54 |
| For virtual supply activity in Israel | 82 | 62 |
| In respect of the Eshkol tender | 51 | - |
| For operating projects in the US Renewable Energies Segment | 89 | 50 |
| In respect of projects under construction and development in the USA (Group 3) (CPV) | 195 | 90 |
| Total | 699 | 441 |
(1) The increase arises mainly from an increase in bank guarantees provided by the companies in favor of the System Operator in the ordinary course of business.
(2) The increase in the balance of guarantees stems mainly from an increase in bank guarantees provided by the Company in the name of Zomet in favor of the Israeli Electricity Authority in respect of the permanent generation license, and in favor of Zomet's lenders as part of the Equity Subscription Agreement (as described in Note 16B2 to the annual financial statements).
(3) The increase stems mainly from an increase in bank guarantees provided to various third parties in connection with a renewable energies project under advanced development.
Furthermore, CPV Group provided a corporate guarantee of approx. NIS 110 million (approx. USD 30 million) for the purpose of supporting energy retail sale activities through a whollyowned subsidiary of CPV Group.

Further to what is stated in Note 17B to the annual financial statements, set forth below are the financial covenants attached to the Series B and C debentures as defined in the deeds of trust, and the actual amounts and/or ratios as of September 30, 2023:
| Ratio | Required value Series B | Required value Series C | Actual value |
|---|---|---|---|
| Net financial debt (1) to adjusted EBITDA (2) | will not exceed 13 (for distribution purposes - 11) | will not exceed 13 (for distribution purposes - 11) | 5.6 |
| will not fall below NIS 250 million (for distribution | will not fall below NIS 1 billion (for distribution | Approx. NIS 4,057 | |
| The Company shareholders' equity (separate) | purposes - NIS 350 million) | purposes - NIS 1.4 billion) | million |
| The Company's equity to asset ratio | will not fall below 17% (for distribution purposes | will not fall below 20% (for distribution purposes - | |
| (separate) | - 27%) | 30%) | 68% |
| The Company's equity to asset ratio (consolidated) |
-- | will not fall below 17% | 44% |
(1) The consolidated net financial debt less the financial debt designated for construction of the projects that have not yet started to generate EBITDA. (2) Adjusted EBITDA as defined in the deeds of trust.
As of September 30, 2023, the Company complies with the said financial covenants.
Further to Note 16 to the annual financial statements and Note 7A1, set forth below are the financial covenants, as defined in the said note, which apply to Group companies in connection with their financing agreements with banking corporations (including long-term loans and binding short-term credit facilities), and the actual amounts and/or ratios as of September 30, 2023:
| Financial covenants | Breach ratio | Actual value | ||
|---|---|---|---|---|
| Covenants applicable to Hadera in connection with the Hadera Financing Agreement | ||||
| Minimum projected DSCR | 1.10 | 1.19 | ||
| Average projected DSCR | 1.10 | 1.56 | ||
| LLCR | 1.10 | 1.68 | ||
| Covenants applicable to the Company in connection with the Hadera Equity Subscription Agreement | ||||
| Company's shareholders equity (separate) (through the end of the construction contractor's warranty period) | will not fall below NIS 250 million | Approx. NIS 4,057 million | ||
| The Company's equity to asset ratio (separate) | will not fall below 20% | 68% | ||
| Minimum cash balance or bank guarantee from Hadera's commercial operation date through the end of the | ||||
| construction contractor's warranty period | will not fall below NIS 50 million | Approx. NIS 332 million | ||
| Covenants applicable to Zomet in connection with the Zomet Financing Agreement (1) | ||||
| Expected ADSCR | 1.05 | 1.37 | ||
| Historic ADSCR | 1.05 N/A | |||
| LLCR | 1.05 | 1.42 | ||
| Covenants applicable to the Gat Partnership in connection with the Gat Financing Agreement | ||||
| Minimum projected DSCR | 1.05 | 1.35 | ||
| Average projected DSCR | 1.05 | 1.35 | ||
| LLCR | 1.05 | 1.36 | ||
| Covenants applicable to OPC Power Plants in connection with the Gat Equity Subscription Agreement | ||||
| OPC Power Plants' total assets balance | will not fall below NIS 2,500 million | Approx. NIS 5,603 million | ||
| OPC Power Plant's equity to asset ratio | will not fall below 15% | 33% | ||
| Ratio of net debt to adjusted EBITDA of OPC Power Plants | will not exceed 12 | 2.9 | ||
| OPC Power Plants' minimum cash balance | will not fall below NIS 30 million | Approx. NIS 217 million | ||
| OPC Power Plants' minimum cash balance ("separate") | will not fall below NIS 20 million | Approx. NIS 21 million | ||
| Covenants applicable to the Company in connection with the Harel credit facility | ||||
| The Company shareholders' equity (separate) | will not fall below NIS 550 million | Approx. NIS 4,057 million | ||
| The Company's equity to asset ratio (separate) | will not fall below 20% | 68% | ||
| The Company's net debt to adjusted EBITDA ratio | will not exceed 12 | 5.6 | ||
| The LTV of the pledged rights | will be less than 50% | N/A | ||
| Covenants applicable to the Company in connection with the Discount credit facility | ||||
| The Company shareholders' equity (separate) | will not fall below NIS 1,000 million | Approx. NIS 4,057 million | ||
| The Company's equity to asset ratio (separate) | will not fall below 20% | 68% | ||
| Covenants applicable to the Company in connection with the Mizrahi and Hapoalim credit facilities | ||||
| The Company shareholders' equity (separate) | will not fall below NIS 1,200 million | Approx. NIS 4,057 million | ||
| Will not fall below 40% (in respect of | ||||
| The Company's equity to asset ratio (separate) | Hapoalim) and below 30% (in respect of | 68% | ||
| Mizrahi) | ||||
| The Company's net debt to adjusted EBITDA ratio | Will not exceed 12 | 5.6 | ||
| Covenants applicable to OPC Israel in connection with the Mizrahi credit facility | ||||
| OPC Israel's standalone shareholders' equity, including non-controlling interests | will not fall below NIS 500 million | Approx. NIS 2,125 million | ||
| OPC Israel's equity to asset ratio (consolidated) | will not fall below 20% | 37% | ||
| The Company's net debt to adjusted EBITDA ratio | will not exceed 10 | 2.9 | ||
(1) It should be noted that according to the Zomet Financing Agreement the historical ADSCR financial covenant shall be assessed for the first time after the first repayment date of the loans principal.
As of September 30, 2023, the Group companies comply with the said financial covenants.
Furthermore, in the first quarter of 2023, Rotem and Hadera recognized approx. a NIS 18 million (approx. USD 5 million) contractual financial amount, which was recognized in the cost of sales line item and is expected to be received in early 2024.
The carrying amounts of certain financial assets and financial liabilities, including short-term and long-term deposits, cash and cash equivalents, restricted cash, trade receivables, other receivables, trade payables and other payables, and some of the Group's long-term loans are the same as or approximate to their fair values.
The fair values of the other financial assets and financial liabilities, together with the carrying amounts stated in the statement of financial position, are as follows:
| As at September 30, 2023 | ||||
|---|---|---|---|---|
| Carrying amount | Fair value | |||
| (*) | ||||
| (Unaudited) | (Unaudited) | |||
| NIS million | NIS million | |||
| Loans from banks and financial institutions (Level 2) | 2,962 | 2,973 | ||
| Loans from non-controlling interests (Level 2) | 426 | 399 | ||
| Debentures (Level 1) | 1,841 | 1,682 | ||
| 5,229 | 5,054 |
| As at September 30, 2022 | |||
|---|---|---|---|
| Carrying amount | Fair value (Unaudited) |
||
| (*) (Unaudited) |
|||
| NIS million | NIS million | ||
| Loans from banks and financial institutions (Level 2) | 1,786 | 1,838 | |
| Loans from non-controlling interests (Level 2) | 473 | 431 | |
| Debentures (Level 1) | 1,834 | 1,722 | |
| 4,093 | 3,991 |
| As at December 31, 2022 | ||||
|---|---|---|---|---|
| Carrying amount | Fair value | |||
| (*) | ||||
| (Audited) | (Audited) | |||
| NIS million | NIS million | |||
| Loans from banks and financial institutions (Level 2) | 1,817 | 1,859 | ||
| Loans from non-controlling interests (Level 2) | 437 | 400 | ||
| Debentures (Level 1) | 1,854 | 1,734 | ||
| 4,108 | 3,993 |
For details regarding the Group's risk management policies, including entering into financial derivatives as well as the manner of determining the fair value, see Note 23 to the Annual Financial Statements.
The table below presents an analysis of financial instruments measured at fair value, on a periodic basis, using an evaluation method. The evaluation techniques and various levels were detailed in Note 23 to the annual financial statements.
| In NIS million | As at September 30 | |||
|---|---|---|---|---|
| 2023 | 2022 | 2022 (Audited) |
||
| (Unaudited) | ||||
| Financial assets | ||||
| Derivatives used for hedge accounting | ||||
| CPI swap contracts (Level 2) | 38 | 34 | *33 | |
| Interest rate swaps (USA) (Level 2) | 43 | 25 | 24 | |
| Forwards on exchange rates (Level 2) | 1 | 6 | 2 | |
| Total | 82 | 65 | 59 |
(*) The nominal NIS-denominated discounted interest rate range in the value calculations is 3.94%-4.20% and the real discounted interest rate range is 0.24%-2.10%.
A. Subsequent to the reporting period, on October 7, 2023 the "Iron Swords" war (hereinafter – the "War") broke out in Israel following a murderous attack by the terrorist organization Hamas on settlements surrounding the Gaza Strip in the south of Israel. Naturally, the war led to consequences and restrictions that affected the Israeli economy, which include, among other things, a decline in business activity, extensive recruitment of reservists, restrictions on gatherings in workplaces and public spaces, restrictions on the activity of the education system, and more. The effects of the War also include a significant uncertainty as to the War's impact on macroeconomic factors in Israel and on the financial position of the State of Israel, including potential adverse effects on the credit rating of the State of Israel and Israeli financial institutions (specifically the Israeli banking system), sharp changes in exchange rates, specifically the strengthening of the US dollar against the shekel, and instability in the Israeli capital market (including increased volatility, slumps, and restricted liquidity and accessibility).
As of the report's approval date, there is a significant uncertainty as to the development of the War, its scope and duration. There is also significant uncertainty as to the impact of the War on macroeconomic and financial factors in Israel, including the situation in the Israeli capital market. Therefore, at this stage, it is not possible to assess the effect that the War will have on the Company, nor is it possible to assess the magnitude of the War's effect on the Company and its results of operations, if any, in the short and medium term.
B. In the nine-month periods ended September 30, 2023 and 2022 the Group purchased property, plant and equipment for a total of approx. NIS 1,991 million and approx. NIS 555 million, respectively, including property, plant and equipment purchased under a business combination during the nine-month period ended September 30, 2023, for a total of approx. NIS 1,321 million, as detailed in Notes 6A1 and 6B.
The said purchase amounts also include credit costs, which were capitalized to property, plant and equipment at approx. NIS 44 million and approx. NIS 39 million, in the nine-month periods ended September 30, 2023 and 2022, respectively. Furthermore, these amounts include non-cash purchases totaling approx. NIS 82 million and approx. NIS 119 million during these periods, respectively.
As of the report date, the Group recognized - in accordance with the vesting period - a NIS 129 million liability out of the fair value; a total of NIS 97 million was included in the other long-term liabilities line item, and the remaining amount - NIS 32 million - was included in the payables and credit balances line item.
Under the terms and conditions of the Tender, the bids' amount shall be paid in the following manner for each of the compounds: (1) in connection with participating in the Tender, the Group has provided an approx. NIS 5 million guarantee for each of the compounds which are the subject matter of the Tender (a total of NIS 15 million), which, in accordance with the terms and conditions of the Tender, was realized upon winning and will be deducted from the first payment, as stated below; (2) in August 2023, a further amount was paid, which is comprised of amounts that constitute 20% of the bid amount for each compound in respect of a planning authorization agreement for the period prescribed in the tender documents; (3) Upon authorizing a new outline plan, under which the project may be constructed (to the extent that it is authorized), lease agreements will be signed for a period of 24 years and 11 months, to build and operate the project(s), against payment of the remaining 80% of the bid amount per compound. To clarify, 20% of the said bid amount paid will not be refunded to the Winning Bidder even if the project(s)' development and planning procedures never develop into an authorized plan and lease agreements are not signed.
As of the approval date of the report, it is uncertain that approvals, consents, or actions required for the completion of the project/s will be completed with respect to any of the compounds.
The Group attaches to these condensed consolidated interim financial statements the condensed interim financial statements of Valley and Towantic, and the condensed interim financial data of Fairview (hereinafter - "Material Associates"), including adjustments from US GAAP to IFRS presented below. According to an approval issued by the Israel Securities Authority Staff at the request of the Company, the Company shall publish the condensed interim financial statements of Fairview for the third quarter of 2023 by December 31, 2023.
According to legal advice received by CPV Group, under the relevant US law it is not required to sign the financial statements of the material associates, and the attached financial statements were approved by the competent organs, and a review report of the independent auditors was attached thereto.
The Material Associates' functional and presentation currency is the USD. As of the report date, the exchange rate is NIS 3.824 per USD.
The financial statements of the Material Associates are drawn up in accordance with US GAAP, which vary, in some respects, from IFRS. Set forth below is information regarding adjustments made to the Material Associates' financial statements in order to make them compatible with the Company's accounting policies and rules.
Further to what is stated in Note 26D to the annual financial statements, on June 27, 2023 Valley's financing agreement was amended and extended (hereinafter - the "Amendment and Extension Agreement). According to the original financing agreement, the contractual repayment date with regard to loans whose balance as of the signing date of the amendment and extension agreement is NIS 1.5 billion (approx. USD 415 million, CPV Group's share - 50%), will be June 30, 2023. According to the amendment and extension agreement, the final repayment date was postponed to May 31, 2026. Set forth below are the key terms of the new financing agreement:
Statement of Financial Position:
| As at September 30, 2023 | |||||
|---|---|---|---|---|---|
| US GAAP | Adjustments | IFRS | |||
| In USD thousand | In USD thousand | In USD thousand | |||
| Cash and cash equivalents | 97 | 8,769 | 8,866 | ||
| Restricted cash | 8,769 | (8,769) | - | ||
| Property, plant & equipment | A, C, D | 771,593 | (157,143) | 614,450 | |
| Intangible assets | D | 20,102 | (20,102) | - | |
| Other assets | 66,075 | - | 66,075 | ||
| Total assets | 866,636 | (177,245) | 689,391 | ||
| Accounts payable and deferred expenses | A | 10,533 | (1,702) | 8,831 | |
| Other liabilities | 457,411 | (2,775) | 454,636 | ||
| Total liabilities | 467,944 | (4,477) | 463,467 | ||
| Partners' equity | A, C | 398,692 | (172,768) | 225,924 | |
| Total liabilities and equity | 866,636 | (177,245) | 689,391 |
| As at September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Cash and cash equivalents | 97 | 6,312 | 6,409 | |
| Restricted cash | 9,878 | (6,312) | 3,566 | |
| Property, plant & equipment | A, C, D | 792,690 | (168,991) | 623,699 |
| Intangible assets | D | 20,353 | (20,353) | - |
| Other assets | 79,534 | - | 79,534 | |
| Total assets | 902,552 | (189,344) | 713,208 | |
| Accounts payable and deferred expenses | A | 24,618 | (1,466) | 23,152 |
| Other liabilities | 525,558 | - | 525,558 | |
| Total liabilities | 550,176 | (1,466) | 548,710 | |
| Partners' equity | A,C | 352,376 | (187,878) | 164,498 |
| Total liabilities and equity | 902,552 | (189,344) | 713,208 |
| As at December 31, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Cash and cash equivalents | 145 | 1,041 | 1,186 | |
| Restricted cash | 4,630 | (1,041) | 3,589 | |
| Property, plant & equipment | A, C, D | 786,365 | (165,597) | 620,768 |
| Intangible assets | D | 20,604 | (20,604) | - |
| Other assets | 112,188 | - | 112,188 | |
| Total assets | 923,932 | (186,201) | 737,731 | |
| Accounts payable and deferred expenses | A | 31,775 | (1,409) | 30,366 |
| Other liabilities | 518,259 | - | 518,259 | |
| Total liabilities | 550,034 | (1,409) | 548,625 | |
| Partners' equity | A, C | 373,898 | (184,792) | 189,106 |
| Total liabilities and equity | 923,932 | (186,201) | 737,731 | |
Statements of income and other comprehensive income:
| For the nine-month period ended September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Revenues | 162,353 | - | 162,353 | |
| Operating expenses | A | 96,062 | (4,218) | 91,844 |
| Depreciation and amortization | C | 19,552 | (5,032) | 14,520 |
| Operating profit | 46,739 | 9,250 | 55,989 | |
| Finance expenses | B | 32,815 | (4,869) | 27,946 |
| Profit for the period | 13,924 | 14,119 | 28,043 | |
| Other comprehensive income - derivative financial instruments | B | 10,870 | (2,094) | 8,776 |
| Comprehensive income for the period | 24,794 | 12,025 | 36,819 |
| For the nine-month period ended September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP | Adjustments In USD thousand |
IFRS In USD thousand |
||
| In USD thousand | ||||
| Revenues | 305,725 | - | 305,725 | |
| Operating expenses | A | 226,620 | (4,194) | 222,426 |
| Depreciation and amortization | C | 19,367 | (5,032) | 14,335 |
| Operating profit | 59,738 | 9,226 | 68,964 | |
| Finance expenses | B | 24,027 | (5,030) | 18,997 |
| Profit for the period | 35,711 | 14,256 | 49,967 | |
| Other comprehensive income (loss) - derivative financial instruments | B | 767 | (5,030) | (4,263) |
| Comprehensive income for the period | 36,478 | 9,226 | 45,704 | |
Statements of income and other comprehensive income: (cont.)
| For the three-month period ended September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Revenues | 54,402 | - | 54,402 | |
| Operating expenses | A | 32,827 | (1,703) | 31,124 |
| Depreciation and amortization | C | 6,522 | (1,677) | 4,845 |
| Operating profit | 15,053 | 3,380 | 18,433 | |
| Finance expenses | B | 11,591 | 333 | 11,924 |
| Profit for the period | 3,462 | 3,047 | 6,509 | |
| Other comprehensive income - derivative financial instruments | B | 11,220 | - | 11,220 |
| Comprehensive income for the period | 14,682 | 3,047 | 17,729 |
| For the three-month period ended September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Revenues | 116,064 | - | 116,064 | |
| Operating expenses | A | 83,323 | (1,465) | 81,858 |
| Depreciation and amortization | C | 6,475 | (1,677) | 4,798 |
| Operating profit | 26,266 | 3,142 | 29,408 | |
| Finance expenses | B | 8,413 | (1,572) | 6,841 |
| Profit for the period | 17,853 | 4,714 | 22,567 | |
| Other comprehensive loss - derivative financial instruments | B | (4,309) | (1,572) | (5,881) |
| Comprehensive income for the period | 13,544 | 3,142 | 16,686 |
| For the year ended December 31, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Revenues | 405,548 | - | 405,548 | |
| Operating expenses | A | 296,645 | (5,603) | 291,042 |
| Depreciation and amortization | C | 25,714 | (6,709) | 19,005 |
| Operating profit | 83,189 | 12,312 | 95,501 | |
| Finance expenses | B | 32,913 | (6,546) | 26,367 |
| Profit for the year | 50,276 | 18,858 | 69,134 | |
| Other comprehensive income (loss) - derivative financial instruments | B | 7,724 | (6,546) | 1,178 |
| Comprehensive income for the year | 58,000 | 12,312 | 70,312 | |

Material adjustments to the statement of cash flows:
| For the nine-month period ended September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP | Adjustments In USD thousand |
IFRS | ||
| In USD thousand | In USD thousand | |||
| Profit for the period | A, B, C | 13,924 | 14,119 | 28,043 |
| Net cash from operating activities | 49,728 | - | 49,728 | |
| Net cash provided by (used in) investing activities | E | (4,229) | 21,616 | 17,387 |
| Net cash used in financing activities | (59,435) | - | (59,435) | |
| Net increase (decrease) in cash and cash equivalents | (13,936) | 21,616 | 7,680 | |
| Balance of cash and cash equivalents at beginning of period | E | 145 | 1,041 | 1,186 |
| Restricted cash balance at beginning of period | E | 57,680 | (57,680) | - |
| Balance of cash and cash equivalents at end of period | E | 97 | 8,769 | 8,866 |
| Restricted cash balance at end of period | E | 43,792 | (43,792) | - |
| For the nine-month period ended September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS | ||
| In USD thousand | ||||
| Profit for the period | A, B, C | 35,711 | 14,256 | 49,967 |
| Net cash from operating activities | 57,273 | - | 57,273 | |
| Net cash provided by (used in) investing activities | E | (10,722) | 19,684 | 8,962 |
| Net cash used in financing activities | (60,105) | - | (60,105) | |
| Net increase (decrease) in cash and cash equivalents | (13,554) | 19,684 | 6,130 | |
| Balance of cash and cash equivalents at beginning of period | E | 98 | 181 | 279 |
| Restricted cash balance at beginning of period | E | 76,390 | (76,390) | - |
| Balance of cash and cash equivalents at end of period | E | 97 | 6,312 | 6,409 |
| Restricted cash balance at end of period | E | 62,837 | (62,837) | - |

Material adjustments to the statement of cash flows: (cont.)
| For the three-month period ended September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP | Adjustments In USD thousand |
IFRS In USD thousand |
||
| In USD thousand | ||||
| Profit for the period | A, B, C | 3,462 | 3,047 | 6,509 |
| Net cash from operating activities | 12,893 | - | 12,893 | |
| Net cash provided by (used in) investing activities | E | (2,803) | 2,985 | 182 |
| Net cash used in financing activities | (5,800) | - | (5,800) | |
| Net decrease in cash and cash equivalents | 4,290 | 2,985 | 7,275 | |
| Balance of cash and cash equivalents at beginning of period | E | 93 | 1,498 | 1,591 |
| Restricted cash balance at beginning of period | E | 39,506 | (39,506) | - |
| Balance of cash and cash equivalents at end of period | E | 97 | 8,769 | 8,866 |
| Restricted cash balance at end of period | E | 43,792 | (43,792) | - |
| For the three-month period ended September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Profit for the period | A, B, C | 17,853 | 4,714 | 22,567 |
| Net cash from operating activities | 25,981 | - | 25,981 | |
| Net cash provided by (used in) investing activities | E | (6,137) | 27,746 | 21,609 |
| Net cash used in financing activities | (42,990) | - | (42,990) | |
| Net increase (decrease) in cash and cash equivalents | (23,146) | 27,746 | 4,600 | |
| Balance of cash and cash equivalents at beginning of period | E | 99 | 1,710 | 1,809 |
| Restricted cash balance at beginning of period | E | 85,981 | (85,981) | - |
| Balance of cash and cash equivalents at end of period | E | 97 | 6,312 | 6,409 |
| Restricted cash balance at end of period | E | 62,837 | (62,837) | - |
| For the year ended December 31, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Profit for the year | A, B, C | 50,276 | 18,858 | 69,134 |
| Net cash from operating activities | 62,497 | - | 62,497 | |
| Net cash provided by (used in) investing activities | E | (11,226) | 19,571 | 8,345 |
| Net cash used in financing activities | (69,934) | - | (69,934) | |
| Net increase (decrease) in cash and cash equivalents | (18,663) | 19,571 | 908 | |
| Balance of cash and cash equivalents at beginning of year | E | 98 | 180 | 278 |
| Restricted cash balance at beginning of year | E | 76,390 | (76,390) | - |
| Balance of cash and cash equivalents at end of year | E | 145 | 1,041 | 1,186 |
| Restricted cash balance at end of year | E | 57,680 | (57,680) | - |
Statement of Financial Position:
| As at September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Cash and cash equivalents | 88 | 25,103 | 25,191 | |
| Restricted cash | 26,287 | (25,103) | 1,184 | |
| Property, plant & equipment | A, D | 821,022 | 47,024 | 868,046 |
| Intangible assets | D | 26,971 | (26,971) | - |
| Other assets | 67,263 | - | 67,263 | |
| Total assets | 941,631 | 20,053 | 961,684 | |
| Accounts payable and deferred expenses | A | 16,218 | (11,117) | 5,101 |
| Other liabilities | 406,718 | 490 | 407,208 | |
| Total liabilities | 422,936 | (10,627) | 412,309 | |
| Partners' equity | A | 518,695 | 30,680 | 549,375 |
| Total liabilities and equity | 941,631 | 20,053 | 961,684 |
| As at September 30, 2022 | |||
|---|---|---|---|
| US GAAP | Adjustments In USD thousand |
IFRS In USD thousand |
|
| In USD thousand | |||
| 87 | 2,200 | 2,287 | |
| 2,346 | (2,200) | 146 | |
| A, D | 844,413 | 39,672 | 884,085 |
| 27,841 | (27,841) | - | |
| 168,358 | - | 168,358 | |
| 1,043,045 | 11,831 | 1,054,876 | |
| 31,790 | (10,551) | 21,239 | |
| 578,009 | 770 | 578,779 | |
| 609,799 | (9,781) | 600,018 | |
| 433,246 | 21,612 | 454,858 | |
| 1,043,045 | 11,831 | 1,054,876 | |
| D A A |
| As at December 31, 2022 | ||||
|---|---|---|---|---|
| US GAAP | Adjustments | IFRS | ||
| In USD thousand | In USD thousand | In USD thousand | ||
| Cash and cash equivalents | 89 | 1,370 | 1,459 | |
| Restricted cash | 10,098 | (1,370) | 8,728 | |
| Property, plant & equipment | A, D | 839,665 | 45,684 | 885,349 |
| Intangible assets | D | 27,624 | (27,624) | - |
| Other assets | 142,274 | - | 142,274 | |
| Total assets | 1,019,750 | 18,060 | 1,037,810 | |
| Accounts payable and deferred expenses | A | 38,800 | (6,354) | 32,446 |
| Other liabilities | 533,630 | 700 | 534,330 | |
| Total liabilities | 572,430 | (5,654) | 566,776 | |
| Partners' equity | A | 447,320 | 23,714 | 471,034 |
| Total liabilities and equity | 1,019,750 | 18,060 | 1,037,810 | |
Statements of income and other comprehensive income:
| For the nine-month period ended September 30, 2023 | |||||
|---|---|---|---|---|---|
| US GAAP | IFRS adjustments | Adjustments to the Group's accounting policies* |
IFRS - according to the Group's accounting policies |
||
| In USD thousand | In USD thousand | In USD thousand | In USD thousand | ||
| Revenues | 218,205 | 460 | 13,195 | 231,860 | |
| Operating expenses | A | 116,664 | (6,756) | 13,195 | 123,103 |
| Operating profit | 101,541 | 7,216 | - | 108,757 | |
| Finance expenses | B | 18,896 | (4,114) | - | 14,782 |
| Profit for the period | 82,645 | 11,330 | - | 93,975 | |
| Other comprehensive loss - interest rate swaps | B | (3,270) | (4,364) | - | (7,634) |
| Comprehensive income for the period | 79,375 | 6,966 | - | 86,341 |
| For the nine-month period ended September 30, 2022 | |||||
|---|---|---|---|---|---|
| US GAAP | IFRS adjustments | Adjustments to the Group's accounting policies* |
IFRS - according to the Group's accounting policies |
||
| In USD thousand | In USD thousand | In USD thousand | In USD thousand | ||
| Revenues | 350,465 | - | (69,413) | 281,052 | |
| Operating expenses | A | 266,949 | (6,219) | (69,413) | 191,317 |
| Operating profit | 83,516 | 6,219 | - | 89,735 | |
| Finance expenses | B | 21,254 | (4,843) | - | 16,411 |
| Profit for the period | 62,262 | 11,062 | - | 73,324 | |
| Other comprehensive income - interest rate swaps | B | 29,769 | (4,633) | - | 25,136 |
| Comprehensive income for the period | 92,031 | 6,429 | - | 98,460 |
(*) Represents adjustments to the Group's accounting policies regarding the presentation of hedging transactions regarding energy margins.
Statements of income and other comprehensive income: (cont.)
| For the three-month period ended September 30, 2023 | |||||
|---|---|---|---|---|---|
| US GAAP | IFRS adjustments | Adjustments to the Group's accounting policies* |
IFRS - according to the Group's accounting policies |
||
| In USD thousand | In USD thousand | In USD thousand | In USD thousand | ||
| Revenues | 67,330 | 460 | 3,806 | 71,596 | |
| Operating expenses | A | 34,371 | (2,326) | 3,806 | 35,851 |
| Operating profit | 32,959 | 2,786 | - | 35,745 | |
| Finance expenses | B | 5,546 | (1,346) | - | 4,200 |
| Profit for the period | 27,413 | 4,132 | - | 31,545 | |
| Other comprehensive loss - interest rate swaps | B | (7,284) | (1,737) | - | (9,021) |
| Comprehensive income for the period | 20,129 | 2,395 | - | 22,524 |
| For the three-month period ended September 30, 2022 | |||||
|---|---|---|---|---|---|
| US GAAP | IFRS adjustments | Adjustments to the Group's accounting policies* |
IFRS - according to the Group's accounting policies |
||
| In USD thousand | In USD thousand | In USD thousand | In USD thousand | ||
| Revenues | 154,943 | - | (27,523) | 127,420 | |
| Operating expenses | A | 103,251 | (2,059) | (27,523) | 73,669 |
| Operating profit | 51,692 | 2,059 | - | 53,751 | |
| Finance expenses | B | 6,665 | (1,797) | - | 4,868 |
| Profit for the period | 45,027 | 3,856 | - | 48,883 | |
| Other comprehensive income - interest rate swaps | B | 8,718 | (1,727) | - | 6,991 |
| Comprehensive loss for the period | 53,745 | 2,129 | - | 55,874 |
| For the year ended December 31, 2022 | |||||
|---|---|---|---|---|---|
| US GAAP | IFRS adjustments | Adjustments to the Group's accounting policies* |
IFRS - according to the Group's accounting policies |
||
| In USD thousand | In USD thousand | In USD thousand | In USD thousand | ||
| Revenues | 450,906 | - | (76,939) | 373,967 | |
| Operating expenses | A | 345,546 | (8,251) | (76,939) | 260,356 |
| Operating profit | 105,360 | 8,251 | - | 113,611 | |
| Finance expenses | B | 21,065 | (6,360) | - | 14,705 |
| Profit for the year | 84,295 | 14,611 | - | 98,906 | |
| Other comprehensive income - interest rate swaps | B | 21,810 | (6,080) | - | 15,730 |
| Comprehensive income for the year | 106,105 | 8,531 | - | 114,636 |
(*) Represents adjustments to the Group's accounting policies regarding the presentation of hedging transactions regarding energy margins.
Material adjustments to the statement of cash flows:
| For the nine-month period ended September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Profit for the period | A, B | 82,645 | 11,330 | 93,975 |
| Net cash from operating activities | 138,620 | - | 138,620 | |
| Net cash provided by (used in) investing activities | E | (1,071) | 10,124 | 9,053 |
| Net cash used in financing activities | (123,941) | - | (123,941) | |
| Net increase in cash and cash equivalents | 13,608 | 10,124 | 23,732 | |
| Balance of cash and cash equivalents at beginning of period | E | 89 | 1,370 | 1,459 |
| Restricted cash balance at beginning of period | E | 38,404 | (38,404) | - |
| Balance of cash and cash equivalents at end of period | E | 88 | 25,103 | 25,191 |
| Restricted cash balance at end of period | E | 52,013 | (52,013) | - |
| For the nine-month period ended September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments | IFRS | ||
| In USD thousand | In USD thousand | |||
| Profit for the period | A, B | 62,262 | 11,062 | 73,324 |
| Net cash from operating activities | 106,243 | - | 106,243 | |
| Net cash provided by (used in) investing activities | E | (5,479) | 33,945 | 28,466 |
| Net cash used in financing activities | (136,830) | - | (136,830) | |
| Net increase (decrease) in cash and cash equivalents | (36,066) | 33,945 | (2,121) | |
| Balance of cash and cash equivalents at beginning of period | E | 78 | 4,330 | 4,408 |
| Restricted cash balance at beginning of period | E | 72,663 | (72,663) | - |
| Balance of cash and cash equivalents at end of period | E | 87 | 2,200 | 2,287 |
| Restricted cash balance at end of period | E | 36,588 | (36,588) | - |
Material adjustments to the statement of cash flows: (cont.)
| For the three-month period ended September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP | Adjustments In USD thousand |
IFRS In USD thousand |
||
| In USD thousand | ||||
| Profit for the period | A, B | 27,413 | 4,132 | 31,545 |
| Net cash from operating activities | 39,796 | - | 39,796 | |
| Net cash provided by (used in) investing activities | E | (438) | 849 | 411 |
| Net cash used in financing activities | (21,904) | - | (21,904) | |
| Net increase in cash and cash equivalents | 17,454 | 849 | 18,303 | |
| Balance of cash and cash equivalents at beginning of period | E | 65 | 6,823 | 6,888 |
| Restricted cash balance at beginning of period | E | 34,582 | (34,582) | - |
| Balance of cash and cash equivalents at end of period | E | 88 | 25,103 | 25,191 |
| Restricted cash balance at end of period | E | 52,013 | (52,013) | - |
| For the three-month period ended September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Profit for the period | A, B | 45,027 | 3,856 | 48,883 |
| Net cash from operating activities | 35,358 | - | 35,358 | |
| Net cash provided by (used in) investing activities | E | (2,148) | 4,300 | 2,152 |
| Net cash used in financing activities | (39,169) | - | (39,169) | |
| Net decrease in cash and cash equivalents | (5,959) | 4,300 | (1,659) | |
| Balance of cash and cash equivalents at beginning of period | E | 65 | 3,881 | 3,946 |
| Restricted cash balance at beginning of period | E | 42,569 | (42,569) | - |
| Balance of cash and cash equivalents at end of period | E | 87 | 2,200 | 2,287 |
| Restricted cash balance at end of period | E | 36,588 | (36,588) | - |
| For the year ended December 31, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Profit for the year | A, B | 84,295 | 14,611 | 98,906 |
| Net cash from operating activities | 140,040 | - | 140,040 | |
| Net cash provided by (used in) investing activities | E | (7,323) | 31,299 | 23,976 |
| Net cash used in financing activities | (166,965) | - | (166,965) | |
| Net increase (decrease) in cash and cash equivalents | (34,248) | 31,299 | (2,949) | |
| Balance of cash and cash equivalents at beginning of year | E | 78 | 4,330 | 4,408 |
| Restricted cash balance at beginning of year | E | 72,663 | (72,663) | - |
| Balance of cash and cash equivalents at end of year | E | 89 | 1,370 | 1,459 |
| Restricted cash balance at end of year | E | 38,404 | (38,404) | - |
Statement of Financial Position:
| As at September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP Adjustments |
IFRS | |||
| In USD thousand | In USD thousand | In USD thousand | ||
| Cash and cash equivalents | 98 | 6,581 | 6,679 | |
| Restricted cash | 6,624 | (6,581) | 43 | |
| Property, plant & equipment | A, D | 746,449 | 80,704 | 827,153 |
| Intangible assets | D | 52,210 | (52,210) | - |
| Other assets | 126,492 | - | 126,492 | |
| Total assets | 931,873 | 28,494 | 960,367 | |
| Accounts payable and deferred expenses | A | 11,697 | (2,397) | 9,300 |
| Other liabilities | 449,955 | (123) | 449,832 | |
| Total liabilities | 461,652 | (2,520) | 459,132 | |
| Partners' equity | A | 470,221 | 31,014 | 501,235 |
| Total liabilities and equity | 931,873 | 28,494 | 960,367 |
| As at September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Cash and cash equivalents | 100 | 23,216 | 23,316 | |
| Restricted cash | 30,106 | (23,216) | 6,890 | |
| Property, plant & equipment | A, D | 771,119 | 81,325 | 852,444 |
| Intangible assets | D | 55,719 | (55,719) | - |
| Other assets | 138,121 | - | 138,121 | |
| Total assets | 995,165 | 25,606 | 1,020,771 | |
| Accounts payable and deferred expenses | A | 19,953 | (2,383) | 17,570 |
| Other liabilities | 621,601 | (193) | 621,408 | |
| Total liabilities | 641,554 | (2,576) | 638,978 | |
| Partners' equity | A | 353,611 | 28,182 | 381,793 |
| Total liabilities and equity | 995,165 | 25,606 | 1,020,771 |
| As at December 31, 2022 | ||||
|---|---|---|---|---|
| US GAAP Adjustments |
IFRS | |||
| In USD thousand | In USD thousand | In USD thousand | ||
| Cash and cash equivalents | 90 | 40,230 | 40,320 | |
| Restricted cash | 42,251 | (40,230) | 2,021 | |
| Property, plant & equipment | A, D | 764,996 | 81,413 | 846,409 |
| Intangible assets | D | 54,842 | (54,842) | - |
| Other assets | 134,217 | - | 134,217 | |
| Total assets | 996,396 | 26,571 | 1,022,967 | |
| Accounts payable and deferred expenses | A | 21,025 | (1,857) | 19,168 |
| Other liabilities | 605,364 | (175) | 605,189 | |
| Total liabilities | 626,389 | (2,032) | 624,357 | |
| Partners' equity | A | 370,007 | 28,603 | 398,610 |
| Total liabilities and equity | 996,396 | 26,571 | 1,022,967 | |
Statements of income and other comprehensive income:
| For the nine-month period ended September 30, 2023 | |||||
|---|---|---|---|---|---|
| US GAAP In USD thousand |
IFRS adjustments In USD thousand |
Adjustments to the Group's accounting policies* In USD thousand |
IFRS - according to the Group's accounting policies In USD thousand |
||
| Revenues | 270,449 | (18) | 12,406 | 282,837 | |
| Operating expenses | A | 129,571 | (6,670) | 12,406 | 135,307 |
| Depreciation and amortization | A | 21,625 | 4,207 | - | 25,832 |
| Operating profit | 119,253 | 2,445 | - | 121,698 | |
| Finance expenses | B | 14,214 | (6,130) | - | 8,084 |
| Profit for the period | 105,039 | 8,575 | - | 113,614 | |
| Other comprehensive income (loss) - interest rate swaps | B | (4,825) | (6,165) | - | (10,990) |
| Comprehensive income for the period | 100,214 | 2,410 | - | 102,624 |
| For the nine-month period ended September 30, 2022 | |||||
|---|---|---|---|---|---|
| US GAAP In USD thousand |
IFRS adjustments In USD thousand |
Adjustments to the Group's accounting policies* In USD thousand |
IFRS - according to the Group's accounting policies In USD thousand |
||
| Revenues | 347,948 | - | 44,306 | 392,254 | |
| Operating expenses | A | 284,017 | (5,616) | 44,306 | 322,707 |
| Depreciation and amortization | A | 21,607 | 3,199 | - | 24,806 |
| Operating profit | 42,324 | 2,417 | - | 44,741 | |
| Finance expenses | B | 21,466 | (5,138) | - | 16,328 |
| Profit for the period | 20,858 | 7,555 | - | 28,413 | |
| Other comprehensive income - interest rate swaps | B | 30,010 | (5,191) | - | 24,819 |
| Comprehensive income for the period | 50,868 | 2,364 | - | 53,232 |
(*) Represents adjustments to the Group's accounting policies regarding the presentation of hedging transactions regarding energy margins.
Statements of income and other comprehensive income: (cont.)
| For the three-month period ended September 30, 2023 | ||||||
|---|---|---|---|---|---|---|
| US GAAP IFRS adjustments |
Adjustments to the Group's accounting policies* |
IFRS - according to the Group's accounting policies |
||||
| In USD thousand | In USD thousand | In USD thousand | In USD thousand | |||
| Revenues | 83,791 | (1,856) | 7,097 | 89,032 | ||
| Operating expenses | A | 36,169 | (2,372) | 7,097 | 40,894 | |
| Depreciation and amortization | A | 7,210 | 1,403 | - | 8,613 | |
| Operating profit | 40,412 | (887) | - | 39,525 | ||
| Finance expenses | B | 1,537 | (3,245) | - | (1,708) | |
| Profit for the period | 38,875 | 2,358 | - | 41,233 | ||
| Other comprehensive loss - interest rate swaps | B | (8,258) | (1,407) | - | (9,665) | |
| Comprehensive income for the period | 30,617 | 951 | - | 31,568 |
| Adjustments to the | IFRS - according | ||||
|---|---|---|---|---|---|
| Group's | to the Group's | ||||
| accounting | accounting | ||||
| US GAAP | IFRS adjustments | policies* | policies | ||
| In USD thousand | In USD thousand | In USD thousand | In USD thousand | ||
| Revenues | 134,122 | - | 24,596 | 158,718 | |
| Operating expenses | A | 98,424 | (2,380) | 24,596 | 120,640 |
| Depreciation and amortization | A | 7,207 | 1,402 | - | 8,609 |
| Operating profit | 28,491 | 978 | - | 29,469 | |
| Finance expenses | B | 7,408 | (1,840) | - | 5,568 |
| Profit for the period | 21,083 | 2,818 | - | 23,901 | |
| Other comprehensive income - interest rate swaps | B | 9,199 | (1,858) | - | 7,341 |
| Comprehensive income for the period | 30,282 | 960 | - | 31,242 |
| For the year ended December 31, 2022 | ||||||
|---|---|---|---|---|---|---|
| US GAAP | IFRS adjustments | Adjustments to the Group's accounting policies* |
IFRS - according to the Group's accounting policies |
|||
| In USD thousand | In USD thousand | In USD thousand | In USD thousand | |||
| Revenues | 445,028 | - | 49,637 | 494,665 | ||
| Operating expenses | A | 349,588 | (7,460) | 49,637 | 391,765 | |
| Depreciation and amortization | A | 28,815 | 4,602 | - | 33,417 | |
| Operating profit | 66,625 | 2,858 | - | 69,483 | ||
| Finance expenses | B | 28,645 | (6,597) | - | 22,048 | |
| Profit for the year | 37,980 | 9,455 | - | 47,435 | ||
| Other comprehensive income - interest rate swaps | B | 29,284 | (6,667) | - | 22,617 | |
| Comprehensive income for the year | 67,264 | 2,788 | - | 70,052 |
(*) Represents adjustments to the Group's accounting policies regarding the presentation of hedging transactions regarding energy margins.
Material adjustments to the statement of cash flows:
| For the nine-month period ended September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Profit for the period | A, B | 105,039 | 8,575 | 113,614 |
| Net cash from operating activities | 98,957 | - | 98,957 | |
| Net cash from investing activities | E | (413) | 31,115 | 30,702 |
| Net cash used in financing activities | (163,300) | - | (163,300) | |
| Net increase (decrease) in cash and cash equivalents | (64,756) | 31,115 | (33,641) | |
| Balance of cash and cash equivalents at beginning of period | E | 90 | 40,230 | 40,320 |
| Restricted cash balance at beginning of period | E | 119,838 | (119,838) | - |
| Balance of cash and cash equivalents at end of period | E | 98 | 6,581 | 6,679 |
| Restricted cash balance at end of period | E | 55,074 | (55,074) | - |
| For the nine-month period ended September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP In USD thousand |
Adjustments In USD thousand |
IFRS In USD thousand |
||
| Profit for the period | A, B | 20,858 | 7,555 | 28,413 |
| Net cash from operating activities | 54,427 | - | 54,427 | |
| Net cash used in investing activities | E | (312) | (7,307) | (7,619) |
| Net cash used in financing activities | (24,942) | - | (24,942) | |
| Net increase (decrease) in cash and cash equivalents | 29,173 | (7,307) | 21,866 | |
| Balance of cash and cash equivalents at beginning of period | E | 100 | 1,350 | 1,450 |
| Restricted cash balance at beginning of period | E | 78,410 | (78,410) | - |
| Balance of cash and cash equivalents at end of period | E | 100 | 23,216 | 23,316 |
| Restricted cash balance at end of period | E | 107,583 | (107,583) | - |
Material adjustments to the statement of cash flows: (cont.)
| For the three-month period ended September 30, 2023 | ||||
|---|---|---|---|---|
| US GAAP | Adjustments | IFRS | ||
| In USD thousand | In USD thousand | In USD thousand | ||
| A, B | 38,875 | 2,358 | 41,233 | |
| 44,247 | - | 44,247 | ||
| (338) | 1,848 | 1,510 | ||
| (47,506) | - | (47,506) | ||
| (3,597) | 1,848 | (1,749) | ||
| E | 100 | 8,328 | 8,428 | |
| E | 58,669 | (58,669) | - | |
| E | 98 | 6,581 | 6,679 | |
| E | 55,074 | (55,074) | - | |
| E |
| For the three-month period ended September 30, 2022 | ||||
|---|---|---|---|---|
| US GAAP | Adjustments In USD thousand |
IFRS In USD thousand |
||
| In USD thousand | ||||
| Profit for the period | A, B | 21,083 | 2,818 | 23,901 |
| Net cash from operating activities | 45,667 | - | 45,667 | |
| Net cash used in investing activities | E | (57) | (6,986) | (7,043) |
| Net cash used in financing activities | (24,488) | - | (24,488) | |
| Net increase (decrease) in cash and cash equivalents | 21,122 | (6,986) | 14,136 | |
| Balance of cash and cash equivalents at beginning of period | E | 99 | 9,081 | 9,180 |
| Restricted cash balance at beginning of period | E | 86,462 | (86,462) | - |
| Balance of cash and cash equivalents at end of period | E | 100 | 23,216 | 23,316 |
| Restricted cash balance at end of period | E | 107,583 | (107,583) | - |
| For the year ended December 31, 2022 | ||||
|---|---|---|---|---|
| US GAAP | Adjustments | IFRS In USD thousand |
||
| In USD thousand | In USD thousand | |||
| Profit for the year | A, B | 37,980 | 9,455 | 47,435 |
| Net cash from operating activities | 78,126 | - | 78,126 | |
| Net cash used in investing activities | E | (519) | (2,548) | (3,067) |
| Net cash used in financing activities | (36,189) | - | (36,189) | |
| Net increase (decrease) in cash and cash equivalents | 41,418 | (2,548) | 38,870 | |
| Balance of cash and cash equivalents at beginning of year | E | 100 | 1,350 | 1,450 |
| Restricted cash balance at beginning of year | E | 78,410 | (78,410) | - |
| Balance of cash and cash equivalents at end of year | E | 90 | 40,230 | 40,320 |
| Restricted cash balance at end of year | E | 119,838 | (119,838) | - |
Set forth below is a breakdown of the key adjustments between US GAAP and IFRS in Valley, Fairview, and Towantic
Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.