For the period from 1 to 31 December 2021
The Company reports 103.3 GWh of electricity produced YTD compared to 70.0 GWh one year ago (+47.6%), propelled by the addition of new Hungarian power plants over the past 15 months (15.5 MWp added in October 2020, November 2020 and December 2021) and of our two utility-scale PV power plants in Leeton, Australia (14.6 MWp connected to the grid in August 2021). This represents an avoidance of 43,864 tonnes of CO2 emissions in 2021.
In December the proprietary portfolio outperformed the audits by 4.6% and by 0.9% year-to-date.
For more information, please refer to chapter 2. Proprietary PV power plants.
The Company sold its 65% stake in its 160 MWp solar PV power project in Maryvale, New South Wales, to the global renewable energy group WIRSOL.
Maryvale Solar Farm is located in the NSW Central-West Orana Renewable Energy Zone, which is earmarked to unlock up to 3 GW of network capacity by the mid-2020s.
By the transaction Photon Energy Group immediately realised a capital gain in the amount of EUR 0.5 million, which will be reflected in the Group's Q4 2021 financial statements. In addition, the agreement foresees another two milestone-related payments for the Company upon successful completion and commissioning of the project by the Investor.
Following the project exit, Photon Energy Group plans to fully focus its future project development activities in Australia on large utility-scale projects based on the unique RayGen technology that combines PV Ultra solar co-generation and electro-thermal energy storage technologies.
The Company announced that it has early repaid the remaining project financing of its Czech PV portfolio provided by Raiffeisen - Leasing, s.r.o. ("RL") on 30 December 2021. The project financing for a total installed capacity of 12.3 MWp had been originally provided by RL's predecessor in 2009 and 2010 and was due on 1 January 2023. The remaining outstanding principal, accrued interest and expected break fees as of 30 December 2021 amounted to approximately CZK 288.65 million (EUR 11.57 million) and were repaid by a combination of the cash balances (partially restricted) held by the project companies (CZK 116.4 million, EUR 4.66 million) and loans provided by the Group to the project companies totalling CZK 172.25 million (EUR 6.91 million). In January 2022 the Group will exercise its call options and take legal ownership of 100% of the equity of the project companies. The Photon Energy Group's cash injection into this transaction has been financed by the equity raised during the placement of treasury shares in June 2021.
Depending on market conditions, or should the need arise, Photon Energy Group could arrange new project financing for the Czech PV portfolio in order to either service group-level financial debt and/or to finance the expansion of its proprietary portfolio.
The Company has been the lead investor along two other investors in Lerta S.A.'s series A equity financing round, investing PLN 8.75 million and increasing its ownership stake from 12% to 24%.
Lerta raised a total of PLN 12.75 million in new equity. Photon Energy Group's new investment goes hand-in-hand with the Company's deepening cooperation with Lerta in the areas of electricity trading for the Company's utility-scale PV power plant portfolio, an integrated approach to the booming behind-the-meter market segment combining on-site energy generation, electricity trading and VPP services and jointly exploring new business models in the dynamically developing energy market.
Since Photon Energy Group's first investment in December 2020 Lerta has obtained electricity trading licenses in Poland, Hungary, Romania and the Czech Republic and managed to expand its presence on the Polish capacity market to over 50 MW of demand side response (DSR) assets under management.
Since 9 December, Lerta has provided electricity trading and balancing services to Photon Energy Group's first European merchant PV power plant with an installed capacity of 1.4 MWp in Tolna, Hungary.
The new capital will be allocated to the development of Lerta's Virtual Power Plant in Poland and to the growth of operations in its new markets within the CEE region, where the company will work closely with Photon Energy Group.
Photon Energy Group had already indirectly invested in Lerta through its investment in the ValueTech Seed Fund that led Lerta's first financing round in 2018. The investment in the Value-Tech Seed Fund is what originally brought Lerta to Photon Energy Group's attention, followed by extensive discussions about a strategic alignment between the companies, which has convinced Photon Energy Group's management to lead Lerta's second and third equity rounds.
Photon Energy is currently developing PV projects in Australia (300.0 MWp), Hungary (95.2 MWp), Romania (225.5 MWp) and Poland (155.0 MWp), and is evaluating further markets for opportunities. For detailed information, please refer to chapter 3 "Reporting on Photon Energy's project pipeline".
The table below represents power plants owned directly or indirectly by Photon Energy N.V. as of the date of the report.
| Project name | Capacity | Feed-in Tariff/LGC |
Prod. 2021 December |
Proj. 2021 December |
Perf. | YTD Prod. | YTD Proj. | Perf. | YTD YoY |
|---|---|---|---|---|---|---|---|---|---|
| Unit | kWp | per MWh, in 2021 |
kWh | kWh | % | kWh | kWh | % | % |
| Komorovice | 2,354 | CZK 15,117 | 31,161 | 47,533 | -34.4% | 2,367,683 | 2,497,558 | -5.2% | -6.5% |
| Zvíkov I | 2,031 | CZK 15,117 | 37,400 | 50,537 | -26.0% | 2,224,776 | 2,300,217 | -3.3% | -6.1% |
| Dolní Dvořiště | 1,645 | CZK 15,117 | 32,419 | 43,429 | -25.4% | 1,660,058 | 1,683,565 | -1.4% | -2.7% |
| Svatoslav | 1,231 | CZK 15,117 | 20,208 | 23,720 | -14.8% | 1,147,700 | 1,203,924 | -4.7% | -4.4% |
| Slavkov | 1,159 | CZK 15,117 | 28,021 | 27,037 | 3.6% | 1,332,623 | 1,333,231 | 0.0% | -0.3% |
| Mostkovice SPV 1 | 210 | CZK 15,117 | 4,704 | 4,974 | -5.4% | 215,065 | 219,971 | -2.2% | -0.6% |
| Mostkovice SPV 3 | 926 | CZK 16,240 | 14,129 | 14,770 | -4.3% | 977,786 | 972,628 | 0.5% | 1.2% |
| Zdice I | 1,499 | CZK 15,117 | 34,756 | 41,009 | -15.2% | 1,624,141 | 1,686,900 | -3.7% | -5.8% |
| Zdice II | 1,499 | CZK 15,117 | 35,985 | 41,985 | -14.3% | 1,661,008 | 1,700,269 | -2.3% | -5.2% |
| Radvanice | 2,305 | CZK 15,117 | 49,696 | 45,355 | 9.6% | 2,473,035 | 2,501,919 | -1.2% | -0.3% |
| Břeclav rooftop | 137 | CZK 15,117 | 3,364 | 3,836 | -12.3% | 156,765 | 154,025 | 1.8% | -2.6% |
| Total Czech PP | 14,996 | 291,844 | 344,187 | -15.2% | 15,840,639 | 16,254,207 | -2.5% | -3.7% | |
| Babiná II | 999 | EUR 425.12 | 23,112 | 19,003 | 21.6% | 989,584 | 970,581 | 2.0% | 3.0% |
| Babina III | 999 | EUR 425.12 | 23,268 | 20,218 | 15.1% | 1,003,712 | 984,711 | 1.9% | 3.0% |
| Prša I. | 999 | EUR 425.12 | 24,532 | 20,320 | 20.7% | 1,026,964 | 1,056,586 | -2.8% | 2.2% |
| Blatna | 700 | EUR 425.12 | 12,970 | 13,734 | -5.6% | 723,883 | 719,873 | 0.6% | 1.8% |
| Mokra Luka 1 | 963 | EUR 382.61 | 37,597 | 29,892 | 25.8% | 1,199,969 | 1,138,187 | 5.4% | 3.6% |
| Mokra Luka 2 | 963 | EUR 382.61 | 41,642 | 31,529 | 32.1% | 1,226,323 | 1,180,582 | 3.9% | 4.8% |
| Jovice 1 | 979 | EUR 382.61 | 20,591 | 15,776 | 30.5% | 868,106 | 893,378 | -2.8% | -0.5% |
| Jovice 2 | 979 | EUR 382.61 | 20,063 | 15,517 | 29.3% | 860,774 | 883,494 | -2.6% | -0.7% |
| Brestovec | 850 | EUR 382.61 | 14,399 | 19,655 | -26.7% | 979,734 | 1,021,651 | -4.1% | -5.3% |
| Polianka | 999 | EUR 382.61 | 11,865 | 17,877 | -33.6% | 971,584 | 979,968 | -0.9% | -0.7% |
| Myjava | 999 | EUR 382.61 | 19,299 | 23,094 | -16.4% | 1,125,440 | 1,120,362 | 0.5% | -1.7% |
| Total Slovak PP | 10,429 | 249,337 | 226,614 | 10.0% | 10,976,072 | 10,949,372 | 0.2% | 0.9% | |
| Tiszakécske 1 | 689 | HUF 34,140 | 24,760 | 22,652 | 9.3% | 872,398 | 845,174 | 3.2% | 2.0% |
| Tiszakécske 2 | 689 | HUF 34,140 | 25,512 | 23,309 | 9.5% | 876,299 | 850,620 | 3.0% | 2.0% |
| Tiszakécske 3 | 689 | HUF 34,140 | 20,961 | 20,377 | 2.9% | 843,417 | 827,512 | 1.9% | 1.1% |
| Tiszakécske 4 | 689 | HUF 34,140 | 26,067 | 23,309 | 11.8% | 880,079 | 850,620 | 3.5% | 2.2% |
| Tiszakécske 5 | 689 | HUF 34,140 | 24,994 | 22,652 | 10.3% | 830,533 | 845,174 | -1.7% | -1.8% |
| Tiszakécske 6 | 689 | HUF 34,140 | 25,189 | 23,309 | 8.1% | 874,891 | 850,620 | 2.9% | 2.1% |
| Tiszakécske 7 | 689 | HUF 34,140 | 25,527 | 22,634 | 12.8% | 873,117 | 844,555 | 3.4% | 1.9% |
| Tiszakécske 8 | 689 | HUF 34,140 | 24,338 | 21,840 | 11.4% | 866,657 | 841,727 | 3.0% | 2.0% |
| Almásfüzitő 1 | 695 | HUF 34,140 | 19,042 | 23,054 | -17.4% | 837,893 | 840,464 | -0.3% | 0.6% |
| Almásfüzitő 2 | 695 | HUF 34,140 | 18,297 | 22,986 | -20.4% | 836,824 | 839,870 | -0.4% | 3.0% |
| Almásfüzitő 3 | 695 | HUF 34,140 | 21,114 | 22,634 | -6.7% | 839,496 | 835,806 | 0.4% | 4.5% |
| Almásfüzitő 4 | 695 | HUF 34,140 | 19,008 | 23,251 | -18.2% | 863,449 | 842,485 | 2.5% | 3.0% |
| Almásfüzitő 5 | 695 | HUF 34,140 | 21,153 | 22,713 | -6.9% | 857,729 | 836,892 | 2.5% | 0.9% |
| Almásfüzitő 6 | 660 | HUF 34,140 | 20,422 | 21,798 | -6.3% | 872,233 | 804,938 | 8.4% | 3.5% |
| Almásfüzitő 7 | 691 | HUF 34,140 | 19,684 | 22,548 | -12.7% | 868,699 | 831,973 | 4.4% | 3.3% |
| Almásfüzitő 8 | 668 | HUF 34,140 | 19,163 | 22,248 | -13.9% | 856,802 | 814,589 | 5.2% | 1.5% |
| Nagyecsed 1 | 689 | HUF 34,140 | 19,440 | 21,031 | -7.6% | 862,279 | 825,772 | 4.4% | 2.1% |
| Nagyecsed 2 | 689 | HUF 34,140 | 19,007 | 21,031 | -9.6% | 862,332 | 825,772 | 4.4% | 2.2% |
| Nagyecsed 3 | 689 | HUF 34,140 | 19,283 | 20,759 | -7.1% | 865,146 | 826,184 | 4.7% | 1.7% |
| Fertod I | 528 | HUF 34,140 | 15,945 | 16,018 | -0.5% | 680,660 | 612,168 | 11.2% | 0.1% |
| Fertod II No 2 | 699 | HUF 34,140 | 27,289 | 21,481 | 27.0% | 892,330 | 833,707 | 7.0% | 1.3% |
| Fertod II No 3 | 699 | HUF 34,140 | 27,147 | 21,481 | 26.4% | 906,184 | 833,707 | 8.7% | 2.8% |
| Fertod II No 4 | 699 | HUF 34,140 | 27,180 | 21,481 | 26.5% | 899,126 | 833,707 | 7.8% | 2.3% |
| Project name | Capacity | Feed-in-Tariff/LGC | Prod. 2021 December |
Proj. 2021 December |
Perf. | YTD Prod. | YTD Proj. | Perf. | YTD YoY |
|---|---|---|---|---|---|---|---|---|---|
| Unit | kWp | per MWh, in 2021 |
kWh | kWh | % | kWh | kWh | % | % |
| Fertod II No 5 | 691 | HUF 34,140 | 26,941 | 23,406 | 15.1% | 900,175 | 838,402 | 7.4% | 2.8% |
| Fertod II No 6 | 699 | HUF 34,140 | 26,958 | 21,481 | 25.5% | 899,662 | 833,707 | 7.9% | 3.0% |
| Kunszentmárton I No 1 | 697 | HUF 34,140 | 24,462 | 23,814 | 2.7% | 908,571 | 885,501 | 2.6% | 2.6% |
| Kunszentmárton I No 2 | 697 | HUF 34,140 | 22,574 | 23,847 | -5.3% | 901,403 | 885,636 | 1.8% | 2.5% |
| Kunszentmárton II No 1 | 693 | HUF 34,140 | 23,436 | 19,543 | 19.9% | 923,943 | 855,866 | 8.0% | 77.1% |
| Kunszentmárton II No 2 | 693 | HUF 34,140 | 24,086 | 19,642 | 22.6% | 928,453 | 856,165 | 8.4% | 57.9% |
| Taszár 1 | 701 | HUF 34,140 | 29,588 | 26,271 | 12.6% | 888,976 | 885,316 | 0.4% | -0.6% |
| Taszár 2 | 701 | HUF 34,140 | 29,905 | 26,271 | 13.8% | 893,930 | 885,316 | 1.0% | -0.9% |
| Taszár 3 | 701 | HUF 34,140 | 29,675 | 26,271 | 13.0% | 899,906 | 885,316 | 1.6% | 0.2% |
| Monor 1 | 688 | HUF 34,140 | 24,511 | 20,073 | 22.1% | 896,298 | 852,356 | 5.2% | 5.9% |
| Monor 2 | 696 | HUF 34,140 | 22,851 | 20,172 | 13.3% | 883,430 | 862,899 | 2.4% | 3.8% |
| Monor 3 | 696 | HUF 34,140 | 23,893 | 20,172 | 18.4% | 887,940 | 862,899 | 2.9% | 4.6% |
| Monor 4 | 696 | HUF 34,140 | 23,657 | 20,172 | 17.3% | 892,689 | 862,899 | 3.5% | 4.3% |
| Monor 5 | 688 | HUF 34,140 | 24,311 | 19,941 | 21.9% | 893,927 | 846,445 | 5.6% | 4.3% |
| Monor 6 | 696 | HUF 34,140 | 24,506 | 20,172 | 21.5% | 892,477 | 862,899 | 3.4% | 3.8% |
| Monor 7 | 696 | HUF 34,140 | 24,295 | 20,172 | 20.4% | 893,418 | 862,899 | 3.5% | 2.8% |
| Monor 8 | 696 | HUF 34,140 | 24,470 | 20,172 | 21.3% | 892,939 | 862,899 | 3.5% | 4.5% |
| Tata 1 | 672 | HUF 34,140 | 19,546 | 18,817 | 3.9% | 917,050 | 923,288 | -0.7% | 9.5% |
| Tata 2 | 676 | HUF 34,140 | 20,680 | 22,523 | -8.2% | 828,482 | 835,261 | -0.8% | 12.7% |
| Tata 3 | 667 | HUF 34,140 | 20,681 | 20,972 | -1.4% | 829,648 | 815,853 | 1.7% | 9.8% |
| Tata 4 | 672 | HUF 34,140 | 20,460 | 19,395 | 5.5% | 934,102 | 945,462 | -1.2% | 10.5% |
| Tata 5 | 672 | HUF 34,140 | 20,129 | 19,486 | 3.3% | 886,926 | 948,671 | -6.5% | 4.6% |
| Tata 6 | 672 | HUF 34,140 | 19,757 | 19,078 | 3.6% | 926,307 | 933,569 | -0.8% | 8.3% |
| Tata 7 | 672 | HUF 34,140 | 19,678 | 18,833 | 4.5% | 920,655 | 923,890 | -0.4% | 8.6% |
| Tata 8 | 672 | HUF 34,140 | 20,353 | 19,184 | 6.1% | 939,733 | 937,796 | 0.2% | 11.6% |
| Malyi 1 | 695 | HUF 34,140 | 20,059 | 19,919 | 0.7% | 853,977 | 828,586 | 3.1% | 52.8% |
| Malyi 2 | 695 | HUF 34,140 | 20,785 | 20,041 | 3.7% | 859,084 | 829,718 | 3.5% | 54.8% |
| Malyi 3 | 695 | HUF 34,140 | 21,078 | 20,041 | 5.2% | 860,605 | 829,718 | 3.7% | 52.9% |
| Puspokladány 1 | 1,406 | HUF 34,140 | 38,465 | 34,527 | 11.4% | 1,962,033 | 1,944,330 | 0.9% | nm |
| Puspokladány 2 | 1,420 | HUF 34,140 | 39,416 | 31,248 | 26.1% | 2,029,466 | 1,892,045 | 7.3% | nm |
| Puspokladány 3 | 1,420 | HUF 34,140 | 37,891 | 30,097 | 25.9% | 1,997,180 | 1,848,792 | 8.0% | nm |
| Puspokladány 4 | 1,406 | HUF 34,140 | 38,099 | 34,305 | 11.1% | 1,997,879 | 1,930,447 | 3.5% | nm |
| Puspokladány 5 | 1,420 | HUF 34,140 | 39,509 | 31,159 | 26.8% | 2,045,805 | 1,887,556 | 8.4% | nm |
| Puspokladány 6 | 1,394 | HUF 34,140 | 36,622 | 32,033 | 14.3% | 1,972,498 | 1,911,209 | 3.2% | nm |
| Puspokladány 7 | 1,406 | HUF 34,140 | 37,990 | 34,275 | 10.8% | 1,995,957 | 1,930,451 | 3.4% | nm |
| Puspokladány 8 | 1,420 | HUF 34,140 | 37,776 | 30,245 | 24.9% | 2,004,661 | 1,854,378 | 8.1% | nm |
| Puspokladány 9 | 1,406 | HUF 34,140 | 38,025 | 34,246 | 11.0% | 1,934,218 | 1,929,491 | 0.2% | nm |
| Puspokladány 10 | 1,420 | HUF 34,140 | 37,693 | 30,052 | 25.4% | 1,997,844 | 1,847,324 | 8.1% | nm |
| Tolna | 1,358 | HUF 113,1071 | 22,860 | 33,117 | -31.0% | 22,860 | 33,117 | -31.0% | nm |
| Total Hungarian PP | 50,456 | 1,568,195 | 1,449,786 | 8.2% | 64,713,678 | 62,442,410 | 3.6% | 52.3% | |
| Symonston | 144 | AUD 301.60 | 20,574 | 22,527 | -8.7% | 169,877 | 178,176 | -4.7% | 0.4% |
| Leeton | 7,261 | AUD 37 + 432 | 1,699,170 | 1,577,075 | 7.7% | 5,823,120 | 6,292,894 | -7.5% | na |
| Fivebough | 7,261 | AUD 38 + 432 * |
1,596,360 | 1,565,135 | 2.0% | 5,746,110 | 6,227,865 | -7.7% | na |
| Total Australian PP | 14,744 | 3,316,104 | 3,164,737 | 4.8% | 11,739,107 | 12,698,935 | -7.6% | nm | |
| Total | 90,547 | 5,425,480 | 5,185,324 | 4.6% | 103,269,496 | 102,344,925 | 0.9% | 47.6% |
Capacity: installed capacity of the power plant
Prod.: production in the reporting month - Proj.: projection in the reporting month
Perf.: performance of the power plant in reporting month i.e. (production in Month / projection for Month) - 1.
YTD Prod.: accumulated production year-to-date i.e. from January until the end of the reporting month.
YTD Proj.: accumulated projection year-to-date i.e. from January until the end of the reporting month
Perf. YTD: performance of the power plant year-to-date i.e. (YTD prod. in 2021 / YTD proj. in 2021) – 1
YTD YOY: (YTD Prod. in 2021 / YTD Prod. in 2020) – 1.
.
1 Average realized electricity price during the reporting period in Hungary. 2 Average electricity price during the reporting period + Australian Largescale Generation Certificate spot closing price at the end of the reporting period.








Specific Performance Ratio is a measure of efficiency which shows the amount of kWh generated per 1 kWp of installed capacity and enables the simple com-
parison of year-on-year results and seasonal fluctuations during the year. The Company reports 103.3 GWh of electricity produced YTD compared to 70.0 GWh one year ago (+47.6%), propelled by the
addition of new Hungarian power plants over the past over the past 15 months (15.5 MWp added in October 2020, November
2020 and December 2021) and of our two utility-scale PV power plants in Leeton, Australia (14.6 MWp connected to the grid in August 2021). This represents an avoidance of 43,864 tonnes of CO2 emissions in 2021.
In December the proprietary portfolio outperformed the audits by 4.6% and by 0.9% year-to-date.
Project development is a crucial activity in Photon Energy's business model of covering the entire value chain of PV power plants. The main objective of project development activities is to expand the PV proprietary portfolio, which provides recurring revenues and free cash flows to the Group. For financial or strategic reasons Photon Energy may decide to cooperate with third-party investors either on a joint-venture basis or with the goal of exiting the projects to such investors entirely. Ownership of project rights provides Photon Energy with a high level of control and allows locking in EPC (one-off) and O&M (long-term) services. Hence, Our Slovak, Hungarian and Australian portfolios exceeded energy forecasts by 10.0%, 8.2% and 4.8% respectively, while our Czech portfolio was short of estimates by 15.2%.
The specific performance ratio of the proprietary portfolio (SPR) reached 59.9 kWh/kWp compared to 19.4 kWh/kWp one year ago (+208.9% year-on year).
project development is a key driver for Photon Energy's future growth. The Group's experience in project development and financing in the Czech Republic, Slovakia, Germany, Italy and Hungary is an important factor in selecting attractive markets and reducing the inherent risks related to project development.
Photon Energy is currently developing PV projects in Australia (300.0 MWp), Hungary (95.2 MWp), Romania (225.5 MWp) and Poland (155.0 MWp), and is evaluating further markets for opportunities.
| Country | 1. Feasibility* | 2. Early development |
3. Advanced development |
4. Ready-to-build technical |
5. Under construction |
Total in MWp |
|---|---|---|---|---|---|---|
| Australia | - | 300.0 | - | - | - | 300.0 |
| Hungary | 68.0 | 23.1 | 2.7 | - | 1.4 | 95.2 |
| Romania | 44.5 | 92.1 | 88.9 | - | - | 225.5 |
| Poland | 130.9 | 24.1 | - | - | - | 155.0 |
| Total in MWp | 243.4 | 439.4 | 91.6 | - | 1.4 | 775.7 |
*Development phases are described in the glossary available at the end of this chapter.
PV projects have two definitions of capacity. The grid connection capacity is expressed as the maximum of kilowatts or megawatts which can be fed into the grid at any point in time. Electricity grids run on alternating current (AC). Solar modules produce direct current (DC), which is transformed into AC by inverters. Heat, cable lines, inverters and transformers lead to energy losses in the system be-tween the solar modules and the grid connection point. Cumulatively system losses typically add up to 15-20%. Therefore, for a given grid connection capacity a larger module capacity (expressed in Watt peak – Wp) can be installed without exceeding the grid connection limit. At times of extremely high production, inverters can reduce the volume of electricity so that the plant stays within the grid connection limits. Photon Energy will refer to the installed DC capacity of projects expressed in Megawatt peak (MWp) in its reporting, which might fluctuate over the project development process.
Projects having reached an advanced development phase, as well as projects for which sufficient details can be disclosed are described in the table below:
| Country | Location | Dvt Phase |
Project function |
Share | MWp | Commercial Model | Land | Grid con nection |
Construc tion permit |
Expected RTB |
|---|---|---|---|---|---|---|---|---|---|---|
| Australia | Undis closed |
2 | All options open |
100% | 300.0 | All options open | Secured | Ongoing | Ongoing | Q4 2023 |
| Hungary | Tolna 1a | 5 | Own portfolio |
100% | 1.4 | Merchant/PPA | Secured | Secured | Secured | Under Construc tion |
| Hungary | Tolna 1b | 3 | Own portfolio |
100% | 2.7 | Merchant/PPA | Secured | Secured | Secured | Q2 2022 |
| Hungary | Tolna 2 | 2 | Own Portfolio |
100% | 23.2 | Merchant/PPA | Ongoing | Secured | Secured | Q3 2022 |
During the reporting period, Photon Energy had two large scale solar farms under development.
► Maryvale Project (160 MWp): During the reporting period, the Group sold its 65% stake in Maryvale Solar Farm Pty. Ltd., the project company which is holding all project rights and has obtained Development Approval for the 125 MW AC PV power plant project, which enables to install up to 160 MWp DC capacity, in Maryvale, to the global renewable energy group WIRSOL.
Maryvale Solar Farm is located in the NSW Central-West Orana Renewable Energy Zone, which is earmarked to unlock up to 3 GW of network capacity by the mid-2020s.
By the transaction Photon Energy realised a capital gain in the amount of EUR 0.5 million which will be reflected in the Group's Q4 2021 financial statements. In addition the agreement foresees further two milestone related payments for Photon Energy upon successful completion and connection of the project by the new investor.
With exiting this development project Photon Energy will fully focus its future development efforts in Australia for large scale projects on combined generation and storage projects based on RayGen Technology.
In November 2021, the Group secured 1,200 hectares of land in South Australia to develop a 300 MWp solar farm suitable for RayGen's solar technology in combination with its energy storage solution.
► Development status Raygen Project (300 MWp): Based on preliminary designs, Photon Energy will develop a solar generation capacity of 300 MWp with a grid connection capacity of 150 MW. The target storage energy storage capacity is 3.6 GWh, equivalent to 24 hours of full load, to the grid, from storage. This will exceed the 3 GWh capacity of the Ouarzazate Solar Power Station in Morocco, which currently has the world's largest energy storage capacity of any type, excluding pumped hydro.
Photon Energy has commenced the permitting and gridconnection processes and expects to reach the ready-tobuild stage in Q4 2023.
RayGen recently closed its Series C capital raise for AUD 55 million where Photon Energy participated alongside AGL Energy, Schlumberger New Energy, Chevron Technology Ventures, Equinor Ventures and other investors. RayGen is currently building a 4 MW / 50 MWh solar energy-plus-storage plant in Carwarp, Victoria, Australia due for completion in mid-2022.
Below is a short summary of projects and progress achieved in the reporting period.
► Tolna (27.3 MWp in development, 1.3 MWp project commissioned on 9 December 2021): The thirteen projects with a total planned installed DC capacity of 28.6 MWp are located in the Tolna region in the south of Hungary. Two power plants have a grid connection capacity of 5.0 MW AC each, whereas 1 MW AC have been secured for each of the remaining eleven projects. The grid connection points have been secured and the negotiations for suitable land plots have been finalized for several projects. Grid connection plans have been initiated and already partially approved, to allow us to conclude grid connection agreements with E.ON. with a validity of two years.
On 8 December 2020, one of the 1MW AC (approx. 1.4 MWp DC) projects was granted a METAR premium of 24,470 HUF/MWh (approx. EUR 68 per MWh) with a maximum supported production of 21,585 MWh over a period of up to 15 years. This achievement results from the approval of the project application to the first pilot tender for the METAR system organized in September 2019. Three other projects have entered into advanced development after securing the binding extraction and construction permits. Construction started for two of the projects with one of them commissioned on 9 December 2021 (please see details below).
The revenue model will be the direct sale of electricity through a trader on the Hungarian electricity market for the time being. The option to still enter into a contract-fordifference based on a METÁR license (for the project that has proven successful through the auction process) or entering into PPAs in the future, remains in place. Construction plans include the use of tracking technology allowing bi-facial solar modules to follow the course of the sun, which are expected to achieve a 15-20% higher specific performance than fixed installations.
Now the team has solidified grid capacity, land, and a commercial structure, the projects will continue to take shape as they move towards construction and realization.
► On 9 December 2021, we have completed and gridconnected the first photovoltaic power plant with a capacity of 1.3 MWp near the municipality of Tolna. This latest addition expands the Company's portfolio of proprietary power plants in Hungary to a total of 62, with a combined capacity of 50.4 MWp. Globally, the Company now owns and operates 87 power plants with a combined capacity of 90.6 MWp.
The new power plant represents the first European utilityscale PV power plant in Photon Energy Group's IPP portfolio that the Company will operate without a support scheme. The total annual production of the power plant is expected to be around 2.1 GWh, which corresponds to expected annual revenues of EUR 420,000 based on current forward prices for electricity base load in Hungary in 2022. Given the power plant's electricity production profile, there is potential for even higher revenues in 2022.
The new power plant extends over 2.2 hectares, uses bifacial PV modules mounted on single-axis trackers and is connected to the grid of E.ON Dél-dunántúli Áramhálózati Zrt..
The electricity is sold on the national electricity market on a merchant basis. This means no power purchase agreements (PPAs) have been entered into by the Company. However, they may play a role in the plant's future revenue management strategy, alongside other hedging options.
The Company developed the project fully in-house and delivered engineering, procurement and construction services through its subsidiary Photon Energy Solutions HU Kft. Photon Energy Operations HU Kft. – another of the Group's subsidiaries – will provide long-term monitoring, operations and maintenance services to the power plant.
| Glossary of terms | Definitions |
|---|---|
| Development phase 1: "Feasibility" |
LOI or MOU signed, location scouted and analyzed, working on land lease/purchase, environmental assessment and applica tion for grid connection. |
| Development phase 2: "Early development" |
Signing of land option, lease or purchase agreement, Environmental assessment (environmental impact studies "EIS" for Australia), preliminary design. Specific to Europe: Application for Grid capacity, start work on permitting aspects (construction, connection line, etc.). Specific to Australia: community consultation, technical studies. |
| Development phase 3: "Advanced development" |
In Europe: Finishing work on construction permitting, Receiving of MGT (HU)/ATR (ROM) Letter, Finishing work on permitting for connection line, etc. In Australia: Site footprint and layout finalised, Environmental Impact Statement and development application lodged. Grid connection studies and design submitted. |
| Development phase 4: "Ready-to-build technical" |
In Europe: Project is technical ready to build, we work on offtake model (if not FIT or auction), securing financing (inter nal/external). In Australia: Development application approved, offer to connect to grid received and detailed design commenced. Financing and off-take models/arrangements (internal/external) under negotiation. |
| Development phase 5: "Under construction" |
Procurement of components, site construction until the connection to the grid. On top for Australian projects, signature of Financing and off-take agreements, reception of Construction certificate, conclusion of connection agreement, EPC agree ment, Grid connection works agreements. |
| Glossary of terms | Definitions |
| NSW Department for Planning and Environment (DP&E) |
NSW DP&E is a government agency in charge of planning and development of New South Wales, to ensure the balance between the commercial business development and the needs of local communities. Each project submitted to DP&E must include environmental impact studies (EIS) and once it is reviewed by DP&E, the project is published and available for the public opinion to submit their comments. If the project is rejected by more than 25 people it is moved to Independent Planning Committee (IPC) for review. If there is no public opposition, the project is approved and DP&E issues the project Development Approval (DA) |
| Independent Planning Com mittee (IPC) |
In case more than 25 public petitions against the project are submitted, IPC needs to investigate further into social and envi ronmental impact of the project. IPC might make some recommendations to be made to the project plan to secure the issu ance of DA. |
| Essential Energy | Essential Energy is Distribution Network Service Provider, which operates and manages low voltage electricity network in NSW. The process to secure the grid connection with Essential Energy includes GPS and AEMO's license. |
| Transgrid | Transgrid is a Distribution Network Service Provider (DNSP), which operates and manages the NSW high voltage transmis sion network. Transgrid, in co-operation with Australian Energy Market Operator (AEMO, see description below), is in charge of grid connection approval. To issue its decision Transgrid requires Generation Protection Studies (GPS). GPS is a complete analysis and tests of the impact that a potential power plant would have on the grid. Each power plant is tested under different assumptions (extreme weather conditions, demand/supply changes etc.) and its performance/impact on the grid's stability is thoroughly analysed. Once GPS are completed and accepted, Transgrid is issuing grid connection terms. Those terms are part of the agreement signed with Transgrid, which together with AEMO license secures and finalizes the grid connection process. |
| Australian Energy Market Operator (AEMO) |
AEMO is responsible for operating Australia's largest gas and electricity markets and power systems. AEMO is overlooking all energy producers in NSW and is involved in the process of grid connection approval. AEMO reviews the grid connection terms and GPS studies and issues the license to feed electricity to the grid. AEMO also controls the on-going power generation to make sure that grid stability is maintained. |
On 31 December 2021 the Company's shares (ISIN NL0010391108) closed at a price of PLN 7.15 (-4.7% MoM), corresponding to a price to book ratio of 1.74. The monthly trading volume amounted to 326,609 shares (vs. an average monthly volume of 583,569 YTD).

EV – Enterprise value is calculated as the market capitalisation as of the end of the reporting month, plus debt, plus minority interest, minus cash. All the balance sheet data are taken from the last quarterly report.
Trailing 12 months EBITDA – defined as the sum of EBITDA reported in the last four quarterly reports; i.e. the sum of EBITDA reported in Q4 2020, Q1 2020, Q2 2021, and Q3 2021.

Price/book ratio – is calculated by dividing the closing price of the stock as of the end of the reporting period by the book value per share reported in the latest quarterly report.
EV/EBITDA ratio – is calculated by dividing the Enterprise Value by the Trailing 12 months (TTM) EBITDA.

On 31 December 2021 the share price (ISIN NL0010391108) closed at a level of CZK 38.20 (-9.0% MoM), corresponding to a price to book ratio of 1.71. The Company reports a monthly trading volume of 382,182 shares, compared to an average monthly trading volume of 243,118 YTD.
Trading of the Company's shares on the regulated market of the Prague Stock Exchange (PSE) (Burza cenných papírů Praha) commenced on 5 January 2021. Prior to that date, Data have been extracted from the trading activity on the Free Market of the Prague Stock Exchange.
On 31 December 2021 the share price (FSX: A1T9KW) closed at a level of EUR 1.51 (-4.6% MoM), corresponding to a price to book ratio of 1.68.
The Company reports a monthly trading volume of 2,180 shares, compared to an average monthly trading volume of 37,908 in 2021.
The Company's shares have been traded on the Quotation Board of the Frankfurt Stock Exchange since 11 January 2021.
In December 2016 the Company issued a 7-year corporate bond with a 6% annual coupon and monthly payments in the Czech Republic. The corporate bond (ISIN CZ0000000815) with a nominal value of CZK 30,000 has been traded on the Free Market of the Prague Stock Exchange since 12 December 2016.
On 27 October 2017 the Company issued a 5-year corporate EUR bond with a 7.75% annual coupon and quarterly coupon payments in Germany, Austria and Luxemburg. The original target volume of EUR 30 million was successfully increased in two steps with all parameters unchanged, to an outstanding amount of EUR 45.0 million prior to the completion of the exchange offer described below. The corporate bond (ISIN DE000A19MFH4) with a nominal value of EUR 1,000 has been traded on the Open Market of the Frankfurt Stock exchange since 27 October 2017. The bond is also listed on the stock exchanges in Berlin, Hamburg, Hannover, Munich and Stuttgart. The Group has. The total outstanding bond volume amounts to EUR 23.719 million as of the end of the reporting period.
On 17 November 2021, The Company successfully placed its 6.50% Green EUR Bond 2021/2027 (ISIN: DE000A3KWKY4) in
In the trading period from 25 October 2017 until 31 December 2021, the trading volume amounted to EUR 53.876 million (nominal value, including the volume traded in Berlin, Munich & Stuttgart) with an opening price of 100.00 and a closing price of 101.00 in Frankfurt. During this period the average daily turnover amounted to EUR 50,922.

Chart 7. The Company's EUR bond 2017/22 trading on

In addition the Company's shares have also been traded on the Free Market (Freiverkehr) of the Berlin Stock Exchange since 13 January 2021 and on the Free Market (Freiverkehr) of the Stuttgart Stock Exchange since 14 January 2021.
the amount of EUR 50 million. The bond issuance was met with strong demand from the Company's existing bondholders, who subscribed to EUR 21.281 million in the exchange that was offered for the existing EUR Bond 2017/2022. The green bond – with an interest rate of 6.50% p.a., paid quarterly – was confirmed by imug | rating with regard to its sustainability in a Second Party Opinion, and can be traded on the Open Market of the Frankfurt Stock Exchange.
The Company intends to use the net proceeds of the green bond placement to finance or refinance, in part or in whole, new and/or existing eligible assets, as well as financial instruments that were used to finance such projects or assets, in accordance with the Company's Green Finance Framework, enabling Photon Energy Group to make a significant contribution to an environmentally friendly future.
On 29 November 2021, the Group successfully increased the bond placement by EUR 5.0 million with all parameters unchanged. The total outstanding bond volume amounts to EUR 55.0 million as of the end of the reporting period.
In December 2021 the trading volume amounted to EUR 485,000 with an opening price of 101.50 and a closing price of 101.00 in Frankfurt. The average daily turnover amounted to EUR 23,095.
In the trading period from 17 November 2021 until 31 December 2021, the trading volume amounted to EUR 6.420 million (nominal value, including the volume traded in Berlin, Munich & Stuttgart) with an opening price of 100.00 and a closing price of 102.00 in Frankfurt. During this period the average daily turnover amounted to EUR 149,302.
In the trading period from 12 December 2016 until 31 December 2021, the trading volume amounted to CZK 40.290 million with a closing price of 100.00 (unchanged compared to last month).
In December 2021 the trading volume amounted to EUR 1,226,000 with an opening price of 100.40 and a closing price of 102.00 in Frankfurt. The average daily turnover amounted to EUR 58,381.
In the period covered by this report the following current report has been published in the EBI (Electronic Database Information) system of the Warsaw Stock Exchange during or after the reporting period.
► None
In the period covered by this report the following current reports have been published in the ESPI (Electronic Information Transmission System) system of the Warsaw Stock Exchange:
After the reporting period, the following reports have been published in the ESPI (Electronic Information Transmission System) system of the Warsaw Stock Exchange:
► None.
Emeline Parry, Investor relations & Sustainability manager
E-mail: [email protected]
Photon Energy N.V. Barbara Strozzilaan 201 1083 HN Amsterdam The Netherlands Web: www.photonenergy.com
Amsterdam, 13 January 2022
Georg Hotar, Member of the Board of Directors Michael Gartner, Member of the Board of Directors