AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

ANDRADA MINING LIMITED

Earnings Release Jul 6, 2023

7481_rns_2023-07-06_ee98613a-e262-40d4-bdc6-754ca59f4738.html

Earnings Release

Open in Viewer

Opens in native device viewer

National Storage Mechanism | Additional information

RNS Number : 1002F

Andrada Mining Limited

06 July 2023

6 July 2023

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information will be in the public domain.

Andrada Mining Limited

("Andrada" or the "Company")

Drill programme results for the Spodumene Hill Project on ML129

Drill results provide indication of high-grade spodumene zones within the B1 and C1 pegmatites.

Andrada Mining Limited (AIM: ATM, OTCQB: ATMTF), the African technology metals mining company with a portfolio of mining and exploration assets in Namibia is pleased to provide assay results for the inaugural drill programme undertaken over the B1 and C1 pegmatites, located within the ML129 mining license and referred to as the Spodumene Hill Project.

HIGHLIGHTS

·    All drill holes intersected mineralised pegmatites, indicating continuity at depth.

·    Significant pegmatite intersections include:

o  Drill hole B1_01: 14.52 m at 1.38% Li2O, 285 ppm Ta and 0.131% Sn from a depth of 15.48 m to 30.00 m.

§ Including notable lithium intersections of 5 m at 2.32% Li2O from 18 m to 23 m; and 2.5m at 2.04% Li2O from 25.5m to 28 m.

o  Drill hole B1_09: 12.78 m at 0.74% Li2O, 181 ppm Ta and 0.052% Sn from a depth of 65.80 m to 78.58 m.

§ Including a notable lithium intersection of 4.66 m at 1.45% Li2O from 69 m to 73.66 m.

o  Drill hole C1_04:  11.06 m at 0.81% Li2O, 1101 ppm Ta and 0.033% Sn from a depth of 13.59 m to 24.65 m.

§ Including a notable lithium intersection of 3.65 m at 2.14% Li2O from 16 m to 19.65 m.

·    High grade lithium intersections suggest the presence of significant spodumene mineralisation.

·    The pegmatite intersections are positive for tantalum and provide additional upside, in the light of the near completion of the tantalum concentration circuit.

·    Metallurgical programme initiated to investigate the optimal beneficiation process.

Anthony Viljoen, Chief Executive Officer, commented:

"These drill results provide an initial glimpse into the potential of the Spodumene Hill Project. The identified high-grade lithium intersections within the pegmatite could be separated through ore sorting to provide a potentially high-grade pre-concentrate for the lithium processing plant.

These results have also highlighted the tantalum potential of this area, and the relevance of the recently constructed tantalum recovery circuit. The proximity of the Spodumene Hill Project to the existing operations provides an immediate opportunity for additional revenues from the project area by blending tantalum grades.

The highlighted intersections provide a promising starting point for the next phase of exploration which will aim to define the extent of these zones both laterally and with depth. We have also initiated a metallurgical programme to investigate the optimal beneficiation process for the recovery of both lithium and tantalum, whilst also producing tin as a by-product."

OVERVIEW OF THE RESULTS

An exploration drill programme was undertaken on the Spodumene Hill Project, resulting in 1159 m of Diamond Drilling ("DD") being completed over seventeen drill holes. The pegmatite intersections reported here will form the base of an updated geological model and development of an ongoing exploration initiative. The drill results indicate zones of lithium enrichment within the pegmatite unit with the primary and only lithium ore mineral identified thus far being spodumene. The construction of a lithium pilot plant and tantalum processing circuit will assist with metallurgical investigations and the development of an optimised process flow diagram for material from these pegmatites.

The tabulated results (Table 1) provide the weighted average metal content of the entire pegmatite intersection and show the selected intersections, including those within the pegmatites. The selected intervals highlight areas where lithium values are greater than the average indicated by the entire pegmatite intersection and indicate that these pegmatites may contain zones of elevated lithium mineralisation. Future work programmes will investigate the nature and origin of these higher-grade zones within the pegmatite, with the aim of identifying extensions and additional occurrences. 

Table 1: Exploration results of diamond drill holes indicating the full pegmatite intersections, grade and selected internal intersections. The drill holes were oriented with an inclination of 60 degrees, intersections are indicative of apparent thickness and not true thickness.

Hole ID Pegmatite From - To (m) Interval (m) Grade
Li₂O (%) Ta (ppm) Sn (%)
B1 01 B1 15.48 - 30.00 14.52 1.38 285 0.131
Including 18.00 - 23.00 5.00 2.32 159 0.124
Including 25.50 - 28.00 2.50 2.04 161 0.216
B1 02 B1 17.44 - 51.35 33.91 0.22 187 0.093
B1 03 B1 13.08 - 39.55 26.47 0.38 169 0.080
B1 04 B1 6.93 - 32.18 25.25 0.45 147 0.072
Including 10.00 - 13.00 3.00 1.25 133 0.052
B1 05 B1 20.10 - 37.18 17.08 0.47 110 0.070
Including 22.15 - 28.00 5.85 0.91 105 0.111
B1 06 B1 53.75 - 71.50 17.75 0.22 147 0.119
B1 07 B1 74.84 - 85.64 10.80 0.44 119 0.049
Including 79.00 - 80.00 1.00 1.86 151 0.045
B1 08 B1 52.61 - 61.95 9.34 0.18 166 0.083
B1 09 B1 4.60 - 62.32 57.72 0.19 352 0.076
B1 Lower 65.80 - 78.58 12.78 0.74 181 0.052
Including 69.00 - 73.66 4.66 1.45 116 0.088
C1 01 C1 10.00 - 20.65 10.65 0.26 243 0.062
C1 02 C1 11.15 - 18.1 6.95 0.48 426 0.066
Including 15.97 - 17.46 1.49 0.99 803 0.052
C1 03 C1 13.50 - 28.26 14.76 0.20 343 0.037
C1 04 C1 13.59 - 24.65 11.06 0.81 1101 0.033
Including 16.00 - 19.65 3.65 2.14 2742 0.057
C1 05 C1 45.68 - 52.76 7.08 0.09 233 0.026
C1 06 C1 53.64 - 59.91 6.27 0.44 163 0.049
Including 55.00 - 56.50 1.50 1.20 212 0.074
C1 07 C1 43.21 - 46.17 2.96 0.02 304 0.020
C1 08 C1 14.00 - 37.6 23.60 0.25 463 0.045
Including 18.00 - 22.00 4.00 0.92 129 0.021

All drill holes were drilled as DD at an inclination of sixty degrees from the horizontal. In all instances, apart from drill holes B1 09 and C1 08, the holes were planned to intersect the pegmatite perpendicular to the surface strike direction. Due to the undulating dip angle of the pegmatite units the intersections are assumed to be an indication of apparent thickness, which is greater than true thickness.

Other minor pegmatites identified in the drill hole, have not been reported on because they are not considered to be of economic significance. Each drill hole was geologically and geotechnically logged before being sampled. The sample analysis was undertaken by UIS Analytical Services, a certified independent laboratory, using a peroxide fusion. ICP-OES analysis was utilised for major and minor elements and ICP-MS utilised for the trace elements. No top cut has been applied when calculating the weighted average grades for anomalously rich intersections.

Figure 1: Maps of the programme indicating: A) The localities of the pegmatites in relation to each other, the holes drilled during this programme and the main road linking Uis and Henties Bay. B) The mapped outcrop areas of the B1 pegmatite and location of the drill holes for this programme and indicating the locality of the section line in Figure 2. C) The mapped pegmatite outcrop area and location of the C1 location of the drill holes.

Figure 2: Cross section through line A-A' as indicated in Figure 1B, showing the average grade of the whole intersection and the two selected intersections within the pegmatite as indicated in Table 1.

COMPETENT PERSON STATEMENT

The technical data relating to the exploration results in this announcement have been reviewed by Professor Laurence Robb (M.Sc.,PhD; FGSSA, FSEG, CGeol., Pr. Sci Nat. (Geological Sciences)), who is Visiting Professor at the University of Oxford and University of Johannesburg. Professor Robb is a non-executive director of Andrada Mining and has over 40 years of experience working in many of the great African mineral districts, including the Witwatersrand Basin, the Bushveld Complex, Barberton, Namaqualand, and the Birimian of West Africa. He also undertook extensive research into the metallogeny of southeast Asia (Malaysia and Myanmar). Professor Robb consents to the inclusion of the information in the form and context in which it appears.

Glossary of abbreviations

DD Diamond Drilling
ICP-MS Inductively Coupled Plasma-Mass Spectrometry
ICP-OES Inductively Coupled Plasma-Optical Emission Spectrometry
Li Symbol for Lithium
Li → Li2O Metal to metal-oxide conversion factor of 2.153
Li2O Lithium oxide
PPM Parts Per Million
QA/QC Quality Assurance / Quality Control
Sn Symbol for Tin
Ta Symbol for Tantalum

Glossary of terminology

Apparent thickness The relationship between apparent width and true thickness is based on the formula by Addie (1968 Economic Geology, vol 63, pp 188-189).
Dip angle The angle of inclination measured downward from horizontal.
Geological model The interpretation of mineralisation and geology that controls mineralisation.  This is usually generated in a three-dimensional computer environment.
Pegmatite An igneous rock typically of granitic composition, which is distinguished from other igneous rocks by the extremely coarse and systematically variable size of its crystals, or by an abundance of crystals with skeletal, graphic, or other strongly directional growth habits, or by a prominent spatial zonation of mineral assemblages, including monomineralic zones.

_______________________________________________________________________________________

Andrada Mining Limited +27 (11) 268 6555
Anthony Viljoen, CEO

Sakhile Ndlovu, Head of Investor Relations
[email protected]
Nominated Adviser +44 (0) 207 220 1666
WH Ireland Limited

Katy Mitchell
Corporate Advisor and Joint Broker
H&P Advisory Limited

Andrew Chubb

Jay Ashfield

Matt Hasson
+44 (0) 20 7907 8500
Stifel Nicolaus Europe Limited

Ashton Clanfield

Callum Stewart

Varun Talwar
+44 (0) 20 7710 7600
Tavistock Financial PR (United Kingdom)

Emily Moss

Catherine Drummond

Adam Baynes
+44 (0) 207 920 3150

[email protected]

About Andrada Mining Limited

Andrada Mining Limited has a vision to create a portfolio of globally significant, conflict-free, production and exploration assets. The Company's flagship asset is the Uis Mine in Namibia, formerly the world's largest hard-rock open cast tin mine.

Andrada has three mining licences namely;

·      ML134 on which Uis Mine is located.

·      ML133 (Nai Nais / Lithium Ridge).

·      ML129 (B1C1 / Spodumene Hill).

The main minerals in these mining licences are tin, lithium and tantalum. Additionally, the Company has an exploration licence EL5445 (Brandberg West) on which the main minerals are tin, copper and tungsten. The Company has set a mineral resource target of 200 Mt to be delineated within the next 5 years. The substantial mineral resource potential allows the Company to consider economies of scale.

Andrada is managed by a board of directors with extensive industry knowledge and a management team with deep commercial and technical skills. Furthermore, the Company is committed to the sustainable development of its operations and the growth of its business. This is demonstrated by how the leadership team places significant emphasis on creating value for the wider community, investors, and other key stakeholders. Andrada has established an environmental, social and governance system which has been implemented at all levels of the Company and aligns with international standards.

[END]

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLUPUGAMUPWGAA

Talk to a Data Expert

Have a question? We'll get back to you promptly.